World Bank – Romania Partnership Program Snapshot April 2012 I. RECENT ECONOMIC of EUR 1.4 billion and a DPL-DDO from the DEVELOPMENTS World Bank of EUR 1 billion, which aims to provide a cushion against potential future shocks. 1. Growth and External Performance 2. Fiscal Performance Romania’s prudent macroeconomic Improvements in revenue collection, management has enabled it to recover quickly optimization of expenditures, better targeted from the global financial crisis. In 2012, following assistance to the poor and vulnerable, stringent the implementation of macro stabilization and expenditure controls, and further measures will structural measures, Romania is expected to be critical to reach the deficit objective. The experience a modest economic recovery of around deficit reached 4.2 percent of GDP in 2011. The 1.5 percent. In 2011, the GDP rise was 2.5 percent budget deficit remained significant, despite fiscal year on year, mostly due to higher exports and better performance in 2010 being better than expected. At agriculture harvests. Foreign Direct Investment a global level, Romania is part of the EU Fiscal (FDI) inflows continue to be weak, at 1.4 percent in Treaty. Continued fiscal consolidation has improved 2011, and expected to reach 1.9 percent in 2012. Romania’s credibility and lowered financial costs. The unemployment rate has remained relatively The deficit of the general Government remained constant for the past three years at around 7.2 below the 4.2 percent-of-GDP target in 2011. This percent. There was a steady and sustainable drop in year’s 1.9 percent-of-GDP target is very ambitious inflation, which eased to 3.1 percent at end-2011 but the Government has committed itself to bring from 7.9 percent in December 2010. down the deficit in European System of Integrated Romania’s current account deficit narrowed to Economic Accounts (ESA’95) terms to less than 3 4.3 percent in 2011 mainly due to a significant percent of GDP before 2013. decrease in the trade gap. The shrinking net FDI, 3. Financial Sector the scarcer external financing and hopefully the better absorption of EU funds are the key drivers of The National Bank of Romania (NBR) and the the dynamics affecting the balance of payments in Government took strong measures to safeguard the short run. the stability of financial markets, and banks weathered the stress well. Since the international There are risks to maintaining growth, and they financial support package, the exchange rate has include uncertainty in the eurozone, exports remained broadly stable. The banking sector remains markets, political developments in the context well capitalized and liquid.. Prudential regulations of elections, and low absorption of EU funds. were strengthened to address the risks of contagion Sustainable long-term growth, in light of these risks, from the turmoil in European financial markets. entails a transformation of the Romanian economy Contingency plans mandated by the Strategic Action with three underpinning factors: (i) measures to Plan for strengthening the financial sector are being assure compliance with fiscal targets while clearing reviewed by the NBR to verify the credibility of the arrears, improving quality of spending and assumptions and robustness of the banks’ strengthening tax collections; (ii) progress on the emergency funding arrangements. The reporting structural reform agenda with a focus on energy and framework the NBR has put in place monitors transport sectors; and (iii) ensuring continued exposures that do not appear in the banks’ balance financial-sector stability. The new precautionary sheets. program (2011-13) agreed between the Government of Romania, the International Monetary Fund The contagion effect in the financial sector is (IMF), and the European Commission (EC), details being mitigated in several ways. Greek banks the measures and priorities for the reform agenda account for about a sixth of the assets in Romania's focusing on fiscal consolidation and state enterprises banking system and concern over the impact of reform, and structural reforms for sustainable Greece's debt crisis leads to occasional turbulence in economic growth. This EUR 3.5 billion Stand-by the RON exchange rate. In an extreme event, some Arrangement (SBA) is in conjunction with effects on the financial sector might occur (given the precautionary support from the EU in the amount presence of several subsidiaries of eurozone 1 periphery banks in Romania), but strong capital phenomenon at the level of the state-owned or buffers in banks, tight banking supervision, and state-controlled enterprises. The state is the sole healthy reserves in the National Bank should owner of the transmission grids for gas and mitigate this risk. electricity, all major electricity generators, three out of eight electricity distributors, all gas storage, and Structural reform agenda the hard coal and lignite mines. Half of the The crisis prompted long-needed reforms. The electricity and gas markets are fully regulated-– financial difficulties gave rise to a series of reforms, consumers purchase energy at prices regulated by with support from the IFIs, in health, education, the ANRE, and power or gas producers are required to financial sector, public financial management (such supply at regulated prices. as treasury and debt management, macro forecasting There are risks for the fiscal stability due to capacity, strategic prioritization in the budget losses of potential revenue and arrears, risks to process), public administration, social insurance, and energy security and economic growth due to social assistance. Some of these reforms address interruptions of supply, and risks to fair short-term responses to the crisis, while others are competition, due to distortion of competition in anchored in a coherent longer-term strategy. the downstream markets. To address these Structural reform priorities in 2011-12 include problems, the Government has initiated measures to public finance, energy and health. improve the governance of energy SOEs, enhance competition, and attract the private capital needed to The Fiscal Compact requires Romania to take boost competitiveness in the sector. The measures that ensure its public financial management framework meets the binding Government’s 2012-14 program includes improved governance and contracting practices, legislative and standards imposed by the Treaty. This is not an regulatory measures to improve competition to easy task and in the coming years the Government attract private investment and to align the energy will need to focus on adopting good practices in sector with the EU’s energy acquis, improved revenue and expenditure management. This will heating services and containment of the cost of consolidate macroeconomic stability, allow a better heating for households and municipal budgets, alignment of the budget formulation and execution increased private sector participation in the processes with the development priorities of the country and the public policy framework, and result financing and management of the energy sector, and updated tax and royalty regulations for the oil and in a more efficient allocation of the public resources. gas sector. The national fiscal planning should adopt a multi- annual perspective, so as to attain the medium term In health, Romania spends less than 5 percent objective of the balance of the general government, of GDP, compared with a European average of with a limit of a structural deficit of up to 1 percent 6.5 percent and an EU average of 8.7 percent. of the gross domestic product. The numerical fiscal Access to health care in Romania is skewed towards rules assumed under the medium-term fiscal wealthier groups. Almost half of the poor do not framework for 2012-15 should also promote seek care when required, compared with around 20 compliance with the Treaty reference values for percent of those in the top income quintile. Of the deficit and debt. public funds allocated for healthcare, much is wasted on inefficient and unnecessary services or The performance of the energy sector treatments. The current health system is heavily (dominated by state-owned enterprises—SOEs) biased towards inpatient hospital care. The lack of carries significant risks for Romania’s fiscal an appropriate Health Technology Assessment for stability, energy security, and economic growth. new drugs and medical devices has resulted in a SOEs poor financial performance affects Romania’s fiscal sustainability. The largest SOEs are in energy health system also biased towards high cost technology. The reforms continue the agenda of and gas, where they represent 53 percent of all 2009-2011 that aimed to contain rising costs and economic activity; transport and storage (34 improve the quality of services delivered. The percent); and mining and quarrying (27 percent). Government’s medium-term reform program in Despite some moderation during the pre-crisis health promotes cost-effective outpatient and period, arrears accumulation remains an endemic primary care services instead of costly in-patient 2 services, introduces co-payments, rationalizes benefits and social security, addressing deficiencies hospital infrastructure, regulates the introduction of in administration, improving quality of services new drugs and technologies, and reviews the basic provided to beneficiaries of the EU Common benefit package reimbursed by the public health Agriculture Policy, and enhancing capacity to insurance system. monitor and enforce food safety and quality standards. Improvement of quality of life in rural space is an overarching goal also involving II. RECENT SECTORAL DEVELOPMENTS development and modernization of rural infrastructure. 1. Sustainable Development The Bank is supporting agricultural sector and (i) Agriculture rural development through three ongoing projects: Agriculture plays an important role in Romania the Modernizing Agricultural Knowledge and Information in terms of the size of the rural population and Systems (MAKIS) Project (to improve competitiveness employment, making it central to Romania’s of farmers and agro-processors through improved European integration and social cohesion goals. advisory services to modernize agricultural research Romania has one of the best resource endowments and improve food safety, in line with EU in Europe and was once widely considered a requirements), the Complementing EU Support for breadbasket for Europe, but the sector is Agricultural Restructuring (CESAR) Project (to support underdeveloped. Despite the highest proportion of implementation of land tenure and titling reform rural population (45 percent) in the EU, Romania and enabling better absorption of EU funds), and has the highest incidence of rural poverty (over 70 the Irrigation Rehabilitation and Reform (IRR) Project (to percent) and gap in living and social standards support the increase in agricultural productivity and between rural and urban areas, and one of the sector reform). lowest competitiveness in agriculture. Although almost 30 percent of employment is in agriculture To further develop the sector, immediate action (compared to some 2 percent in EU15 and 3-14 should include: (i) developing a sector strategy percent in EU8), Romania imports an increasing focused on improving the access of local producers proportion of its food needs. to domestic and external markets; (ii) initiating the programming process for the National Rural Average yields are half of those in the EU-27. Development Program for 2014-20; (iii) improving Less than optimal production factors led to low MARD, streamlining decision-making and honing average yields in Romanian farming, at only half of targeting of the national programs, and (iv) those in the EU-27 for most field crops and continuing to scale up the government’s