The World Bank Implementation Status & Results Report Support to the National Education Pact Project (P146831) Support to the National Education Pact Project (P146831) LATIN AMERICA AND CARIBBEAN | Dominican Republic | Education Global Practice | IBRD/IDA | Investment Project Financing | FY 2016 | Seq No: 10 | ARCHIVED on 25-Dec-2019 | ISR39530 | Implementing Agencies: Ministry of Education, Dominican Republic Key Dates Key Project Dates Bank Approval Date: 30-Sep-2015 Effectiveness Date: 09-Dec-2016 Planned Mid Term Review Date: 31-Jul-2018 Actual Mid-Term Review Date: 31-Jul-2018 Original Closing Date: 30-Jun-2020 Revised Closing Date: 30-Sep-2022 pdoTable Project Development Objectives Project Development Objective (from Project Appraisal Document) The objective of the Project is to improve the Borrower’s capacity to: (i) recruit and train primary and secondary school teachers, (ii) assess student learning in primary and secondary education, (iii) evaluate the quality of service provided by Public Early Childhood Development Centers, and (iv) enhance the process for decentralizing public school management. Has the Project Development Objective been changed since Board Approval of the Project Objective? No Components Table Name Improving capacity to recruit and train primary and secondary school teachers:(Cost $38.88 M) Improving capacity to assess student learning in primary and secondary education:(Cost $62.25 M) Improving capacity to evaluate the quality of service provided by public early childhood development centers:(Cost $5.00 M) Improving capacity to enhance the process of decentralized school management:(Cost $43.50 M) Overall Ratings Name Previous Rating Current Rating Progress towards achievement of PDO Satisfactory Satisfactory Overall Implementation Progress (IP) Satisfactory Moderately Satisfactory Overall Risk Rating Substantial Substantial Implementation Status and Key Decisions The Project continues to show strong results, with 72% of the original loan ($50M) disbursed against the achievement of Disbursement-Linked Indicators (DLIs). This amount includes $2M that have been requested by the client on December 12, 2019 and that are expected to be disbursed before the end of the year. The changes made as part of the Additional Financing (AF) and Restructuring (approved by the Bank's Board on December 13, 2018) are now reflected in the Results Framework and DLIs in the system, and are being tracked by the team. 12/25/2019 Page 1 of 19 The World Bank Implementation Status & Results Report Support to the National Education Pact Project (P146831) The Project has achieved the final targets of two of the five PDO Indicators and is making good progress towards achieving the remaining three. A brief overview of progress by Component follows: Component 1: Improve the capacity to recruit and train primary and secondary teachers In terms of pre-service teacher training, ISFODOSU is making progress in developing a new academic career for the institution and has hired a consultant to prepare the academic regulations and expects approval of the components in July of this year. ISFODOSU is also making progress in the accreditation process, as a quality management system is being designed with the support of ACSU (the international agency supporting ISFODOSU in the accreditation process). In addition, the new training program for school directors was launched and implementation began with the collaboration of APTUS and Uncommon Schools. In terms of the teacher competitive entrance exam, exams were implemented in August 2019, but the item bank aligned with new teacher professional standards could not be used due to technological issues. Ministry expects to hold exams again at the beginning of 2020. The Vice- Ministry of Certification and Accreditation is revising the 10,000 items to use them in the new exam and is planning to develop a platform to apply the exams. MINERD has initiated dialogue with the Bank and other partners on developing a mid-term plan for future exams that considers the management and continuous development of the item bank and the possibility of recruiting for specific posts through the competitions. Regarding in-service teacher training, the Vice-Ministry of Technical-Pedagogical Services and INAFOCAM have worked with over 31,000 early grade teachers in 2,190 schools through the Strategy of School-Centered Training (EFCCE). The EFCCE approach focuses on reading and math in the early grades, and utilizes the results of the 3rd grade diagnostic learning assessment conducted in 2017. The Bank and MINERD agreed during the most recent mission to work together to further develop this approach in terms of prioritization, reviewing the content, and assessing the results. Regarding teacher performance evaluation, IDEICE has evaluated over 83,000 directors, assistant principals, technicians and teachers against the new performance standards. IDEICE created a platform to allow individuals to access their results and developed aggregated reports for school directors, districts, and regions. During the most recent mission the Bank discussed with IDEICE the importance of coordinating efforts to maximize the value of data collected through performance evaluations and national tests for teacher training and school improvement, and will continue to support these issues. Component 2: Improving the capacity to evaluate primary and secondary student learning The 6th grade diagnostic exam was completed in 2018, the reports for national-level, regionals, districts, schools and families were finished and distributed by the Assessment Directorate The 9th grade