PROCUREMENT PLAN (Textual Part) Project information: Management and Protection of Key Biodiversity Areas in Belize (P130474) Project Implementation agency: PACT Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. PROCUREMENT Belize : Management and Protection of Key Biodiversity Areas in Belize PLAN General Information Country: Belize Bank’s Approval Date of the Original Procurement Plan: 2018-04-13 2019-08-26 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P130474 GPN Date: Project Name: Management and Protection of Key Biodiversity Areas in Belize Loan / Credit No: TF / 13004, TF / 16773 Executing Agency(ies): Protected Areas Conservation Trust WORKS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GOODS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 3: Institutional BZ-PACT-65673-GO-RFQ / 2 Strengthening and Capacity Request for Single Stage - One vehicles for the Department TF / 16773 Building for Enhanced Post Open - National 50,000.00 86,490.06 Completed 2018-09-25 2018-11-03 2019-01-02 Quotations Envelope of Environment Enforcement of Environmental Regulations Component 3: Institutional BZ-PACT-65676-GO-RFQ / Strengthening and Capacity Purchase of skiff and Request for Single Stage - One TF / 16773 Building for Enhanced Post Open - National 30,000.00 27,757.11 Signed 2018-09-15 2018-10-24 2019-01-22 outboard engine to facilitate Quotations Envelope Enforcement of water quality monitoring Environmental Regulations BZ-PACT-71076-GO-RFQ / 1 Component 2: Promoting Request for Single Stage - One vehicle for the Biodiversity TF / 16773 Effective Management of Post Open - National 40,000.00 34,171.92 Completed 2018-07-30 2018-09-25 2018-11-09 Quotations Envelope Monitoring program Key Biodiversity Areas BZ-PACT-81698-GO-RFQ / 3 Component 2: Promoting Request for Single Stage - One Laptops for Biodiversity TF / 16773 Effective Management of Post Open - National 10,000.00 4,934.30 Completed 2018-10-17 2018-11-21 2018-12-21 Quotations Envelope activities Key Biodiversity Areas BZ-PACT-82320-GO-RFQ / 100 Camera Traps & Component 2: Promoting Request for Single Stage - One accessories to be used for TF / 16773 Effective Management of Post Open - National 20,000.00 33,983.23 Completed 2018-10-19 2018-11-25 2019-01-24 Quotations Envelope Biodiversity Monitoring Key Biodiversity Areas activities . BZ-PACT-82332-GO-RFQ / Component 2: Promoting 10 GPS Collars for Request for Open - Single Stage - One TF / 16773 Effective Management of Post 30,000.00 25,022.00 Completed 2018-10-23 2018-11-29 2019-01-28 Biodiversity Monitoring Quotations International Envelope Key Biodiversity Areas Activities BZ-PACT-82337-GO-RFQ / Component 2: Promoting Tracking equipment for Request for Open - Single Stage - One TF / 16773 Effective Management of Post 20,000.00 9,125.00 Completed 2018-10-24 2018-12-05 2019-03-05 Biodiversity Monitoring Quotations International Envelope Key Biodiversity Areas activities Component 3: Institutional BZ-PACT-94404-GO-RFQ / Strengthening and Capacity Request for Single Stage - One 20 Rain coats for the DOE TF / 16773 Building for Enhanced Post Open - National 5,000.00 4,216.90 Completed 2019-01-12 2019-02-10 2019-03-12 Quotations Envelope Compliance Unit. Enforcement of Environmental Regulations Page 1 Component 3: Institutional BZ-PACT-95495-GO-RFQ / Strengthening and Capacity Equipment for water quality Request for Single Stage - One TF / 16773 Building for Enhanced Post Open - National 10,000.00 16,539.41 Completed 2019-02-04 2019-03-23 2019-05-07 Lab - Incubator,Infrated Quotations Envelope Enforcement of thermometer etc. Environmental Regulations Component 3: Institutional