Procurement Plan Community Development Program Support Project – Phase III (Programme National de Développement Participatif – Phase III) I. General 1. Bank’s approval Date of the procurement Plan [Original: February 2016]: Revision of Updated Procurement Plan, May 05, 2017 2. Date of General Procurement Notice: February 15, 2016 3. Period covered by this procurement plan: The procurement period of project covered from year January to December 2017 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Procurement Method Prior Review Threshold Comments US$ 1. ICB and LIB (Goods) Above US$ 1,500,000 All 2. NCB (Goods) None 3. ICB (Works) Above US$ 5 million All 4. NCB (Works) Above US$ 5 million 5. DC (Non-Consultant Services) none 2. Prequalification. Not applicable. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: Procurement (works, goods and services) for subprojects of communes, such as small infrastructure, social infrastructure, classrooms, health centers, community halls, , minor works or rehabilitation, will be procured on the basis of community participation in accordance with the clause 3.19 of the World Bank Procurement Guidelines (Community Participation in Procurement), and the Guidelines for Simplified Procurement and Disbursement for Community-Based Investments (March 3, 1998) detailed in the specific manual or guidelines to communes approved by the bank. 4. Reference to (if any) Project Operational/Procurement Manual: Guide des Acteurs intervenant dans le processus de passation et de l’exécution des marchés communaux financés par le PNDP – Juin 2010, révisé en Janvier 2016 5. Any Other Special Procurement Arrangements: 5 ICB works packages will be financed under - retroactive financing 6. Summary of the Procurement Packages planned during the first 18 months after project effectiveness (including those that are subject to retroactive financing and advanced May 05, 2017 procurement) 1 2 3 4 5 6 7 Ref. Description Estimated Packages Domestic Review Comments No. Cost Preference by Bank US$ million (yes/no) (Prior / Post) Summary of 2.328 2 No Prior the ICB (Goods) Summary of 0.700 1 No Post 1st contract for the NCB Prior Review (Goods) III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Threshold Comments 1. Competitive Methods (Firms) Above US$ 500,000 2. Single Source (Firms) Above US$ 500,000 Justification prior reviewed by bank 3. Individual Above US$ 200,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: not applicable 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 7 Ref. Description of Assignment Estimated Selection Review by Expected Comments/ No cost (US$ method the Bank proposals completion equivalent) (prior/post) submission date date For the first 1 Support for the preparation Post year 20,000 IC 21/08/15 of Statutory Instruments 24/09/15 (30 days) 2 Study on the definition of a 40,000 Post CQS 22/04/16 planning methodology at 25/01/16 (03 months) regional level 3 Study on the planning 40,000 CQS Post 25/01/16 22/04/16 process in the communes and (03 months) urban communities May 05, 2017 1 2 3 4 5 6 7 Ref. Description of Assignment Estimated Selection Review by Expected Comments/ No cost (US$ method the Bank proposals completion equivalent) (prior/post) submission date date 4 Study for the establishment 20,000 IC Post 19/02/16 24/03/16 of local public service in (30 days) communes 5 Study on the sustainability of 40,000 CQS Post 11/04/16 18/07/16 the PNDP (03 months) 6 Evaluation of the 40,000 CQS Post 13/07/16 18/10/16 decentralization process in (03 months) Cameroon/supports to the finalization of the national strategy for decentralization 7 Selection of a consultant to 20,000 IC Post 20/11/15 30/12/15 develop the practitioner's (30 days) manual for the 31 communes 8 Municipal staff training 100,000 SSS Prior NA Service provided by the CEFAM (Convention) 9 Training of procurement 100,000 SSS Prior NA Service commissions provided by ARMP (Convention) 10 Financial Audits