. EXECUTIVE SUMMARY ENVIRONMENTAL MANAGEMENT FRAMEWORK 1. Background Governments of Assam intend to upgrade the existing Inland water transport system in state. To modernize and transform IWT in Assam, the World Bank is assisting the GoA through a phase-wise project which includes up gradation of ferry Infrastructure, last mile connectivity. Fleet modernization, institutional capacity development etc. for total 11 identified Terminal/ Jetty / Landing point locations. However, in phase-I, three ghats/ landing points have been selected.The projectincludes civil works along with new construction activity; for which it has been categorized as Environment Category-A according to World Bank classifications. Project development / civil intervention works during development may have interface with various physical, social and biological components of the environment, i.e. water quality, aquatic and terrestrial flora & fauna, air quality, noise levels etc. at all project development stages. All these environmental components will get affected due to development and operation of the terminals and a detailed environment and social impact assessment has been carriedout toassess all the potential impacts of the project. Further the impacts of development can be due to its location or due to the nature of activities to be performed during its development and operation phase thus both these aspects should be looked into while carrying out EIA study. As thecomplete lists of project activities and locations havenot been finalized, a framework approach has been adopted. Under this approach, the present Environmental ManagementFramework (EMF) has been prepared to identify all the potential but generic negative environmental and social impacts, propose mitigation measures, provide basic screening criteria for selecting subprojects, implementation and provide institutional arrangements, grievance redressal mechanismsand monitoring, reporting and documentation measures for environmental and social safeguards compliance. The EMFcovers all physical works activities as well as feasibility and other studies to be carried out under the project. 2. Project Description 2.1 Strategic Components and Action Plan of the Project 2.1.1 Project Development Objective (PDO) The Project's Development Objectives are to: (a) Improve passenger ferry infrastructure and services in Assam, and (b) to improve the institutional capacity and framework. 2.1.2 Project Components The project is focused primarily on improving ferrying of cross-river passengers on the Brahmaputra, and seeks to use the opportunity to establish a tenable foundation for development of a modern IWT sector in Assam. The long absence of adequate policy response and piecemeal investments in IWT in the state (as also nationally) have resulted in somewhat unorganised and weak condition for the sector, which is not predisposed to a linear scale-up. Despite the odds however, Assam manages to provide ferry services to about 5 million people annually, usually along with their vehicles/livestock/goods. In order to support the functioning but ill-equipped IWT sector therefore requires a more granular approach encompassing a range of supply and demand side factors. As such, the project is guided by a binding philosophy that admits wider, and even incremental interventions as long as they contribute to strengthening institutions and planning; operational efficiency and safety; and importantly sustainability. Estimated cost of the project is USO 150 million. Broadly, the project is structured through the following three components: 2.1.2.1 Component 1: Institutional and Safety Strengthening a. Technical assistance in sector planning; An Integrated Strategic Development Plan (ISDP) for the state is being prepared. The exercise involves preparing an overall transport strategy for Assam, and more specifically preparing investment plan to help mainstream Water Transport in the state including multi-modal AIWTDS Page ii integration and last mile connectivity. Detailed Project Report is also under preparation for three priority terminals which will incorporate the EMP to be prepared for all the specific priority ghats. b. Technical assistance in design and roll-out of new regulatory authority; Complementing the investments in infrastructure, the project aims to strengthen the AIWT Sector through a supportive institutional framework. A wide-ranging consultancy on Institutional Strengthening and Business Plan (ISBP) is assigned to study the apparent system weaknesses in detail and develop prescription for more effective institutions. In doing so, the study has already provided the basis for legislation for an Independent IWT regulatory authority (RA) to carry out the safety, environmental and economic regulation of the sector (shipping, ports, and shipbuilding). An important emphasis of the sub-component while assessing sector laws and regulations is particular attention to Safety regulations for vessel and passenger movement, even more specifically for women and children. Recently, the bill has been passed by the state in November 2018 for establishing an independent regulatory authority for Inland Water Transport. c. Business Planning for Assam Shipping Company and Assam Ports Company; The operational and commercial functions of the government's shipping operations and terminal services have been decided to be vested in two new corporations, the Assam Shipping Company Limited (ASCL) and the Assam Ports Company Limited (APCL) respectively. The two new corporations will be constituted under the Companies Act (2013), subject to rigors of the market. The ISBP will develop a business plan for the two companies and guide them through the initial period of independent operation. d. Navigation aids, including night navigation on some routes; The sub-component would draw on national / international experience in assessing appropriate aids to navigation, their procurement and deployment to allow 24-hour services / night navigation on most vulnerable / trafficked routes / crossing points. Beginning with pilots at 2-3 crucial locations, deployment of navigation aids will be scaled up based on the investment strategy for the sector. e. Establishment of an emergency response system (policy, procedures, equipment, and management); An important objective will be to support establishment of a Search and Rescue (SAR) organization/piloting emergency response system (policy, procedures, equipment, and management) as well as improving systems for emergency preparedness including climate and natural disasters. 2 Training of staff for roles in restructured industry. The ISBP consultancy will also undertake a detailed assessment of capacity building needs of DIWTA staff from the point of view of their professional development, re-skilling and job mapping needs. 3 Component 2: Fleet Modernization This will include financing of an incentive scheme (known as Jibondinga) to drive private sector fleet upgrading by scrapping of unsafe or obsolete vessels and replacement with new vessels or retrofitting newer vessels with new marine engines and safety equipment. The objective of supporting an incentive scheme is to encourage investment in modern shipping technology including adoption of greener and safer technologies, through review of fiscal and other barriers affecting quality of boat construction and maintenance. GoA has prepared a draft proposal entitled 'Jibondinga' - meaning water as source for life/livelihood for private country boat operators, which provides incentive both for new vessel acquisition as well as for retrofitting. The scheme considers special incentive to encourage women entrepreneurs and women self-help groups. Vessels design and specifications for procurement and retrofitting will be standardized to have better regulation as well as for ease of repair and maintenance. The project will facilitate condition surveys of the existing govt. fleet, hull & machinery, deck and outfit items to trade suitability, impact stability (for the area of operation), loading and other conditions. Select vessels may be retrofitted. This will also include measures to "green" the vessel fleet, including on waste management practices, as well as fuel efficiency and fuel mix. AIWTDS Page iii Potential pilot development of a CNG refuelling station for vessels, likely in Guwahati, will also be explored. The project would also like to improve connectivity between the many islands, villages and far- off chars by inducing additional floating stock which is customized to the specific demands. Discussion with the district administration and local governments during early preparation missions, particularly to the upper reaches of Brahmaputra (Dibrugarh, Jorhat, Majuli), had revealed serious connectivity constraints between numerous small islands and remote chars. These have had profound impacts on health (high maternal and infant mortality), education, jobs and trade. For example, many inhabited islands do not have medical facilities and people have to travel to other nearby bigger towns to access the services, which become critical during emergencies. Similarly there are several riverine islands that are used by people only for their livelihood - cultivation and to keep their livestock, requiring people to travel between their village and the island on a daily basis, while the ferry services are limited and irregular. The project therefore will prepare specifications and support procurement of appropriate Vessels (preferably smaller and high speed) to operate as water ambulance emergency services, school ferry / regular ferry services, search and rescue boats. 4 Component 3: Improvement in terminal infrastructure This would involve developing modern, scalable floating terminal (a mix of fixed and floating) infrastructure at major urban and rural ferry ghats; road accesses, terminal buildings and other amenities that is user friendly, specifically for physically challenged, women, children, old and infirm and passengers travelling for health facilities. Given the limited bridges / land connection across the banks and the regular demand to access markets to trade local produce etc., the project will also consider providing a few RO-RO/ RO-Pax (about 5 pairs) landing stations. In particular, the component will finance the design and construction of eight new priority terminals at four busy crossings plus approximately 20 terminal (10 routes) at other locations where upgrading is urgent. It would also provide standard designs for scalable infrastructure that can be adapted for other urban and rural ferry terminals (Ghats). The infrastructure improvements / designs will in particular adopt a 'working with nature' approach which ensures that project objectives are satisfied in a way that places natural ecosystem at centre stage thereby making solutions non-damaging and sustainable (limit dredging, utilize portable / modular infrastructure design adaptation for landing stations to enhance climate change resiliency, low draft vessel designs, etc.). The developments would offer opportunities for ecotourism development, rejuvenating the river waterfront and integration of quality ferry terminals in the urban context. This EMF lays out the requirements to ensure that appropriate screening, and implementation of relevant environment management and mitigation measures as necessary, will be carried out for all the project components (1, 2 and 3). 5 Summary of Works The components of the project that may potentially cause environmental and social impact and therefore relevant for the present analysis are the physical works. The summary list of potential physical activities is provided below: • Up gradation of Terminals/ Ghats/ Ferry locations as per ISDP In addition, the present EMF covers the feasibility and other studies to be carried out under the project. Most of the proposed activities comprise rehabilitation, maintenance or repair works.The works on flood protection structures would not involve any structure large enough to trigger the dam safety policy. The activities will be screened to ensure none of the activities result in any irreversible or significant environmental or social, negative impact. Hence all the activities carried out under the project will fall under WB Environment Category A. 6 Safeguards Policies Triggered Based on an assessment of the civil works involved the following safeguards policies are relevant for the project: AIWTDS Page iv Name Key Requirements Project ADDlica bili ty OP 4.01 Ensures sustainability and environmental feasibility of the Triggers Environmental project. Projects are classified into A, B & C category Assessment depending on the nature and extent of the impact. OP 4.04 Ensures conservation of natural habitats and discourages Triggers Natural habitats disturbance of nay natural habitat due to project development by recommending adoption of alternative method/route/approach or adopting management measures OP 4.36 Ensures that project activities do not disturbs/interfere with May be triggered Forests the forest, forest dwellers activities, fauna and flora of the for Forest forest. Prevents and discourages deforestation and Triggers for tree impacts on rights of forest dependent people. cutting WBG The applicability of the EHS guidelines should be tailored Applicable Environmental, to the hazards and risks established for each project on Health and Safety the basis of the results of an environmental assessment (EHS) Guidelines (general) WBG sector- The EHS Guidelines for ports, Harbours, and Terminals Applicable specific EHS are applicable to marine and freshwater jetties, harbours, guidelines for and terminals for cargo and passengers. Jetty, Harbours and Terminals. 7 Environmental and Social Safeguards Screening As part of environmental and social assessment process, environmental and social safeguards screening exercises have been conducted. The screening exercise has identified the following potential impacts from the project activities: Positive Impacts: • Improvement in IWT and north south connectivity in Assam • Protection of human lives • Poverty reduction through protection of livelihood and productive assets • Protection of vulnerable population from extreme poverty, deprivation, social and economic inequalities that would impact positively on economic growth and human development index. • Well-being of children • Improvement in income and living standards. • Protection of vulnerable groups from disasters • Protection of villages and settlement from damages to housing and other physical assets. • Reduction in temporary displacement. • Decrease in area of land lost due to erosion. • Improvement in local environmental and social conditions. • Decrease in public health risk by reducing incidence of water borne and other disaster related diseases, and mental fears • Protection against damages to crop and livestock. • Increase in agricultural production and economic gain. • Reduction in poverty through generation of employment opportunities for the locals. Negative Impacts: • Water pollution • Use of water for construction • Elimination of washing areas/sites • Leakages of chemicals etc. • Land pollution may happen when solid waste material, camp site area, stone stacking area and removed vegetative cover is left unattended • Noise and vibration due to use of machinery and movement of vessels • Air pollution due to smoke and dust AIWTDS Page v • Traffic and public nuisance • Removal of vegetation ( mostly herbs and shrubs) during site clearance • Land use change • Health and safety issues of subprojects professional staff/labor and communities residing near project areas • Access issues for communities residing near projects areas • Threat to cultural environment due to influx of work force, may have impact on gender • Risk hazard • Terrestrial and aquatic ecology The EMF assess all of these potential negative environmental and social impacts and provide mitigation measures to address these impacts as well as lists down institutional arrangements to ensure that the mitigation measures are implemented. A Social Management Plan (SMP) as a part of sub-project specific ESMP will be prepared to address construction related social impacts of the sub-projects. A Resettlement Policy Framework (RPF) will be developed as a part of SMFto allow application of OP 4.12 requirements. RPF defines objectives and principles of resettlement, including a screening mechanism for sub-projects to ensure that no such sub-projects would be selected, which involve acquisition of private land and significant resettlementimpacts. In case the land is required from government departments, common community land and private titleholders; it will be acquired as voluntary donation. lnaddition to this, RPF includes mechanism for preparation of Resettlement Action Plans(RA Ps) to efficiently mitigate and compensate low to moderate level social impacts, institutional arrangements to implement RA Ps, monitoring and reporting of RA Ps implementation and funding mechanism for them. During preparation of RA Ps and ESMPs consultations will be conducted with potentially affected persons and other stakeholders, to ensure support of potentially affected and beneficiary communities, and other stakeholders. These stakeholders will be engaged during implementation of RA Psand ESMPs and monitoring of subproject results will be done via development of a citizen's engagement mechanism such as access to information, education and communication, feedback and grievance redressalmechanisms. These mechanisms will ensure transparency and accountability of project implementers and enhance positive impacts of the project. The EMF identifies and categorizes all potential activities (subprojects) that may require physical works, identifies the instrument type that will be used to screen, assess, and mitigate the negative environmental impacts, details and extent of the stakeholder consultation that shall be needed for each assessment type, the disclosure requirements and the institutional, reporting and monitoring measures that shall be needed to ensure implementation of mitigation measures. The EMF includes identification of all possible project-environment interactions, categorization of environmental impacts, identification of mitigation measures, a comprehensive environmental and social baseline, identification of stakeholders and details and results of a comprehensive stakeholder consultation exercise, institutional arrangements needed to ensure implementation of mitigation measures, monitoring, reporting and documentation regimes and table of costs associated with implementation of the EMF. 8 ScreeningSafeguards The EMFcategorizes subprojects on the basis of nature of activities, potential impacts on environment and or people. The EMF specifies types and extent of environmental and social assessments that will need to be carried out before initiating each subproject. The EMF includes social and environmental checklists that will be used to assess the potential impacts of each subproject on the basis of its scale/size, nature and potential negative impacts. These checklists prescribe further screening and environmental and social management instruments to be prepared for subprojects which might have more expansive impacts. 9 Monitoring and Reporting The project will employ a three tiered monitoring structure with focal persons nominated from the construction staff to monitor impacts during works phase. The environmental and social AIWTDS Page vi safeguards specialist will compile the monitoring checklists to prepare and collate regular environmental progress reports. In addition to this, annual third party validation will also be conducted to validate compliance with the EMF and RPF, and implementation of safeguard instruments such as RA Ps, ESMP. 10 EMF Disclosure The EMF shall be released on the IAs and project website, hard copies shall be sent to all institutional stakeholders and all their regional offices. The EMF shall be disclosed internally within the World Bank and shall be released on info shop. The EMF and RPF will be translated into local language and disclosed on the websites of IAs and the projects, and distributed among institutional stakeholders and affected and beneficiary communities at the early stage of sub-projects. 11 Stakeholder Consultations Stakeholder consultations have been carried out while finalizing the project details and during the preparation of EMF and RPF. These consultations have been carried out with institutional as well as grass-root stakeholders. The consultations have revealed that the project is considered to have a number of positive social and environmental impacts. However, in particular, the stakeholders suggested that mechanisms in EMF should ensure selection of sub-projects on the basis of community needs, regular consultations, participation, communication, access to information, grievance redressal of project affected and beneficiary communities and other stakeholders; and mitigation of environment and social/resettlement impacts in an effective manner. 12 Grievance Redress Mechanism (GRM) Complaints can be registered through multiple grievance uptake channels, such as a dedicated helpline, email, by letter to the GRCs (a divisional level or upper level GRC) or walk-ins and registering a complaint on grievance logbook to be provided at each project site/ghat or suggestion box. There will be specific procedures for Gender Based Violence (GBV) including confidential reporting with safe and ethical documenting of GBV cases. An SOP/Guidebook will be developed which will lay down procedures for handling grievances in a timely and effective manner. A divisional level Grievance Redressal Committee (GRC) will be set up to resolve the complaints from the field. The GRC will comprise of Divisional Executive Engineer; Additional Deputy Commissioner of concerned district; Social Officer-PIU, representatives of the concerned Village Panchayat/Council President or his/her authorized representative and supporting NGOs for implementing the RAP. Grievances of PAPs in writing will either be brought to GRC for redressal by the supporting NGO or through multiple uptake channels. The GRC will respond to the grievance within 7 days. Grievances brought to the GRC shall be redressed within a period of one month (30 days) from the date of receipt of grievance. The decision of the GRC will not be binding to PAPs i.e., decision of the GRC does not debar PAPs taking recourse to court of law. Petitioners who wish to submit an appeal to the higher authorities can directly appeal to the GRC at the PMU, which will comprise of the Project Director, Advisor (Administration),Social Development Specialist, member of the Assam IWT Regulatory Authority, representative from the Revenue Department and a recognised NGO. On receiving the complaint, the Advisor (Administration), designated as the Officer in charge of GRM at the PMU will issue an acknowledgement to the petitioner within 7 days. The case will be disposed by the PMU within 30 days of receiving the complaint. Details of the resolved cases will be documented and published on the website. As per the provisions of the Assam Right to Fair Compensation and Transparency in Land Acquisition Resettlement and Rehabilitation Rules 2015 (Section 45) the state Government will designate a Rehabilitation & Resettlement Authority to handle the disputes related to the payment of compensation for L.A and R&R issues. AIWTDS Page vii f l Project Affected Persons l ) Multiple uptake channel: Helpline no., Email, SMS, Suggestion Box, Walk in, etc. I ,v Construction Induced Impact, Environment, Grievance Redressal regarding LA Process and Health & Safety, Harassment, Quality & R&R Provisions Efficiency of Services r ! t 1 Redressed GRO (Advisor- Admin) R&R Authority GO ~ HR Manager & 2 OME, ~ (RFCTLARR) e Social Officer at Pill Social Specialist t t Not Redressed/ Grievance Redressal Option to move court Redressed ~ Committee (GRC) PIU t -1, Not Redressed/ Option to Civil Court .... / mow tu GRC P:\11'/ Court J, -1, Grievance Redressal Redressed ; ' Committee (GRC) PMU 13 Institutional Arrangements The Project implementation will be led by the Project Implementation Unit (PIU) that will be established within AIWTDS. The PIU will be headed by the Project Director (PD). The PIU consist of Environmental & Social Development Expert. These experts will assist PIU on issues related to environmental and social management and also provide trainings to the field personnel of PIU & DIWT responsible for monitoring of environmental compliance during both construction and O&M phases of the project. The overall responsibility of environmental performance including EMP implementation of the Project will rest with the PIU. The Technical Supervision Consultant (TSC) will take up the role of supervision and monitoring of the Project activities during the implementation phase. An independent third party monitoring will be done on a quarterly basis, engaging independent Consultants as Safeguard Monitoring Consultants (SMC)' further for monitoring the safeguard aspects. AIWTDS Page viii O rganization Structure for Im plem entation of EMP [ Govt. oflndia ] [ PMU (AIWfD S), ]a.,,_______ World Bank ~ . _ . _}- -~-'---~ ~ 4 '---- ----' f ,;, Environment & Social ~------------- Development Experts (PMU) +------------t General Consultant (GC) t I. Execution of Civil Work II. Modernization of / ' r j_r r ~ - - - - - - - - - - - - - - - - - - - - - - - - - - - -_t i Vessels Technical Supervision Consultant (TSC} Use of eco-friendly '- devices in modernized I i , I vessels to reduce & Social Dev. Env. Officer& Social Dev. emission, oil spillage Env. Officer& So cer Guwahoti Division, Officer Dibrugorh Division, OfficerSilchar and noise vibration in Safeguard (PMU/ (PMU) (P water Monitoring Consultant ... (Third Party Non-Governmental Organization (NGO} Monitoring) Env. & Safety Officer Env. & Safety Officer Env. & Safety Officer forRAP Implementation & Micro-Plan (ESO} of Contractor, (ESO} of Contractor, {ESO} of Contractor, Preparation at Si/char {PMU} atGuwahati at Dibrugarh AIWTDS Page 9 Environmental Management Plan The key components of EMP are summarized below and each of thiscomponents are explained in detail in the following subsections: • Mitigation Measures • Monitoring Measures • Institutional Arrangement • Reporting Requirements • EMP Budget Impact identification and EMF application for the development