diagnostic exam was applied in mid-May and initial results will be available in the coming months. IDEICE elaborated a report with the results from PISA 2018 for DR and shared it with the Bank. Component 3: Improving the capacity to evaluate the quality of services delivered by public early childhood development centers The pilot of a new quality assessment was successfully jointly carried out by IDEICE and INAIPI in 10 CAIPIs of the metropolitan region (10% of all CAIPIs). Staff members from INAIPI and IDEICE were certificated in the use of TEACH ECE tool, which will be piloted at the beginning of 2020 at CAIPIs. The plan is to evaluate more than the 50% of CAIPIs by 2020 using TEACH ECE and the tools used in the first pilot. Component 4: Improving capacity to enhance the process for decentralizing public school management Regarding school management committees, the Decentralization Directorate informed that although 1,030 school management committees received the funds directly, they are having issues to continue the direct payments. They are working on resolving the challenges that have prevented more committees from doing so, including administrative burdens and limited capacity of committee members. In addition, MINERD approved new functional spending guidelines for the committees, enabling them to direct resources to where they are most needed. To address the challenges to directly obtaining funds and to build committees' capacity to better utilize their funds, the Decentralization team is working in the development of a platform. In parallel, the Bank supported the Decentralization team in the development of short tutorial videos using trust funds grants (TFSCB and REACH). Regarding the performance evaluation of regional and district directors, the process was completed by IDEICE, with continued technical assistance from the Bank through the REACH trust fund grant. Risks Systematic Operations Risk-rating Tool Risk Category Rating at Approval Previous Rating Current Rating Political and Governance Substantial Substantial Substantial Macroeconomic Moderate Moderate Moderate Sector Strategies and Policies Substantial Substantial Substantial Technical Design of Project or Program Moderate Moderate Moderate Institutional Capacity for Implementation and Sustainability Substantial Substantial Substantial 12/25/2019 Page 2 of 19 The World Bank Implementation Status & Results Report Support to the National Education Pact Project (P146831) Fiduciary Moderate Moderate Moderate Environment and Social Low Low Low Stakeholders Moderate Moderate Moderate Other -- -- -- Overall Substantial Substantial Substantial Results PDO Indicators by Objectives / Outcomes Improve the Borrower's capacity to recruit and train primary and secondary school teacher IN00772754 ►Teacher positions staffed through the revised teacher entrance exam (Yes/No, Custom) Baseline Actual (Previous) Actual (Current) End Target Value No No No Yes Date 30-Jun-2014 31-Dec-2018 31-Dec-2019 31-Dec-2022 "Teacher positions" refers to positions for teachers and directors hired by MINERD. "Teacher entrance exam" refers to the Concurso de Oposicion. “Revised” means aligned with Professional Standards for Comments: Teachers. “Staffed” refers to the action of hiring teachers and directors for available positions as teachers or school principals in primary and secondary school levels. IN00772782 ►Positions to study teaching degrees at ISFODOSU filled through revised entry exam (Yes/No, Custom) Baseline Actual (Previous) Actual (Current) End Target Value No Yes Yes Yes Date 30-Jun-2014 31-Dec-2018 31-Dec-2019 31-Dec-2022 "Positions to study teaching degrees at ISFODOSU" refers to students that ISFODOSU could accept to study a teaching degree. "Entry exam" refers to an assessment of potential candidates for those positions Comments: that at least assesses content knowledge in key areas. "Revised entry exam" refers to an exam that has incorporated technical improvements recommended by an expert on assessment. Improve the Borrower's capacity to assess student learning in primary and secondary education IN00772755 ►At least one full cycle of the national student assessment strategy has been implemented (Yes/No, Custom) Baseline Actual (Previous) Actual (Current) End Target Value No Yes Yes Yes Date 30-Jun-2014 31-Dec-2018 31-Dec-2019 31-Dec-2022 Assessment refers to a diagnostic, census-based Spanish and mathematics assessment (at a minimum) Comments: designed for the purpose of providing feedback for parents, schools, teacher training institutions, and MINERD. The tests must assess learning outcomes of the first and second cycle of primary education, as 12/25/2019 Page 3 of 19 The World Bank Implementation Status & Results Report Support to the National Education Pact Project (P146831) well as secondary education (administered in 3rd, 6th and 9th grade). "Implemented" means assessments applied and results disseminated. Improve the Borrower's capacity to evaluate the quality of service provided by Public Early Childhoo IN00772781 ►Percentage of QEC care centers that have been evaluated against quality standards and their results analyzed (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 10.00 10.00 50.00 Date 30-Jun-2014 31-Dec-2018 31-Dec-2019 31-Dec-2022 The assessment must be in accordance with the guidelines established in the strategic plan for INAIPI, and for the last year should be verified by an independent agency according to the protocols for verifying Comments: Disbursement-Linked Indicators. The analysis should include improvement plans with specific areas of improvement and a fixed time frame