of the 150,000 LCS Post 10/03/15 Contract for 2 project for the first 2 years years 11 legal advice 10,000 IC Post 28/12/15 Annual contract 12 Design and development of 90,000 CQS Post 12/02/16 22/08/16 an internet portal on the (06 months) PNDP and communes 13 Translation of documents 90,000 CQS Post 11/05/16 20/08/16 (03 months) 14 Technical audit 80,000 QCBS Post 16/02/16 31/08/16 (06 months) 15 Beneficiary assessment 50,000 QCBS Post 15/11/16 22/05/17 (06 months) 16 Environmental and Social 70,000 QCBS Post 13/12/16 26/06/17 Assessment (06 months) 17 Follow-up of training Service deployment and technical SSS Prior NA provided by 70,000 assistance to Sim_ba AIMF expert software in communes (Convention) 18 IC Post 27/05/15 Annual contract (the current 10,000 contract ends June 30, Insurance advice 2015) 19 Preparation of CDPs for the QCBS Post 01/12/16 16/04/16 80,000 31 communes (06 months) May 05, 2017 May 05, 2017 PROCUREMENT Cameroon : Community Development Program Support Project-Phase III PLAN General Information Country: Cameroon Bank’s Approval Date of the Original Procurement Plan: 2016-09-06 2019-06-27 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P144637 GPN Date: 2016-09-06 Project Name: Community Development Program Support Project-Phase III Loan / Credit No: IDA / 57180 Executing Agency(ies): PROGRAMME NATIONAL DE DEVELOPPEMENT PARTICIPATIF WORKS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GOODS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CM-PNDP-2738-GO-RFQ / Fourniture des groupes Single Stage - One IDA / 57180 A posteriori Demande de prix Open - National 0.00 Annulé 2017-02-17 2017-04-14 2017-10-11 électrogènes pour les Envelope communes sim_ba CM-PNDP-2739-GO-RFQ / Acquisition des fournitures de bureau, produits Single Stage - One IDA / 57180 A posteriori Demande de prix Limited 0.00 Annulé 2016-10-26 2016-12-21 2017-06-19 d'entretien, matériel et Envelope produits pause-café, et consommables informatiques Passation de CM-PNDP-2836-GO-UN / marchés auprès En cours Acquisition de véhicules et IDA / 57180 A priori Direct 0.00 2016-10-27 2016-11-01 2016-12-06 2017-06-04 des agences de d'exécution motos par UNOPS l'ONU CM-PNDP-2839-GO-RFQ / Single Stage - One Edition des documents à la IDA / 57180 A posteriori Demande de prix Limited 19,309.09 Achevé 2016-11-01 2016-12-27 2017-06-25 Envelope CNC CM-PNDP-2835-GO-RFB / Fourniture du mobilier de Single Stage - One IDA / 57180 A posteriori Appel d'offres Open - National 166,116.71 Achevé 2016-12-11 2016-12-16 2017-01-27 2017-02-26 2017-04-02 2017-09-29 bureau pour la CNC et les Envelope 10 CRC CM-PNDP-2736-GO-RFB / Fourniture et installation du Single Stage - One matériel informatique et du IDA / 57180 A priori Appel d'offres Open - National 0.00 Annulé 2016-11-09 2016-11-14 2016-12-26 2017-01-25 2017-03-01 2017-08-28 Envelope matériel didactique au PNDP CM-PNDP-6227-GO-RFQ / Fourniture des supports de Single Stage - One IDA / 57180 A posteriori Demande de prix Limited 8,626.13 Achevé 2017-02-09 2017-04-06 2017-10-03 communication dans le cadre Envelope du lancement du PNDP III Page 1 CM-PNDP-2932-GO-RFB / Production du bulletin trimestriel de certaines Single Stage - One IDA / 57180 A posteriori Appel d'offres Open - National 346,339.56 Signé 2016-12-12 2016-12-17 2017-01-28 2017-02-27 2017-04-03 2017-09-30 communes (10 Agences de Envelope communications au niveau régional) CM-PNDP-9661-GO-RFB / Acquisition du matériel Single Stage - One informatique (ordinateurs et IDA / 57180 A posteriori Appel d'offres Open - National 235,266.69 Signé 2017-03-22 2017-03-27 2017-04-26 2017-05-10 2017-05-24 2017-07-08 Envelope mini-réseau) pour SIM-BA dans les 184 communes CM-PNDP-9664-GO-RFB / Fourniture des groupes électrogènes dans le cadre Single Stage - One IDA / 57180 A posteriori Appel d'offres Open - National 266,817.12 Signé 2017-03-22 2017-03-27 2017-04-26 2017-05-10 2017-06-07 2017-07-22 de la mise en oeuvre du Envelope logiciel Sim_ba