program of livestock. Even at this low productivity level, property title registration of land assets in rural areas agriculture’s share in the country’s total gross value to improve the security of property rights and the added is 7 percent compared to 1.7 percent in the functioning of rural land markets. EU-27. Also, agricultural production is vulnerable to natural calamities and the inability to effectively (ii) Environment prevent and contain animal diseases. Transforming agriculture and delivery of public Romania is below the EU average and has yet goods to rural areas is, therefore, central to to take advantage of the EUR 4.5 million EU Romania. Despite EU financial support, the Structural Funds for Environmental Protection considerable agricultural potential remains and Climate Change. In light of its commitments insufficiently tapped and additional national actions to achieve the EU 20/20/20 energy-climate change are vital both for benefiting from EU membership package, and the EU ―Low Carbon Roadmap‖ for and for addressing key sectoral shortcomings. building a competitive low-carbon Europe by 2050, Romania needs to: (i) thoroughly analyze the Removing constraints to competitiveness is a opportunities, options and related costs for the key priority. Key issues include addressing land medium and long-term to meet these commitments; tenure security and high transaction costs in the land (ii) prepare a comprehensive program for funding market, creating off-farm employment to absorb climate change and green growth under the next surplus labor in agriculture, rethinking pension 3 programming period for EU financing (2014-20); 2. Human Development (iii) improve climate-change mitigation by enhancing inter-ministerial cooperation; (iv) adapt to the (i) Health economic risks of climate change by preparing and implementing an adaptation strategy; (v) streamline Romania has made notable improvements in the environmental permitting process; and (vi) health; nonetheless, challenges remain and invest in ―Green Growth‖ with a view to develop a there is much to be done. Many basic health comparative advantage in this nascent industry. indicators have shown improvements. Reductions in Another key commitment of Romania is to comply infant and maternal mortality have been remarkable; with EU water directives, which will also be a major the infant mortality rate fell from 43.5 per 1,000 focus of the next EU cohesion funds programming infants in 1970, to 21.7 in 1995, and 11.6 in 2008. period. Correspondingly, there have been improvements in life expectancy at birth during the same period (from The Bank has two ongoing projects – Mine 68.5 years in 1970 to 73.4 in 2008). That said, Closure, Environmental and Socio-economic notable challenges remain; life expectancy at birth is Regeneration, Integrated Nutrient Pollution five years below EU averages and maternal and Control – that directly support the environment infant mortality is among the EU’s highest, with sector in Romania through investments in high mortality rates more concentrated in low- environmentally-friendly mine closures, assisting income rural areas. Romania in meeting EU environmental directives by Romania has historically committed a relatively financing water, wastewater, and waste-management low share of national wealth to health care. The infrastructure, and providing institutional support to public fraction of health care spending has increased the Ministry of Environment. from 2.9 to 3.7 percent of GDP, but still remains well below other EU countries. Coverage increased; At the request of the Government, the Bank however, quality and results of health care is still far completed (in June 2011) a functional review of behind EU standards. The generous basic package the Environment, Water, and Forestry sector, of health services can no longer be covered by the which resulted in a significant number of health insurance system in a sustainable manner. recommendations spanning strategy formulation, The sector is plagued with problems including lack priority setting and human resource management, of investment, which had as a result deteriorated regulatory effectiveness, sustainable forest health facilities, disgruntled the workforce, and management, and absorption of EU Structural created public dissatisfaction with the health system. Funds. Romania’s health infrastructure still suffers (iii) Infrastructure from fragmentation, inefficiency, and poor regulation. The current facilities providers are A considerable share of the Bank’s assistance characterized by small private businesses in primary program previously was directed to the health care, abundant low, mid- and high-level rehabilitation of Romania’s infrastructure. While hospitals, and a few facilities for specialized most Bank financing went for investment and outpatient services/secondary ambulatory care equipment for rehabilitation and expansion, loans (diagnosis and treatment). Projects include Health typically also included a technical assistance Services Rehabilitation, Programmatic Adjustment Loans component for improving the policy-making (APL 1 and 2), and Health Sector Reform projects. capacity of the ministry in charge and for developing Also, several elements of health sector reforms were plans for restructuring the sectors to make them implemented under the framework of budget- efficient. Often the rationale for the Bank’s support loans such as the Programmatic Adjustment involvement was to facilitate sector restructuring to Loan and DPL series. promote competition and private-sector investment, New reforms should build on those already by involvement in railway rehabilitation, petroleum completed, such as hospital rationalization, sector rehabilitation, power rehabilitation, streamlined provider payment mechanisms and the telecommunications, and the electricity market. recently approved copayment law—by: (i) reducing 4 arrears, eliminating waste of resources by the use of training, as well as the ongoing rehabilitation and generic drugs, and bringing additional resources into construction of kindergartens in communities with a the system through reviewing the legal framework significant Roma population. Substantial Bank for hospital accreditation, in connection to the assistance is also ongoing through the ICT in Schools quality of provided services, and through the claw- component of the Knowledge Economy Project. This is back tax; (ii) reviewing the benefits package; (iii) aimed at improving primary and lower secondary implementing transparent mechanisms for new education through the integration of ICT in the technology and new drugs (Health Technology teaching-learning practices at the classroom level, Assessment); and (iv) developing a legal basis for thereby improving students’ skills and knowledge. introducing private health insurance. At the tertiary level, technical assistance was provided for introducing a student loan scheme in The Bank will further support the health sector. Romania, which is expected to be implemented in The Bank is preparing a future operation for the the future. The Functional Review on the Pre-university health sector aiming to enhance the service delivery Education Sector as well as the Functional Review of the system, strengthen financing and payment methods, Higher Education Sector, undertaken in 2010 and 2011, and improve governance in the health system. supported the education program by providing (ii) Education detailed recommendations for the improvement of the sector’s performance, which were reflected by One of Romania’s key priorities continues to be the Ministry of Education in specific action plans. upgrading the skills of its population to meet Selected activities are expected to be further Europe 2020 targets. The economic crisis has exposed the weaknesses of the economy, and in implemented with the help of the World Bank. particular the lack of competitiveness, partly due to The Government has moved forcefully in the level of skills. A highly skilled workforce advancing the reform agenda. A new National depends on an education system that can produce Education Law has been in force since early 2011 graduates with the right skills and quality. The promoting changes in virtually all important challenge is to bring the level of achievement of education areas: new education cycles and a focus Romanian children in key subjects to current levels on early childhood education; a shift to competence- found in most European countries. To this end, the based curriculum; new systems for professional content of education delivered in schools needs to development; evaluation and assessment; pre- be better aligned with the requirements of a university financing in the decentralization context; knowledge-based economy; the quality of the classification of universities; a new approach to teaching and the learning process needs to be university management; a focus on lifelong learning, improved; and the system’s efficiency should be etc. In order to meet the ambitious targets of the increased. Europe 2020 strategy, one of Romania’s key priorities will continue to be upgrading the The system has been strengthened in a number population’s skills. To this end, the education sector of ways over past decades, although there is a significant unfinished agenda in provision of should focus on: (i) implementation challenges related to the comprehensive National Education education. Comprehensive reforms were initiated Law, with particular attention to the alignment of in the 1990s with World Bank and other donor education services delivered at the pre-university and support. tertiary levels with labor market requirements; (ii) In 2009-10, Development Policy Loans (DPL) 1 increasing the capacity of the Ministry of Education and 2 have promoted key reforms on per capita to focus on core business, and enhance operational financing to increase the system’s efficiency and efficiency and accountability in the system; and (iii) effectiveness. At the same time, an important using the schools network and teaching force more contribution to advance the country’s social efficiently. inclusion agenda is currently provided under the (iii) Poverty and Social Protection Early Childhood Education Component of the Social Inclusion Project. These include development of new Poverty declined in 2009 due to a generous curriculum and application guidelines for inclusive increase in social protection and pension early childhood education, associated teacher 5 spending. Romania’s poverty rate1 declined Bank-financed Employment and Social Protection dramatically between 2000-2008, from 36 percent in and Social Sector Development Projects. A National 2000 to 5.7 percent in 2008. In 2009, poverty Agency for Employment was created in 1998, declined further to 4.4 percent, due to increased comprising a network of offices with countrywide social protection and insurance spending. However, reach, and is operating effectively. Progress was also despite large strides, the poverty rate in Romania is made toward pension reform that further led to the still among the highest in the EU. introduction of private pension funds. In 2010 social issues were very present on the The public pension system has improved public agenda for crisis, post-crisis, and other considerably. A new Pension Law was adopted in unrelated reasons: (i) unemployment levels 2001, which promoted the gradual increase in the remained high despite declining from over 8.3 retirement ages and introduced a new point- value percent in early 2010 to around 7 percent currently; benefit formula based on contribution. As a result, (ii) the unfavorable climatic conditions that affected the burden of the public pension system on public rural populations; (iii) the increase in inflation, which finances was reduced (until 