for improvement and a plan for verification of improvement. Improve the Borrower's capacity to enhance the process for decentralizing public school management IN00772783 ►MINERD develops targets for student achievement at the regional, district, and school levels and a monitoring plan to track progress against targets (DLI 33) (Yes/No, Custom) Baseline Actual (Previous) Actual (Current) End Target Value No No No Yes Date 31-Dec-2014 31-Dec-2018 31-Dec-2019 31-Dec-2022 Targets refer to a limited set of indicators on student achievement, such as passing rates, completion Comments: rates, or learning results from assessments. Intermediate Results Indicators by Components Improving capacity to recruit and train primary and secondary school teachers IN00772787 ►Design and implementation of ISFODOSU revised entrance examination (Text, Custom) Baseline Actual (Previous) Actual (Current) End Target ISFODOSU revised ISFODOSU revised ISFODOSU revised Revised entrance entrance examination is entrance examination entrance examination Value examination designed. applied to all its is applied to all its is applied to all its applicants. applicants. applicants. Date 31-Dec-2014 31-Dec-2018 13-Dec-2019 31-Dec-2022 Design and implementation of ISFODOSU revised entrance examination. "Entrance exam" refers to an assessment of potential candidates for those positions that at least assesses content knowledge in key areas. "Revised entrance exam" refers to an exam that has incorporated technical improvements Comments: recommended by an expert on assessment. (Note that entry/entrance are used interchangeably in describing the indicators) IN00772793 ►Implementation of ISFODOSU secondary-level teaching degrees (Text, Custom) 12/25/2019 Page 4 of 19 The World Bank Implementation Status & Results Report Support to the National Education Pact Project (P146831) Baseline Actual (Previous) Actual (Current) End Target ISFODOSU offers at ISFODOSU began to ISFODOSU began to least three secondary offer two new offer two new secondary level teaching degrees Value Not started secondary level level teaching degrees in and advances on teaching degrees in September 2017. implementation of September 2017. curricula. Date 31-Dec-2014 31-Dec-2018 13-Dec-2019 31-Dec-2022 “Secondary-level degrees” refers to degree programs in any of the following areas: mathematics, Comments: chemistry, social sciences/history, and other sciences. IN00772795 ►ISFODOSU has started the implementation of its own teaching career (Text, Custom) Baseline Actual (Previous) Actual (Current) End Target The academic The academic regulations needed for ISFODOSU has regulations needed for the proposal of the started the the proposal of the revised teaching implementation of its Value Not started revised teaching career career are being own professional are being prepared and prepared and the draft development plan for the draft is expected to is expected to be its educators be ready by July 2019. ready by June 2020. Date 31-Dec-2014 31-Dec-2018 13-Dec-2019 31-Dec-2022 ISFODOSU teaching career refers to career development and evaluation system of ISFODOSU educators (teachers of teachers) focused on standards and competencies, with clear incentives to stimulate Comments: professional development of educators. IN00772797 ►Design and adoption of professional standards for teachers (Text, Custom) Baseline Actual (Previous) Actual (Current) End Target Professional standards Professional standards Professional standards Design and adoption Value for teachers adopted and for teachers adopted for teachers adopted completed by MINERD disseminated and disseminated and disseminated Date 31-Dec-2014 31-Dec-2018 13-Dec-2019 31-Dec-2022 Professional standards for teachers refer to the standards for teacher performance designed by the Vice- Comments: Ministry for Certification within MINERD, which teachers must know and apply. IN00772799 ►Design and implementation of competitive entrance exam for teachers (Text, Custom) Baseline Actual (Previous) Actual (Current) End Target Item bank for revised Item bank for exam is MINERD applies exam will be completed being revised and a MINERD applies entrance exam within approximately one competitive exam is competitive entrance (Concurso de Value month, and a competitive expected to be held in exam to hire teachers Oposición) aligned exam is expected to be calendar year 2020. (Concurso de Oposición) with professional held in calendar year standards for teachers 2019. Date 31-Dec-2014 31-Dec-2018 13-Dec-2019 31-Dec-2022 Comments: Competitive examination or concurso de oposición refers to the entrance exam applied to all candidates applying to be hired as teachers by MINERD. Professional standards for teachers refer to the standards for teacher performance designed by the Vice-Ministry for Certification within MINERD that teachers must know and apply. 