FOR OFFICIAL USE ONLY Report No: RES37331 INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT RESTRUCTURING PAPER ON A PROPOSED PROGRAM RESTRUCTURING OF INNOVATIVE FINANCING FOR AIR POLLUTION CONTROL IN JING-JIN-JI APPROVED ON MARCH 22, 2016 TO PEOPLE'S REPUBLIC OF CHINA Energy & Extractives Global Practice East Asia And Pacific Region Regional Vice President: Victoria Kwakwa Country Director: Martin Raiser Regional Director: Ranjit Lamech The World Bank Innovative Financing for Air Pollution Control in Jing-Jin-Ji (P154669) Practice Manager: Jie Tang Task Team Leader(s): Xiaodong Wang The World Bank Innovative Financing for Air Pollution Control in Jing-Jin-Ji (P154669) ABBREVIATIONS AND ACRONYMS APPCAP Air Pollution Prevention and Control Action Plan CO2 carbon dioxide CY calendar year DLI Disbursement-Linked Indicator EE energy efficiency ESCO energy service company ESSA environmental and social systems assessment HXB Hua Xia Bank Co. Limited IBRD International Bank for Reconstruction and Development JJJ Jing-Jin-Ji Region (refers to Beijing-Tianjin-Hebei and its neighboring regions, including Shandong, Shanxi, Inner Mongolia, and Henan provinces) NOx nitrogen oxides OM Operational Manual PDO program development objective PforR Program for Results PM2.5 particulates less than or equal to 2.5 micrometers in diameter RE renewable energy SO2 sulfur dioxide tce ton of coal equivalent VOC Volatile Organic Compounds The World Bank Innovative Financing for Air Pollution Control in Jing-Jin-Ji (P154669) DATA SHEET (Innovative Financing for Air Pollution Control in Jing-Jin-Ji - P154669) BASIC DATA Project ID Financing Instrument IPF Component Program-for-Results Financing No Approval Date Current Closing Date 22-Mar-2016 30-Jun-2022 Organizations Borrower Responsible Agency People's Republic of China Hua Xia Bank Program Development Objective(s) To reduce air pollutant and carbon emissions through increasing energy efficiency and clean energy, with a focus in Beijing-Tianjin-Hebei (Jing-Jin-Ji) and neighboring regions. OPS_TABLE_PDO_CURRENTPDO Summary Status of Financing Net Approval Effectiveness Closing Ln/Cr/TF Signing Date Commitment Disbursed Undisbursed Date Date Date 22-Mar- IBRD-85920 20-May-2016 18-Aug-2016 30-Jun-2022 500.00 212.15 293.46 2016 Policy Waiver(s) Does the Program require any waivers of Bank policies applicable to Program-for-Results operations? No Page 1 of 24 The World Bank Innovative Financing for Air Pollution Control in Jing-Jin-Ji (P154669) I. PROGRAM STATUS AND RATIONALE FOR RESTRUCTURING A. Project Status 1. The Innovative Financing for Air Pollution Control in Jing-Jin-Ji Program (P154669) Program was approved on March 22, 2016. The program became effective on August 18, 2016, and the program closing date is June 30, 2022. The latest implementation support mission carried out in May 2019 confirmed that the Project Development Objective (PDO) continues to be highly relevant to the priorities of the country and the Bank, and progress towards achievement of the PDO is Highly Satisfactory. 2. Program implementation has made impressive progress at the mid-term. To date, the program has financed over a US$1 billion investments in energy efficiency (EE), renewable energy (RE), and emission control, of which US$165 million (or €149 million) is from Bank loan, US$332 million from Hua Xia Bank (HXB) counterpart funds, and the remaining from the sub-borrowers. The IBRD funds are leveraged 5 times, way exceeding the originally planned 1:1 leveraging ratio. 3. The program has made important contributions to air pollution control in the Jing-Jin-Ji (JJJ) region and climate change mitigation, with significant emission reductions. All the disbursement-linked indicators (DLIs) and result indicators are met or exceeded the 2019 targets. HXB has financed 22 sub-projects, out of which 10 sub-projects on EE, 10 on RE, 2 on pollution abatement of desulfurization and denitrification. These investments are expected to generate significant environmental benefits with an estimated annual energy savings of 893,000 tons of coal equivalent (tce), and annual emission reduction of CO2 of 2.2 million tons, SO2 of 12.4 thousand tons (of which 7,022 tons from desulfurization investments and 5,358 from EE and RE investments), NOx of 14.1 thousand tons (of which 9,468 tons from denitrification investments and 4,644 tons from EE and RE investments), and particulates of 3,215 tons – all exceeded the targets by the end of calendar year 2019. As decentralized coal-fired heating boilers is the most important source for air pollutants in the JJJ region in winter, HXB has financed a series of sub-projects on clean heating. HXB has financed seven clean heating sub-projects utilizing waste heat, or large-scale co-generation, or RE (biomass co-generation) to replace many decentralized small-scale inefficient coal heating boilers in Shandong, Shanxi, Inner Mongolia, and Henan. 