PROCUREMENT PLAN Project information: Democratic Republic of Congo - Kinshasa Urban Development and Resilience Project (P161602) Project Implementation agency: Ministry of Urban Development and Housing - Secretariat Permanent Date of the Procurement Plan: September 23, 2017 Period covered by this Procurement Plan: September 2017, June 2018 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in the DRC Procurement code of April 27, 2010, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. (a) Standard Bidding Documents. All Standard Bidding Documents to be used for the project under NCB shall be found acceptable to the World Bank before their use during the implementation of the project. (b) Eligibility. Eligibility of bidders and acceptability of their goods and services shall not be based on their nationality and/or their origin, and association with a national firm shall not be a condition for participation in a bidding process. Therefore, except for the ineligibility situations referred to in paragraphs 1.10(a) (i) and 1.10(a) (ii) of the Procurement Guidelines, the eligibility of bidders must be based solely on their qualification, experience, and capacity to carry out the contract related to the specific bidding process. (c) Advertising and bid preparation time. Bidding opportunities shall be advertised at least in a national newspaper of wide circulation and on the website of the Recipient’s Procurement Regulator (Autorité de Régulation des Marchés Publics), and bidders should be given at least 30 days from the date of invitation to bid or the date of availability of the bidding documents, whichever is later. (d) Criteria for qualification of bidders. Qualification criteria shall only concern the bidder’s capability and resources to perform the contract, taking into account objective and measurable factors. Such criteria for qualification of bidders shall be clearly specified in the bidding documents. (e) Evaluation and contract award. A contract shall be awarded to the substantially responsive and lowest evaluated bidder provided that such bidder meets the qualification criteria specified in the bidding documents. No scoring system shall be allowed for the evaluation of bids, and no ‘blanket’ limitation to the number of lots which can be awarded to a bidder shall apply. The criteria for bid evaluation and the contract award conditions shall be clearly specified in the bidding documents; (f) Preferences. No preference shall be given to domestic/regional bidders, to domestically/regionally manufactured goods, and to bidders forming a joint venture with a national firm or proposing national subcontractors or carrying out economic activities in the territory of the recipient. (g) Publication of contract award. Information on all contract awards shall be published in at least a national newspaper of wide circulation or in the Recipient’s Procurement Regulator (Autorité de Régulation des Marchés Publics) website. (h) Fraud and corruption. In accordance with the Procurement Guidelines, each bidding document and contract shall include provisions stating the World Bank’s policy to sanction firms or individuals found to have engaged in fraud and corruption as set forth in the Procurement Guidelines. (i) Inspection and audit rights. In accordance with the Procurement Guidelines, each bidding document and contract shall include provisions stating the World Bank’s policy with