Sample Procurement Plan I. General 2. Bank’s approval Date of the procurement Plan : 19 mai 2015 3. Date of General Procurement Notice: 21 Août 2015 4. Period covered by this procurement plan: 2015-2016 (18 mois) II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Expenditure Category Contract Value Procurement Method Contract Subject to (Threshold) (US$) Prior Review 1. Works ≥5,000,000 ICB All <5,000,000 NCB <500,000 Shopping No threshold Direct Contracting All 2. Goods ≥500,000 ICB All <500,000 NCB <200,000 Shopping No threshold Direct Contracting All 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: 4. Reference to (if any) Project Operational/Procurement Manual: 5. Any Other Special Procurement Arrangements: 6. Summary of the Procurement Packages planned during the first 18 months after project effectiveness ( including those that are subject to retroactive financing and advanced procurement) July 9, 2010 Annex Table 3.1: Simplified Procurement Plan (With Methods and Time Schedule) a) Goods 1 2 3 4 5 6 7 8 9 10 Expected Estim. Pre- Dom. Prior Ref. Contract Proc. Bid- Start Amount qualific. Pref. Rev. Comments No. (Description Method Opening Date (US$) (yes/no) (yes/no) (yes/no) Date FDG Matériels Feb.2 240,000 AON No No Yes Dec.2015 1 roulants 016 b) Non-consulting Services 1 2 3 4 5 6 7 8 9 10 Expected Estim. Pre- Dom. Prior Ref. Contract Proc. Bid- Start Amount qualific. Pref. Rev. Comments No. (Description Method Opening Date (US$) (yes/no) (yes/no) (yes/no) Date APD Paiement G1 bénéficiaires Quotati Aug. 133,585 No No Yes June 2015 TMC/ACTP on 15 lot1 III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Expenditure Category Contract Value Procurement Method Contract Subject to (Threshold) (US$) Prior Review 3. Consulting firms QCBS, QBS, LCS, FBS, ≥200,000 CQS All contracts QCBS, QBS, LCS, FBS, <200,000 CQS Individuals ≥100,000 Comparison of 3 CVs All contracts <100,000 Comparison of 3 CVs Firms and individuals No threshold Single Source All Note: All terms of reference regardless of contract value are subject to prior review. 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_200,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. July 9, 2010 3. Any Other Special Selection Arrangements: [including advance procurement and retroactive financing, if applicable or delete if not applicable] 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 7 Ref. Description of Estimate Selection Prior Expected Comments No. Assignment d Method Review Proposals Submission Cost (yes/no) Date (US$) Dénombrement- ciblage communautaire CIC1 109,205 QCBS Yes May 2015 TMC/ACTP lot1 Vatomandry Mahanoro Planification PLA3 ACTP Région 70,000 QCBS Yes July 2015 Haute Matsiatra Encadrement ENCA1 97,459 QCBS Yes Dec.2015 ACTP Vague 1 CONS Enquêtes PMT DGTA pour TMC/ACTP 357,750 QCBS Yes June 2015 1 lot1 CONS Enquêtes PMT DGTA pour TMC/ACTP 511,500 QCBS Yes June 2015 2 lot2 CONS Enquêtes PMT DGTA pour TMC/ACTP 255,750 QCBS Yes June 2015 3 lot3 July 9, 2010 PROCUREMENT Madagascar : Social Safety Net Project PLAN General Information Country: Madagascar Banks Approval Date of the Original Procurement Plan: 2017-03-22 Revised Plan Date(s): (comma delineated, leave blank if none) 2018-06-12 Project ID: P149323 GPN Date: Project Name: Social Safety Net Project Loan / Credit No: IDA / D1450, IDA / 57080 Executing Agency(ies): Intervention Funds for Development, Ministry of Population, Community Nutrition National Program Unit WORKS Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual DRA13TRINF17001 / Travaux de Component 1: Building a safety construction de l' infrastructure Request for Single Stage - One IDA / 57080 net for the poor in selected rural Post Limited 42,419.35 39,648.58 Signed 2017-07-24 2017-08-25 2017-07-25 2017-08-25 2017-08-04 2017-09-04 2017-08-14 2017-09-11 2017-08-28 2017-10-10 2017-12-06 N°01 dans la région Analanjirofo Proposals Envelope areas (Toamasina). DRA13TRINF17002 / Travaux de Component 1: Building a safety construction de l'infrastructure Request for Single Stage - One IDA / 57080 net for the poor in selected rural Post Limited 42,419.35 35,816.12 Signed 2017-07-24 2017-08-25 2017-07-25 2017-08-25 2017-08-04 2017-09-04 2017-08-14 2017-09-11 2017-08-28 2017-10-10 2017-12-06 N°02 dans la région Analanjirofo Proposals Envelope areas (Toamasina). DRK13MPETR17001 / Component 1: Building a safety TRAVAUX DE REHABILITATION Single Stage - One IDA / 57080 net for the poor in selected rural Post Request for Bids Limited 41,129.03 37,996.17 Completed 2017-07-13 2017-10-05 2017-07-20 2017-10-05 2017-08-04 2017-10-20 2017-08-07 2017-10-20 2017-08-21 2017-11-10 2017-12-19 2018-04-19 DES OUVRAGES Envelope areas VOHITRINDRY ILAKATRA ARA13TRMPE17005 / Travaux Component 1: Building a safety Single Stage - One de construction infrastructure de IDA / 57080 net for the poor in selected rural Post Request for Bids Limited 42,164.52 0.00 Canceled 2017-07-28 2017-07-31 2017-08-15 2017-08-18 2017-09-05 2018-12-21 Envelope base n°05 areas ARA13TRMPE17006 / Travaux Component 1: Building a safety Single Stage - One de construction infrastructure de IDA / 57080 net for the poor in selected rural Post Request for Bids Limited 42,164.52 0.00 Canceled 2017-07-28 2017-07-31 2017-08-15 2017-08-18 2017-09-05 2018-12-21 Envelope base n°06 areas ARA13TRMPE17007 / Travaux Component 1: Building a safety Single Stage - One de construction infrastructure de IDA / 57080 net for the poor in selected rural Post Request for Bids Limited 42,164.52 0.00 Canceled 2017-07-28 2017-07-31 2017-08-15 2017-08-18 2017-09-05 2018-12-21 Envelope base n°07 post catastrophe areas ARA13TRMPE17008 / Travaux Component 1: Building a safety Single Stage - One de construction infrastructure de IDA / 57080 net for the poor in selected rural Post Request for Bids Limited 42,164.52 0.00 Canceled 2017-07-28 2017-07-31 2017-08-15 2017-08-18 2017-09-05 2018-12-21 Envelope base n°08 post catastrophe areas ARA13TRMPE17009 / Travaux Component 1: Building a safety Single Stage - One de construction infrastructure de IDA / 57080 net for the poor in selected rural Post Request for Bids Limited 42,164.52 0.00 Canceled 2017-07-28 2017-07-31 2017-08-15 2017-08-18 2017-08-26 2018-12-11 Envelope base n°09 post catastrophe areas ARA13TRMPE17010 / Travaux Component 1: Building a safety Single Stage - One de construction infrastructure de IDA / 57080 net for the poor in selected rural Post Request for Bids Limited 42,164.52 0.00 Canceled 2017-07-28 2017-07-31 2017-08-15 2017-08-18 2017-09-05 2018-12-21 Envelope base n°10 post catastrophe areas ARA13TRMPE17011 / Travaux Component 1: Building a safety Single Stage - One de construction infrastructure de IDA / 57080 net for the poor in selected rural Post Request for Bids Limited 42,164.52 0.00 Canceled 2017-07-28 2017-07-31 2017-08-15 2017-08-18 2017-09-05 2018-12-21 Envelope base n°11 post catastrophe areas DRP83TRMPE17007 / Component 1: Building a safety TRAVAUX DE REHABILITATION Request for Single Stage - One IDA / 57080 net for the poor in selected rural Post Limited 42,741.94 0.00 Canceled 2017-07-26 2017-08-01 2017-08-16 2017-08-17 2017-08-31 2018-12-31 EPP POSTENAWO Proposals Envelope areas AMBOVOMBE7 DRP83TRMPE17006 / Component 1: Building a safety TRAVAUX DE REHABILITATION Request for Single Stage - One IDA / 57080 net for the poor in selected rural Post Limited 42,741.94 0.00 Canceled 2017-07-26 2017-08-01 2017-08-16 2017-08-17 2017-08-31 2018-12-31 EPP POSTENAWO Proposals Envelope areas AMBOVOMBE6 DRP83TRMPE17005 / Component 1: Building a safety TRAVAUX DE REHABILITATION Request for Single Stage - One IDA / 57080 net for the poor in selected rural Post Limited 42,741.94 0.00 Canceled 2017-07-26 2017-08-01 2017-08-16 2017-08-17 2017-08-31 2018-12-31 EPP POSTENAWO Proposals Envelope areas AMBOVOMBE5 DRP83TRMPE17003 / Component 1: Building a safety TRAVAUX DE REHABILITATION Request for Single Stage - One IDA / 57080 net for the poor in selected rural Post Limited 42,741.94 0.00 Canceled 2017-07-26 2017-08-01 2017-08-16 2017-08-17 2017-08-31 2018-12-31 EPP POSTENAWO Proposals Envelope areas AMBOVOMBE3 DRP83TRMPE17004 / Component 1: Building a safety TRAVAUX DE REHABILITATION Request for Single Stage - One IDA / 57080 net for the poor in selected rural Post Limited 42,741.94 0.00 Canceled 2017-07-26 2017-08-01 2017-08-16 2017-08-17 2017-08-31 2018-12-31 EPP POSTENAWO Proposals Envelope areas AMBOVOMBE4 DRP83TRMPE17002 / Component 1: Building a safety TRAVAUX DE REHABILITATION Request for Single Stage - One IDA / 57080 net for the poor in selected rural Post Limited 42,741.94 0.00 Canceled 2017-07-26 2017-08-01 2017-08-16 2017-08-17 2017-08-31 2018-12-31 EPP POSTENAWO Proposals Envelope areas AMBOVOMBE2 DRP83TRMPE17001 / Component 1: Building a safety TRAVAUX DE REHABILITATION Request for Single Stage - One IDA / 57080 net for the poor in selected rural Post Limited 42,741.94 0.00 Canceled 2017-07-26 2017-08-01 2017-08-16 2017-08-17 2017-08-31 2018-12-31 EPP POSTENAWO Proposals Envelope areas AMBOVOMBE1 DRP13TRMPE17001 / TRAVAUX DE RAHABILITATION Component 1: Building a safety Single Stage - One POST ENAWO EPP IDA / 57080 net for the poor in selected rural Post Request for Bids Open - National 85,483.87 61,209.37 Signed 2017-08-23 2017-09-13 2017-08-25 2017-09-24 2017-09-13 2017-09-26 2017-10-16 2017-10-09 2017-11-21 2018-10-09 Envelope AMBOVOMBE CENTRE areas ET EPP SEVOHIPOTY DRP13TRMPE17002 / Component 1: Building a safety TRAVAUX DE REHABILITATION Single Stage - One IDA / 57080 net for the poor in selected rural Post Request for Bids Open - National 42,741.94 40,164.95 Signed 2017-08-23 2017-09-13 2017-08-25 2017-09-24 2017-09-13 2017-09-26 2017-10-16 2017-10-09 2017-11-20 2018-10-09 POST ENAWO EPP Envelope areas AMPAMATA SUD DRP13TRMPE17003 / TRAVAUX DE REHABILITATION Component 1: Building a safety Single Stage - One POST ENAWO EPP KOROMA IDA / 57080 net for the poor in selected rural Post Request for Bids Open - National 85,483.87 71,667.24 Signed 2017-08-23 2017-09-13 2017-08-25 2017-09-24 2017-09-13 2017-09-26 2017-10-16 2017-10-09 2017-11-27 2018-10-09 Envelope SOALAVA areas ET EPP AMPAHIJOLOKE DRP13TRMPE17004 / TRAVAUX DE REHABILITATION Component 1: Building a safety Single Stage - One POST ENAWO EPP IDA / 57080 net for the poor in selected rural Post Request for Bids Open - National 85,483.87 72,467.42 Signed 2017-08-23 2017-09-13 2017-08-25 2017-09-24 2017-09-13 2017-09-26 2017-10-31 2017-10-09 2017-11-27 2018-10-09 Envelope LAHIMANARA HAUT areas ET EPP ANDANGORO ARA13TRMPE17001 / Travaux Component 1: Building a safety de construction CEG BELAOKA Single Stage - One IDA / 57080 net for the poor in selected rural Post Request for Bids Limited 42,164.52 0.00 Canceled 2017-07-28 2017-07-31 2017-08-15 2017-08-18 2017-09-05 2018-12-21 LOKOHO - BELAOKA LOKOHO Envelope areas - ANDAPA ARA13TRMPE17012 / Travaux Component 1: Building a safety de construction/réhabilitation Single Stage - One IDA / 57080 net for the poor in selected rural Post Request for Bids Limited 42,216.13 0.00 Canceled 2017-07-28 2017-07-31 2017-08-15 2017-08-18 2017-09-05 2018-12-21 CSB AMBINANIFAHO - Envelope areas AMBINANIFAHO - ANTALAHA ARA13TRMPE17002 / Travaux Component 1: Building a safety de construction EPP Single Stage - One IDA / 57080 net for the poor in selected rural Post Request for Bids Limited 42,164.52 0.00 Canceled 2017-07-28 2017-07-31 2017-08-15 2017-08-18 2017-09-05 2018-12-21 AMPAPAMENA I - Envelope areas ANDRATAMARINA - SAMBAVA DRP83TRMPE17008 / REHAB Component 1: Building a safety Single Stage - One EPP ANJATOKA AMBOVOMBE IDA / D1450 net for the poor in selected rural Post Request for Bids Open - National 40,967.74 49,172.17 Signed 2017-09-28 2017-11-14 2017-10-02 2017-11-02 2017-11-14 2017-11-06 2017-12-18 2017-11-20 2018-02-13 2018-11-20 Envelope 1 areas DRP83TRMPE17009 / REHAB Component 1: Building a safety Single Stage - One EPP AMPAMOLORA IDA / D1450 net for the poor in selected rural Post Request for Bids Open - National 40,967.74 35,265.46 Signed 2017-09-28 2017-11-14 2017-10-02 2017-11-02 2017-11-14 2017-11-06 2017-12-18 2017-11-20 2018-02-13 2018-11-20 Envelope AMBOVOMBE 2 areas DRP83TRMPE17010 / REHAB Component 1: Building a safety Single Stage - One EPP AMBOASARY I IDA / D1450 net for the poor in selected rural Post Request for Bids Open - National 40,967.74 48,527.17 Signed 2017-09-28 2017-11-14 2017-10-02 2017-11-02 2017-11-14 2017-11-06 2017-12-18 2017-11-20 2018-02-13 2018-11-20 Envelope AMBOVOMBE 4 areas DRP83TRMPE17011 / REHAB Component 1: Building a safety Single Stage - One EPP ANKALITSANDRAKE IDA / D1450 net for the poor in selected rural Post Request for Bids Open - National 40,967.74 37,445.98 Signed 2017-09-28 2017-11-14 2017-10-02 2017-11-02 2017-11-14 2017-11-06 2017-12-18 2017-11-20 2018-02-13 2018-11-20 Envelope AMBOVOMBE 3 areas DRP83TRMPE17012 / REHAB Component 1: Building a safety Single Stage - One EPP ANKILIROE AMBOVOMBE IDA / D1450 net for the poor in selected rural Post Request for Bids Open - National 40,967.74 41,927.02 Signed 2017-09-28 2017-11-14 2017-10-02 2017-11-02 2017-11-14 2017-11-06 2017-12-18 2017-11-20 2018-03-13 2018-11-20 Envelope 1 areas Page 1 Component 1: Building a safety DRP83TRMPE17013 / REHAB Single Stage - One IDA / D1450 net for the poor in selected rural Post Request for Bids Open - National 40,967.74 34,283.63 Signed 2017-09-28 2017-11-14 2017-10-02 2017-11-02 2017-11-14 2017-11-06 2017-12-18 2017-11-21 2018-02-13 2018-11-21 EPP VOHIBARY AMBOASARY I Envelope areas Component 1: Building a safety DRP83TRMPE17014 / REHAB Single Stage - One IDA / D1450 net for the poor in selected rural Post Request for Bids Open - National 40,967.74 35,003.15 Signed 2017-09-28 2017-11-14 2017-10-02 2017-11-02 2017-11-14 2017-11-06 2017-12-18 2017-11-21 2018-02-13 2018-11-21 EPP BELAY AMBOASARY 2 Envelope areas DRP83TRMPE17015 / REHAB Component 1: Building a safety Single Stage - One EPP SOARAVINA LIMBY IDA / D1450 net for the poor in selected rural Post Request for Bids Open - National 40,967.74 41,516.29 Signed 2017-09-28 2017-11-14 2017-10-02 2017-11-02 2017-11-14 2017-11-06 2017-12-18 2017-11-21 2018-02-12 2018-11-21 Envelope AMBOASARY 4 areas DRP83TRMPE17016 / REHAB Component 1: Building a safety Single Stage - One EPP ANKILIMANARA IDA / D1450 net for the poor in selected rural Post Request for Bids Open - National 40,967.74 34,945.40 Signed 2017-09-28 2017-11-14 2017-10-02 2017-11-02 2017-11-14 2017-11-06 2017-12-18 2017-11-21 2018-02-13 2018-11-21 Envelope AMBOASARY 1 areas DRP13TRMPE18001 / Component 1: Building a safety TRAVAUX REPRISES EPP Single Stage - One Pending IDA / 57080 net for the poor in selected rural Post Request for Bids Open - National 47,602.52 0.00 2018-05-04 2018-05-10 2018-06-11 2018-06-15 2018-07-02 2019-07-02 CENTRE ET EPP SEVOHIPOTY Envelope Implementation areas AMBOVOMBE ARA13TRMPE17004 / Travaux Component 1: Building a safety Single Stage - One Pending de reconstruction EPP Ankorabe IDA / 57080 net for the poor in selected rural Post Request for Bids Limited 10,469.16 0.00 2017-07-28 2017-07-31 2017-08-15 2017-08-18 2017-09-05 2017-09-05 Envelope Implementation - CR Ambohimalaza - SAMBAVA areas ARA13TRMPE17003 / Travaux Component 1: Building a safety de construction EPP Single Stage - One Pending IDA / 57080 net for the poor in selected rural Post Request for Bids Limited 11,988.04 0.00 2017-07-28 2017-07-31 2017-08-15 2017-08-18 2017-09-05 2017-09-05 Mahitsiarongana - CR Envelope Implementation areas Ambodivoara - SAMBAVA DRS13TRMPE1801 / TRAVAUX DE REPRISE Component 1: Building a safety Single Stage - One Pending RECONSTRUCTION EPP IDA / 57080 net for the poor in selected rural Post Request for Bids Open - National 45,245.17 0.00 2018-04-25 2018-04-25 2018-05-25 2018-05-28 2018-06-09 2018-09-15 Envelope Implementation MAHITSIARONGANA - CR areas AMBODIVOARA - SAMBAVA DRS13TRMPE1802 / TRAVAUX DE REPRISE Component 1: Building a safety Single Stage - One Pending RECONSTRUCTION EPP IDA / 57080 net for the poor in selected rural Post Request for Bids Open - National 55,325.60 0.00 2018-04-25 2018-04-25 2018-05-25 2018-05-28 2018-06-09 2018-09-15 Envelope Implementation ANKORABE - CR areas AMBOHIMALAZA - SAMBAVA DRS13TRMPE1701 / Travaux de reconstruction CEG BELAOKA Component 1: Building a safety Single Stage - One Pending LOKOHO - CR BELAOKA IDA / 57080 net for the poor in selected rural Post Request for Bids Open - National 66,418.96 0.00 2018-01-10 2018-01-15 2018-02-14 2018-02-21 2018-03-12 2018-07-10 Envelope Implementation LOKOHO - District ANDAPA - areas Région SAVA DRS13TRMPE1702 / Travaux de reconstruction EPP Component 1: Building a safety Single Stage - One Pending SARAHANDRANO - CR IDA / 57080 net for the poor in selected rural Post Request for Bids Open - National 56,624.69 0.00 2018-01-10 2018-01-15 2018-02-14 2018-02-21 2018-03-12 2018-07-10 Envelope Implementation AMBODIAMPANA - District areas SAMBAVA - Région SAVA DRS13TRMPE1703 / Travaux de reconstruction EPP Component 1: Building a safety Single Stage - One Pending AMPAMPAMENA I - CR IDA / 57080 net for the poor in selected rural Post Request for Bids Open - National 67,659.27 0.00 2018-01-10 2018-01-15 2018-02-14 2018-02-21 2018-03-12 2018-07-10 Envelope Implementation ANDRATAMARINA - District areas SAMBAVA - Région SAVA DRS13TRMPE1704 / Travaux de É ole reconstruction c Component 1: Building a safety Communautaire Single Stage - One Pending IDA / 57080 net for the poor in selected rural Post Request for Bids Open - National 47,035.39 0.00 2018-01-10 2018-01-15 2018-02-14 2018-02-21 2018-03-12 2018-07-10 ANDALAMAHITSY - CR Envelope Implementation areas ANTSIRABE NORD - District VOHEMAR - Région SAVA DRS13TRMPE1705 / Travaux de É ole reconstruction c Component 1: Building a safety Single Stage - One Pending Communautaire NOSIMBARY - IDA / 57080 net for the poor in selected rural Post Request for Bids Open - National 75,988.36 0.00 2018-01-10 2018-01-15 2018-02-14 2018-02-21 2018-03-12 2018-07-10 Envelope Implementation CR TSARABARIA - District areas VOHEMAR - Région SAVA DRS13TRMPE1706 / Travaux de Component 1: Building a safety réhabilitation/reconstruction EPP Single Stage - One Pending IDA / 57080 net for the poor in selected rural Post Request for Bids Open - National 63,332.95 0.00 2017-12-04 2018-01-15 2018-02-14 2018-02-21 2018-03-12 2018-07-10 SAHAMAZAVA - CU ANDAPA - Envelope Implementation areas District ANDAPA - Région SAVA DRS13TRMPE1707 / Travaux de réhabilitation/reconstruction CEG Component 1: Building a safety Single Stage - One Pending AMPAHANA - CR AMPAHANA - IDA / 57080 net for the poor in selected rural Post Request for Bids Open - National 71,678.29 0.00 2017-12-04 2018-01-15 2018-02-14 2018-02-21 2018-03-12 2018-07-10 Envelope Implementation District ANTALAHA - Région areas SAVA DRS13TRMPE1708 / Travaux de réhabilitation CEG Component 1: Building a safety Single Stage - One Pending MAHERIFODY - CU ANTALAHA IDA / 57080 net for the poor in selected rural Post Request for Bids Open - National 65,080.20 0.00 2017-12-04 2018-01-15 2018-02-14 2018-02-21 2018-03-12 2018-07-10 Envelope Implementation - District ANTALAHA - Région areas SAVA DRS13TRMPE1709 / Travaux de réhabilitation EPP Component 1: Building a safety Single Stage - One Pending AMBATOFISAKA - CU IDA / 57080 net for the poor in selected rural Post Request for Bids Open - National 62,405.47 0.00 2017-12-04 2018-01-15 2018-02-14 2018-02-21 2018-03-12 2018-07-10 Envelope Implementation ANTALAHA - District ANTALAHA areas - Région SAVA DRS13TRMPE1710 / Travaux de réhabilitation/reconstruction CSB Component 1: Building a safety Single Stage - One Pending AMBINANIFAHO - CR IDA / 57080 net for the poor in selected rural Post Request for Bids Open - National 56,442.27 0.00 2017-12-04 2018-01-15 2018-02-14 2018-02-21 2018-03-12 2018-07-10 Envelope Implementation AMBINANIFAHO - District areas ANTALAHA - Région SAVA DRK13MPETR18001 / Component 1: Building a safety TRAVAUX DE Single Stage - One Pending IDA / 57080 net for the poor in selected rural Post Request for Bids Limited 43,593.75 0.00 2018-06-05 2018-06-12 2018-06-27 2018-06-30 2018-07-14 2018-10-12 RÉHABILITATION/RECONSTRU Envelope Implementation areas CTION ECOLE 1 VOHIPENO DRF13TRMPE18001 / Component 1: Building a safety TRAVAUX DE Single Stage - One Pending IDA / 57080 net for the poor in selected rural Post Request for Bids Limited 45,125.00 0.00 2018-07-31 2018-08-07 2018-08-22 2018-08-25 2018-09-08 2018-12-07 RECONSTRUCTION EPP Envelope Implementation areas AMBOHIMAHASOA 01 DRF13TRMPE18002 / TRAVAUX DE Component 1: Building a safety Single Stage - One Pending RECONSTRUCTION D'UNE IDA / 57080 net for the poor in selected rural Post Request for Bids Limited 45,125.00 0.00 2018-07-31 2018-08-07 2018-08-22 2018-08-25 2018-09-08 2018-12-07 Envelope Implementation ECOLE PRIMAIRE areas AMBOHIMAHASOA 02 DRT13TRMPE18001 / Travaux Component 1: Building a safety de réhabilitation/reconstruction Single Stage - One Pending IDA / 57080 net for the poor in selected rural Post Request for Bids Limited 47,419.35 0.00 2018-07-24 2018-07-26 2018-08-10 2018-08-18 2018-08-30 2019-12-13 d'une cé ole dans le District Envelope Implementation areas d'Arivonimamo DRT13TRMPE18002 / Travaux Component 1: Building a safety de réhabilitation/reconstruction Single Stage - One Pending IDA / 57080 net for the poor in selected rural Post Request for Bids Limited 47,419.35 0.00 2018-07-24 2018-07-26 2018-08-10 2018-08-18 2018-08-30 2019-12-13 d'une cé ole dans le District de Envelope Implementation areas Faratsiho GOODS Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 2: Strengthening MG-FID-9596-GO-UN / safety net administration, DGPO127849-1-2 ACQUISITION IDA / D1450 Prior UN Agencies (Direct) Direct 203,654.39 211,043.69 Signed 2017-01-29 2017-03-23 2017-02-12 2017-03-24 2017-03-03 2017-03-03 2017-03-03 monitoring and social 6 VEHICULES PICK UP 4X4 accountability Component 3: Building the A17 / Aquisition of six (06) institutional capacity for vehicles 4X4 and twenty three IDA / D1450 coordination, monitoring and Prior UN Agencies (Direct) Direct 360,000.00 270,310.18 Completed 2017-01-12 2017-01-12 2017-02-06 2017-02-06 2017-02-06 2017-10-20 (23) motorcycles evaluation of the social protection syst em Component 3: Building the MG-UPNNC-11684-GO-DIR / institutional capacity for Acquisition de suppléments IDA / D1450 coordination, monitoring and Prior Direct Selection Direct 1,000,000.00 1,238,076.23 Signed 2017-04-11 2017-04-18 2017-06-06 2017-07-27 2018-06-01 nutritionnels (250 tonnes de evaluation of the social Plumpy Sup) protection syst em DG11FRMAC17001 / Marchés Component 1: Building a safety multiples divers divers travaux Request for Single Stage - One IDA / 57080 net for the poor in selected rural Post Limited 5,143.58 643.46 Completed 2017-05-06 2017-11-20 2017-05-29 2017-12-11 2017-06-19 2018-01-09 d'impression pour mesures Quotations Envelope areas d'accompagnement Page 2 DG11FRMAC17002 / Marchés multiples divers outils pour Component 1: Building a safety Request for Single Stage - One Under mesures d'accompagnement IDA / 57080 net for the poor in selected rural Post Limited 20,391.54 0.00 2017-05-06 2017-05-30 2017-05-29 2017-06-19 Quotations Envelope Implementation ACTP (pins, pochette à areas é argne...) p DG20FRINFO17003 / Marchés Component 1: Building a safety Request for Single Stage - One Under multiples achats matériels IDA / 57080 net for the poor in selected rural Post Limited 39,275.35 29,954.89 2017-05-06 2017-05-12 2017-05-29 2017-06-19 Quotations Envelope Implementation informatiques areas DG11FRCPS17004 / Marchés Component 1: Building a safety Request for Single Stage - One Under multiples (Outils de travail et IDA / 57080 net for the poor in selected rural Post Limited 16,212.53 12,826.60 2017-05-16 2017-09-12 2017-06-09 2017-07-09 Quotations Envelope Implementation d'identification des CPS) areas MG-MPPSPF-18168-GO-UN / Component 3: Building the Fournitures et livraison de deux institutional capacity for voitures 4x4 stations wagon,deux IDA / D1450 coordination, monitoring and Prior UN Agencies (Direct) Direct 275,000.00 154,723.45 Signed 2017-06-15 2017-06-22 2017-06-20 2017-06-27 2017-07-20 2017-06-15 2017-11-24 voitures 4x4 pick-up, trente IDA / 57080 evaluation of the social motos pour le fonds initial et pour protection syst em le fonds additionnel Component 3: Building the A14 FSS COT SMARTPHONE institutional capacity for Request for Single Stage - One Pending GEOPORTAIL / Acquisition de IDA / D1450 coordination, monitoring and Post Limited 2,000.00 0.00 2018-02-19 2018-04-16 2018-06-15 Quotations Envelope Implementation deux smartphones Géoportail evaluation of the social protection syst em Component 3: Building the A13 FSS ED 100T PS / institutional capacity for Pending Acquisition de 100 tonnes de IDA / D1450 coordination, monitoring and Post Direct Selection Direct 500,000.00 0.00 2018-02-27 2018-03-04 2018-04-13 2018-10-10 Implementation Plumpy Sup evaluation of the social protection syst em Component 3: Building the A11 FSS COT PAGNES / institutional capacity for Request for Single Stage - One Pending Acquisition de pagnes (Outils de IDA / D1450 coordination, monitoring and Post Limited 10,000.00 0.00 2018-03-11 2018-05-06 2018-11-02 Quotations Envelope Implementation communication) evaluation of the social protection syst em Component 3: Building the A17 FSS COT EQT MOB / institutional capacity for Acquisition de divers Request for Single Stage - One Pending IDA / D1450 coordination, monitoring and Post Limited 5,000.00 0.00 2018-03-11 2018-05-06 2018-07-05 é uipements et mobiliers de q Quotations Envelope Implementation evaluation of the social bureau protection syst em Component 3: Building the A11 FSS COT RENY institutional capacity for MAVITRIKA / Multiplication Request for Single Stage - One Pending IDA / D1450 coordination, monitoring and Post Limited 24,000.00 0.00 2018-03-06 2018-05-01 2018-10-28 livrets RENY MAVITRIKA Quotations Envelope Implementation evaluation of the social (Supports de communication) protection syst em Component 3: Building the A11 FSS COT BP / Impression institutional capacity for Request for Single Stage - One Pending et multiplication de bulletins IDA / D1450 coordination, monitoring and Post Limited 12,000.00 0.00 2018-02-11 2018-04-08 2018-10-05 Quotations Envelope Implementation périodiques (deux numéros) evaluation of the social protection syst