4. The program has mainstreamed green financing at HXB, who has become a top leader on green financing in China. Green financing has been elevated as a top corporate strategic priority in HXB’s four-year development plan from 2017-2020. HXB has established a Green Finance Center, and substantially improved its capacity in green financing under the PforR operation. HXB has been promoting the PforR concept and applying across HXB with an emphasis on results orientation. HXB has also been exploring innovative business models and financing mechanisms to remove the financing barriers, particularly for distributed RE and energy service company (ESCOs). Finally, HXB has substantially increased its green financing business to nearly US$17 billion in 2018. 5. However, IBRD disbursement remains low. IBRD disbursement achieved US$212.15 million, or 41 percent of the total loan amount. This is attributable to a few factors: : (a) the government stopped approval all new solar PV investments in 2018, which has seriously affected the market demand for RE; (b) there has been a domestic slowdown of economic growth; (c) the weak RMB makes sub-borrowers reluctant to borrow Euro-based IBRD loans; (d) HXB is going through capital increase, and as a result its prioritized allocation of co-funding for this program has declined; and (e) the internal incentives and bonuses offered to investment officers for program implementation have phased out. The World Bank Innovative Financing for Air Pollution Control in Jing-Jin-Ji (P154669) 6. HXB has made significant efforts to address these challenges and has developed a robust action plan to accelerate IBRD disbursement. These efforts includes that (a) it has restored its internal incentives and prioritized its fund allocation for this program, to accelerate implementation; (b)HXB has received a capital increase by the end of 2018; (c) HXB is also considering offering exchange rate hedging services to its clients; (d) the government has recently re-opened the solar PV market and re-assured the investors of government’s continued support to RE. HXB has developed an action plan and disbursement projection to accelerate IBRD disbursement: €120 million for FY20, €100 million for FY21, and €60 million for FY22. 7. Overall, the implementation measured by DLIs are progressing ahead of schedule, especially DLI-2 and DLI-3b, once all verified, will exceed the end-of-project targets. Table 1 lists the details of the achievement of each DLI. Table 1: Detailed DLIs Achievement Expected Cumulative Verified as Results -- End DLIs Target by of April Progress Actions not yet targets June 2019 2019 verified Verification DLI-1: Sub-loan June 2019 target has been disbursed to exceeded, 90% of 425 436 497 1000 completed by sub-borrowers the target by the end the end of (million US$) of CY2019 June 2019 target DLI-2: Coal exceeded. After reduction 105 300.8 893 550 verification, the end (thousand tce) targets will be exceeded Verification DLI-3a: has been Reduced SO2 2.4 3.1 7.0 8.6 2019 target met completed by (thousand the end of tons) June 2019 target Verification DLI-3b: exceeded. After has been Reduced NOx 1.65 3.3 9.5 5.9 verification, the end completed by (thousand targets will be the end of tons) exceeded June The Center was DLI-4: Green established on Dec. Financing 26, 2016 and WB has Established Established Center confirmed the result Established of achievement in Jan 2017. DLI-5: Number June 2019 target 2 2 2 3 of innovative met The World Bank Innovative Financing for Air Pollution Control in Jing-Jin-Ji (P154669) financial products Verification DLI-6: Number will be made of ESCOs 5 5 6 10 2019 target achieved by the end of receiving loans June 8. All the result indicators have met or exceeded targets, as shown in table 2. Table 2. Result Indicator Achievements Actual Cumulative End of achievements at Target by project mid-term CY2019 targets PDO Indicator 1: Reduction in particulate emissions from 3.2 2.0 3.6 eligible EE and RE subprojects (thousand tons) PDO Indicator 2: Reduction in SO2 emissions from eligible 12.4 9.3 16.9 EE, RE, and desulfurization subprojects (thousand tons) PDO Indicator 3: Reduction in NOx emissions from eligible 14.1 7.0 12.7 EE, RE, and denitrification