respect to inspection and audit of accounts, records, and other documents relating to the bid submission and contract performance. (j) Requirement for administrative documents and/or tax clearance certificate. The bidding documents shall not require foreign bidders to produce any administrative or tax- related certificates before confirmation of awarding a contract. (k) Modifications of a signed contract. Any change in the contract amount which, singly or combined with all previous changes, increases the original contract amount by 15 percent or more must be done through an amendment to the signed contract instead of signing a new contract. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is not applicable Works: is not applicable PROCUREMENT Congo, Democratic Republic of : Kinshasa Multisector Development and Resilience Project PLAN General Information Country: Congo, Democratic Republic of Bank’s Approval Date of the Original Procurement Plan: 2017-09-23 2019-12-18 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P161602 GPN Date: Project Name: Kinshasa Multisector Development and Resilience Project Loan / Credit No: IDA / V1090, IDA / V2800 Executing Agency(ies): Cellule Infrastructures WORKS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GOODS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ZR-PDU-29876-GO-RFQ / ACQUISITION UN Single Stage - One En cours IDA / V1090 A posteriori Demande de prix Limited 45,000.00 86,600.00 2017-09-30 2017-10-18 2017-10-25 VEHICULE 4 x 4 Tout Envelope d'exécution terrain ZR-PDU-91852-GO-DIR / ACQUISITION LOGICIEL DE GESTION COMPTABLE Passation de TOM2PRO TYPE MONO En attente IDA / V1090 A posteriori marché de gré à Direct 35,000.00 0.00 2019-01-08 2019-01-13 2019-02-17 2019-03-04 SITE ET MULTIPROJETS, d'exécution gré Y COMPRIS FORMATION DES UTILISATEURS (RAF & COMPTABLE) ZR-PDU-91872-GO-RFQ / ACQUISITION MATÉRIELS INFORMATIQUES, Single Stage - One En attente IDA / V1090 A posteriori Demande de prix Limited 25,000.00 0.00 2019-01-08 2019-03-05 2019-03-19 MOBILIERS ET AUTRES Envelope d'exécution ÉQUIPEMENTS DE BUREAUX POUR L'UCP NON CONSULTING SERVICES Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Market Contract Type Estimated Actual Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 1 ZR-PDU-29868-CS-CQS / Cabinet en charge Mission Sélection fondée Etudes techniques pour sur les Open - En cours IDA / V1090 A posteriori 150,000.00 0.00 2017-09-29 2017-10-13 2017-11-02 2017-11-17 2017-11-27 2018-01-26 Travaux construction des qualifications des International d'exécution STBV et Gestion filière Ville consultants de Kinshasa ZR-PDU-29877-CS-CQS / Cabinet en charge mission Etude de Sélection fondée préfaisabilité_Amélioration de sur les Open - En cours IDA / V1090 A posteriori 250,000.00 0.00 2017-09-28 2017-10-12 2017-11-02 2017-11-12 2017-11-27 2018-01-26 la desserte, des qualifications des International d'exécution infrastructures et services de consultants proximité_ Quartiers C/ Lemba, Matete et Ndjili Sélection fondée ZR-PDU-35191-CS-CQS / sur les Open - En cours IDA / V1090 A posteriori 200,000.00 251,600.00 2017-11-02 2017-11-05 2017-11-11 2017-11-13 2017-11-17 2018-05-16 Etude sociale qualifications des International d'exécution consultants ZR-PDU-35198-CS-CQS / Sélection fondée ETUDE TECHNIQUE sur les Open - En attente IDA / V1090 A posteriori 150,000.00 0.00 2017-11-02 2017-11-08 2017-11-22 2017-11-26 2017-11-30 