Skip to Main Navigation

Mauritania - Banda Gas-to-Power Guarantee Operation Project : environmental assessment (Vol. 4 of 6) : Étude d'impact environnemental (French)

The objective of the Banda Gas-to-Power Guarantee Operation Project for Mauritania is to involve the drilling and installation of two gas production wells, and their connection to an onshore gas processing facility, via a sub-sea pipeline. Negative impacts include: interference with shipping and navigation of other sea users, loss of access to fishing grounds, water and sediment contamination, discharges of commissioning fluids, noise, impacts to...
See More

Document also available in : French, French, English, English, English

DETAILS

  • 2013/11/14

  • Environmental Assessment

  • E4276

  • 4

  • 6 (See all volumes)

  • Senegal, Mauritania, Mali,

  • Western and Central Africa,

  • 2013/12/02

  • Disclosed

  • Étude d'impact environnemental

  • abatement


Citation

Mauritania - Banda Gas-to-Power Guarantee Operation Project : environmental assessment (Vol. 4 of 6) : Étude d'impact environnemental (French). Mauritania ; SPEG. http://documents.worldbank.org/curated/en/813881468304224191

This document is being processed or is not available.