Información
-
Autor
-
Fecha del documento
2021/09/30
-
Tipo de documento
Informe sobre el estado de ejecución y los resultados
-
Número del informe
ISR47721
-
Volumen
1
-
Total Volume(s)
1
-
País
-
Región
-
Fecha de divulgación
2021/09/30
-
Disclosure Status
Disclosed
-
Nom. del doc.
Disclosable Version of the ISR - West Bengal Major Irrigation and Flood Management Project - P162679 - Sequence No : 04
-
Palabras clave
groundwater level; asset management plan; irrigation and drainage; flood risk management; observation well; groundwater management area; irrigation service delivery; climate change resilience; irrigation or drainage; amount of water; deterioration of groundwater; irrigation water supply; Investment Project Financing; number of women; main canals; water delivery; flood depth; historical event; historical data; Gender Gap; women engineer; delivery contract; bulk water; budget planning; outreach activity; female student; local university; result indicator; application development; adequate lighting; administrative function; involuntary resettlement; Irrigation Operation; irrigation efficiencies; delivery schedule; risk category; operation risk; management improvement; water global
- Vea más
Descargas
INFORME COMPLETO
Versión oficial del documento (puede incluir firmas, etc.)
- Versión oficial (PDF)
- TXT*
- Total Downloads** :
- Download Stats
-
*La versión texto es una versión realizada con reconocimiento óptico de caracteres, sin corregir. Esta versión se ofrece únicamente en beneficio de los usuarios que cuentan con una conexión lenta.