subprojects (thousand tons) PDO Indicator 4: Reduction in CO2 emissions from eligible EE 2,180 1,353 2,461 and RE subprojects (thousand tons) Intermediate Result Indicator 1: Total investments in 1,000 786 1,400 eligible EE, RE, and pollution abatement subprojects (million US$) Intermediate Result Indicator 2: Subloans (for eligible EE, 498 550 1,000 RE, and pollution abatement subprojects) disbursed to sub- borrowers (million US$) Intermediate Result Indicator 3: Coal reduction from eligible 893 550 1,000 EE and RE subprojects (thousand tce) Intermediate Result Indicator 4: Reduction of SO2 emissions 7.02 5.9 10.8 from desulfurization subprojects (thousand tons) Result Indicator 5: Reduction of NOx emissions from 9.5 4.1 7.4 denitrification subprojects (thousand tons) Intermediate Result Indicator 6: Establishment of a Green Established in Dec Done Done Finance Center at the HXB and adoption of internal 2016 procedures for the identification, risk assessment, appraisal, and approval of green lending Intermediate Result Indicator 7: Number of different 2 3 3 eligible innovative financial products for green financing deployed Intermediate Result Indicator 8: 6 6 10 Number of different ESCOs receiving subloans (for eligible EE and RE subprojects Result Indicator 9: Number of subprojects financed by 1 1 2 syndicated loans The World Bank Innovative Financing for Air Pollution Control in Jing-Jin-Ji (P154669) B. Rationale for Restructuring 8. Expansion of Program Scope and Amendment to Loan Agreement: The Loan Agreement needs to be amended to reflect the PforR Program support for the Three-Year Action Plan to Protect Blue Sky from 2018-2020 and also take the opportunity to correct the Schedule 4 Disbursement Linked Results table: (1) changing the unit price of DLI-1 from €0.276 to €0.3 per € in Sub-loans disbursed to Sub-borrowers for Sub-projects; and (2) changing DLI-3b from desulfurization Sub-projects to denitrification Sub-projects. Both errors were made due to oversight at the negotiations. The increased unit price for DLI-1 will be applicable from January 21, 2016, and the total amount to be claimed after the restructuring is approved and amendment letter is signed is euro €12, 477,600. II. DESCRIPTION OF PROPOSED CHANGES 9. Expansion of program scope: This PforR operation finances a slice of the Government Program of Air Pollution Prevention and Control Action Plan (APPCAP) issued by the State Council in 2013, which covers nationwide and specifically mandates the Beijing-Tianjin-Hebei region to reduce its annual average PM2.5 concentration by 25 percent between 2012 and 2017. In 2017, the APPCAP target was successfully met. In 2018, the State Council issued the subsequent air pollution control program Three-Year Action Plan to Protect Blue Sky from 2018-2020. This new government air pollution control plan (1) sets a target to reduce the total SO2 and NOx emissions by 15 percent and annual concentration of PM2.5 by 18 percent from 2015 to 2020; (2) covers the JJJ and neighboring regions, Fen-Wei Plain covering Shanxi and Shaanxi, and Yangtze River delta, while the Pearl River Delta has graduated from this new Action Plan. The JJJ and neighboring regions are expanded to include Shaanxi, in addition to the original Beijing, Tianjin, Hebei, Shandong, Inner Mongolia, and Henan; (3) focuses air pollution control measures on clean heating in the winter, as decentralized inefficient small-scale coal heating boilers are the most important air pollution source in the winter; and (4) broadens the priority targeted air pollutants to Volatile Organic Compounds (VOC), in addition to the originally targeted air pollutants of particulates, SO2, and NOx. 10. HXB requested for expanding the geographic area to Shaanxi and air pollutants to VOC, to comply with the new government air pollution control action plan. Since the Loan Agreement provided that the geographical scope of P4R operation can be expanded to any other provinces/municipalities that may be added to the APPCAP or the subsequent program, and the Loan Agreement does not specify the air pollutants covered, the proposed changes in geographic areas and air pollutants do not require amendment of Loan Agreement, but will require revision of the Operational Manual. HXB has agreed to revise the Operational Manual. However, the team needs to undertake technical, environmental and social assessments of the expanded geographic areas and air pollutants. 