interventions are carried out to set the management framework The Environmental Management Plan, covering project activities and relevant environmental components for proposed Terminal Project for both constructional and operational phase has been worked out and approximate timeframe and institutional responsibilities have been specified. The same has been presented in Tabular form. A three-tier monitoring program has been proposed: • Compliance monitoring, • Effects monitoring, and • External monitoring. The main purpose of this monitoring program is to ensure that the various tasks detailed in the EMP are implemented in an effective manner, and also to evaluate program impacts on the key environment and social parameters. Institutional Set-up for Effective EMP Implementation and its Monitoring The Project implementation will be led by the Project Implementation Unit (PIU) that will be established within AIWTDS. The PIU will be responsible for engagement of consultants for carrying out the various studies related to EMP. The PIU will be headed by the Project Director (PD). The PIU consists of an Environment and Social (E&S) Cell with environmental & social expert. E&S Cell will assist the PMU on issues related to environmental and social management and oversee the Construction Supervision Consultant (CSC) and contractors .Quarterly monitoring reports on EMP compliance is to be sent to the Project Director and also shared with the World Bank, throughout the construction period. The CSC will supervise and monitor the contractors for effective EMP implementation. The contractors in turn will also have HSE supervisors who will ensure EMP implementation during construction activities Environmental Codes of Practices and Performance Indicators The contractor will be required to follow the environmental codes of practice (ECoPs) by preparing site-specific management plans. For evaluating the performance of the environmental management and monitoring plan, performance indicators are identified to evaluate the efficiency. The indicators are defined both for construction and operation phase. Capacity Building/ Training and environmental awareness Capacity building for effective implementation EMP is highly essential. Capacity building on environmental and social safeguard will be taken up for all levels stakeholders, including AIWTDS, ARKITECHNff E&S Cell of AIWTDS, supervisor, and contractors. At the construction site, supervisor will take the lead in capacity building plan. The contractors will also be responsible to conduct trainings for their own staff and workers. During the O&M phase of the project, these trainings will continue to be conducted by AIWTDS staff for all relevant O&M personnel and community. It is vital that all personnel are adequately trained to efficiently perform their designated tasks. In addition to training, general environmental awareness must be fostered among the project's workforce and general public to encourage the environmentally sound practices. Documentation and Record Keeping A document handling system will be established to ensure updating of EMP documents, and availability of documents for the effective functioning of the EMP. The document handling system have been suggested Stakeholder Engagement It is expected that the stakeholders would have opportunity to comment on the content of the EIA report. Environment Monitoring Plan Budget Tentative Environment budget has been prepared for design, construction and operation phase of the project. The Environmental budget includes the cost of environmental structures like septic tank &soak pit, Air Pollution Control System at terminals, monitoring, enhancement measures, training and awareness and technical support for establishment, enhancement measures and environmental guidelines. EMP cost estimates of North Guwahati Terminal, Gateway Guwahati Terminal and Aphalamukh ghat are Rs .30,58,650/-, Rs 30,58,650/- and Rs .31,42,650/- respectively. Summary and Conclusion Environmental impact assessment is carried out pertaining to the up-gradation proposals of Ghats and other components of the project. The investigation is taken into account both national and international legal requirements (as per WB).The EIA is prepared based on field investigation, secondary data/information, environmental quality monitoring and feedback from the stakeholders. Both positive and negative environmental impacts are evaluated. The positive environmental impacts of the Project are development of all weather navigation routes for transportation of passengers and generation of employment opportunities during construction, operation and maintenance stages. The project will induce economic growth in the region. The negative environmental impacts are not significant. However, the positive impact of the project will improve the sanitary condition, proper waste management and over all aesthetics of the area. EMP has been formulated to mitigate the negative impacts during various phases (pre- dredging/construction, during dredging/ construction and Post dredging/O&M).The main monitoring parameters include monitoring of dredging and dredge material disposal, biological monitoring and enhancement, environmental quality monitoring (air, noise, surface water, river bed sediment), health and safety, etc. Most of the potential impacts are short-term that can be addressed by adopting mitigation measures and relevant ECoPs. To keep the project influence area environmentally friendly, AIWTDS should ensure that the Contractor prepare site specific EMPs including Emergency response plan, Oil Spill Contingency Plan and Workers Health and Safety plan and Environmental Pollution Abatement and Mitigation Measures Plan. Regular and effective monitoring of environmental quality parameters as indicated in this EIA report.AIWTDS should follow the EMP for improvement of navigation and environment quality of the area. ARKITECHNff Assam Inland Water Transport Project, Social Management Framework Report EXECUTIVE SUMMERY SOCIAL MANAGEMENT FRAMEWORK (SMF), RESETTLEMENT POLICY FRAMEWORK (RPF), INDIGENOUS PEOPLE DEVELOPMENT FRAMEWORK (IPDF) AIWTDS Page 1 Assam Inland Water Transport Project, Social Management Framework Report 1. Project Context The Project's Development Objectives are to (a) improve passenger ferry infrastructure and services in Assam, and (b) to improve the institutional capacity and framework. The Project has three main components and eight sub-components collectively intended to tackle the regulatory, operational and infrastructure challenges of the sector. The three main components are: 1. Institutional, regulatory and safety strengthening (estimated cost USO 20 million). This component will include: a. Technical assistance: sector planning, design and roll-out of new Regulatory Authority, business planning for Assam Shipping Company and Assam Ports Company; training of staff to fulfill new roles in the restructured industry (USO 8 million); b. Safety management: river navigation aids, night navigation technology on some routes, and emergency response system (policy, procedures, vessel and equipment) (USO 12 million). 2. Fleet safety improvements and modernization (estimated cost USO 25 million). This will include financing of: a. GoA incentive scheme (known as Jibondinga) to assist industry transition to the new regulatory regime; it is designed to support the scrapping and replacement of unsafe or obsolete private vessels and replace them with new vessels, or retrofit existing but acceptable vessels with modern marine engines and safety equipment (USO 10 million); b. procurement of new vessels for the Assam Shipping Company (USO 15 million). 3. Improvement in terminal infrastructure (estimated cost USO 105 million). This will finance: a. provision of priority terminals for the Guwahati and Majuli Island ferry routes (USO 70 million); and b. provision of terminals on several other mainly rural routes, to be selected (USO 35 million). This report comprises of the Social Management Framework (SMF), Resettlement Policy Framework (RPF), Indigenous People Development Framework (IPDF) and Gender Development Strategy for all project investments. The RPF has been prepared for construction of terminals and ancillary infrastructure such as road access, terminal buildings and other amenities for differently abled, women, children, old and infirm (Component 3). 5 priority terminals have been identified under Component 3(a) of the project. Site identification and planning for 3 priority terminals sites namely LachitGhat, North Guwahati and Aphalamukh is completed which will be developed in the first 18 months of the project. The remaining two priority sites, namely Kamlabari and Neamati are still under consideration for finalization and planning of design at initial stage. Other terminal sites under Component 3 (b) are yet to be identified and construction will be undertaken during phase two of the project. Thus, a consolidated RAP/IPDP has been prepared for the 3 identified locations in phase 1: Lachit Ghat, North Guwahati and Aphalamukh. AIWTDS Page 2 Assam Inland Water Transport Project, Social Management Framework Report 1.1. Project Area of Influence Project Area of Influence includes both the area of direct impacts (physical footprint of the project) and the area of indirect impacts (10 km radius from each of the landing ghats). Villages that fall within the 10 km radius from each of the landing centre/Ghats were found to be dependent on IWT facilities for socio-economic activities, particularly the rural communities living in the northern bank of the river. Hence, the 10 km radius helps capture all indirect or cumulative risks associated with the project. Area falling within 50 metres of the landing centre/ghats, where people using the IWT services, and those directly impacted (loss of livelihood, structure/land and other assets) by the project were identified. This area includes the physical footprint of the project such as the terminal and access road, work staging areas, and areas likely to be affected during the operational phase. 100% survey was done among PAPs within this area to generate information on the socio-economic baseline for the SIA. 1.2. Socio Economic Profile of Assam The population of Assam is about 31,169,272 of which 15,954,927 are males and 15,214,345 are females. The sex ratio is 954 which is better than national average of 940 and under 6 years sex ratio is 957, again slightly better than national average of 914. The literacy rate in Assam is 73.18 percent (male 78.81, female 67.27) which is lower than India average of 74.04 percent (male 82.14, female 65.46). Almost 86 per cent of state's population still live in rural areas (85.92 %) far higher than national average (68.84%) while urban population is only 14.08 %. The high growth rate of population, partly due to heavy influx of cross border migrants, poses another set of challenges for the states planned development. 1.3. Summary of Social Safeguard Impacts and Risks This section details out the potential social impacts of the project which were identified during the SIA of three pre-identified sub-projects namely LachitGhat, North Guwahati and Apahlamukh. Name of/ type of Amount of land Type of Land (private, government, community) sub-project required (in Acres) Private Government Community LachitGhat 0.0378 Acres Nil 0.0378 Acres Nil North Guwahati 0.0341 Acres Nil 0.0341 Acres Nil Apahlarnukh 0.3188 Acres Nil 0.3188 Acres Nil The estimated no. of PAPs/squatters whoare likely to be impacted are 13 in the three priority sub-projects. The RAP-cum-lPDP will provide a detailed assessment of the no. of PAPs affected and the type of losses incurred due to the project. AIWTDS Page 3 Assam Inland Water Transport Project, Social Management Framework Report 2.1. Relevant Policies and Social Legislations Relevant Gal and GoA rules and regulations and applicable World Bank policies on social safeguard triggered under the project are listed below: World Bank Policies on Social Gol&GoA Rules and Regulations Safeguard OP/BP 4.12: Involuntary Resettlement RFCTLAR&R Act, 2013. OP/BP 4.10: Indigenous People Assam Right to Fair Compensation and Transparent OP/BP 4.11 : Physical Cultural Resources Land Acquisition and Rehabilitation and Resettlement ESSE Note on Adverse impacts of labour (RFCTLAR&R) Rules 2015. influx 3.1. Implementation Arrangement for Social Management at PMU The project implementation will be led by the Project Management Unit (PMU), established within AIWTDS. The State Project Director (PD) will be the Head of the PMU and he will be assisted by an Additional State Project Director and a Deputy Director to discharge the functions of the PMU. The Social Development Specialist at PMU will be responsible for overall coordination and monitoring of the implementation of social safeguard instruments- SMF/RPF/IPDF and sub-project SMP/RAP cum IPDP. The PMU will monitor the activities of the social specialist at the Divisional office (E.&S Cell) in-charge of coordinating the field level activities related to the implementation of the SMP/RAP cum IPDP, with the assistance from a RAP Implementation Agency (supporting NGO), deployed for the purpose. Orqanoqrarn; AIWTDS Page 4 Assam Inland Water Transport Project, Social Management Framework Report Flow Chart - B: Institutional Arrangements for Environmental & Social Safeguards Management 1 [ Govt. ofindia ~ . _ · ---+i _r •\,_______)4 l •- - [ PMU (AIWfDS), l World Bank ] General Consultant (GC) . ~----------- Environment & Social Develo~;:,•~ltperts +---------- -1 General Consultant (GC) t t I. .~--------------------------- Execution of Civil Work I II. Modernization of Technical Supervision !'" - - - - - - - - - j_ t- - - - - - - - - - - - , Consultant ;. (TSC) ' Use devices in of eco·friendly modernized vessels to reduce '- Env. O/f,ur& Soc iol tk v. ,cer& Socia/ Dt!v. Env. Off Env. O/f,cer& Socia/ pev, emission, oil spillage and O/f,cerSilcho r DM slon, Officer Guwahorl Division, Officer Oibrugarh Division, nnk,o vihrntinn in wntPr r Safeguard (PMU) IPM /11 Monitoring Consultant (Third Party Em,. & Safety Officer ,cer En11. & Safety off Em,. & Safety Officer Non-Govern mental Organization {NGO) Monitoring} (ESOJ of Contractor, (ES O} of Contractor, (ESQ) of Contractor, /orRAP Implementation & Micro-Plan Preparation 1 Flow Chart- -- to be followed for GRM procedure AIWTDS Page 5 Assam Inland Water Transport Project, Social Management Framework Report 4.1. Capacity Building Strategies Capacity development and training is critical for successful implementation of the Project. All capacity building and training initiatives needs to secure social and economic advantages from improved operations, enhancing the quality of service to IWT users, and lastly, promoting decent work and sustainable jobs. In order to increase the competency of the IWT staff and vessel crew, ISBP prescribes an approach for capacity development and a three-year training plan for the IWT sector. In line with the identified approach, the AIWTDS will undertake: Upgrading of curriculum followed by the Crew Training Centre (CTC) to include certain aspects of social management and safeguards: such as GRM including RTI, labour standard compliance including HR policies, safety and security of women users (including gender sensitization), disaster management, and passenger services for differently abled, senior citizens, women and children. Develop training calendar and modules for land acquisition and R&R process, grievance redressal and livelihood restoration for AIWTDS staff, supporting NGOs and other officials linked to these activities etc. 5.1. Citizen Engagement Citizen Engagement Plan aims to operate through suggestive measures /consultations with the community, especially the users of the IWT. Hence, it is important to understand the scope and purpose of the citizen engagement process. It helps to: • Identify or prioritise the needs of the community at the planning stage itself which can be integrated into the project design. • Inform the design of the engagement mechanism through an understanding of interests, incentives, and objectives of key stakeholders. • Inform the decision-making or service delivery needs of the community • Develop new or collaborative ways of implementing elements of the project • Review progress on the project, through feedback mechanisms. During the project preparation, consultations were carried out with all significant stakeholder groups including the project affected persons (PAP). Stakeholder Mapping has been done to list the key stakeholders, and project details were explained to them and their feedback recorded in such consultations which gives several valuable suggestions for the project design. Kl I and Focus Group Discussions were organised in all the Ghat areas with different social groups including indigenous people, women, livelihood groups, elected representatives and officials in the villages, and ferry operators. Several valid suggestions obtained from these PAPs were incorporated in the draft framework (SMF, RPF, IPDF) and the site-specific plans (SMP, RAP cum IPDP).The revised documents will be disclosed at a place accessible to displaced persons and other stakeholders in a form, manner, and language that are understandable to them. Details of consultation held with various stakeholders detailed in Attachment-2. AIWTDS Page 6 Assam Inland Water Transport Project, Social Management Framework Report 5.2. Community Monitoring of lncentivisation Scheme for Improvement of Country Boat Services (Jibondinga Scheme) As per the proposed scheme, a vigilance body comprising of AIWT staff (Jalsarathis) or volunteers from local communities in the villages at each Jetty/Ghat will monitor the implementation of the Jibondinga scheme. The vigilance body will also monitor compliance to Standard Operating Procedures (SOPs) for ferry terminals to ensure convenience, safety and security of passengers, particularly women. They will report any incident or non-compliance of Scheme/SOP related to safety of passengers or use of any boat not compliant to safety standards as specified by nodal agency at respective jetty/ghat.The members from local communities will also be trained and deployed to act as search & rescue team personnel, if required. 5.3. Citizen's charter The 'Citizens Charter' published at the website of AIWTD will be appropriately revised to ensure that the charter reflects the organisation's commitment towards its citizen with regard to the standard of service, participation, inclusion, grievance redressal, transparency and accountability in the AIWT sector. 5.4. Grievance Redress Mechanism (GRM) Complaints can be registered through multiple grievance uptake channels, such as a dedicated helpline, email, by letter to the GRCs (a divisional level or upper level GRC) or walk-ins and registering a complaint on grievance logbook to be provided at each project site/ghat or suggestion box. There will be specific procedures for Gender Based Violence (GBV) including confidential reporting with safe and ethical documenting of GBV cases. An SOP/Guidebook will be developed which will lay down procedures for handling grievances in a timely and effective manner. A divisional level Grievance Redressal Committee (GRC) will be set up to resolve the complaints from the field. The GRC will comprise of Divisional Executive Engineer; Additional Deputy Commissioner of concerned district; Social Officer-PIU, representatives of the concerned Village PanchayaUCouncil President or his/her authorised representative and supporting NGOs for implementing the RAP. Grievances of PAPs in writing will either be brought to GRC for redressal by the supporting NGO or through multiple uptake channels. The GRC will respond to the grievance within 7 days. Grievances brought to the GRC shall be redressed within a period of one month (30 days) from the date of receipt of grievance. The decision of the GRC will not be binding to PAPs i.e., decision of the GRC does not debar PAPs taking recourse to court of law. Petitioners who wish to submit an appeal to the higher authorities can directly appeal to the GRC at the PMU, which will comprise of the Project Director, Advisor (Administration),Social Development Specialist, member of the Assam IWT Regulatory Authority, representative from the Revenue Department and a recognised NGO. On receiving the complaint, the Advisor (Administration),designated as the Officer in charge of GRM at the PMU will issue an acknowledgement to the petitioner within 7 days. The case will be disposed by the PMU within 30 days of receiving the complaint. Details of the resolved cases will be documented and published on the website. AIWTDS Page 7 Assam Inland Water Transport Project, Social Management Framework Report As per the provisions of the Assam Right to Fair Compensation and Transparency in Land Acquisition Resettlement and Rehabilitation Rules 2015 (Section 45) the state Government will designate a Rehabilitation & Resettlement Authority to handle the disputes related to the payment of compensation for L.A and R&R issues. r \ Project Affected Persons l J r ,) Multiple uptake channel: Helpline no., Email, SMS, Suggestion BOK, Walk in, etc. I IV Construction Induced Impact, Environment, Grievance Redressal regarding LA Process and Health & Safety, Harassment, Quality & R&R Provisions Efficiency of Services r ..., ! ..., l l Redressed GRO (Advisor- Admin) R&R Authority GO ~ HR Manager & 2 OME, ~ (RFCTLARR) e Social Officer at Pl U Social Specialist l l Not Redressed/ Grievance Redressal Redressed ~ Option to move court Committee (GRC) PIU t r 1 ..., Civil Court ,,. Nol Redressed/ Option to ' mow to GKC P'.\ll / Court 1 1 Redressed ,,. Grievance Redressal ' Committee (GRC) PMU 6.1. Gender Development Strategy The Gender Development Strategy for the project will ensure social inclusion, by providing women with an enabling environment to exercise their rights and equal access to opportunities and resources within the project. Inclusive and effective transport development can only be achieved if these gender differences in demand and impact are properly identified and addressed. 6.1.2. Gender Based Violence (GBV) There are increasing instances of domestic violence and sexual assault/ harassment in the state of Assam. As per NCRB 2016, Assam has reported the highest crime rate under Section 498A 'Cruelty by Husband or His Relatives' (58.7%). Women also report feeling unsafe in public spaces, further reducing their mobility. As per the study conducted by the Centre for Urban Equity, women in Guwahati listed - general harassment by co-passengers, driver or conductor (47 %), eve-teasing (10 %), and stalking (7 %), as major constraints to use of public AIWTDS Page 8 Assam Inland Water Transport Project, Social Management Framework Report transportation. Assam is also a major source and transit point for human trafficking, accounting for 21.7 per cent of all cases relating to human trafficking recorded across the country (NCRB 2015). The SIA studies revealed that most IWT terminals and vessels had limited seating; while waiting areas were mostly overcrowded. Few, if any had clean toilets or drinking water facility. Potential for sexual harassment of women and girls on IWT can be addressed by limiting overcrowding, providing sufficient seats and well-lit spaces. A Gender Action Plan has been prepared to address these challenges through a set of activities, specifying the roles of different implementing agencies, including indicators to track its progress. Some of the key activities are: • To encourage women's economic participation and mobility, certain measures such as proper approach road to the terminals, ramps for differently-abled, old and infirm, toilet facilities, adequate seating, dedicated facilities for patients/nursing mothers, storage, convenient boat operating schedules and pricing regulations, among others will be incorporated in the project design. • In addition to deployment of a security personnel at every terminal, dedicated project helpline no. and state-run women helpline nos. will be displayed at the terminals & ferries. • Regular user satisfaction survey will be conducted to evaluate how passengers, particularly women and girls experience IWT travel in terms of their safety, security and convenience. • The upgraded GRM system for AIWT project will have specific procedures for GBV, including confidential reporting with safe and ethical documenting of GBV cases. Parallel GRM outside of the project GRM may be warranted for substantial to high risk situations. • To address sexual harassment at the workplace, Internal Complaints Committees will be established, capacity building and awareness will be generated at the PIUs, PMUs and among contractors as per the Sexual Harassment of Women at Workplace (Prevention, Prohibition and Redressal) Act, 2013. 