12/25/2019 Page 5 of 19 The World Bank Implementation Status & Results Report Support to the National Education Pact Project (P146831) IN00772801 ►Design and implementation of teacher evaluation system (Text, Custom) Baseline Actual (Previous) Actual (Current) End Target Over 80% of teaching Over 80% of teaching At least 80% of staff have been staff have been teachers have been evaluated using the evaluated using the evaluated using the revised teacher revised teacher revised teacher Value Career proposal drafted evaluation system, which evaluation system, evaluation system, is aligned with which is aligned with which is aligned with professional standards professional standards professional standards for teachers. for teachers. for teachers. Date 31-Dec-2014 31-Dec-2018 13-Dec-2019 31-Dec-2022 Teaching career proposal refers to a document establishing the guidelines for the components of a teaching career, including entrance, progress, and exit. It should also include issues such as the selection process for teachers, in-service training, professional standards, a growth-oriented teacher evaluation Comments: system, an attractive career in terms of responsibilities (career advancement, definition of each stage of the teaching career with requirements for entry and exit), links to certification and teacher induction, and teacher development and improvement options, among others. IN00772802 ►Design and adjustment of INAFOCAM in-service training programs (Text, Custom) Baseline Actual (Previous) Actual (Current) End Target INAFOCAM adjusts in- INAFOCAM adjusts in- INAFOCAM adjusts in- service training service training service training programs programs based on programs based on Value Not started based on results from results from results from assessments and/or assessments and/or assessments and/or impact evaluations. impact evaluations. impact evaluations Date 31-Dec-2014 31-Dec-2018 13-Dec-2019 31-Dec-2022 New training programs refer to in-service specific modular programs, that could include an online component, mentoring, or other features. The design of these programs must be based on evidence from national test results, diagnostic evaluations, and/or teacher evaluations in the areas of language and mathematics. These programs are intended for primary teachers (first cycle), and will be part of the design Comments: of an impact evaluation. The impact evaluation could include a group of schools that will apply the existing in-service programs, and a control group. At least the control group and the group undertaking the new modular training programs will be selected randomly, within the schools under consideration. IN00772806 ►Implementation of SIGEF in MINERD decentralized agencies (Text, Custom) Baseline Actual (Previous) Actual (Current) End Target INAFOCAM's annual INAFOCAM's annual financial reports are financial reports are INAFOCAM and Planning for prepared using SIGEF; prepared using SIGEF; ISFODOSU’s annual Value implementation in both ISFODOSU is working ISFODOSU is working financial reports are institutions towards it (expected in towards it (expected in prepared using SIGEF 2019). 2020). Date 30-Jun-2014 31-Dec-2018 13-Dec-2019 31-Dec-2022 SIGEF refers to the national comprehensive financial management system implemented nationwide. Comments: Implementation means the use of SIGEF to produce financial reports. IN00772808 ►MINERD leverages ICT to strengthen in-service teacher training (Text, Custom) 12/25/2019 Page 6 of 19 The World Bank Implementation Status & Results Report Support to the National Education Pact Project (P146831) Baseline Actual (Previous) Actual (Current) End Target MINERD piloting MINERD piloting different different in-service in-service teacher teacher training At least 10% of training approaches for approaches for early teachers who enroll in early grade reading and Value n/a grade reading and an ICT-based in- math that are informed math that are informed service training by the data from the 3rd by the data from the program complete it grade assessment 3rd grade assessment (applied in 2017). (applied in 2017). Date 31-Dec-2014 31-Dec-2018 13-Dec-2019 31-Dec-2022 An information technology-based approach refers to strategies, programs, and/or activities that involve the use of information and communications technology (ICT) for in-service teacher training that is aligned with the curriculum. ICT use could include the use of websites with pedagogical material, virtual coaches, pedagogical feedback delivered via phone, or other technology. The approach will incorporate a strategy Comments: for use, a clearly defined target population of teachers, tracking of use, and could incorporate a certification aspect to incentivize teachers. This approach would try to align different activities that MINERD is doing to support teachers and make their training more sustainable and impactful on student learning. IN00772809 ►ISFODOSU advances in the process of international accreditation of its first-cycle teacher training programs (Text, Custom) Baseline Actual (Previous) Actual (Current) End Target ISFODOSU is ISFODOSU advances ISFODOSU is designing designing an internal in the process of an internal quality quality management international Value n/a management system in system in line with accreditation of its first- line with international international cycle teacher training standards. standards. programs. Date 31-Dec-2014 31-Dec-2018 13-Dec-2019 31-Dec-2022 Accreditation means the process by which an international institution assesses ISFODOSU’s process as a Comments: higher-education institution and against a set of predetermined criteria. Improving capacity to assess student learning in primary and secondary education IN00772786 ►Student learning outcomes for the first cycle of primary education analyzed (including by gender) and disseminated (Text, Custom) Baseline Actual (Previous) Actual (Current) End Target MINERD’s Student MINERD’s Student MINERD’s Student Assessment Assessment Assessment Directorate Directorate staff have Directorate staff have staff have received received training on received training on Value Not started training on sampling, sampling, item design, sampling, item design, item design, database database database management, and management, and management, and statistical software. statistical software. statistical software. Date 31-Dec-2014 31-Dec-2018 13-Dec-2019 