11. Technical, environmental, and social assessments were conducted in June 2019 and concluded that the expanded program scope to add a new province of Shaanxi and a new air pollutant VOC (1) will not change the overall risk rating and category of the program and they are eligible to be supported by the program, thus the ESSA prepared in the program appraisal stage is still applicable without the need for significant revision or updating; (2) for VOC emission control, both of the end of pipe technologies and the source control technologies are to be eligible for this program; and (3) the proposed changes will not exceed the thresholds for high-value procurement contracts. The World Bank Innovative Financing for Air Pollution Control in Jing-Jin-Ji (P154669) I. SUMMARY OF CHANGES Changed Not Changed Change in Program Scope ✔ Other Change(s) ✔ Change in Implementing Agency ✔ Change in Program's Development Objectives ✔ Change in Results Framework ✔ Change in Loan Closing Date(s) ✔ Change in Cancellations Proposed ✔ Reallocation between and/or Change in DLI ✔ Change in Disbursements Arrangements ✔ Change in Disbursement Estimates ✔ Change in Systematic Operations Risk-Rating Tool ✔ (SORT) Change in Safeguard Policies Triggered ✔ Change in Legal Covenants ✔ Change in Institutional Arrangements ✔ Change in Implementation Schedule ✔ II. DETAILED CHANGE(S) OPS_DETAILEDCHANGES_EA_TABLE . The World Bank Innovative Financing for Air Pollution Control in Jing-Jin-Ji (P154669) ANNEX 1: RESULTS FRAMEWORK . . Results framework Program Development Objectives(s) To reduce air pollutant and carbon emissions through increasing energy efficiency and clean energy, with a focus in Beijing-Tianjin-Hebei (Jing-Jin-Ji) and neighboring regions. Program Development Objective Indicators by Objectives/ Outcomes RESULT_FRAME_TBL_PDO Indicator Name DLI Baseline End Target Reduction in particulate emissions from eligible EE and RE subprojects (thousand tons) PDO Indicator 1: Reduction in particulate emmisions from eligible 0.00 3.60 EE and RE subprojects (thousand tons) (Number (Thousand)) Reduction in SO2 emmissions from eligible EE, RE, and desulfurization subprojects (thousand tons) PDO 2 Reduction in SO2 emmissions from eligible EE, RE, and 0.00 16.90 desulfurization subprojects (thousand tons) (Metric tons/year) Reduction of NOX emission from EE, RE and Denitrification subprojects (thousand tons) PDO Indicator 3: Reduction in NOx emmissions from eligible EE, RE, and desulfurization subprojects (thousand tons) (Number 0.00 12.70 (Thousand)) Reduction in CO2 emissions from eligible EE and RE subprojects (thousand tons) Page 7 of 24 The World Bank Innovative Financing for Air Pollution Control in Jing-Jin-Ji (P154669) RESULT_FRAME_TBL_PDO Indicator Name DLI Baseline End Target PDO Indicator 4: Reduction in CO2 emissions from eligible EE and 0.00 2,461.00 RE subprojects (thousand tons) (Number (Thousand)) PDO Table SPACE Intermediate Results Indicators by Result Areas RESULT_FRAME_TBL_IO Indicator Name DLI Baseline End Target Intermediate Result Indicator 1: Total investments in eligible EE, RE and pollution abatement subprojects Intermeidate Result Indicator 1: Total investments in eligible EE, RE and pollution abatement subprojects (million USD) 0.00 1,400.00 (Amount(USD)) Intermediate Result Indicator 2: Subloans (for eligilbe EE, RE, and pollution abatement subprojects) disbursed to sub-borrowers Intermediate Result Indicator 2: Subloans(for eligible EE, RE, and pollution abatement subprojects) disbursed to sub-borrowers 0.00 1,000.00 (million USD) (Amount(USD)) Intermediate Result Indicator 3: Coal reduction from eligible EE and RE subprojects Intermediate Result Indicator 3: Coal reduction from eligible EE 0.00 1,000.00 and RE subprojects (thousand tce) (Number (Thousand)) Intermediate Result Indicator 4: Reduction of SO2 emissions from desulfurization subprojects Intermediate Result Indicator 4: Reduction of SO2 emissions from desulffurization subprojects (thousand tons) (Number 0.00 10.80 (Thousand)) Intermediate Result Indicator 5: Reduction of NOx emissions from denitrification subprojects Page 8 of 24 The World Bank Innovative Financing for Air Pollution Control in Jing-Jin-Ji (P154669) RESULT_FRAME_TBL_IO Indicator Name DLI Baseline End Target Intermediate Result Indicator 5: Reduction of NOx emissions from denitrification subprojects (thousand tons) (Number 0.00 7.40 (Thousand)) Intermediate Result Indicator 6: Establishment of a Green Finance Center at the HXB and adoption of internal procedures for the identification, risk assessment, appraisal, and approval of green lendin Intermediate Result Indicator 6: Establishment of a Green Finance Center at the HXB and adoption of internal