2007 when the process reduced real incomes across the board; (iv) the started to reverse). Beginning in January 2011, the massive cuts in the compensation of public sector public pensions system was reformed again, in order employees, who lost not only 25 percent in basic to improve its medium- and long-term financial salaries, but also numerous other benefits; and (v) sustainability. At the same time, progress has been the cuts in untargeted social transfers. made in the capacity to evaluate poverty status by the Romania Antipoverty and Social Inclusion The impact of the cuts in untargeted social Commission. The Child Welfare project (1998) transfers and public sector wages is mitigated actively promoted community-based approaches as by several factors. First, the incidence of poverty sustainable and cost-effective alternatives to among public servants is very low. There is a institutionalized child welfare. The most tangible minimum wage floor of 600 RON per month. result was the large reduction in the number of Second, the social assistance programs that have children in state-run institutions. been reduced are programs with low targeting performance that affect mostly middle- and upper- Over the short term, the key challenge is to income households. The main measures include reign in social protection spending, by focusing reducing the ―child raising‖ allowance by 15 percent, on the needs-based social assistance programs. revising the eligibility rules for family allowances, Over the medium term, a key objective is to and removing the package (―trusou‖) and allowance improve labor market participation and for newborn babies, and, most importantly, the earnings while reducing dependence on social budget of the income-tested program has been transfers. While the recently adopted Social protected. Assistance Framework Law creates the foundation for a streamlined, less- costly social assistance Before 2010, the Bank’s overall objective in system that stimulates work and human capital social protection and poverty alleviation focused accumulation, materialization of results would on: strengthening the capacity of labor offices to require that secondary legislation and regulations be provide employment services; strengthening the developed based on careful analyses; service delivery Ministry of Labor and Social Protection to monitor systems being strengthened; activation policies and evaluate employment and social protection developed and implemented; and reduction of error programs; labor retraining; pension reform; and fraud. improved targeting of social assistance; and promoting Community-Driven Development. The Bank is currently working with the Ministry of Labor, Family and Social Protection to Significant progress is visible in social support social assistance reforms in Romania. protection, including through support from the The Social Assistance System Modernization Project provides the vehicle for World Bank support to the 1The total poverty line is set at RON258.9 (US$86) per Government’s new Social Assistance Law. The adult equivalent per month, expressed in January 2009 project rewards operational results set out in a series prices. The poverty rate (headcount) shows the number of persons below the poverty line. 6 of 20 disbursement-linked indicators (as opposed to basic institutions needed to support the transition to financing project inputs). a market economy: an appropriate legal and regulatory framework, separation of regulatory and The project covers a wide range of reforms to commercial interests, and a financial system that improve the overall performance of Romania’s could operate on a commercial basis to enforce a social assistance system. There are four key areas hard budget constraint on borrowers. Unlike some of reform: (i) strengthening performance of its neighbors, Romania had hardly experimented management, to ensure that monitoring reports are with even limited policy or institutional reforms to produced frequently and used by the Ministry to separate commercial and regulatory functions or to inform decision-making; (ii) improving equity, which promote private sector activity. aims to ensure that the share of social assistance funds going to the poorest quintile is increased; (iii) Despite the lack of basic institutions 20 years administrative efficiency, which aims to reduce the ago, Romania has made considerable progress administrative and client participation costs of since then in developing institutions compatible means-tested programs; and (iv) reducing error and with a market economy. But the country lagged fraud, which should reduce leakage from the system behind other Central and Eastern European and increase the public's trust. countries in policy reform and institutional development, until the prospect of EU membership The Bank carried out a Functional Review of became a driving force for reform and the Ministry of Labor, Family and Social modernization. Protection to provide advice regarding the administrative functioning of the ministry, including areas such as: structure, personnel, budgeting and 4. Private sector development organization. Positioning Romania to become more 3. Public Sector Reform competitive in a global market requires renewed effort to attract investment and enhance (i) Reform of the Public Administration productivity through innovation. Functional Reviews2 of the Romanian public administration were completed in June 2011. The  Competition: priority actions should aim at Functional Reviews (FR) were operational and reducing the dominant role of the state in the managerial assessments of 12 ministries, agencies, economy (e.g. transport, energy, and other public bodies conducted by the Bank in communication) and at consolidating capacity of two stages starting in March 2010. The reviews were the Competition Council to enforce competition agreed in an MoU signed in June 2009, between the policy. Government of Romania and the European  Business environment: Romania lags behind Commission, and were financed out of EU the EU, and globally, in terms of the number of structural funds. The Bank has been requested to tax payments to which SMEs are subjected and support the modernization of the administration. the number of procedures and days to register The aim of the FRs was to provide the basis for a property. . Globally, the functions regarding the series of action plans, as the Government’s intention investment climate should be consolidated in was to use the reports in developing its medium- the Ministry of Economy, Commerce and term reform agenda. The process will result in a Business Environment, which, in turn, should strengthened effectiveness and efficiency of the move closer to the central coordination of the public administration. Government, eventually in the General Secretariat of the Government. (ii) Governance/ Institutional Development  Research Development and Innovation: A Institutional development has gradually become preeminent task is to strengthen the governance a central element of the Bank’s assistance of the Research, Development and Innovation strategy. Like other countries in Eastern Europe system. The first step could be activating the after the fall of communism, Romania lacked the National Council for Science, Technology and Innovation Policy at the Prime Minister’s level, 2 thus ensuring high-level government oversight More details about FRs in pages 23-24. 7 and enforcement of accountability for The Bank’s support to Romania is focused on performance. three EU related cross-sectoral themes. Theme 1: Policy reforms to reap the benefits of EU membership and meet the objectives of the III. WORLD BANK GROUP PROGRAM Europe 2020 strategy. Supporting ongoing structural reforms and new Romania joined the International Bank for policy actions in line with NRP will be critical Reconstruction and Development (IBRD) in for Romania to achieve greater convergence 1972, the International Finance Corporation with EU Member States. Reforms in health, (IFC) in 1991, and the Multilateral Investment education, financial sector and budget processes Guarantee Agency (MIGA) in 1992. The World were supported in 2011 via development policy Bank has been active in Romania for almost 40 lending. The 2012 Government Program reconfirms years. Lending was discontinued in the early 1980s that policy reforms in social assistance, health, tax and resumed in 1991. Up through 2012 IBRD administration, energy, transport, and SOEs must committed US$7.06 billion through 58 projects. continue, and these are likely areas for a new Bank lending since 1991 was extended in four main budget-support operation that is under preparation. stages: (i) support to the transition of Romania’s Issues on macroeconomic stability and building command economy to a market economy, FY91-94; blocks for sustainable growth may be considered. (ii) support to reforms in energy, education, Also, inclusion and participation requires attention, infrastructure and the land market, FY94-04, and to especially on the significant challenges to provide poverty reduction, reform of the state and opportunities for the Roma while overcoming environmental protection, FY97-04; (iii) support for prejudice and stigma. A set of Policy Notes on Growth institution building, governance reform and EU and Competitiveness provides a framework to orient accession, FY05-10; and (iv) support to systemic policy dialogue concerning challenges to EU reforms (public finances, public administration, convergence and propel Romania’s growth and financial sector, education, health, social assistance, competitiveness. social security, mobilization of EU funds) and Theme 2: Modernization of public institutions mitigation of economic and financial crisis, FY10-12. to enhance resource allocation and absorption The change in Government priorities translated into of EU funds. an increasing share of policy-based lending, from 10 percent in FY05-08 to 73 percent in FY10-12. Over the past year and a half, the Bank carried out Functional Reviews (FRs) of 12 public institutions in Romania3 as mentioned earlier. The The ongoing Bank Portfolio consists of lending reviews are providing operational recommendations and grant-financed projects and analytical and on strategic management, organizational structure, advisory work. While the number of investment sector governance, budgeting, and human resources lending projects in the portfolio is declining, the management to help guide structural reforms. Phase Bank program of analytical and advisory (AAA) 1 FRs (presented to the Government in October work is growing. As of February 2012 the active 2010) covered Transport, Pre-University Education, portfolio included 12 investment projects totaling Agriculture and Rural Development, Public Finance, US$1.7 billion and some grants (two co-financing and the Center of Government, Competition Global Environmental Facilities, one Prototype Council. Phase 2 FRs (presented to the Government Carbon Funds, and one Japanese grant for policy in March 2011) analyzed Environment and Forestry, making for People with Disabilities). The Bank Energy and Economy, Health, Labor and Social analytical work program includes work on public Protection, Regional Development and Tourism, finance, education, health, regional development, Higher Education, Research, and Innovation). In labor and social protection, and the Modernization December 2010, the Government approved the of the Public Administration (MAP). action plans derived from the recommendations of the first phase, part of which the Bank may support 3 See pages 24-25. 