This is the tenth report of the International Environmental and Social Panel of Experts (POE) for the Nam Theun 2 Hydropower Project in the Lao People's Democratic Republic. NTPC (National Thermal Power Corporation) act firmly to ensure that there is effective interaction, including consultation and timely preparation and review of environmental documents and plans, between and among the Head Contractor, the sub-contractors and the NTPC Construction...
Vea más
INFORMACIÓN
-
2006/10/30
-
Documento de trabajo
-
70880
-
1
-
1
-
2012/07/05
-
Disclosed
-
Laos - Nam Theun 2 Hydropower Project : tenth report of the international environmental and social panel of experts
-
reservoir