The development objective of the First Phase of the Dasu Hydropower Project for Pakistan is to facilitate the expansion of electricity supply of hydro-power in Pakistan. Some of the negative impacts and mitigation measures include: (1) contractor will take extra measures to prevent fuel and other hazardous material spillage; (2) contractor will ensure zero disposal of spoils in the water bodies and take measures to prevent water pollution; (3) proper...
Vea más

Document also available in : Inglés, Inglés

INFORMACIÓN

  • 2019/11/01

  • Evaluación ambiental

  • SFG5884

  • 3

  • 3 (Ver todos los volúmenes)

  • Pakistán,

  • Asia meridional,

  • 2019/11/22

  • Disclosed

  • ماحولیاتی اور سماجی اثرات کی تجزیہ کار : مختصر خلاصہ

DESCARGAS

INFORME COMPLETO

Versión oficial del documento (puede incluir firmas, etc.)

This document is being processed or is not available.