em Component 3: Building the A11 FSS COT CALENDRIERS institutional capacity for Request for Single Stage - One Pending 2019 / Impression et IDA / D1450 coordination, monitoring and Post Limited 30,000.00 0.00 2018-09-21 2018-11-23 2018-12-23 Quotations Envelope Implementation multiplication calendriers 2019 evaluation of the social protection syst em Component 3: Building the A6 FSS COT REGISTRE SPC institutional capacity for PECMAM / Impression et Request for Single Stage - One Pending IDA / D1450 coordination, monitoring and Post Limited 11,000.00 0.00 2018-02-25 2018-04-22 2018-06-21 multiplication registres SPC et Quotations Envelope Implementation evaluation of the social PECMAM protection syst em MG-MPPSPF-40473-GO-UN / Component 3: Building the Acquisition de matériel roulant: institutional capacity for Pending fournitures et livraison de cinq IDA / 57080 coordination, monitoring and Post UN Agencies (Direct) Direct 185,400.00 0.00 2018-01-16 2018-01-17 2018-01-25 2018-04-02 Implementation voiture 4x4 double cabine pick evaluation of the social up land cruiser protection syst em DG20FRCOMM1801 / Component 2: Strengthening Fournitures d'outils de safety net administration, Request for Single Stage - One communication - travaux IDA / 57080 Post Limited 2,250.00 1,311.87 Signed 2018-03-07 2018-03-15 2018-03-26 2018-04-13 2018-04-25 monitoring and social Quotations Envelope d'impression (autocollant, accountability pochette porte documents....) Component 2: Strengthening DG20FRCOMM1802 / safety net administration, Request for Single Stage - One FOURNITURES D'OUTILS DE IDA / 57080 Post Limited 850.00 4,330.86 Signed 2018-03-22 2017-11-22 2018-04-30 2017-12-07 2018-05-30 monitoring and social Quotations Envelope COMMUNICATION - GOODIES accountability DG20FRCOMM1803 / Component 2: Strengthening FOURNITURES D'OUTILS DE safety net administration, Request for Single Stage - One Under IDA / 57080 Post Limited 3,250.00 0.00 2018-03-08 2018-03-21 2018-03-31 2018-04-30 COMMUNICATION (tee shirt, monitoring and social Quotations Envelope Implementation casquette, gilet...) accountability Component 2: Strengthening DG20FRCONSINFO1804 / safety net administration, Request for Single Stage - One Pending Achat consommables IDA / 57080 Post Limited 5,800.00 0.00 2018-05-08 2018-06-02 2018-07-02 monitoring and social Quotations Envelope Implementation informatiques accountability Component 2: Strengthening DG20FRANTVIR1805 / Achat safety net administration, Request for Single Stage - One Pending IDA / 57080 Post Limited 15,200.00 0.00 2018-05-08 2018-05-26 2018-06-25 antivirus monitoring and social Quotations Envelope Implementation accountability DG12FREVEILPE1806 / Achat Component 1: Building a safety Request for Single Stage - One Pending é eil fournitures de stimulation et v IDA / 57080 net for the poor in selected rural Post Limited 19,300.00 0.00 2018-05-11 2018-06-07 2018-07-07 Quotations Envelope Implementation petite enfance areas Component 1: Building a safety DG12FRJOUEPE1807 / Achat Single Stage - One Pending IDA / 57080 net for the poor in selected rural Post Request for Bids Open - National 38,600.00 0.00 2018-05-10 2018-05-11 2018-06-10 2018-06-17 2018-06-27 2018-07-27 jouets petite enfance Envelope Implementation areas Component 1: Building a safety DG12FRAFFTMDH1808 / Request for Single Stage - One Pending IDA / 57080 net for the poor in selected rural Post Limited 8,190.00 0.00 2018-06-07 2018-06-19 2018-07-10 IMPRESSION AFFICHES TMDH Quotations Envelope Implementation areas DG11FRBANDMAC1809 / Component 1: Building a safety CONFECTION BANDEROLES Request for Single Stage - One Pending IDA / 57080 net for the poor in selected rural Post Limited 27,176.00 0.00 2018-06-12 2018-07-02 2018-08-01 EN BACHE POUR MESURE Quotations Envelope Implementation areas D'ACCOMPAGNEMENT TMDH NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual DRF11CFPAI17001 / Component 1: Building a safety MARCHES MULTIPLES POUR Single Stage - One IDA / 57080 net for the poor in selected rural Post Request for Bids Limited 2,363.33 17,273.54 Signed 2017-04-18 2017-09-14 2017-04-21 2017-09-14 2017-05-22 2017-09-25 2017-05-25 2017-09-25 2017-06-02 2017-10-03 2019-06-03 LE PAIEMENT DES Envelope areas É ICIAIRES BÉNF ACTP DRF12CFPAI17002 / Component 1: Building a safety MARCHES MULTIPLES POUR Single Stage - One Pending IDA / 57080 net for the poor in selected rural Post Request for Bids Limited 8,459.93 0.00 2017-06-19 2017-06-21 2017-07-25 2017-07-27 2017-08-10 2019-08-10 LE PAIEMENT DES Envelope Implementation areas É ICIAIRES BÉNF TMDH DRT12CFPAI17001 / Marché Component 1: Building a safety Single Stage - One multiple pour paiement des IDA / 57080 net for the poor in selected rural Post Request for Bids Limited 5,198.00 3,463.83 Signed 2017-05-02 2017-05-16 2017-05-08 2017-05-16 2017-06-07 2017-05-23 2017-06-10 2017-05-30 2017-06-17 2017-06-02 2019-11-30 Envelope é iciaires TMDH bénf areas DRT12PRPAI17001 / Marché Component 1: Building a safety Single Stage - One multiple pour paiement des IDA / 57080 net for the poor in selected rural Post Request for Bids Limited 13,819.00 0.00 Canceled 2017-08-30 2017-09-05 2017-09-15 2017-09-30 2017-10-06 2019-11-30 Envelope é iciaires du TMDH (lot 1) bénf areas DRT12PRPAI17002 / Marché Component 1: Building a safety Single Stage - One multiple pour paiement des IDA / 57080 net for the poor in selected rural Post Request for Bids Limited 10,730.00 0.00 Canceled 2017-08-30 2017-09-05 2017-09-15 2017-09-30 2017-10-06 2019-11-30 Envelope é iciaires du TMDH (Lot 2) bénf areas DRF11CFPAI18001 / Component 1: Building a safety MARCHES MULTIPLES POUR Single Stage - One Pending IDA / 57080 net for the poor in selected rural Post Request for Bids Limited 2,363.33 0.00 2018-04-10 2018-04-15 2018-04-25 2018-05-08 2019-05-08 LE PAIEMENT DES Envelope Implementation areas É ICIAIRES BÉNF ACTP DRF12CFPAI18001 / Component 1: Building a safety MARCHES MULTIPLES POUR Single Stage - One Pending IDA / 57080 net for the poor in selected rural Post Request for Bids Limited 7,156.06 0.00 2018-02-27 2018-03-04 2018-03-11 2018-03-22 2019-03-22 LE PAIEMENT DES Envelope Implementation areas É ICIAIRES BÉNF TMDH Page 3 CONSULTING FIRMS Activity Reference No. / Combined Evaluation Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Technical Description Loan / Credit No. Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual DRP83CFAGEX17001 / Component 1: Building a safety Consultant ENCADREMENT ACT POST Under IDA / D1450 net for the poor in selected rural Post Qualification Open - National 4,375.00 0.00 2017-04-07 2017-05-05 2017-04-14 2017-05-01 2017-05-09 2017-05-10 2017-05-14 2017-06-13 CATA RANOPISO REGION Implementation areas Selection ANOSY DRP83CFAGEX17002 / Component 1: Building a safety Consultant ENCADREMENT ACT POST IDA / D1450 net for the poor in selected rural Post Qualification Open - National 4,375.00 0.00 Canceled 2017-04-07 2017-04-14 2017-05-01 2017-05-10 2017-05-14 2017-06-13 CATA ANALAPATSY REGION areas Selection ANOSY DRF11CFAGEC17001 / Component 1: Building a safety MARCHES MULTIPLES Quality And Cost- Under IDA / 57080 net for the poor in selected rural Post Open - National 10,117.37 0.00 2017-04-23 2017-09-13 2017-04-30 2017-05-18 2017-06-02 2017-07-03 2017-07-06 2017-07-10 2018-07-10 ENCADREMENT DES UTB EN Based Selection Implementation areas ACTP DRA13MOINF17001 / Maitrise Component 1: Building a safety Consultant d'Suvre des infrastructures N°01 IDA / 57080 net for the poor in selected rural Post Qualification Open - National 5,161.29 4,544.55 Signed 2017-05-08 2017-07-05 2017-05-15 2017-05-22 2017-07-05 2017-06-06 2017-07-28 2017-06-13 2017-08-02 2018-12-26 et N°02 dans la région d' areas Selection Analanjirofo (Toamasina). DRK13CFMO17001 / MAITRISE D'RUVRE DES TRAVAUX DE Component 1: Building a safety REHABILITATION DES IDA / 57080 net for the poor in selected rural Post Least Cost Selection Open - National 3,870.97 5,215.22 Completed 2017-05-10 2017-06-15 2017-05-10 2017-05-20 2017-07-13 2017-06-04 2017-07-24 2017-06-05 2017-07-25 2017-06-08 2017-08-07 2017-06-15 2017-08-10 2017-12-12 2018-04-19 OUVRAGRES VOHITRINDRY areas ILAKATRA DRP83CFBE17001 / MAITRISE Component 1: Building a safety D'OEUVRE EPP POST CATA IDA / 57080 net for the poor in selected rural Post Least Cost Selection Open - National 6,774.19 5,600.27 Signed 2017-05-09 2017-06-30 2017-05-10 2017-06-06 2017-06-30 2017-06-21 2017-07-14 2017-06-21 2017-07-17 2017-06-27 2017-07-17 2017-07-07 2017-08-04 2018-12-31 ENAWO AMBOVOMBE 1 areas DRP83CFBE17002 / MAITRISE Component 1: Building a safety D'OEUVRE EPP POSTENAWO IDA / 57080 net for the poor in selected rural Post Least Cost Selection Open - National 9,032.26 7,169.65 Signed 2017-05-09 2017-07-17 2017-05-09 2017-06-06 2017-06-30 2017-06-21 2017-07-14 2017-06-21 2017-07-17 2017-06-27 2017-07-17 2017-07-07 2017-08-07 2018-12-31 AMBOVOMBE2 areas DG11CFAGFDF17001 / Agence chargée de l'élaboration d'un guide pour la formation des formateurs des agences de mise Component 1: Building a safety Consultant en oeuvre en matière d'épargne IDA / 57080 net for the poor in selected rural Post Qualification Open - National 60,000.00 0.00 Canceled 2017-05-12 2017-05-19 2017-06-11 2017-07-25 2017-08-02 2019-04-30 communautaire et de areas Selection développement d'affaires dans les activités ACT-P du Projet de Filets Sociaux mis en oeuvre par le FID Component 2: Strengthening DG23CFFORMSIG17002 / Consultant safety net administration, Formation des personnels du FID IDA / 57080 Post Qualification Open - National 693.75 1,580.42 Completed 2017-06-07 2017-06-07 2017-06-14 2017-06-27 2017-08-18 2017-07-17 2017-09-05 2017-07-21 2017-09-13 2017-08-20 2017-10-17 monitoring and social sur l'utilisation des SIG Selection accountability DRT11CFPLAN17001 / Agence de planification chargée du suivi Component 1: Building a safety Consultant et supervision des chantier, suivi IDA / 57080 net for the poor in selected rural Post Qualification Open - National 15,000.00 0.00 Canceled 2017-07-18 2017-07-19 2017-08-07 2017-08-27 2017-09-03 2019-04-26 é aluation communautaire, mise v areas Selection à jour des PAMO DRT11CFPLAN17002 / Agence de planification chargée du suivi Component 1: Building a safety Consultant et supervision des chantiers, IDA / 57080 net for the poor in selected rural Post Qualification Open - National 15,000.00 0.00 Canceled 2017-07-18 2017-07-19 2017-08-07 2017-08-27 2017-09-03 2019-04-26 é aluation communautaire, suivi v areas Selection mise à jour des PAMO DRT11CFPLAN17003 / Agence de planification chargée du suivi Component 1: Building a safety Consultant et supervision des chantiers, IDA / 57080 net for the poor in selected rural Post Qualification Open - National 15,000.00 0.00 Canceled 2017-07-18 2017-07-19 2017-08-07 2017-08-27 2017-09-03 2019-04-26 é aluation communautaire, suivi v areas Selection mise à jour des PAMO DG81CFPLAT1701 / Component 1: Building a safety Consultant FOURNITURE DE SERVICE EN IDA / D1450 net for the poor in selected rural Post Qualification Open - National 30,000.00 0.00 Canceled 2017-07-26 2017-07-28 2017-08-17 2017-09-11 2017-09-15 2018-12-14 PLATE FORME INTERNET DE areas Selection COLLECTE DE DONNÉES DRK11CFSECCS1702 / Suivi- É aluation Communautaire, Mis v Component 1: Building a safety Quality And Cost- a jours PAMO, Contrôle et Suivi IDA / 57080 net for the poor in selected rural Post Open - National 7,419.35 0.00 Canceled 2017-08-21 2017-08-22 2017-09-10 2017-10-08 2017-10-12 2017-10-19 2017-10-29 2020-04-16 Based Selection UTB ONILAHY - FENOMBY - areas BENIHAONANA DRK11CFSECCS1703 / Suivi- É aluation Communautaire, Mis v a jours PAMO, Contrôle et Suivi Component 1: Building a safety Quality And Cost- UTB VOHILAVA - IDA / 57080 net for the poor in selected rural Post Open - National 9,677.42 0.00 Canceled 2017-08-21 2017-08-22 2017-09-10 2017-10-08 2017-10-12 2017-10-19 2017-10-29 2020-04-16 Based Selection AMBOHIMANARIVO MANGAIKA areas - SAHANABOHITRA - AMBORONDRA DRK11CFSECCS1704 / Suivi- É aluation Communautaire, Mis v Component 1: Building a safety Quality And Cost- a jours PAMO, Contrôle et Suivi IDA / 57080 net for the poor in selected rural Post Open - National 7,419.35 0.00 Canceled 2017-08-21 2017-08-22 2017-09-10 2017-10-08 2017-10-12 2017-10-19 2017-10-29 2020-04-16 Based Selection UTB MAROFARIHY - MIZILO areas GARA - FENOARIVO DG12CFCIB1701 / Ciblage Component 1: Building a safety Consultant Enquête Enregistrement IDA / 57080 net for the poor in selected rural Post Qualification Open - National 3,135.48 0.00 Canceled 2017-09-07 2017-09-07 2017-09-23 2017-10-14 2017-10-27 2017-12-26 é iciaires bénf nouvelles areas Selection communes BETIOKY LOT 1 DG12CFCIB1702 / Ciblage Component 1: Building a safety Consultant Enquête Enregistrement IDA / 57080 net for the poor in selected rural Post Qualification Open - National 2,090.32 0.00 Canceled 2017-09-07 2017-09-07 2017-09-23 2017-10-14 2017-10-17 2017-12-16 é iciaires bénf nouvelles areas Selection communes VOHIPENO LOT 2 MG-MPPSPF-33851-CS-QCBS Component 3: Building the / Evaluations de processus du institutional capacity for système de paiement et du Quality And Cost- Under IDA / 57080 coordination, monitoring and Post Open - National 60,000.00 0.00 2017-10-25 2017-10-25 2017-10-26 2017-11-06 2017-11-24 2017-11-28 2017-11-30 2017-12-04 2018-05-14 système de ciblage des Based Selection Implementation evaluation of the social programmes (ACTP, TMC et protection syst em TMDH) Component 3: Building the MG-MPPSPF-36025-CS-QCBS institutional capacity for Quality And Cost- Pending / Evaluation d'impact aux IDA / 57080 coordination, monitoring and Post Open - National 53,000.00 0.00 2017-11-08 2017-12-08 2018-01-21 2018-02-18 2018-03-20 2018-04-06 2018-04-23 2019-06-21 Based Selection Implementation ménages vulnérables evaluation of the social protection syst em DRT11CFPLAN17004 / Agence de planification chargée de suivi Component 1: Building a safety Quality And Cost- et de supervision de chantier, IDA / 57080 net for the poor in selected rural Post Open - National 15,000.00 14,243.10 Signed 2017-11-13 2017-05-31 2017-11-14 2017-11-30 2018-01-22 2017-12-28 2018-02-23 2017-12-28 2018-02-27 2018-01-08 2018-03-27 2018-01-18 2018-04-17 2019-04-30 Based Selection é aluation communautaire, suivi v areas mise à jour PAMO DRT11CFPLAN17005 / Agence de planification chargée du suivi Component 1: Building a safety Quality And Cost- et supervision des chantiers, IDA / 57080 net for the poor in selected rural Post Open - National 15,000.00 12,029.98 Signed 2017-11-13 2017-05-31 2017-11-14 2017-11-30 2018-01-22 2017-12-28 2018-02-23 2017-12-28 2018-02-27 2018-01-08 2018-03-27 2018-01-18 2018-04-17 2019-04-30 Based Selection é aluation communautaire, suivi v areas mise à jour des PAMO DRT11CFPLAN17006 / Agence de planification chargée du suivi Component 1: Building a safety Quality And Cost- et supervision des chantiers, IDA / 57080 net for the poor in selected rural Post Open - National 15,000.00 0.00 Canceled 2017-11-13 2017-05-31 2017-11-14 2017-11-30 2018-01-22 2017-12-28 2018-02-23 2017-12-28 2018-02-27 2018-01-08 2018-03-09 2018-01-18 2019-04-30 Based Selection é aluation communautaire, suivi v areas mise à jour des PAMO Component 1: Building a safety Consultant DRT11CFSEN1701 / Agence de IDA / 57080 net for the poor in selected rural Post Qualification Open - National 21,564.13 0.00 Canceled 2017-11-17 2017-11-24 2017-12-11 2018-01-03 2018-01-11 2019-05-31 sensibilisation areas Selection DRA11CFSEN1701 / Agence de Component 1: Building a safety Consultant Pending Sensibilisation ACTP IDA / 57080 net for the poor in selected rural Post Qualification Open - National 20,584.64 0.00 2017-11-17 2017-11-24 2017-12-11 2018-01-03 2018-01-11 2019-05-31 Implementation Vatomandry areas Selection DRK11CFAGEC17001 / COLLECTE DE DONNÉES ET Component 1: Building a safety Quality And Cost- ENCADREMENT UTB IDA / 57080 net for the poor in selected rural Post Open - National 64,516.13 30,964.76 Signed 2017-11-28 2018-01-03 2017-11-29 2017-12-18 2018-01-05 2018-01-08 2018-01-20 2018-01-12 2018-02-07 2018-01-16 2018-03-18 2018-01-21 2018-04-13 2020-01-21 Based Selection FENOARIVO II ET MIZILO GARA areas MANAKARA DRK11CFAGEC17002 / Component 1: Building a safety COLLECTE DE DONNÉES ET Quality And Cost- Under IDA / 57080 net for the poor in selected rural Post Open - National 32,258.06 0.00 2017-11-28 2017-11-29 2017-12-18 2018-01-08 2018-01-12 2018-01-16 2018-01-21 2020-01-21 ENCADREMENT UTB Based Selection Implementation areas MAROFARIHY MANAKARA Page 4 Component 1: Building a safety DRK12CFAGEC17001 / Quality And Cost- IDA / 57080 net for the poor in selected rural Post Open - National 4,356.33 0.00 Canceled 2017-12-03 2017-12-04 2018-01-05 2018-01-26 2018-01-30 2018-02-03 2018-02-08 2020-02-08 MARCHE MULTIPLE Based Selection areas Component 1: Building a safety DRK12CFAGEC17002 / Quality And Cost- IDA / 57080 net for the poor in selected rural Post Open - National 5,576.44 0.00 Canceled 2017-12-03 2017-12-04 2018-01-05 2018-01-26 2018-01-30 2018-02-03 2018-02-08 2020-02-08 MARCHE MULTIPLE Based Selection areas DRU11CFAGEC001 / ACTP Component 1: Building a safety Quality And Cost- Encadrement marché multiples IDA / 57080 net for the poor in selected rural Post Open - National 14,696.97 11,730.49 Signed 2017-11-29 2017-10-25 2017-12-14 2017-12-20 2017-11-13 2018-01-10 2017-11-28 2018-01-13 2017-12-01 2018-01-23 2018-02-06 2018-01-30 2018-03-09 2020-01-30 Based Selection UTB 06 Antsoha areas DRF11CFAGEC180001 / Component 1: Building a safety Quality And Cost- Pending MARCHE MULTIPLE AGENCE IDA / 57080 net for the poor in selected rural Post Open - National 10,117.37 0.00 2018-03-11 2018-04-01 2018-05-16 2018-05-31 2018-06-02 2018-06-06 2018-06-10 2019-06-10 Based Selection Implementation D'ENCADREMENT ACTP areas DRF13PCAGEX18001 / Component 1: Building a safety Consultant ENCADREMENT - PAIEMENT IDA / 57080 net for the poor in selected rural Post Qualification Open - National 4,147.42 648.14 Completed 2018-01-16 2018-01-15 2018-01-17 2018-01-19 2018-01-16 2018-02-02 2018-01-18 2018-02-07 2018-01-18 2018-02-28 2018-02-16 ACT Post catastrophe FKT1 - areas Selection Ifanadiana DRF13PCAGEX18002 / Component 1: Building a safety Consultant ENCADREMENT - PAIEMENT IDA / 57080 net for the poor in selected rural Post Qualification Open - National 4,147.42 0.00 Canceled 2018-01-16 2018-01-15 2018-01-17 2018-01-19 2018-01-18 2018-02-02 2018-01-18 2018-02-07 2018-02-28 ACT Post catastrophe FKT2 - areas Selection Ifanadiana DRF11CFSENS18001 / Component 1: Building a safety Consultant AGENCE DE SENSIBILISATION IDA / 57080 net for the poor in selected rural Post Qualification Open - National 22,975.07 0.00 Canceled 2018-01-16 2018-01-17 2018-01-24 2018-02-12 2018-02-19 2019-02-19 ACTP ISANDRA areas Selection DRT13CFAGEX1801 / Encadrement et paiement des Component 1: Building a safety Consultant é iciaires de l'ACT post bénf IDA / 57080 net for the poor in selected rural Post Qualification Open - National 4,147.42 362.71 Signed 2018-01-17 2018-01-11 2018-01-17 2018-01-17 2018-01-12 2018-02-02 2018-01-15 2018-02-07 2018-01-15 2018-02-28 catastrophe dans le Fokontany areas Selection 1, Antananarivo Renivohitra DRT13CFAGEX1802 / Encadrement et paiement des Component 1: Building a safety Consultant é iciaires de l'ACT post bénf IDA / 57080 net for the poor in selected rural Post Qualification Open - National 4,147.42 362.71 Signed 2018-01-17 2018-01-11 2018-01-17 2018-01-17 2018-01-12 2018-02-02 2018-01-15 2018-02-07 2018-01-15 2018-02-28 catastrophe dans le Fokontany areas Selection 2, Antananarivo Renivohitra DRT13CFAGEX1803 / Encadrement et paiement des Component 1: Building a safety Consultant é iciaires de l'ACT post bénf IDA / 57080 net for the poor in selected rural Post Qualification Open - National 4,147.42 362.71 Signed 2018-01-17 2018-01-11 2018-01-17 2018-01-17 2018-01-12 2018-02-02 2018-01-15 2018-02-07 2018-01-15 2018-02-28 catastrophe dans le Fokontany areas Selection 3, Antananarivo Renivohitra DRA13CFAGEX18001 / LOT 1 Component 1: Building a safety Consultant ENCADREMENT - PAIEMENT IDA / 57080 net for the poor in selected rural Post Qualification Open - National 16,591.05 1,741.78 Completed 2018-01-17 2018-01-14 2018-01-17 2018-01-17 2018-01-15 2018-02-02 2018-01-16 2018-02-07 2018-01-17 2018-02-28 2018-02-19 ACT POST CATASTROPHE areas Selection DES 04 FKT DIST BRICKAVILLE DRA13CFAGEX18002 / LOT 2 ENCADREMENT - PAIEMENT Component 1: Building a safety Consultant ACT POST CATASTROPHE IDA / 57080 net for the poor in selected rural Post Qualification Open - National 12,442.25 1,189.19 Completed 2018-01-17 2018-01-14 2018-01-17 2018-01-17 2018-01-14 2018-02-02 2018-01-16 2018-02-07 2018-01-17 2018-02-28 2018-03-06 DES 04 FKT DIST TOAMASINA areas Selection II DRA13CFAGEX18003 / LOT 3 Component 1: Building a safety Consultant ENCADREMENT - PAIEMENT IDA / 57080 net for the poor in selected rural Post Qualification Open - National 16,589.67 1,577.47 Completed 2018-01-17 2018-01-14 2018-01-17 2018-01-17 2018-01-14 2018-02-02 2018-01-16 2018-02-07 2018-01-17 2018-02-28 2018-02-19 ACT POST CATASTROPHE areas Selection DES 04 FKT DIST TOAMASINA I DRA13CFAGEX18004 / LOT 4 Component 1: Building a safety Consultant ENCADREMENT - PAIEMENT IDA / 57080 net for the poor in selected rural Post Qualification Open - National 16,589.67 1,624.03 Completed 2018-01-17 2018-01-14 2018-01-17 2018-01-17 2018-01-14 2018-02-02 2018-01-16 2018-02-07 2018-01-17 2018-02-28 2018-03-06 ACT POST CATASTROPHE areas Selection DES 04 FKT DIST TOAMASINA I DRA13CFAGEX18005 / LOT 5 Component 1: Building a safety Consultant ENCADREMENT - PAIEMENT IDA / 57080 net for the poor in selected rural Post Qualification Open - National 16,589.67 1,561.19 Completed 2018-01-17 2018-01-14 2018-01-17 2018-01-17 2018-01-15 2018-02-02 2018-01-16 2018-02-07 2018-01-17 2018-02-28 2018-03-07 ACT POST CATASTROPHE areas Selection DES 04 FKT DIST TOAMASINA I DRA13CFAGEX18006 / LOT 6 Component 1: Building a safety Consultant ENCADREMENT - PAIEMENT IDA / 57080 net for the poor in selected rural Post Qualification Open - National 12,442.25 1,197.21 Completed 2018-01-17 2018-01-14 2018-01-17 2018-01-17 2018-01-15 2018-02-02 2018-01-16 2018-02-07 2018-01-17 2018-02-28 2018-02-15 ACT POST CATASTROPHE areas Selection DES 03 FKT DIST TOAMASINA I DRA13CFAGEX18007 / LOT 7 Component 1: Building a safety Consultant ENCADREMENT - PAIEMENT IDA / 57080 net for the poor in selected rural Post Qualification Open - National 12,442.25 1,217.56 Completed 2018-01-17 2018-01-14 2018-01-17 2018-01-17 2018-01-15 2018-02-02 2018-01-16 2018-02-07 2018-01-17 2018-02-28 2018-02-15 ACT POST CATASTROPHE areas Selection DES 03 FKT DIST TOAMASINA I DRT13CFAGEX1804 / Encadrement et paiement des Component 1: Building a safety Consultant é iciaires de l'ACT post bénf IDA / 57080 net for the poor in selected rural Post Qualification Open - National 4,147.42 362.71 Signed 2018-01-17 2018-01-11 2018-01-17 2018-01-17 2018-01-12 2018-02-02 2018-01-15 2018-02-07 2018-01-15 2018-02-28 catastrophe dans le Fokontany areas Selection 4, Antananarivo Renivohitra DRT13CFAGEX1805 / Encadrement et paiement des Component 1: Building a safety Consultant é iciaires de l'ACT post bénf IDA / 57080 net for the poor in selected rural Post Qualification Open - National 4,147.42 366.91 Signed 2018-01-17 2018-01-11 2018-01-17 2018-01-17 2018-01-12 2018-02-02 2018-01-15 2018-02-07 2018-01-15 2018-02-28 catastrophe dans le Fokontany areas Selection 5, Antananarivo Renivohitra DRT13CFAGEX1806 / Encadrement et paiement des Component 1: Building a safety Consultant é iciaires de l'ACT post bénf IDA / 57080 net for the poor in selected rural Post Qualification Open - National 4,147.42 366.91 Signed 2018-01-17 2018-01-11 2018-01-17 2018-01-17 2018-01-12 2018-02-02 2018-01-15 2018-02-07 2018-01-15 2018-02-28 catastrophe dans le Fokontany areas Selection 6, Antananarivo Renivohitra DRT13CFAGEX1807 / Encadrement et paiement des Component 1: Building a safety Consultant é iciaires de l'ACT post bénf IDA / 57080 net for the poor in selected rural Post Qualification Open - National 4,147.42 373.05 Signed 2018-01-17 2018-01-11 2018-01-17 2018-01-17 2018-01-12 2018-02-02 2018-01-15 2018-02-07 2018-01-15 2018-02-28 catastrophe dans le Fokontany areas Selection 7, Antananarivo Renivohitra DRT13CFAGEX1808 / Encadrement et paiement des Component 1: Building a safety Consultant é iciaires de l'ACT post bénf IDA / 57080 net for the poor in selected rural Post Qualification Open - National 4,147.42 367.51 Signed 2018-01-17 2018-01-11 2018-01-17 2018-01-17 2018-01-12 2018-02-02 2018-01-15 2018-02-07 2018-01-15 2018-02-28 catastrophe dans le Fokontany areas Selection 8, Antananarivo Renivohitra DRT13CFAGEX1809 / Encadrement et paiement des Component 1: Building a safety Consultant é iciaires de l'ACT post bénf IDA / 57080 net for the poor in selected rural Post Qualification Open - National 4,147.42 380.35 Signed 2018-01-17 2018-01-11 2018-01-17 2018-01-17 2018-01-12 2018-02-02 2018-01-15 2018-02-07 2018-01-15 2018-02-28 catastrophe dans le Fokontany areas Selection 9, Antananarivo Renivohitra DRT13CFAGEX1810 / Encadrement et paiement des Component 1: Building a safety Consultant é iciaires de l'ACT post bénf IDA / 57080 net for the poor in selected rural Post Qualification Open - National 4,147.42 380.35 Signed 2018-01-17 2018-01-11 2018-01-17 2018-01-17 2018-01-12 2018-02-02 2018-01-15 2018-02-07 2018-01-15 2018-02-28 catastrophe dans le Fokontany areas Selection 10, Antananarivo Renivohitra DRT13CFAGEX1811 / Encadrement et paiement des Component 1: Building a safety Consultant é iciaires de l'ACT post bénf IDA / 57080 net for the poor in selected rural Post Qualification Open - National 4,147.42 380.35 Signed 2018-01-17 2018-01-11 2018-01-17 2018-01-17 2018-01-12 2018-02-02 2018-01-15 2018-02-07 2018-01-15 2018-02-28 catastrophe dans le Fokontany areas Selection 1, Antananarivo Atsimondrano DRT13CFAGEX1812 / Encadrement et paiement des Component 1: Building a safety Consultant é iciaires de l'ACT post bénf IDA / 57080 net for the poor in selected rural Post Qualification Open - National 4,147.42 380.35 Signed 2018-01-17 2018-01-11 2018-01-17 2018-01-17 2018-01-12 2018-02-02 2018-01-15 2018-02-07 2018-01-15 2018-02-28 catastrophe dans le Fokontany areas Selection 2, Antananarivo Atsimondrano DRT13CFAGEX1813 / Encadrement et paiement