BZ-PACT-95497-GO-RFQ / Strengthening and Capacity Pending tools for ECMU unit - Request for Single Stage - One TF / 16773 Building for Enhanced Post Open - National 5,000.00 0.00 Implementati 2019-02-08 2019-05-16 2019-06-15 machete , tool kits,tape Quotations Envelope Enforcement of on measure etc. Environmental Regulations Component 3: Institutional BZ-PACT-95499-GO-RFQ / Strengthening and Capacity tablets, cameras,GPS, Request for Single Stage - One TF / 16773 Building for Enhanced Post Open - National 27,000.00 22,009.42 Signed 2019-02-08 2019-03-20 2019-05-04 computers, projector, for Quotations Envelope Enforcement of DOE Environmental Regulations Component 3: Institutional BZ-PACT-95502-GO-RFQ / Strengthening and Capacity waterproof boots for DOE Request for Single Stage - One TF / 16773 Building for Enhanced Post Open - National 4,000.00 3,111.00 Completed 2019-01-22 2019-03-01 2019-03-31 staff for water quality Quotations Envelope Enforcement of monitoring. Environmental Regulations Component 3: Institutional Strengthening and Capacity BZ-PACT-95503-GO-RFQ / Request for Single Stage - One TF / 16773 Building for Enhanced Post Open - National 15,000.00 8,782.00 Completed 2019-02-08 2019-03-20 2019-04-19 shirts/polos/caps for DOE Quotations Envelope Enforcement of Environmental Regulations BZ-PACT-102649-GO-RFQ / Component 2: Promoting 6 GPS units for the Request for Single Stage - One TF / 16773 Effective Management of Post Open - National 1,600.00 1,762.76 Completed 2019-02-25 2019-03-22 2019-04-21 Biodiversity Monitoring Quotations Envelope Key Biodiversity Areas Activities BZ-PACT-102657-GO-RFQ / Component 2: Promoting Request for Single Stage - One Heavy Duty Multi_Function TF / 16773 Effective Management of Post Open - National 9,500.00 1,762.76 Completed 2019-02-26 2019-03-16 2019-04-15 Quotations Envelope photocopier Key Biodiversity Areas Component 2: Promoting BZ-PACT-107180-GO-RFQ / Request for Single Stage - One TF / 16773 Effective Management of Post Open - National 66,000.00 65,969.64 Completed 2019-03-26 2019-05-04 2019-06-18 300 camera traps Quotations Envelope Key Biodiversity Areas Component 1: Supporting Forest Protection and Under BZ-PACT-107584-GO-RFQ / Request for Single Stage - One TF / 16773 Sustainable Forest Post Open - National 13,000.00 0.00 Implementati 2019-04-03 2019-05-29 2019-07-31 Fire Fighting Equipment Quotations Envelope Management Activities in on Key Biodiversity Areas Component 1: Supporting BZ-PACT-107585-GO-RFQ / Forest Protection and Pending Request for Single Stage - One Fire Management - TF / 16773 Sustainable Forest Post Open - National 16,000.00 0.00 Implementati 2019-04-03 2019-05-29 2019-07-31 Quotations Envelope Protective Clothing Management Activities in on Key Biodiversity Areas Component 1: Supporting BZ-PACT-107756-GO-RFQ / Forest Protection and Pending Purchase of 1 water tanks Request for Single Stage - One TF / 16773 Sustainable Forest Post Open - National 4,000.00 0.00 Implementati 2019-04-13 2019-05-28 2019-08-30 built on trailer - 100 gallons Quotations Envelope Management Activities in on capacity Key Biodiversity Areas Component 1: Supporting Forest Protection and Pending BZ-PACT-107757-GO-RFQ / Request for Single Stage - One TF / 16773 Sustainable Forest Post Open - National 13,000.00 0.00 Implementati 2019-04-20 2019-06-15 2019-08-30 Purchase of 1 ATV Quotations Envelope Management Activities in on Key Biodiversity Areas Page 2 BZ-PACT-71073-GO-RFQ / Provide equipment such as Component 2: Promoting radio communications, Request for Single Stage - One TF / 16773 Effective Management of Post Open - National 55,000.00 0.00 