procedures 0.00 1.00 for the identification, risk assessment, appraisal, and approval of green lednin (Number) Intermediate Results Indicator 7: Number of different eligible innovative financial products for green financing deployed Intermediate Result Indicator 7: Number of different eligible innovative financial products for green financing deployed 0.00 3.00 (number of products) (Number) Intermediate Result Indicator 8: Number of different ESCOs receiving subloans (for eligible EE and RE subprojects) Intermediate Result Indicator 8: Number of different ESCOs receiving subloans (for eligible EE and RE subprojects) (number 0.00 10.00 of ESCOs) (Number) Intermediate Result Indicator 9: Number of subprojects financed by syndicated loans Intermediate Result Indicator 9: Number of subprojects financed 0.00 2.00 by syndicated loans ( number of projects) (Number) IO Table SPACE Page 9 of 24 The World Bank Innovative Financing for Air Pollution Control in Jing-Jin-Ji (P154669) Disbursement Linked Indicators Matrix DLI IN00738618 ACTION DLI 1 DLI-1: Subloans (for eligible EE, RE, and pollution abatement subprojects) disbursed to sub-borrowers (million USD) Type of DLI Scalability Unit of Measure Total Allocated Amount (USD) As % of Total Financing Amount Intermediate Outcome Yes Amount(USD) 540.00 0.00 Period Value Allocated Amount (USD) Formula Baseline 0.00 December 2016 0.00 CY2016 50.00 15.00 CY2017 100.00 30.00 CY2018 150.00 45.00 CY2019 250.00 75.00 CY2020 250.00 75.00 CY2021 1,000.00 300.00 Page 10 of 24 The World Bank Innovative Financing for Air Pollution Control in Jing-Jin-Ji (P154669) DLI IN00738619 ACTION DLI 2 DLI-2: Coal reduction from eligible EE and RE subprojects (thousand tons of coal equivalent) Type of DLI Scalability Unit of Measure Total Allocated Amount (USD) As % of Total Financing Amount Number Intermediate Outcome Yes 195.00 0.00 (Thousand) Period Value Allocated Amount (USD) Formula Baseline 0.00 December 2016 0.00 0.00 CY2016 0.00 0.00 CY2017 5.00 1.00 CY2018 50.00 11.00 CY2019 100.00 23.00 CY2020 155.00 35.00 CY2021 550.00 125.00 DLI IN00738620 ACTION DLI 3 DLI-3a: Reduction of SO2 emissions from desulfurization subprojects (thousand tons) Type of DLI Scalability Unit of Measure Total Allocated Amount (USD) As % of Total Financing Amount Number Intermediate Outcome Yes 16.90 0.00 (Thousand) Period Value Allocated Amount (USD) Formula Page 11 of 24 The World Bank Innovative Financing for Air Pollution Control in Jing-Jin-Ji (P154669) Baseline 0.00 December 2016 0.00 0.00 CY2016 0.00 0.00 CY2017 0.50 0.60 CY2018 1.10 1.30 CY2019 1.60 1.90 CY2020 2.70 3.10 CY2021 8.60 10.00 DLI IN00738681 ACTION DLI 4 DLI-3b: Reduction of NOx emissions from denitrification subprojects (thousand tons) Type of DLI Scalability Unit of Measure Total Allocated Amount (USD) As % of Total Financing Amount Number Intermediate Outcome Yes 25.30 0.00 (Thousand) Period Value Allocated Amount (USD) Formula Baseline 0.00 December 2016 0.00 0.00 CY2016 0.00 0.00 CY2017 0.40 0.90 Page 12 of 24 The World Bank Innovative Financing for Air Pollution Control in Jing-Jin-Ji (P154669) CY2018 0.70 1.90 CY2019 1.10 2.80 CY2020 1.90 4.70 CY2021 5.90 15.00 DLI IN00738682 ACTION DLI-4: Establishment of a Green Finance Center and adoption of internal procedures for the identification, risk assessment, DLI 5 appraisal, and approval of green lending Type of DLI Scalability Unit of Measure Total Allocated Amount (USD) As % of Total Financing Amount Intermediate Outcome No Number 21.50 0.00 Period Value Allocated Amount (USD) Formula Baseline 0.00 December 2016 0.00 0.00 CY2016 1.00 10.75 CY2017 0.00 CY2018 0.00 CY2019 0.00 CY2020 0.00 CY2021 1.00 10.75 Page 13 of 24 The World Bank Innovative Financing for Air Pollution Control in Jing-Jin-Ji (P154669) DLI IN00738683 ACTION DLI 6 DLI-5: Number of different eligible innovative financial products for green financing deployed (# of products) Type of DLI Scalability Unit of Measure Total Allocated Amount (USD) As % of Total Financing Amount Intermediate Outcome Yes Number 36.00 0.00 Period Value Allocated Amount (USD) Formula Baseline 0.00 December 2016 0.00 0.00 CY2016 0.00 0.00 CY2017 1.00 6.00 CY2018 1.00 6.00 CY2019 1.00 6.00 CY2020 0.00 0.00 CY2021 3.00 18.00 DLI IN00738684 ACTION DLI 7 DLI-6: Number of different ESCOs receiving subloans (for eligible EE, RE, and pollution abatement subprojects) (# of ESCOs) Type of DLI Scalability Unit of Measure Total Allocated Amount (USD) As % of Total Financing Amount Intermediate Outcome Yes Number 36.00 0.00 Period Value Allocated Amount (USD) Formula Baseline 0.00 Page 