dans 187 communes ( Relance) CM-PNDP-9665-GO-RFB / Fourniture des plaques solaires pour Sim_ba dans le Single Stage - One IDA / 57180 A posteriori Appel d'offres Open - National 372,702.15 Achevé 2017-03-27 2017-04-01 2017-05-01 2017-05-15 2017-06-12 2017-07-27 cadre de la mise en oeuvre Envelope du logiciel Sim_ba dans 40 commune ( deuxième vague) CM-PNDP-9669-GO-RFQ / Fourniture de bureau (lot 1), produits d'entretien et Single Stage - One IDA / 57180 A posteriori Demande de prix Limited 0.00 Annulé 2017-10-28 2017-12-09 2018-12-04 matériel et produits pause- Envelope café ( lot 3) à la CNC du PNDP CM-PNDP-9671-GO-RFQ / Fourniture des consommables Single Stage - One IDA / 57180 A posteriori Demande de prix Limited 0.00 Annulé 2017-10-28 2017-12-09 2018-12-04 informatiques à la CNC du Envelope PNDP (LOT4) CM-PNDP-9806-GO-RFQ / Fourniture et installation du Single Stage - One IDA / 57180 A posteriori Demande de prix Limited 180,370.23 Signé 2017-04-22 2017-06-03 2017-06-24 mobilier de bureau au Envelope PNDP CM-PNDP-9813-GO-RFQ / Acquisition des fournitures dans le cadre de l'appui au Single Stage - One Ministère des Affaires IDA / 57180 A posteriori Demande de prix Limited 4,499.21 Signé 2017-04-22 2017-06-03 2017-06-17 Envelope Sociales pour la Journée Internationale des Peuples Autochtone (JIPA) CM-PNDP-9817-GO-DIR / Souscription pour la participation du PNDP à la Passation de Journée Africaine de la IDA / 57180 A posteriori marché de gré à Direct 0.00 Annulé 2017-03-30 2017-04-04 2017-04-25 2017-04-27 Décentralisation et du gré Développement Local (JADDEL 2017) CM-PNDP-9820-GO-RFQ / Conception et pose Single Stage - One d'affichettes sur les IDA / 57180 A posteriori Demande de prix Limited 0.00 Annulé 2017-06-23 2017-08-04 2017-08-25 Envelope comportements souhaités dans le cadre du PNDP III CM-PNDP-9822-GO-RFB / Fourniture et installation du Single Stage - One IDA / 57180 A posteriori Appel d'offres Open - National 0.00 Annulé 2017-07-07 2017-07-12 2017-08-11 2017-08-25 2017-09-08 2017-10-23 matériel informatique et Envelope didactique au PNDP Page 2 CM-PNDP-9825-GO-RFQ / Fourniture du matériel de Single Stage - One IDA / 57180 A posteriori Demande de prix Limited 0.00 Annulé 2017-04-22 2017-06-03 2017-06-17 formation (paper board) pour Envelope la CNC et les CRC CM-PNDP-9828-GO-RFQ / Fourniture de 182 téléphones Single Stage - One IDA / 57180 A posteriori Demande de prix Limited 0.00 Annulé 2017-04-22 2017-05-27 2017-06-03 portables pour le personnel Envelope du PNDP CM-PNDP-9833-GO-DIR / Convention de partenariat Passation de avec la CRTV poste IDA / 57180 A posteriori marché de gré à Direct 0.00 Annulé 2017-03-14 2017-03-19 2017-04-09 2018-04-04 nationale pour la diffusion gré des messages dans l'émission radio" Croissance Plus" CM-PNDP-9838-GO-DIR / Convention de partenariat pour la diffusion de Passation de programmes sur les stations IDA / 57180 A posteriori marché de gré à Direct 0.00 Annulé 2017-05-08 2017-05-13 2017-05-27 2018-05-22 réionales Extrême-nord, gré Nord, Adamaoua, et est de la CRTV CM-PNDP-9840-GO-DIR / Convention de partenariat avec les radios Passation de communautaires pour la IDA / 57180 A posteriori marché de gré à Direct 0.00 Annulé 2017-05-08 2017-05-13 2017-05-27 2018-05-22 difusion d'émissions sur les gré thématiques chères au PNDP III dans les quatres régions CM-PNDP-9843-GO-DIR / Passation de Acquisition des ouvrages sur IDA / 57180 A posteriori marché de gré à Direct 0.00 Annulé 2017-05-08 2017-05-13 2017-05-27 2017-06-03 la décentralisation et le gré développement local CM-PNDP-2928-GO-RFB / Production des outils de communication du PNDP 3 ( Single Stage - One IDA / 57180 A posteriori Appel d'offres Open - National 8,637.90 Achevé 2017-04-03 2017-04-08 2017-04-29 2017-05-29 2017-06-19 2017-07-10 Plaquette, Kakemonos, Envelope agenda, présentoires, pagnes, polos, t-shirts, casquette, etc) CM-PNDP-2931-GO-DIR / Passation de Edition du Magazine IDA / 57180 A posteriori marché de