Guinea - Urban Water Project (Inglés)

Ratings of Urban Water Project for Guinea were as follows: outcome was satisfactory, Bank performance was satisfactory, and monitoring and evaluation quality was substantial. Some of the lessons learned include: Re-engaging Bank support after an extended hiatus necessitates thorough preparation, should consider potential deficiencies in client capacity, willingness to reform the sector, and political instability; Preparation must ensure that the M&E...
Vea más

INFORMACIÓN

  • 2024/10/17

  • Informe final de ejecución y resultados 

  • ICR00141

  • 1

  • Guinea,

  • Western and Central Africa,

  • 2024/10/25

  • Disclosed

  • Guinea - Urban Water Project