2018-01-14 AMENAGEMENT ESPACES qualifications des International d'exécution PUBLICS NDJILI consultants Sélection fondée ZR-PDU-35199-CS-CQS / sur les Open - En attente IDA / V1090 A posteriori 150,000.00 0.00 2017-11-02 2017-11-09 2017-11-17 2017-11-24 2017-11-29 2018-01-28 Etude Projets Quartiers qualifications des International d'exécution consultants ZR-PDU-35203-CS-CQS / Sélection fondée Etude collecte des déchets sur les Open - En cours IDA / V1090 A posteriori 150,000.00 0.00 2017-11-02 2017-11-09 2017-11-21 2017-11-24 2017-11-28 2018-01-27 & Evaluation du CET qualifications des International d'exécution MPASA consultants ZR-PDU-45966-CS-CQS / ETUDES TECHNIQUES POUR LA REHABILITATIONET Sélection fondée L'AMENAGEMENT DE sur les Open - En cours IDA / V1090 A posteriori 350,000.00 0.00 2018-01-25 2018-01-29 2018-02-18 2018-03-04 2018-03-15 2018-07-13 CERTAINES VOIES DE qualifications des International d'exécution DESENCLAVEMENT DES consultants BASSINS-VERSANTS EST ET OUEST DE LA RIVIERE N'DJILI ZR-PDU-45998-CS-CQS / ETUDES TECHNIQUES POUR LES OPERATIONS Sélection fondée PILOTES DE LUTTE sur les En cours IDA / V1090 A posteriori Limited 300,000.00 0.00 2018-01-25 2018-02-08 2018-02-28 2018-03-08 2018-08-05 CONTRE L'EROSION ET qualifications des d'exécution LES INONDATIONS DANS consultants LA COMMUNE DE KISENSO ZR-PDU-91749-CS-CQS / Sélection fondée RÉALISATION PAR POUR sur les CONSTRUCTION D'UNE IDA / V1090 A posteriori Limited 70,000.00 0.00 Annulé 2018-12-19 2019-01-02 2019-02-01 2019-03-08 2019-04-22 qualifications des STBV A L'ITA MOMBELE consultants A KINSHASA ZR-PDU-91751-CS-CQS / ÉLABORATION D'UNE Sélection fondée EIES LIÉE AU VOLET sur les IDA / V1090 A posteriori Limited 75,000.00 0.00 Annulé 2018-12-21 2019-01-07 2019-01-25 2019-02-11 2019-03-28 "GESTION DES DÉCHETS qualifications des SOLIDES" DANS LA VILLE consultants DE KINSHASA Page 2 ZR-PDU-91753-CS-CQS / RÉALISATION D'UN PLAN D'ACTION DE RÉINSTALLATION (PAR) Sélection fondée RELATIF AUX TRAVAUX sur les En cours IDA / V1090 A posteriori Limited 100,000.00 0.00 2018-12-19 2019-01-03 2019-01-24 2019-02-12 2019-03-29 DE RÉHABILITATION DES qualifications des d'exécution AVENUES Me CROQUET consultants ET LWEMBA DANS LA COMMUNE DE NDJILI A KINSHASA ZR-PDU-91754-CS-CQS / RÉALISATION D'UN PAR Sélection fondée RELATIF AUX TRAVAUX sur les D'AMENAGEMENT DE IDA / V1090 A posteriori Limited 70,000.00 0.00 Annulé 2018-12-24 2019-01-07 2019-01-22 2019-02-15 2019-04-01 qualifications des DEUX ESPACES PUBLICS consultants A NDJILI DANS LA VILLE DE KINSHASA ZR-PDU-91755-CS-CQS / RECRUTEMENT CABINET Sélection fondée EN CHARGE DE L'AUDIT sur les En attente IDA / V1090 A posteriori Limited 60,000.00 0.00 2019-01-21 2019-02-04 2019-02-25 2019-03-18 2022-03-17 EXTERNE DU PROJET qualifications des d'exécution POUR UNE PÉRIODE DE consultants TROIS (3) ANS ZR-PDU-91750-CS-CQS / LA RÉALISATION D'UNE EIES RELATIVE AUX Sélection fondée TRAVAUX DE sur les CONSTRUCTION D'UNE IDA / V1090 A posteriori Limited 75,000.00 0.00 Annulé 2018-12-17 2019-01-03 2019-01-18 2019-02-09 2019-04-10 qualifications des STATION DE TRAITEMENT consultants DE BOUES DE VIDANGE SUR LE SITE DU CNPP A KINSHASA ZR-PDU-107929-CS-CQS / ELABORATION D'UN PLAN D'ACTION DE Sélection fondée REINSTALLATION sur les En cours RELATIF AUX TRAVAUX IDA / V1090 A posteriori Open - National 75,000.00 0.00 2019-03-28 2019-04-11 2019-04-21 2019-04-30 2019-05-13 2019-06-27 