Sample Procurement Plan (Text in italic font is meant for instruction to staff and should be deleted in the final version of the PP) (This is only a sample with the minimum content that is required to be included in the PAD. The detailed procurement plan is still mandatory for disclosure on the Bank’s website in accordance with the guidelines. The initial procurement plan will cover the first 18 months of the project and then updated annually or earlier as necessary). I. General 1. Bank’s approval Date of the procurement Plan: Updated Procurement Plan, M 2. Date of General Procurement Notice: Dec 24, 2006 3. Period covered by this procurement plan: The procurement period of project covered from year June 2010 to December 2012 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: [Thresholds for applicable procurement methods (not limited to the list below) will be determined by the Procurement Specialist /Procurement Accredited Staff based on the assessment of the implementing agency’s capacity.] Procurement Method Prior Review Threshold Comments US$ 1. ICB and LIB (Goods) Above US$ 500,000 All 2. NCB (Goods) Above US$ 100,000 First contract 3. ICB (Works) Above US$ 15 million All 4. NCB (Works) Above US$ 5 million All 5. (Non-Consultant Services) Below US$ 100,000 First contract [Add other methods if necessary] 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: [Refer to the relevant CDD project implementation document approved by the Bank or delete if not applicable] 4. Reference to (if any) Project Operational/Procurement Manual: Project Implementation Manual for World Bank Loan Project XYZ 04/01/2010 issued by July 9, 2010 5. Any Other Special Procurement Arrangements: [including advance procurement and retroactive financing, if applicable] 5 ICB works packages will be financed under retroactive financing 6. Summary of the Procurement Packages planned during the first 18 months after project effectiveness ( including those that are subject to retroactive financing and advanced procurement) [List the Packages which require Bank’s prior review first and then the other packages] 1 2 3 4 5 6 7 Ref. Description Estimated Packages Domest Review Comments No. Cost ic by Bank US$ Prefere (Prior / Post) million nce (yes/no) Summary of 82 5 No Prior the ICB (Works) Summary of 43.77 15 No Prior the ICB (Goods) Summary of 64.53 18 No Post 1st the NCB contract (Works) for Prior Review Summary of 1.86 4 No Post 1st the NCB contract (Goods) for Prior Review Summary of 0.45 1 No Prior the ICB (Non- Consultant Services) III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Threshold Comments 1. Competitive Methods (Firms) Above US$ 100,000 2. Single Source (Firms) All 3. Individual Above US$ 50,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise July 9, 2010 entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: [including advance procurement and retroactive financing, if applicable or delete if not applicable] 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Ref. No. Description of Estimated Packages Review Comments Assignment Cost by Bank US$ (Prior / million Post) Summary of 4.17 7 Prior number of contracts that will be let under QCBS Summary of 0.83 1 Prior CQS number of contracts that will be let under other methods July 9, 2010 PROCUREMENT Ethiopia : Second Agricultural Growth Project PLAN General Information Country: Ethiopia Bank’s Approval Date of the Original Procurement Plan: 2017-03-27 2019-10-06 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P148591 GPN Date: Project Name: Second Agricultural Growth Project Loan / Credit No: IDA / 56050 Executing Agency(ies): Ministry of Agriculutre and Natural Resources Development WORKS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GOODS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Project Management, DC/UNOPS / 102 Vechicles UN Agencies IDA / 56050 Capacity Building and Prior Direct 3,000,000.00 4,759,844.78 Signed 2016-07-14 2017-02-22 2017-04-10 2017-07-13 and 688 Motor Cycles (Direct) Monitoring and Evaluation ICB/FAGP/CU-003 / Row Agricultural Public Support Open - Single Stage - One IDA / 56050 Post Request for Bids 500,000.00 0.00 Canceled 2017-03-31 2017-04-05 2017-05-17 2017-06-09 2017-07-14 2018-01-10 planter Services International Envelope NCB/FAGP/CU-007 / Project Management, Under Single Stage - One Equiping Data Center for IDA / 56050 Capacity Building and Post Request for Bids Open - National 535,600.00 359,643.68 Implementati 2017-04-05 2017-04-10 2017-05-10 2017-06-09 2017-07-14 2018-01-10 Envelope MoANR Monitoring and Evaluation on Project Management, Pending NCB/FAGP/CU-002 / Single Stage - One IDA / 56050 Capacity Building and Post Request for Bids Open - National 450,000.00 0.00 Implementati 2017-04-05 2017-04-07 2017-05-06 2017-06-04 2017-07-03 2017-12-30 Standby Diesel Generator Envelope Monitoring and Evaluation on NCB/FAGP/CU-008 / Project Management, Under Single Stage - One Computer and IT IDA / 56050 Capacity Building and Post Request for Bids Open - National 360,000.00 0.00 Implementati 2017-04-05 2017-04-06 2017-05-15 2017-06-01 2017-07-06 2018-01-02 Envelope equipments Monitoring and Evaluation on Project Management, Under NCB/FAGP/CU-009 / Office Single Stage - One IDA / 56050 Capacity Building and Post Request for Bids Open - National 765,000.00 0.00 Implementati 2017-04-05 2017-04-06 2017-05-05 2017-05-22 2017-06-26 2017-12-23 equipment Envelope Monitoring and Evaluation on ICB/AGP/CU-005 / Provision Under Agriculture Marketing and Open - Single Stage - One of new parent stock for IDA / 56050 Post Request for Bids 200,000.00 0.00 Implementati 2017-04-17 2017-04-22 2017-06-06 2017-07-06 2017-08-10 2018-02-06 Value Chains International Envelope poultry multiplication centers on ICB/FAGP/CU-004 / Agriculture Marketing and Open - Single Stage - One Nitrogen plant and spare IDA / 56050 Post Request for Bids 1,100,000.00 0.00 Canceled 2017-04-24 2017-05-09 2017-06-23 2017-07-23 2017-08-27 2018-02-23 Value Chains International Envelope parts ICB/AGP/CU-002 / Seed Agricultural Public Support Open - Single Stage - One quality control Laboratory IDA / 56050 Prior Request for Bids 1,600,000.00 0.00 Canceled 2017-06-01 2017-06-06 2017-07-21 2017-08-17 2017-09-21 2018-03-20 Services International Envelope equipments NCB/AGP/CU-07/09 / Ear Agriculture Marketing and Single Stage - One Tag (printed and black) for IDA / 56050 Post Request for Bids Open - National 100,000.00 0.00 Canceled 2017-05-26 2017-05-31 2017-07-12 2017-08-11 2017-09-15 2018-03-14 Value Chains Envelope cows Page 1 Project Management, Under SH/FAGP/CU-001/17 / Request for Single Stage - One IDA / 56050 Capacity Building and Post Limited 30,000.00 0.00 Implementati 2017-05-20 2017-06-11 2017-07-26 Stationery items Quotations Envelope Monitoring and Evaluation on Project Management, MOANR/AGPII/UNOPS1 / UN Agencies IDA / 56050 Capacity Building and Prior Direct 2,155,000.00 2,085,429.87 Signed 2016-07-14 2017-02-22 2017-05-16 2017-08-16 620 motor cycles (Direct) Monitoring and Evaluation Project Management, Under SH/FAGP/CU/001 / four Request for Single Stage - One IDA / 56050 Capacity Building and Post Limited 17,500.00 0.00 Implementati 2017-09-24 2017-11-12 2018-05-11 station furniture Quotations Envelope Monitoring and Evaluation on NCB/AGP/CU-10/2010 / Project Management, Under Single Stage - One Antivirus soft ware including IDA / 56050 Capacity Building and Post Request for Bids Open - National 110,000.00 0.00 Implementati 2017-09-15 2017-09-18 2017-10-18 2017-11-17 2017-12-22 2018-06-20 Envelope instalation Monitoring and Evaluation on SH/FAGP/CU-001/10 / Project Management, Audiovisual equipment s for Request for Single Stage - One IDA / 56050 Capacity Building and Post Limited 160,000.00 0.00 Canceled 2017-10-11 2017-12-06 2018-06-04 public relation/communication Quotations Envelope Monitoring and Evaluation of project SH/FAGP/CU-002/10 / Self Pending Agricultural Public Support Request for Single Stage - One propelled reaper binder IDA / 56050 Post Limited 100,000.00 0.00 Implementati 2017-10-23 2017-12-06 2018-06-04 Services Quotations