7 .1. Indigenous People Development Framework The IPDF is intended to guide selection and preparation of subprojects under this project where impacts on ST are identified. The framework is prepared in accordance with the WB's OP/BP 4.10 on IP. The main objective of I PDF will be to ensure that the project activities do not adversely affect ST, and that they receive culturally compatible social and economic benefits. The framework will be applied, and the focus will be to carefully select and screen all subprojects and their locations and sites, to determine whether ST are present in the subproject area, and also to ensure their participation in the civil works selection and implementation processes. The screening of the ST will be undertaken with the help of the community leaders and local authorities. If the results of the screening indicate the presence of ST households in the zone of influence of the proposed subproject, a social impact assessment and IPDP will be undertaken for those areas. While conducting the SIA studies and preparing site-specific IPDPs for prioritised terminals (Phase- 1 and 2) under the project the following strategies will be adopted to avoid, mitigate or minimise adverse risks to the affected tribal communities within the project: AIWTDS Page 9 Assam Inland Water Transport Project, Social Management Framework Report Stages Procedures Activities & Outcome Preparation • Identify concerns/issues in relation • Preparation of a list of issues to the project activities through during the social screening and Participatory Rural Appraisal (PRA) scoping process exercises • Communicate with Autonomous • Information dissemination on the project and brief account of District Councils/Gaon Panchayat project implementation plans to carry out Free, Prior, Informed and framework held on February Consultation at the village level th • Organize consultation with STs to • Stakeholders' consultations and inform about the project activities FGDs held at Majuli during the and benefits SIA. • Identify key areas of constraints • List areas of constraints that may be improved through the • Number of consultations & project and develop detailed plan signed minutes for tribal development • Prepare a site specific IPDP listing risks and mitigation measures specifically targeting tribal development Implementation • One-time additional financial • List the no. of PAFs accruing the assistance of Rs. 50,000 to SC/ST benefit. PAFs who are displaced and require to relocate due to the project. • Employment to members from tribal • Number of ST s employed community in carrying out actual construction work Operation • Improvement of terminals and ferry • % of tourists visiting historic services to attract and promote sites, areas, museums, other tourism heritage attractions using the • Free Prior and Informed ferry Consultation with the tribal communities. • Capacity building of ST/SC and • Training calendar to be prepared other vulnerable groups, and skill • Number of trainings undertaken up-gradation for institutional strengthening. • Number of tribal members trained • • Employment generation for ST in • Number of ST employed undertaking various activities related sub project activities under the project • Help build linkages with major • Number of STs that have government schemes for skill availed the Jibondinga scheme enhancement and improvement of or similar incentivization ferry services (Jibondinga scheme). schemes. AIWTDS Page 10 Assam Inland Water Transport Project, Social Management Framework Report Stages Procedures Activities & Outcome GRM • Including a member of the ADC in • Number of grievances brought the sixth schedule area in the GRC, forward in ST areas and to address R&R and land related addressed. disputes. 7.1.2. GRM for IPP The grievance redress mechanism will be the same as mentioned in the main chapter, with an additional emphasis to include a member of the Autonomous District Council in the GRC for project investments in the sixth scheduled areas. 8.1. Resettlement Policy Framework (RPF) The main purpose of the RPF is to clarify resettlement principles, eligibility criteria, compensation entitlements, and organizational arrangements for land acquisition, asset loss, and resettlement of people that may be necessary during project implementation. The RPF has been prepared for construction of terminals and ancillary infrastructure such as road access, terminal buildings and other amenities for differently abled, women, children, old and infirm (Component 3). 5 priority terminals have been identified under Component 3(a) of the project. Site identification and planning for 3 priority terminals at Lachit, North Guwahati and Aphlamukh is completed. The remaining two priority sites, namely Kamlabari and Neamati are still under consideration for finalization and planning of design at initial stage. The location of other terminal sites under Component 3 (b) which will be undertaken during phase two of the project are yet to be identified.A consolidated RAP-cum-lPDP with full details of all affected people for 3 priority terminals (Lachit, North Guwahati and Aphlamukh) have been prepared. The purpose of the RPF, therefore, is to clarify resettlement principles and compensation, as well as organizational arrangements, to be applied for proposed sub-projects financed during phase two of the project. As per the provisions of the RFCTLARR Act, 2013, State Revenue Department will oversee the LA and R&R process for any private land to be acquired under the project. 8.1.2. Objective of RPF In accordance with the World Bank Operational Policy on Involuntary Resettlement (OP 4.12) and relevant central and state laws (RFCTLARR, 2013 and Assam LARR Rule, 2015), the RPF has been prepared with the objective to: • Avoid or minimize adverse impacts and to conceive and execute resettlement activities for sustainable development of the project. • Give affected person's opportunities to participate in the design and implementation of resettlement process. • Assist affected persons in their efforts to improve their livelihoods and standards of living, or at least to restore these to pre-project levels. • Develop Indigenous Peoples' Development plan along with RAP. Land for land for is an option across all sectors. AIWTDS Page 11 Assam Inland Water Transport Project, Social Management Framework Report 8.2. Entitlement Matrix The entitlement framework designed for various categories is based on RFCTLARR 2013 and RTFCTLARR Rules, 2015 of GoA and World Bank Policy guidelines. Both, non-titleholders and titleholder will be compensated as per their eligibility and detailed in the entitlement matrix summarised below: SI. Impact Category Entitlements Implementation Guidelines No. PART I. TITLE HOLDERS - Compensation for Loss of Private Property 1 Loss of Land 1.1 Compensation for land at Land will be acquired by the (agricultural, Replacement Cost or competent authority in accordance homestead, Land for land, where with the provisions of RFCTLARR commercial or feasible. Act, 2013. otherwise or assets attached to the land) Replacement cost for land will be: (i) market value as per Indian Stamp Act, 1899 for the registration of sale deed or agreements to sell, in the area where land is situated; or (ii) average sale price for similar type of land, situated in the nearest village or nearest vicinity area, ascertained from the highest 50% of sale deeds of the preceding 3 years; or (iii) consented amount paid for PPPs or private companies (whichever amount is higher). Plus 100% solatium and 12% interest from date of notification to award. The multiplied factor adopted by the GoA for land in rural area, based on the distance from urban area to the affected area, will be applied. In case only a part of any land plot is affected and its owner desires that the whole plot be acquired on the grounds that the plot has been rendered uneconomic or has been severed due to LA, the competent authority any make additional award as per section 94 of RFCT-LARR Act, 2013 for the remaining part of AIWTDS Page 12 Assam Inland Water Transport Project, Social Management Framework Report SI. Impact category Entitlements Implementation Guidelines No. land without initiating the land acquisition process afresh. Value of Assets attached to the land/building: Compensation for trees/crops etc. a. Cash compensation as estimated u/s 29 (3), RFCT-LARR Act, 2013 by: i. Forest Department for timber trees ii. State Agriculture Department for crops iii. Horticulture Department for horticulture, perennial trees iv. Cash assistance to title holders and non-squatters for loss of trees, crops and perennials at market value. b. Three months' advance notice to affected parties to harvest fruits, crops. In case standing crops, the affected parties shall receive three months' advance notice to salvage crops, or compensation in lieu thereof as determined above. 2 Loss of Structure 2.1 Compensation at The market value of structures and (house, shop, replacement cost other immovable properties will be building or determined based on relevant basic immovable property) Schedule of Rates (SR) as on date without depreciation. Plus 100% solatium For partly affected structures, the PAP will have the option of claiming compensation for the entire structure, if the remaining portion is unviable. PART II. REHABILITATION AND RESETTLEMENT - Both Land Owners and Families Whose livelihoods are primarily dependent on Land Acquired 3 Loss of Land 3.1 Employment to at least one member per affected family in the project or arrange for a job in such other project as may be AIWTDS Page 13 Assam Inland Water Transport Project, Social Management Framework Report SI. Impact category Entitlements 1mplementatlo n GuldeHnes No. required after providing suitable training and skill development in the required field and at a rate not lower than the minimum wages. or One-time payment of Rs. 5,00,000/- for each affected household or Annuity policy that shall pay Rs. 2000/- per month for 20 years with appropriate indexation to CPIAL 3.2 Subsistence allowance of Rs. 3,000/- per month for a period of one year to affected households who require to relocate due to the project 3.3 Transportation assistance of Rs. 50,000/- for affected households who require to relocate due to the project 3.4 One-time assistance of Cattle shed or petty shop shall get not less than Rs. one-time financial assistance of such 25,000/- to all those who amount as the appropriate lose a cattle shed or a Government may, by notification, petty shop. specify subject to a minimum of twenty-five thousand rupees for construction of cattle shed or petty shop as the case may be. Petty shop will include commercial kiosk, vendor where business is carried out. PIU and the implementation support AIWTDS Page 14 Assam Inland Water Transport Project, Social Management Framework Report SI. Impact Category Entitlements Implementation GuideHnes No. NGO / agency will consult such PAPs and assess the requirement of subsistence allowance for kiosks and vendors receiving this cash assistance under the petty shop category. Cattle shed shall mean any permanent, semi-permanent structure or makeshift shed erected on long term basis for keepinq cattle. 3.5 One-time Resettlement Allowance of Rs. 50,000/- for affected household who have to relocate 3.6 Additional one-time assistance of Rs. 50,000/- for scheduled caste and scheduled tribe families who are displaced from scheduled areas and are required to relocate due to the project 4 Loss of Residence 4.1 An alternative house for An alternative house for those who those who have to have to relocate, as per PMAY-G relocate, as per PMAY-G (/AY has been restructured) specifications in rural specifications in rural areas and a areas and a constructed constructed house / flat of minimum house/flat of minimum 50 50 sq. m. in urban areas or cash in sq. m. in urban areas; lieu of house if opted (the cash in lieu of house will be Rs.1,20,000/- (plain) or and 1,30,000/- (difficult terrain) in line with Gol PMAY-G standards in rural Cash in lieu of house if areas and Rs.1,50,000 in case of opted, for those who do urban areas). not have any homestead land and who have been The benefits listed above shall also residing in the affected be extended to any affected family area continuously for a which is without homestead land and minimum period of 3- which has been residing in the area years. continuously for a period of not less than three years preceding the date of notification of the affected area and which has been involuntarily AIWTDS Page 15 Assam Inland Water Transport Project, Social Management Framework Report SI. Impact Category Entitlements Implementation Guidelines No. displaces from such area. This assistance shall be extendable to mixed-use structures fulfilling residential and commercial purposes in owner as well as un-titled categories. 4.2 Employment to at least one member per affected family in the project or arrange for a job in such other project as may be required after providing suitable training and skill development in the required field and at a rate not lower than the minimum wages. or One-time payment of Rs. 5,00,000/- for each affected household or Annuity policy that shall pay Rs. 2000/- per month for 20 years with appropriate indexation to CPIAL 4.3 Monthly subsistence allowance of Rs. 3,000/- per month for a period of one year to affected households who require to relocate due to the project 4.4 Transportation assistance of Rs. 50,000/- for affected households who require to relocate due to the project AIWTDS Page 16 Assam Inland Water Transport Project, Social Management Framework Report SI. Impact Category Entitlements Implementation Guidelines No. 4.5 One-time assistance of Cattle shed or petty shop shall get not less than Rs. one-time financial assistance of such 25,000/- to all those who amount as the appropriate lose a cattle shed or a Government may, by notification, petty shop. specify subject to a minimum of twenty-five thousand rupees for construction of cattle shed or petty shop as the case may be. Petty shop will include commercial kiosk, vendor where business is carried out. PIU and the implementation support NGO / agency will consult such PAPs and assess the requirement of subsistence allowance for kiosks and vendors receiving this cash assistance under the petty shop category. Cattle shed shall mean any permanent, semi-permanent structure or makeshift shed erected on long term basis for keeping cattle. 4.6 One-time assistance of Rs. 25,000/- for each affected family of an artisan or self-employed and who has to relocate 4.7 One-time Resettlement Allowance of Rs. 50,000/- for affected household who have to relocate 4.8 Additional one-time assistance of Rs. 50,000/- to scheduled caste and scheduled tribe families who are displaced from scheduled areas and are required to relocate due to the project 4.9 Right to salvage affected materials AIWTDS Page 17 Assam Inland Water Transport Project, Social Management Framework Report SI. Impact category Entltlements Implementation GuldeHnes No. 5 Loss of shop/ trade/ 5.1 Employment to at least commercial structure one member per affected family in the project or arrange for a job in such other project as may be required after providing suitable training and skill development in the required field and at a rate not lower than the minimum wages. or One-time payment of Rs.5,00,000/- for each affected household or Annuity policy that shall pay Rs. 2000/- per month for 20 years with appropriate indexation to CPIAL 5.2 Monthly subsistence allowance of Rs. 3,000/- per month for a period of one year to affected households who require to relocate due to the project 5.3 Transportation assistance of Rs. 50,000/- for affected households who are required to relocate due to the project. 5.4 One-time assistance of Rs. 25,000/- for each affected family of an artisan or self-employed or small trader and who has to relocate. 5.5 One-time Resettlement Allowance of Rs. AIWTDS Page 18 Assam Inland Water Transport Project, Social Management Framework Report SI. Impact Category Entitlements Implementation Guidelines No. 50,000/- for affected household who have to relocate 5.6 Additional onetime assistance of Rs. 50,000/- to scheduled caste and scheduled tribe families who are displaced from scheduled areas and who require to relocate due to the project 5.7 Right to salvage affected materials PART Ill. IMPACT TO SQUATTERS AND ENCROACHER$ - Those in the Right of Way where no Land Acquisition is done 6 Impact to Squatters 6.1 Loss of House Only those directly affected squatters 6.1.1 Compensation at who live there will be eligible for all scheduled rates without assistance. depreciation for structure with 1-month notice to Structure owners in government demolish the affected lands who do not live there and have structure rented out the structure will be 6.1.2 Right to salvage the provided compensation for structure affected materials and no other assistance will be 6.1.3 House construction grant provided to them. The occupier of Rs. 1,20,000/- for all ( squatter-tenant) will be eligible for those who have to other assistances. relocate and who do not have a house. Additional house site grant of Rs. 50,000/- to those who do not have a house site 6.1.4 One-time subsistence allowance of Rs. 18,000/- 6.1.5 Shifting assistance of Rs. 10,000/- 6.2 Loss of Shop Only those directly affected squatters 6.2.1 Compensation at who do business there will be eligible scheduled rates without for all assistance. depreciation for structure with 1-month notice to Structure owners in government land demolish affected who do not do the business and structure have rented out the structure will be 6.2.2 Right to salvage the provided compensation for structure AIWTDS Page 19 Assam Inland Water Transport Project, Social Management Framework Report SI. Impact Category Entitlemem. Implementation GuideUnes No. affected materials and no other assistance will be 6.2.3 One-time rehabilitation provided to them. The occupier grant of Rs. 25,000 for (squatter-tenant) will be eligible for reconstruction of affected other assistances. shop. 6.2.4 One-time subsistence allowance of Rs. 18,000/- 6.2.5 Shifting assistance of Rs. 10,000/- 6.3 Kiosks / Street Vendors Petty shop will include commercial 6.3.1 1-month advance notice kiosk, vendor where business is to relocate to nearby carried out. Petty shop shall get one- place for continuance of time financial assistance of such economic activity. amount as the appropriate 6.3.2 For temporary loss of Government may, by notification, livelihood during specify subject to a minimum of construction period, a twenty-five thousand rupees for monthly subsistence construction of petty shop. allowance of Rs. 3,000/- will be paid for the PIU and the implementation support duration of disruption to NGO I agency will consult such livelihood, but not PAPs and assess the requirement of exceeding 3-months subsistence allowance for kiosks and .. 6.3.3 If relocation to nearby vendors recetvmq the cash place and continuance of assistance under the petty shop economic activity in the category. same place is not possible, then one time rehabilitation grant of Rs. 25, 000/-. 6.4 Cultivation 6.4.1 3-month notice to harvest standing crops or market value of compensation for standing crops 7 Impact to 7.1 Cultivation Market value for the loss of standing Encroachers 7.1.1 3-month notice to harvest crops will be decided by the PIU in standing crops or market consultation with the Agriculture or value of compensation Horticulture Department for standing crops, if notice is not given 7.2 Structure 7.2.1 1-month notice to demolish the encroached structure 7.2.2 Compensation at The value of commercial structures AIWTDS Page 20 Assam Inland Water Transport Project, Social Management Framework Report SI. Impact categ ory Entitlements Jn,plemeatatlon Guidelines No. scheduled rates without and other immovable properties will depreciation for the be determined on the basis of affected portion of the relevant Basic Schedule of Rates structure (SR) as on date without depreciation PART IV. IMPACT TO VULNERABLE HOUSEHOLDS 8 Vulnerable 8.1 One-time assistance of One adult member of the affected Households Rs. 25,000/- to DHs who household, whose livelihood is have to relocate affected, will be entitled for skill development. The PIU with support from the NGO will identify the number of eligible vulnerable displaced persons during joint verification and updating of the RAP and will conduct training need assessment in consultations with the PAPs so as to develop appropriate training programmes suitable to the PAP's skill and the region. Suitable trainers or local resources will be identified by PIU and NGO in consultation with relevant training institutes PART V. IMPACT DURING CIVIL WORKS 9 Impact to structure I 9.1 The contractor is liable to The PIU will ensure compliance to assets / tree / crops pay damages to assets / these provisions. trees I crops in private / public land, caused due to civil works 10 Use of Private Land 10.1 The contractor should obtain prior written consent from the land owner and pay mutually agreed rental for use of private land for storage of material or movement of vehicles and machinery or setting up of camps or diversion of docking areas during civil works. PART VI. COMMON PROPERTY RESOURCES 11 Impact to common 11.1 Relocation or restoration, property resources if feasible, or cash AIWTDS Page 21 Assam Inland Water Transport Project, Social Management Framework Report SI. ....,_ct Category Entitlements Implementation Guidelines No. such as places of compensation at worship, community replacement cost. buildings, schools, etc. 12 Utilities such as 12.1 Will be relocated and The PIU will ensure that utilities are water supply, services restored prior to relocated prior to commencement of electricity, etc. commencement of civil civil works in accordance with the works. civil works schedule. PART VII. UNFORESEEN IMPACTS Unforeseen impacts encountered during implementation will be addressed in accordance with the principles of RFCTLAR 2013 / World Bank Safeguards Policies. 8.2.1. Implementation Process and Arrangements: The implementation of RAP is the responsibility of the AIWTDS along with the Revenue Department (in case of private land acquisition). A Social Development Specialist at PMU will be responsible for overall coordination of the implementation of SMP/RAP. The Social Specialist at the E&S Cell, PIU at the divisional level will coordinate the field level activities with the support of an NGO (RAP implementation agency). 8.2.2. Rehabilitation and Resettlement Award: In accordance with the provisions of the RFCTLARR Act [Sec31 (1 )], the competent authority will pass a Rehabilitation and Resettlement (R&R) Award. All the affected titleholders who are eligible for R&R assistance will be notified along with details of eligible assistance as per the provisions of RFCTLARR Act. Initially a draft list will be notified by giving minimum of 15 days' time inviting objections, if any, regarding discrepancies on the nature and quantum of assistance. The final list will be notified after taking into account the objections, if any. Similarly, the list of those affected non- title holders will also be notified along with the details of R&R assistance and a separate R&R award enquiry will be conducted for the non-titleholders. Non- title holders who settle in the affected areas after the cut-off date (start date of the project census survey) will not be eligible for compensation. They will however be given sufficient advance notice (60 days) to vacate the premises and dismantle affected structures prior to project implementation. 8.2.3. Micro plan: The implementation support NGO will prepare the draft micro plan, milestone wise for each of the sub-project detailing the type of loss, tenure of the PAP, vulnerability status and the entitlements as per the provisions of the Entitlement Matrix (EM) in the RPF. The draft micro plan will be disclosed in the jurisdictional village panchayat where the PAPs are living/having business, and 1-week after the disclosure, the R&R award enquiry will be held by the jurisdictional Additional Collector (R&R Administrator). AIWTDS Page 22 Assam Inland Water Transport Project, Social Management Framework Report Based on the R&R award enquiry outcome, the NGO will submit the final micro plan to the Executive Engineer, PIU for verification and onward transmission to Project Director, PMU. The Project Director, PMU, after scrutiny of the micro plan will accord approval for the same and submit to the jurisdictional Additional Collector (R&R Administrator) with necessary funds for disbursement. 8.2.4. R&R Award Process The Additional Collector (R&R Administrator) will hold R&R award enquiry in the project area and will send prior intimation to all concerned PAPs through the jurisdictional Patwaris and the NGO. During the R&R award enquiry, each PAP will be informed about the type of loss and tenure as recorded during census and socio-economic survey and verified subsequently, and the entitlements due to the PAP as per the provisions contained in the Entitlement Matrix of the RPF. All the PAPs will be given an opportunity to be heard and concerns if any, will be addressed. The R&R proceedings will be recorded and copy of the R&R award will be issued to the PAP then and there. 8.2.5. Livelihood Restoration and Income Generation Plan Majority of the eligible families for income restoration earn their livelihood through petty businesses and agricultural activities (marginal/small) therefore, it is imperative to ensure that the PAPs can reconstruct their livelihood. The NGOs engaged in the implementation of the RAP will ensure that the PAPs are facilitated to obtain plots near their existing habitation to minimize disruption to their social network and normal work pattern, wherever possible. Other short-term strategies for restoring their income during periods immediately before and after relocation/vacating includes providing the PAPs with adequate compensation prior to relocation/vacating the premises, along with transit allowances, one-time relocation allowance, free transport to resettlement areas or assistance for transport, transitional/subsistence allowances or grants until adequate income is generated, special allowances for vulnerable groups. With consideration of PAPs skills and the project's workforce requirement, PAPs access to project-related employment opportunities will be encouraged. The PAPs are required to participate in developing feasible long- term income generating strategies. The long- term options are expected to be developed during the implementation of the RAP and supported by the government assistance. Central andAssam state government runs various poverty alleviation and livelihood programmes. Partnering NGO can facilitate PAPs to participate in these programmes as per their choices and skill requirement. 9.1. Monitoring and Evaluation Framework: The social development specialist at the PMU is responsible for overall monitoring of social safeguards, with the assistance of the General Consultant during preparation and Technical Supervision Consultant at the construction phase. Internal monitoring and supervision of the AIWTDS Page 23 Assam Inland Water Transport Project, Social Management Framework Report project activities will be done by the General Consultant, at the time of implementation of the Project, to ensure that the set milestones of the project are met with and in line with the requirements of the SMF/RPF/IPDF and sub-project specific RAP/I PDP. The PMU will carry out concurrent monitoring of RAP implementation through the PIU and prepare monthly and quarterly progress report in terms of physical and financial progress. Additionally, the monitoring process will also look at: grievance management; public consultation and information dissemination to PAPs on benefits; income restoration activities, community monitoring of the Jibondinga Scheme and compliance of safety measures; citizen engagement to assess users' satisfaction; labour standard compliance of all physical investments; training and capacity building; prevention of GBV and gender mainstreaming. The subsequent calendar month. The progress report will be reviewed by the PMU and feedback if any, will be communicated to PIU for immediate action. PMU will conduct periodic site visits to identify potential challenges faced in the project implementation and provide support to take timely corrective measures, if needed. A third party monitoring will be carried out on a quarterly basis to review social and environmental safeguard activities being implemented in the project, and provide specific recommendations to mitigate the issues identified during the review period. 