Información
-
Autor
-
Fecha del documento
2021/09/23
-
Tipo de documento
Informe sobre el estado de ejecución y los resultados
-
Número del informe
ISR48047
-
Volumen
1
-
Total Volume(s)
1
-
País
-
Región
-
Fecha de divulgación
2021/09/23
-
Disclosure Status
Disclosed
-
Nom. del doc.
Disclosable Version of the ISR - Primary Education Improvement Project - P171973 - Sequence No : 02
-
Palabras clave
school improvement plan; measure of use; number of teachers; quality of teaching; primary education school; baseline data; teacher training program; Investment Project Financing; absence from school; professional development; student learning; direct intervention; representative sample; procurement process; school network; risk category; test construction; learning environment; primary level; project intervention; science lab; monitoring tool; performance data; operation risk; baseline assessment; basic infrastructure; female student; grant program; school board; Ownership Share Type
- Vea más
Descargas
INFORME COMPLETO
Versión oficial del documento (puede incluir firmas, etc.)
- Versión oficial (PDF)
- TXT*
- Total Downloads** :
- Download Stats
-
*La versión texto es una versión realizada con reconocimiento óptico de caracteres, sin corregir. Esta versión se ofrece únicamente en beneficio de los usuarios que cuentan con una conexión lenta.