8 under the EU-financed Modernization of Romanian medium-term strategy require the center of Public Administration Program (see below). The government to be strengthened in order to fulfill Government has approved the Action Plans derived core functions: prioritization and coordination of from the second phase of the Functional Reviews reform initiatives that are fully incorporated into the recommendations and submitted them to the National Reform Programme (NRP) and the European Commission. Government Program, and monitoring, evaluation and reporting of their results and impact. The Bank engaged with the Government in strengthening administrative capacity through Theme 3: Complement to EU funding the Modernization of Public Administration The availability of Structural Funds makes Bank (MAP), including the promotion of better policy financing a minor instrument for Romania. coordination and monitoring and evaluation However, the Bank can complement EU support by activities. So far, the Bank has been asked to provide financing activities that are not covered by Structural technical support to the Government to implement Funds or alternative instruments. For example, its action plans derived from the Phase 1 Functional development policy lending and results-based Reviews recommendations – currently 17 projects operations can support improved outcomes and under a Modernization of Public Administration provide additional financing to the current budget. Package (MAP) that have provisionally been agreed Sub-national activities, access to financial markets upon. The Bank has also received a request for via guarantees and areas of national responsibility similar assistance in justice (this TA is signed and (i.e. education, health, justice) for which typically begun implementation), procurement and EU funds structural funds are not allocated could be explored. absorption, as part of the MAP. The MAP package supports several interventions both on policy IFC is investing in Romania on a selective reforms and institutional capacity building. basis: IFC has withdrawn from sectors and business Government action plans for the second phase have lines where the private sector is ready to take over, been approved and the Bank is ready to support however, IFC will assist local companies to become their implementation upon request. However, the competitive in the domestic market and expand to key current issue is to finalize signing the MAP other countries in the region, and promote South- activities to be able to start implementation. South investments. IFC will continue to support projects of high development impact such as in The Bank has been asked to provide technical infrastructure, frontier regions and climate change- assistance for increasing absorption of EU related projects. funds. The Government aims to achieve a 20 percent EU-funds absorption rate in 2012, which is Additional lending operations were envisaged an ambitious agenda. The Plan of Priority Measures for the following two years, mainly focusing on for strengthening the capacity to absorb structural budget support operations (DPL) and key sectors and cohesion funds could significantly reduce such as tax administration and health (see table barriers to absorption. One of its key components is below). This potential new lending is indicative and to identify the 100 top project priorities, and actual delivery will depend on the GoR's request, concentrate counterpart funding and administrative Bank resources, Romania's performance, and global capacity on these projects. The GoR, through its economic developments. Ministry of European Affairs and in agreement with The Government has expressed interest in a new the EC, requested Bank support (on a fee basis with budget support operation (development policy loan) EU financing) to implement a series of actions, in 2012, with a deferred drawdown option. This including an analysis of policy impediments would focus on key reform areas being supported by constraining EU funds. In this sense, a IFIs, such as tax administration, health, energy, Memorandum of Understanding between the SOEs, transport, corporate governance and the Government and the Bank was signed on January financial sector. 26, 2012 and covers priority areas of intervention. Strengthening the center of Government to prioritize, monitor and proactively manage the reform process. A successful reform program and 9 IBRD lending (US$ million) resource efficiency. As vulnerabilities related to the Project Commitment eurozone crisis recede, it is anticipated that IFC will FY2011 make increasingly selective investments targeting DPL2 €300 (US$426) commitments of around US$100 million per year SASM4 €500 (US$710) through FY15. TOTAL €800 (US$1136) FY12 commitments to date total US$271 million Project Commitment in 6 projects, including US$93 million mobilized FY2012 from partners. Commitments in the financial sector DPL 3 €400 (US$560) included a trade finance line with Bancpost, a New DPL DDO €1000 (US$1380) US$32.5 million senior loan to Garanti Bank to TOTAL €1400 (US$1940) provide on-lending to SMEs, with 50 percent of the Project Commitment loan earmarked for female-owned enterprises. FY2013 (tentative) Infrastructure commitments this fiscal year consist Tax Admin €75 (US$100) of a US$75 million loan package for Cernavoda and Health €250 (US$344) Pestera wind power plants. IFC also mobilized a TOTAL €325 (US$444) US$57 million B loan to support Medlife, a leading IV. INTERNATIONAL FINANCE private sector provider of healthcare services and CORPORATION long term client of IFC, and provided a US$67 million senior loan to Lidl, a discount grocery chain IFC has invested a total of US$1.37 billion in 52 with strong linkages to Romanian suppliers. In the projects, supporting around US$3.3 billion in agribusiness sector, IFC provided US$16 million in investment, since the start of its operations in senior debt to Agricover Credit IFN, a non-bank Romania. IFC’s Committed Portfolio in Romania financial institution, to finance the investment and stands at US$650 million (US$583 million working capital needs of farmers. outstanding). At present, Romania is IFC’s fourth largest country exposure in the CEU region after IFC has implemented 25 Advisory Services projects in Romania since 1990 in a variety of sectors. IFC Russia, Turkey and Ukraine, accounting for 1.8 has no active advisory programs in Romania, but is percent of the outstanding global portfolio. developing a possible PPP advisory project in the Portfolio composition is 92 percent debt and loan type quasi-equity, 4 percent equity and quasi-equity, healthcare sector. and 4 percent guarantees. There are currently no V. MULTILATERAL INVESTMENT NPLs out of a total of 32 projects. IFC has played GUARANTEE AGENCY (MIGA) an active crisis-response role in Romania. From FY09 to FY12, IFC invested approximately US$580 MIGA has guaranteed 13 projects in Romania, million of its own funds and mobilized an additional including Raiffeisen Zentralbank, Austria’s equity US$242 million in 18 projects in various sectors. investment in Banca Agricola. It also guaranteed the Particular support was provided to the financial, loans accommodated by Volksbanken Austria to renewable energy and health sectors. modernize Colţea Clinical Hospital and those provided by Raiffeisen Bank for enlarging loan IFC is targeting commitments of around operations for small- and medium-enterprises US$160 million in FY12, not including (SMEs). MIGA’s outstanding guarantee portfolio in mobilization. While vulnerabilities from the Romania consists of three contracts in the financial eurozone crisis and global economic downturn sector. At the end of FY 2010, the agency’s gross persist, IFC will continue to play a countercyclical exposure in Romania is about US$102 million role through selective private sector investments. In (equivalent to 1.4 percent of MIGA’s gross the real sector, this includes supporting projects that exposure), while the exposure net of reinsurance create jobs, increase investment in underserved amounts to about US$55 million (also equivalent to frontier regions, contribute to the growth and 1.4 percent of MIGA’s net exposure). competitiveness of local firms in promising sectors such as agribusiness and infrastructure, and improve As an investor country, Romania’s gross exposure is US$9.6 million, representing one project in Moldova’s financial and leasing sector. 4 Social Assistance System Modernization 10 HEALTH SECTOR REFORM APL 2 PROJECT Approved: December 16, 2004 Effective: June 27, 2005 Restructured: February 16, 2011(level 2) Closing: December 15, 2012(R) Financing in million US Dollars: Financier Financing IBRD Loan 80 Government of Romania 44.8 Co-financier: EIB 81.7 Total Project Cost 206.5 World Bank Disbursements, million US Dollars *: Total Disbursed Undisbursed IBRD 80 69.5 10.5 * as of March 15, 2012. Note: Disbursements may differ from financing due to exchange rate fluctuations at the time of disbursement. The Health Sector Reform 2 project continues the support provided to the Romanian Government by the World Bank in implementing key elements of the program set out in 2000 through the first Health Sector Reform project, also adding support for the rehabilitation of the maternity and neonatal care units. Project Objective: The strategic purpose of this program is to improve health in Romania, with lower morbidity and fewer premature deaths, equitable access to health services, and improved efficiency of the health system. The objectives of the project are to: (a) provide more accessible services of increased quality and improved health outcomes for those requiring maternity and newborn care and emergency medical care, and (b) to provide support for the preparation of the primary health care strategy. Key Expected Results and Current Achievements: Project interventions in the areas of mother and child care and emergency services are targeted at priority areas of preventable morbidity and mortality, and are expected to contribute to improving the health status for conditions where Romania lags behind other EU recent member countries.  In the area of mother and child care, the project supports the procurement and delivery of medical equipment for the entire network of maternities, as well as the training of the medical staff (both doctors and nurses) in order to improve the quality of services delivered. A new referral system was developed, and its implementation is well under way. The Maternal Mortality Rate decreased from 0.24 percent in 2004 to 0.14 percent in 2009, while the Neonatal Death Rate decreased from 9.6 percent to 5.6 percent within the same time frame.  In the area of emergency health services, the Project supported the establishment of: in-take emergency units and intensive care units in the emergency hospitals, as well as the improvement of the communications for the integrated emergency dispatch centers under the EU unique call number (112). As a result, the response time for emergency services decreased for all types of emergencies. Also, the 24-hour death rate among the patients treated in the in-take rooms and then admitted to the ICU decreased from 5.78 percent to 3.67 percent. 