qualifications des d'exécution D'AMENAGEMENT DE consultants DEUX PLACES PUBLIQUES DANS LA COMMUNE DE NDJILI A KINSHASA ZR-PDU-128045-CS-CQS / ÉTUDES TECHNIQUES Sélection fondée RELATIVES AUX TRAVAUX sur les En attente DE RÉHABILITATION DES IDA / V2800 A posteriori Limited 50,000.00 0.00 2019-08-30 2019-09-17 2019-10-07 2019-10-31 2019-12-30 qualifications des d'exécution CENTRES DE PROMOTION consultants SOCIALE DE NDJILI ET MATETE/KISENSO ZR-PDU-128046-CS-CQS / ÉLABORATION E.I.E.S. ET P.A.R. RELATIFS AUX Sélection fondée TRAVAUX DE sur les En attente IDA / V2800 A posteriori Limited 80,000.00 0.00 2019-09-09 2019-09-23 2019-10-18 2019-11-15 2020-01-14 RÉHABILITATION DES qualifications des d'exécution CENTRES DE PROMOTION consultants SOCIALE DE NDJILI ET MATETE/KISENSO Page 3 ZR-CI-144991-CS-CQS / Recrutement Cabinet International chargé du développement et de la Sélection fondée révision des programmes de sur les Open - En attente IDA / V2800 A posteriori 210,000.00 0.00 2019-11-14 2019-11-28 2020-01-13 2020-01-23 2020-02-16 2020-07-15 formation basés sur les qualifications des International d'exécution compétences dans les consultants secteurs prioritaires et principalement sur les formations numériques ZR-CI-145065-CS-CQS / Recrutement d'un Consultant (Firme) chargé de la conception pour le compte de Sélection fondée l'Institut National de sur les En attente IDA / V2800 A posteriori Open - National 40,000.00 0.00 2019-11-14 2019-12-05 2020-01-06 2020-01-27 2020-03-02 2020-05-31 Préparation Professionnelle qualifications des d'exécution (INPP), d'un pilote de consultants conseil de compétences sectorielles dans un des secteurs prioritaires ZR-CI-144994-CS-CQS / Recrutement Cabinet pour la conception et l'étude Sélection fondée technique des travaux de sur les En attente construction du Centre de IDA / V2800 A posteriori Limited 50,000.00 0.00 2019-11-27 2019-12-11 2019-12-29 2020-01-26 2020-06-24 qualifications des d'exécution formation professionnelle de consultants l'Institut National de Préparation Professionnelle (INPP) à Maluku. INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Market Contract Type Estimated Actual Draft Negotiated Description Component Review Type Method Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ZR-PDU-27631-CS-INDV / En cours Consultant individuel IDA / V1090 A posteriori Individuel Limited 75,000.00 0.00 2017-09-07 2017-09-12 2017-10-03 2017-11-07 2018-05-06 d'exécution Mission Elaboration CGES ZR-PDU-27644-CS-INDV / En attente IDA / V1090 A posteriori Individuel Limited 75,000.00 0.00 2017-09-07 2017-09-12 2017-10-03 2017-11-07 2018-05-06 Consultant individuel CPR d'exécution ZR-PDU-27648-CS-INDV / En attente IDA / V1090 A posteriori Individuel Limited 75,000.00 0.00 2017-09-07 2017-09-12 2017-10-03 2017-11-07 2018-05-06 Consultant EIES d'exécution ZR-PDU-27651-CS-INDV / En attente Consultant individuel IDA / V1090 A posteriori Individuel Limited 75,000.00 0.00 2017-09-07 2017-09-12 2017-10-03 2017-11-07 2018-05-06 d'exécution Elaboration PAR ZR-PDU-29878-CS-INDV / Consultant individuel en charge de la Mission En attente IDA / V1090 A posteriori Individuel Limited 75,000.00 0.00 2017-09-27 2017-10-01 2017-10-06 2017-10-16 2017-11-15 d'Etudes d' Evaluation d'exécution financiere de la Ville Prov de Kinshasa et 8 communes- ZR-PDU-29880-CS-INDV / Mission d'Etude En attente organisationnelle de la ville IDA / V1090 A posteriori Individuel