Skip to Main Navigation

Cameroon - Second Semry Rice Project (Inglés)

The project would be carried out over a six-year period (1977/78- 1982/83) and would consist of: (a) constructing two dikes, totalling 48 km, with main intake structure, feeder canal, regulators, and drainage outfall; (b) constructing an irrigation and drainage system, including on-farms works and feeder roads, serving an area of 7,000 ha; (c) constructing access roads linking, in particular, the main localities in the project area, viz. Tekele, Pouss...
Vea más

INFORMACIÓN

This document is being processed or is not available.