11 SOCIAL ASSISTANCE SYSTEM MODERNIZATION Approved: May 26, 2011 Effective: N/A Closing: September 30, 2014 Financing in million US Dollars: Financier Financing IBRD Loan 710.4 Government of Romania 0 Co-financier: 0 Total Project Cost 710.4 World Bank Disbursements, million US Dollars*: Total Disbursed Undisbursed IBRD 710.4 0 710.4 * as of March 15, 2012. Project Objective. The project aims to improve the overall performance of Romania’s social assistance system by strengthening performance management, improving equity and administrative efficiency, and reducing error and fraud. Key Expected Results and Current Achievements: The project aims at improving the performance of Romania’s social assistance system, with a focus on the Government’s main programs for low-income households, the disabled, and families with children. It is organized around four key results areas, each contributing to the project objective:  Strengthened Performance Management: Romania’s social assistance reform is implemented following a results - oriented strategy and action plan and is supported by a performance management M&E system;  Improved Equity: The share of social assistance funds going to the first poorest quintile of the population increases to 45 percent from 37.7 percent at baseline (in 2009);  Improved Administrative Efficiency: Reduction in administrative and client costs for means-tested programs by 15 percent from baseline value; and  Reduced Error and Fraud: Programs for low-income households, disability benefits and family policy programs have strengthened information systems, and oversight and control procedures including detection of error and fraud using risk-based investigation, data matching, data quality audits, and consolidated beneficiary registries. Important progress is being made with the reform and institutional development agenda. Several significant steps have been taken to consolidate, harmonize, audit, and target some key benefits. The counterparts have set an ambitious agenda for further reforms with several key steps that were anticipated during 2011. The Ministry of Finance is ready to submit a withdrawal application for seven out of 20 DLIs once the project becomes effective. Work has begun on the Terms of Reference for key elements of the technical assistance agenda that will underpin some of the more complex reform efforts, as well as an accompanying communications strategy. This technical assistance will be financed from the Social Inclusion Project. Project contribution to the CPS outcome indicators: Although not envisaged in the CPS, the Project is fully consistent with the objectives and pillars of the strategy. The project is directly linked with Pillar 3, Social and Spatial Inclusion. 12 SOCIAL INCLUSION PROJECT Approved: June 13, 2006 Effective: March 17, 2007 Restructured: Feb 16, 2011 (level 2); March 9, 2011 (level 1) Closing: February 1, 2013(R) Financing in million US Dollars: Financier Financing IBRD Loan 58.5 Government of Romania 15.9 Total Project Cost 74.4 World Bank Disbursements, million US Dollars *: Total Disbursed Undisbursed IBRD 58.5 23.8 34.7 * as of March 15, 2012. Note: Disbursements may differ from financing due to exchange rate fluctuations at the time of disbursement. In the pre-accession years, Romania took a significant number of actions to facilitate a smooth integration with the European Union. Social inclusion and poverty-reduction measures, targeted at disadvantaged groups, were meant to contribute to Romania’s continued stability, social cohesion, participation in growth, and economic integration. Romania and the European Commission signed a Joint Inclusion Memorandum on June 20, 2005, aimed at preparing the country for full participation in the ―open method of coordination‖ on social inclusion. The memorandum identified as vulnerable social groups the Roma minority, children at high risk, persons with disabilities, youth over 18 leaving the state child protection system, and victims of domestic violence. Project Objective: The overall objective is to improve the living conditions and the social inclusion of the most disadvantaged and vulnerable people in Romania by: (i) improving living conditions and social inclusion of Roma from poor settlements; and (ii) strengthening the administration of social assistance benefits. Key Expected Results and Current Achievements: Key Project outcome indicators are:  reduction in the gap between targeted settlements and neighboring communities, measured by living conditions index;  improvement of basic living conditions acknowledged by the Roma from targeted poor settlements;  increased participation of children from vulnerable groups in targeted communities to early childhood education;  compliance with the quality of standards for the social services for persons with disabilities; and  an increase in the employment rate for youth 18+ from multifunctional centers. The project is highly relevant in all respects. Almost 72.4 percent of the loan funds had been committed under selected investment subprojects relating to Roma priorities, kindergartens for children at risk, shelters for victims of domestic violence, and persons with disabilities. Thus in 130 poor Roma settlements, the living conditions are being improved as a result of the investments in community infrastructure (sanitation, water supply, roads, and electricity supply) as access to social services has increased from the establishment of community centers of social interest. The construction and rehabilitation of kindergartens (currently underway) in 27 selected communities with a majority of Roma population will improve the access of Roma children to inclusive early childhood education, preparing them for school attendance. The tenders for the construction/rehabilitation of the 38 sub-projects for social assistance services (short- and long-term care for persons with disabilities and multifunctional centers for youth at risk) were launched, but more time is needed for the completion of works. The Social Inclusion Project was restructured (reallocation of savings to support further improvement in community infrastructure in Roma settlements and other activities supporting the reforms of the cash benefits transfers). 13 ROMANIA IRRIGATION REHABILITATION AND REFORM PROJECT Approved: July 31, 2003 Effective: April 29, 2004 Closing: June 30, 2012 (R) Financing in million US Dollars: Financier Financing IBRD Loan 80.00 Government of Romania 20.65 Beneficiaries 2.33 Total Project Cost 102.98 World Bank Disbursements, million US Dollars *: Total Disbursed Undisbursed IBRD 80.0 70.0 11.9 * as of March 15, 2012. Note: Disbursements may differ from financing due to exchange rate fluctuations at the time of disbursement. Irrigation is vital to Romanian agriculture because it offsets the rain deficit that amounts to about 200-350 mm in the country’s semi-arid southern and eastern regions. A large area was equipped for irrigation during the socialist regime (30 percent of arable land), but much of it is uneconomical under the market economy because of the high energy consumption required for pumping water to high terraces and significant water losses. Land reform enabled the restitution of land to previous owners, but led to severe fragmentation of land holdings, making it difficult to apply modern farming and irrigation practices. The project established water users organizations (WUO) as part of a structural sector reform including institutions and financing systems. Project Objective: The primary objectives of the project are to: (a) achieve more economic use of irrigation resources through changes in behavior of farmers and the Land Reclamation Agency; and (b) increase agricultural productivity in the project area. Key Expected Results and Current Achievements:  Component 1 is rehabilitating primary irrigation infrastructure on about 100,000 ha in four schemes (―project areas‖), eight major pumping stations covering about 90,000 ha, and tertiary infrastructure owned by WUOs covering about 150,000 within and outside project area. To date, over 75 percent of the above targets have been met and, as a result, energy efficiency increased by 27 percent due to both improved pumps parameters and reduction of water losses. It is expected that by project-end, energy efficiency will increase, on average, by 30 percent in each scheme.  Component 2 is supporting institutional development of the sector through development and strengthening of at least 150 WUOs, reform of irrigation financing, reform of the irrigation agency, and support to the Ministry of Agriculture and Rural Development. To date, 435 WUOs have been established covering over 1 million ha, of which the project provided support to 135 WUOs covering over 300,000 ha through irrigation and office equipment, training, and communication equipment.  Component 3 will study the use of new technologies for on-farm reduction of energy and water consumption applicable in Romania and demonstrate it on pilot basis. Project contribution to the CPS outcome indicators. The project is directly linked with Pillar 2, Growth and Competitiveness of CPS through its support to development of competitiveness in agriculture and also absorption of EU funds. Donor coordination: Strong collaboration with USAID and Government of The Netherlands. 14 ROMANIA HAZARD RISK MITIGATION AND EMERGENCY PREPAREDNESS PROJECT Approved: May 20, 2004 Effective: October 20, 2004 Restructuring: July 30, 2010 (level 1); Dec 9, 2010 (level 2) Closing: June 30, 2012(R) Financing in million US Dollars: Financier Financing IBRD Loan 150.00 Government of Romania 46.66 GEF 7.00 Total Project Cost 203.66 World Bank Disbursements, million US Dollars *: Total Disbursed Undisbursed IBRD 143.3 126.3 22.0 * as of March 15, 2012. Romania is severely exposed to natural disasters, particularly earthquakes and floods, causing economic and human losses. Since 1908, 14 earthquakes of magnitude VII or greater and 18 major floods were recorded, affecting over 2 million people and causing massive economic losses. The 1977 earthquake, measuring 7.2 on the Richter scale, resulted in economic losses well in excess of US$2 billion, while the 2005 flood caused damages estimated at over EUR 1 billion, affecting a large area of about 6,500 km2, and damaged more than 45,000 houses. In 2005-2010, floods caused damages estimated at over EUR 2 billion. Romania also faces risk of water pollution from mining accidents. Project Objective: The project objective is to assist the Government in reducing environmental, social, and economic vulnerability to natural disasters and catastrophic mining accidental spills of pollutants through: (i) strengthening institutional and technical capacity for disaster management and emergency response by upgrading communication and information systems; (ii) implementing specific risk reduction investments for floods, landslides, and earthquakes; (iii) improving safety of selected water-retention dams; and (iv) improving management and safety of tailings dams and waste dump facilities on a pilot basis. Key Expected Results and Current Achievements:  Under Component A, an Emergency Management Information System (EMIS) is under implementation, a public awareness and preparedness campaign was prepared, and technical work and institutional framework for launching of the Romanian Catastrophe Insurance Program (RCIP) was undertaken. RCIP is active and insurance policies subscribed.  Under Component B, to assist the Government in reducing seismic vulnerability of at least 40 priority technical and social infrastructure through the retrofitting of at least 40 key structures (hospitals, public administration, emergency response facilities, education facilities). To date, 23 buildings have been finished and construction works are underway for another 17.  Under Component C, to reduce flood risk and vulnerability in 10 critical areas in Romania, to improve safety of four large and three small dams to function as designed, and to map and model the risk of landslides in order to reduce losses and provide for better land use planning tools. Works for all flood protection sites and safety of five dams have been completed.  Under Component D, the reduction of risk of water and soil contamination and loss of human and aquatic life from catastrophic mining accidental spills of pollutants is supported by the rehabilitation of at least five tailings management facilities. The global environmental objective to demonstrate and provide for replication for the reduction of catastrophic accidental spills of trans-boundary pollution loads from mine operations flowing into the Danube and Black Sea basins is supported by the development of a computer-based monitoring system applicable in the mining sector. Project contribution to the CPS outcome indicators: Linked with Pillar 2, Growth and Competitiveness through support to reduction of environmental, social, and economic vulnerabilities to natural and technological disasters. 