10.1. Labour Standard Compliance and Labour Influx Mitigation Framework: The influx of workers and followers can lead to adverse social and environmental impacts on local communities, especially if the communities are rural, remote or small. However, the current project for development of IWT involves both rural and urban areas of Assam. While some Ghats are in typical urban centres like Guwahati and Jorhat, others are located in remote rural settings of Majuli. Furthermore, IWT services offers one of the most important modes of connectivity for multiple sections of population, especially in rural areas. Based on this assessment, potential adverse impacts of labour influx have been enumerated below: - • Labour influx may influence the demographic composition of the existing mass of population in riparian areas, where there already seems to be a decline of man-land ratio, shortage of food, settlement pattern, and ethnic differences. • Increased demand and competition for local social and health services, as well as for goods and services, which can lead to price hikes and crowding out of local consumers. SIA of three priority sites indicated low capacity of the community to manage and absorb the incoming labour force. This is particularly relevant for Assam, as it already deals with such risk from cross border and interstate migration. • Bearing in mind the present socio-political environment, temporary labour influx due to the project may amplify social conflicts between the local community and the construction migrant workers. • Project may result in increased rates of illicit behaviour and harassment, which is a real threat for Assam where incidence of crime against women is reportedly high. • SIA of three priority sites revealed that the project will directly impact the livelihood of affected families who earn their living through petty businesses and agricultural activities AIWTDS Page 24 Assam Inland Water Transport Project, Social Management Framework Report (marginal/small) in the project area. It is therefore imperative to ensure that the PAPs can reconstruct their livelihood. The temporary labour influx may increase competition for jobs and have an impact on wage distribution. 10.1.2.Recommended Mitigating Measures • The contractor is responsible for recruitment of labourers for construction work. Specifications on employment of local workforce including women should be reflected in the civil works bidding documents and subsequent contracts to ensure that the contractors fulfil these commitments. Locals including women may be screened further for skills, and adequate orientations can be provided to recruit for the work. AIWTDS can prepare a roster of interested workers and their skills. The lists can be provided to contractors at the pre-bid meetings for recruitment consideration. • The project contractor needs to prepare a site-specific Labour Influx Management Plan and/or a Workers' Camp Management Plan. This plan will include specific measures that will be undertaken to minimize the impact on the local community, including elements such as worker codes of conduct, grievance redressal, skills development, training programs and awareness generation on HIV/AIDS and gender-based violence (GBV) for the workers and host community. A Workers' Camp Management Plan will also address specific aspects of the establishment and operation of the workers' camps in compliance with relevant labour laws. The plan should include appropriate screening and monitoring mechanisms for addressing non-compliance. • Adequate measures will be taken to ensure safety and security of women within the community and at the construction site. A security personnel will be deployed at the construction sites, and emergency nos. including contact details of local law enforcement officers, project's helpline no., existing state-run women helpline nos. will be prominently displayed at the site. The contractors will ensure that an Internal Complaints Committee (ICC) for each establishment is set-up to meet their corporate requirement and legal mandate under the Sexual Harassment at the Workplace Act, 2013. • Welfare measures, such as canteens, first-aid facilities, creche, ambulance, housing accommodations for workers near the work place, as per the Building and Other Construction Workers (regulation of employment and conditions of service) act, 1996 is the contractor's responsibility. • Awareness camps on HIV/AIDS and GBV for both, construction workers and neighbouring villages must be organised at regular intervals by NGOs. • PMU must prepare and disseminate IEC materials on labour welfare and compliance. 11.1. Budgetary Allocation The estimated budget is about I NR 173millionwhich covers institutional cost, awareness program and training, grievance redressal mechanism, compensation for land, structure, and other assets and resettlement and rehabilitation assistances, etc. AIWTDS Page 25 EXECUTIVE SUMMARY ENVIRONMENTAL IMPACT ASSESSMENT MAY 2019 AIWTDS Page 1 1. Background Governments of Assam intend to upgrade the existing Inland water transport system in state. To modernize and transform IWT in Assam, the World Bank is assisting the GoA through a phase-wise project which includes up gradation of ferry Infrastructure, last mile connectivity. Fleet modernization, institutional capacity development etc. for total 11 identified Terminal/ Jetty / Landing point locations. However, in phase-I, three ghats/ landing points have been selected. The project includes civil works along with new construction activity; for which it has been categorized as Environment Category-A according to World Bank classifications. Project development / civil intervention works during development may have interface with various physical, social and biological components of the environment, i.e. water quality, aquatic and terrestrial flora & fauna, air quality, noise levels, soil, project affected families, persons, cultural and historical monuments etc. at all project development stages. All these environmental& social components may get affected due to development and operation of the terminals and a detailed environment and social impact assessment has been carried out toassess all the potential impacts of the project. 2. Project Description Project Development Objective (PDO) The Project's Development Objectives are to (a) improve passenger ferry infrastructure and services in Assam, and (b) to improve the institutional capacity and framework. The Project has three main components and intended to tackle the regulatory, operational and infrastructure challenges of the sector. The three main components are: 1. Institutional, regulatory and safety strengthening (estimated cost USO 20 million). This component will include: a) Technical assistance: sector planning, design and roll-out of new Regulatory Authority, business planning for Assam Shipping Company and Assam Ports Company; training of staff to fulfill new roles in the restructured industry (USO 8 million); b) Safety management: river navigation aids, night navigation technology on some routes, and emergency response system (policy, procedures, vessel and equipment) (USO 12 million). 2. Fleet safety improvements and modernization (estimated cost USO 25 million). This will include financing of: a) GoA incentive scheme (known as Jibondinga) to assist industry transition to the new regulatory regime; it is designed to support the scrapping and replacement of unsafe or obsolete private vessels and replace them with new vessels, or retrofit existing but acceptable vessels with modern marine engines and safety equipment b) Procurement of new vessels 3. Improvement in terminal infrastructure (estimated cost USO 105 million). This will finance: c) Provision of priority terminals for the Guwahati and Majuli Island ferry routes (USO 70 million); and d) Provision of terminals on several other mainly rural routes, to be selected (USO 35 million). The project components in 1st phase are summarized below- Physical Investments Sub Component a. Technical assistance: sector radation of crew AIWTDS Page 2 Institutional, design and roll-out of new Regulatory training centre regulatory and Authority, business planning for Assam safety Shipping Company and Assam Ports strengthening Com an ; trainin of staff b. Safety management: river navigation aids, night navigation technology on some routes, and emergency response system (policy, procedures, vessel and e ui ment Vessel improvement a. GoA incentive scheme (known as Component 2: works for private boat Jibondinga) to assist for up-gradation of operator (engine, hull Fleet safety country boats etc. improvements • Procurement of 20 and b. Procurement of new vessels and new vessels modernization retrofitting of existing public vessels • Retrofitting of few ovt. vessels • 2 terminals at Guwahati (Gateway Component 3: a. Infrastructure Development of Guwahati Ghat and Improvement in terminals at Guwahati and Majuli Island ferry routes North Guwahati) terminal • 1 terminal at Majuli infrastructure A halamukh b. Development of terminals on several other rural routes, to be selected 3. Objective of theEIAStudy The objectives of the study include: • Identification of potential environmental relating to the Project through Environmental Management Framework (EMF) • Assessment of possible environmental impact during stages of implementation of the project (construction and operation phase) through Environmental Impact Assessment (EIA) • Mitigation measures suggested in accordance with World Bank's operational policies, WB Guideline, MoEF&CC Notification & Guidelines • Environmental Management Plan (EMP) as per EMF followed by effective implementation. • Incorporate environmental consideration during design The EMF has been prepared considering all the 11 priority ghats for Assam Inland Water Transport Project. The EIA is prepared for Phase I locations, which include 2 Ghats in Guwahati Division i.e. Gateway Guwahati Ghat (GGG) on South Bank at about 1 00m upstream of Existing GG Ghat of the Brahmaputra River at Kamrup (Metro) district and North Guwahati Ghat on North Bank of the Brahmaputra River at Kamrup district and one Ghat in Dibrugarh Division i.e. Aphalamukh Ghat at Majuli district on North Bank of Brahmaputra River. 4. Administrative and Legal (Regulatory) Framework The national environmental legislations are broadly discussed. The MoEF&CC, Central Pollution Control Board (CPCB), Dept. of Environment& Forest, GoA and State Pollution Control Board, Assam (SPCB) together forms the regulatory authorities for implementation of provisions of environmental legislations. World Bank has also defined its Environmental and Social Safeguard AIWTDS Page 3 Operational Policies. World Bank's operational policy categorize the project into Category A, B & C on the basis of nature and extent of the impacts anticipated. This project is classified as Category A as per WB policy and therefore comprehensive environment assessment studies are required. The project is likely to impact quality of life, livelihood, terrestrial and aquatic ecology, air quality, water quality, economy, noise levels etc. The anticipated impacts are both positive and negative. MOEF&CC, GOI has notified standards under EP Act, 1986 for disposal of effluents, National Ambient Air Quality Standard (NAAQS) and surface water body, which would be complied with. 5. Planning considerations for Terminals and vessels The terminals are planned considering ease accessibility and passenger comfort. Environmental& social consideration such as solid waste management, sewage treatment, vessel wastewater management, noise control devices, landscaping, green belt, solar energy, special provision for elderly, women & differently-able passengers have been taken into account during the designing and layout of the terminals. 6. Project Benefits The major benefits from the project are outlined below. • Higher quality ferry service with wider transport network • Improve the infrastructure for better public convenience. • Accommodate the enhance traffic volume by systematic and timely operation • Have greater positive impact on socio-economy of the area • Improve the safety and environment aspects • Comfortable passenger vessels with all amenities • Minimum impact on existing environmental status • Improve connectivity to many regions/ areas. 7. Environmental Safeguards Screening As part of environmental and social assessment process, environmental and social safeguards screening exercises have been conducted. The screening exercise has identified the following potential impacts from the project activities: Positive Impacts: • Improvement in IWT and north south connectivity in Assam • Protection of human lives • Well-being of children • Improvement in income and living standards. • Protection of vulnerable groups from disasters • Protection of villages and settlement from damages to housing and other physical assets. • Reduction in temporary displacement. • Decrease in area of land lost due to erosion. • Improvement in local environmental and social conditions. • Decrease in public health risk by reducing incidence of water borne and other disaster related diseases, and mental fears • Protection against damages to crop and livestock. • Increase in agricultural production and economic gain. • Reduction in poverty through generation of employment opportunities for the locals. Negative Impacts: • Water pollution • Elimination of washing areas/sites • Leakages of chemicals etc. • Land pollution may happen when solid waste material, camp site area, stone stacking area and removed vegetative cover is left unattended AIWTDS Page 4 • Noise and vibration due to use of machinery and movement of vessels • Air pollution due to smoke and dust • Traffic and public nuisance • Removal of vegetation ( mostly herbs and shrubs) during site clearance • Land use change • Health and safety issues of subprojects professional staff/labour and communities residing near project areas • Risk hazard • Terrestrial and aquatic ecology The EMF assesses all of these potential negative environmental and social impacts and provide mitigation measures to address these impacts as well as lists down institutional arrangements to ensure that the mitigation measures are implemented. The EMF identifies and categorizes all potential activities (subprojects) that may require physical works, identifies the instrument type that will be used to screen, assess, and mitigate the negative environmental impacts, details and extent of the stakeholder consultation that shall be needed for each assessment type, the disclosure requirements and the institutional, reporting and monitoring measures that shall be needed to ensure implementation of mitigation measures. The EMF includes identification of all possible project-environment interactions, categorization of environmental impacts, identification of mitigation measures, a comprehensive environmental and social baseline, identification of stakeholders and details and results of a comprehensive stakeholder consultation exercise, institutional arrangements needed to ensure implementation of mitigation measures, monitoring, reporting and documentation regimes and table of costs associated with implementation of the EMF. 8. Screening Safeguards The EMF categorizes subprojects on the basis of nature of activities, potential impacts on environment and or people. The EMF specifies types and extent of environmental and social assessments that will need to be carried out before initiating each subproject. The EMF includes checklists that will be used to assess the potential impacts of each subproject on the basis of its scale/size, nature and potential negative impacts. These checklists prescribe further screening and environmental management instruments to be prepared for subprojects which might have more expansive impacts. 9. Monitoring and Reporting The project will employ a three tiered monitoring structure with focal persons nominated from the construction staff to monitor impacts during works phase. The environmental safeguards specialist will compile the monitoring checklists to prepare and collate regular environmental progress reports. In addition to this, third party safeguards monitoring will also be conducted to validate compliance with the EMF and implementation of safeguard instruments like the EMP. 10. EMF Disclosure The EMF shall be released on the IAs and project website, hard copies have been sent to all institutional stakeholders and all their regional offices. The Executive Summary of the EMF has been translated into local language and disclosed on the websites of IAs and the projects, and distributed among institutional stakeholders and affected and beneficiary communities at the early stage of sub-projects. AIWTDS Page 5 11. Stakeholder Consultation Key findings from the public consultations were mostly on improvement and extension of terminals, safety and security of passengers, impact on livelihood, dredging, river ecology and environmental issues including management of dredged materials. All the stakeholders and community overall appreciated the project. Stakeholders also expressed their concern on ecology of river, safety of passengers, special facilities for women & senior citizen at terminals & ferries, facilities for differently-able passengers. The stakeholders also suggested to ensure selection of sub-projects on the basis of community needs, regular consultations, participation, communication, access to information, grievance redressal of project affected and beneficiary communities and other stakeholders. 12. Grievance Redress Mechanism (GRM) An integrated grievance mechanism has been created to handle any complaints related project performance on environmental aspects, along with social aspects. Complaints can be registered through multiple grievance uptake channels, such as a dedicated helpline, email, by letter to the GRCs (a divisional level or upper level GRC) or walk-ins and registering a complaint on grievance logbook to be provided at each project site/ghat or suggestion box. 13. Current Environmental Scenario For the activities identified for execution until now, detailed Environmental Impact Assessment had been completed. Baseline environmental status around 10 km radius of the proposed terminals is considered and relevant primary and secondary data with respect to various environmental components were collected, compiled, analysed and presented. Environmental monitoring was carried out to understand the baseline status. Various environment monitoring conducted in the study area for relevant parameters. 13.1 Physiography The Brahmaputra Valley has a uniform level alluvial Plain interspersed with low elevated hillocks scattered along the banks of the River. The alluvial fans formed by the coarse alluvial debris in the northern fringe of the Valley have given rise to semi-tame conditions where water percolates down resulting in wet soil and dense forest. In the South Brahmaputra plain the meandering course of the tributaries is conspicuous only in the eastern part where there are numerous beels and oxbow lakes. The most physical characteristic of the Brahmaputra is that the river itself is highly braided due to its gradient. As a result, there are innumerable Chars or riverine islands. 13.2 Landuse pattern The existing land use pattern of the area was analysed from the Satellite data: The Indian Remote Sensing satellite data RESOURCESAT-2, LISS Ill and Topographical maps of the study area. Land use pattern of study area of three proposed terminals with respect to Agricultural crop, Fallow land, Settlement, Forest, Open Scrub/Grazing Land, Wetland, Water body, river are analysed. It is observed that settlement in the study area of GGG (18.76%) and NG (17.04%) is higher than Aphalamukh (0.21 %). There is no forest area in the study area of Aphalamukh, where as in GGG and NG the forest over are 48% and 45.43 % respectively. Agricultural in Aphalamukh (20.17%) are higher than GGG (8.31 %) and NG (9.23%). River and sandy areas comparable (GGG-8.85%, NG-9.51 and Aphalamukh-11.92%) AIWTDS Page 6 13.3. Water Environment Surface Water Quality Brahmaputra river water quality has been monitored by Central Pollution control Board (CPCB). As per Water quality Monitoring data of CPCB, pH, DO and Total Coliforms meet the water quality criteria, Class (C) for drinking water source after conventional treatment and disinfection at most of the monitoring locations except samples at Jogijhoga. The BOD ranges from 0.3 to 9.2 mg/I. The maximum BOD was recorded at Brahmaputra at Kherghat. Faecal Coliform ranges from Oto 1500 MPN/100 ml at Sualkuchi. Total coliform ranges from Oto 15000 MPN/100 ml at Jogighopa. This may be due to domestic wastewater discharge from urban bodies. Surface water sample were collected from the upstream and downstream of the proposed terminals/ jetty/ landing points. The water samples were analysed for Physico-chemical parameters and bacteriological parameters. It is revealed from the analysis that water quality meets with BOU Class C Criteria of CPCB. Parameters pH & DO which meets A class criteria of CPCB. Ground Water Quality Ground water samples were collected from 3 different locations of each proposed terminals/ jetty / landing points. The water samples were examined for physico-chemical parameters and bacteriological parameters. The results of samples are compared and found that all the parameters are within the permissible limits of drinking water Standard (IS: 10500). 13.4 Climate & Hydrometeorology The climate of the project area is sub-tropical in nature with four distinct seasons. The southwest monsoon lasts from June to September. Almost 90% of the annual rainfall occurs during this timeframe.The annual average rainfall in the area is about 1722mm. Mean daily temperatures reach a minimum of about 18°C in January, occasionally dropping in some cold years below 1 osc. In April, maximum daily temperatures often exceed 35°C.Wind speeds & directions are of primary importance in the diffusion and transport of atmospheric pollutants. The wind rose for Guwahati shows that the predominating Wind direction is from East-Northeast to West-Southwest (WSW).Humidity is an indicator of water vapor content of air. It is observed that monsoon season has the highest humidity level. 13.5. Air Environment Ambient air quality monitoring was conducted in the study area of the proposed project sites during August -September, 2018 for PM10, PM2.5, SO2, NOx, COand compared with National Ambient Air Quality standards(NAAQS,2009), notified under EP Act, 1986 by MOEF&CC. Three monitoring stations were located within 5.0 km radius of each sites for baseline air quality of the area. The monitoring was carried out following CPCB guideline. The ambient air quality monitoring was carried out for Particulate Matter (PM1 0& PM2.5), Sulphur dioxide (SO2),Oxides of Nitrogen (NOx}, CO& all parameters as per NAAQS,2009. Sampling was carried out on 24hourly twice a week for one week. It is observed that ambient air quality for the monitored parameters in all locations well within the NAAQMS. 13.6 Noise Environment Noise levels in three project sites were monitored for 24 hrs. Monitoring was conducted at three locations in each site by using Sound Level Meter. Noise level was monitored for day time (06.00 AIWTDS Page 7 AM to 10.00 PM) and night time (10.00 PM to 06.00 AM) for comparison with the standard. The noise monitoring results show that the day and night time noise level at all locations meet the norms for commercial zone. However, the noise level exceeds the standard (45 dBA) during day time for residential zone. The major source of the noise in the study area is vehicular movement as well as commercial activities. 13. 7 Ecology & Biodiversity Ecology & biodiversity study is an important aspect of EIA. Existing status covers the following: • Study of the ecology & biodiversity {Terrestrial & Aquatic) of the project area along with identification of Rare, Endangered & Threatened (RET) species if any. • Identification of Protected areas/Ramsar sites. • Identification of IBAs near project influence areas. • Identification of breeding ground of Fishes & Avifauna near project locations. Ecology and Biodiversity Study is carried out in 10 km radius of individual proposed terminals including stretches of Brahmaputra River. Detail studies were conducted on followings: • Floral & Fauna! diversity both Aquatic & Terrestrial • Phytoplankton's & Zooplanktons, Benthos • Forest Area and endangered species Gangatic /River Dolphin were spotted in project locations. The active breeding period of sensitive aquatic fauna is during the monsoon period (June to August). Endangered Species (Aquatic Fauna): Endangered (EN) has been categorized by the International Union for Conservation of Nature {IUCN). No aquatic species is found endanger in the study area. Dolphin which is a schedule-I species is reported in Brahmaputra River. Dolphins were spotted at the Gateway Guwahati Ghat (GGG)area during site visit and also dolphin movement were reported in and around the proposed site. Secondary data on dolphin presence in stretches of the river have been relied on. However, the number of Dolphins in the project area was not estimated. A fresh study on Dolphin has been initiated'. 13.8 Soil Quality Three samples of soils were collected from each proposed terminal site and analysed for Physical- chemical parameters. The soil analysis results of Gateway Guwahati Ghat, North Guwahati Ghat and Aphalamukh Ghat indicate that the soil in all three terminals are acidic and is sandy loam. Clay percentage varies from 67.2% to 72.4%. Heavy metals content is to soil is negligible. 