Limited 75,000.00 0.00 2017-09-27 2017-10-02 2017-10-09 2017-10-26 2017-11-25 d'exécution province de Kinshasa et de 8 Communes pilotes ZR-PDU-35038-CS-INDV / EIES Transversales au Bd IDA / V1090 A posteriori Individuel Limited 75,000.00 0.00 Annulé 2017-11-03 2017-11-06 2017-11-12 2017-11-16 2017-12-31 Lumumba Page 4 ZR-PDU-47857-CS-INDV / Consultant individuel chargé En cours IDA / V1090 A posteriori Individuel Limited 40,000.00 37,200.00 2018-02-07 2018-02-08 2018-02-09 2018-02-11 2019-02-06 de passation des marchés d'exécution pour appuyer le SP.PDU Sélection de ZR-PDU-47856-CS-CDS / En attente IDA / V1090 A posteriori consultants par Direct 80,000.00 0.00 2018-10-01 2018-10-07 2018-10-20 2018-11-19 EIES / Projets des Quartiers d'exécution entente directe ZR-PDU-61230-CS-INDV / THIMO - Détermination taux de paiement conforme En cours situation socio-économique- IDA / V1090 A posteriori Individuel Limited 15,000.00 8,300.00 2018-05-14 2018-05-19 2018-05-22 2018-05-31 2018-07-30 d'exécution Ville de Kinshasa pour les participants aux travaux de THIMO ZR-PDU-61234-CS-INDV / THIMO-Consultation - choix En cours modalité paiement IDA / V1090 A posteriori Individuel Limited 15,000.00 9,560.00 2018-05-14 2018-05-19 2018-05-22 2018-05-31 2018-07-30 d'exécution participants travaux de THIMO ZR-PDU-47851-CS-CDS / Sélection de EIES / STATIONS DE IDA / V1090 A posteriori consultants par Direct 80,000.00 0.00 Annulé 2018-02-07 2018-02-13 2018-02-26 2018-03-28 TRAITEMENT BOUES entente directe VIDANGE ZR-PDU-47848-CS-CDS / Sélection de EIES VOIES IDA / V1090 A posteriori consultants par Direct 80,000.00 0.00 Annulé 2018-02-07 2018-02-13 2018-02-26 2018-03-28 TRANSVERSALES AU BLD entente directe LUMUMBA ZR-PDU-47849-CS-CDS / Sélection de EIES/ Projets pilotes - IDA / V1090 A posteriori consultants par Direct 80,000.00 0.00 Annulé 2018-02-07 2018-02-13 2018-03-01 2018-03-31 Erosions entente directe ZR-PDU-47854-CS-CDS / Sélection de EIES / Espaces publics / IDA / V1090 A posteriori consultants par Direct 80,000.00 0.00 Annulé 2018-02-07 2018-02-13 2018-02-26 2018-03-28 Commune Ndjili entente directe ZR-PDU-61855-CS-CDS / EIES STBV -EIES CONNECT/ STATIONS Sélection de TRAITEMENT BOUES IDA / V1090 A posteriori consultants par Direct 181,100.00 193,100.00 Signé 2018-05-04 2018-05-10 2018-05-23 2018-06-22 VIDANGE &EIES/ VOIES entente directe TRANSVERSALES AU Bld Lumumba/ Marché attribué au cabinet SERF BURKINA ZR-PDU-47849-CS-CDS-2 / EIES / EROSION -Kisenso / EIES- ESPACES Sélection de En cours PUBLICS/NDJILI IDA / V1090 A posteriori consultants par Direct 171,250.00 171,250.00 2018-05-04 2018-05-10 2018-05-26 2018-06-25 d'exécution Marché gré à gré attribué entente directe au cabinet CA-GES de Dakar- SENEGAL ZR-PDU-91762-CS-INDV / Recrutement de Consultants membres des pannels d'évaluation des dossiers de En attente IDA / V1090 A posteriori Individuel Limited 22,500.00 0.00 2019-01-07 2019-01-14 2019-01-28 2019-02-07 2019-05-08 manifestation d'intérêt d'exécution (Etudes techniques, EIES, PAR ) recrutement staff de l'UCP et diverses offres ZR-PDU-91842-CS-INDV / En cours RECRUTEMENT IDA / V1090 A posteriori Individuel Limited 18,000.00 0.00 2018-12-21 2018-12-26 2019-01-16 2019-02-20 2019-08-19 d'exécution COMPTABLE/UCP Page 5 ZR-PDU-97961-CS-CDS / ÉLABORATION D'UN PAR RELATIF AUX TRAVAUX Sélection de DE SÉCURISATION ET IDA / V1090 A posteriori consultants par Direct 70,000.00 0.00 Annulé 