31-Dec-2022 Student learning outcomes are defined as the results obtained by students in standardized test that measure learning during the first three grades of primary education. These must include the rollout of the dissemination strategy. “Analyzed” means reporting and publishing results by area of learning (and Comments: subarea if possible), area, gender, type of school, rural/urban, and school district or other geographic disaggregation. IN00772789 12/25/2019 Page 7 of 19 The World Bank Implementation Status & Results Report Support to the National Education Pact Project (P146831) ►Application and dissemination of international student assessments (Text, Custom) Baseline Actual (Previous) Actual (Current) End Target MINERD produces and delivers school- Application of PISA level reports that track Application of PISA 2018 2018 completed and progress across the Value PISA 2015 pilot applied completed. national report two waves of the published. assessment for the first cycle of primary education Date 31-Dec-2014 31-Dec-2018 13-Dec-2019 31-Dec-2022 PISA refers to the Programme for International Student Assessment of the OECD. Dissemination refers to activities that share the main lessons learned from the participation in international assessments to a Comments: wider audience. IN00772792 ►Student learning outcomes for second cycle of primary and for secondary education analyzed and disseminated (Text, Custom) Baseline Actual (Previous) Actual (Current) End Target MINERD successfully administered a student assessment for the 6th grade in 2018 and MINERD produces MINERD successfully results were published and delivers school- administered a student Value n/a in 2019. Student level reports with assessment for the 6th Assessment for 9th recommendations from grade. grade was 9th grade assessment administered in 2019 and results will be publish in 2020. Date 31-Dec-2014 31-Dec-2018 13-Dec-2019 31-Dec-2022 The assessment refers to the national diagnostic assessment to be carried out in all schools in 6th and 9th grade. School-reports refers to the results that each school achieved in the subjects measured in the Comments: assessment, and will include results by gender, and subject, and relevant comparisons with other schools and/or group of schools in the district, and the country. Improving capacity to evaluate the quality of service provided by public early childhood development centers IN00772785 ►Capacity strengthening of INAIPI and assessment of QEC centers (Text, Custom) Baseline Actual (Previous) Actual (Current) End Target Pilot assessment for Pilot assessment for 70% of functioning Discussions about the Public Early Childhood Public Early Childhood Public Early Childhood Value themes the content of Development Centers Development Centers Development Centers INAIPI’s strategic plan carried out (in 10% of carried out (in 10% of are assessed for centers). centers by 2018). quality standards Date 31-Dec-2014 31-Dec-2018 13-Dec-2019 31-Dec-2022 Strategic plan refers to a document providing guidelines in terms of: i) Organizational and operational structure of the Institute, including administrative and management structure; ii) strategic framework (mission, vision, values, operational manual); and iii) a system of quality management including service Comments: delivery standards. In place refers to the fact that is used to assess quality of service delivery and it is used for decision making in terms of improving quality in centers. The assessment must be in accordance with the guidelines established in the strategic plan for INAIPI, and should be verified by an independent agency according to the protocols of verification of DLIs. 12/25/2019 Page 8 of 19 The World Bank Implementation Status & Results Report Support to the National Education Pact Project (P146831) Improving capacity to enhance the process of decentralized school management IN00772784 ►Number of School Management Committees (SMCs) receiving funds directly (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 1,021.00 1,030.00 1,030.00 2,500.00 Date 30-Jun-2014 31-Dec-2018 13-Dec-2019 30-Dec-2022 SMCs refer to school management committees (Juntas Centro), and the number refers to the number of SMCs currently receiving transfers through direct deposit to their bank account. The number would be Comments: determined as the number of SMC receiving funds directly to their bank accounts during the first quarter of each calendar year. Unit of measure is Number and it is not cumulative. IN00772788 ►Implementation of revised SMC guidelines (Text, Custom) Baseline Actual (Previous) Actual (Current) End Target New functional New functional spending spending guidelines guidelines for School for School Advanced capacity Management Value Not started Management building using ICT on Committees (Juntas de Committees (Juntas new SMC guidelines Centro) adopted by de Centro) adopted by MINERD. MINERD. Date 31-Dec-2014 31-Dec-2018 13-Dec-2019 31-Dec-2022 New guidelines refer to the revision of the ordinances and resolutions regulating SMCs to provide more flexibility to the SMCs in terms of allowable expenses and streamlining financial flows. Report on the Comments: characteristics of School Management Committees’ (Juntas Escolares) improvement projects could be done in 2017 and 2019. IN00772790 ►Beneficiary feedback included at different levels (Text, Custom) Baseline Actual (Previous) Actual (Current) End Target Two of three Two of three All three mechanisms mechanisms currently Value Not started mechanisms currently in in place and in place and place and implemented. implemented implemented. Date 31-Dec-2014 