15 MODERNIZING AGRICULTURAL KNOWLEDGE AND INFORMATION SYSTEMS PROJECT Approved : November 16, 2004 Effective: June 24, 2005 Restructuring: September 14, 2010 (level 1) Closing: September 25, 2012(R) Financing in million EUR: Financier Financing IBRD Loan EUR 40.6 IBRD Loan US$ 43.9 Government of Romania 18.2 Total Project Cost EUR 58.8 World Bank Disbursements, million US Dollars *: Total Disbursed Undisbursed IBRD 43.9 28.9 15.0 * as of March 15, 2012. Project Objective. The development objective of the Modernizing Agricultural Knowledge and Information Systems (MAKIS) project is to help Romania comply with the agricultural acquis communautaire and to help the agrifood sector take advantage of the benefits and opportunities arising from EU membership. Key Expected Results and Current Achievements: The primary beneficiaries are small- and middle-sized farmers with the potential to become commercial. The project impact would be measured in terms of:  better implementation of the inspection control measures in food safety matters;  increased access to and adoption of improved farm practices, marketing, and post-harvest technologies;  effective provision of EU agricultural supports funds (CAP payments). The intermediary results of the project demonstrate steady progress towards achieving most project targets. For example:  three Border Inspection Posts have been constructed and equipped in accordance with EU specifications to assure the safeguarding of the European Food Safety Standards at Romania’s external EU borders;  regional laboratories for food safety have been established;  investments in phyto-sanitary units throughout the country to improve implementation of food safety controls;  significant reform in the structure and governance of agricultural research;  agricultural research institutions were transformed into National Research Institutes, they are now internationally recognized and successfully competing on the European market. The institutes are also generating substantial revenue through third-party funding;  fundamental reform of the Agricultural Research Law, to include improved research sector oversight and coordination, and the provision of core-funding for public good elements generated by these institutes;  1.3 million farmers and rural entrepreneurs have been provided with effective knowledge and advisory service, particularly in the area of EU common Agricultural Policy requirements. The main project activities still to be implemented are the rehabilitation/construction works at the research institutes supported under the project and procurement of equipment for four agricultural research institutes. Project contribution to the CPS outcome indicators The project contributes to the objectives of promoting knowledge-based economic growth, building institutional capacity to meet EU requirements and address the competitive challenges faced by the agricultural sector, and providing opportunities for farmers and agro-processors to access European markets. Donor coordination, if any The project has provided highly relevant assistance to Romania for complying with its EU agricultural accession and membership obligations and the absorption of EU rural funds. Further, assistance to the Paying Agency (APIA) is being provided in response to deficiencies in the management of EU CAP funds identified by the European Commission. 16 ROMANIA INTEGRATED NUTRIENT POLLUTION CONTROL PROJECT Approved: October 30, 2007 Effective: December 8, 2008 Closing: December 31, 2013 Financing in million EUR: Financier Financing IBRD Loan 50 IBRD Loan US$ 68.1 Government of Romania 1.1 Beneficiaries 5.06 GEF Grant 5.5 Total Project Cost 81.6 World Bank Disbursements, million US$ *: Total Disbursed Undisbursed IBRD 68.1 9.8 58.3 * as of March 15, 2012. Romanian agriculture is dominated by individual and household farms, around 4 million agricultural holdings of less than 1 ha to 2,000 ha. Few households have controls to prevent direct seepage of effluents into the soil and groundwater. Small- and medium-size farms typically do not take into account environmental impacts, and there is a lack of awareness to comply with the Nitrates Directive, which requires compliance in order to qualify for farm subsidy payments in Nitrate Vulnerable Zones (NVZ). The combination of underdeveloped sanitation, poor livestock management, and a large number of small farms results in significant nitrate and microbial contamination of shallow groundwater. Project Objective. The Integrated Nutrition Pollution Control loan and associated Global Environment Facility (GEF) grant will help Romania meet the EU Nitrates Directive requirements by reducing pollution discharge into bodies of water and strengthening institutional and regulatory capacity. The overall development objective is to support the Government of Romania to meet the EU Nitrates Directive requirements by reducing nutrient discharges into water bodies, promoting behavioral change at the communal level, and strengthening institutional and regulatory capacity. The global environment objective of project is to reduce over the long-term, the discharge of nutrients into water bodies leading to the Danube River and Black Sea through integrated land and water management. Key Expected Results and Current Achievements: The proposed interventions will build on the successes of a pilot activity in Calarasi County, and help to implement priority actions identified in the Black Sea-Danube Strategic Partnership Nutrient Reduction Investment Fund, the Danube River Strategic Action Plan, and the Danube River Basin Pollution Reduction Program supported by the GEF. The project’s key outcomes include:  At least 80 percent of targeted NVZs show a 10 percent reduction in nutrient discharge in water bodies.  Around 50 percent of the population in the project area adopting preventative and remedial measures to reduce nutrient discharges.  Improved inter-governmental coordination and capacity to assess, monitor, and report on progress with implementation of the EU Nitrates Directive. The project will finance investments in handling the animal waste, in more than 70 NVZs; investments in wastewater in 10-12 NVZs, as well as public awareness campaigns and activities for promotion of good agricultural practices in order to reach farmers with more practical and replicable approaches – e.g. the nutrient management plans at farm level. It will also test/demonstrate the feasibility of biogas/energy co-generation from manure/organic household waste. Project contribution to the CPS outcome indicators: The project is directly linked with Pillar 2, Growth and Competitiveness of CPS through its support to EU convergence goals through more efficient agriculture, and for meeting EU climate change targets. Donor coordination, if any: The nitrates reduction investments were identified as an urgent priority by the Ministry of Environment and Forests (MEF) and were highlighted in an MoU between the Prime Minister, the Ministry of Public Finance, and the MEF as a high priority for IBRD funds. The GEF has also cleared eligibility of a concept for approximately US$5.5 million under the Danube Black Sea Strategic Partnership to provide incremental support for nutrient control measures under the proposed project. 17 COMPLEMENTING EU SUPPORT FOR AGRICULTURAL RESTRUCTURING PROJECT Approved : November 27, 2007 Effective: March 9, 2009 Restructured: March 9, 2011 (level 2) Closing: June 30, 2013 Financing in million EUR: Financier Financing IBRD Loan 43.4 IBRD Loan US$ 59.1 Government of Romania 3.7 Total Project Cost 47.1 World Bank Disbursements, million US$ *: Total Disbursed Undisbursed IBRD 59.1 7.4 51.7 * as of March 15, 2012. Note: Disbursements may differ from financing due to exchange rate fluctuations at the time of disbursement. Project Objective: The objective of the Complementing EU Support for Agricultural Restructuring (CESAR) Project is to facilitate market-based farm restructuring by enhancing the ability of farmers, farm family members, and farm workers to manage their assets and income. Under this overarching objective, the CESAR project helps Romania in completing the property title registration of land assets in rural areas to improve the security of land property rights and reduce transaction costs on rural land markets. Equally important, the project assists the Romanian government in improving the delivery of guidance services that enable the agricultural population to more sustainably manage its income and assets and thus contribute to the absorption of available national and EU support programs. Key Expected Results and Current Achievements: Project impact will be measured in terms of:  Improvement of property rights security through implementation of systematic survey and registration of properties in selected rural localities;  Enhanced functioning of rural land markets;  More effective provision of socio-economic guidance services to the agricultural population, enabling it to make informed decisions about income opportunities and asset transfers and to access national and EU CAP support programs. The project was restructured in March 2011to revise the project targets, cancel an amount of EUR 4.3 million, and revise the Socio-Economic Guidance Component to follow up on implementation of recommendations emerging from the Functional Review of Ministry of Agriculture and Rural Development undertaken in 2010. 18 MINE CLOSURE, ENVIRONMENTAL AND SOCIOECONOMIC REGENERATION PROJECT Approved: December 16, 2004 Effective: June 27, 2005 Restructuring: May 6, 2010 (level 2) Closing: May 30, 2012(R) Financing in million US Dollars: Financier Financing IBRD Loan 88.9 Government of Romania 29.5 Total Project Cost 117.4 World Bank Disbursements, million US Dollars *: Total Disbursed Undisbursed IBRD 88.9 74.3 14.6 * as of March 15, 2012. Note: Disbursements may differ from financing due to exchange rate fluctuations at the time of disbursement. The communist policy of economic self-sufficiency since the 1950s created an excess of mines opened in Romania without consideration of viability or environmental concerns. By the late 1990s, many of these mines had become a major drain on resources, but bringing the production to a halt was expected to produce significant adverse environmental and social consequences. In 2004, a new Mining Sector Strategy was approved to transform the mining industry according to EU standards. One of the objectives required a considerable downsizing of the mining sector. Since closures and downsizing threatened both the health and the livelihoods of people in surrounding communities, the Mine Closure, Environmental and Socioeconomic Regeneration Project was designed to ensure that these could be done in a socially and environmentally sustainable way. Project Objective: The development objective of the project was to strengthen the Government’s ability to undertake mining sector reform. The Project has two components: The Mine Closure and Environment component aims to: (i) complete the closure and rehabilitation of mine sites where production is terminated and thereby reduce environmental impacts and the environmental legacy of the mining sector in line with accession requirements for EU, and return former mine land to other social and economic purposes; and (ii) improve the mining sector environmental performance. The Socio-Economic Regeneration component is designed to: (i) scale up the job creation measures implemented under the first