13.9 River Bed Sediment Quality The riverbed sediment is an integral component of the aquatic ecosystem. The sediment quality influence benthic organisms, vegetative communities, and the aquatic food web. Organisms and plants, particularly those living in the sediment, can get affected. Secondary data on sediment quality from IIT, Guwahati was collected for all three proposed terminals. From the study report, it is concluded that the sediment is non-hazardous and not contaminated. 14. Current Social Scanerio 1 Dolphin survey for 'dry season' has been completed in March, 2019 and for 'wet season' it is proposed on June-July'2019. Final estimated numbers of dolphin in project location will be ensured after the 'wet season' Dolphin Survey which will be incorporated in the Final EIA. AIWTDS Page 8 14.1 Land Requirement for the Project (Phase-I) Three Ghats viz. Gateway Guwahati Ghat and North Guwahati Ghat in Guwahati Division and Aphalamukh Ghat in Dibrugarah Division were selected for the 1st phase implementation of the of the project. The extent of land required for the construction of these Ghats is shown below: Name of/ type of Amount of land Type of Land (private, government, sub-project required (in community) Acres) Private Government Community Gateway Guwahati 0.0378 Acres Nil 0.0378 Acres Nil Ghat North Guwahati 0.0341 Acres Nil 0.0341 Acres Nil Apahlamukh 0.3188 Acres Nil 0.3188 Acres Nil N. B.: Construction of approach road and the requirement of land are not considered in this. 14.2. The Socio-Economic Profile of the PIA2 • Gateway Guwahati Ghat is in Ward No 02 of Guwahati Municipal Corporation, is the 7th most populous ward in the city and as per 2011 census report, have a population of 16613 persons,8780 (53%) males and 7833 (47%) females(2011 census). Sex ratio is 892.Average Literacy rate is 91 %with 94% male and 88% female literates. 631 ?persons (38%)in Guwahati Ward No.-2 are engaged in main or marginal works. Male work participation rate is 55% and female work participation is 19%. 47% of male workers are engaged in Main works and 8% of the men are engaged in marginal works. Among working women 14% are main workers and 6% are marginal workers. • North Guwahati has a Town Committee in Kamrup district of Assam. The city is divided into 4 wards. As per 2011 census data, it has a population of 10,328 persons with 5,088 males and 5,240 females. Sex Ratio is of 1030 against state average of 958. Literacy rate 93.68 %, higher than state average of 72.19 %, with 96.51 %male literates and 90.97% female literates. Aphalamukh Ghat is in the Majuli Island where there are 144 villages .Total population of the island is 150,000 with a population density of 300 individuals per square km. The total literacy rate is 78.56% with 74.56% male literates and 61.34% female literates. Four villages viz. Garamur Jugi Pathar, AtoiChuk, Dakhinpat Satra and Borboka Pathar are the core area villages falling in the PIA of this Ghat. 15. Environmental Impact & Mitigation Measures This chapter describes the environmental impacts that are likely to result from the project activities. The interaction between various project components and environmental elements are being analysed to identify and evaluate impacts. Mitigation measures proposed to be taken to minimize environmental impacts are also discussed. EMF Guideline, public consultation and observations during field survey of the project sites were important inputs and incorporated in the mitigation measures. Impact during construction and operational phases are separately dealt. Impact due to maintenance dredging of channels is typical to the project activities and discussed separately. Dolphins in the river are endangered species and therefore special emphasis has been given for their conservation and least impact. Major environmental factors, covered are as follows: 2 For details on Social Aspects summarized here in Section 14 and 16, please refer to the SMF and RAP which have been prepared for the porject and disclosed separately. AIWTDS Page 9 • Impact due to solid and liquid waste disposal • Sanitation, health and safety facilities • Impact on Ambient Air Quality due to emission during construction and operational phase • Impact on river water quality due to proposed amenities • Impact on noise level • Impact due to Dredging Activities • Impact on environmental aesthetics and cultural values • Impact on Biological Environment • Impact due to Climate Change • Impact on Social Environment (Project Affected People} • Labour Influx, Gender Based Violence, Community Health & Safety. All the project activities and relevant environmental parameters are covered in the study. It is concluded that the environmental impact during construction phase will be temporary and with the mitigation measures, it will be localised. All the dredged materials shall be disposed off-shore since the river bed sediment is not contaminated. The overall impact during this phase will be within the acceptable limit. Due to integration of environmental factors in the project, the environmental impact during operational phase will be negligible and overall environmental quality of the area will improve with better infrastructure and amenities. 16. Social Impact & Mitigation Measures The project has direct and indirect impact on the people and their families as summarized below. A detailed analysis of social impact and mitigation measures has been highlighted in the Executive Summary of the SIA, SMF/RPF-cum-lPDF and consolidated RAP-cum-lPDP for three priority terminals prepared under the project. Land required for the project is limited as the constructions of the Ghats mostly happen in the River portion. Still some land is required especially for approach road and parking etc and in these 3priority Ghats, Government land is available and no private land need to be acquired, during the 1st phase. Some commercial squatters occupying government land will be impacted and they will be resettled providing compensation for their loss as per the entitlement matrix. Some other people occupying the Ghat vicinity may also be affected during construction phase and they will be compensated for their livelihood loss as per the entitlement matrix, prepared in line with the World Bank OP 4.12 and RFCTLARR Act, 2013 and Assam LARR Rule 2015. Major and Minor Impacts Impact on the affected properties Major impact: The land proposed for the construction of the 3 Ghats are Government properties and some commercial squatters are running small tea shops / pan shops in temporary sheds and kiosks. 13 such structures were identified to be shifted to adjacent places and their livelihood will be impacted. Minor impact: Some Common Property Resources such as a potable water kiosk, parking area and a ticket counter etc. will be impacted in Lachit Ghat area, which can be shifted or allowed to continue as per the technical design proposed for the Ghat. After the construction phase the possibility of repositioning some of these shops can be considered by the authorities, as these services are required for the passengers as well. Details of major/minor impacts of the project are shown below Category of PAPs Type of Impact Unit of Entitlement Nos. affected Titleholder - Agriculture Loss of Land and Nil Nil Land / Non-agriculture Assets land I Homestead Land AIWTDS Page 10 and assets Titleholder - Residential Loss of Structure Nil Nil Structure Titleholder-Commercial/ Loss of Structure Nil Nil industrial Structure Titleholder-Residential Loss of Structure Nil Nil cum-commercial/ industrial structure Tenants-Residential I Loss of Structure Nii Nil commercial I industrial Structure Squatter-Residential I Loss of Structure 4Nos 4 Commercial I Residential cum- commercial Encroacher Loss of Structure/ Nil Nil Assets Additional support to Nil Nil Nil vulnerable orouos Employees in shops, Loss of Livelihood 9 structures 9 agricultural labourers, sharecropper Community Assets Loss of Community Water kiosk 1 Assets Ticket counter 1 Scheduled Tribes Loss of Land, Nil Nil Structure or both Disruption Temporary Impact 9 structures 9 Type of Structures affected Structure Total Major Impact Minor Impact Affected Structure Pucca Semi Kutcha Pucca Semi Kutcha Pucca Pucca Residential Nil NA NA NA NA NA NA Commercial 4 Nil 4 Nil Nil Nil Nil Mixed Nil NA NA NA NA NA NA Other( cattle- Nil NA NA NA NA NA NA shed) Loss of other Assets Types of Assets Nos. Trees 2 Open Well Nil Boundary Wall 1 Cattle shed Nil Water Tank/kiosk 1 Others Park Impact on cultural properties and community assets Some Community assets such as water kiosk, park, ticket counter etc in a closed premise owned by the Inland Water authority and used by the public will be impact by the Gateway Guwahati Ghat Project. But these structures can be shifted to an appropriate place in the premises, for continued use of public. No cultural properties will be impacted. AIWTDS Page 11 17. Environmental Monitoring Programme Environmental Monitoring Programmeis to ensure that the intended environmental protection goals are achieved and result in desired benefits of the project. The monitoring programme on each environmental parameter with frequency of monitoring for individual project site has been worked out for both construction as well as operational phase. The same will be included in tender / bid document. This has been done as per CPCB guideline. 18. Additional Environmental Studies Flood Assessment and Erosion Control Flooding in river Brahmaputra is observed almost every year. From 1953 -2003 the Flood Control Department of Assam has so far constructed 105.2 km. of embankments on the bank of the Brahmaputra, Kherkotia and Subansiri Rivers. No substantial changes on the embankment cope line observed in Guwahati Gateway Ghat (GGG) and North Guwahati Ghat. However, it is observed in Aphalamukh that, between 2009 and 2014, substantial changes on position of river have occurred (October 2012 and February 2014 vary between 100 - 190m westwards). Additional studies have been conducted on flood assessment and river bank erosion control. Erosion control measures have also been suggested. 19. Risk Assessment Hazard Identification: Following hazard potentials are identified and .emergency response and preparedness plan suggested- Damage of Fuel tanks and oil leaks into the river. Fire hazard from Fuel Storage Emergency during ship manoeuvring Vessel or boat collision The degree of damage depends on- Nature of hazardous substances (gas, liquid or vapour); Pathway of release (boat, vessel etc.); Dispersion of released gas or vapour in atmosphere or liquid in river water. Oil spill disaster management due to vessel collision and/or accidental oil leakage has been discussed in greater detail. Coordination and control emergency have also been suggested. Safety standards are applied during all phase of project activities. The personnel would be periodically undergoing medical check to identify anybody suffering from occupational health hazard.Special emphasis has been given to Training and Awareness, which cover the following- • Types of emergencies with potential threats, hazards, and protective actions • Components of emergency preparedness and response plan • Individual roles and responsibilities • Relevant standards and Codes • Notification, Warning, and Communications procedures • Evacuation, Shelter, and Head Count procedures • Location and use of common emergency equipment • Mock Drill procedure and accounting for personnel • Techniques of accident investigations AIWTDS Page 12 20. Entitlement Matrix The entitlement framework specified in the RPF-cum-lPDF and consolidated RAP-cum-lPDP for three priority terminals has been designed for various categories, based on the central RFCTLARR Act, 2013 and RTFCTLARR Rules, 2015 of GoA and World Bank OP 4.12 on Involuntary Settlement. Each category of loss for the purpose of R&R entitlements is classified under two major categories- 1. Titleholders (owners) 2. Non-titleholders (Tenants in the commercial/residential properties, Encroachers and Squatters). The entitlement matrix will be informed to the PAPs, to ensure that their interests are protected and if not, to submit their grievances to the appropriate authorities and get it resolved in the right time. 21. Implementation of Environmental Management Plan (EMP) The proposed organogram for the implementation and monitoring of EMP is presented below: AIWTDS Page 13 Figure-1: Organization Structure for Implementation of EMP ~~ Govt. of India - -------+t l •..______,._ , ------~ ( PMU (AIWTDS), ] World Bank Environment & Social ~-----------• Development Experts +------------t [PMU) General Consultant (GC) I. Execution of Civil Work II. Modernization of Vessels Technical f t,_-----------1 t Supervision Consultant (TSC) : : Use of eco-friendly devices in modernized vessels to reduce Env. Officer& Social Dev. Env. Officer& Socio/ Dev. Em,. Officer& Social Dev. emission, oil spiJ/age ...., Officer Guwohati Division, / Off,cerSilchor Division, Officer Dibrugarh Division, and noise vibration in Safeguard (PMU) /PMU/ (PMU) water Monitoring t Consultant (Third Party Env. & Safety Officer Env. & Safety Officer Env. & Safety Officer Non-Governmental Organization (NGO) Monitoring) {ESO) of Contractor, {ESO/ of Contractor, (ESO) of Contractor, forRAP Implementation & Micro-Plan ., at Si/char {PMU) otGuwahati at Dibrugarh Preparation AIWTDS Page 14 21.1 Environmental Management Plan The key components of EMP are summarized below and each of these components is explained in detail in the following subsections: • Mitigation Measures • Monitoring Measures • Institutional Arrangement • Reporting Requirements • EMP Budget Impact identification and EMF application for the development interventions are carried out to set the management framework The Environmental Management Plan, covering project activities and relevant environmental components for proposed Terminal Project for both constructional and operational phase has been worked out and approximate timeframe and institutional responsibilities have been specified. The same has been presented in Tabular form. A three-tier monitoring program has been proposed: • Compliance monitoring, • Effects monitoring, and • External monitoring. The main purpose of this monitoring program is to ensure that the various tasks detailed in the EMP are implemented in an effective manner, and also to evaluate program impacts on the key environment and social parameters. The same has been presented in Tabular form as Attachment 1 to the Summary. 21.2 Institutional Set-up for Effective EMP Implementation and its Monitoring The Project implementation will be led by the Project Implementation Unit (PIU) that will be established within AIWTDS. The PIU will be responsible for engagement of consultants for carrying out the various studies related to EMP. The PIU will be headed by the Project Director (PD). The PIU consists of an Environment and Social (E&S) Cell with environmental & social expert. E&S Cell will assist the PMU on issues related to environmental and social management and oversee the Construction Supervision Consultant (CSC) and contractors .Quarterly monitoring reports on EMP compliance is to be sent to the Project Director and also shared with the World Bank, throughout the construction period. The CSC will supervise and monitor the contractors for effective EMP implementation. The contractors in turn will also have HSE supervisors who will ensure EMP implementation during construction activities. AIWTDS Page 15 21.3 Environmental Codes of Practices and Performance Indicators The contractor will be required to follow the environmental codes of practice (ECoP's) by preparing site-specific management plans. For evaluating the performance of the environmental management and monitoring plan, performance indicators are identified to evaluate the efficiency. The indicators are defined both for construction and operation phase. Integrated Grievance Redressal Mechanism A formal grievance redress process will be outlined in the project's operational manual and a protocol will be set up. The grievance submission mechanism should be online or though toll- free communication system. The GRM is based on four guiding principles of the company which include: Transparency, Fairness, Response, Accountability Capacity Building/ Training and environmental awareness Capacity building for effective implementation EMP is highly essential. Capacity building on environmental and social safeguard will be taken up for all levels stakeholders, including AIWTDS, E&S Cell of AIWTDS, supervisor, and contractors. At the construction site, supervisor will take the lead in capacity building plan. The contractors will also be responsible to conduct trainings for their own staff and workers. During the O&M phase of the project, these trainings will continue to be conducted by AIWTDS staff for all relevant O&M personnel and community. It is vital that all personnel are adequately trained to efficiently perform their designated tasks. In addition to training, general environmental awareness must be fostered among the project's workforce and general public to encourage the environmentally sound practices. Documentation and Record Keeping A document handling system will be established to ensure updating of EMP documents, and availability of documents for the effective functioning of the EMP. The document handling system have been suggested Stakeholder Engagement It is expected that the stakeholders would have opportunity to comment on the content of the EIA report. 21.4 Environmental Monitoring Plan & EMP Budget Tentative Environment budget has been prepared for design, construction and operation phase of the project. The Environmental budget includes the cost of environmental structures like septic tank &soak pit, Air Pollution Control System at terminals, monitoring, enhancement measures, training and awareness and technical support for establishment, enhancement measures and environmental guidelines. EMP cost estimates of North Guwahati Terminal, Gateway Guwahati Terminal and Aphalamukh ghat are Rs .30,58,650/-, Rs 30,58,650/- and Rs.31,42,650/- respectively. AIWTDS Page 16 22 Summary & Conclusion Environmental impact assessment is carried out pertaining to the up-gradation proposals of Ghats and other components of the project. The investigation is taken into account both national and international legal requirements (as per WB).The EIA is prepared based on field investigation, secondary data/information, environmental quality monitoring and feedback from the stakeholders. Both positive and negative environmental impacts are evaluated. The positive environmental impacts of the Project are development of all weather navigation routes for transportation of passengers and generation of employment opportunities during construction, operation and maintenance stages. The project will induce economic growth in the region. The negative environmental impacts are not significant. However, the positive impact of the project will improve the sanitary condition, proper waste management and over all aesthetics of the area. EMP has been formulated to mitigate the negative impacts during various phases (pre- dredging/construction, during dredging/ construction and Post dredging/O&M).The main monitoring parameters include monitoring of dredging and dredge material disposal, biological monitoring and enhancement, environmental quality monitoring (air, noise, surface water, river bed sediment), health and safety, etc. Most of the potential impacts are short-term that can be addressed by adopting mitigation measures and relevant ECoPs. To keep the project influence area environmentally friendly, AIWTDS should ensure that the Contractor prepare site specific EMPs including Emergency response plan, Oil Spill Contingency Plan and Workers Health and Safety plan and Environmental Pollution Abatement and Mitigation Measures Plan. Regular and effective monitoring of environmental quality parameters as indicated in this EIA report. AIWTDS should follow the EMP for improvement of navigation and environment quality of the area. AIWTDS Page 17 AIWTDS Page 18 Attachment-1 Budget estimates for Social Management Plan including R&R costs Resettlement and Rehabilitation Assistance Budget for 3 Priority Sites Cost I SI. Total Amount in Items Unit@ unit in No. Units Rs. Rs. Structure (Residential, Commercial, Res-cum-Comm) of Non - Titleholders Compensation at scheduled rates without 1 100000 11 100000 depreciation for structure 1100000 One-time rehabilitation grant of Rs. 25,000 2 25000 11 25000 275000 for reconstruction of affected shop. One-time subsistence allowance of Rs. 3 18000 13 18000 234000 18,000/- 4 Shifting assistance of Rs. 10,000/- 10000 13 10000 130000 Temporary loss of livelihood during 5 50000 20 50000 1000000 construction (kiosks/vendors) One-time rehabilitation grant of Rs. 25,000/- 6 25000 2 25000 50000 for relocation of kiosk/vendors Assistance to Tenant (Residential, 7 No. 0 0 0 Commercial and Res-Commercial Structure) Loss of Employment (Wage-earners, workers/ employees) Subsistence allowance of Rs. 3000/- for 3000 each employee equivalent to 25 days of 10 9000 90000 8 x3 MAW for a period of 3 months Training Cost for vocation skill improvement 10000 13 10000 130000 Loss of livelihood 9 Provision of vocation training 10000 13 10000 130000 Additional amount for vulnerable group 10 One-time financial assistance 50000 10 50000 500000 Loss of CPR 11 Replacement cost Sq.mtr NIL 0 36,39,000 Sub-Total 3.37million 1 AIWTDS Attachment-1 RAP & IPDP Implementation Budget for 3 priority sites SI. No. Items Cost Amount in Rs. 3360000 1 Institutional Cost (RAP & IPDP) Lump sum 300000 2 Awareness on HIV/AIDS and GBV Lump sum Capacity building of implementing 500000 3 Lump sum agency 300000 4 Cost of External M&E agency Lump sum 1000000 Dissemination of project information 5 Lump sum and project progress by PIU Sub-total 5460000 5.46 million Total Costs for Social Management Plan = 3.37 + 5.46 = INRB.83 million. 2 AIWTDS Attachment-1 Gender Action Plan Stages of Activities Indicators Responsibility the Project Planning Gender inclusive IWT and Trade Equity of access to key ISDP Consultant; Facilitation Study carried out to services through IWT DPR Consultant provide recommendations that can (including health, education be integrated into the project and economic centres) design. Beneficiaries ( sex Modification of fleet and terminal disaggregated, senior citizens, and differently abled) satisfied design features to accommodate with [specified dimensions e.g. requirements of women, children, access, quality of services, infirm and differently abled from responsiveness to needs, the perspective of quality, quality of facilities] (%) reliability, safety and security such as: No. of vessels operating that have: Provision of clean, gender •Seats for all passengers •Life Jackets for all segregated, well-lit wheelchair passengers accessible toilets. •Safety instructions, •Secure spaces for goods Specific women rest room (Nursing rooms) to accommodate facilities No. of vessels that have for women to breast feed and to disability access look after infants and small No. of long distance vessels children at the terminals. with toilet facilities with disability access Provision within the terminal and vessels of an adequately covered area and seating keeping in view the volumes of passengers, at peak hours, particularly for women, differently abled and elderly persons. Standard Ramp with protective hand rail for barrier free entry- design consideration (ramp configuration, width, slope and landings, handrail, surface and tactile markings) for access to wheelchair users and people with mobility problems Provision of signage of appropriate visibility and provision for audio announcements- This implies (a) 3 AIWTDS Attachment-1 use of different modes (pictorial, verbal, tactile) for redundant presentation of essential information. (b) Maximizing "legibility" of essential information. (c) Differentiating elements in ways that can be described (i.e., make it easy to give instructions or directions). {d) Providing compatibility with a variety of techniques or devices used by people with sensory limitations. Preparation Gather gender disaggregated data No. of payments disbursed on Revenue officers during the SIA and organise joint names. and AIWTDS consultations with users to incorporate their suggestions while No. of women headed planning and designing the households who've received Ghats/vessels. one-time payment assistance LA and R&R: Ensure payment of compensation No. of women who've received on joint names; training on skill development One-time assistance to women headed households; Ensure training for skill development to women (and other vulnerable groups) whose livelihood is affected, including cost of training and financial assistance for travel/conveyance and food Construction Measures such as compliance with No. of skilled/ unskilled/ Construction various labour welfare legislations professional women employed contractors which mandate the contractor to in the project construction Supervision provide facilities, which would works. Consultant encourage more women to join the AIWTDS workforce, such as those No. of female employees who pertaining to creches, working have accessed employee conditions and remuneration. welfare schemes and benefits under labour laws. Trainings and awareness camps on prevention and protection No. of trainings and awareness against GBV and HIV/AIDS camps on GBV and HIV/AIDS organised at the construction Developing a code of sites. conducUSHW policy and setting up of ICC as per the mandate of SHW ICC constituted at all Act, 2013. establishments related to the 4 AIWTDS Attachment-1 project. Operation Strict and regulated scheduling Display boards about boat E&S cell (timing and price) of IWT services. schedules and strict AIWT Regulatory adherence to the same. Authority Security personnel deployed at the Crew Training terminals for safety and security of No. of trainings for vessel Centre passengers, particularly women. crews and IWT staff on GRM including RTI, labour standard compliance including HR Training of vessel crew and IWT policies, safety and security of staff on GRM including RTI, labour women users (including standard compliance including HR gender sensitization), and policies, safety and security of passenger services for women users (including gender differently abled, senior sensitization), and passenger citizens, women and children. services for differently abled, senior citizens, women and children. No. of SHG applicants availing the Jibondinga Scheme Under the Jibondinga scheme, registered women self-help groups No. of women entrepreneur shall be provided an additional applicants availing the 10% or equivalent in absolute Jibondinga Scheme terms, of the benefit amount for encouraging them to expand their target market Under the Jibondinga scheme, individual women entrepreneurs shall be eligible for an additional 5% or equivalent in absolute terms, of the benefit amount for encouraging them to expand their business GRM Display the penal consequences of No. of SHW cases adjudicated AIWTD/GRM sexual harassment at a by ICC and resolved. system conspicuous place in the workplace. Dedicated helpline for the project established and Display of the "citizen charter" at working. the terminals. No. and nature of complaints Project helpline no. along with received from women. existing hotlines for women's safety to be advertised on board MoU with exiting women the vessels and the terminals. 