31-Dec-2018 13-Dec-2019 31-Dec-2022 Reports of the data collected are published and analyzed. Details of the type and opportunities for Comments: beneficiary feedback will be included in the Operational Manual. IN00772791 ►Direct project beneficiaries (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 629,427.00 629,427.00 1,289,820.00 Date 31-Dec-2014 31-Dec-2018 13-Dec-2019 31-Dec-2022 12/25/2019 Page 9 of 19 The World Bank Implementation Status & Results Report Support to the National Education Pact Project (P146831) Direct beneficiaries are people or groups who directly derive benefits from an intervention (i.e., children who benefit from an immunization program; families that have a new piped water connection). Please note Comments: that this indicator requires supplemental information. Supplemental Value: Female beneficiaries (percentage). Based on the assessment and definition of direct project beneficiaries, specify what IN00772794 proportion of the direct project beneficiaries are female. This indicator is calculated as a percentage. Female beneficiaries (Percentage, Custom Supplement) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 56.00 56.00 53.00 IN00772796 ►Teachers recruited or trained (Number, Corporate) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 44,000.00 44,000.00 130,000.00 Date 31-Dec-2014 31-Dec-2018 13-Dec-2019 31-Dec-2022 Teachers recruited refers to the number of new teachers to the education system who enter via the revised entrance exam. Teachers trained refers to the number of existing teachers trained through Comments: INAFOCAM in in-service programs that responded to needs identified with data and/or using the Ministry's new ICT-based approaches. IN00772798 Number of teachers recruited (Number, Corporate Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 3,000.00 3,000.00 1,000.00 Date 31-Dec-2014 31-Dec-2018 13-Dec-2019 31-Dec-2022 IN00772800 Teachers recruited or trained - Female (RMS requirement) (Number, Corporate Supplement) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 30,800.00 30,800.00 91,000.00 IN00772803 Number of teachers trained (Number, Corporate Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 35,000.00 35,000.00 115,000.00 Date 31-Dec-2014 31-Dec-2018 13-Dec-2019 31-Dec-2022 IN00772804 ►Development and delivery of a training module to promote awareness about children's rights, gender quality, and violence reduction (Yes/No, Custom) Baseline Actual (Previous) Actual (Current) End Target Value No Yes Yes Yes Date 31-Dec-2014 31-Dec-2018 13-Dec-2019 31-Dec-2022 Development and delivery of a training module to promote awareness about children's rights, gender Comments: quality, and violence reduction IN00772805 ►MINERD strengthens appointment and training of decentralized management (Text, Custom) 12/25/2019 Page 10 of 19 The World Bank Implementation Status & Results Report Support to the National Education Pact Project (P146831) Baseline Actual (Previous) Actual (Current) End Target Second cohort of MINERD competitively MINERD competitively public school principals appointed over 90% of appointed over 90% of Value Not started has completed training regional and district regional and district using improved directors directors methods Date 31-Dec-2014 31-Dec-2018 13-Dec-2019 31-Dec-2022 "Strengthening appointment" of decentralized management refers to the competitive appointment of regional and district directors. "Strengthening training" of decentralized management means the operationalization of new roles and responsibilities for regional and district directors (through the Comments: distribution of new manuals and development of an implementation plan) and the training of school directors using improved methods. IN00772807 ►MINERD strengthens decentralized collection of vulnerability data (Text, Custom) Baseline Actual (Previous) Actual (Current) End Target 30% of school districts collect school infrastructure Value 0.00 Not started Not started information to improve disaster risk management Date 31-Dec-2014 31-Dec-2018 13-Dec-2019 31-Dec-2022 Collection of vulnerability data refers to the development, piloting, and use of a module to enable Comments: collection and analysis of school infrastructure information in MINERD’s administrative data system. Disbursement Linked Indicators IN00772810 ►DLI 2 DLI 1: ISFODOSU’s revised standardized entrance examination is applied to all its applicants (Yes/No, Process, 2,500,000.00, 100.00%) Baseline Actual (Previous) Actual (Current) 30-Jun-2020 Value No Yes Yes -- Date -- 31-Dec-2018 31-Dec-2019 -- IN00772811 ►DLI 4 DLI 2: MINERD administers competitive entrance exam to hire teachers (Concurso de Oposición) (Yes/No, Outcome, 2,500,000.00, 100.00%) Baseline Actual (Previous) Actual (Current) 30-Jun-2020 Value No Yes Yes -- Date -- 31-Dec-2018 31-Dec-2019 -- IN00772812 ►DLI 6 DLI 3: PISA 2015 applied by MINERD (Yes/No, Outcome, 3,000,000.00, 100.00%) Baseline Actual (Previous) Actual (Current) 30-Jun-2020 12/25/2019 Page 11 of 19 The World Bank Implementation Status & Results Report Support to the National Education Pact Project (P146831) Value No Yes Yes -- Date -- 31-Dec-2018 31-Dec-2019 -- IN00772813 ►DLI 8 DLI 4: 250 additional School Management Committees (Juntas de Centro) receive transfers to SMCs. (Yes/No, Outcome, 2,000,000.00, 100.00%) Baseline Actual (Previous) Actual (Current) 30-Jun-2020 Value No Yes Yes -- Date -- 31-Dec-2018 31-Dec-2019 -- IN00772814 ►DLI 10 DLI 5: Dissemination of professional standards for teachers started (Yes/No, Outcome, 2,500,000.00, 100.00%) Baseline Actual (Previous) Actual (Current) 30-Jun-2020 Value