Updated Procurement Plan of GEF Green Freight Demonstration Project P119654 unit:USD 10,000 Reviewed by Description of Estimated Ratio of Preparation Cont. # Bank Selection Method Note Assignment Cost GEF Grant of TOR (Prior / Post) Procurement Agent C1 Service for the 5 QCBS Prior 100% Dec. 2010 signed Project Commercial and C2 Technology Agent 16 CQ Post 100% Nov. 2011 signed Service Study on demonstration scheme C3 —— —— —— —— —— moved to of drop-and-pull transport corresponding Design of incentive demonstration scheme scheme C4 —— —— —— —— —— for logistics transaction Development of Green C5 Freight information 10 SSS Prior 100% Jun..2011 signed platform Study on green C6 9 CQ Post 100% Jun.2012 signed freight policy Development of updated the Teaching Materials time needed C7 7 CQ Post 100% Sep.2013 for Green Freight for preparing Training TOR Planning and C8 Organizing of 15 CQ Post 100% Jun.2011 signed Guangdong Prior , as the first Design of green C9 2 CQ contract to adopt 100% Mar.2011 signed freight logo CQ method Technical experts updated the (To employ technical time needed C11 10 IC Post 100% Dec.2013 experts based on the for preparing needs) TOR updated the Preparation of time needed C12 Project Completion 1 IC Post 100% Aug.2014 for preparing Report TOR 合计 75 Note: IC-Individual Consultant; SSS-Single Source Selection; CQS-Selection Based on Consultants’ Qualifications; QCBS-Quality and Cost-Based Selection; SOE—Statement of Expenditure, based on actual expenditure. Updated Procurement Plan of GEF Green Freight Demonstration Project P119654 unit:USD 10,000 Description of Estimated Ratio of Cont. # Selection Method Implementing Period Note Assignment Cost GEF Grant Domestic Studies and Training (for the staff from the project coordinating T1 7 SOE 100% Jan.2011-Dec.2014 group, relevant transport departments and the PMO) Overseas Studies and Training (for the staff from the project coordinating T2 18 SOE 100% Jan.2011-Dec.2014 group, relevant transport departments and the PMO) Project Evaluation (Evaluation of the M1 project’s medium 5 SOE 100% Dec.2013 and Dec. 2014 period and the completion) incremental M2 2 SOE 100% Jan.2011-Dec.2014 operating cost (IOC) Dissemination and Promotion of Green P1 Freight 9 SOE 100% Jan.2011-Dec.2014 Demonstration Project Total 41 Note: IC-Individual Consultant; SSS-Single Source Selection; CQS-Selection Based on Consultants’ Qualifications; QCBS-Quality and Cost-Based Selection; SOE—Statement of Expenditure, based on actual expenditure.