5 AIWTDS Attachment-1 helpline nos. and/or prominent NGOs to report complaints of harassment. M&E Satisfaction survey shall be carried % of women respondents AIWTD out to assess the feedback of interviewed for the satisfaction AIWT Regulatory beneficiaries and other citizens survey. Authority (50% women respondents) on the implementation of the project No of operators refused activities. licences to operate because of non-compliance of safety Monitoring of safety and security of provisions (percentage of total passengers as per the SOP by the applicants) under the SOP. vigilance team. Regular reporting on all social safeguard activities including training and capacity building, GRM, Labour Compliance, R&R, citizen engagement and other project activities related to gender mainstreaming and prevention of GBV. Indigenous Peoples Plan for various stages of Project Cycle Stages Procedures Activities & Outcome Preparation Identify concerns/issues in relation to the Preparation of a list of issues during the project activities through Participatory social screening and scoping process Rural Appraisal (PRA) exercises Communicate with Autonomous District Information dissemination on the project Councils/GaonPanchayat to carry out and brief account of project Free, Prior, Informed Consultation at the implementation plans and village level framework held on February ih Organize consultation with STs to inform Stakeholder consultations and FGDs held about the project activities and benefits at Majuli during the SIA. Identify key areas of constraints that may be Rate of poverty andperiodic floods in the improved through the project and area has an adverse impact on the develop detailed plan for tribal livelihood of the tribe who mostly development dwell near the bank of the river. Project will facilitate access to short- term and long-term economic opportunities, particularly to women weavers. Both sites, in North Guwahati and Majuli has huge potential for tourism. It is likely that tourism will expand more in these 6 AIWTDS Attachment-1 Stages Procedures Activities & Outcome areas with the improvement of IWT. Implementation One-time additional financial assistance 13 no. of PAFs (SC) accruing the benefit. of R~. 50,000 to SC/ST PAFs who are displaced and require to relocate due to the project. Employment to members from tribal Number of STs employed community in carrying out actual construction work Operation Improvement of terminals and ferry services % oftourists visiting historic sites, areas, to attract and promote tourism museums, other heritage attractions Free Prior and Informed Consultation with using the ferry the tribal communities. Capacity building of ST/SC and other Training calendar to be prepared vulnerable groups, and skill up- Number oftrainings undertaken gradation for institutional Number of tribal members trained strengthening. Employment generation for ST in related Number of ST employed undertaking sub project activities various activities under the project Help build linkages with major government Number of STs that have availed the schemes for skill enhancement and Jibondingascheme or similar improvement of ferry services incentivization schemes. (Jibondinga scheme). GRM Including a member of the ADC in the sixth Number of grievances brought forward schedule area in the GRC, to address in ST areas and addressed. R&R and land related disputes. 7 AIWTDS AIWTP- Draft Environmental Impact Assessment Report 2019 Environment Management Plan for proposed Terminal Project (Construction Phase) During Contractor TSC & PMU Management site design and Rules, 2016, Labour and Construction Hazardous & construction Stage Other Waste Camp (Management Locations and Transboundary) Rules, 2016 C & D waste Rules, 2016. norms. The Water • Green belt/landscaping (Prevention & would be developed at the Control of site and as per the Green Pollution) Act, Belt management Plan. 1974 and • Survival rate of tree would amendments be regularly monitored. It thereof. should be minimum of 70%. • Sedimentation tanks shall be provided for storm water drain to arrest the sediments and these sediments shall be 8 ARKITECHNO" AIW TP - Draft Environm ental Im pact Assessm ent Report 2019 removed and stored with remaining excavated soil. • Shore protection works like stone pitching along the bank shall be undertaken. 1.2 Setting of Contamination of • Construction camp location Solid Waste Labour and Construction Contractor TSC & PMU Labour & land and water would be as per proposed Management construction Stage Constructio resources from Construction & Labour Rules, 2016, Camp n Camps: waste generation. Camp Management Plan. Hazardous & Locations Other Waste • Labour camps would be (Management located close to the and construction sites to the Transboundary) extent possible. Rules, 2016 • Top soil (15 cm) would be C & D waste stripped and kept Rules, 2016. separately in stockpiles for The Water use in landscaping. (Prevention & Control of • Excavated materials would Pollution) Act, be preferably used for site 1974 and filling/low lying area filling amendments and the surplus material thereof. would be disposed as per norms. 9 ARKITECHNO" A IW TP - Draft Environm ental Im pact Assessm ent Report 2019 1.3 Sanitation, Unhygienic and • Hygiene in the camps Health & unsafe living and would be maintained by Safety: working condition. providing good sanitation and cleaning facilities. • Camp would be well ventilated with adequate provision for illumination, kitchen and safe drinking water. Proper drainage to be maintained around the sites to avoid water logging. • Proper sanitation with toilet and bathing facilities would be provided at the sites and labour camps. Wastewater generated from these facilities would be disposed through septic tanks and soak pit • Preventive medical care to be provided to workers • Segregated solid waste would be disposed of at municipal solid waste disposal location. If municipal solid waste site not available then waste should be land fill followina 10 ARKITECHNO" A IW TP - D raft Enviro nm ental Im pact Assessm ent Report 2019 local regulations. • LPG will be used for cooking in construction camps • Provision would be made for day creche for children • First aid facilities, with room, personnel and ambulance would be available at the site. Also, tie-up with local hospitals would be done to handle emergency case, if any • Rest area would be provided at the site where workers can rest after lunch and should not lie on site anywhere • Working hours of labourers would not exceed than standard norms as per Factory Act • Wastewater from construction site would not be allowed to be accumulated as it may lead to breeding of mosquitoes. Septic tanks/soak pits would be provided for its 11 ARKITECHNO" A IW TP - Draft Enviro nm ental Im pact Assessm ent Report 2019 disposal • Temporary storm water drainage system would also be provided at camp site so that no water loaaina takes olace 1.4 Waste Generation of solid, • Arrangement should be Management liquid and hazardous made for segregation of waste waste into recydable and non-recydable waste • Non-recydable waste generated should be disposed regularly through authorized agency. Recyclable waste should be sold to authorized vendors. • Construction waste generated should be segregated at site into recydable, reusable & rejected fraction. Recyclable should be sold to authorized vendor, reusable waste should be stored at site for usage and rejected fraction should be disposed at designated sites of the municipal 12 ARKITECHNO' A IW TP - Draft Enviro nm ental Im pact Assessm ent Report 2019 authority • If no debris or waste disposal site exists in the area then a site would be identified with approval of AIWTDS and would be used & manage for the same as per the Debris Management Plan. • Any waste oil generated from construction machinery, should be stored on concrete platform and disposed off to authorized recvclers. 2. Climate 2.1 Climate Project is unlikely to • Daily monitoring of the Kyoto Protocol, Construction During Contractor TSC& PMU Change cause negative ewe Gauge data at Pandu site Design and effect on climate. Ghat (for North Guwahati & Forest construction However, project GGG Ghat) &Neamati Ghat Conservation stage. (for Aphalamukh Ghat) Act & National can contribute positively for climate • Regular interaction Forest Policy mechanism with Indian Meteorological Department (IMD) for early forecasting to avoid casualties • Working jointly with State 13 I ARKITECHNO" A IW TP - D raft Environm ental Im pact Assessm ent Report 2019 Disaster Management Authority, State Disaster Response Force (SDRF) & National Disaster Response Force (NDRF) during emergency situation • Awareness programme with staff, passengers and contractors on Climate Change. • Project would be designed in a way to minimize the tree cutting. As far as possible trees along the terminal boundary will be retained as part of greenbelt. • If any tree cutting will be required at any terminal it shall be carried out only after obtaining NOC from Forest Department. • Shifting to alternative energy options like solar energy • Adoption of best practices to cut down resources and energy requirement 3. Air Quality 14 ARKITECHNO" AIWTP - Draft Environmental Impact Assessment Report 2019 • No crushers or Batching Environmental Construction During the to construction plants will be located at the Protection Act, sites, Loading Construction activities and sites. Ready mix concrete 1986 and areas, storage phase material handling. will be used. These amendments areas, considerably reduce the thereof; emission. • Low sulphur diesel would The Air Emission from be used for operating DG (Prevention machinery, DG and sets and construction and Control of vehicular movement. equipment. Pollution) Act, • Periodic monitoring of air 1981 and quality for PM10, PM2.s, amendments SOx, NOx, and CO shall be thereof carried out quarterly at construction site • Regular water sprinkling/fogging to suppress the dust generatedat site, approach road & haulage roads. • Proper servicmq and maintenance of earth moving vehicles and other machinery to minimize the emission generation • Vehicles transporting the loose and fine materials like sand and aggregates shall be covered. 15 ARKITECHNO" A IW TP - D raft Environm ental Im pact Assessm ent Report 2019 • Masks and other PPE shall be provided to workers in high dust generation area • Loading and unloading of construction materials shall be made at designated locations with provisions of water sprinkling. • Construction vehicle, machinery & equipment shall be regularly serviced and maintained and would have valid PUC certificate • Monitoring of air quality shall be carried out on quarterly basis to check the level of pollutants and effectiveness of mitigative measures 4. Noise 4.1 Noise • Noise generation • Protection devices Noise Pollution Terminal site During the Contractor TSC &PMU Pollution from construction (earplugs or ear muffles) (Regulation and access Construction activity. shall be provided to the and Control) roads. stage • Noise generation workers operating near Rules, 2000 from operation of high noise generating and vehicle, machines. amendments equipment and • Barricading (Temporary thereof machinery. noise barrier) around the construction site to 16 ARKITECHNO" AIW TP - Draft Environm ental Im pact Assessm ent Report 2019 minimize the noise level • Restriction of high noise generating activity between 10:00 PM to 6AM. • Restriction on Honking at the project site • Job rotations systems for workers, working in high noise level areas • Periodic monitoring of noise levels to check the level of pollutants and effectiveness of proposed EMP 5. Water Quality 5.1 Water Surface water • Preference would be given Water Act, Terminal site During Contractor TSC& PMU pollution pollution and to use river water for 1974 Construction Depletion of construction with stage Groundwater due permission from concerned to abstraction for authorities construction • In case of use of ground water, permission will be purpose.Siltation obtained from due to CGWNCGWB construction of • Water monitoring to be terminal and carried out as per contamination monitoring plan. due to disposal of • Natural Drainage pattern of area shall be maintained b 17 I ARKITECHNO" A IW TP - Draft Enviro nm ental Im pact Assessm ent Report 2019 domestic waste making a proper drainage network in project site. • Washing of vehicle and equipment shall not be carried out in river or nearby place. Washing area would be in a designated area with oil & grease trap. • Storage of debris and raw materials would be in designated area clearly demarcated. • Site would be regularly cleaned • Septic tank/soak pit shall be provided for the toilets at both construction site as well as workers camp. Adequate toilets & bathrooms shall be provided to prevent open defecation. Use of mobile toilets with anaerobic digestion facility would be explored. No domestic wastewater shall be allowed to be discharged to river. 18 ARKITECHNO" A IW TP - Draft Enviro nm ental Im pact Assessm ent Report 2019 • Wastewater, generated from the washing/cleaning area after passing through oil & grease trap shall be re-used for water sprinkling. • Fuel shall be stored in leak proof containers and containers shall be placed on paved surface under shed. • The piling work in river shall be undertaken during low flow period. • Turbidity traps/curtains/ Geo-Textile synthetic sheet curtain would be placed around piling and construction area to prevent movement of sediments and construction waste. • Sedimentation tanks shall be provided for treating run-off from site before discharging into the river. • Proper collection, management and disposal of construction and 19 ARKITECHNO" A IW TP - D raft Enviro nm ental Im pact Assessm ent Report 2019 municipal waste from site shall be made to prevent mixing of the waste in run- off and entering the water bodies • Monitoring of surface water quality shall be carried out on quarterly basis to check the level of pollutants and effectiveness of proposed EMP 6. Accident, Incident and Safety Risks 6.1 Health & Accident and • Local labour would BOCWA & Terminal Site During Contractor TSC & PMU Safety Incident risk from preferably be employed for BOCWR and the Construction construction construction. material source stage activities and safety • Site would be barricaded areas and of workers and would have security Central Motor haulage roads guards. Vehicle Construction Impact on Social life. • Resister would be Act 1988 sites maintained for entry to the construction sites. No unauthorized person would be allowed to enter the site. EP Act 1986 • A board in local language at entrance of site would Noise Rules display name of project, 2002 area and hazards associated for public awareness 20 ARKITECHNO" A IW TP - Draft Environm ental Im pact Assessm ent Report 2019 • Adequate illumination would be provided at site during evening and night time till the work is being carried out • Rest area for workers would be provided. • Personal protective equipment like helmet, gum boots, safety shoes, safety jackets, ear plugs, gloves etc to be provided to workers. Fines would be levied if they are found not using PPE • Noise level in the work zone would be maintained and followed as per OSHAS norms • Contractors would adopt and maintain safe working practices. SOPs would be prepared and followed for all activities under supervision of site engineer • Training would be given to workers to handle the heavy equipment so as to prevent accidents 21 ARKITECHNO" A IW TP - Draft Enviro nm ental Im pact Assessm ent Report 2019 • Complete medical check- up would be done for workers prior to joining and after six months of joining • Emergency telephone nos.of hospitals, ambulance and doctors would be displayed in first aid room. • Working hours of labour should not exceed norms as per state factory law • Speed limit of vehicles would be restricted at site to prevent any accidents and fines would be imposed for violation. All construction vehicles would follow the designated routes & timings. • Arrangement of fire-fighting would be made at site and workers would be trained on their use. • Maintenance and repair of any local village road used for the project activities should be carried out both before and end of 22 ARKITECHNO" AIW TP - Draft Environm ental Im pact Assessm ent Report 2019 7. Protection of Flora and Fauna 7.1 Loss of • Loss of • Caution sign shall be Wild Life Terminal During Contractor TSC& PMU Biodiversity terrestrial flora & placed to prevent hunting (Protection) site/construction design and fauna. of animals Act, 1972, Bio- camps construction Construction activities diversity stage • Loss of Aquatic • Around Fauna including shall be restricted to 6:00 Conservation Piling/dredging Dolphins and Am-10:00 Pm especially Act, 2002 Area macrophytes noise generating activities. • No hazardous material or waste shall be disposed in the land or nearby area as it may harm the animals, if consumed accidently • Site should be barricaded to prevent entry of the animal in the site • Illumination at the night time should be reduced (if no activity is going on) as it may disturb the nocturnal animals • Workers should not use any timber or firewood as fuel for any purpose 23 ARKITECHNO" AIWTP- Draft Environmental Impact Assessment Report 2019 • The river area in which the piling is planned, advisable to carefully determine drop sites before anchor placement to ensure that Dolphin and fish communities that could locally still be present in the area are not unnecessarily damaged. • Before starting piling allow some time to aquatic fauna to displace from the piling area. • Bubble curtains can be provided at the time of pilling to displace the aquatic fauna prior start of construction activities • The piling activities must be carried out in shortest possible timefrarne. • All the debris should be disposed away from river course. • Noise reducing devices 24 I ARKITECHNO" AIWTP - Draft Environmental Impact Assessment Report 2019 like mufflers, enclosures shall be fitted with the equipment as much as feasible. • Fish exclusion devices shall be installed in water column around the pile driving area to prevent fish access • Geo Textile synthetic sheet curtain &turbidity traps shall be placed around piling and construction area to prevent movement of sediments and construction waste • Piling/dredging should be stopped for some time, if any dolphin/turtle/RET species is sighted in activity area • Aquatic ecology monitoring should be carried out prior to start of construction and after 25 ARKITECHNO" AIW TP - D raft Enviro nm ental Im pact A ssessm ent Report 2019 completion of construction to assess the impact of construction activities on aauatic life. Dredging Generation of To prepare Dredging Terminal During Contractor TSC &PMU suspended plan including site/construction design and sediments timeframe camps construction causing an stage To stop dredging Around increase in during breeding & Piling/dredging turbidity, spawning season Area destruction of benthic (June to August) environment and To use turtle & change in river Dolphin deflectors at morphology & sensitive location spillage during transportation • Contractors need to submit SOPs and action time chart with risk management plan prior to any dredging work. Dredging sub- contractor should follow the defined safety procedures to avoid accidents and spills, and AIWTDS will ensure that other vessel users are 26 I ARKITECHNO" AIWTP - Draft Environmental Impact Assessment Report 2019 provided with adequate information and instruction to avoid conflict with the dredgers. Cultural & • Temporary • Adequate diversion Near the During Contractor TSC & PMU Heritage diversion of signs shall be Heritage Site design and Resources access towards displayed in the construction cultural access route for the stage resources, devotees towards temples; these cultural heritage and temples. • Safety issues to devotees during • Warning signs shall be the construction given if there is any large stage various excavation work done or construction scaffoloing put thereof activities. etc. • Chances of vibration impact to these cultural resources during the construction work; Labour Influx • Influence in the • Specifications on Construction During Contractor TSC & PMU demographic employment of local Area design and composition workforce induding construction women should be stage • Increased reflected in the civil works 27 I ARKITECHNO" A IW TP - D raft Enviro nm ental Im pact Assessm ent Report 2019 demand and bidding documents and competition for subsequent contracts to local social and ensure that the health services contractors fulfil these commitments. Locals • Social conflicts including women may be between the screened further for skills, local community and adequate orientations and the can be provided to recruit construction for the work. AIWTDS can migrant workers. prepare a roster of • Increased rates interested workers and of behaviour crime illicit and against . their skills The project contractor needs to prepare a site- women, which is specific Labour Influx a real threat for Management Plan and/or Assam where a Workers' Camp gender-based Management Plan. violence is • Security personnel will be rampant deployed at the construction • Increase sites, and emergency nos. competition for including contact details of jobs and have an local law enforcement impact on wage distribution officers, project's helpline no., existing state-run women helpline nos. will be prominently displayed at the 28 I ARKITECHNO" A IW TP - Draft Environm ental Im pact Assessm ent Report 2019 ensure that an Internal Complaints Committee (ICC) for each establishment is set-up to meet their corporate requirement and legal mandate under the Sexual Harassment at the Workplace Act, 2013. Health problems of the workers should be taken care of by providing basic health-care' facilities through health centres temporarily set up for the construction camp. The health centre should have the requisite staff, free medicines and minimum medical facilities to tackle first-aid requirements or minor accidental cases, linkage with nearest higher order hospital to refer patients of major illnesses and critical cases. 