Canceled 2018-07-27 2018-09-22 2018-11-06 camping gear, GPS, cameras, Quotations Envelope Key Biodiversity Areas first aid kits for the Compliance Unit BZ-PACT-102656-GO-RFQ / Component 2: Promoting Request for Single Stage - One Promotional items for World TF / 16773 Effective Management of Post Open - National 5,000.00 0.00 Canceled 2019-02-25 2019-03-09 2019-04-08 Quotations Envelope Forest Day Key Biodiversity Areas NON CONSULTING SERVICES Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Market Contract Type Estimated Actual Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CS-26 / KBA CS 26. Develop and Implement Component 1: Supporting Functional Web-based Forest Protection and Information Management Quality And Cost- Open - TF / 16773 Sustainable Forest Prior 302,000.00 232,142.50 Signed Systems (IMS) for the Based Selection International Management Activities in Department of the Key Biodiversity Areas Environment and the Forest Department BZ-PACT-65524-CS-CQS / Consultancy to review the PA Statutory Instrument, Component 2: Promoting Consultant Pending ground truth boundary lines TF / 16773 Effective Management of Post Qualification Open - National 89,000.00 0.00 2018-08-06 2018-08-20 2018-09-01 2018-09-16 2018-10-02 2019-03-31 Implementation and map land incursions Key Biodiversity Areas Selection Vaca FR, Chiquibul NP MMFR and CRFR BZ-PACT-107181-CS-CQS / Monitoring Data Warehouse Component 2: Promoting Consultant Solution (DWS), with an TF / 16773 Effective Management of Post Qualification Open - National 80,000.00 89,543.25 Signed 2019-03-27 2019-04-17 2019-05-31 2019-06-30 2019-07-21 2019-09-30 emphasis on high volume Key Biodiversity Areas Selection camera trap data BZ-PACT-65523-CS-CQS / Analyse and draft the legislation for improved Component 2: Promoting Consultant wildlife management TF / 16773 Effective Management of Post Qualification Open - National 75,000.00 0.00 Canceled 2018-08-27 2018-09-10 2018-09-29 2018-10-09 2018-10-21 2019-04-19 including research, Key Biodiversity Areas Selection monitoring, wildlife rehabilitation, reintroduction to the wild BZ-PACT-65515-CS-CQS / Develop a protected areas GIS database and Component 2: Promoting Consultant application for data TF / 16773 Effective Management of Post Qualification Open - National 75,000.00 0.00 Canceled 2018-10-08 2018-10-22 2018-11-06 2018-11-21 2018-12-03 2019-06-01 management and analysis Key Biodiversity Areas Selection that will contribute to the FIS Page 3 BZ-PACT-65514-CS-CQS / Consultancy to develop and implement a capacity development plan aimed at Component 2: Promoting Consultant ensuring that individuals TF / 16773 Effective Management of Post Qualification Open - National 30,000.00 0.00 Canceled 2018-09-24 2018-09-26 2018-10-15 2018-10-25 2018-11-06 2019-05-05 and organizations have the Key Biodiversity Areas Selection requisite capacities to ensure effective management of the targeted KBAs BZ-PACT-65521-CS-CQS / Capacity building of co- Component 2: Promoting Consultant management organizations TF / 16773 Effective Management of Post Qualification Open - National 116,000.00 0.00 Canceled 2018-09-03 2018-09-17 2018-10-08 2018-10-18 2018-10-30 2019-04-28 including funds accounting Key Biodiversity Areas Selection technical reporting and proposal writing Component 1: Supporting BZ-PACT-65504-CS-CQS / Forest Protection and Consultant Development of a TF / 16773 Sustainable Forest Post Qualification Open - National 35,000.00 0.00 Canceled 2018-08-22 2018-08-27 2018-09-16 2018-09-26 2018-10-08 2019-04-06 management plan for Fresh Management Activities in Selection Water Creek Forest Reserve Key