2019-02-11 2019-02-19 2019-03-22 2019-05-01 AMÉNAGEMENT DU CET entente directe DE MPASA DANS LA VILLE DE KINSHASA ZR-PDU-97981-CS-CDS / Réalisation EIES pour Sélection de travaux de construction/ En attente IDA / V1090 A posteriori consultants par Direct 20,000.00 0.00 2019-02-18 2019-02-28 2019-04-05 2019-05-20 réhabilitation de la Maison d'exécution entente directe Communale de Ndjili à Kinshasa ZR-PDU-91830-CS-INDV / ÉLABORATION MANUEL En attente DE PROCÉDURE IDA / V1090 A posteriori Individuel Limited 20,000.00 0.00 2019-02-18 2019-02-23 2019-03-16 2019-04-16 2019-05-31 d'exécution ADMINISTRATIVE ET FINANCIÈRE ZR-PDU-97971-CS-INDV / RECRUTEMENT En attente IDA / V1090 A posteriori Individuel Limited 6,000.00 0.00 2019-02-15 2019-02-20 2019-03-13 2019-04-04 2019-10-01 SECRÉTAIRE d'exécution CAISSIÈRE/UCP ZR-PDU-97968-CS-INDV / En attente IDA / V1090 A posteriori Individuel Limited 24,000.00 0.00 2019-02-15 2019-02-20 2019-03-13 2019-04-09 2019-10-06 RECRUTEMENT RAF/UCP d'exécution ZR-PDU-97989-CS-INDV / RECRUTEMENT EXPERT En attente IDA / V1090 A posteriori Individuel Limited 18,000.00 0.00 2019-02-11 2019-02-16 2019-03-09 2019-04-05 2019-10-02 EN DÉVELOPPEMENT d'exécution SOCIAL/UCP ZR-PDU-99485-CS-CDS / Sélection de Recrutement d'un Consultant En cours IDA / V1090 A posteriori consultants par Direct 37,200.00 0.00 2019-02-07 2019-02-17 2019-04-23 2020-04-22 Spécialiste en Passation des d'exécution entente directe Marchés ZR-PDU-102000-CS-CDS / Élaboration d'un Plan d'action de réinstallation relatif aux travaux (i) de Sélection de En cours construction d'une STBV à IDA / V1090 A posteriori consultants par Direct 140,000.00 0.00 2019-02-21 2019-03-04 2019-04-03 2019-06-17 d'exécution l'ITA/Mombele et (ii) de entente directe Sécurisation et aménagement du site du CET/Mpasa à Kinshasa ZR-PDU-107869-CS-CDS / ÉTUDE TECHNIQUE DES TRAVAUX DE RECONSTRUCTION DE LA Sélection de MAISON COMMUNALE DE En cours IDA / V1090 A posteriori consultants par Direct 75,000.00 0.00 2019-04-30 2019-05-05 2019-06-03 2019-07-18 NDJILI A KINSHASA. d'exécution entente directe MARCHE PAR ENTENTE DIRECTE AVEC LE GROUPEMENT ARTER & VSI ZR-PDU-107938-CS-CDS / L'ÉTUDE COMPLÉMENTAIRE POUR L'OPÉRATIONNALISATION DES PROPOSITIONS D'AMÉLIORATION DE LA Sélection de FILIÈRE GESTION DE IDA / V1090 A posteriori consultants par Direct 50,000.00 44,000.00 Signé 2019-04-30 2019-05-05 2019-06-07 2019-07-12 DÉCHETS SOLIDES entente directe VILLE DE KINSHASA /PROJET PDMRUK . MARCHE PAR ENTENTE DIRECTE AVEC Mr JEROME BALLOT. Page 6 ZR-PDU-127262-CS-CDS / ÉLABORATION P.A.R. RELATIF AUX TRAVAUX Sélection de En attente DE CONSTRUCTION DE IDA / V2800 A posteriori consultants par Direct 70,000.00 0.00 2019-08-20 2019-08-26 2019-09-27 2019-11-26 d'exécution STATION DE TRAITEMENT entente directe DES BOUES DE VIDANGE A ITA/MOMBELE ZR-PDU-127243-CS-CDS / RECRUTEMENT CONSULTANT INDIVIDUEL POUR ASSURER LA Sélection de COORDINATION ET En cours IDA / V2800 A posteriori consultants par Direct 22,500.00 0.00 2019-08-17 2019-08-21 2019-09-08 2019-10-18 ANIMATION TABLE d'exécution entente directe RONDE RELATIVE A LA GESTION DE L'ASSAINISSEMENT SUR LA VILLE DE KINSHASA ZR-PDU-127267-CS-CDS / ÉLABORATION P.A.R. RELATIF AUX TRAVAUX D'AMÉNAGEMENT DE Sélection de En attente DEUX PLACES PUBLIQUES IDA / V2800 A posteriori consultants par Direct 70,000.00 0.00 2019-08-20 2019-08-26 2019-09-25 2019-11-24 d'exécution (PLACE SAINTE THÉRÈSE entente