No Yes Yes -- Date -- 31-Dec-2018 31-Dec-2019 -- IN00772815 ►DLI 12 DLI 6: MINERD aligns entrance exam (Concurso de Oposición) with professional standards for teachers (Yes/No, Outcome, 2,500,000.00, 0.00%) Baseline Actual (Previous) Actual (Current) 30-Jun-2020 Value No No No -- Date -- 31-Dec-2018 31-Dec-2019 -- IN00772816 ►DLI 14 DLI 7: The implementation of the Student assessment strategy has started (Yes/No, Outcome, 2,500,000.00, 100.00%) Baseline Actual (Previous) Actual (Current) 30-Jun-2020 Value No Yes Yes -- Date -- 31-Dec-2018 31-Dec-2019 -- IN00772817 ►DLI 16 DLI 8: ISFODOSU offers two new degrees for training secondary-level teachers (Yes/No, Outcome, 2,500,000.00, 100.00%) Baseline Actual (Previous) Actual (Current) 30-Jun-2020 Value No Yes Yes -- Date -- 31-Dec-2018 31-Dec-2019 -- IN00772818 ►DLI 18 DLI 9: 80% of public school teachers have been evaluated using an improved evaluation system (Yes/No, Outcome, 2,500,000.00, 0.00%) Baseline Actual (Previous) Actual (Current) 30-Jun-2020 12/25/2019 Page 12 of 19 The World Bank Implementation Status & Results Report Support to the National Education Pact Project (P146831) Value No No No -- Date -- 31-Dec-2018 31-Dec-2019 -- IN00772819 ►DLI 20 DLI 10: MINERD pilots, and based upon the results of the pilot, revises the dissemination component of the Student assessment strategy (Yes/No, Outcome, 2,500,000.00, 100.00%) Baseline Actual (Previous) Actual (Current) 30-Jun-2020 Value No Yes Yes -- Date -- 31-Dec-2018 31-Dec-2019 -- IN00772820 ►DLI 22 DLI 11: New functional spending guidelines for School Management Committees (Juntas de Centro) adopted by MINERD (Yes/No, Outcome, 2,000,000.00, 0.00%) Baseline Actual (Previous) Actual (Current) 30-Jun-2020 Value No No Yes -- Date -- 31-Dec-2018 31-Dec-2019 -- IN00772821 ►DLI 24 DLI 12: INAFOCAM and ISFODOSU’s annual financial reports are prepared using SIGEF (Yes/No, Intermediate Outcome, 3,000,000.00, 50.00%) Baseline Actual (Previous) Actual (Current) 30-Jun-2020 Value No Yes Yes -- Date -- 31-Dec-2018 31-Dec-2019 -- IN00772822 ►DLI 26 DLI 13: 20% of public school teachers have been evaluated using the teacher career and evaluation system (Yes/No, Outcome, 2,500,000.00, 0.00%) Baseline Actual (Previous) Actual (Current) 30-Jun-2020 Value No Yes Yes -- Date -- 31-Dec-2018 31-Dec-2019 -- IN00772823 ►DLI 28 DLI 14: MINERD administers a student assessment for the first cycle of primary education (Yes/No, Outcome, 2,500,000.00, 100.00%) Baseline Actual (Previous) Actual (Current) 30-Jun-2020 Value No Yes Yes -- Date -- 31-Dec-2018 31-Dec-2019 -- IN00772824 ►DLI 30 DLI 15: Pilot assessment for Public Early Childhood Development Centers carried out (Yes/No, Outcome, 2,500,000.00, 0.00%) Baseline Actual (Previous) Actual (Current) 30-Jun-2020 12/25/2019 Page 13 of 19 The World Bank Implementation Status & Results Report Support to the National Education Pact Project (P146831) Value No Yes Yes -- Date -- 31-Dec-2018 31-Dec-2019 -- IN00772825 ►DLI 32 DLI 16: 1,750 School Management Committees (Juntas de Centro) are fully functional (Yes/No, Outcome, 2,500,000.00, 0.00%) Baseline Actual (Previous) Actual (Current) 30-Jun-2020 Value No No No -- Date -- 31-Dec-2018 31-Dec-2019 -- IN00772826 ►DLI 34 DLI 17: ISFODOSU has started the implementation of its own professional development plan for its educators (Yes/No, Intermediate Outcome, 2,375,000.00, 0.00%) Baseline Actual (Previous) Actual (Current) 30-Jun-2020 Value No No No -- Date -- 31-Dec-2018 31-Dec-2019 -- IN00772827 ►DLI 36 DLI 18: INAFOCAM adjusts in-service training programs based on results from assessments and/or impact evaluations (Yes/No, Outcome, 2,500,000.00, 0.00%) Baseline Actual (Previous) Actual (Current) 30-Jun-2020 Value No Yes Yes -- Date -- 31-Dec-2018 31-Dec-2019 -- IN00772828 ►DLI 38 DLI 19: MINERD’s Student Assessment Directorate staff have received training on sampling, item design, database management, and statistical software. (Yes/No, Intermediate Outcome, 2,500,000.00, 0.00%) Baseline Actual (Previous) Actual (Current) 30-Jun-2020 Value No Yes Yes -- Date -- 31-Dec-2018 31-Dec-2019 -- IN00772829 ►DLI 40 DLI 20: 50% of functioning Public Early Childhood Development Centers are assessed for quality standards (Yes/No, Outcome, 2,500,000.00, 0.00%) Baseline Actual (Previous) Actual (Current) 30-Jun-2020 Value No No No -- Date -- 31-Dec-2018 31-Dec-2019 -- IN00772830 ►DLI 41 DLI 21: MINERD administers a student assessment for the 6th grade (Yes/No, Outcome, 6,000,000.00, 0.00%) Baseline Actual (Previous) Actual (Current) 30-Jun-2020 12/25/2019 Page 14 of 19 The World Bank Implementation Status & Results Report Support to the National Education Pact Project (P146831) Value No No No -- Date -- 31-Dec-2018 31-Dec-2019 -- IN00772831 ►DLI 42 DLI 22: MINERD competitively appoints at least 90% of regional and district directors (Yes/No, Outcome, 6,000,000.00, 0.00%) Baseline Actual (Previous) Actual (Current) 30-Jun-2020 Value No No No -- Date -- 31-Dec-2018 31-Dec-2019 -- IN00772832 ►DLI 43 DLI 23: MINERD uses assessment data to prioritize teacher in-service training strategies (Yes/No, Outcome, 6,000,000.00, 0.00%) Baseline Actual (Previous) Actual (Current) 30-Jun-2020 Value No No No -- Date -- 31-Dec-2018 31-Dec-2019 -- IN00772833 ►DLI 44 DLI 24: MINERD produces and delivers school-level reports with recommendations from 6th grade assessment (Yes/No, Outcome, 6,000,000.00, 0.00%) Baseline Actual (Previous) Actual (Current) 30-Jun-2020 Value No No No -- Date -- 31-Dec-2018 31-Dec-2019 -- IN00772834 ►DLI 45 DLI 25: MINERD administers a student assessment for the 9th grade (Yes/No, Outcome, 