des Component 1: Building a safety Consultant é iciaires de l'ACT post bénf IDA / 57080 net for the poor in selected rural Post Qualification Open - National 4,147.42 374.26 Signed 2018-01-17 2018-01-11 2018-01-17 2018-01-17 2018-01-12 2018-02-02 2018-01-15 2018-02-07 2018-01-15 2018-02-28 catastrophe dans le Fokontany areas Selection 3, Antananarivo Atsimondrano DRT13CFAGEX1814 / Encadrement et paiement des Component 1: Building a safety Consultant é iciaires de l'ACT post bénf IDA / 57080 net for the poor in selected rural Post Qualification Open - National 4,147.42 374.26 Signed 2018-01-17 2018-01-11 2018-01-17 2018-01-17 2018-01-12 2018-02-02 2018-01-15 2018-02-07 2018-01-15 2018-02-28 catastrophe dans le Fokontany areas Selection 4, Antananarivo Atsimondrano DRT13CFAGEX1815 / Encadrement et paiement des Component 1: Building a safety Consultant é iciaires de l'ACT post bénf IDA / 57080 net for the poor in selected rural Post Qualification Open - National 4,147.42 374.26 Signed 2018-01-17 2018-01-11 2018-01-17 2018-01-17 2018-01-12 2018-02-02 2018-01-15 2018-02-07 2018-01-15 2018-02-28 catastrophe dans le Fokontany areas Selection 5, Antananarivo Atsimondrano Page 5 DRT13CFAGEX1816 / Encadrement et paiement des Component 1: Building a safety Consultant é iciaires de l'ACT post bénf IDA / 57080 net for the poor in selected rural Post Qualification Open - National 4,147.42 374.26 Signed 2018-01-17 2018-01-11 2018-01-17 2018-01-17 2018-01-12 2018-02-02 2018-01-15 2018-02-07 2018-01-15 2018-02-28 catastrophe dans le Fokontany areas Selection 6, Antananarivo Atsimondrano DRT13CFAGEX1817 / Encadrement et paiement des Component 1: Building a safety Consultant é iciaires de l'ACT post bénf IDA / 57080 net for the poor in selected rural Post Qualification Open - National 4,147.42 372.74 Signed 2018-01-17 2018-01-11 2018-01-17 2018-01-17 2018-01-12 2018-02-02 2018-01-15 2018-02-07 2018-01-15 2018-02-28 catastrophe dans le Fokontany areas Selection 7, Antananarivo Atsimondrano DRT13CFAGEX1818 / Encadrement et paiement des Component 1: Building a safety Consultant é iciaires de l'ACT post bénf IDA / 57080 net for the poor in selected rural Post Qualification Open - National 4,147.42 372.74 Signed 2018-01-17 2018-01-11 2018-01-17 2018-01-17 2018-01-12 2018-02-02 2018-01-15 2018-02-07 2018-01-15 2018-02-28 catastrophe dans le Fokontany areas Selection 8, Antananarivo Atsimondrano DRT13CFAGEX1819 / Encadrement et paiement des Component 1: Building a safety Consultant é iciaires de l'ACT post bénf IDA / 57080 net for the poor in selected rural Post Qualification Open - National 4,147.42 372.74 Signed 2018-01-17 2018-01-11 2018-01-17 2018-01-17 2018-01-12 2018-02-02 2018-01-15 2018-02-07 2018-01-15 2018-02-28 catastrophe dans le Fokontany areas Selection 9, Antananarivo Atsimondrano DRT13CFAGEX1820 / Encadrement et paiement des Component 1: Building a safety Consultant é iciaires de l'ACT post bénf IDA / 57080 net for the poor in selected rural Post Qualification Open - National 4,147.42 372.90 Signed 2018-01-17 2018-01-11 2018-01-17 2018-01-17 2018-01-12 2018-02-02 2018-01-15 2018-02-07 2018-01-15 2018-02-28 catastrophe dans le Fokontany areas Selection 10, Antananarivo Atsimondrano DRT13CFAGEX1821 / Encadrement et paiement des Component 1: Building a safety Consultant é iciaires de l'ACT post bénf IDA / 57080 net for the poor in selected rural Post Qualification Open - National 4,147.42 402.86 Signed 2018-01-17 2018-01-11 2018-01-17 2018-01-17 2018-01-12 2018-02-02 2018-01-15 2018-02-07 2018-01-15 2018-02-28 catastrophe dans le Fokontany areas Selection 1, Andasibe DRT13CFAGEX1822 / Encadrement et paiement des Component 1: Building a safety Consultant é iciaires de l'ACT post bénf IDA / 57080 net for the poor in selected rural Post Qualification Open - National 4,147.42 402.86 Signed 2018-01-17 2018-01-11 2018-01-17 2018-01-17 2018-01-12 2018-02-02 2018-01-15 2018-02-07 2018-01-15 2018-02-28 catastrophe dans le Fokontany areas Selection 1, Moramanga DRT13CFAGEX1823 / Encadrement et paiement des Component 1: Building a safety Consultant é iciaires de l'ACT post bénf IDA / 57080 net for the poor in selected rural Post Qualification Open - National 4,147.42 402.86 Signed 2018-01-17 2018-01-11 2018-01-17 2018-01-17 2018-01-12 2018-02-02 2018-01-15 2018-02-07 2018-01-15 2018-02-28 catastrophe dans le Fokontany areas Selection 2, Moramanga DRK13CFAGEX18001 / Component 1: Building a safety Consultant ENCADREMENT - PAIEMENT Under IDA / 57080 net for the poor in selected rural Post Qualification Open - National 4,147.42 0.00 2018-01-19 2018-01-19 2018-01-19 2018-02-04 2018-02-09 2018-02-20 ACT Post catastrophe FKT1 - Implementation areas Selection MANAKARA DRK13CFAGEX18002 / Component 1: Building a safety Consultant ENCADREMENT - PAIEMENT Under IDA / 57080 net for the poor in selected rural Post Qualification Open - National 4,147.42 0.00 2018-01-19 2018-01-19 2018-01-19 2018-02-04 2018-02-09 2018-02-20 ACT Post catastrophe FKT2 - Implementation areas Selection MANAKARA DRK13CFAGEX18003 / Component 1: Building a safety Consultant ENCADREMENT - PAIEMENT Under IDA / 57080 net for the poor in selected rural Post Qualification Open - National 4,147.42 0.00 2018-01-19 2018-01-19 2018-01-19 2018-02-04 2018-02-09 2018-02-20 ACT Post catastrophe FKT3 - Implementation areas Selection VOHIPENO DRK13CFAGEX18004 / Component 1: Building a safety Consultant ENCADREMENT - PAIEMENT Under IDA / 57080 net for the poor in selected rural Post Qualification Open - National 4,147.42 0.00 2018-01-19 2018-01-19 2018-01-19 2018-02-04 2018-02-09 2018-02-20 ACT Post catastrophe FKT4 - Implementation areas Selection VOHIPENO DRK13CFAGEX18005 / Component 1: Building a safety Consultant ENCADREMENT - PAIEMENT Under IDA / 57080 net for the poor in selected rural Post Qualification Open - National 4,147.42 0.00 2018-01-19 2018-01-19 2018-01-19 2018-02-04 2018-02-09 2018-02-20 ACT Post catastrophe FKT5 - Implementation areas Selection MANANJARY DRK13CFAGEX18006 / Component 1: Building a safety Consultant ENCADREMENT - PAIEMENT Under IDA / 57080 net for the poor in selected rural Post Qualification Open - National 4,147.42 0.00 2018-01-19 2018-01-19 2018-01-19 2018-02-04 2018-02-09 2018-02-20 ACT Post catastrophe FKT6 - Implementation areas Selection MANANJARY Component 2: Strengthening Consultant DG20CFFEXC1801 / Formation safety net administration, Under IDA / 57080 Post Qualification Open - National 1,109.25 0.00 2018-02-01 2018-03-28 2018-02-06 2018-02-24 2018-02-27 2018-03-02 2018-03-17 en Excel avancé DRS monitoring and social Implementation Selection accountability Component 2: Strengthening Consultant DG20CFFEXC1802 / Formation safety net administration, Under IDA / 57080 Post Qualification Open - National 1,109.25 0.00 2018-02-01 2018-03-28 2018-02-06 2018-02-24 2018-02-27 2018-03-02 2018-03-17 en Excel avancé DRA monitoring and social Implementation Selection accountability Component 2: Strengthening Consultant DG20CFFEXC1803 / Formation safety net administration, Under IDA / 57080 Post Qualification Open - National 1,109.25 0.00 2018-02-01 2018-03-28 2018-02-06 2018-02-24 2018-02-27 2018-03-02 2018-03-03 en excel avancé DRT et DG monitoring and social Implementation Selection accountability Component 2: Strengthening Consultant DG20CFFEXC1804 / Formation safety net administration, Under IDA / 57080 Post Qualification Open - National 1,109.25 0.00 2018-02-01 2018-03-28 2018-02-06 2018-02-24 2018-02-27 2018-03-02 2018-03-17 en excel avancé DRF monitoring and social Implementation Selection accountability Component 2: Strengthening Consultant DG20CFFEXC1805 / Formation safety net administration, Under IDA / 57080 Post Qualification Open - National 1,109.25 0.00 2018-02-01 2018-03-28 2018-02-06 2018-02-24 2018-02-27 2018-03-02 2018-03-17 en excel avancé DRK monitoring and social Implementation Selection accountability Component 2: Strengthening Consultant DG20CFFEXC1806 / Formation safety net administration, Under IDA / 57080 Post Qualification Open - National 1,109.25 0.00 2018-02-01 2018-03-28 2018-02-06 2018-02-24 2018-02-27 2018-03-02 2018-03-17 en excel avancé DRU monitoring and social Implementation Selection accountability Component 2: Strengthening Consultant DG20CFFEXC1807 / Formation safety net administration, Under IDA / 57080 Post Qualification Open - National 1,109.25 0.00 2018-02-01 2018-03-28 2018-02-06 2018-02-24 2018-02-27 2018-03-02 2018-03-17 en excel avancé DRP monitoring and social Implementation Selection accountability Component 2: Strengthening DG20CFFPORT1809 / Consultant safety net administration, Under Formation en gestion de IDA / 57080 Post Qualification Open - National 9,317.73 0.00 2018-02-07 2018-03-28 2018-02-12 2018-03-06 2018-03-09 2018-03-14 2018-04-13 monitoring and social Implementation portefeuille d'activitées Selection accountability DG20CFRECDG1811 / Component 2: Strengthening CABINET EN CHARGE DU safety net administration, Quality And Cost- Under IDA / 57080 Post Open - National 2,580.65 0.00 2018-01-30 2017-09-19 2018-01-30 2018-01-30 2017-12-08 2018-01-30 2018-01-09 2018-02-01 2018-03-14 2018-02-16 2018-03-02 2018-04-01 RECRUTEMENT D'UN monitoring and social Based Selection Implementation DIRECTEUR GENERAL accountability DRT13CFAGEX1824 / Encadrement et paiement des Component 1: Building a safety Consultant é iciaires de l'ACT post cata bénf IDA / 57080 net for the poor in selected rural Post Qualification Open - National 4,147.42 364.53 Signed 2018-02-27 2018-02-23 2018-02-27 2018-02-28 2018-02-26 2018-03-03 2018-03-02 2018-03-10 2018-03-02 2018-03-31 dans le Fokontany 1 à areas Selection Antananarivo Atsimondrano DRT13CFAGEX1825 / Encadrement et paiement des Component 1: Building a safety Consultant é iciaires de l'ACT post cata bénf IDA / 57080 net for the poor in selected rural Post Qualification Open - National 4,147.42 364.53 Signed 2018-02-27 2018-02-23 2018-02-27 2018-02-28 2018-02-26 2018-03-03 2018-03-02 2018-03-10 2018-03-02 2018-03-31 dans le Fokontany 2 à areas Selection Antananarivo Atsimondrano DRF13PCAGEX18003 / Component 1: Building a safety Consultant ENCADREMENT - PAIEMENT IDA / 57080 net for the poor in selected rural Post Qualification Open - National 4,147.42 3,987.72 Completed 2018-02-28 2018-02-22 2018-02-28 2018-03-01 2018-02-27 2018-03-04 2018-02-27 2018-03-10 2018-02-28 2018-03-31 2018-03-23 ACT Post Catastrophe FKT 8 areas Selection AMBALAVAO DRF13PCAGEX18004 / Component 1: Building a safety Consultant ENCADREMENT -PAIEMENT IDA / 57080 net for the poor in selected rural Post Qualification Open - National 4,147.42 0.00 Canceled 2018-02-28 2018-02-28 2018-03-01 2018-03-04 2018-03-10 2018-03-31 ACT Post Catastrophe FKT 9 areas Selection Ambalavao DG13CFAGEX1801 / Component 1: Building a safety Consultant ENCADREMENT PAIEMENT IDA / 57080 net for the poor in selected rural Post Qualification Open - National 12,442.26 1,149.03 Signed 2018-03-01 2018-02-23 2018-03-02 2018-03-07 2018-03-28 2018-03-08 2018-03-05 2018-03-10 2018-03-08 2018-09-06 ACT POST CATASTROPHE 3 areas Selection COMMUNES MAHAJANGA Page 6 DRK11CFSECCS1701 / Suivi- Evaluation Communautaire,Mis à jour PAMO, côntrole et suivi UTB VATANA-MITANTY OUEST- VOHIBOATAVO-AMBALAROKA- Component 1: Building a safety Quality And Cost- Under AMBOHITROVA-MAROFARIHY- IDA / 57080 net for the poor in selected rural Post Open - National 34,193.54 0.00 2017-08-21 2017-08-22 2017-09-10 2017-10-08 2017-10-12 2017-10-19 2017-10-29 2020-04-16 Based Selection Implementation MIZILO GARA-FENOARIVO- areas VOHILAVA-AMBOHIMANARIVO MANGAIKA-SAHANABOHITRA- AMBORONDRA-ONILAHY FENOMBY-BENIHAONANA DRK13CFAGEX18007 / Component 1: Building a safety Consultant ENCADREMENT - PAIEMENT Under IDA / 57080 net for the poor in selected rural Post Qualification Open - National 4,147.42 0.00 2018-03-01 2018-03-01 2018-03-01 2018-03-17 2018-03-22 2018-04-02 ACT Post Catastrophe FKT6 - Implementation areas Selection Farafangana DRK13CFAGEX18008 / Component 1: Building a safety Consultant ENCADREMENT - PAIEMENT Under IDA / 57080 net for the poor in selected rural Post Qualification Open - National 4,147.42 0.00 2018-03-01 2018-03-01 2018-03-01 2018-03-17 2018-03-22 2018-04-02 ACT Post catastrophe FKT7 - Implementation areas Selection Farafangana DRK13CFAGEX18009 / Component 1: Building a safety Consultant ENCADREMENT - PAIEMENT Under IDA / 57080 net for the poor in selected rural Post Qualification Open - National 4,147.42 0.00 2018-03-01 2018-03-01 2018-03-01 2018-03-17 2018-03-22 2018-04-02 ACT Post catastrophe FKT8 - Implementation areas Selection Vangaindrano DRK13CFAGEX18010 / Component 1: Building a safety Consultant ENCADREMENT - PAIEMENT Under IDA / 57080 net for the poor in selected rural Post Qualification Open - National 4,147.42 0.00 2018-03-01 2018-03-01 2018-03-01 2018-03-17 2018-03-22 2018-04-02 ACT Post catastrophe FKT9 - Implementation areas Selection Vangaindrano DRA11CFAGEC18001 / REPRISE ENCADREMENT Component 1: Building a safety Quality And Cost- ACTP UTB TANAMBAO IDA / 57080 net for the poor in selected rural Post Open - National 16,569.33 8,508.26 Signed 2018-03-04 2018-03-02 2018-03-04 2018-03-05 2018-03-06 2018-04-02 2018-03-28 2018-04-03 2018-03-28 2018-04-08 2018-04-10 