Biodiversity Areas BZ-PACT-65533-CS-INDV / Consultancy to review and Component 3: Institutional revise the national water Strengthening and Capacity Consultant quality monitoring program TF / 16773 Building for Enhanced Post Qualification Open - National 60,000.00 0.00 Canceled 2018-08-02 2018-08-16 2018-09-04 2018-09-14 2018-09-25 2019-03-24 with a view to modernize Enforcement of Selection and equip the capacity of Environmental Regulations the DOE. BZ-PACT-65476-CS-CQS / Support for the implementation of community- Component 1: Supporting based rehabilitation sub- Forest Protection and Consultant projects for sustainable TF / 16773 Sustainable Forest Post Qualification Open - National 70,000.00 0.00 Canceled 2018-07-23 2018-07-24 2018-08-13 2018-08-28 2018-09-05 2019-08-30 harvesting and marketing of Management Activities in Selection NTFPs and for other Key Biodiversity Areas community-based forestry opportunities INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Market Contract Type Estimated Actual Draft Negotiated Description Component Review Type Method Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 1: Supporting Forest Protection and Individual No. 1 . Procurement Officer TF / 13004 Sustainable Forest Prior Consultant Open 0.00 26,060.61 Signed / Procurement Officer Management Activities in Selection Key Biodiversity Areas Component 1: Supporting Forest Protection and Individual No. 3 Project Manager / TF / 13004 Sustainable Forest Prior Consultant Open 0.00 36,666.67 Signed Project Manager Management Activities in Selection Key Biodiversity Areas Component 1: Supporting Forest Protection and KBA/SER/006 / KBA TF / 16773 Sustainable Forest Prior Direct Selection Direct 0.00 34,328.36 Signed Project Manager Management Activities in Key Biodiversity Areas Component 1: Supporting Forest Protection and Individual No. 2 Project Officer / TF / 13004 Sustainable Forest Prior Consultant Open 0.00 30,606.06 Signed Project Officer Management Activities in Selection Key Biodiversity Areas Page 4 Component 1: Supporting BZ-PACT-65511-CS-INDV / Forest Protection and Individual Sustainable Forest TF / 16773 Sustainable Forest Post Consultant Open 46,800.00 36,484.08 Signed 2018-06-05 2018-06-25 2018-07-05 2018-07-11 2019-06-07 Management Specialist Management Activities in Selection Key Biodiversity Areas BZ-PACT-65528-CS-INDV / Component 2: Promoting Individual Biodiversity Monitoring TF / 16773 Effective Management of Post Consultant Limited 50,000.00 55,970.15 Signed 2018-06-05 2018-06-19 2018-06-24 2018-07-06 2019-08-31 Coordinator Key Biodiversity Areas Selection BZ-PACT-65530-CS-INDV / Component 3: Institutional conduct training of DOE Strengthening and Capacity Individual staff and other key public Pending TF / 16773 Building for Enhanced Post Consultant Open 28,000.00 0.00 2018-08-02 2018-08-29 2018-09-08 2018-09-20 2018-11-19 agencies on topics related to Implementation Enforcement of Selection monitoring, enforcement, and Environmental Regulations use of key equipment BZ-PACT-65536-CS-INDV / Component 3: Institutional consultancy to develop a Strengthening and Capacity Individual manual with standardized TF / 16773 Building for Enhanced Post Consultant Open 39,000.00 16,594.73 Signed 2018-07-31 2018-08-29 2018-09-08 2018-09-19 2019-03-18 guidelines and methodology Enforcement of Selection for EIA preparation and Environmental Regulations NEAC Procedural Manual Component 3: Institutional BZ-PACT-65677-CS-INDV / Strengthening and Capacity Individual Institutional Development TF / 16773 Building for Enhanced Post Consultant Limited 37,500.00 19,844.22 Signed 2018-07-09 2018-07-14 