Skip to Main Navigation

Documentos e informes

Mostrar 1 - 20 de 405 resultados | Muestre resultados en grupos de 10 | 20 | 50

Exportar:
Su búsqueda no encontró ningún documento. Cambie su criterio de búsqueda e intente otra vez. No puedo encontrar el documento que busco
  • Fiji : Lautoka and Ba Hospitals (Inglés)

    Redevelopment of Lautoka Hospital and Ba Hospital is the first Public Private Partnership (PPP) to be implemented in Fiji. These upgrades represent a major milestone towards the Government of Fiji’s (GoF)...

    Tipo de documento: Resumen Número del informe: 185814 Fecha del documento: 31 de octubre de 2023 Tipo de divulgación: Disclosed Autor: World Bank


  • India : Bengaluru Public Street Lighting (Inglés)

    Bengaluru is the information technology capital of India, often branded as the country’s Silicon Valley. The city boasts 485,000 street lights but upgrading and maintaining the infrastructure has been...

    Tipo de documento: Resumen Número del informe: 185818 Fecha del documento: 31 de diciembre de 2022 Tipo de divulgación: Disclosed Autor: World Bank


  • Assessing the Impact of COVID-19 on PPP Pipelines and Projects in Preparation (Inglés)

    Coronavirus disease 2019 (COVID-19) has impacted infrastructure public-private partnerships (PPP) projects and investments around the globe in all sectors. In its first 18 months, the pandemic caused disruptions...

    Tipo de documento: Informe Número del informe: 173031 Fecha del documento: 26 de junio de 2022 Tipo de divulgación: Disclosed Autor: Jamieson,Jane,Meco,Lorena,Paul,Christina Jutta,Sy,Jemima T.

  • Stocktake of Government Responses to the Impact of COVID-19 on PPP Projects (Inglés)

    Coronavirus disease 2019 (COVID-19) has impacted infrastructure public-private partnerships (PPP) projects around the globe in all sectors. There were disruptions not only to operational projects, but...

    Tipo de documento: Informe Número del informe: 173030 Fecha del documento: 26 de junio de 2022 Tipo de divulgación: Disclosed Autor: Jamieson,Jane,Meco,Lorena,Paul,Christina Jutta,Sy,Jemima T.

  • Assessing Operational PPP Portfolios (Inglés)

    The Coronavirus disease 2019 (COVID-19) pandemic will continue to impact infrastructure projects around the globe in all sectors as supply chains are disrupted, customer demand falls, and health regulations...

    Tipo de documento: Informe Número del informe: 173033 Fecha del documento: 26 de junio de 2022 Tipo de divulgación: Disclosed Autor: Jamieson,Jane,Chao,Jenny Jing,Sy,Jemima T.

  • Cleaner Production Case Study : Energy Recovery Square Fashions Limited (Inglés)

    A washing, dyeing, and finishing (WDF) factory can recover exhaust heat from gas engines by utilizing the energy to generate steam for process heating. Readymade garment (RMC) factories, where there is...

    Tipo de documento: Resumen Número del informe: 162058 Fecha del documento: 23 de julio de 2021 Tipo de divulgación: Disclosed Autor:

  • Cleaner Production Case Study : Installation of Flow Meters (Inglés)

    This series showcases success stories of partnership for cleaner textile (PaCT) partner factories in the Bangladesh textile sector that have implemented cleaner production projects.

    Tipo de documento: Resumen Número del informe: 162055 Fecha del documento: 23 de julio de 2021 Tipo de divulgación: Disclosed Autor: Chowdhury,Nishat Shahid

  • Cleaner Production Case Study : Water Saving Evince Textiles Limited (Inglés)

    Processing operations in the textile industry consume a lot of water. While the mechanical aspects involving spinning and weaving need little water, the wet processing operations use water extensively...

    Tipo de documento: Resumen Número del informe: 162059 Fecha del documento: 23 de julio de 2021 Tipo de divulgación: Disclosed Autor:

  • Cleaner Production Case Study : Electrical Efficiency (Inglés)

    This series provides examples of partnership for cleaner textile (PaCT’s) advisory work with clients to implement cleaner production solutions in the Bangladesh textile wet processing sector.

    Tipo de documento: Resumen Número del informe: 162053 Fecha del documento: 23 de julio de 2021 Tipo de divulgación: Disclosed Autor: Chowdhury,Nishat Shahid


  • Cleaner Production Case Study : Automatic Blowdown Control System (Inglés)

    If water in a boiler contains high concentrations of dissolved solids, it carries over through the steam produced, which can lead to foaming. This leads to a phenomenon called water hammer, which damages...

    Tipo de documento: Resumen Número del informe: 162052 Fecha del documento: 23 de julio de 2021 Tipo de divulgación: Disclosed Autor:

  • Cleaner Production Case Study : Thermal Efficiency (Inglés)

    Most thermal energy wastage stems from lack of awareness amongst workers and managers, and inadequate upkeep of plants, machinery and auxiliary systems. Lack of monitoring interferes with the estimation...

    Tipo de documento: Resumen Número del informe: 162065 Fecha del documento: 23 de julio de 2021 Tipo de divulgación: Disclosed Autor:


  • Cleaner Production Case Study : Metering Resouce Usage (Inglés)

    Many textile factories realize the embedded costs of water, energy and other resources in the production process. For instance, water is free, but pumping, treating, heating, cooling and/or discharging...

    Tipo de documento: Resumen Número del informe: 162063 Fecha del documento: 23 de julio de 2021 Tipo de divulgación: Disclosed Autor: