The project consists of the 120 MW Matucana hydroelectric power station on the Rio Rimac, a 220 KV double circuit steel tower transmission line about 80 km long from the power station to Lima and associated substations, and meters, communications equipment, distribution cables and other items for the expansion of the distribution system.
Vea más
INFORMACIÓN
-
1967/08/31
-
Informe de evaluación inicial preparado por el personal
-
TO596
-
1
-
1
-
2010/06/18
-
Disclosed
-
Peru - Matucana Power Project
-
transmission and distribution system