gré à Direct 35,168.70 Signé 2017-03-17 2017-03-22 2017-04-26 2018-04-21 Trimestriel " LES ECHOS gré DU PNDP" CM-PNDP-2837-GO-RFB / Acquisition du petit équipement (GPS et supports Single Stage - One IDA / 57180 A posteriori Appel d'offres Open - National 0.00 Annulé 2017-04-13 2017-04-18 2017-05-09 2017-06-08 2017-06-29 2017-08-13 pour le Système Envelope d'Information Géographique) pour 75 communes CM-PNDP-2929-GO-RFQ / Production de la signalétique Single Stage - One IDA / 57180 A posteriori Demande de prix Limited 0.00 Annulé 2017-03-31 2017-05-19 2017-07-03 des 11 sites du PNDP Envelope (agence de communication) CM-PNDP-11819-GO-RFQ / Accompagnement des communes d'intervention du Single Stage - One PNDP de la Région du Nord IDA / 57180 A posteriori Demande de prix Limited 30,396.26 Achevé 2017-04-10 2017-06-05 2017-12-02 Envelope dans l'édition d'un bulletin trimestriel d'informations communal Page 3 CM-PNDP-11820-GO-RFQ / Accompagnement des communes d'intervention du Single Stage - One PNDP de la Région du Nord IDA / 57180 A posteriori Demande de prix Limited 33,677.33 Achevé 2017-04-10 2017-06-05 2017-12-02 Envelope Ouest dans l'édition d'un bulletin trimestriel d'informations communal CM-PNDP-11821-GO-RFQ / Accompagnement des communes d'intervention du Single Stage - One PNDP de la Région de IDA / 57180 A posteriori Demande de prix Limited 23,070.62 Achevé 2017-04-10 2017-06-05 2017-12-02 Envelope l'Ouest dans l'édition d'un bulletin trimestriel d'informations communal CM-PNDP-11824-GO-RFQ / Accompagnement des communes d'intervention du Single Stage - One PNDP de la Région du Sud IDA / 57180 A posteriori Demande de prix Limited 39,765.30 Achevé 2017-04-10 2017-06-05 2017-12-02 Envelope dans l'édition d'un bulletin trimestriel d'informations communal CM-PNDP-11825-GO-RFQ / Accompagnement des communes d'intervention du Single Stage - One PNDP de la Région du Sud IDA / 57180 A posteriori Demande de prix Limited 28,967.73 Achevé 2017-04-10 2017-06-05 2017-12-02 Envelope Ouest dans l'édition d'un bulletin trimestriel d'informations communal CM-PNDP-7974-GO-RFB / Fourniture et installation du Single Stage - One matériel informatique et IDA / 57180 A posteriori Appel d'offres Open - National 385,850.67 Signé 2017-06-21 2017-06-28 2017-07-12 2017-07-19 2017-08-09 2017-09-23 Envelope didactique au PNDP (relance) CM-PNDP-2834-GO-RFQ / Single Stage - One Acquisition des fournitures IDA / 57180 A posteriori Demande de prix Limited 37,641.01 Signé 2016-11-25 2017-01-20 2017-07-19 Envelope pour véhicules à la CNC CM-PNDP-9803-GO-RFB / Fourniture de l'assurance Single Stage - One automobile: 31 motos, 28 IDA / 57180 A posteriori Appel d'offres Open - National 78,503.07 Signé 2017-03-10 2017-03-15 2017-04-14 2017-05-14 2017-05-28 2018-02-22 Envelope nouveaux véhicules et 04 véhicules ASGIRAP CM-PNDP-9807-GO-RFB / Fourniture de 380 tablettes Single Stage - One dans le cadre de l'appui à IDA / 57180 A posteriori Demande de prix Limited 78,693.25 Signé 2017-04-03 2017-04-08 2017-05-08 2017-05-22 2017-06-05 2017-06-19 Envelope la mise en oeuvre du ScoreCard par les OSC CM-PNDP-30128-GO-RFQ / Fourniture des services de maintenance curative et Single Stage - One préventive du parc des IDA / 57180 A posteriori Demande de prix Limited 0.00 Annulé 2017-10-01 2017-11-26 2018-05-25 Envelope machines ( photocopieurs, scanner, imprimantes etc) de la CNC du PNDP CM-PNDP-9849-GO-RFB / Souscription des polices d'assurance maladie (lot1), Single Stage - One IDA / 57180 A posteriori Appel d'offres Open - National 0.00 Annulé 2017-08-25 2017-08-30 2017-09-29 2017-10-13 2017-10-27 2018-10-22 automobile (lot2) et Envelope multirisque bureuax (lot3) au PNDP Page 4 CM-PNDP-9799-GO-RFQ / Acquisition des fournitures Single Stage - One IDA / 57180 A posteriori Demande de prix Limited 0.00 Annulé 2017-12-09 2018-01-13 2019-01-08 pour les véhicules de la Envelope CNC CM-PNDP-2737-GO-RFQ / Fourniture de Kits solaires Single Stage - One IDA / 57180 A