2018-04-14 2018-05-07 2019-06-30 Based Selection VAHATRAKAKA- LOT 7 - areas DISTRICT VATOMANDRY DRA11CFAGEC18002 / REPRISE ENCADREMENT Component 1: Building a safety Quality And Cost- ACTP UTB SAHAMATEVINA - IDA / 57080 net for the poor in selected rural Post Open - National 17,442.67 10,451.31 Signed 2018-03-04 2018-03-02 2018-03-04 2018-03-05 2018-03-06 2018-04-02 2018-03-28 2018-04-03 2018-03-28 2018-04-08 2018-04-10 2018-04-14 2018-05-07 2019-06-30 Based Selection LOT 3 - DISTRICT areas VATOMANDRY DRA11CFAGEC18003 / REPRISE ENCADREMENT Component 1: Building a safety Quality And Cost- ACTP UTB AMPANALANA - IDA / 57080 net for the poor in selected rural Post Open - National 28,899.30 14,286.57 Signed 2018-03-04 2018-03-02 2018-03-04 2018-03-05 2018-03-06 2018-04-02 2018-03-28 2018-04-03 2018-03-28 2018-04-08 2018-04-10 2018-04-15 2018-05-07 2019-06-30 Based Selection UTB AMBALAVOLO - LOT 4 - areas DISTRICT VATOMANDRY DG13CFAGEX1802 / Component 1: Building a safety Consultant ENCADREMENT PAIEMENT IDA / 57080 net for the poor in selected rural Post Qualification Open - National 4,147.42 0.00 Canceled 2018-03-15 2018-03-16 2018-03-21 2018-03-22 2018-03-24 2018-04-23 ACT POST CATASTROPHE areas Selection ANKATAFAHELY CU AMBANJA DG13CFAGEX1803 / Component 1: Building a safety Consultant ENCADREMENT PAIEMENT IDA / 57080 net for the poor in selected rural Post Qualification Open - National 4,147.42 0.00 Canceled 2018-03-15 2018-03-16 2018-03-21 2018-03-22 2018-03-24 2018-04-23 ACT POST CATA TANAMBAO V areas Selection CU AMBANJA DG13CFAGEX1804 / Component 1: Building a safety Consultant ENCADREMENT PAIEMENT IDA / 57080 net for the poor in selected rural Post Qualification Open - National 4,147.42 1,532.04 Signed 2018-03-15 2018-03-16 2018-03-16 2018-03-21 2018-03-20 2018-03-22 2018-03-20 2018-03-24 2018-03-20 2018-04-23 ACT POST CATA BEGAVO I CU areas Selection AMBANJA DG13CFAGEX1805 / Component 1: Building a safety Consultant ENCADREMENT PAIEMENT IDA / 57080 net for the poor in selected rural Post Qualification Open - National 4,147.42 0.00 Canceled 2018-03-15 2018-03-16 2018-03-21 2018-03-22 2018-03-24 2018-04-23 ACT POST CATA BEGAVO II areas Selection CU AMBANJA DRP81CFAGEE18001 / Component 1: Building a safety Consultant ENCADREMENT REPRISE Pending IDA / D1450 net for the poor in selected rural Post Qualification Open - National 43,932.00 0.00 2018-04-25 2018-04-25 2018-04-25 2018-05-02 2018-05-03 2019-12-31 AGEE TMNC TRANOVAHO Implementation areas Selection BELOHA DRU11CFAGSEN18001 / ACT-P Component 1: Building a safety Consultant Agence de Sensibilisation des IDA / 57080 net for the poor in selected rural Post Qualification Open - National 9,600.00 0.00 Canceled 2018-04-28 2018-05-01 2018-06-03 2018-07-06 2018-07-19 2019-12-31 UTB dans le district d'Ankazoabo areas Selection ARA13CFMO17001 / Maîtrise Component 1: Building a safety d'Suvre CEG BELAOKA Pending IDA / 57080 net for the poor in selected rural Post Least Cost Selection Open - National 2,593.10 0.00 2017-05-24 2017-05-24 2017-05-25 2017-06-09 2017-06-10 2017-06-14 2017-06-23 2018-09-23 LOKOHO - CR BELAOKA Implementation areas LOKOHO - ANDAPA ARA13CFMO17002 / maîtrise Component 1: Building a safety d'Suvre travaux EPP Pending IDA / 57080 net for the poor in selected rural Post Least Cost Selection Open - National 2,593.10 0.00 2017-05-24 2017-05-24 2017-05-25 2017-06-09 2017-06-10 2017-06-14 2017-06-23 2018-09-23 SARAHANDRANO - CR Implementation areas AMBODIAMPANA - SAMBAVA ARA13CFMO17003 / maîtrise Component 1: Building a safety d'Suvre EPP Pending IDA / 57080 net for the poor in selected rural Post Least Cost Selection Open - National 2,593.10 0.00 2017-05-24 2017-05-24 2017-05-25 2017-06-09 2017-06-10 2017-06-14 2017-06-23 2018-09-23 MAHITSIARONGANA - CR Implementation areas AMBODIVOARA - SAMBAVA ARA13CFMO17004 / maîtrise Component 1: Building a safety Pending d'Suvre EPP ANKORABE - CR IDA / 57080 net for the poor in selected rural Post Least Cost Selection Open - National 2,593.10 0.00 2017-05-24 2017-05-24 2017-05-25 2017-06-09 2017-06-10 2017-06-14 2017-06-23 2018-09-23 Implementation AMBOHIMALAZA - SAMBAVA areas ARA13CFMO17005 / maîtrise Component 1: Building a safety d'Suvre EPP AMPAMPAMENA I Pending IDA / 57080 net for the poor in selected rural Post Least Cost Selection Open - National 2,593.10 0.00 2017-05-24 2017-05-24 2017-05-25 2017-06-09 2017-06-10 2017-06-14 2017-06-23 2018-09-23 - CR ANDRATAMARINA - Implementation areas SAMBAVA ARA13CFMO17006 / maîtrise d'Suvre ECOLE Component 1: Building a safety Pending COMMUNAUTAIRE IDA / 57080 net for the poor in selected rural Post Least Cost Selection Open - National 2,593.10 0.00 2017-05-24 2017-05-24 2017-05-25 2017-06-09 2017-06-10 2017-06-14 2017-06-23 2018-09-23 Implementation ANDALAMAHITSY - CR areas ANTSIRABE NORD - VOHEMAR ARA13CFMO17007 / maîtrise d'Suvre ECOLE Component 1: Building a safety Pending COMMUNAUTAIRE IDA / 57080 net for the poor in selected rural Post Least Cost Selection Open - National 2,593.10 0.00 2017-05-24 2017-05-24 2017-05-25 2017-06-09 2017-06-10 2017-06-14 2017-06-23 2018-09-23 Implementation NOSIMBARY - CR areas TSARABARIA - VOHEMAR ARA13CFMO17008 / maîtrise Component 1: Building a safety Pending d'Suvre EPP SAHAMAZAVA - IDA / 57080 net for the poor in selected rural Post Least Cost Selection Open - National 3,806.90 0.00 2017-05-24 2017-05-24 2017-05-25 2017-06-09 2017-06-10 2017-06-14 2017-06-23 2018-09-23 Implementation CU ANDAPA - ANDAPA areas ARA13CFMO17009 / maîtrise Component 1: Building a safety Pending d'Suvre CEG AMPAHANA - CR IDA / 57080 net for the poor in selected rural Post Least Cost Selection Open - National 3,806.90 0.00 2017-05-24 2017-05-24 2017-05-25 2017-06-09 2017-06-10 2017-06-14 2017-06-23 2018-09-23 Implementation AMPAHANA - ANTALAHA areas ARA13CFMO17010 / maîtrise Component 1: Building a safety Pending d'Suvre CEG MAHERIFODY - IDA / 57080 net for the poor in selected rural Post Least Cost Selection Open - National 4,146.55 0.00 2017-05-24 2017-05-24 2017-05-25 2017-06-09 2017-06-10 2017-06-14 2017-06-23 2018-09-23 Implementation CU ANTALAHA - ANTALAHA areas ARA13CFMO17011 / maîtrise Component 1: Building a safety Pending d'Suvre EPP AMBATOFISAKA - IDA / 57080 net for the poor in selected rural Post Least Cost Selection Open - National 4,064.48 0.00 2017-05-24 2017-05-24 2017-05-25 2017-06-09 2017-06-10 2017-06-14 2017-06-23 2018-09-23 Implementation CU ANTALAHA - ANTALAHA areas ARA13CFMO17012 / maîtrise Component 1: Building a safety d'Suvre CSB AMBINANIFAHO - Pending IDA / 57080 net for the poor in selected rural Post Least Cost Selection Open - National 3,791.38 0.00 2017-05-24 2017-05-24 2017-05-25 2017-06-09 2017-06-10 2017-06-14 2017-06-23 2018-09-23 CR AMBINANIFAHO - Implementation areas ANTALAHA DRK11CFAGSEN18001 / ACTP Component 1: Building a safety Quality And Cost- Agence de sensibilisation district IDA / 57080 net for the poor in selected rural Post Open - National 26,758.24 0.00 Canceled 2018-04-30 2018-04-30 2018-05-21 2018-06-05 2018-06-08 2018-07-14 2018-07-27 2020-01-23 Based Selection Manakara areas DRK11CFAGEC18001 / COLLECTE DE DONNEES ET Component 1: Building a safety Quality And Cost- Pending ENCADREMENT UTB IDA / 57080 net for the poor in selected rural Post Open - National 57,096.77 0.00 2018-06-05 2018-06-06 2018-06-25 2018-07-16 2018-07-20 2018-07-24 2018-07-29 2019-01-05 Based Selection Implementation AMBOHIMANARIVO MANGAIKA- areas UTB VATANA - UTB VOHILAVA DRK13CFMO18001 / MAÎTRISE Component 1: Building a safety D' OEUVRE TRAVAUX DE Pending IDA / 57080 net for the poor in selected rural Post Least Cost Selection Open - National 4,843.75 0.00 2018-06-05 2018-06-05 2018-06-15 2018-06-30 2018-07-01 2018-07-04 2018-07-11 2018-12-08 RÉHABILITATION D' UN ECOLE Implementation areas A VOHIPENO DRF13CFMO18001 / MAITRISE D'OEUVRE POUR LA Component 1: Building a safety Quality And Cost- Pending RECONSTRUCTION DES IDA / 57080 net for the poor in selected rural Post Open - National 4,750.00 0.00 2018-06-06 2018-06-11 2018-06-27 2018-07-12 2018-07-13 2018-07-23 2018-07-30 2018-11-27 Based Selection Implementation ECOLES DISTRICT areas AMBOHIMAHASOA Page 7 DRT13CFMO18001 / Maîtrise d'Suvre des travaux de Component 1: Building a safety Consultant Pending réhabilitation/reconstruction d'une IDA / 57080 net for the poor in selected rural Post Qualification Open - National 2,580.65 0.00 2018-06-12 2018-06-12 2018-06-18 2018-06-29 2018-07-05 2019-12-13 Implementation é ole dans le District c areas Selection d'Arivonimamo DRT13CFMO18002 / Maîtrise d'Suvre des travaux de Component 1: Building a safety Consultant Pending réhabilitation/reconstruction d'une IDA / 57080 net for the poor in selected rural Post Qualification Open - National 2,580.65 0.00 2018-06-12 2018-06-12 2018-06-18 2018-06-29 2018-07-05 2019-12-13 Implementation é ole dans le District de c areas Selection Faratsiho Component 2: Strengthening DG20CFFORMGRH1814 / Consultant safety net administration, Pending FORMATION EN GESTION DES IDA / 57080 Post Qualification Open - National 745.00 0.00 2018-06-10 2018-06-13 2018-07-07 2018-07-22 2018-07-29 2018-08-28 monitoring and social Implementation RESSOURCES HUMAINES Selection accountability Component 2: Strengthening DG20CFFORMFINPUB1815 / Consultant safety net administration, Pending FORMATION EN FINANCE IDA / 57080 Post Qualification Open - National 745.00 0.00 2018-06-10 2018-06-13 2018-07-07 2018-07-22 2018-07-29 2018-08-28 monitoring and social Implementation PUBLIQUE Selection accountability DG11CFENQML1818 / Component 1: Building a safety Consultant Pending ENQUETE EMPLOI DU TEMPS IDA / 57080 net for the poor in selected rural Post Qualification Open - National 10,000.00 0.00 2018-06-11 2018-06-14 2018-06-27 2018-07-07 2018-07-12 2018-08-11 Implementation DES MERES LEADERS areas Selection INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Contract Type Estimated Actual Amount Draft Negotiated Description Loan / Credit No. Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual DRU12CICMP17001 / Component 1: Building a safety Individual Consultant Pending Complémentation enregistrement IDA / 57080 net for the poor in selected rural Post Limited 754.72 0.00 2017-04-11 2017-05-03 2017-05-09 2017-05-15 2017-06-29 Selection Implementation é iciaires TMDH Betioky CI1 bénf areas DRF12CICMP17001 / COMPLEMENTATION Component 1: Building a safety Individual Consultant ENREGISTREMENT IDA / 57080 net for the poor in selected rural Post Limited 968.56 576.99 Completed 2017-04-11 2017-05-02 2017-05-03 2017-05-31 2017-05-09 2017-06-23 2017-05-15 2017-07-04 2017-06-29 2017-11-30 Selection BENEFICIAIRES TMDH areas AMBOHIMAHASOA DRT12CICMP17001 / Component 1: Building a safety Complémentation enregistrement Individual Consultant IDA / 57080 net for the poor in selected rural Post Limited 782.16 787.85 Signed 2017-04-11 2017-04-10 2017-05-03 2017-05-09 2017-06-12 2017-05-15 2017-06-12 2017-06-29 é iciaires TMDH du District de bénf Selection areas Faratsiho DRA12CICMP17001 / Component 1: Building a safety Complémentation enregistrement Individual Consultant IDA / 57080 net for the poor in selected rural Post Limited 645.76 576.60 Completed 2017-04-11 2017-04-11 2017-05-03 2017-04-28 2017-05-09 2017-05-23 2017-05-15 2017-06-07 2017-06-29 2017-09-14 béneficiaire TMDH TOAMASINAII Selection areas et MAHANORO DRK12CICMP17001 / Component 1: Building a safety COMPLEMENT Individual Consultant Under IDA / 57080 net for the poor in selected rural Post Limited 1,016.04 0.00 2017-04-11 2017-05-03 2017-05-09 2017-05-15 2017-06-29 ENREGISTREMENT TMDH Selection Implementation areas VOHIPENO DRA12CICMP17002 / Component 1: Building a safety complémentation enregistrement Individual Consultant IDA / 57080 net for the poor in selected rural Post Limited 645.76 610.62 Completed 2017-04-11 2017-04-10 2017-05-03 2017-04-28 2017-05-09 2017-05-23 2017-05-15 2017-06-07 2017-06-29 2017-09-14 béneficiaires TMDH TOAMASINA Selection areas II et MAHANORO DRF12CICMP17002 / COMPLEMENTATION Component 1: Building a safety Individual Consultant ENREGISTREMENT IDA / 57080 net for the poor in selected rural Post Limited 968.56 467.35 Completed 2017-04-11 2017-05-02 2017-05-03 2017-07-01 2017-05-09 2017-07-03 2017-05-15 2017-07-04 2017-06-29 2017-11-30 Selection BENEFICIAIRES TMDH areas AMBOHIMAHASOA DRT12CICMP17002 / Component 1: Building a safety Complémentation enregistrement Individual Consultant IDA / 57080 net for the poor in selected rural Post Limited 782.16 748.17 Signed 2017-04-11 2017-04-10 2017-05-03 2017-05-09 2017-06-12 2017-05-15 2017-06-12 2017-06-29 é iciaires TMDH du District de bénf Selection areas Faratsiho DRF12CICMP17003 / COMPLEMENTATION Component 1: Building a safety Individual Consultant ENREGISTREMENT IDA / 57080 net for the poor in selected rural Post Limited 968.56 464.25 Completed 2017-04-11 2017-05-02 2017-05-03 2017-05-31 2017-05-09 2017-06-23 2017-05-15 2017-07-04 2017-06-29 2017-11-26 Selection BENEFICIAIRES TMDH areas AMBOHIMAHASOA DRK12CICMP17002 / Component 1: Building a safety COMPLEMENTATION Individual Consultant Under IDA / 57080 net for the poor in selected rural Post Limited 1,016.04 0.00 2017-04-11 2017-05-03 2017-05-09 2017-05-15 2017-06-29 ENREGISTREMENT TMDH Selection Implementation areas VOHIPENO Component 3: Building the MG-MPPSPF-10539-CS-CDS / institutional capacity for Under C/723/MP33 Appui ciblage IDA / 57080 coordination, monitoring and Prior Direct Selection Direct 16,000.00 0.00 2016-09-16 2016-11-23 2016-11-16 2016-12-23 2017-01-26 Implementation communautaire evaluation of the social protection syst em DRA12CICMP17003 / Component 1: Building a safety complémentation enregistrement Individual Consultant IDA / 57080 net for the poor in selected rural Post Limited 645.76 583.03 Completed 2017-04-11 2017-04-10 2017-05-03 2017-04-28 2017-05-09 2017-05-23 2017-05-15 2017-06-07 2017-06-29 2017-09-14 béneficiaires TMDH Toamasina II Selection areas et Mahanoro DRA12CICMP17004 / Component 1: Building a safety Complémentation enregistrement Individual Consultant IDA / 57080 net for the poor in selected rural Post Limited 645.76 733.54 Completed 2017-04-11 2017-04-10 2017-05-03 2017-04-28 2017-05-09 2017-05-23 2017-05-15 2017-06-07 2017-06-29 2017-09-14 béneficiaire TMDH ToamasinaII et Selection areas Mahanoro DRU12CICMP17002 / Component 1: Building a safety Individual Consultant Pending Complémentation enregistrement IDA / 57080 net for the poor in selected rural Post Limited 754.72 0.00 2017-04-11 2017-05-03 2017-05-09 2017-05-15 2017-06-29 Selection Implementation é iciaires TMDH Betioky CI2 bénf areas DRA12CICMP17005 / Component 1: Building a safety Complémentation enregistrement Individual Consultant IDA / 57080 net for the poor in selected rural Post Limited 645.76 648.44 Completed 2017-04-11 2017-04-10 2017-05-03 2017-04-28 2017-05-09 2017-05-23 2017-05-15 2017-06-07 2017-06-29 2017-09-14 béneficiaires TMDH ToamasinaII Selection areas et Mahanoto DRU12CICMP17004 / Component 1: Building a safety Individual Consultant Pending Complémentation enregistrement IDA / 57080 net for the poor in selected rural Post Limited 754.72 0.00 2017-04-11 2017-05-03 2017-05-09 2017-05-15 2017-06-29 Selection Implementation é iciaires TMDH Betioky CI4 bénf areas DRA12CICMP17006 / Component 1: Building a safety Complémentation enregistrement Individual Consultant IDA / 57080 net for the poor in selected rural Post Limited 645.76 644.57 Completed 2017-04-11 2017-04-10 2017-05-03 2017-04-28 2017-05-09 2017-05-23 2017-05-15 2017-06-07 2017-06-29 2017-09-14 béneficiaire TMDH Toamasina II Selection areas et Mahanoro DRU12CICMP17005 / Component 1: Building a safety Individual Consultant Pending Complémentation enregistrement IDA / 57080 net for the poor in selected rural Post Limited 754.72 0.00 2017-04-11 2017-05-03 2017-05-09 2017-05-15 2017-06-29 Selection Implementation é iciaires TMDH Betioky CI5 bénf areas DRA12CICMP17007 / Component 1: Building a safety Complémentation enregistrement Individual Consultant IDA / 57080 net for the poor in selected rural Post Limited 645.76 666.63 Completed 2017-04-11 2017-04-10 2017-05-03 2017-04-28 2017-05-09 2017-05-23 2017-05-15 2017-06-07 2017-06-29 2017-09-14 é iciaire TMDH Toamasina II bénf Selection areas et Mahanoro DRU12CICMP17003 / Component 1: Building a safety Individual Consultant Pending Complémentation enregistrement IDA / 57080 net for the poor in selected rural Post Limited 754.12 0.00 2017-04-11 2017-05-03 2017-05-09 2017-05-15 2017-06-29 Selection Implementation é iciaires TMDH Betioky CI3 bénf areas DRA12CICMP17008 / Component 1: Building a safety Complémentation enregistrement Individual Consultant IDA / 57080 net for the poor in selected rural Post Limited 645.76 661.09 Completed 2017-04-11 2017-04-10 2017-05-03 2017-04-28 2017-05-09 2017-05-23 2017-05-15 2017-06-07 2017-06-29 2017-09-14 é iciaire TMDH Toamasina II bénf Selection areas et Mahanoro DRA12CICMP17009 / Component 1: Building a safety Complémentation enregistrement Individual Consultant IDA / 57080 net for the poor in selected rural Post Limited 645.76 642.20 Completed 2017-04-11 2017-04-10 2017-05-03 2017-04-28 2017-05-09 2017-05-23 2017-05-15 2017-06-07 2017-06-29 2017-09-14 é iciaire TMDH Toamasina II bénf Selection areas et Mahanoro DRA12CICMP17010 / Component 1: Building a safety Complémentation enregistrement Individual Consultant IDA / 57080 net for the poor in selected rural Post Limited 645.76 673.07 Completed 2017-04-11 2017-04-10 2017-05-03 2017-04-27 2017-05-09 2017-05-23 2017-05-15 2017-06-07 2017-06-29 2017-09-14 é iciaire TMDH Toamasina II bénf Selection areas et Mahanoro DRA12CICMP17011 / Component 1: Building a safety Complémentation enregistrement Individual Consultant IDA / 57080 net for the poor in selected rural Post Limited 645.76 514.63 Completed 2017-04-11 2017-04-10 2017-05-03 2017-04-28 2017-05-09 2017-05-23 2017-05-15 2017-06-07 2017-06-29 2017-09-14 é iciaire TMDH Toamasina II bénf Selection areas et Mahanoro DRA12CICMP17012 / Component 1: Building a safety Complémentation enregistrement Individual Consultant IDA / 57080 net for the poor in selected rural Post Limited 645.76 597.96 Completed 2017-04-11 2017-04-10 2017-05-03 2017-04-27 2017-05-09 2017-05-23 2017-05-15 2017-06-07 2017-06-29 2017-09-14 é iciaire TMDH Toamasina II bénf Selection areas et Mahanoro Page 8 DRK12CICMP17003 / Component 1: Building a safety COMPLEMENTATION DES Individual Consultant Under IDA / 57080 net for the poor in selected rural Post Limited 1,016.04 0.00 2017-04-11 2017-05-03 2017-05-09 2017-05-15 2017-06-29 BENEFICIAIRES TMDH Selection Implementation areas VOHIPENO DRK12CICMP17004 / Component 1: Building a safety COMPLEMENTATION Individual Consultant Under IDA / 57080 net for the poor in selected rural Post Limited 1,016.04 0.00 2017-04-11 2017-05-03 2017-05-09 2017-05-15 2017-06-29 ENREGISTREMENT TMDH Selection Implementation areas VOHIPENO DRT12CICMP17003 / Component 1: Building a safety Complémentation enregistrement Individual Consultant IDA / 57080 net for the poor in selected rural Post Limited 782.16 762.67 Signed 2017-04-11 2017-04-10 2017-05-03 2017-05-09 2017-06-12 2017-05-15 2017-06-12 2017-06-29 é iciaires TMDH du District de bénf Selection areas Faratsiho DRT12CICMP17004 / Component 1: Building a safety Complémentation enregistrement Individual Consultant IDA / 57080 net for the poor in selected rural Post Limited 782.16 773.52 Signed 2017-04-11 2017-04-10 2017-05-03 2017-05-09 2017-06-12 2017-05-15 2017-06-12 2017-06-29 é iciaires TMDH du District de bénf Selection areas Faratsiho DRT12CICMP17005 / Component 1: Building a safety Complémentation enregistrement Individual Consultant IDA / 57080 net for the poor in selected rural Post Limited 782.16 751.44 Signed 2017-04-11 2017-04-10 2017-05-03 2017-05-09 2017-06-12 2017-05-15 2017-06-12 2017-06-29 é iciaires TMDH du District de bénf Selection areas Faratsiho MG-UPNNC-11703-CS-CDS / Component 3: Building the Appui des Associations/ONG institutional capacity for partenaires dans le Secteur IDA / D1450 coordination, monitoring and Prior Direct Selection Direct 750,000.00 0.00 Under Review 2017-04-12 2017-04-22 2017-06-26 2019-06-16 Nutrition et Santé dans les zones evaluation of the social d'intervention du Projet protection syst em MG-UPNNC-11931-CS-INDV / Component 3: Building the Consultant individuel chargé de institutional capacity for Individual Consultant l'élaboration et de la mise à jour IDA / D1450 coordination, monitoring and Post Limited 5,000.00 3,797.52 Signed 2017-04-07 2017-06-30 2017-04-12 2017-05-17 2017-04-26 2017-07-01 2017-05-17 2017-07-01 2017-06-06 Selection du Manuel des Opérations evaluation of the social (MANOP) protection syst em DRF12CISAI17001 / SAISIE SUR BASE DE DONNÉES LES Component 1: Building a safety Individual Consultant INFORMATIONS SUR LES IDA / 57080 net for the poor in selected rural Post Limited 218.75 1,366.22 Completed 2017-04-18 2017-05-09 2017-04-20 2017-06-15 2017-05-18 2017-06-16 2017-05-24 2017-06-21 2017-12-31 2018-01-16 Selection MÉNAGES BENEFICIAIRES EN areas TMDH DRF12CISAI17002 / SAISIE DANS LA BASE DE DONNÉES Component 1: Building a safety Individual Consultant LES INFORMATIONS IDA / 57080 net for the poor in selected rural Post Limited 218.75 1,365.16 Signed 2017-04-18 2017-05-15 2017-04-20 2017-05-30 2017-05-18 2017-06-16 2017-05-24 2017-06-21 2017-12-31 Selection CONCERNANT LES MÉNAGES areas É ICIAIRES BÉNF TMDH DRF12CISAI17003 / SAISIE DANS LA BASE DE DONNÉES Component 1: Building a safety Individual Consultant LES INFORMATIONS IDA / 57080 net for the poor in selected rural Post Limited 218.75 1,370.21 Completed 2017-04-18 2017-05-09 2017-04-20 2017-06-15 2017-05-18 2017-06-16 2017-05-24 2017-06-21 2017-12-31 2018-01-16 Selection CONCERNANT LES MÉNAGES areas É ICIAIRES BÉNF TMDH DRF11CISAI17001 / SAISIE DANS LA BASE DE DONNÉES Component 1: Building a safety Individual Consultant LES INFORMATIONS IDA / 57080 net for the poor in selected rural Post Limited 218.75 1,353.05 Signed 2017-04-18 2017-05-15 2017-04-20 2017-05-30 2017-05-18 2017-06-16 2017-05-24 2017-06-21 2017-12-31 Selection CONCERNANT LES MÉNAGES areas É ICIAIRES BÉNF ACTP DRF11CISAI17002 / SAISIE DANS LA BASE DE DONNÉES Component 1: Building a safety Individual Consultant LES INFORMATIONS IDA / 57080 net for the poor in selected rural Post Limited 218.75 3,089.48 Signed 2017-04-18 2017-05-09 2017-04-20 2017-05-30 2017-05-18 2017-06-16 2017-05-24 2017-06-21 2017-12-31 Selection CONCERNANT LES MÉNAGES areas É ICIAIRES BÉNF ACTP DRF11CISAI17003 / SAISIE DANS LA BASE DE DONNÉES Component 1: Building a safety Individual Consultant LES INFORMATIONS IDA / 57080 net for the poor in selected rural Post Limited 218.75 1,366.85 Signed 2017-04-18 2017-05-09 2017-04-20 2017-06-15 2017-05-18 2017-06-16 2017-05-24 2017-06-21 2017-12-31 Selection CONCERNANT LES MÉNAGES areas É ICIAIRES BÉNF ACTP DRK12CISAI17001 / SAISIE DANS LA BASE DE DONNÉES Component 1: Building a safety LES INFORMATIONS Individual Consultant Under IDA / 57080 net for the poor in selected rural Post Limited 2,250.00 0.00 2017-04-25 2017-05-17 2017-05-27 2017-06-05 2017-12-31 CONCERNANT LES MÉNAGES Selection Implementation areas É ICIAIRES BÉNF TMDH VOHIPENO DIRK12CISAI17002 / SAISIE DANS LA BASE DE DONNÉES Component 1: Building a safety LES INFORMATIONS Individual Consultant Under IDA / 57080 net for the poor in selected rural Post Limited 2,250.00 0.00 2017-04-25 2017-05-17 2017-05-27 2017-06-05 2017-06-25 CONCERNANT LES MÉNAGES Selection Implementation areas É ICIAIRES BÉNF TMDH VOHIPENO DIRK11CISAI17001 / SAISIE DANS LA BASE DE DONNÉES Component 1: Building a safety LES INFORMATIONS Individual Consultant Under IDA / 57080 net for the poor in selected rural Post Limited 2,250.00 0.00 2017-04-25 2017-05-17 2017-05-27 2017-06-05 2017-12-31 CONCERNANT LES MÉNAGES Selection Implementation areas É ICIAIRES BÉNF ACTP MANAKARA DIRK11CISAI17002 / SAISIE DANS LA BASE DE DONNÉES Component 1: Building a safety DES INFORMATIONS Individual Consultant Under IDA / 57080 net for the poor in selected rural Post Limited 2,250.00 0.00 2017-04-25 2017-05-17 2017-05-27 2017-06-05 2017-12-31 CONCERNANT LES MÉNAGES Selection Implementation areas É ICIAIRES BÉNF ACTP MANAKARA DRA12CISAI17001 / Saisie des Registres de coresponsabilité et Component 1: Building a safety Individual Consultant Mise à jour des données des IDA / 57080 net for the poor in selected rural Post Limited 1,166.67 416.99 Signed 2017-04-28 2017-04-26 2017-05-20 2017-05-26 2017-10-10 2017-06-01 2017-10-10 2018-01-01 Selection ménages bénfé iciaires sur MIS areas TMDH. DRA12CISAI17002 / Saisie des registres de coresponsabilité et Component 1: Building a safety Individual Consultant mise à jour des données des IDA / 57080 net for the poor in selected rural Post Limited 1,166.67 416.99 Signed 2017-04-28 2017-04-26 2017-05-20 2017-10-09 2017-05-26 2017-10-10 2017-06-01 2017-10-10 2017-12-31 Selection ménages bénf é iciaires sur MIS areas TMDH. DRA12CISAI17003 / Saisie des registres de coresponsabilité et Component 1: Building a safety Individual Consultant mise à jour des données des IDA / 57080 net for the poor in selected rural Post Limited 1,166.67 416.99 Signed 2017-04-28 2017-04-26 2017-05-20 2017-10-09 2017-05-26 2017-10-10 2017-06-01 2017-10-10 2017-12-31 Selection ménages bénf é iciaires sur MIS areas TMDH. DRA12CISAI17004 / Saisie des registres de coresponsabilité et Component 1: Building a safety Individual Consultant mise à jour des données des IDA / 57080 net for the poor in selected rural Post Limited 1,166.67 416.99 Signed 2017-04-28 2017-04-26 2017-05-20 2017-10-09 2017-05-26 2017-10-10 2017-06-01 2017-10-10 2017-12-31 Selection ménages bénf é iciaires sur MIS areas TMDH. DRA12CISAI17005 / Saisie des registres de coresponsabilité et Component 1: Building a safety Individual Consultant mise à jour des données des IDA / 57080 net for the poor in selected rural Post Limited 1,166.67 416.99 Signed 2017-04-28 2017-04-26 2017-05-20 2017-10-09 2017-05-26 2017-10-10 2017-06-01 2017-10-10 2017-12-31 Selection ménages bénf é iciaires sur MIS areas TMDH. DRA12CISAI17006 / Saisie des registres de coresponsabilité et Component 1: Building a safety Individual Consultant mise à jour des données des IDA / 57080 net for the poor in selected rural Post Limited 1,166.67 416.99 Signed 2017-04-28 2017-04-26 2017-05-20 2017-10-09 2017-05-26 2017-10-10 2017-06-01 2017-10-10 2017-12-31 