Envelope harvesting machine on FAGP/CU/DC/003/10 / Hass Agricultural Public Support IDA / 56050 Prior Direct Selection Direct 540,000.00 0.00 Canceled 2017-12-14 2017-12-19 2018-01-23 2018-07-22 Variety Avocado Scion Services NCB/FAGP/CU-001/10 / Under Agricultural Public Support Single Stage - One Agricultural Mechanization IDA / 56050 Post Request for Bids Open - National 350,000.00 299,913.20 Implementati 2017-12-07 2017-12-12 2018-01-23 2018-02-22 2018-03-29 2018-09-25 Services Envelope Machines for Demonstration on NCB/FAGP/CU/002/10 / Agricultural Public Support Single Stage - One Computer and Servers for IDA / 56050 Post Request for Bids Open - National 280,000.00 0.00 Canceled 2018-01-01 2018-01-06 2018-02-17 2018-03-19 2018-04-23 2018-10-20 Services Envelope NAIC Project Management, Under NCB/FAGP/CU-013/2017 / Single Stage - One IDA / 56050 Capacity Building and Post Request for Bids Open - National 200,000.00 0.00 Implementati 2018-01-05 2018-01-10 2018-02-09 2018-02-24 2018-03-25 2018-06-23 Audio Visual equipments Envelope Monitoring and Evaluation on Project Management, Pending NCB/FAGP/CU-002/10 / Request for Single Stage - One IDA / 56050 Capacity Building and Post Limited 500,000.00 0.00 Implementati 2018-01-19 2018-03-03 2018-06-01 vehicles Quotations Envelope Monitoring and Evaluation on ET-MOANRD-47309-GO-RFB Agricultural Public Support Open - Single Stage - One IDA / 56050 Post Request for Bids 540,000.00 0.00 Canceled 2018-02-05 2018-02-10 2018-03-24 2018-04-23 2018-05-28 2018-11-24 / Aocado Scion Hass Variety Services International Envelope LNB/FAGP/CU/008/10 / Pending Agricultural Public Support Single Stage - One Lime for the treatment of IDA / 56050 Post Request for Bids Limited 358,000.00 0.00 Implementati 2018-05-04 2018-05-09 2018-06-20 2018-07-20 2018-08-24 2019-02-20 Services Envelope soil acidity on Under SH/AGP-CU/05/2018 / plant Agricultural Public Support Request for Single Stage - One IDA / 56050 Post Limited 50,000.00 0.00 Implementati 2018-08-18 2018-10-13 2019-04-11 clinic facility materials Services Quotations Envelope on DC/MOALR/- AGP2/LAB/O2/17 / Project Management, Pending UN Agencies Procurement of Trucks with IDA / 56050 Capacity Building and Post Direct 1,028,015.75 0.00 Implementati 2016-10-05 2016-10-06 2018-08-24 2019-05-24 (Direct) liquid Nitrogen Storage tank Monitoring and Evaluation on and crane SH/AGP-CU/06/2018 / Desk Project Management, Pending Request for Single Stage - One top computer and photocopy IDA / 56050 Capacity Building and Post Limited 40,000.00 0.00 Implementati 2018-11-18 2019-01-13 2019-07-12 Quotations Envelope machine Monitoring and Evaluation on Page 2 Project Management, Pending SH/AGP-CU/07/2018 / Office Request for Single Stage - One IDA / 56050 Capacity Building and Post Limited 45,000.00 0.00 Implementati 2018-12-05 2019-01-30 2019-07-29 Furniture Quotations Envelope Monitoring and Evaluation on Project Management, Under SH/AGP-CU/08/2018 / Request for Single Stage - One IDA / 56050 Capacity Building and Post Limited 17,000.00 0.00 Implementati 2018-12-03 2019-01-28 2019-07-27 Stationary items Quotations Envelope Monitoring and Evaluation on SH/AGP-CU/09/2018 / water Request for Single Stage - One IDA / 56050 Small Scale Irrigation Post Limited 65,000.00 0.00 Canceled 2018-12-26 2019-02-20 2019-08-19 lifting and saving equipment Quotations Envelope ET-MOANRD-82712-GO-RFB / Equipping central Agricultural Public Support Single Stage - One IDA / 56050 Post Request for Bids Open - National 215,000.00 173,991.45 Signed 2018-12-28 2019-01-02 2019-02-13 2019-03-15 2019-04-19 2019-10-16 veterinary drug and feed Services Envelope quality control laboratory ET-MOANRD-94168-GO-RFB Agricultural Public Support Open - Single Stage - One IDA / 56050 Post Request for Bids 750,000.00 1,163,376.82 Signed 2019-01-24 2019-01-29 2019-03-12 2019-04-11 2019-05-16 2019-11-12 / Agricultural machinery Services International Envelope ICB/FAGP/CU/G-004/09 / Agricultural Public Support Open - Single Stage - One Liquid Nitrogen Plant and IDA / 56050 Prior