14 of 24 The World Bank Innovative Financing for Air Pollution Control in Jing-Jin-Ji (P154669) December 2016 0.00 0.00 CY2016 0.00 0.00 CY2017 2.00 4.00 CY2018 2.00 4.00 CY2019 2.00 4.00 CY2020 2.00 4.00 CY2021 10.00 20.00 Page 15 of 24 The World Bank Innovative Financing for Air Pollution Control in Jing-Jin-Ji (P154669) ANNEX 2: PROGRAM ACTION PLAN . . PAP_NOT_CHANGE_TBL Action Description Source DLI# Responsibility Timing Completion Measurement The HXB to provide extensive training to its staff at HQ and branches on technical, results M&V, environmental and social, procurement, and FM areas Client Recurrent Continuous The HXB to designate specific staff to be responsible for technical, fiduciary, and environmental and social aspects Client Due Date 29-Nov-2016 HXB to engage experts for technical, fiduciary, and environmental and social support as needed Client Due Date 31-May-2018 HXB to specify the fiduciary and environmental and social requirements and procedures in the OM Client Due Date 16-Dec-2015 HXB to specify the fiduciary and environmental and social requirements and procedures in the subloan agreements with sub-borrowers Client Recurrent Continuous HXB to report required actions Client Recurrent Yearly Page 16 of 24 The World Bank Innovative Financing for Air Pollution Control in Jing-Jin-Ji (P154669) taken to the Bank in program reports Techncial: HXB to engage independent third-party IVAs for results M&V Client Recurrent Continuous Technical: The HXB to report portfolio composition and quality to the Bank to ensure transparency and quality of the portfolio Client Recurrent Yearly Procurement: In line with Article 34 of the Regulation on the Implementation of the Tendering and Bidding Law of the People’s Republic of China, the sub- project application and the sub-loan agreement with beneficiaries include a mandatory provision Client Recurrent Continuous Procurement: HXB to set up a complaints handling mechanism and reporting procedures, details of which will be included in the subproject application package and on the HXB’s website. Client Due Date 31-Aug-2016 Procurement: The HXB and the subloan beneficiaries shall cooperate fully with representatives of Client Recurrent Continuous Page 17 of 24 The World Bank Innovative Financing for Air Pollution Control in Jing-Jin-Ji (P154669) the Bank in any inquiry conducted by the Bank into allegations or other indications of F&C in connection with the program. Procurement: The OM and subloan agreement to include that sub- borrowers will not award contracts to firms and individuals on temporary suspension or debarment by the Bank and other MDBs. Client Due Date 15-Dec-2016 Procurement: HXB to strengthen its capacity to assess the capacity of beneficiaries to carry out procurement and contract management efficiently as part of subproject appraisal and provide guidance to beneficiaries with weak procurement capacity. Client Recurrent Continuous Procurement: The HXB will hire expertise as needed to strengthen procurement and contract management. Client Due Date 31-May-2018 Financial Management: HXB to set up the memorandum records for the program to record Client Recurrent Continuous Page 18 of 24 The World Bank Innovative Financing for Air Pollution Control in Jing-Jin-Ji (P154669) each subloan released and related reference information for ease of tracking the record in the corporate accounting system and the original supporting documents. Financial Management: HXB to conduct reconciliation between the CBD and the accounting division on a quarterly basis. Client Recurrent Quarterly Financial Management: Annually, HXB to prepare the program-specific financial report according to the specifically tailored format agreed with the Bank for the program and submit report to the Bank Client Recurrent Yearly Environmental and Social: HXB to strengthen environment and social impact management within the bank by specifying the requirements and procedures in the OM. Client Due Date 16-Dec-2015 Environmental and Social: Enhance capacity of the HXB staff by designating staff, allocating adequate resources, and Client Due Date 30-Dec-2016 Page 19 of 24 The World Bank Innovative Financing for Air Pollution Control in Jing-Jin-Ji (P154669) specifying operating arrangements and coordination with other departments in the bank. Achievement of DLI4:to establish a Green Finance Center, and disburse $10.75. Client Due Date 31-Jan-2017 Achievement of DLI1: to approve sub-projects with no less than $50m, and disburse of $15m by the end of 2016. Client Due Date 30-Dec-2016 Submit all candidate