posteriori Demande de prix Open - National 0.00 Annulé 2017-02-10 2017-04-07 2017-10-04 pour les communes de Envelope sim_ba CM-PNDP-11815-GO-RFQ / Accompagnement des communes d'intervention du Single Stage - One PNDP de la Région de l'Est IDA / 57180 A posteriori Demande de prix Limited 0.00 Annulé 2017-04-10 2017-06-05 2017-12-02 Envelope dans l'édition d'un bulletin trimestriel d'informations communal CM-PNDP-11818-GO-RFQ / Accompagnement des communes d'intervention du Single Stage - One PNDP de la Région du IDA / 57180 A posteriori Demande de prix Limited 0.00 Annulé 2017-04-10 2017-06-05 2017-12-02 Envelope Littoral dans l'édition d'un bulletin trimestriel d'informations communal CM-PNDP-11814-GO-RFQ / Accompagnement des communes d'intervention du Single Stage - One PNDP de la Région du IDA / 57180 A posteriori Demande de prix Limited 0.00 Annulé 2017-04-10 2017-06-05 2017-12-02 Envelope Centre dans l'édition d'un bulletin trimestriel d'informations communal CM-PNDP-11817-GO-RFQ / Accompagnement des communes d'intervention du Single Stage - One PNDP de la Région de IDA / 57180 A posteriori Demande de prix Limited 0.00 Annulé 2017-04-10 2017-06-05 2017-12-02 Envelope l'Extreme Nord dans l'édition d'un bulletin trimestriel d'informations communal CM-PNDP-11813-GO-RFQ / Accompagnement des communes d'intervention du Single Stage - One PNDP de la Région de IDA / 57180 A posteriori Demande de prix Limited 0.00 Annulé 2017-04-10 2017-06-05 2017-12-02 Envelope l'Adamaoua dans l'édition d'un bulletin trimestriel d'informations communal CM-PNDP-59143-GO-DIR / Projection de films éducatifs dans les 10 régions sur la décentralisation et le Passation de développement local IDA / 57180 A posteriori marché de gré à Direct 0.00 Annulé 2018-05-30 2018-06-04 2018-06-25 2018-07-25 ''Convention avec gré l'Association Cinéma Numérique Ambulant'' (B202203) CM-PNDP-59145-GO-DIR / Convention de Partenariat avec Zenü Network pour la Passation de co-production d'une émission IDA / 57180 A posteriori marché de gré à Direct 0.00 Annulé 2018-05-30 2018-06-04 2018-07-02 2018-08-01 de télévision intitulée gré "Gouvernance locale" diffusée sur la CRTV (B202206) Page 5 CM-PNDP-59146-GO-DIR / Convention de Partenariat avec Peace Communication Passation de pour la co-production d'une IDA / 57180 A posteriori marché de gré à Direct 0.00 Annulé 2018-05-30 2018-06-04 2018-06-25 2018-07-25 émission de télévision gré intitulée "Lumière sur la décentralisation" diffusée sur CANAL 2 (B202206) CM-PNDP-59147-GO-DIR / Passation de Abonnement des journaux IDA / 57180 A posteriori marché de gré à Direct 3,210.79 Achevé 2018-05-06 2018-05-11 2018-06-08 2019-06-03 annuel à Cameroun tribune gré (B202123) CM-PNDP-59149-GO-RFQ / Conception et pose d'affichettes sur les Single Stage - One IDA / 57180 A posteriori Demande de prix Open - National 0.00 Annulé 2018-06-20 2018-08-08 2018-09-07 comportements souhaités Envelope dans le cadre du PNDP III (B202209) CM-PNDP-59151-GO-DIR / Acquisition d'ouvrages et documents pour les centres Passation de de documentation et IDA / 57180 A posteriori marché de gré à Direct 0.00 Annulé 2018-07-10 2018-07-15 2018-08-08 2018-08-18 constitution d'une gré photothèque et videothèque (B202212) CM-PNDP-59152-GO-RFB / Fourniture des groupes électrogènes dans le cadre Single Stage - One IDA / 57180 A posteriori Appel d'offres Open - National 228,723.23 Achevé 2018-06-28 2018-07-03 2018-07-23 2018-08-06 2018-09-03 2018-10-18 de la mise en œuvre du Envelope logiciel Sim_ba dans les 124 communes ( B301101) CM-PNDP-59153-GO-RFB / Fourniture des plaques solaires pour SIM_BA dans Single Stage - One En cours le cadre de la mise en IDA / 57180 A posteriori Appel d'offres Open - National 548,244.75 2018-06-28 2018-07-03 2018-08-14 2018-08-28 2018-09-25 2018-11-09 Envelope d'exécution œuvre du logiciel Sim_ba dans les 60 communes. ( B301101) CM-PNDP-59156-GO-RFB / Acquisition du matériel informatique (ordinateur + imprimante) pour les Single