loan; (ii) support local development activities through community capacity building and financing of economic infrastructure and social services; and (iii) strengthen the Borrower’s capacity to implement the socio-economic regeneration program. Key Expected Results and Current Achievements: As of October 31, 2011, under the socioeconomic regeneration component, the following has been achieved: (i) over 7,666 jobs created, (ii) 187 localities supported to develop local economic development plans, (iii) 522 small grants schemes and 189 social development schemes for mining communities successfully implemented; (iv) 21 municipal infrastructure projects completed; (v) 56 percent of local public authorities from the operating area have issued strategic development plans in a participatory manner; (vi) 62.1 percent of assisted communities in the operating area are funding the priorities identified in the strategic plans, by accessing national, and EU programs; and (vii) an average 79 percent increase in the local budget revenues in the operating area after the mining companies stopped contributing to local budgets as a result of mine closure. The following has been achieved under the mine closure component: (i) the mine closure manual and technical norms and regulations for the closure works were revised to enable closure implementation according to EU and international best practices; (ii) 26 mines and mining enterprises have been permanently closed in an environmentally and technically sound manner; and (iii) 467 hectares of land previously under mining company usage has been rehabilitated and transformed for public or private use in localities. In addition, 658 people have received training and capacity building in International Federation of Consulting Engineers conditions of contract management, and environmentally sound mine closures. Key Partners: The Ministry of Economy, Trade, and Business Environment (MEC) has overall responsibility for implementing the strategy. 19 ROMANIA - KNOWLEDGE ECONOMY PROJECT Approved : November 29, 2005 Effective: January 25, 2006 Restructured: June 25, 2010 (level 2) Closing: February 28, 2013 (R) Financing from all co-financiers, million US Dollars: Financier Financing IBRD 60.00 Government of Romania 0.00 Total Project Cost 60.00 World Bank Disbursements, million US Dollars *: Total Disbursed Undisbursed IBRD 60.00 35.4 24.6 * as of March 15, 2012. Note: Disbursements may differ from financing due to exchange rate fluctuations at the time of disbursement. The Government of Romania has launched an ambitious program advancing an information society and fulfilling the requirements of e-Europe+. The focus of the program is to facilitate Romania’s progression towards a knowledge-based economy and to work towards bridging the country’s digital divide with EU countries. Project Objective is to accelerate the participation of knowledge-disadvantaged communities in the knowledge-based society and economy in Romania. The Project Components addressed a range of interconnected sector issues through (i) Access to ICT in Disadvantaged Communities and Improved Digital Literacy; (ii) Development and Promotion of e-Government Services; and (iii) Promotion of e-Commerce and Innovation Support for Micro-, Small- and Medium-Size Enterprises (MSMEs). Key Expected Results and Current Achievements:  The first stage towards meeting the project objective (Access) was achieved: ICT access was provided to people in about 44 percent of most knowledge-disadvantaged communities in Romania. Thus 255 local community electronic networks (LCeNs) were established in 208 communes and 47 small cities, covering about 1.8 million people. Selection of communities was done through a competitive and transparent selection procedure, built on community ownership commitments.  Activities planned under the last two project stages (Use – Benefits) are in different status of implementation and preparation. Significant progress has been achieved in increasing the benefits for communities by leveraging access to information provided by the LCeNs with provision of technical assistance. Thus, communities have been supported to prepare and submit local development projects for financing from EU structural funds. 741 projects have been prepared, of which 430 were declared eligible by the EU structural funds’ Managing Authorities with a total value of EUR 175 million. The project is also contributing to enhancing secondary education through the integration of ICT into the classroom: 93 percent of the schools in the 255 communities now have Internet access; have enhanced their certified digital skills (4,476 students); and ICT policy in education has been approved and digital competence is required in the draft new education law as a key competence for students. The e-community portal launched in 2009 has progressively developed content (number of users increased to 9,000). The project also provided matching grants (of about US$1.2 million) to 41 firms to implement e-business solutions in their organizations. Project activities have started for the implementation of the G2C e-government service for the online registration of the civil status information. Key Partners: Ministry of Communication and Information Society, which is responsible for overall project implementation, the Ministry of Education, Research, Youth and Sports and the Ministry of Administration and Interior, 255 Local Public Administrations, the European Commission. 20 JUDICIAL REFORM PROJECT Approved: December 15, 2005 Effective: May 26, 2006 Restructured : October 6, 2010 (level 2) Closing: March 31, 2013 (R) Financing in million US Dollars: Financier Financing IBRD Loan 130.00 Government of Romania 41.86 Total Project Cost 171.86 World Bank Disbursements, million US$ *: Total Disbursed Undisbursed IBRD 130 48.6 81.4 * as of March 15, 2012. Note: Disbursements may differ from financing due to exchange rate fluctuations at the time of disbursement. Institutional reforms, similar to economic reforms, have accelerated since 2000 after a slow start early in the transition period. When the Romanian government embarked on an ambitious economic development program to enhance economic growth, reduce poverty, and integrate smoothly into the European Union, it was evident that sustained progress in growth and investment also requires institutional reforms. A weak judicial system, poor accountability, and widespread perception of corruption were seen as liabilities to business and therefore to private sector investment and growth. Project Objective. The project’s development objectives are: (i) improvement of judicial efficiency and transparency; (ii) upgrading of court infrastructure and automation; and (iii) institutional building for the main judicial governing bodies, all with the purpose to improve accountability of the judiciary and address corruption concerns. Key Expected Results and Current Achievements: In order to reach the goals of efficiency and accountability, the following areas require support under the project:  Rehabilitation of at least 15 court houses in line with international standards;  Improvement of judicial efficiency in pilot courts through a program of case delay reduction  Implementation of a Resource Management System (RMS) for the judiciary, to assist the Ministry of Justice (MoJ) strengthen its overall administrative oversight of the courts and the financial management of the sector;  Institution building for the main judicial governing bodies (e.g. Superior Council of Magistrates, High Court of Cassation and Justice and Ministry of Justice). To date:  Ten contracts for rehabilitation of judicial buildings are completed, four contracts are on-going in Pitesti, Tulcea, Iasi, Sibiu, and one in Oradea is under procurement.  All four new codes – Civil, Criminal, Civil Procedure, and Criminal Procedure codes – have been adopted by the Parliament; and TA for impact assessment of their implementation was provided to MoJ. Most technical assistance assignments are completed. Two assignments added in 2010: Strengthening the Insolvency mechanism in Romania, and Information System for Audio Recording of Courts Proceedings, are on track. The Bank has conducted an evaluation of the legal and institutional framework for creditor-debtor regimes and insolvency system.  Objective and merit-based tests are in place for all new magistrates recruitments; new teaching techniques including e- learning and distance learning systems are being used for training the magistrates and court clerks. Project contribution to the CPS outcome indicators: The project contributes to CPS Pillar 1 – Public Sector Reform. Its policy reform agenda mirrors the Government’s priorities outlined in the Strategy for the Development of Justice as a Public Service 2010-20145 and responds to the EU’s Cooperation and Verification Mechanism benchmarks6. The project will also help with the four new codes. 5 The document ―Strategy for the Development of Justice as a Public Service 2010-2014‖ (April 2010) identifies the successful completion of this project as one of the important goals of the Government. 6 When Romania joined the European Union in January 2007, a Co-operation and Verification Mechanism (CVM) was set up by the EC to help the new Member State engage in far reaching judicial reform sand the fight against corruption. 21 MUNICIPAL SERVICES PROJECT Approved : July 13, 2006 Effective: May 31, 2007 Closing: June 30, 2011; March 31, 2012 (R) (only for part I Bucharest Municipality) Financing in million US dollars: Financier Financing IBRD Loan 131.7 Beneficiaries (Municipality of Bucharest/Municipality of Arad) 38.9 Total Project Cost 170.6 World Bank Disbursements, million US Dollars *: Total Disbursed Undisbursed IBRD 131.7 131.7 - * as of March 15, 2012. Note: Disbursements may differ from financing due to exchange rate fluctuations at the time of disbursement. As an EU member, the Romanian Government has adopted the relevant environmental protection legislation–specifically its water and wastewater directives. The investment costs to meet the EU directives for water and wastewater services are estimated at EUR 5.6 billion and EUR 9.5 billion respectively (by end-2018). These costs stem from the need for investments to increase the coverage of piped water supply, develop sewerage networks, and build wastewater treatment plants. Project Objective: The Municipal Services Project was designed to assist Romania in meeting EU environmental directives in the water and wastewater sector, thereby improving the quality and coverage of water and wastewater services. Key Expected Results and Current Achievements: The project’s objective will be met through: Tthe support of infrastructure development in the municipalities of Bucharest and Arad to improve water and wastewater service and storm water management; and  Preparation of priority water and wastewater projects in 10 counties. The proposed projects will be submitted for financing by EU Structural and Cohesion grants along with other co-financing. In 2006 at the time of project approval, about 20 percent of the 2.2 million residents in Bucharest did not have piped water supply and relied on water from wells, with quality standards far below those set in EU legislation. The project included investment to extend water supply coverage to those areas of the city using groundwater and not connected with sewerage, and using low-quality septic tanks (increasing the risk of contamination of groundwater). The closing date for this component in Bucharest was extended from June 30, 2011 until March 31, 2012 to enable the Municipality to complete the remaining civil works. In Arad, a city with a population of 190,000, about 90 percent of the citizens in the project areas did not have access to sewerage networks. The project supported the development and expansion of the sewerage network. It also provided investments in storm water drainage to reduce flooding in both cities. The project also aimed at supporting Romania’s efforts to meet its commitment to the EU through the identification and full preparation of a pipeline of priority water and wastewater investments for financing by EU Structural Funds. Project contribution to the CPS outcome indicators: The Project is directly linked with Pillar 2, Growth and Competitiveness of CPS through its support to EU convergence goals through more efficient water infrastructure, and absorption of EU funds. Donor coordination, if any: The component for preparation of priority investments in 10 counties is coordinated, by the main client (the Ministry of Environment), with JASPERS and the European Commission (DG Regio). 