sub- projects involving “ building large- scale efficient facilities to replace small inefficient ones” to WB for screening. Client Recurrent Continuous A screening table covering all key social requirements in OM should be developed as part of subproject document requirement, and be attached to the subproject application package in the review process within the Hua Xia Bank. Client Due Date 31-May-2018 A social monitoring report should be prepared, based on desk review of compliance of OM by all subprojects before loan Client Due Date 31-May-2018 Page 20 of 24 The World Bank Innovative Financing for Air Pollution Control in Jing-Jin-Ji (P154669) approval, and field visit reporting of all subprojects after the loan approval. Submit verification report on the results of DLI-1, issued by a third-party, to WB Client Due Date 30-Jun-2017 Submit an annual report to WB. Client Recurrent Yearly The Bank to provide training to the HXB in technical, results M&V, environmental and social, procurement, and FM areas Bank Due Date 29-Nov-2016 . Page 21 of 24 The World Bank Innovative Financing for Air Pollution Control in Jing-Jin-Ji (P154669) Annex 3: Assessment of expanding the geographical areas and air pollutant The Hua Xia Bank has proposed to add a new province of Shaanxi to the geographical scope, and a new air pollutant- VOCs1 to the program under the Activities Within Result Area 2 – Reduced Air Pollution Emissions from Pollution Abatement Measures. Thus, the mission made an assessment of the proposal by Hua Xia Bank in terms of the potential environmental & social impacts and the technical implications to this program. Geographical implication: Shaanxi Province is bordered by Shanxi and Henan Provinces to the east. It is well renowned for its splendid cultural heritages created through the long history of thousands of years. The activities to be supported by the program, namely the energy efficiency, pollution abatement and renewable energy, will be extended to cover the province of Shaanxi. Like other program provinces assessed in the ESSA, the current environmental system provides adequate basis in the province of Shaanxi for addressing the environmental concerns related to sensitive areas, such as the critical natural habitats and physical cultural resources. And through the procedure of the EA, the activities involving the sensitive areas can be identified and excluded from the program boundary according to the eligibility criteria of the ESSA. On the social risk management, Shaanxi Province has the same legal framework and procedures like other program provinces assessed in the ESSA in dealing with potential impacts on land acquisition and involvement with ethnic minority communities. Such potential impacts could come from some renewable energy subprojects under the Program where limited amount of land acquisition might be involved. For those energy efficiency and pollution abatement subprojects, since proposed activities would be carried out within the premises of existing enterprises, no social impacts would be expected. In addition to the new air pollutant of VOCs, the activities on VOCs reduction/removal will be located within existing facilities, such as the wastewater treatment facilities and industrial enterprises which use, produce or storage the materials containing VOCs. These activities would neither be located in or near physical cultural resources, nor involve the natural habitats and forests. Technical and environmental implications: The most common sources of fugitive VOC emissions are associated with industrial activities that produce, store, and use VOC-containing liquids or gases where the material is under pressure, exposed to a lower vapor pressure, or displaced from an enclosed space. At the industrial sector/ fixed sources, the main areas for VOCs production in China are petrochemical, organic chemical, printing, painting and surface spray, and packaging. Typical sources include equipment leaks, open vats and mixing tanks, storage tanks, unit operations in wastewater treatment systems, and accidental releases. For the end of pipe technologies commercially available at markets handling VOC emissions in open vats and mixing processes include: 1 The definition of VOCs in China is set very wide to include those that involve in the photochemical reaction process. Page 22 of 24 The World Bank Innovative Financing for Air Pollution Control in Jing-Jin-Ji (P154669)  Collection of vapors through air extractors and subsequent treatment of gas stream by removing VOCs with control devices such as condensers or activated