Skip to Main Navigation

Executive summary for the Aynak copper mine (Inglés)

The current project involves a two-phase development of the Aynak copper mine including a processing plant with a capacity of 30 ktpd of ore in phase one and 60 ktpd in phase two. The proposed alternative involves: 1) building a processing plant with a capacity of only 10 ktpd of ore, or a third of size envisaged in phase one, 2) relying on a mining contractor, and 3) renting diesel generators to supply power. This alternative project would reduce...
Vea más

Document also available in : Darí, Pashtu

INFORMACIÓN

  • 2013/04/01

  • Resumen

  • 79738

  • 1

  • 1

  • Afganistán,

  • Asia meridional,

  • 2013/07/24

  • Disclosed

  • Executive summary for the Aynak copper mine

  • Cash flow

This document is being processed or is not available.