22 ROMANIA: FUNCTIONAL REVIEWS (PHASE 1) Key Dates Start of FBS Program: March 2010 Completion Date: March 2011 The objective of the FBS was to help the Government of Romania (GOR) to develop a series of medium-term action plans to strengthen the effectiveness and efficiency of public administration in the six key sectors or functions that supported Romania’s implementation of the Europe 2020 Strategy. In its Memorandum of Understanding with the GOR in June 2009, the European Commission (EC) expressed the aim of seeing Romania undertake structural reforms that were to be identified with assistance from the World Bank through functional reviews (FRs) of public administration. The EC envisioned 12 functional reviews in two stages. This FBS represented the first of the two stages, and it included the following six sectors: transport, education, agriculture and rural development, public finance, center of government, and the Competition Council. To achieve this objective, the program considered the following priority areas:  Analyzing sector practices and constraints with respect to strategic and performance management, organizational structure and governance, budget management, human resource management, and other internal management systems and practices that were relevant in order to understand the primary barriers to performance in each sector/function.  Conducting the work in a collaborative manner to ensure the proposed action plans took into account the strategic priorities of the ministry and the relevant political economy concerns. Results: The prime minister of Romania hosted and moderated an inter-ministerial conference in October 2010, at which the relevant ministers, World Bank experts, the EC, and the IMF discussed key recommendations and next steps. By December 2010, the government had approved reform action plans based on the FRs, which included timelines, estimated resource needs, and levels of priority. The actions plans were submitted to the EC, and the GOR recently agreed to report quarterly to the EC on implementation progress. Impact: Each of the ministries and agencies has submitted requests for technical assistance to help them implement key elements of their action plans. The GOR’s Letter of Intent to the IMF, as part of the Stand -By Agreement, included reform actions that were inspired by the FRs. A few specific actions have already been taken in the sectors, including: (i) the General Secretariat of the government has begun to prepare an annual work plan to reflect legislative priorities and will launch a project to improve capacity to monitor implementation of government-wide reform activities; (ii) the Ministry of Education has revised the per capita education formula and advanced the methodologies for implementation of the new education law; (iii) the Ministry of Finance is preparing a project to modernize tax administration as a means to reduce the compliance burden on taxpayers and increase tax yields; (iv) the Ministry of Transport is requesting technical assistance to improve the strategic planning capacity of the sector and the governance of state companies; and (v) the Ministry of Agriculture has obtained financing to improve performance monitoring across its network of programs. Key Partners: Romania’s General Secretariat of the Government (GSG) was the primary partner for the Bank and coordinated the functional reviews on behalf of the government and in collaboration with the EC’s Secretariat General (SG). In each sector, the relevant minister provided his or her own leadership team to offer day-to-day assistance to the Bank. There was also close collaboration between the Bank and the EC, especially those Directorate Generals that had specific policy expertise in a given sector (e.g., DG Regio for issues on transport, DG Competition for competition policy, etc.) 23 ROMANIA: FUNCTIONAL REVIEWS (PHASE 2) Key Dates Start of FBS Program: November 2010 Completion Date: July 2011 The objective of the FBS was to help the Government of Romania (GOR) to develop a series of medium-term action plans to strengthen the effectiveness and efficiency of public administration in the six key sectors or functions that supported Romania’s implementation of the Europe 2020 Strategy. In its Memorandum of Understanding with the GOR in June 2009, the European Commission (EC) expressed the aim of seeing Romania undertake structural reforms that were to be identified with assistance from the World Bank through functional reviews (FRs) of public administration. The EC envisioned 12 functional reviews in two stages. This FBS represented the second of the two stages and it included the following six sectors: health, labor and social protection, regional development and tourism, environment and forestry, energy and business environment, and higher education, research and innovation. To achieve this objective, the program considered the following priority areas:  Analyzing sector practices and constraints with respect to strategic and performance management, organizational structure and governance, budget management, human resource management, and other internal management systems and practices that were relevant in order to understand the primary barriers to performance in each sector/function  Conducting the work in a collaborative manner to ensure that the proposed action plans took into account the strategic priorities of the ministry and the relevant political economy concerns Results. The government approved the reform action plans based on the FRs, which included timelines, estimated resource needs, and levels of priority. The actions plans were submitted to the EC, and the GOR recently agreed to report quarterly to the EC on implementation progress. Some ministries have begun to seek technical assistance to address some of the barriers to the absorption of European Union (EU) structural funds that were identified in the FRs. Recommendations from the FR for energy have been used in the government’s Stand-by Agreement with the IMF. Impact. A few specific actions have already been taken in the sectors. For example, the GOR resumed the implementation of energy reform, which had stalled in 2007. The GOR and electricity suppliers worked toward a solution to clear CFR Railways arrears, leading to an improved cash flow for electricity distributors and the elimination of penalties for the railway company. In addition, institutions administering social assistance (SA) were restructured, which improved their capacity to design better targeted SA programs and to fight against error, fraud, and corruption in the safety nets sector. The Ministry of Health is revising the basic package of health services so as to exclude goods and services that are not cost efficient, and is moving forward on the reduction of hospital beds. Finally, the Ministry of Regional Development is requesting technical assistance to help improve the absorption of EU funds. Key Partners. Romania’s General Secretariat of the Government (GSG) was the primary partner for the Bank and coordinated the functional reviews on behalf of the government and in collaboration with the EC’s Secretariat General (SG). In each sector, the relevant minister provided his or her own leadership team to offer day-to-day assistance to the Bank. There was also close collaboration between the Bank and the EC, especially those Directorate Generals that had specific policy expertise in a given sector (e.g., DG Regio for issues on regional development, DG Environment for environmental policy, etc.). 24 Annex on AAA Synopsis Analytical and Advisory Work (AAA) complements Bank lending  In 1995-2002, the Bank’s AAA focused on core diagnostics related to transition to the market economy, restructuring, and privatization of the financial and enterprise sectors.  Later, the AAA has diversified its functions to due diligence for the Bank (macro-monitoring, poverty profiling and monitoring, CPARs, etc), development of policy options and advice for the Government (in sectors including education, social protection, energy, transport).  In 2005, the AAA program provided inputs to lending or serving as a platform for dialogue with the (new) Government.  AAA work was particularly useful in the pre-accession period (2006-2007). At that time Romania was interested in the Bank helping identify the next generation of policies and issues that would be important in the future, such as the Challenges of EU Accession in Romanian and the Policy Note Implementation of Regional Development and Integration with Other EU Operational Programs.  Under the CPS 2009-2013, the AAA program is complementing the DPL series, helping the Government design and implement specific reforms. A Public Expenditures Review focused on identifying opportunities for budget savings and efficiency gains in major expenditures categories of the public budget, including education, health, transport and agriculture. Later, a PER update (FY09) focused on improving budget formulation and execution. In addition a Financial Sector Assessment (FY09) and a Financial Sector TA contributed toward meeting the mid-term CPS milestones in the Financial Sector.  In 2010, Romania participated in the regional Diagnostic Review on Consumer Protection and Financial Literacy. The work was carried out closely with the EC.  In March 2010, the Bank signed the first Fee Based Service agreement with Romania for a series of Functional Reviews for 12 ministries or sectors of the Romanian administrations, financed jointly from EU Structural Funds and Government funds, and supporting reforms for improved fiscal sustainability and operability in line with the EC requirements.  The FY11 AAA included, in addition to the Functional Reviews, the Fiscal Decentralization and Tax Administration TA that would feed into a new operation to help authorities establish more effective revenue administration procedures; one TA to the Health and Education ministries to support the design of specific DPL reforms (introduction of a co-payment system with exemptions for the poor; a reform of education financing in primary and secondary education and, at tertiary level, the introduction of a Student loans scheme); TA for development of a Student Loan Scheme; a newly added Accounting and Audit Strengthening TA, and a series of policy Notes on Growth and Competitiveness.  The Phase 1 of the FBS Functional Reviews was completed in November 2010 (reports discussed and accepted by the Government). FBS Phase 2 Functional Reviews (Environment & Forestry, Ministry of Economy & Energy, Health, Labor and Social Protection, Regional Development, Higher Education & Research and Development) is completed.  For FY12, in addition to the series of FBS TAs on the Modernization of the Administration program, the following activities are planned: the continuation of the Policy Notes on Growth and Competitiveness, Citizens Scorecard/Social Accountability ESW, and Climate Change TA. 25 Annex Mapping Country Needs and World Bank Program 26