29 ARKITECHNO" A IW TP - Draft Environm ental Im pact A ssessm ent Report 2019 • Awareness camps on HIV/AIDS for both, construction workers and neighbouring villages must be organised at regular intervals by NGOs empanelled with NACO. • It is expected that among the women workers there will be mothers with infants and small children. The provision of a day care creche as per the Building and Other Construction Workers (regulation of employment and conditions of service) act, 1996 is the contractor's responsibility. The creche should be provided with trained women to look after the children. • In case work schedule extents up till night, it should be ensured that women workers are exempted night 30 ARKITECHNO" AIWTP - Draft Environmental Impact Assessment Report 2019 • • Social • 8. Repairing & Retrofitting of vessels of IWT: Repairing & The reparing and • Wastewater will be Hazardous & Pandu Design & Contractor TSC& PMU Retrofitting of retrofitting of passed through oil and Other Waste Construction vessels of IWT vessels involve grease trap and treated in (Management Phase replacement of old STP. and The contaminated waste machineries with • will be seggregated and Transboundary) latest one. In the kept in separate Rules, 2016 process the waste drums/bins under shed. The Water water is likely to be • The used oil will be (Prevention & generated from the collected in leak proof Control of washings and drums and kept under shed. Pollution) Act, contaminated with The waste will be 1974 and oil and grease. The • categorised as amendments waste generated recydeable, incinerable thereof. from repairing will and land disposable. be asbestos, • Used oil and mettalic ferrous and non waste will be sold to ferrous scraps, authorised recyders. plastics, packings, • The incinerable waste oil contaminated such as oil contminated 31 ARKITECHNO" A IW TP - Draft Enviro nm ental Im pact Assessm ent Report 2019 cotton, paint waste cottons, filters, waste oil etc. in addition to sludge, paint waste etc this, used engine oil will be disposed of in authorised common and oily sludge are incinerator. likely to be • Land disposable waste generated. such as wood, fibers etc will be disposed of in authorised common hazardous waste treatment, storage and disposal facilities (TSDF). Environment Management Plan for proposed Terminal Project (Operation Phase) Component Environmental Remedial Measures Relevant Approximate Time Institutional Resoonsibillty Attribute and potential laws/ Location Frame lmplementat Supervision Impacts Contracts Ion 1.0 Climate Climate Project is unlikely to • Greenbelt shall be Kyoto Protocol, Terminal site Operation IWT IWT Change cause negative effect on developed all along the Forest and climate. However, terminal premises. Conservation maintena project can contribute • Energy efficient measures Rules & nee positively for climate in the terminal buildings will National Forest be implemented Policy • Solar power will be used in potential area 2.0 Air Quality 32 ARKITECHNO" AIWTP - Draft Environmental Impact Assessment Report 2019 Component Environmental Remedial Measures Relevant Approximate Time Institutional ResDOnslbilnv Attribute and potential laws/ Location Frame lmplementat Supervision impacts Contracts Ion Air Pollution Emission from • Only Passenger ferry will be Environment Terminals Operation IWT IWT machinery, ferry, DG handled in the terminal al Protection and and vehicular hence no dust pollution Act, 1986; maintena movement. anticipated. The Air nee • Green belt shall be (Prevention developed and maintained and Control as per lay out of Pollution) • Local Species selected for Act, 1981 development of green belt. • Water sprinkling would be provided in dust generating areas • DG exhaust will be 1, minimised by regular maintenance in AMC • Monitoring of air quality shall be carried out on quarterly basis to check the level of pollutants and effectiveness of EMP • Ferries, deployed, will have efficient fuel combustion system with minimum emission 3.0 Soil Erosion Soil Erosion and • Soil erosion of embankment during . Periodic checking of the slope stabilization Project requirement Along river bank and Regular surveillan IWT IWT manageme heavy rainfall. measures ( stone pitching or Embankme ce during nt. otherwise) would be carried nt operation to assess the damaqe if 33 ARKITECHNO" AIWTP- Draft Environmental Impact Assessment Report 2019 Component Environmental Remedial Measures Relevant Approximate Time Institutional Re-ibllltv Attribute and potential laws/ Location Frame lmplementat Supervision Impacts Contracts ion any. Necessary measures for repair shall be followed wherever there are failures 4.0 Wastewater Management Water pollution • Surface water • STP (10KLD) would be Project Terminal Operatio IWT IWT pollution. provided to treat the requirement and vessels nal sewage generated. Treated Phase • Siltation and erosion water would be used for and contamination due to disposal of horticulture and plantation domestic waste purpose at the site • Storm water drainage system would be provided at the site. • Rain water harvesting facility would be developed and maintained • Oil interceptors shall be provided with the storm water drains in the parking lots & loading &unloading areas • Fuel shall be stored in leak proof containers and containers shall be placed on paved surfaces so that no spill occurs • Fuelling of vessels will be leak proof system • Quarterly Monitoring of surface water aualitv shall 34 ARKITECHNO. A IW TP - Draft Environm ental Im pact Assessm ent Report 2019 Component Environmental Remedial Measures Relevant Approximate Time Institutional Responslbllltv Attribute and potential laws/ Location Frame lmplen;ientat Supervision Impacts Contracts Ion be carried out to check the level of pollutants and effectiveness of EMP 5.0 Noise Control Noise Pollution • Noise generation from • Timely maintenance and Noise Access Road Operationa IWT IWT operation of vehide, servicing of transportation Pollution & Terminal I phase equipment and vehicles and the (Regulation Site machinery. machinery/pumps/vessels and Control) to be used during operation Rules, 2000 phase to reduce the noise generation. • Honking shall be prohibited at the project site • Hearing test for the workers shall be undertaken before employing them and thereafter shall be done after every six months • DG sets shall be provided with acoustic enclosure • Monitoring of Noise levels shall be carried out on quarterly basis to check the level of pollutants and effectiveness of proposed EMP 6.0 Accidental Risk Accident and Accident risks • Traffic control measures, Project Access Road Operationa IWT IWT Incident. associated with includinq soeed limits requirement I phase 35 ARKITECHNO" A IW TP - Draft Environm ental Im pact Assessm ent Report 2019 Component Environmental Remedial Measures Relevant Approximate Time Institutional Responslbilitv Attribute and potential laws/ Location Frame lmplementat Supervision Impacts Contracts Ion traffic movement. should be enforced strictly. Accidents due to • Further encroachment Project Throughout Operationa IWT IWT Movement of Vessels of squatters within the requirement the Project I phase and other hazards ROW of approach road will route associated with site be prevented. • Monitor/ensure that all safety provisions included in design and construction phase are properly maintained • Adequate illumination should be provided at the site during evening 7.0 Vessel Repairina Water Generation of • Wastewater generated from HW Rules, Vessel Operationa IWT IWT pollution wastewater and washings is normally 2016. EP Act, Maintenance I phase and hazardous waste contaminated with oil. 1986 Unit waste Therefore, wastewater will managem be passed through oil water ent separator and treated in STP. • Bilge and other water will be treated as above • Wastewater evacuation system would be leak proof and no untreated wastewater would be 36 ARKITECHNO" AIW TP - Draft Enviro nm ental Im pact Assessm ent Repo rt 2019 Component Environmental Remedial Measures Relevant Approximate Time Institutional Resoonslbillty Attribute and potential laws/ Location Frame lmplementat Supervision Impacts Contracts Ion allowed to discharge to river • Treated wastewater will be used for plantation, lawn and garden to the maximum extent possible • Used and waste oil will be collected separately by adopting leak proof arrangements • Used oil will be stored under shed and will be auctioned to authorised recyder. • Hazardous waste will be stored separately under shed and disposed in CommonTSDF • Non-hazardous scraps, plastics will be collected separately and sold as scrap • Domestic waste will be segregated and hand over to facility of local body 8.0 Flora & Fauna Biodiversity Loss of Aquatic Fauna • Propeller shall have net Forest Project tree Operationa IWT IWT loss including Dolphins and system to avoid any Conservation plantation I phase other macrophytes accident with dolphins and Act 1980, Wild sites. 37 I ARKITECHNO" A IW TP - Draft Enviro nm ental Im pact A ssessm ent Report 2019 Component Environmental Remedial Measures Relevant Approximate Time Institutional lbilitv Attribute and potential laws/ Location Frame lmplementat Supervision Impacts Contracts ion other aquatic animals. Life Protection Terminal site • No wastewater or waste Act. 1972 and shall be disposed in river surrounding from terminal site or from area vessel into the water. Penalty shall be imposed on the vessels reported disposing waste/wastewater in the river • Run-off from stockpile area, storage yards, parking areas & roads shall not be disposed directly in to river. • Instruction should be given to all vessels and all employee and staff that no dolphin or any other endangered species shall be harmed due to any I' reason • Instruction shall be given to vessel operator that in case any accident with dolphin occurs that should be reported immediately to terminal authority 38 ARKITECHNO" A IW TP - Draft Enviro nm ental Im pact A ssessm ent Report 2019 Component Environmental Remedial Measures Relevant Approximate Time Institutional ReSD011S lbllltv Attribute and potentlal laws/ Location Frame lmplementat Supervision Impacts Contracts Ion • Waiting time of vessels shall be reduced at the terminal/lock sites by providing the adequate loading and unloading equipment and vehicles. • Vessels shall be instructed for not using sharp lights and sounds all the time as they may disturb aquatic organisms. 9.0 Repairina & Retrofittina of vessels of IWT: Repairing & The reparing and • Wastewater will be passed Hazardous & Pandu Design & Contractor TSC&PMU Retrofitting of retrofitting of vessels through oil and grease trap Other Waste Repairing Constructio vessels of involve replacement of and treated in STP. (Management &Retrofitting n Phase IWT old machineries with • The contaminated waste and of vessels of latest one. In the will be seggregated and Transboundary IWT process the waste water kept in separate ) Rules, 2016 is likely to be generated drums/bins under shed. The Water from the washings and • The used oil will be (Prevention & contaminated with oil collected in leak proof Control of and grease. The waste drums and kept under Pollution) Act, generated from repairing shed. 1974 and will be asbestos, ferrous • The waste will be amendments and non ferrous scraps, thereof. categorised as recycleable, plastics, packings, oil incinerable and land 39 I ARKITECHNO" A IW TP - Draft Environm ental Im pact Assessm ent Report 2019 Component Environmental Remedial Measures Relevant Approximate Time Institutional ResDOnSibillty Attribute and potential laws/ Location Frame lmplementat Supervision Impacts Contracts Ion contaminated cotton, disposable. paint waste etc. in • Used oil and mettalic waste addition to this, used will be sold to authorised engine oil and oily recyders. sludge are likely to be • The incinerable waste such generated. as oil contminated cottons, filters, waste oil sludge, paint waste etc will be disposed of in authorised common incinerator. • Land disposable waste such as wood, fibers etc will be disposed of in authorised common hazardous waste treatment, storage and disposal facilities (TSDF). 40 ARKITECHNO" A IW TP - Draft Environm ental Im pact Assessm ent Report 2019 ;,"~"1'1'.•,;;_'.l~ r\ :·, ·,·.,.::·~,•-:-,'fl{,,.-~:'.· ~·,,,.;.,;_·-~ EMP Cost Estimates North Guwahati Terminal ~·~t"",:i;~~,.W~r,rt2"""'!.'.;J;''P.)\'li-~ ~"1,".'¾7F,;1f"~Tm, •(>.<~-;,A,;'-!;~~~ ,,~~''il"'-'~~~~J...,-1<''"-";'• ", 'ft;,,;~,,J:~:ir~-~·k\J'--<..' ,:,1. lt' / .,~ -~--~, :~, ,..•1:11"-1~~, CONSTRUCTION STAGE Technical Support Technical support for 1 Lump sum 65000 65000 preparation of guidelines, conservation action plan for turtle and dolphin areas and performance indicators Drainage Provision of adequate To be covered in project design and engineering cost congestion & surveillance disposal of accumulated water Covered in project Embankment and River Bank To be covered in project design and engineering cost design and Protection Measures engineering cost Measures to River training works, To be covered in project design and engineering cost reduce dredging Sandalling, Catchment requirement treatment Land Compensation against land As required for specific site and is included separately under SINRAP reports. Soil Soil contamination To be covered in project design and engineering cost protection(Septic tanks, grease traps etc.) and rehabilitation of borrow 41 ARKITECHNO" A IW TP - Draft Environm ental Im pact A ssessm ent Report 2019 ~:,1~~i"",;~F~'l:!· ~,._, t, ~ "• ~ ....r-,•:,1.,· \.':'- •. ~ ~',)~' J.;.~.. _~iJ~i.-r/~·;,,;;-:_±~·~.,:: 'ii''""'!'.~f;r, '!"!:-. ~ >~~ ~.,l', 1<.:.. 0/ ~r~·,. :'-', ;/;_i,. n ,1-- ' "r,~·l';' ,("_. .. ,, 1\.•: i' """'~ : • / ''-~... / .. ~ ,,. -,fu"t1,'i'"":"W'¥"'"':"~~,-,,~-'~r.; >•f'-~, 't~lt.i_j';f,~ ,.,,,,:,~·~•t•,- "'~ i 1~. w:.-;;:,~ "'"/~•1"'.•"''-~' ..lt ;\; ' ,:-.-f~'l,; ".. :1-r: ,:,:•,,~'>',1;h < ;~:·i~.t. "·i'~-'¼t:;frt'l.'~4~:¥,it·: :4~:''t ~/-'•'sd: •( 'i~) ii,','',,\~-~ ,.,,,;k;t?\,~ ::~j .t·:~-:~~:fi \..11' "'*'t:'! ,· ,-. • .. ff, I'./~,,,,,•,]'. ,,l1~· J:, -·~ ~ . '-:~ I -;::.a-.~{.~. t,,i·•,:r;;t~-! ": <. '.' •,J\,~ i,"} ';,~;)\ ~,(~:.~·~"'.·::..;i l . . : t·,;·i areas/debris disposal site/plant site & labour camps Noise Canopy for DG sets PPEs like To be covered in project design and engineering cost ear plug Timely maintenance of the machinery, equipment and vehicles Barricading the site Water Provision of storm water and To be covered in project design and engineering cost wastewater management system Construction of soak pits at To be covered in project design and engineering cost construction sites & labour camps Provision of clean drinking & To be covered in project design and engineering cost domestic water facility at labour camps and construction site STP construction, Zero Including in project design and engineering costs Discharge management ( collection of storm water and its distillation and use, and rain water harvesting Air Quality - Dust Water Sprayer/ Watering for To be covered in project design and engineering cost 42 I ARKITECHNO" AIW TP - Draft Enviro nm ental Im pact Assessm ent Report 2019 ~,~ ~~:,f\ tt,.. . ·~~/~r~::-_ ,-;.~-~-Elf\F!k<';.E.Jii!:~ '\?-:·:.-ij-~..... ·.;'--"'"'~- -.· y~ ....~~;"..;(l·~)r:~-~-,:~ ,. ; ~;··r1"t~1 ~'-:;4;1~-~:;.;~;·~'" 1'-~~::-- --:~.-- ""I: /.~ . :_:,,:~ .::1 ~-.1~A:t: •:i,.;:-.\ ... - _\ .. -1~1.'$;::_,, :i.,.t 1,~"i:.. •-'" ~~-t~·- 1' -.~r~t\> - ·\:;:: ·. :;J:::· .,.,:··,t;::, . i./ - :·:1 ;·-:) .~-?:;;:;}:~~u !.!,~~ . ~4.~;l.~~ ::..:.-;0-.a.'t.. -1t" a."'s _t.,,,( ~.. : ,,k-.-, ', ;,t~:r: ;'.1~)~ · ·.t;~i:!i ::u:~~~\ ~~ ·x~: ---~.--~~t.,,\, ...,4l~ ~ ~...:'. • • .,.. 4"~:--""-· k~•• .f ~ Management Dust suppression during construction Green belt development, dust To be covered in project design and engineering cost control system, mechanized material handling systems for material loading and unloading at terminal and vessel. Safety Appointment of Safety To be covered in project design and engineering cost Officers Safety signage, fire-fighting To be covered in project design and engineering cost measures& water ambulance etc. Provision of trainings and To be covered in the responsibility of the Contractor PPE to workers Health Health check-up camps for To be covered in the responsibility of the Contractor construction workers Reparing and Improvement of old vessels of To be covered in project design and engineering cost Retrofitting of IWT with modern gadgets vessels of IWT, Assam Enhancement Institutional Support for No Lump sum 25000 Measures ecology awareness through reputed institutions 43 I ARKITECHNO" A IW TP - Draft Environm ental Im pact A ssessm ent Report 2019 1/#! .,.. .,.,,. . {(iY:.· _ ". < :,._. :· ·-.-·.' ~;,;n 1~9-ffli,~.'-(-4~~~...~~~.,,..~-f"~-~"?-"· . -~· ....,:,,i.•;--.~';""~'"''l'('>f•-."."J:•";,,11'~..-'t'.,,.,_~~~-i;i,.f,~~mmiii"l"'-, ·:/. ,_~:.:. )'.t; t:~~· o.•J ~ I, :tJ ,'!",fl, U li,.o•·:-iei;~ • .'-'t1 I ., ~ w>•~"' / 1 ::·_- ·:'.:.-. · • ·: ::,}' t\(\' .-,I<,' 'I , _: r, T,. ,.~ '.,),t• ,.,.)1, ~11 ' r., • f f "•'• I 1, 'l'• I If \\.?·r, ,-i( r\//~~ _.,_ijl.,.Jti,.~.,,.\"._Ql,rf'f -~--t~ ,,.,. '•~ ,,, 1:~,,:.·.... • kf" ,,. . ,1n.T•l-itl<, ... ,,. ... ..,-.i "- - "' ~,:. -,_ •}• .) -~ •;l.;iil,. Bath shelter for women along No the stretch for maintaining privacy from vessel movement Support for deanliness at To be covered in the responsibility of the Lump sum 0 Ghats and improvement of Contractor Ghats Environmental Terrestrial and Aquatic Fauna 50,000 per season. Once in six month for 3 300000 Monitoring in the (lnduding Dolphin years construction Conservation Management phase Plan) Ambient Air Quality Monitoring at Total sample per location for 15,000/ sample 180000 along the 3years is 12, Considering stretch 15,000/sample, cost for12 samples will be 12X15000 Monitoring at Total sample per location for 15,000/ sample 180000 construction 3years is 12, Considering sites 15,000/sample, cost for12 samples will be 12X15000 Surface Water Quality Surface water As per the standard norms, 12,000/ sample 108000 resources sample may be collected for three season (Pre-monsoon, monsoon & post monsoon or winter) at each location for three years. Hence, 44 ARKITECHNO" A IW TP - Draft Environm ental Im pact Assessm ent Repo rt 2019 3samples each location in one year & 9 samples each location for 3years. Then costing @12000/sample will be 12000*9 i.e 108000 Environmental Surface Water Quality Ground water As per the standard norms, 12,000/ sample 108000 Monitoring in the bodies sample may be collected for construction three season (Pre-monsoon, phase monsoon & post monsoon or winter) at each location for three years. Hence, 9 samples each location for 3years. Then costing @12000/samples will be 12000*9 i.e 108000 Drinking Water Quality There will be strict instruction to all the contractors to supply 0 filtered driking water to the labours. Hence, it is not required to anyalysis drinking water quality since the project activities have no direct impact on drinking water in the nearby area. Noise & Vibration At monitoring 24 hourly/season for pre and 4,000/ sample 72000 locations post monsoon at 3 locations identified in per site for 3 years for 1 the ghat. Number of sample per Environmental year per location is 2. Total management number of samples is 18 plan 1 site for 45 ARKITECHNO" A IW TP - Draft Enviro nm ental Im pact Assessm ent Report 2019 ;:; :, > : r·: ·: ·: ·.r}. /,,. · ·'. ~ ?~.:: ~:~ilfii~~~[l;:) .: ; :G.??'.,t~ ~::~.::>_ · _· · . . -.:·. · :·: '. \ :.:r:::· ;.~ . · -;« .;:;:-~~r ::{)~{ii ~":f' '1,-. r 1\ i, ~ _ 1 ,,1.,.~_A:1._ ' • ,,. • , " , ,. !. .i , ''\'-1~,,~•,i , ,ti -. -<-J"':.tj::~ , .»' f,.., ! .,. .I t:,{-11-. ,;t"tx,q., r,i~---:---··~t.";'' ~ , • .- • ~»1,. • • io, ...i.,. fC. •':,, ,, ", \ ,-- • , ,• ,, , , , ~ .. •, ,'ly,,\'-'i ..:•l', - ,. ."'I,., •, 1 , ., , · ~~ , ~·'.l:\~1,.~J..·,:tl.. , , •·~ "-' l\~:11;~~~;' .. -), .'i i;,; .f•;~ ""'~ • ,.~-r . • 3 years Underwater Per month for 3years i.e. 36 4,000/ sample 144000 noise samples during construction Monitoring stage Soil Quality, Erosion & At terminal As per the standard norms, 8,000/ sample 72000 Siltation and River Bed and landing sample to be collected for construction three season (Pre-monsoon, site for 3 monsoon & post monsoon or years winter) at each location for three years. Hence 9 samples each location for 3years. Then, 9X8000will be total cost per terminal. River Bed Sediment At dredging 2 times per year for three 8,000/ sample 48000 sites years SUB TOTAL (CONSTRUCTION STAGE) 1302000 OPERATION STAGE Erosion Control and Visual Check To be part of Regular maintenance and landscaping operation costs 46 I ARKITECHNO" A IW TP - D raft Environm ental Im pact Assessm ent Report 2019 Water Waste Water Management STP To be part of Regular maintenance and 0 (compact STP cost in NBC) Operation, operation cost based on number of rainwater people/hour harvesting management and maintenance Storm Water Management Maintenance To be part of Regular maintenance and costs System of Storm water drains Provision of drinking water There will be strict instruction to all the contractors to supply 0 facilities filtered drinking water to the labours. Hence, it is not required to analysis drinking water quality since the project activities have no direct impact on drinking water in the nearby area. Waste Management System Collection, To be part of Regular maintenance and segregation operation cost and disposal of municipal waste, hazardous waste (used oil) and dredged soil 47 ARKITECHNO" A IW TP - Draft Enviro nm ental Im pact Assessm ent Report 2019 ~~:<.~:~-:;::~r> ~- ~_: · :_ ~:;_/rr;:~<·:·' -:·;~':·: .- -~~-~~"_{rT)·: -~-~~:~:-.: ~~h,;: ,; ~-~;~.;·: ~;;I:,~:~'- :; . :.'.·}t~ :,;.:-:I;~.,:;~ Environmental Monitoring in Terrestrial and 7 ;:: :,: .:~ •· During operation stage, surveillance audit of 300000 the operation phase Aquatic Fauna Aquatic ecology to be conducted on quarterly including basis for 3years @ Rs. 25000/- surveillance audit & Dolphin Conservation Management Plan Ambient Air 4 samples/location/year 15,000/ sample 180000 Quality @15000/samples for 1 location will be 4X1X15000 i.e. 60000 For 3years it will be 180000 Surface Water 3 samples per location for 12,000/ sample 324000 Quality one year (at pre-monsoon, monsoon & post-monsoon) @12000/- will be 3X1X3X12000 i.e. 1,08,000/- . For three years, it will be 3,24,000/- Environmental Ground water 3 samples per location for 12,000/ sample 108000 Monitoring during one year (at pre-monsoon, Operation Stage monsoon & post-monsoon) at 1 location @12,000/sample will be Rs36000 . For three years it 48 I ARKITECHNO" AIWTP- Draft Environmental Impact Assessment Report 2019 ~~i:1~~,:;1y~;;~~f:!!:i;~~~ i "°/~,, ,::~ ~-~.4~~ r.-«'i·:.;J~ "'~,;j./ ~,1>-"~T:·:, .·,:~ r.'. ~!,. ~ ~~ilf\;!,~'.~!~£~,t~,>J , ..,}j1~, ~""~~~-~ i}~~ ,l:t:Ct., ~ 't~ I~ ~\;~Lti;,-rr.:.Zi'",,, '/jj "'""' J,:, '1l~ ~~·tl~;,.""···t. f~$-~f.~"'• '•f::·t· •. ...._.,.,,.,~ .. ,~(i,tl:.,\ 1 H "\!.'I ~ !~._ .. 4•• ~S'~'~t:~·-~~,.," ':r~. t'~~ :,,. _'\~~.~; •. t, t P, ~', J-~ " ~'"- Noise & 24 hourly/season for3 4,000/ sample 1,08,000 Vibration season per year at 3 locations per site for 1 year for 1 ghat i.e. 3X3X3X4000 Soil Quality, 4 samples/location/year 8,000/ sample 96000 River Bed @8000/samples for 1 Sediments, location will be 4X1X8000 Soil Erosion & i.e. 32000. For 3years it will Siltation, be 96000 Integrity of embankments Electricity Solar Panels Cost of solar Provision of installing solar panels to be 0 panels for covered in design & engineering cost priority ghats SUB TOTAL (OPERATION PHASE) 1116000 ESTABLISHMENT, TRAINING & MANAGEMENT SYSTEM Training General environmental Selected staff of AIWTDS, Training for Lump sum 15000 awareness; environmental supervisor, and contractors Selected staff of and social sensitivity of the AIWTDS, project influence area; Key supervisor, and findings of the EIA; Mitigation contractors, measures; EMP; Social and Vessel 49 ARKITECHNO" A IW TP - D raft Environm ental Im pact Assessm ent Report 2019 cultural values of the area. Operators Training for Ghat Ghat officers, Ghat Maintenance workers Lump sum 50000 management via training for Ghat/section officers/ vessel operators/masters/ khalasi etc. General environmental and PIU; supervisor; selected contractors' crew Lump sum 5000 awareness; Environmental and social sensitivity of the project influence area; Mitigation measures; Community issues; Awareness of transmissible diseases; Social and cultural values. EMP;Waste disposal, Cultural Construction crew Contractors 10000 values and social sensitivity. Road/waterway safety; Drivers; boat/launch crew, Contractors 10000 Defensive driving/sailing; Waste disposal; Camp operation; Waste Camp staff Contractors 10000 so I ARKITECHNO" A IW TP - D raft Enviro nm ental Im pact Assessm ent Report 2019 ~~ ~ ~~!t~t-'J¥i~r:if,: :;"'~~:i'i!i'i\~..Z~~'t .\--' (.,;' 11 •·~~ r~., ~ ·, 1, ~~~ . ~~~~"±...,.,,~~"':'JI 1,,L~~ .t',°~ (,i ' ; ~-4·~• ·- :-..- , °"'"'-~·~, ~ ,.1'\;,J', .-". ~'"•' .. , ~, ~#, "'-~ ~ · • ., -. :,'(°l· l,..r • ,;i,1) I J i~-l"<.._,., .. ,. i t,K~;,:_, .. ~,. ,,,f!•~ ,,!'"'-;;.' -,._,.. ~~ '; 11,~ ~":'\ _~ . .f/6 ,f, ~ l,'":-' ~:S :,1,: .~.. ., ~- .. l?,.-.1! .. >,~.' .-,_ j'• ~r;:~---~~:--_.!,~ .;.,,, .tf1'A..,~~~ :U,I; ~/1!;(.J ,..,. ,....,~· <..'1 ~\ ~ ~~ . ..~,.·-·1· -~·-n ·• <~ -,~., ·~ ,i7'• ,• ,,.~.,.,._~,fl' < .. •: ' ,, . .,.. "' f:. ,.. l ~ ~· .;; .-:. r,.~ ,.' .... ,~ r,.. ;.,..·;,;i~ :- £ ,r.f uit ,,.i• ,.,, - .,. •. ·· · · ~: , ~ 'l; , ~ Jf(-:"' . , 1, ...J:'1-,, ~(,. ~ f'· r.;,J, • 1.,. . ~~,~- 1i '"· ':-- w,· ";,t'-; ·.-l~.J.,.~~ ,\,~._1'-ft. ~tli-i , • ,_.. " ~i,~ 't,~ • • s } r 'l/;# I • ~ f';f-=1.- ......:. ~ 1 . ,.>.:"-· '.•tt,.·"· :t .,.,.~.\.>. ·~ ,.,.:.,~:; • ".?.. .s \,:-·~··.. -ir.,,,· .~ ;_ 1 W:JJ.J .•• 1'f. f;u,l,.,, --- ~ ~ ' ~ ~ disposal;Natural resource conservation;Housekeeping. Restoration requirements; Restoration teams Contractors 10000 Waste disposal. Construction Implementation PIU;supervisor; selected Contractors, 10000 requirements;handling contractors' crew Supervisor and situations for important flora / E&S cell fauna especially Dolphin;Physical Cultural resources; Management Systems Health and safety 1 Lump sum 25000 equipment on board and in terminals Management Information 1 Lump sum 350000 and tracking system SUBTOTAL (ESTABLISHMENT & TRAINING and MANAGEMENT SYSTEM) 495000 SUB TOTAL (Construction, and Operation and mobilization) 2913000 CONTINGENCIES @ 5 % on total Environmental Costs 145650 GRAND TOTAL for one ghat (in Rs) 3058650 51 ARKITECHNO" A IW TP - Draft Enviro nm ental Im pact A ssessm ent Report 2019 EMP Cost Estimate for Gateway Guwahati Ghat ({i. m,~ 1 ;/,, . .,.-~,.... ;h 1·t~ ;f'I ~--~ "-t\ ~ ~ 1· C 4, ~· ,.'-. , t•·1 ,i..._1: 't ~ \~. :),,. 'c ~ ·.; 1.;_.::,,,::_M ... ,1::,,..1 .. ,·, •• ,-· ' ~ ~t 1<·\-~ '7 ··;;,:~ 1~;' • ;. . ,:> ,},('-~~~)~,,_''!':':i.'( ,-~"'--"""r+~..; :.';'.-i:-,,?£',; :·~,.::t:.~:,, /.'', •' 0 1• ...·., n; ,"·" • •;P ~· ~ 9: c;:"·. r:. .•+ , . · 5. tx. ~ )!:/\' ~ ~~'):~ 1,:-:. !'-('",•~·,; , •• ,·;J,rt.. i'~ --.-1 ~-, -~ j ~ _,.,;, "',, ," ~, "..,~i/;,.y.. r"-i"l"~1 t·~1,T1 ':J1J'?!if."" ,,'' ,•J'l:,::,,-,:~".• ,·•''' ,·,~;t~··, 1,;,~'.. , ', ~--- ~ \'~ ·: '·,.::f~•,. 1 #t' t- • • ,...r/, , 1,, '•'\,,,.~~ ~ii.,.- ,,_ r '"" -: 1. ·, ~tt: "-.. ·,.t •• <.,, i,i",i,, 1:: , 1 : j."!.'~ ,,.: ,... ·~ ,' • • 1 ~ JI(!' ·~ }:,,~~t~t ~ ::#~ '::i'Jfi . ~ . v-i: : "~' t ~rt} •. t ,/t: .. ~r ~· ;·; '.:/w-W P't..~"',lrrij -;,1,'""'"~ 1',, ! ,~ ~ , ·· .·~- '-' 1.... t-?.~-:t-, ~. • " .:- ,~. :fe._~~:.., . _. .}: - ......-A-..i~ .......,~ ..... 'l.:it. &..-:, ,\. • ~--""k..,. '-!'l.~1g~~~~!: • t~ ......i. ..... , ""-",';,,-tk_~X, ...........,.U¥~\";.... r'- ,~· :w.91. • '~'!. 1~··1.,,-:.'k,,.,"'~&40'.~ CONSTRUCTION ST AGE Technical Support Technical support for preparation of Lump sum North Guwahati 65000 65000 guidelines, conservation action plan for turtle and dolphin areas and perfonnance indicators Drainage Provision of adequate surveillance To be covered in project design and engineering cost congestion & disposal of accumulated water Covered in project Embankment and River Bank Protection To be covered in project design and engineering cost design and Measures engineering cost Measures to reduce River training works, Sandalling, Catchment To be covered in project design and engineering cost dredging treatment requirement Land Compensation against land As required for specific site and is included separately under SIA/RAP reports. Soil Soil contamination protection(Septic tanks, To be covered in project design and engineering cost grease traps etc.) and rehabilitation of borrow areas/debris disposal site/plant site & labour camps Noise Canopy for DG sets PPEs like ear plug To be covered in project design and engineering cost 52 ARKITECHNO" A IW TP - Draft Enviro nm ental Im pact Assessm ent Report 2019 - Timely maintenance of the machinery, equipment and vehides Barricading the site Water Provision of storm water and wastewater To be covered in project design and engineering cost management system Construction of soak pits at construction To be covered in project design and engineering cost sites & labour camps Provision of clean drinking & domestic water To be covered in project design and engineering cost facility at labour camps and construction site STP construction, Zero Discharge Including in project design and engineering costs management ( collection of storm water and its distillation and use, and rain water harvesting Air Quality - Dust Water Sprayer/ Watering for Dust To be covered in project design and engineering cost Management during suppression construction Green belt development, dust control To be covered in project design and engineering cost system, mechanized material handling systems for material loading and unloading at terminal and vessel. Safety Appointment of Safety Officers To be covered in project design and engineering cost Safety signage, fire-fighting measures& To be covered in project design and engineering cost water ambulance etc. Provision of trainings and PPE to workers To be covered in the responsibility of the Contractor 53 ARKITECHNO" AIW TP - Draft Enviro nm ental Im pact Assessm ent Report 2019 ,,,-:,;«--:-•. - .