6,000,000.00, 0.00%) Baseline Actual (Previous) Actual (Current) 30-Jun-2020 Value No No No -- Date -- 31-Dec-2018 31-Dec-2019 -- IN00772835 ►DLI 46 DLI 26: MINERD publishes and distributes new regional and district operations manuals, and develops an implementation plan (Yes/No, Outcome, 6,000,000.00, 0.00%) Baseline Actual (Previous) Actual (Current) 30-Jun-2020 Value No No No -- Date -- 31-Dec-2018 31-Dec-2019 -- IN00772836 ►DLI 47 DLI 27: MINERD incorporates ICT into an in-service teacher training program (Yes/No, Outcome, 4,000,000.00, 0.00%) Baseline Actual (Previous) Actual (Current) 30-Jun-2020 12/25/2019 Page 15 of 19 The World Bank Implementation Status & Results Report Support to the National Education Pact Project (P146831) Value No No No -- Date -- 31-Dec-2018 31-Dec-2019 -- IN00772837 ►DLI 48 DLI 28: ISFODOSU prepares itself to initiate the accreditation process by carrying out an auto-evaluation aligned with international standards (Yes/No, Outcome, 4,000,000.00, 0.00%) Baseline Actual (Previous) Actual (Current) 30-Jun-2020 Value No No No -- Date -- 31-Dec-2018 31-Dec-2019 -- IN00772838 ►DLI 49 DLI 29: MINERD produces and delivers school-level reports with recommendations from 9th grade assessment (Yes/No, Outcome, 4,750,000.00, 0.00%) Baseline Actual (Previous) Actual (Current) 30-Jun-2020 Value No No No -- Date -- 31-Dec-2018 31-Dec-2019 -- IN00772839 ►DLI 50 DLI 30: MINERD administers a student assessment for the first cycle of primary education for the second time (Yes/No, Outcome, 5,000,000.00, 0.00%) Baseline Actual (Previous) Actual (Current) 30-Jun-2020 Value No No No -- Date -- 31-Dec-2018 31-Dec-2019 -- IN00772840 ►DLI 51 DLI 31: MINERD disseminates results of PISA 2018 (Yes/No, Outcome, 4,000,000.00, 0.00%) Baseline Actual (Previous) Actual (Current) 30-Jun-2020 Value No No No -- Date -- 31-Dec-2018 31-Dec-2019 -- IN00772841 ►DLI 52 DLI 32: First cohort of public school principals has completed training using improved methods (Yes/No, Outcome, 4,000,000.00, 0.00%) Baseline Actual (Previous) Actual (Current) 30-Jun-2020 Value No No No -- Date -- 31-Dec-2018 31-Dec-2019 -- IN00772842 ►DLI 53 DLI 33: MINERD develops targets for student achievement at the regional, district, and school levels and a monitoring plan to track progress against targets (Yes/No, Outcome, 4,000,000.00, 0.00%) Baseline Actual (Previous) Actual (Current) 30-Jun-2020 12/25/2019 Page 16 of 19 The World Bank Implementation Status & Results Report Support to the National Education Pact Project (P146831) Value No No No -- Date -- 31-Dec-2018 31-Dec-2019 -- IN00772843 ►DLI 54 DLI 34: At least 10% of teachers who enroll in an ICT-based in-service training program complete it. (Yes/No, Outcome, 6,000,000.00, 0.00%) Baseline Actual (Previous) Actual (Current) 30-Jun-2020 Value No No No -- Date -- 31-Dec-2018 31-Dec-2019 -- IN00772844 ►DLI 55 DLI 35: ISFODOSU formally initiates the process of international accreditation of its first-cycle teacher training programs (Yes/No, Outcome, 6,000,000.00, 0.00%) Baseline Actual (Previous) Actual (Current) 30-Jun-2020 Value No No No -- Date -- 31-Dec-2018 31-Dec-2019 -- IN00772845 ►DLI 56 DLI 36: MINERD produces and delivers school-level reports that track progress across the two waves of the assessment for the first cycle of primary education (Yes/No, Outcome, 5,000,000.00, 0.00%) Baseline Actual (Previous) Actual (Current) 30-Jun-2020 Value No No No -- Date -- 31-Dec-2018 31-Dec-2019 -- IN00772846 ►DLI 57 DLI 37: Second cohort of public school principals has completed training using improved methods (Yes/No, Outcome, 4,000,000.00, 0.00%) Baseline Actual (Previous) Actual (Current) 30-Jun-2020 Value No No No -- Date -- 31-Dec-2018 31-Dec-2019 -- IN00772847 ►DLI 58 DLI 38: 30% of school districts collect school infrastructure information to improve disaster risk management (Yes/No, Outcome, 4,000,000.00, 0.00%) Baseline Actual (Previous) Actual (Current) 30-Jun-2020 Value No No No -- Date -- 31-Dec-2018 31-Dec-2019 -- IN00772848 ►DLI 59 DLI 39: 2,500 School Management Committees (Juntas de Centro) are fully functional (Yes/No, Outcome, 5,000,000.00, 0.00%) Baseline Actual (Previous) Actual (Current) 30-Jun-2020 12/25/2019 Page 17 of 19 The World Bank Implementation Status & Results Report Support to the National Education Pact Project (P146831) Value No No No -- Date -- 31-Dec-2018 31-Dec-2019 -- IN00772849 ►DLI 60 DLI 40: MINERD uses improved methods to train district and regional staff in planning to improve student learning as part of the implementation of district and regional operation manuals (Yes/No, Outcome, 4,000,000.00, 0.00%) Baseline Actual (Previous) Actual (Current) 30-Jun-2020 Value No No No -- Date -- 31-Dec-2018 31-Dec-2019 -- Data on Financial Performance Disbursements (by loan) Project Loan/Credit/TF Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P146831 IBRD-85400 Effective USD 50.00 50.00 0.00 34.13 15.88 68% Not P146831 IBRD-89130 USD 100.00 100.00 0.00 0.00 100.00 0% Effective Key Dates (by loan) Project Loan/Credit/TF Status Approval Date Signing Date Effectiveness Date Orig. Closing Date Rev. Closing Date P146831 IBRD-85400 Effective 30-Sep-2015 08-Oct-2015 09-Dec-2016 30-Jun-2020 30-Jun-2020 Not P146831 IBRD-89130 13-Dec-2018 -- -- 30-Sep-2022 30-Sep-2022 Effective Cumulative Disbursements 12/25/2019 Page 18 of 19 The World Bank Implementation Status & Results Report Support to the National Education Pact Project (P146831) Restructuring History There has been no restructuring to date. Related Project(s) P167815-Additional Financing - Support to the National Education Pact Project 12/25/2019 Page 19 of 19