directe ET PLACE DE LA MAISON COMMUNALE) DANS LA COMMUNE DE NDJILI ZR-PDU-127274-CS-CQS / ÉLABORATION D'UNE EI.ES ET D'UN P.A.R. En attente RELATIFS AUX TRAVAUX IDA / V2800 A posteriori Individuel Limited 40,000.00 0.00 2019-08-23 2019-08-26 2019-09-13 2019-10-04 2019-12-03 d'exécution DE RECONSTRUCTION DE LA MAISON COMMUNALE DE NDJILI ZR-PDU-127662-CS-CDS / ÉLABORATION P.A.R. Sélection de RELATIF AUX TRAVAUX En cours IDA / V2800 A posteriori consultants par Direct 70,000.00 0.00 2019-08-22 2019-08-26 2019-09-23 2019-11-22 D’AMÉNAGEMENT ET DE d'exécution entente directe SÉCURISATION DU C.E.T. MPASA ZR-PDU-127664-CS-CDS / ACTUALISATION DES EIES RELATIVES AUX TRAVAUX DE (i) CONSTRUCTION DE Sélection de LA STBV DE L'ITA En attente IDA / V2800 A posteriori consultants par Direct 45,000.00 0.00 2019-08-26 2019-08-31 2019-10-07 2019-11-21 MOMBELE ET (ii) DE d'exécution entente directe REHABILITATION DES AVENUES LWEMBA ET MAITRE CROQUET DANS LA COMMUNE DE NDJILI ZR-PDU-128033-CS-CDS / ACTUALISATION DES EIES RELATIVES (i) AUX TRAVAUX D’AMÉNAGEMENT DE DEUX PLACES PUBLIQUES Sélection de (SAINTE THÉRÈSE ET DE En attente IDA / V2800 A posteriori consultants par Direct 45,000.00 0.00 2019-08-24 2019-08-28 2019-10-03 2019-11-22 LA MAISON COMMUNALE) d'exécution entente directe A NDJILI ET (ii) AUX OPÉRATIONS PILOTES DE LUTTE CONTRE L’ÉROSION ET LES INONDATIONS DANS LA COMMUNE DE KISENSO Page 7 ZR-PDU-128040-CS-INDV / ACTUALISATION DU CADRE DE GESTION ENVIRONNEMENTAL ET SOCIAL (CGES) DU En attente IDA / V2800 A posteriori Individuel Limited 25,000.00 0.00 2019-08-27 2019-08-29 2019-09-19 2019-10-18 2019-11-22 PDMRUK SUIVANT LE d'exécution NOUVEAU CADRE ENVIRONNEMENTAL ET SOCIAL DE LA BANQUE MONDIALE ZR-PDU-128042-CS-CDS / ACTUALISATION DU CADRE DE POLITIQUE DE RÉINSTALLATION (CPR) Sélection de DU PDMRU-K En attente IDA / V2800 A posteriori consultants par Direct 25,000.00 0.00 2019-08-28 2019-09-02 2019-10-08 2019-11-12 CONFORMÉMENT AU d'exécution entente directe NOUVEAU CADRE ENVIRONNEMENTAL ET SOCIAL DE LA BANQUE MONDIALE ZR-PDU-128089-CS-INDV / ÉLABORATION DU PLAN DE GESTION DE LA MAIN En attente IDA / V2800 A posteriori Individuel Limited 25,000.00 0.00 2019-09-02 2019-09-05 2019-09-23 2019-10-21 2019-11-25 D’ŒUVRE (PGMO) A d'exécution EMPLOYER DANS LES CHANTIERS DU PDMRU-K ZR-PDU-128092-CS-INDV / ÉLABORATION ET MONTAGE DES DOSSIERS En attente IDA / V2800 A posteriori Individuel Limited 20,000.00 0.00 2019-09-03 2019-09-06 2019-09-24 2019-10-22 2019-12-06 TECHNIQUES DE LA d'exécution SOUS-COMPOSANTE GOUVERNANCE LOCALE ZR-PDU-128094-CS-INDV / ÉLABORATION DU MANUEL DES En attente OPÉRATIONS DES IDA / V2800 A posteriori Individuel Limited 20,000.00 0.00 2019-09-05 2019-09-09 2019-09-27 2019-10-21 2019-11-30 d'exécution TRAVAUX A HAUTE INTENSITÉ DE MAIN D’ŒUVRE (THIMO) ZR-PDU-128097-CS-INDV / ÉLABORATION ET MISE EN CONFORMITÉ DES MANUELS D’EXÉCUTION En attente DE LA CELLULE IDA / V2800 A posteriori Individuel Limited 18,000.00 0.00 2019-09-05 2019-09-10 2019-10-01 2019-11-05 2019-12-10 d'exécution INFRASTRUCTURES, DE LA CEP-O ET DE L'UCM AVEC LES ACTIVITÉS DU PDMRU-K ZR-PDU-128100-CS-INDV / APPUI A LA CONCRÉTISATION DES En attente IDA / V2800 A posteriori Individuel Limited 18,000.00 0.00 2019-09-16 2019-09-21 2019-10-12 2019-11-16 2019-12-26 ACTIVITÉS EN FAVEUR d'exécution DE LA VILLE PROVINCE DE KINSHASA ZR-PDU-135995-CS-CDS / Sélection de En cours Recrutement du Chargé de IDA / V2800 A