Request for Bids 3,100,000.00 0.00 Canceled 2018-01-16 2018-01-21 2018-03-04 2018-04-03 2018-05-08 2018-11-04 Services International Envelope Spare parts DC/FAGP/CU-12/2017 / Project Management, Document Management IDA / 56050 Capacity Building and Prior Direct Selection Direct 600,000.00 0.00 Canceled 2017-11-28 2017-12-03 2018-01-07 2018-07-06 System Monitoring and Evaluation ET-MOANRD-95997-GO-RFB Under / Liquid nitrogen plant(15 Agricultural Public Support Open - Single Stage - One IDA / 56050 Prior Request for Bids 3,500,000.00 0.00 Implementati 2019-03-18 2019-03-23 2019-05-07 2019-06-06 2019-07-11 2020-01-07 lit/h 7 pcs and 20 lit/h 3 Services International Envelope on pcs ) and spare part ET-MOANRD-118287-GO- Pending Agricultural Public Support Single Stage - One RFB / Computer and IT IDA / 56050 Post Request for Bids Open - National 300,000.00 0.00 Implementati 2019-06-13 2019-06-18 2019-07-30 2019-08-29 2019-10-03 2020-03-31 Services Envelope Equipment on ET-MOANRD-111906-GO- Pending Agricultural Public Support Open - Single Stage - One RFB / Printed ear tag for IDA / 56050 Post Request for Bids 900,000.00 0.00 Implementati 2019-07-31 2019-08-05 2019-09-16 2019-10-16 2019-11-20 2020-05-18 Services International Envelope animals on ET-MOANRD-124213-GO- Pending RFB / Procurement of 4170 Agricultural Public Support Open - Single Stage - One IDA / 56050 Prior Request for Bids 2,156,896.00 0.00 Implementati 2019-09-16 2019-09-23 2019-11-08 2019-12-08 2020-01-12 2020-07-10 units of tablet for AGP II Services International Envelope on implementer. ICB/FAGP/CU/G-001/10 / Agricultural Public Support Open - Single Stage - One Plant protection laboratory IDA / 56050 Prior Request for Bids 1,700,000.00 0.00 Canceled 2017-10-09 2017-10-14 2017-11-25 2017-12-25 2018-01-29 2018-07-28 Services International Envelope equipment for regions ET-MOANRD-136461-GO- Pending Agricultural Public Support Single Stage - One RFB / plant protection & IDA / 56050 Post Request for Bids Open - National 990,000.00 0.00 Implementati 2019-11-28 2019-12-03 2020-01-14 2020-02-13 2020-03-19 2020-09-15 Services Envelope Seed laboratory equipment. on NON CONSULTING SERVICES Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SH/FAGP/CU/NCS-007/10 / Pending Agricultural Public Support Request for Single Stage - One Venues for exhibition at IDA / 56050 Post Limited 35,000.00 0.00 Implementati 2018-05-05 2018-06-30 2018-12-27 Services Quotations Envelope hawassa on Page 3 DS/FAGP/CU/NCS-001/10 / Project Management, Advertising &Broadcasting IDA / 56050 Capacity Building and Post Direct Selection Direct 20,000.00 17,947.52 Signed 2018-10-12 2018-10-17 2018-11-21 2019-05-20 on TV and Radio using Monitoring and Evaluation government owned Media ET-MOANRD-87884-NC-DIR Single Stage - One / Training on small scale IDA / 56050 Small Scale Irrigation Post Direct Selection Direct - National 125,000.00 106,246.22 Signed 2018-11-30 2018-12-07 2019-01-17 2019-03-19 Envelope irrigation (SSI) guidelines ET-MOANRD-91874-NC-DIR Pending Agricultural Public Support / Training of Development IDA / 56050 Post Direct Selection Direct 35,000.00 0.00 Implementati 2018-12-17 2018-12-22 2019-01-26 2019-07-25 Services Agents (DA) on AGP/CU/CONS-012/10 / Pending Direct contract of Agricultural Public Support IDA / 56050 Post Direct Selection Direct 25,000.00 0.00 Implementati 2017-05-15 2017-05-20 2017-06-29 2017-12-26 government owned Alage Services on ATVET to roviding training DC/FAGP/CU-12/2019 / Project Management, Pending Document management IDA / 56050 Capacity Building and Prior Direct Selection Direct 1,500,000.00 0.00 Implementati 2019-06-12 2019-06-17 2019-07-22 2020-01-18 system Monitoring and Evaluation on ET-MOANRD-126769-NC- RFB / Ministry of Pending Agricultural Public Support Single Stage - One Agriculture IT(information IDA / 56050 Post Request for Bids Open - National 795,000.00 0.00 Implementati 2019-09-16 2019-09-21 2019-11-02 2019-12-02 2020-01-06 2020-07-04 Services Envelope technology) infrastructure on up grade . CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Market Contract Type Estimated Actual Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual FAGP/CU/CON-003/09 / Project Management, Quality And Cost- Program Implemntation IDA / 56050 Capacity Building and Prior Open - National 245,000.00 246,075.00 Signed 2016-04-08 2016-04-27 2016-07-11 2016-08-12 2016-10-14 2017-03-23 2017-04-18 2017-09-18 Based Selection Pefrormance Review Monitoring and Evaluation AGP/CU/CONS-002/09 / Project Management, Quality And Cost- Open - Independent procurement IDA / 56050 Capacity Building and Prior 150,000.00 65,170.00 Signed 2017-05-19 2017-06-09 2017-07-23 2017-08-20 2017-09-19 2017-10-24 2017-11-28 2018-11-28 Based Selection International Audit of AGP Monitoring and Evaluation FAGP/CU/CON-006/09 / Quality And Cost- Under Training on SSI Feasibility IDA / 56050 Small Scale Irrigation Post Open - National 250,000.00 0.00 2017-05-12 2017-06-02 2017-07-16 2017-08-13 2017-09-12 2017-10-17 2017-11-21 2018-11-21 Based Selection Implementation Study and Design FAGP/CU/CONS-22/2018 / Design and supervision for Agricultural Public Support Quality And Cost- Under IDA / 56050 Post Open - National 295,000.00 0.00 2018-08-09 2018-08-13 2018-09-07 2018-10-10 2018-10-25 2018-11-05 2018-12-05 2019-06-03 comprehensive laboratory Services Based Selection Implementation construction ET-MOANRD-82633-CS- Project Management, QCBS / Independent Quality And Cost- Open - Pending IDA / 56050 Capacity Building and Prior 100,000.00 0.00 2018-11-27 2018-12-18 2019-01-31 2019-02-28 2019-03-30 2019-05-04 2019-06-08 2020-06-07 procurement audit for 2011 Based Selection International Implementation Monitoring and Evaluation E.C ET-MOANRD-82646-CS-CQS Consultant Open - Pending / Training on Advanced GIS IDA / 56050 Small Scale Irrigation Post Qualification 70,000.00 0.00 2018-12-20 2019-01-10 2019-02-23 2019-03-25 2019-04-29 2019-10-26 International Implementation and Hydrology Selection ET-MOANRD-82723-CS-CQS Consultant Agricultural Public Support Open - Under / Design and supervision for IDA / 56050 Post Qualification 55,000.00 0.00 2018-12-19 2019-01-09 2019-02-22 2019-03-24 2019-04-28 2019-10-25 Services International Implementation molecular laboratory Selection Page 4 ET-MOANRD-133724-CS- Project Management, Least Cost Under LCS / External financial IDA / 56050 Capacity Building and Post Open - National 55,000.00 0.00 2019-10-31 2019-11-21 2020-01-04 2020-02-01 2020-03-02 2020-04-06 2020-05-11 2020-11-07 Selection Implementation audit for 2012 FY Monitoring and Evaluation INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Market Contract Type Estimated Actual Draft Negotiated Description Component Review Type Method Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual DC/FAGP/CU/CON-28/10 / documentary film content Agricultural Public Support Pending production and broadcasting IDA / 56050 Prior Direct Selection Direct 15,000.00 0.00 2017-11-03 2017-11-13 2018-01-17 2018-07-16 Services Implementation by Ethiopian broad casting corporation DC/AGP/CU-003/10 / Project Management, Under Recruitment of consultant ot IDA / 56050 Capacity Building and Prior Direct Selection Direct 500,000.00 0.00 2018-04-16 2018-04-26 2018-06-30 2018-12-27 Implementation conduct Midterm review Monitoring and Evaluation FAGP/CU/CON-013/09 / Project Management, External financial Audit for Under IDA / 56050 Capacity Building and Post Direct Selection Direct 100,000.00 0.00 2017-04-24 2017-05-04 2017-06-16 2017-12-13 AGP 1 closing and Agp 2 Implementation Monitoring and Evaluation 2009 EFY FAGP/CU/CON-012/09 / Project Management, External Financial Audit for IDA / 56050 Capacity Building and Prior Direct Selection Direct 100,000.00 0.00 Canceled 2017-04-24 2017-05-04 2017-06-10 2017-07-25 AGP 1 closing and AGp 2 Monitoring and Evaluation 2009 EFY AGP/CU/CONS-012/09 / Direct contract of Agriculture Marketing and IDA / 56050 Prior Direct Selection Direct 25,000.00 0.00 Canceled 2017-05-15 2017-05-25 2017-07-29 2018-01-25 government owned Alage Value Chains ATVET to provide training Page 5