Environmental and Social Action Plan (ESAP) Afghanistan – Sheberghan Gas-to-Power Project (P166405)) Description of the Action Item To be verified by / Anticipated Deliverables Completion Performance Standard 1: Assessment and Management of Environmental and Social Risks and Impact Plans related to the Operational Environmental and Social Management Plan (Operational Operational ESMP and By mid-October 1. ESMP): related plans 2019 The Project Company shall require the O&M Contractor to develop and implement the following supplemental plans related to the OESMP: waste management plan (hazardous and non-hazardous waste), health & safety plan including provisions for emergency preparedness and response, spill prevention and control, as well as a monitoring plan for the operational phase. Quarterly audit report on By mid-October CESMP Quarterly Auditor Reports: 2. effeteness of CESMP 2019 The Project Company is expected to share the quarterly reports prepared concerning the effectiveness of the CESMP and the associated plans’ effectiveness. Performance Standard 2: Labor and Working Conditions 1 HR policies and procedures By mid October Human Resources Policies and Procedures: 3. by O&M contractor 2019 The Project Company is to ensure that the O&M contractor puts in place equivalent HR policies covering non-discrimination, equal employment opportunity, employee/workers Grievance Redress Mechanism, performance appraisals, workers’ organization, workers’ insurance in case of accidents, code-of-conduct relevant to local working conditions and the surrounding communities to be signed by each worker before commencement of works, OHS, as well as training for staff. Performance Standard 3: Resource Efficiency and Pollution Prevention Greenhouse Gases: 4. (a) The Project Company is to update the ESIA with the expected yearly emissions rate of (a) Updated ESIA End September CO2 per unit of power generated. 2019 (b) In addition, the Project Company will need to track and report GHG emissions on an (b-i) GHG Emissions report (b-i) Annually annual basis (covering Scope 1 emission as prescribed in the GHG protocol from World Resources Institute and the World Business Council for Sustainable Development) and put (b-ii) Emissions control (b-ii) Mid-October in place appropriate emissions control technology. technology in place 2019 5. Emissions and Ambient Air Quality: Supplemental air Mid-October 2019 The Project Company is expected to prepare an air quality monitoring program with dispersion modelling sampling to. 6. Waste Management (Liquid Effluents, Solid Waste, hazardous Waste): Confirmation of adequate Mid October 2019 The Project Company is to confirm the capacity of authorized handlers to safety transport waste management in and dispose of wastewater. Where in-country capacity to manage the various waste 2 streams in an environmentally acceptable manner is not available, the Project Company is place on-site or through to develop an adequate on-site system. capable authorized handler 3