posteriori consultants par Direct 60,000.00 383,302.50 2019-10-02 2019-10-05 2019-10-18 2020-10-17 d'exécution Projet entente directe ZR-PDU-97939-CS-INDV / RECRUTEMENT IDA / V1090 A posteriori Individuel Limited 36,000.00 0.00 Annulé 2019-02-15 2019-02-20 2019-03-13 2019-04-09 2019-10-06 COORDONNATEUR UCP Page 8 ZR-CI-144754-CS-INDV / Recrutement d'un Consultant Individuel, Expert en Gestion Urbaine, pour le En cours IDA / V2800 A posteriori Individuel Direct 45,500.00 0.00 2019-11-13 2019-11-15 2019-11-22 2019-11-27 2020-12-26 compte du Projet de d'examen Développement Multisectoriel et de Résilience Urbaine de la ville de Kinshasa ZR-CI-144987-CS-INDV / Recrutement Spécialiste en Passation des marchés pour En attente le compte du Projet de IDA / V2800 A posteriori Individuel Open 40,000.00 0.00 2019-11-13 2020-01-07 2020-01-19 2020-02-14 2020-12-16 d'exécution Développement Multisectoriel et de Résilience Urbaine de la ville de Kinshasa ZR-CI-144990-CS-INDV / Recrutement Spécialiste en Systèmes photovoltaïques au sein de l'UCM pour le En attente IDA / V2800 A posteriori Individuel Open 49,200.00 0.00 2019-11-13 2019-12-12 2019-12-19 2020-01-05 2020-12-30 compte du Projet de d'exécution Développement Multisectoriel et de Résilience Urbaine de la ville de Kinshasa ZR-CI-145064-CS-INDV / Recrutement Consultant individuel pour le développement d'une modalité de financement pour appuyer les bourses de En attente IDA / V2800 A posteriori Individuel Open 25,000.00 0.00 2019-11-18 2019-12-28 2020-01-18 2020-02-22 2020-05-22 formation professionnelle en d'exécution faveur des populations vulnérables et des femmes à former sur les sites de Maluku et Limeté financement ZR-CI-144981-CS-INDV / Recrutement Expert en Violences sexuelles basées sur le genre (Expert VSBG) En attente IDA / V2800 A posteriori Individuel Direct 35,100.00 0.00 2019-12-20 2019-12-30 2020-01-17 2020-02-21 2020-12-20 pour le compte du Projet de d'exécution Développement Multisectoriel et de Résilience Urbaine de la ville de Kinshasa ZR-CI-144980-CS-INDV / Recrutement Expert en Sauvegarde environnementale En cours pour le compte du Projet de IDA / V2800 A posteriori Individuel Open 38,500.00 0.00 2019-11-22 2019-12-23 2019-12-28 2020-01-16 2020-12-15 d'examen Développement Multisectoriel et de Résilience Urbaine de la ville de Kinshasa ZR-CI-144979-CS-INDV / Recrutement Expert en Développement social pour le En cours compte du Projet de IDA / V2800 A posteriori Individuel Open 38,500.00 0.00 2019-11-22 2019-12-28 2020-01-04 2020-01-22 2020-12-21 d'examen Développement Multisectoriel et de Résilience Urbaine de la ville de Kinshasa Page 9 ZR-CI-144750-CS-INDV / Recrutement Consultant Individuel chargé de la réalisation d'une EIES liée En cours aux travaux de construction IDA / V2800 A posteriori Individuel Limited 18,050.00 0.00 2019-11-25 2019-12-09 2019-12-19 2020-01-06 2020-02-05 d'examen d'un Centre de formation professionnelle de l'INPP sur le site de Maluku dans la ville de Kinshasa ZR-CI-150907-CS-CDS / Recrutement d'un Ingénieur de génie civil, Expert en Voiries et Réseaux divers (Ingénieur VRD) au sein de Sélection de En attente la Cellule Infrastructures IDA / V2800 A posteriori consultants par Direct 38,500.00 0.00 2019-12-18 2019-12-23 2020-01-09 2020-12-08 d'exécution pour le compte du Projet de entente directe Développement Multisectoriel et de Résilience Urbaine de la ville de Kinshasa (PDMRUK) Page 10