•.. :;· ':;"; ')''1. ' .. ,. ,-~'.'~:"-il'~~,-rt,ri:t';>t'.~· :;'i.~ ..,-- ·; ,·,·." ,,. :-~··'\1i~~~·1~r f';-'<--·:c:n :::,r,'"'" ,:, . ,; ,. ; ·.-, ...-},·:;'·~-·":-; J~{~:, ~,;,;l~_ >· - -:... :-(:.:_t~;;~:tri?~tii~!~~:0~t~'iJ~i!1\fr.1;l1~':.-. -':,v__::< .. ·: ·.-::. .. ~•·.t I ', '" ~ "i.!.t~.~. :' L ·..., ,:.1-~~~~"1r~1,:t.l 1., - .. ~u-·:ti~~/. . 1 ..... -~, :. 1 "lo'... !It. ...... , ·. -:. ~ ·>~. ·. ' . ·:-.:·~-··.- ··- . · ., .. ;, . '· ~ :1 :, .: ·.::·r.- ;1i~?~i~J:f, -~~-:+:~tfii- , ., • ,;- , .J -r:!:,&,« i~ .~~... , ""...'-'_i:3ffl ~ .....~~,~---~.'' ~. . ~.. Health Health check-up camps for construction To be covered in the responsibility of the Contractor workers Enhancement Institutional Support for ecology awareness No Lump sum 25000 Measures through reputed institutions Bath shelter for women along the stretch for No maintaining privacy from vessel movement Support for deanliness at Ghats and To be covered in the responsibility of the Lump sum 0 improvement of Ghats Contractor Environmental Terrestrial and Aquatic Fauna induding 50,000 per season. Once in six month for 3 300000 Monitoring in the Dolphin Conservation Management Plan years construction phase Ambient Air Quality Monitoring at along Total sample per 15,000/ sample 180000 the stretch location for 3years is 12, Considering 15,000/sample, cost for12 samples will be 12X15000 Monitoring at Total sample per 15,000/ sample 180000 construction sites location for 3years is 12, Considering 15,000/sample, cost for12 samples will be 12X15000 Surface Water Quality Surface water As per the standard 12,000/ sample 108000 resources norms, sample may 54 I ARKITECHNO" A IW TP - D raft Environm ental Im pact Assessm ent Report 2019 be collected for three I season (Pre- monsoon, monsoon & post monsoon or winter) at each location for three years. Hence, 3samples each location in one year & 9 samples each location for 3years. Then costing @12000/sample will be 12000•9 i.e 108000 Environmental Surface Water Quality Ground water As per the standard 12,000/ sample 108000 Monitoring in the bodies norms, sample may construction phase be collected for three season (Pre- monsoon, monsoon & post monsoon or winter) at each location for three years. Hence, 9 samples each location for 3years. Then costing @12000/samples will 55 ARKITECHNO" AIWTP- Draft Environmental Impact Assessment Report 2019 Drinking Water Quality There will be strict instruction to all the contractors to supply 0 filtered driking water to the labours. Hence, it is not required to anyalysis drinking water quality since the project activities have no direct impact on drinking water in the nearby area. Noise & Vibration At monitoring 24 hourly/season for 4,000/ sample 72000 locations identified pre and post in the monsoon at 3 Environmental locations per site for management plan 3 years for 1 ghat. 1 site for 3 years Number of sample per year per location is 2. Total number of samples is 18 Underwater noise Per month for 3years 4,000/ sample 144000 Monitoring i.e. 36 samples during construction stage Soil Quality, Erosion & Siltation and River At terminal and As per the standard 8,000/ sample 72000 Bed landing norms, sample to be construction site collected for three for 3 years season (Pre- monsoon, monsoon & post monsoon or winter) at each 56 ARKITECHNO" AIW TP - Draft Enviro nm ental Im pact A ssessm ent Report 2019 ~-;·,--.".'.""r-;,y,~r---:-~~~V)', A~- ,·'l\.t!i&\ ~).' i,1'/'li::::,-.i'.~~~-~.r,- : . -:-: ~.:: .. f'.~fli,-" '~ ' lf -~:··,·,,~~-- ';.):Ji;)' ,it,:.l \· ,.f' ····:·r - .. ~ l.. --:,-;:·· :,,,.l'l!"7r:·.-.-"'rl .'!>l~. ;;t\,-.,.',"'t•!U~ ,(;.. ·"\,j '11'~~'*,.~~~'T'"~-·-~,,. --·~r--' ·~~·~ ;'t~1 . ~+ :";~~ .·. · . ._.~ t1v-r~ ~ .,... · : · ::·.- ::f:{t~·~~~~t:·~r~~~~lt,,t.i;,, ~~w.~, ,~ •k ,{e ,... ,I ,~;..,"'::.,'."I, 1-."'I'< • 1' ~A.,'-~·~, w.~}v>, •~~r., .• ~'..:;!(\; • .• • ',.,..,• ''·t'· J,\.:.;/,:•• ~-- ;_;,.. ,' • 1r ··. -~·1, 'ti--;)•i,,,;'., \,,~,',•":}.~; ,..• ,., • ,1,;._'~ _,'l'!l!.~'1t ~i·:4:·t~~tf.,r{~;;,~.1m.J:; 1·;t:t~"':,1.1 \i':,,~·--;l ·:~:, ; r: . t; ; ..• :·:· ;1 't°.:l".;ii-;"~4';.~J\-~ 'i:>:,. :t;)""'' ,2 ~1~ 1':,~ .. :r~ .., ....... "~,· ,: .;t ,r,1.t,•. :if' ~~.. ~ r - • • \.f,-.,;. ~· , , ,>. ;,,v •-;, •;: "" ~-1::f~, ~ •.-ti...: .""~ ... :IJ. >l 'N'!/t:~ r,l$,'H,: location for three years. Hence 9 samples each location for 3years. Then, 9X8000will be ,, total cost per terminal. River Bed Sediment At dredging sites 2 times per year for 8,000/ sample 48000 three years SUB TOTAL (CONSTRUCTION STAGE) 1302000 OPERATION STAGE Erosion Control and landscaping Visual Check To be part of Regular maintenance and operation costs Water Waste Water Management (compact STP STP Operation, To be part of Regular maintenance and 0 cost in NBC) based on number of rainwater operation cost people/hour harvesting management and maintenance Storm Water Management System Maintenance of To be part of Regular maintenance and Storm water drains costs Provision of drinking water facilities There will be strict instruction to all the contractors to supply 0 filtered drinking water to the labours. Hence, it is not required to analysis drinking water quality since the project activities have no direct impact on drinking water in the nearby area. 57 I ARKITECHNO" A IW TP - D raft Environm ental Im pact A ssessm ent Report 2019 Waste Management System Collection, To be part of Regular maintenance and segregation and operation cost disposal of municipal waste, hazardous waste (used oil) and dredged soil Environmental Monitoring in the operation Terrestrial and During operation stage, surveillance audit 300000 phase Aquatic Fauna of Aquatic ecology to be conducted on including quarterly basis for 3years @ Rs. 25000/- surveillance audit and Dolphin Consevation Management Plan Ambient Air Quality 4 15,000/ sample 180000 samples/location/year @15000/samples for 1 location will be 4X1X15000 i.e. 60000 For 3years it will be 180000 Surface Water 3 samples per 12,000/ sample 324000 Quality location for one year (at pre-monsoon, monsoon & post- monsoon) @12000/- will be 3X1X3X12000 58 I ARKITECHNO" AIWTP - Draft Environmental Impact Assessment Report 2019 i.e. 1,08,000/-. For three years, it will be 3,24,000/- Environmental Ground water 3 samples per 12,000/ sample 108000 Monitoring during location for one year Operation Stage (at pre-monsoon, monsoon & post- monsoon) at 1 location @12,000/sample will be Rs36000 . For three years it will be 108000 Noise & Vibration 24 hourly/season for3 4,000/ sample 1,08,000 season per year at 3 locations per site for 1 year for 1 ghat i.e. 3X3X3X4000 Soil Quality, River 4 8,000/ sample 96000 Bed Sediments, samples/location/year Soil Erosion & @8000/samples for 1 Siltation, Integrity location will be of embankments 4X1X8000 i.e. 32000. For 3years it will be 96000 59 ARKITECHNO" A IW TP - D raft Enviro nm ental Im pact Assessm ent Report 2019 ~ii~~~ ;:~:;:~J:\i;;fi/(:;.: ~:.;::~-~\:~- -~. ~:;:~-.:i:¥.:ttfZ;:_::{i!~Ii\~~r;:~:~is:>~ :~: . ·: iJ~::~ t: :_~ /:· ;~- · ·:::irs~t~ ~:- ~ :jii~I Electricity Solar Panels Cost of solar Provision of installing solar panels to be 0 panels for priority covered in design & engineering cost ghats SUB TOTAL (OPERATION PHASE) 1116000 ESTABLISHMENT, TRAINING & MANAGEMENT SYSTEM Training General environmental awareness; Selected staff of Training for Selected Lump sum 15000 environmental and social sensitivity of the AIWTDS, staff of AIWTDS, project influence area; Key findings of the supervisor, and supervisor, and EIA; Mitigation measures; EMP; Social and contractors contractors, Vessel cultural values of the area. Operators Training for Ghat management via traing for Ghat officers, Ghat Maintenance workers Lump sum 50000 Ghat/section officers/ vessel operators/masters/ khalasi etc. General environmental and awareness; PIU; supervisor; selected contractors' crew Lump sum 5000 Environmental and social sensitivity of the project influence area; Mitigation measures;Community issues;Awareness of transmissible diseases;Social and cultural values. EMP;Waste disposal, Cultural values and Construction crew Contractors 10000 social sensitivity. Road/waterway safety;Defensive Drivers;boat/launc Contractors 10000 driving/sailing;Waste disposal; h crew, 60 ARKITECHNO" AIWTP- Draft Environmental Impact Assessment Report 2019 Camp operation; Waste disposal;Natural Camp staff Contractors 10000 resource conservation;Housekeeping. Restoration requirements; Waste disposal. Restoration teams Contractors 10000 Construction Implementation PIU;supervisor; Contractors, 10000 requirements;handling situations for selected Supervisor and E&S important flora / fauna especially contractors' crew cell Dolphin;Physical Cultural resources; Management Systems Health and safety Lump sum 25000 equipment on board and in terminals Management Lump sum 350000 Information and tracking system SUBTOTAL (ESTABLISHMENT & TRAINING and MANAGEMENT SYSTEM) 495000 SUB TOTAL (Construction, and Operation and mobilization) 2913000 CONTINGENCIES@ 5 % on total Environmental Costs 1456000 GRAND TOTAL for one ghat (in Rs) 3058650 61 ARKITECHNO" A IW TP - Draft Environm ental Im pact Assessm ent Report 2019 EMP Cost Estimate for Aphalamukh Ghat -~·:·:.~ :.::.:: :, ,. ,,~... -~, ,. ,,,. 'It'· ~ ... _ ,, ,., - ,!+.~. ., .,., '·•"\;.~··,,"'-»i'lii~"'-<' .l,i.c~{-~!°@." •.. A':"i~"f _!\'~in "e:"i1J~( ~ -~l~~ .J: 'i1~"i:,i'<-~"- l-,-~~/.l'l,-1 ,. ,. }"""• _. , ..!,¾, ;il" - i;;i,,l!.'··-ipj"'),~<' - : ;.'L':'.~,~;1~,}(,;· '.·- o,,,- J; ,A,, ••S ,,s-•}t~r.f/W/'1,,·s .~k,,., .. •,!('•,-,,<'' '· ~ ~'-··~" ~ >~ 1' . -~:~;it_;-' -~•11 .. ,.,, '· ',f,,i? ~. ·,,, ··t"t ' ,' .. '. ___ , -~ i:;.· ~ .c;;l..,',1 '·. • ;i "'· C ;f,#~';i) ~ r. •-{{,: • 1'"') ~,i~,c-- ._r I '•},~ '.t•'.!S ~ ,r, : ~ ', 1 ~,..,,,,._.. ..,,,~ --\i-f&~ ~4-'vt-'~,;f,t;-~ ~,. ,.¼t1'i:.?) ···'\!s~~i·, ~~ '0'."';I;..-(f;'~b I.,! ,~,i:i;~~{\·~ t'... . "' - ' , , [/.I,, -··· ·, .. , .... w . -~-'JJJ""' , ,;;t{l..,; · j, .. CONSTRUCTION STAGE Technical Support Technical support for Lump sum North Guwahati 65000 65000 preparation of guidelines, conservation action plan for turtle and dolphin areas and performance indicators Greenbelt Plantation along the access No. of trees 50trees 50000 per terminal 50000 development road to the terminal provisional Monitoring and No. of trees 50trees 10000 (once in a 30000 aftercare year for 1 terminal for 3yrs i.e., 10000x3) Drainage congestion & Provision of adequate To be covered in project design and engineering cost disposal of surveillance accumulated water Covered in project Embankment and River To be covered in project design and engineering cost design and Bank Protection Measures engineering cost Measures to reduce River training works, To be covered in project design and engineering cost dredging requirement Sandalling, Catchment treatment 62 ARKITECHNO" AIWTP - Draft Environmental Impact Assessment Report 2019 ,. _-~..:·._, --~-! .~:'l. ::-.. ~-"'.-, · ,,---· ---m~· qf!:i.~ -- F";'f!'~No r.- -;ff'~~~·~·.i" ~t·c< :,_; i;:V.,~.~-~ffl~' ,~4 ~~ ir- - ,. -.;., , ... ' --·--,1' \¥ if ,. ... ',:w. ~~~.« 1,,n' .. ~- ·- '' ,:_, -~· 1./ t' --..---,~... ··lft'w.J~i7l·""i'·""R . f&i ..j ,,,. ~ ... ·:~~: IQ ..,. } :.Si, ',.';.;:;,,·.: ., ·~ ,; 11,v·· , . ··. . ,,:., ;f.~, .... :~;~ .',.,"':f, ..,,1/; : ';. .l 1· ·-i~,;v, ,,,p.-~· ,·, . " ,,_,~·tJ1. ,:>, :~;1:'-~:c;:.;-v~; .... ~!: ,~.r,r. :Ji.,.,_.. , ~-: ~q:: ·-~"~ ·.,.., ..;,_,:":; J"'- ·!,~.I ~ ... -~-' •• ~ ~", ;;, ~ .. , ·.'. , . . ·, , . d ~ ..,:, ,, ' •,: ~· '· - ' • ~ •• ,' ·,.. ·"'J!"' ,- ·~ , ...:._;.ie,"r·-~r."1;- ~,;-·;f~'~· «:,,:.<,;1.,.,~ ...~ \~~-i.. ;~ --~--··J~ ¥', ..... J,;,,\~-fii~ ... '!--.11?1,,~ ,, .,•;:J ,~,....... ~ ~· ,, -. ·.-1"·' ,;·, ,., ~ (.~~, ~ .,,lft~..i ;,.J',_)l~':l : 'I'-. ::. ; ,·,, ...... ~-"•,, ,,; '.{- .,,. • , ' 11 ' i., f, '.,.:f ',';"~W... f.,\..,. r,,,..:' :,!•'ll!'"Z:;(~·~--~,,t~.c,,•i,·: "- _ ,., .--11L,._~- • , ,, ., - ' , o;-•".•,i';,~ " .... Ii;~ -~~{',;·'~;;,.,i:'fjw;>">", ..:;!,.j '*' ~- ."'• '~-,,, ;,·.;,,.,,, t ~ 1 ~ -. ... 4. .. ,.,.,,_.,, - r ·, • , ,., · ~ , ,, < ,,;"';i'"''1'.,4;i(~~l(',~ -ilf'1- ~ 1, , • •• -. ", • • - , , \_ : • • _ .,_ Land Compensation against land As required for specific site and is included separately under SIA/RAP reports. Soil Soil contamination To be covered in project design and engineering cost protection(Septic tanks, grease traps etc.) and rehabilitation of borrow areas/debris disposal site/plant site & labour camps Noise Canopy for DG sets PPEs To be covered in project design and engineering cost like ear plug Timely maintenance of the machinery, equipment and vehicles Barricading the site Water Provision of storm water and To be covered in project design and engineering cost wastewater management system Construction of soak pits at To be covered in project design and engineering cost construction sites & labour camps Provision of clean drinking & To be covered in project design and engineering cost domestic water facility at labour camps and construction site 63 ARKITECHNO" A IW TP - D raft Enviro nm ental Im pact Assessm ent Report 2019 ~::\;,; >' :. : j. ; ,J:rr e ~:~:;~~:mf:·:it:·.:·. ;, / STP construction, Zero ~ • ~ • ,c, •.. . i,.1 Including in project design and engineering costs / • " y :<, ;\ ,- 'I f. r • ,. , ',~ ·: ~, ,··:~' ce,,-.:(- • ' ~ ~; , - ~~r,~;·.- ~~~~~:::·,~ ~:i:1~ .•• ,t5: ~,, .~""'""';,d•··~·{ ,_,, ,r' , ' ~;;~:·r.~ '· - z" ~lt:~r. ·-~ :.~ _z ~ ~ ~.:,ri , •., • •.,L• r,, ,;,~q.:,.:.·~· ·'-'""''~ • ........ ..,.:_·~' •;; fr~'f'.,., . . j4.,~<'1~:er."Z'.)-:.!'{ -:_':, Discharge management ( collection of storm water and its distillation and use, and rain water harvesting Air Quality - Dust Water Sprayer/ Watering for To be covered in project design and engineering cost Management during Dust suppression construction Green belt development, To be covered in project design and engineering cost dust control system, mechanized material handling systems for material loading and unloading at terminal and vessel. Safety Appointment of Safety To be covered in project design and engineering cost Officers Safety signage, fire-fighting To be covered in project design and engineering cost measures& water ambulance etc. Provision of trainings and To be covered in the responsibility of the Contractor PPE to workers Health Health check-up camps for To be covered in the responsibility of the Contractor construction workers 64 ARKITECHNO" AIWTP- Draft Environmental Impact Assessment Report 2019 ,-, ;',J""""~-.: O'f ":1!tf'':i1'~'('7-:> .t,11!. t'f: : , "~, ~- k.,.,.•-,·,...,,~ ~,;}i!f""'~-~ -;1,;r•';iif·~·lt ,->~ _... #;s.1-r~,.;_.:.r;c''1'- ,:~... ,~:it.$-·~-:"!.\ t_,.1~~-::.i.~,;.;P.:1,j.. ;~~ u.;. 1-,,•q--~,_,,,~,,?~'.,_',JC,••;-s·•-··: •i!':';·'·,f~ 1\'itJ:JtJ·,.~:~/t~·~J.:."-:.~·;,:'i '.~. ~Jf~~v?-4 g;.-,-""~,... 1' -,~~-t'~ '"-.,lfflf! :,..'" :,7 ':; · ,,;\. _ • ·;. . ' • ~;;;.~"::;(';} ~~~i:J-~ • ~ ~-?!, "?,~,,;• . .. •'ia1i~f~, ,·,) <, ·r:-:", -;_;)>''·ft, r,:;:-,,~ • . . ~ :~-- , : ·:r; _.-, .:~ ~~/. 1-J~~ f'; '".. Y-,.,... .. ~/ ~,. ... ~.,.~~ ,-,:~~- J~-,'1':~i' '1 ~,!!).- ··~~:~ "< -;~~ ~/•. ', '~·. i!,,a 't ·,;fl!,•~~,, •. ·• lt"•,T. r,i,,c·,~ ~... 't.:-::1.~'~,.-·:.t',',')- '\1 -~!•1,A:-.; ,•.~·•'···-J , .. ~, ·, ' l ·.,.,:Ji_ · ~ • .. .. ,• -·- •. -~·}, _, >"!' '~..;,-'i'-!\'"'· .••. ,.l ,,•,, ~ ~- .,,..._,, (,!:;~ 'rr •. '.- -,,, \ .,w,,,c, ..1,... 1 ;,. •'',..u .. "~~...-..,·V)""'!);,tr,,,:;.1 • .c-,r.~('r',,...,._';,:.\';,..:\\i•-.\~.,,..."{Wr,.-;:,t,. ".-..,~,r,~-~~]{,I''~".:'~~ -:,_~~ ,. --; · '•,•, , . ,.•, ·~-··"' ,,., ,,.,,•• I,•~,, ::,i;,.n,,,,, -~, ,•':4l•!·,,i: ., ·;',',>~ 1.. .l, ·•·'•t\"<.jf,•• ""'''."•'·' • ~ .. ., .... ~-~ ,Zfj!-ic-. , ~, -l'\'.,)_ , • , -"',~.-,,,1 -..,'±•~• .,·"~'!:~' 1·~-;,...,_. .,. . , ..J-~Jill ~'/j-/• 1 '" > J·~,'!t.. '._,,~~·11( ,. ,i • .. •""",~I • ,, ' ~;,•-S!!' i ~ ,...k ":"fn1''M~1.1·,1:> ... ~ ,~•r •. ...... ~ ~,,-~..., ...• ~.-.-~·6,M-':!!~.a:, ...1~t\ • ~ 1,.; -~-'t.- jt.t ~~ ,4-.-·~ • • .... ~-~\.>..., Enhancement Institutional Support for No Lump sum 25000 Measures ecology awareness through reputed institutions Bath shelter for women No along the stretch for maintaining privacy from vessel movement Support for cleanliness at To be covered in the responsibility of the Contractor Lump sum 0 Ghats and improvement of Ghats Environmental Terrestrial and Aquatic 50,000 per season. Once in six month for 3 years 300000 Monitoring in the Fauna including Dolphin construction phase Consevation Management Plan Ambient Air Quality Monitoring at along the Total sample per location 15,000/ sample 180000 stretch for 3years is 12, Considering 15,000/sample, cost for12 samples will be 12X15000 Monitoring at construction Total sample per location 15,000/ sample 180000 sites for 3years is 12, Considering 15,000/sample, cost for12 samples will be 12X15000 65 ARKITECHNO" A IW TP - Draft Environm ental Im pact A ssessm ent Report 2019 Surface Water Quality Surface water resources As per the standard 12,000/ sample 108000 norms, sample may be collected for three season (Pre-monsoon, monsoon & post monsoon or winter) at each location for three years. Hence, 3samples each location in one year & 9 samples each location for 3years. Then costing @12000/sample will be 12000*9 i.e 108000 Environmental Surface Water Quality Ground water bodies As per the standard 12,000/ sample 108000 Monitoring in the norms, sample may be construction phase collected for three season (Pre-monsoon, monsoon & post monsoon or winter) at each location for three years. Hence, 9 samples each location for 3years. Then costing @12000/samples will be 12000*9 i.e 108000 Drinking Water Quality There will be strict instruction to all the contractors to supply filtered driking 0 water to the labours. Hence, it is not required to anyalysis drinking water quality since the project activities have no direct impact on drinking water in 66 ARKITECHNO" AIWTP- Draft Environmental Impact Assessment Report 2019 i · . . ·' ,::~~·7;_-·.·-:,,·:;t::tf.". ~- •"'••• ,,_ ~~m~m;4'~~ i ... ;.;. N r'l!-)_ ~, '[.t'.;.j_.., -~~ "(,' _,,•'i,-,•~ ~J,,:· ·t~i.!:~,. f'-~,1.1!'~~:!~~~$,~~\tt' - ;.~?'f°t<{~Jrf:·:-: ,, ~... -_ ,<),"'."'~ ••• t'l< ~ <.-•· t-,~~ ].~~D:.'"' ,,_ ~.~f ~~I-~"·:-,. ·; ~~-:;;:·»-tt"~~":/f' ,,, • " ;e'.t, c.:"'1~- ••• t"1iJ~f?~~ ;.~.,. T•("1''· i ,,.., • .. ,~$r'!1-,~;l~j , ••••• ~,.,. /#t~~-'t!~i--:: :..i.-~~i."'·i~ ..;~.'-1thl:t:1~Sh-~itc,:_,;!,r.:::t.·.- i' ~(·..;;~:~;) .,\~:Rt:~/)•·it4.:S*.. /;r. ·:-:~,-w 'i~.,. -'",-ti\'• ,. .:1 ''il·;,,~ ·;~u:y."··· ,'-1 '•" "•>'- ,~l,. 1 .~~/·~-- 't-1 1 ...,. ~0,1i~%}:1~~~4' ... , 1 ~ • ~,·, ....ts ;"'t:·:.'_, ~·,-::.:··~~~ illi:,.-"··"-· ,•J L,, • --~ ~"?,·:~',., ii·- (f_t~t,} ...,_,j 1l .J-.,:,llii,"'°""'~~"t.,.\;r.,,,,.,"1, ·.·',,f.·, , , ·•.~~;;:.i;,l!,, ,. t ~ ~ .. ~':~~~~~~f.:"_··_1··['~ .~.~. <~'\.1.'lll~~i 'ti~~1~/·... • - , .. ~:·t,i'-.~ ~~- .:.t:.~ . (.#~'-,:~l,-: :}L,;f.~~~~r~ti. ,,•:. ·'(wAAd,-•,.,-L'.;.••"-·~', 1 {,:.---~ ~ .. ,:-~1-.. ... ~-<::: -~-~...,,·.. ~ 1....:,,1;:~."r:!:,,.,,.,_J~--t;:_-.:,;,. .. ,:~·._r.a~,..i,~ . .... I ... }~ il ~- ~1·· .. ~ ., ... -.(, •. , _. ~~, • \- ... ll ~:."'·~-~;;t,>,_,,.C',/,1 ~·\H . OPERATION STAGE Erosion Control and Visual Check To be part of Regular maintenance and landscaping operation costs Water Waste Water Management STP Operation, rainwater To be part of Regular maintenance and 0 (compact STP cost in NBC) harvesting management operation cost based on number of and maintenance people/hour Storm Water Management Maintenance of Storm To be part of Regular maintenance and costs System water drains Provision of drinking water There will be strict instruction to all the contractors to supply filtered drinking 0 facilities water to the labours. Hence, it is not required to analysis drinking water quality since the project activities have no direct impact on drinking water in the nearby area. Waste Management System Collection, segregation To be part of Regular maintenance and and disposal of municipal operation cost waste, hazardous waste (used oil) and dredged soil Environmental Monitoring in Terrestrial and Aquatic During operation stage, surveillance audit of 300000 the operation phase Fauna including Aquatic ecology to be conducted on quarterly surveillance audit & basis for 3years @ Rs. 25000/- Dolphin Conservation Management Plan Ambient Air Quality 4 samples/location/year 115,000/ sample 180000 @15000/samples for 1 68 I ARKITECHNO" AIWTP - Draft Environmental Impact Assessment Report 2019 location will be 4X1X15000 i.e. 60000 For 3years it will be 180000 Surface Water Quality 3 samples per location for 12,000/ sample 324000 one year (at pre- monsoon, monsoon & post-monsoon) @12000/- will be 3X1X3X12000 i.e. 1,08,000/-. For three years, it will be 3,24,000/- Environmental Ground water 3 samples per location for 12,000/ sample 108000 Monitoring during one year (at pre- Operation Stage monsoon, monsoon & post-monsoon) at 1 location @12,000/sample will be Rs36000 . For three years it will be 108000 Noise & Vibration 24 hourly/season for3 4,000/ sample 1,08,000 season per year at 3 locations per site for 1 year for 1 ghat i.e. 3X3X3X4000 Soil Quality, River Bed 4 samples/location/year 8,000/ sample 96000 Sediments, Soil Erosion & @8000/samples for 1 69 ARKITECHNO" A IW TP - Draft Enviro nm ental Im pact Assessm ent Report 2019 ~,;iif~~{rfi't:·>: · i"~IJ:~~ ;~t'. ", :}fr;t:·~??.j,I/7}{ '.': }t:L~- ;~;: Ia Siltation, Integrity of location will be 4X1X8000 embankments i.e. 32000. For 3years it will be96000 Electricity Solar Panels Cost of solar panels for Provision of installing solar panels to be covered 0 priority ghats in design & engineering cost SUB TOTAL (OPERATION PHASE) 1116000 ESTABLISHMENT, TRAINING & MANAGEMENT SYSTEM Training General environmental Selected staff of AIWTDS, Training for Selected Lump sum 15000 awareness; environmental supervisor, and staff of AIWTDS, and social sensitivity of the contractors supervisor, and project influence area; Key contractors, Vessel findings of the EIA; Operators Mitigation measures; EMP; Social and cultural values of the area. Training for Ghat Ghat officers, Ghat Maintenance workers Lump sum 50000 management via traing for Ghat/section officers/ vessel operators/masters/ khalasi etc. 70 ARKITECHNO" AIWTP - Draft Environmental Impact Assessment Report 2019 General environmental and PIU; supervisor; selected contractors' crew Lump sum 10000 awareness; Environmental and social sensitivity of the project influence area; Mitigation measures; Community issues; Awareness of transmissible diseases; Social and cultural values. EMP; Waste disposal, Construction crew Contractors 10000 Cultural values and social sensitivity. Road/waterway safety; Drivers;boat/launch crew, Contractors 10000 Defensive driving/sailing; Waste disposal; Camp operation; Waste Camp staff Contractors 10000 disposal; Natural resource conservation; Housekeeping. Restoration requirements; Restoration teams Contractors 10000 Waste disposal. Construction Implementation PIU;supervisor; selected Contractors, Supervisor 10000 requirements; handling contractors' crew and E&S cell situations for important flora I fauna especially Dolphin; 71 I ARKITECHNO" A IW TP - D raft Environm ental Im pact A ssessm ent Report 2019 Physical Cultural resources; Management Systems Health and safety 1 Lump sum 25000 equipment on board and in terminals Management Information Lump sum 350000 and tracking system SUBTOTAL (ESTABLISHMENT & TRAINING and MANAGEMENT SYSTEM) 495000 SUB TOTAL (Construction, and Operation and mobilization) 2993000 CONTINGENCIES @ 5 % on total Environmental Costs 149650 GRAND TOTAL for one ghat (in Rs) 3142650 72 ARKITECHNO" Attachment-2 Total Count in a S.No Names of Ghats FGDs Categories of Participants Particular FGD Gender fgd ( combination of males & 1 Aloupatty FGD 1 females) 20 FGD2 Indiginious (tribals) 0 FGD3 labour (ferry ghat labours) 15 FGD4 ferry ( ferry opeartors) 4 Village fgd (female residents, FGD 5 workimg and non-working) 15 2 Annapurna FGD 1 gender fgd 18 FGD2 Indiginious 0 FGD 3 labour 13 FGD4 ferry 3 FGD5 Village fgd 12 3 Aphalaghat FGD 1 Gender FGD 15 FGD2 Indiginious 14 FGD3 Labour 10 FGD4 ferry 0 FGD 5 Village FGD 18 4 Beranga FGD 1 Gender FGD 20 FGD2 Indiginious 0 FGD 3 Labour 10 FGD4 ferry 3 FGD5 Village FGD 20 5 Bhukhrodiya FGD 1 Gender FGD 0 FGD2 Indiginious 0 FGD3 Labour 20 FGD4 ferry 0 FGD5 Village FGD 0 6 Dhubri FGD 1 GenderFGD 20 FGD2 Indiginious 0 FGD3 Labour 15 FGD4 ferry 3 FGD5 Village FGD 10 7 Dudpatiel FGD 1 Gender FGD 17 FGD2 Indiginious 10 FGD 3 Labour 10 FGD4 ferry 4 FGD5 Village FGD 18 8 Fakirgunj FGD 1 Gender FGD 10 FGD2 Indiginious 0 FGD 3 Labour 20 FGD4 ferry 5 FGD 5 Village FGD 10 9 Gandh i ghat FGD 1 Gender FGD 19 FGD2 Indiginious 0 FGD3 Labour 10 FGD4 ferry 5 FGD5 Village FGD 15 10 Jaleshswar FGD 1 Gender FGD 20 FGD2 Indiginious 0 FGD3 Labour 15 FGD4 ferry 5 FGD5 Village FGD 17 11 Kachari ghat FGD 1 Gender FGD 15 FGD2 lndiginious 0 FGD3 Labour 15 FGD4 ferry 0 FGD5 Village FGD 13 12 Kamalabari FGD 1 Gender FGD 20 FGD2 Indiginious 14 FGD3 Labour 10 FGD4 ferry 15 FGD5 Village FGD 20 13 Kanakpur FGD 1 Gender FGD 10 FGD2 Indiginious 0 FGD3 Labour 10 FGD4 ferry 10 FGD 5 Village FGD 10 14 ghatLachit FGD 1 Gender FGD 5 FGD2 Indiginious 0 FGD3 Labour 5 FGD4 ferry 0 FGD5 Village FGD 15 15 Nagarbera FGD 1 Gender FGD 20 FGD2 Indiginious 0 FGD3 Labour 20 FGD4 ferry 4 FGD 5 Village FGD 20 16 Neemati ghat FGD 1 Gender FGD 20 FGD2 Indiginious 20 FGD3 Labour 10 FGD4 ferry 9 FGD5 Village FGD 19 17 North Guwahati FGD 1 Gender FGD 20 FGD2 Indiginious 0 FGD3 Labour 20 FGD4 ferry 0 FGD5 VillageFGD 7 18 Rajaduwar FGD 1 Gender FGD 15 FGD2 Indiginious 10 FGD3 Labour 16 FGD4 ferry 5 FGD5 Village FGD 13 19 Sonaram Ghat FGD 1 Gender FGD 0 FGD2 Indiginious 0 FGD3 Labour 20 FGD4 ferry 0 FGD5 Village FGD 4 20 South Salmara FGD 1 Gender FGD 15 FGD2 Indiginious 0 FGD3 Labour 10 FGD4 ferry 5 FGD5 Village FGD 20 21 Umananda FGD 1 Gender FGD 11 FGD2 Indiginious 0 FGD 3 Labour 10 FGD4 ferry 5 FGD5 Village FGD 15