Skip to Main Navigation

Concept Environmental and Social Review Summary (ESRS) - CAR-Electricity Sector Strengthening and Access Project - P176683 (Inglés)

Información

  • Autor

    Eyison,Nash Fiifi

  • Fecha del documento

    2021/09/27

  • Tipo de documento

    Environmental and Social Review Summary

  • Número del informe

    ESRSC02268

  • Volumen

    1

  • Total Volume(s)

    1

  • País

    República Centroafricana,

  • Región

    Africa West,

  • Fecha de divulgación

    2021/09/27

  • Disclosure Status

    Disclosed

  • Nom. del doc.

    Concept Environmental and Social Review Summary (ESRS) - CAR-Electricity Sector Strengthening and Access Project - P176683

  • Palabras clave

    Environmental and Social Management Plan; Environmental and Social Review Summary; water and electricity; accessibility for people with disability; terms and conditions of employment; Soil Erosion and Sediment Control; health and safety risk; electric and magnetic field; community health and safety; security risk management; legal and regulatory framework; resettlement action plan; worker health and safety; Land Acquisition and Resettlement; Occupational health and safety; project affected persons; Assessment and Action Plan; sustainable management; construction and operation; grievance redress mechanism; solar power plant; appropriate mitigation measures; safety and health; battery storage; Access to Electricity; energy and water; code of conduct; categories of worker; solar energy market; Social Risk Rating; Gender-Based Violence; management of risk; adverse environmental impact; community awareness raising; renewable energy resource; infection control precautions; high voltage line; safety of worker; personal protective equipment; protection of workers; risk of transmission; in conflict situation; local water body; risk of exclusion; scale and scope; adverse social impact; education and health; awareness raising activity; national environmental law; private sector entities; local water resource; Construction Building; construction of building; security risk assessment; source income; source of income; risk and vulnerability; cultural heritage management; waste management plan; Access to Energy; social risk assessment; impact on birds; Type of Investment; human capital development; civil works; solar panel; vulnerable group; water pump; education facility; environmental risk; project effectiveness; construction phase; security personnel; heavy equipment; labor influx; security management; rural area; institutional strengthening; solar system; hazardous chemical; solar farm; protected area; response procedure; Safeguard Policies; safeguard policy; construction activities; productive use; energy specialist; project intervention; Natural Resources; emergency preparedness; free movement; operational improvement; water use; clean electricity; involuntary resettlement; communication strategy; grievance mechanism; distribution line; managing risk; power line; armed groups; vehicle traffic; land clearing; special reserve; human densities; human footprint; working condition; contract worker; truck traffic; agricultural land; child labor; forced labor; heavy traffic; construction site; waste generation; provincial city; legal framework; affected communities; mini grid; site preparation; protection equipment; young girl; security concern; female workers; safety training; beneficiary feedback; vulnerable people; industry sector; water point; The Disabled; citizen engagement; management strategy; implementing partner; interested stakeholders; electricity industry; social issue; ethical treatment; Infectious Disease; Equal Opportunity; renewable source; local area; mitigation option; aids transmission; community mobilization; co2 emission; press release; compensation rate; strategic approach; labor camp; social distance; market rate; risk classification; assessment instrument; recent experiences; labor requirement; compensation practice; Road Accidents; general assessment; community level; local law; safety plan; labor issue; technical equipment; enabling environment; baseline information; public security; community consultation; educational institution; sustainable access; population size; fruit tree; sweet potato; electricity network; built structure; land use; contextual factor; solar solution; subsistence farming; securities companies; security company; vulnerable household; complaint process; construction company; displaced people; technology support; Grid Electrification; energy access; road design; electricity infrastructure; project datum; borrower's commitment; in work; culture heritage; project costing; primary forest

Descargas

INFORME COMPLETO

Versión oficial del documento (puede incluir firmas, etc.)

  • Versión oficial (PDF)
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *La versión texto es una versión realizada con reconocimiento óptico de caracteres, sin corregir. Esta versión se ofrece únicamente en beneficio de los usuarios que cuentan con una conexión lenta.