2018-07-29 2018-08-11 2018-11-09 Specialist Enforcement of Selection Environmental Regulations BZ-PACT-65679-CS-INDV / Component 4: Project Individual Administrative Assistant for TF / 16773 Management, Monitoring Post Consultant Limited 8,400.00 19,850.75 Signed 2018-06-06 2018-06-11 2018-06-16 2018-06-29 2019-09-30 the project and Assessment Selection BZ-PACT-73647-CS-INDV / Component 3: Institutional Consultancy for the Strengthening and Capacity Individual development of a Procedural Under TF / 16773 Building for Enhanced Post Consultant Open 16,000.00 0.00 2018-08-10 2018-09-08 2018-10-08 2018-10-15 2018-11-14 Manual for the National Implementation Enforcement of Selection Environmental Appraisal Environmental Regulations Committee (NEAC) BZ-PACT-73649-CS-INDV / Component 2: Promoting Individual Forest Ranger for the TF / 16773 Effective Management of Post Consultant Open 7,500.00 7,520.90 Signed 2018-08-13 2018-10-01 2018-10-11 2018-11-06 2019-09-30 Compliance Monitoring Unit Key Biodiversity Areas Selection BZ-PACT-81702-CS-INDV / Component 2: Promoting Individual 2 additional Rangers for the TF / 16773 Effective Management of Post Consultant Limited 15,000.00 5,624.68 Signed 2018-10-12 2018-10-13 2018-10-23 2018-10-29 2019-09-30 Compliance Unit Key Biodiversity Areas Selection BZ-PACT-98278-CS-CDS / Joares May Jr, Wildlife Veterinarian .The safe Component 2: Promoting capture and anaesthetizing TF / 16773 Effective Management of Post Direct Selection Direct 6,000.00 7,600.00 Completed 2019-02-04 2019-02-06 2019-02-15 2019-03-09 of jaguars in the Northern Key Biodiversity Areas Corridor KBA site of Fresh Water Creek, allowing the deployment of GPS collars. BZ-PACT-104175-CS-CDS / Toledo Institute for Development and the Environment (TIDE) to Component 1: Supporting increase capacity of Forest Protection and community-based TF / 16773 Sustainable Forest Post Direct Selection Direct 7,000.00 6,428.54 Completed 2019-03-04 2019-03-05 2019-03-15 2019-03-20 organizations, NGOs, and Management Activities in the Forest Department on Key Biodiversity Areas wildland fire management through a provision of training. Page 5 BZ-PACT-105753-CS-CDS / Finalization of the Component 1: Supporting Resettlement Audit and Forest Protection and Pending Action Plan (RAAP) for the TF / 16773 Sustainable Forest Post Direct Selection Direct 7,000.00 0.00 2019-03-12 2019-03-13 2019-04-02 2019-05-02 Implementation Columbia River Forest Management Activities in Reserve in the Toledo Key Biodiversity Areas District, Belize BZ-PACT-105755-CS-CDS / Component 3: Institutional Quality Systems Solutions & Strengthening and Capacity Initiatives (QSSI) to conduct TF / 16773 Building for Enhanced Post Direct Selection Direct 30,000.00 41,635.00 Signed 2019-03-12 2019-03-17 2019-04-16 2019-05-16 the ISO 14001 and ISO Enforcement of 17020 standards training to Environmental Regulations DOE staff. BZ-PACT-107174-CS-INDV / Logistic for the Monitoring Component 2: Promoting Individual training for hicatee (Spanish TF / 16773 Effective Management of Post Consultant Limited 30,000.00 30,108.65 Completed 2019-03-21 2019-03-26 2019-04-02 2019-04-13 2019-06-30 Creek), including Key Biodiversity Areas Selection development of monitoring protocol BZ-PACT-107176-CS-CDS / Corozal Sustainable Future Initiative to conduct Component 2: Promoting training, set up and TF / 16773 Effective Management of Post Direct Selection Direct 10,000.00 15,776.16 Signed 2019-03-22 2019-03-25 2019-06-07 2019-09-15 maintain camera trap Key Biodiversity Areas surveys in Freshwater Creek Forest Reserve . BZ-PACT-107177-CS-CDS / Panthera Belize to conduct Component 