Project outcome is regarded as satisfactory, with project sustainability as highly likely. World Bank performance was satisfactory overall while Borrower performance was highly satisfactory. However, some delays in processing payments to contractors remained an issue which the Borrower needs to resolve. Key lessons learned from the project include: Adoption of an appropriate project design supported by good implementation arrangements can deliver substantial benefits. This would include detailed, adequate, and up-front arrangements to handle human relations (especially coordination procedures between government agencies and ministries), as well as employing competent project staff and providing the right salary and incentives. Requiring measurable local stakeholder participation helps to target results and ensure sustainability, but it also requires appropriate skills and effort. It is unnecessary to create a bureacracy to deliver substantial development benefits on a large number of sites. Good and transparent business procedures lower costs and build up institutional capacity and development. This would include the recognition that small contracts require their own set of simple and straightforward procedures and documents.

Información

  • Fecha del documento

    2000/12/29

  • Tipo de documento

    Informe final de ejecución y resultados 

  • Número del informe

    21074

  • Volumen

    1

  • Total Volume(s)

    1

  • País

    Yemen, República del

  • Región

    Oriente Medio y Norte de África,

  • Fecha de divulgación

    2010/06/18

  • Disclosure Status

    Disclosed

  • Nom. del doc.

    Republic of Yemen - Public Works Project

  • Palabras clave

    borrower need;operation and maintenance cost;international competitive bidding procedure;institutional development impact;quality of work;quality at entry;principal performance ratings;urban development region;bank's procurement guidelines;evaluation of bid;storm water drainage;water distribution system;economic reform program;solid waste collection;water supply system;beneficiary impact assessment;exchange rate change;institutional capacity building;outputs by components;contracts for supply;works procurement management;distribution of investment;senior government official;construction and rehabilitation;quality of supervision;labor market condition;lack of awareness;reduction in inflation;reallocation of fund;sound financial management;degree of commitment;local market condition;ratings of bank;urban development adjustment;expressions of interest;sections of society;preparation of bids;civil works;community participation;borrower performance;special account;local contractor;construction supervision;consulting industry;Exchange Rates;environmental specialist;infrastructure service;budgetary support;investment cost;water tank;work contracts;safeguard policy;sanitary condition;Job Creation;sustainability rating;construction cost;bank's performance;counterpart fund;Supervision Assessment;Social Assessment;environmental aspect;Safeguard Policies;contract execution;average cost;community contribution;selection criterion;overseas training;investment program;school building;labor employment;local contribution;constituent elements;small Works;supply contract;benefit stream;classroom school;structural adjustment;site visits;school site;school contract;regular operations;community base;disbursement procedure;payment delays;environment assessment;government support;adequate funds;stakeholder commitment;individual engineer;transition arrangement;remote area;operations analyst;private contract;temporary job;health hazard;Consulting services;construction site;operational plan;corrective measure;finance manager;safety aspect;wastewater system;sewerage line;environmental procedures;human life;qualified professional;marine life;professional competence;local training;bid bond;management capability;administrative procedure;management tool;local condition;basic infrastructure;drainage work;irrigation canal;framework agreement;engineering design;road repair;competitive price;government administrative;qualifying criteria;small dam;bid security;delivery schedule;positive impact;construction company;government control;primary author;simple contract;working day;precautionary measure;sanitary landfill;unemployment rate;safeguard issue;total employment;financial system;reporting procedure;employment generation;Waste Management;spot check;acceptable quality;environmental screening;economic stabilization;grant allocation;girls school;procurement arrangement;flood protection;project costing;construction work;stated objective;community involvement;positive outcome;service contract;future investment;school furniture;portfolio implementation;Social Protection;social studies;social study;Environmental Assessment;classroom furniture;wastewater collection;physical infrastructure;accounting staff;human relation;financial covenant;local stakeholder;beneficiary assessment;environmental issue;risk status;

Descargas

INFORME COMPLETO

Versión oficial del documento (puede incluir firmas, etc.)

  • Versión oficial (PDF)
  • TXT*
  • Total Downloads** :
  • Download Stats
  • *La versión texto es una versión realizada con reconocimiento óptico de caracteres, sin corregir. Esta versión se ofrece únicamente en beneficio de los usuarios que cuentan con una conexión lenta.