carbon absorption;  Collection of vapors through air extractors and subsequent treatment with destructive control devices such as:  Catalytic Incinerators: Used to reduce VOCs from process exhaust gases exiting paint spray booths, ovens, and other process operations;  Thermal Incinerators: Used to control VOC levels in a gas stream by passing the stream through a combustion chamber where the VOCs are burned in air at temperatures between 700º C to 1,300º C;  Enclosed Oxidizing Flares: Used to convert VOCs into CO2 and H2O by way of direct combustion. It should be noted that the destructive technologies by thermal incineration at the high combustion temperature between the range 700OC to 1300 OC may create a good condition for NOx formation. In addition, given the wide definition of the VOCs, combustion of the VOCs may produce dioxins with the presence of Cl and hydrocarbons at the temperatures zone between 300OC and 700OC, ideally narrowly around 300OC. However, the operation of the thermal incinerators and the enclosed oxidizing flare will sustain the temperature of combustion zone/chamber above 700OC, and the start-up period is extremely short. Thus, the risk on the dioxins for the use of the thermal incinerators and enclosed oxidizing flare should be minimal and negligible. The catalytic incineration typically creates a very low temperature zone marginally around 200OC, which may not provide an ideal condition for creation of dioxins and NOx. In addition to the end of pipe technologies, some technologies are readily available to avoid or reduce the production of VOCs, such as the 1) substitution of less volatile substances, such as aqueous solvents; 2) use of floating roofs on storage tanks to reduce the opportunity for volatilization by eliminating the headspace present in conventional storage tanks. Further, the equipment leak is one of the major sources for VOCs emission, including valves, fittings, and elbows which are subject to leaks under pressure. Upgrading or modification of these equipment will economically reduce the emission/leakage of VOCs at sources by at least 90% with the maximal environmental benefits and minimal environmental impacts. Thus, the upgrading/modification of the equipment deserve being included in the program to supplement the end of pipe technologies. Currently the best available technologies to equipment modification include seal-less design, close vent system, better sealings, etc. for pumps, compressors, valves, pressure release devices. The environmental impacts potentially will include the noise, dust, general solid waste, and waste gas by welding, in construction phase; and waste gas, solid waste, heat damage workers in operation phase. Additionally, hazardous/toxic materials will not be used or produced in the process of VOCs control. These environmental impacts are moderate and site-specific, and readily be mitigated by good engineering design and mitigation measures. The control of VOCs has been mainstreamed into the established environmental management system in China. According to the Categorized Directory for Environmental Management of Construction Projects (MEP, 2017), and the Decision on Partial Revision of the Categorized Directory for Environmental Management of Construction Projects (MEE, 2018), the works of new installation of VOCs control devices are subject to either EIA Form or EIA Page 23 of 24 The World Bank Innovative Financing for Air Pollution Control in Jing-Jin-Ji (P154669) Registration. The screening, preparation, review and approval, implementation and supervision of the EA documents are already carried out in an integrated way for the VOCs control within the environmental system in China. As most subprojects on control of VOCs will be located within existing facilities, such as the wastewater treatment facilities and industrial enterprises which use, produce or storage the materials containing VOCs, no land acquisition is required. As a result, no potential social impact will be expected for these subprojects. Conclusion: the assessment of the geographical addition and VOCs’ implication from technical, environmental and social perspectives indicate that (1) they are not going to change the risk rating/category of the program and they are eligible to be supported by the program, thus the ESSA prepared in the program appraisal stage is still applicable without any need for significant revision or updating; (2) for VOC emission control, both of the end of pipe technologies and the source control technologies should be considered eligible for the program. Page 24 of 24