Stage - One IDA / 57180 A posteriori Demande de prix Open - National 11,333.59 Achevé 2018-07-28 2018-09-15 2018-10-30 Communes de Makak Envelope (Centre), Kribi, Meyomessi, Mvangan, Ma'an, Meyomessala (Sud) (A102105) CM-PNDP-59170-GO-RFQ / Acquisition d'une moto PDPP) pour les Communes Single Stage - One IDA / 57180 A posteriori Demande de prix Limited 25,964.21 Achevé 2018-06-15 2018-08-10 2018-09-24 de Makak (Centre), Kribi, Envelope Meyomessi, Mvangan, Ma'an, Meyomessala (Sud) (A102105) CM-PNDP-59405-GO-RFQ / Fourniture du matériel logistique dans le cadre de l'appui au MINAS pour l'organisation de la 11ème Single Stage - One édition de la journée IDA / 57180 A posteriori Demande de prix Limited 3,496.14 Achevé 2018-08-14 2018-10-02 2018-10-07 Envelope Internationale des Peuples Autochtones dans le cadre de la stratégie de mise en œuvre du PDPP au Cameroun (A102103) Page 6 CM-PNDP-113126-GO-RFQ / Edition et diffusion de trois guides d'application des Single Stage - One En attente IDA / 57180 A posteriori Demande de prix Limited 0.00 2019-07-03 2019-08-28 2019-11-26 opérations courantes Envelope d'exécution d'inventaires et d'immobilisation NON CONSULTING SERVICES Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CM-PNDP-2947-NC-DIR / Insertion (souscription) dans Passation de En attente le journal de l'édition 2016 IDA / 57180 A posteriori marché de gré à Direct 0.00 2016-11-04 2016-11-09 2016-12-14 2017-06-12 d'exécution des JEC (Journées de gré l'Entrepreneuriat) CM-PNDP-2838-NC-RFB / Fourniture des services Single Stage - One d'assurances automobiles, IDA / 57180 A posteriori Appel d'offres Open - National 292,530.35 Signé 2016-11-09 2016-11-14 2016-12-26 2017-01-25 2017-03-01 2017-08-28 Envelope maladies et responsabilité civile CM-PNDP-2856-NC-DIR / Insertions et publi-reportages Passation de spéciaux dans le Magazine IDA / 57180 A posteriori marché de gré à Direct 0.00 Annulé 2017-01-16 2017-01-21 2017-02-25 2017-08-24 international CAMEROUN gré ECO, en 2017 (Convention) CM-PNDP-2857-NC-DIR / Passation de Insertions et publi-reportages IDA / 57180 A posteriori marché de gré à Direct 0.00 Annulé 2016-11-09 2016-11-14 2016-12-19 2017-06-17 spéciaux 1, dans le quotidien gré "CAMEROUN TRIBUNE" CM-PNDP-2858-NC-DIR / Passation de Insertions et publi-reportages IDA / 57180 A posteriori marché de gré à Direct 0.00 Annulé 2016-12-17 2016-12-22 2017-01-26 2017-07-25 spéciaux dans d'autres gré journaux CM-PNDP-2860-NC-DIR / Passation de Insertions et publi-reportages IDA / 57180 A posteriori marché de gré à Direct 0.00 Annulé 2016-12-17 2016-12-22 2017-01-26 2017-07-25 spéciaux dans les autres gré radios et televisions CM-PNDP-6228-NC-RFQ / Fourniture des services de maintenance préventive et Single Stage - One IDA / 57180 A posteriori Demande de prix Limited 4,647.04 Signé 2017-02-09 2017-04-06 2017-10-03 curative du parc des Envelope machines de la CNC du PNDP CM-PNDP-6229-NC-RFQ / Fourniture des services de Single Stage - One dédouanement et enlèvement IDA / 57180 A posteriori Demande de prix Limited 91,406.97 Signé 2017-04-05 2017-04-26 2017-10-23 Envelope des 31 motos et 28 véhicules acquis par UNOPS CM-PNDP-2851-NC-DIR / Participation du PNDP au SAGO (Salon de l'Action Passation de Gouvernementale) en 2017 IDA / 57180 A priori marché de gré à Direct 0.00 Annulé 2017-06-08 2017-06-13 2017-07-04 2017-08-03 (Souscription d'une gré Convention avec "Mon Communicateur") Page 7 CM-PNDP-2849-NC-DIR / Participation du PNDP à Passation de PROMOTE 2017 IDA / 57180 A posteriori marché de gré à Direct 0.00 Annulé 2016-10-26 2016-10-31 2016-12-05 2017-06-03 (Souscription d'une gré Convention avec INTER PROGRESS) CM-PNDP-2923-NC-DIR / Projection de films éducatifs dans les 10 régions sur la Passation de décentralisation et le IDA / 57180 A posteriori marché de gré à Direct 0.00 Annulé 2017-05-07 2017-05-12 2017-06-16 2017-12-13 développement local gré (Convention avec l'Association Cinéma Numérique Ambulant) CM-PNDP-2861-NC-DIR / Co-production d'une émission de télévision intitulée Passation de "Gouvernance Locale" à IDA / 57180 A posteriori marché de gré à Direct 0.00 Annulé 2017-06-11 2017-06-16 2017-07-21 2018-01-17 diffusée à la CRTV gré (Convention avec Zenu Network) CM-PNDP-2862-NC-DIR / Co-production d'une émission de télévision intitulée " Passation de Lumière sur la IDA / 57180 A posteriori marché de gré à Direct 0.00 Annulé 2017-06-18 2017-06-23 2017-07-28 2018-01-24 décentralisation"à diffuser gré sur CANAL 2 (Convention avec Peace Communication) CM-PNDP-2850-NC-RFQ / Appui à l'aménagement et Single Stage - One IDA / 57180 A posteriori Demande de prix Limited 0.00 Annulé 2016-12-10 2017-02-04 2017-08-03 animation du stand du Envelope PNDP à PROMOTE 2017 CM-PNDP-2855-NC-RFQ / Appui à l'amménagement et Single Stage - One IDA / 57180 A posteriori Demande de prix Limited 0.00 Annulé 2017-05-19 2017-07-14 2018-01-10 annimation du stand du Envelope PNDP au SACO en 2017 CM-PNDP-2852-NC-RFQ / Appui à l'aménagement et Single Stage - One En attente IDA / 57180 A posteriori Demande de prix Limited 0.00 2017-06-09 2017-08-04 2018-01-31 annimation du stand du Envelope d'exécution PNDP au SAGO CM-PNDP-2854-NC-DIR / Participation du PNDP au SACO (Salon des Communes Passation de de l'Ouest) en 2017 IDA / 57180 A posteriori marché de gré à Direct 0.00 Annulé 2017-02-03 2017-02-08 2017-03-15 2017-09-11 (Souscription d'une gré Convention avec les CVUC Ouest) CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Market Contract Type Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Approach (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CM-PNDP-1203-CS-LCS / Audit financier et comptable Sélection au IDA / 57180 A priori Open - National 0.00 Annulé 2016-08-22 2016-09-12 2016-10-26 2016-11-23 2016-12-23 2017-01-27 2017-03-03 2017-08-30 des exercices fiscaux 2016 et moindre coût 2017 du PNDP Page 8 CM-PNDP-3202-CS-CQS / Sélection fondée Gestion des doléances à sur les travers un Centre d'Appel et IDA / 57180 A posteriori Open - National 28,787.75 Signé 2016-09-19 2016-10-10 2016-11-23 2016-12-23 2017-01-27 2017-07-26 qualifications des un Numéro vert dans le consultants cadre du PNDP III Sélection fondée CM-PNDP-3201-CS-CQS / sur les Migration de Pro-ADP vers IDA / 57180 A posteriori Open - National 50,305.64 Signé 2016-09-19 2016-10-10 2016-11-23 2016-12-23 2017-01-27 2017-07-26 qualifications des une version Web.2.0 consultants CM-PNDP-2939-CS-CQS / Sélection fondée Etude sur le marketing sur les IDA / 57180 A posteriori Open - National 0.00 Annulé 2017-04-02 2017-04-23 2017-06-06 2017-07-06 2017-08-10 2018-02-06 social dans le cadre du qualifications des PNDP 3 consultants CM-PNDP-2944-CS-CQS / Sélection des experts (1 par région) en langues locales Sélection fondée pour la conception ou la sur les IDA / 57180 A posteriori Open - National 0.00 Annulé 2017-04-03 2017-04-24 2017-06-07 2017-07-07 2017-08-11 2018-02-07 traduction d'émissions sur qualifications des les thématiques chères au consultants PNDP 3 à diffuser sur les radios communautaires CM-PNDP-10340-CS-INDV / Sélection fondée Sélection d'un consultant sur les pour la création et la IDA / 57180 A posteriori Open - National 0.00 Annulé 2017-06-26 2017-07-17 2017-08-21 2017-09-04 2017-10-02 2017-11-16 qualifications des gestion d'une plateforme de consultants présentation des communes CM-PNDP-3101-CS-QCBS / Sélection fondée Audit financier et comptable IDA / 57180 A priori sur la qualité et Open - National 0.00 Annulé 2017-03-31 2017-04-21 2017-06-04 2017-07-02 2017-08-01 2017-09-05 2017-10-10 2018-10-10 des exercices fiscaux 2016 et le coût 2017 du PNDP CM-PNDP-2846-CS-QCBS / Recrutement d'un consultant Sélection fondée pour l'élaboration des sur les IDA / 57180 A posteriori Open - National 19,695.13 Signé 2017-06-13 2017-07-04 2017-08-17 2017-09-16 2017-10-07 2018-04-05 modèles de gestion et qualifications des d'entretien des ouvrages consultants d'infrastructures