2: Promoting training, set up and TF / 16773 Effective Management of Post Direct Selection Direct 12,000.00 12,620.93 Signed 2019-03-25 2019-03-25 2019-04-15 2019-08-30 maintain camera trap Key Biodiversity Areas surveys in Spanish Creek Wildlife Sanctuary . BZ-PACT-107178-CS-CDS / Friends for Conservation and Component 2: Promoting Development, large scale TF / 16773 Effective Management of Post Direct Selection Direct 17,000.00 17,353.82 Signed 2019-03-25 2019-03-26 2019-04-08 2019-07-27 camera trap training in Key Biodiversity Areas Vaca Forest Reserve BZ-PACT-107179-CS-CDS / Ya'axche Conservation Trust, Component 2: Promoting large scale camera trap TF / 16773 Effective Management of Post Direct Selection Direct 15,000.00 15,518.18 Signed 2019-03-25 2019-03-26 2019-04-19 2019-07-31 training in Maya Mountain Key Biodiversity Areas Forest Reserve BZ-PACT-107170-CS-CDS / Monitoring training for Component 2: Promoting hicatee (Spanish Creek), TF / 16773 Effective Management of Post Direct Selection Direct 35,000.00 43,700.00 Signed 2019-03-20 2019-04-05 2019-04-15 2019-09-30 including development of Key Biodiversity Areas monitoring protocol by Missouri State University BZ-PACT-107175-CS-CDS / Monitoring training for the capture of large mammals Component 2: Promoting (Freshwater Creek), including TF / 16773 Effective Management of Post Direct Selection Direct 15,000.00 10,517.44 Signed 2019-03-25 2019-04-06 2019-04-23 2019-06-06 development of monitoring Key Biodiversity Areas protocols by Corozal Sustainable Future Initiative Component 1: Supporting BZ-PACT-114169-CS-CDS / Forest Protection and Annual Plan of Operations TF / 16773 Sustainable Forest Post Direct Selection Direct 10,000.00 6,326.37 Signed 2019-05-16 2019-05-16 2019-05-31 2019-06-10 (APO) Preparation Management Activities in Key Biodiversity Areas Page 6 Component 1: Supporting BZ-PACT-114170-CS-INDV / Forest Protection and Individual 2 - Permanent Sample Plots TF / 16773 Sustainable Forest Post Consultant Limited 2,000.00 1,964.58 Signed 2019-05-16 2019-05-21 2019-05-26 2019-06-02 2019-07-31 Field Laborers Management Activities in Selection Key Biodiversity Areas Component 4: Project Individual BZ-PACT-65681-CS-INDV / TF / 16773 Management, Monitoring Post Consultant Open 25,000.00 0.00 Canceled 2018-09-03 2018-10-02 2018-10-17 2018-11-10 2019-04-30 M&E specialist and Assessment Selection BZ-PACT-119246-CS-INDV / Consultancy to review and Component 3: Institutional revise the national water Strengthening and Capacity Individual quality monitoring program TF / 16773 Building for Enhanced Post Consultant Limited 64,000.00 54,375.00 Signed 2019-06-23 2019-07-03 2019-07-07 2019-07-13 2019-09-30 with a view to modernize Enforcement of Selection and equip the capacity of Environmental Regulations the DOE. BZ-PACT-65512-CS-INDV / Support establishing procedures/guidelines criteria Component 2: Promoting Individual and corresponding TF / 16773 Effective Management of Post Consultant Open 29,000.00 0.00 Canceled 2018-08-13 2018-09-06 2018-09-16 2018-09-28 2019-03-27 regulations for the Key Biodiversity Areas Selection declaration re-alignment and de-reservation of Pas BZ-PACT-80708-CS-INDV / Assist DOE's Liaison Officer with the KBA project, will Component 3: Institutional provide technical support to Strengthening and Capacity Individual the DOE and the PIAG, and TF / 16773 Building for Enhanced Post Consultant Open 37,500.00 0.00 Canceled 2018-10-03 2018-11-01 2018-11-11 2018-11-28 2019-09-30 will coordinate the Enforcement of Selection implementation of activities Environmental Regulations under Component 3 of the Project . Page 7