CM-PNDP-2847-CS-QCBS / Audit technique externe Sélection fondée périodique de la IDA / 57180 A priori sur la qualité et Open - National 0.00 Annulé 2017-07-03 2017-07-24 2017-09-06 2017-10-04 2017-10-18 2017-11-22 2017-12-27 2018-12-27 cosommation des allocations le coût par les communes CM-PNDP-10381-CS-QCBS / Sélection fondée Recrutement d'un consultant sur les IDA / 57180 A posteriori Open - National 0.00 Annulé 2017-11-13 2017-12-04 2018-01-17 2018-01-31 2018-02-21 2018-03-21 2018-04-25 2019-04-25 pour l'audit environnemental qualifications des des microprojets consultants CM-PNDP-18652-CS-QCBS / Sélection d'un consultant ( Cabinet/ Burequ d'etude) en Sélection fondée vue de la réalisation de IDA / 57180 A posteriori sur la qualité et Open - National 117,485.52 Signé 2017-06-20 2017-07-11 2017-08-24 2017-09-21 2017-10-21 2017-11-25 2017-12-30 2018-12-30 l'étude diagnostique sur les le coût impacts du PNDP auprès des acteurs locaux. CM-PNDP-18654-CS-QCBS / Selection d'un consultant ( Cabinet/ Burequ d'etude) Sélection fondée devant conduire une étude IDA / 57180 A posteriori sur la qualité et Open - National 222,413.95 Signé 2017-06-20 2017-07-11 2017-08-24 2017-09-21 2017-10-21 2017-11-25 2017-12-30 2018-12-30 sur les modalités le coût d'internalisation et de pérennisation des principaux acquis du PNDP Page 9 CM-PNDP-10307-CS-CQS / Sélection fondée Sélection des OAL pour sur les IDA / 57180 A posteriori Open - National 0.00 Annulé 2017-04-11 2017-05-02 2017-06-15 2017-07-06 2017-08-03 2017-10-02 l'appui à la mise en oeuvre qualifications des du Scorecard par les OSC consultants CM-PNDP-59077-CS-CQS / Définition d'une méthodologie Sélection fondée de planification au niveau sur les IDA / 57180 A posteriori Open - National 32,975.17 Achevé 2018-04-13 2018-05-04 2018-06-08 2018-06-22 2018-07-16 2018-08-30 des communes qualifications des d'arrondissement et au consultants niveau régional. CM-PNDP-59082-CS-QCBS / Sélection fondée En cours Évaluation par les IDA / 57180 A posteriori sur la qualité et Open - National 0.00 2018-09-06 2018-09-27 2018-11-01 2018-11-22 2018-12-06 2019-01-03 2019-02-07 2019-04-08 d'examen bénéficiaires (B201110) le coût CM-PNDP-59087-CS-QCBS / Sélection fondée En cours Audit environnemental des IDA / 57180 A priori sur la qualité et Open - National 0.00 2018-06-25 2018-07-16 2018-08-29 2018-09-12 2018-10-03 2018-10-31 2018-11-28 2019-01-27 d'examen microprojets (B201112) le coût CM-PNDP-59090-CS-CQS / Sélection fondée Recrutement d'un consultant sur les chargé de définir les IDA / 57180 A posteriori Open - National 0.00 Annulé 2018-07-18 2018-08-08 2018-09-05 2018-09-19 2018-10-10 2018-11-24 qualifications des modalités de vulgarisation consultants du PROADP (B202105) CM-PNDP-98186-CS-QCBS / Sélection fondée En cours Audit environnemental des IDA / 57180 A posteriori sur la qualité et Open - National 0.00 2019-02-01 2019-02-22 2019-04-07 2019-04-21 2019-05-12 2019-06-09 2019-07-07 2019-09-05 d'exécution microprojets (B201112) le coût CM-PNDP-59080-CS-QCBS / Recrutement d'un consultant pour la réalisation d'une Sélection fondée étude d'audit technico- En attente IDA / 57180 A posteriori sur la qualité et Open - National 0.00 2019-04-21 2019-05-21 2019-06-18 2019-07-02 2019-07-16 2019-08-13 2019-09-10 2019-11-09 financier de la 3ème phase d'exécution le coût Programme National de Développement Participatif(B201109) Sélection fondée CM-PNDP-98189-CS-QCBS / sur les En attente Évaluation par les IDA / 57180 A posteriori Open - National 0.00 2019-03-20 2019-04-10 2019-05-24 2019-06-23 2019-07-28 2020-01-24 qualifications des d'exécution bénéficiaires (B201110) consultants CM-PNDP-113115-CS-QCBS / Audit technique externe Sélection fondée En attente périodiques de la IDA / 57180 A posteriori sur la qualité et Open - National 0.00 2019-06-21 2019-07-12 2019-08-25 2019-09-22 2019-10-22 2019-11-26 2019-12-31 2020-12-30 d'exécution consommation des allocations le coût par communes INDIVIDUAL CONSULTANTS Page 10