Selection ménages bénf é iciaires sur MIS areas TMDH. DRA12CISAI17007 / Saisie des registres de coresponsabilité et Component 1: Building a safety Individual Consultant mise à jour des données des IDA / 57080 net for the poor in selected rural Post Limited 1,166.67 416.99 Signed 2017-04-28 2017-04-26 2017-05-20 2017-10-09 2017-05-26 2017-10-10 2017-06-01 2017-10-10 2017-12-31 Selection ménages bénf é iciaires sur MIS areas TMDH. DRT11CISAI17001 / Opérateur Component 1: Building a safety Individual Consultant de saisie : saisie des fiches de IDA / 57080 net for the poor in selected rural Post Limited 2,250.00 1,389.96 Signed 2017-04-27 2017-04-26 2017-05-19 2017-05-30 2017-08-07 2017-06-04 2017-08-23 2019-05-31 Selection présence et traitement sur MIS areas DRT11CISAI17002 / Opérateur Component 1: Building a safety Individual Consultant de saisie : saisie des fiches de IDA / 57080 net for the poor in selected rural Post Limited 2,250.00 1,111.97 Signed 2017-04-27 2017-04-26 2017-05-19 2017-05-30 2017-08-11 2017-06-04 2017-08-23 2019-05-31 Selection présence et traitement sur MIS areas DRT11CISAI17003 / Opérateur Component 1: Building a safety Individual Consultant de saisie : saisie des fiches de IDA / 57080 net for the poor in selected rural Post Limited 2,250.00 1,111.97 Signed 2017-04-27 2017-04-26 2017-05-19 2017-05-30 2017-08-07 2017-06-04 2017-08-23 2019-05-31 Selection présence et traitement sur MIS areas DRT11CISAI17004 / Opérateur Component 1: Building a safety Individual Consultant de saisie : saisie des fiches de IDA / 57080 net for the poor in selected rural Post Limited 2,250.00 1,111.97 Signed 2017-04-27 2017-04-26 2017-05-19 2017-05-30 2017-08-07 2017-06-04 2017-08-23 2019-05-31 Selection présence et traitement sur MIS areas Page 9 DRT11CISAI17005 / Opérateur Component 1: Building a safety Individual Consultant de saisie : saisie des fiches de IDA / 57080 net for the poor in selected rural Post Limited 2,250.00 1,111.97 Signed 2017-04-27 2017-04-26 2017-05-19 2017-05-30 2017-08-10 2017-06-04 2017-08-23 2019-05-31 Selection présence et traitement sur MIS areas DRT11CISAI17006 / Opérateur Component 1: Building a safety Individual Consultant de saisie : saisie des fiches de IDA / 57080 net for the poor in selected rural Post Limited 2,250.00 1,297.30 Signed 2017-04-27 2017-04-26 2017-05-19 2017-05-30 2017-08-14 2017-06-04 2017-08-23 2019-05-31 Selection présence et traitement sur MIS areas Component 3: Building the C-723-MP33 / Appui ciblage institutional capacity for Communautaire en vue de IDA / 57080 coordination, monitoring and Prior Direct Selection Direct 16,000.00 25,608.96 Completed 2016-09-16 2017-04-28 2016-11-23 2016-11-16 2016-12-23 2016-12-23 2017-01-26 2017-03-16 l'évaluation d'impacts de l'ACTP evaluation of the social (Cabinet Mitsinjo) protection syst em MG-UPNNC-16399-CS-INDV / Component 3: Building the Consultant Individuel chargé de institutional capacity for Individual Consultant Under l'élaboration du Manuel IDA / D1450 coordination, monitoring and Post Limited 5,000.00 0.00 2017-06-07 2017-06-30 2017-06-21 2017-04-21 2017-07-12 2017-07-10 2017-08-16 2017-11-14 Selection Implementation d'Exécution du Projet Filets evaluation of the social Sociaux de Sécurité protection syst em Component 3: Building the MG-UPNNC-16432-CS-INDV / institutional capacity for Appui la mise en place Individual Consultant Under IDA / D1450 coordination, monitoring and Post Open 5,000.00 0.00 2017-06-12 2017-08-11 2017-06-19 2017-08-12 2017-07-17 2017-08-24 2017-08-14 2017-12-12 (conception et formation) du Selection Implementation evaluation of the social système de collecte de données protection syst em DRU12CISAI001 / saisie des Component 1: Building a safety Individual Consultant Under enregistrement TMDH opérateur IDA / 57080 net for the poor in selected rural Post Limited 900.00 184.90 2017-05-31 2017-06-08 2017-06-05 2017-06-23 2017-06-27 2017-07-06 2017-08-01 2018-01-28 Selection Implementation de saisie areas DRU12CISAI17002 / SAISIE Component 1: Building a safety Individual Consultant Under DES ENREGISTREMENTS IDA / 57080 net for the poor in selected rural Post Limited 900.00 184.90 2017-05-31 2017-06-09 2017-06-05 2017-06-23 2017-06-27 2017-06-23 2017-08-01 2018-01-28 Selection Implementation TMDH OPERATEUR DE SAISIE areas DRU12CISAI17003 / Saisie des Component 1: Building a safety Individual Consultant Under enregistrements TMDH opérateur IDA / 57080 net for the poor in selected rural Post Limited 900.00 185.18 2017-05-31 2017-06-08 2017-06-05 2017-06-23 2017-06-27 2017-07-06 2017-08-01 2018-01-28 Selection Implementation de saisie areas DRU12CISAI17004 / Saisie des Component 1: Building a safety Individual Consultant enregistrements TMDH opérateur IDA / 57080 net for the poor in selected rural Post Limited 900.00 185.18 Signed 2017-05-31 2017-06-09 2017-06-05 2017-07-28 2017-06-27 2017-07-06 2017-08-01 2017-08-07 2018-01-28 Selection de saisie areas A4-APM AMBOVOMBE / Appui Component 3: Building the des Associations/ONG institutional capacity for partenaires dans le Secteur Pending IDA / D1450 coordination, monitoring and Post Direct Selection Direct 54,000.00 0.00 2017-02-15 2017-02-25 2017-05-01 2019-12-31 Nutrition et Santé dans les zones Implementation evaluation of the social d'intervention du Projet APM- protection syst em AMBOVOMBE A4-SAF FJKM AMBOVOMBE / Component 3: Building the Appui des Associations/ONG institutional capacity for partenaires dans le Secteur Pending IDA / D1450 coordination, monitoring and Post Direct Selection Direct 47,000.00 0.00 2017-02-15 2017-02-25 2017-05-01 2019-12-31 Nutrition et Santé dans les zones Implementation evaluation of the social d'intervention du Projet protection syst em SAF/FJKM-AMBOVOMBE A4-AMPELA MITRAOKE AMBOVOMBE / Appui des Component 3: Building the Associations/ONG partenaires institutional capacity for Pending dans le Secteur Nutrition et IDA / D1450 coordination, monitoring and Post Direct Selection Direct 47,000.00 0.00 2017-02-15 2017-02-25 2017-05-01 2019-12-31 Implementation Santé dans les zones evaluation of the social d'intervention du Projet AMPELA protection syst em MITRAOKE-AMBOVOMBE A4-RENY SAMBATRA AMBOVOMBE / Appui des Component 3: Building the Associations/ONG partenaires institutional capacity for Pending dans le Secteur Nutrition et IDA / D1450 coordination, monitoring and Post Direct Selection Direct 45,000.00 0.00 2017-02-15 2017-02-25 2017-05-01 2019-12-31 Implementation Santé dans les zones evaluation of the social d'intervention du Projet RENY protection syst em SAMBATRA-AMBOVOMBE A4-FMF TSIHOMLBE / Appui Component 3: Building the des Associations/ONG institutional capacity for partenaires dans le Secteur Pending IDA / D1450 coordination, monitoring and Post Direct Selection Direct 52,000.00 0.00 2017-02-15 2017-02-25 2017-05-01 2019-12-31 Nutrition et Santé dans les zones Implementation evaluation of the social d'intervention du Projet FMF- protection syst em TSIHOMBE A4-SATRAHA TSIHOMBE / Component 3: Building the Appui des Associations/ONG institutional capacity for partenaires dans le Secteur Pending IDA / D1450 coordination, monitoring and Post Direct Selection Direct 54,000.00 0.00 2017-02-15 2017-02-25 2017-05-01 2019-12-31 Nutrition et Santé dans les zones Implementation evaluation of the social d'intervention du Projet protection syst em SATRAHA-TSIHOMBE A4-TSIMI BELOHA / Appui des Component 3: Building the Associations/ONG partenaires institutional capacity for dans le Secteur Nutrition et Pending IDA / D1450 coordination, monitoring and Post Direct Selection Direct 54,000.00 0.00 2017-02-15 2017-02-25 2017-05-01 2019-12-31 Santé dans les zones Implementation evaluation of the social d'intervention du Projet TSIMI- protection syst em BELOHA A4-KIOMBA BELOHA / Appui Component 3: Building the des Associations/ONG institutional capacity for partenaires dans le Secteur Pending IDA / D1450 coordination, monitoring and Post Direct Selection Direct 41,000.00 0.00 2017-02-15 2017-02-25 2017-05-01 2019-12-31 Nutrition et Santé dans les zones Implementation evaluation of the social d'intervention du Projet KIOMBA- protection syst em BELOHA A4-MANAO BEKILY / Appui des Component 3: Building the Associations/ONG partenaires institutional capacity for dans le Secteur Nutrition et Pending IDA / D1450 coordination, monitoring and Post Direct Selection Direct 45,000.00 0.00 2017-02-15 2017-02-25 2017-05-01 2019-12-31 Santé dans les zones Implementation evaluation of the social d'intervention du Projet MANAO- protection syst em BEKILY A4-FIAINANA BEKILY / Appui Component 3: Building the des Associations/ONG institutional capacity for partenaires dans le Secteur Pending IDA / D1450 coordination, monitoring and Post Direct Selection Direct 25,000.00 0.00 2017-02-15 2017-02-25 2017-05-01 2019-12-31 Nutrition et Santé dans les zones Implementation evaluation of the social d'intervention du Projet FIAINANA- protection syst em BEKILY A4-SAF FJKM AMBOASARY ATSIMO / Appui des Component 3: Building the Associations/ONG partenaires institutional capacity for dans le Secteur Nutrition et Pending IDA / D1450 coordination, monitoring and Post Direct Selection Direct 32,000.00 0.00 2017-02-15 2017-02-25 2017-05-01 2019-12-31 Santé dans les zones Implementation evaluation of the social d'intervention du Projet protection syst em SAF/FJKM-AMBOASARY ATSIMO A4-AMPELA MITRAOKE AMBOASARY ATSIMO / Appui Component 3: Building the des Associations/ONG institutional capacity for partenaires dans le Secteur Pending IDA / D1450 coordination, monitoring and Post Direct Selection Direct 59,000.00 0.00 2017-02-15 2017-02-25 2017-05-01 2019-12-31 Nutrition et Santé dans les zones Implementation evaluation of the social d'intervention du Projet AMPELA protection syst em MITRAOKE-AMBOASARY ATSIMO Component 3: Building the A14-TANGERINE LAB / institutional capacity for Assistance technique sur le Pending IDA / D1450 coordination, monitoring and Prior Direct Selection Direct 620,000.00 0.00 2016-11-30 2016-12-15 2017-01-28 2018-01-28 concept HCD - Consultant Implementation evaluation of the social International TANGERINE Lab protection syst em DRT11CFAGEC17001 / Prise de photos pour les cartes des Component 1: Building a safety récepteurs et enregistrement en IDA / 57080 net for the poor in selected rural Post Direct Selection Direct 2,125.40 0.00 Canceled 2017-07-18 2017-07-26 2017-09-01 2017-10-01 vue de la complémentation des areas bénfé iciaires DRT11CFAGEC17002 / Prise de photos pour les cartes des Component 1: Building a safety récepteurs et enregistrement en IDA / 57080 net for the poor in selected rural Post Direct Selection Direct 728.23 0.00 Canceled 2017-07-18 2017-07-26 2017-09-01 2017-10-01 vue de la complémentation des areas bénfé iciaires (avenant au contrat) DRT11CFAGEC17003 / Prise de photos pour les cartes des Component 1: Building a safety récepteurs et enregistrement en IDA / 57080 net for the poor in selected rural Post Direct Selection Direct 1,035.89 0.00 Canceled 2017-07-18 2017-07-26 2017-09-01 2017-10-01 vue de la complémentation des areas bénfé iciaires (avenant au contrat) DRT11CFAGEC17004 / Prise de photos pour les cartes des Component 1: Building a safety récepteurs et enregistrement en IDA / 57080 net for the poor in selected rural Post Direct Selection Direct 861.45 0.00 Canceled 2017-07-18 2017-07-26 2017-09-01 2017-10-01 vue de la complémentation des areas bénfé iciaires (avenant au contrat) Page 10 DRT11CFAGEC17005 / Prise de photos pour les cartes des Component 1: Building a safety récepteurs et enregistrement en IDA / 57080 net for the poor in selected rural Post Direct Selection Direct 528.39 0.00 Canceled 2017-07-18 2017-07-26 2017-09-01 2017-10-01 vue de la complémentation des areas bénfé iciaires (avenant au contrat) DRT11CFAGEC17006 / Prise de photos pour les cartes des Component 1: Building a safety récepteurs et enregistrement en IDA / 57080 net for the poor in selected rural Post Direct Selection Direct 825.89 0.00 Canceled 2017-07-18 2017-07-26 2017-09-01 2017-10-01 vue de la complémentation des areas bénfé iciaires (avenant au contrat) DRT11CFAGEC17007 / Prise de photos pour les cartes des Component 1: Building a safety récepteurs et enregistrement en IDA / 57080 net for the poor in selected rural Post Direct Selection Direct 1,862.34 0.00 Canceled 2017-07-18 2017-07-26 2017-09-01 2017-10-01 vue de la complémentation des areas bénfé iciaires (avenant au contrat) DRT11CFAGEC17008 / Prise de photos pour les cartes des Component 1: Building a safety récepteurs et enregistrement en IDA / 57080 net for the poor in selected rural Post Direct Selection Direct 872.18 0.00 Canceled 2017-07-18 2017-07-26 2017-09-01 2017-10-01 vue de la complémentation des areas bénfé iciaires (avenant au contrat) DRT11CFAGEC17009 / Prise de photos pour les cartes des Component 1: Building a safety récepteurs et enregistrement en IDA / 57080 net for the poor in selected rural Post Direct Selection Direct 1,067.50 0.00 Canceled 2017-07-18 2017-07-26 2017-09-01 2017-10-01 vue de la complémentation des areas bénfé iciaires (avenant au contrat) DRT12CISAI17001 / Opérateur Component 1: Building a safety de saisie : chargé de la saisie Individual Consultant IDA / 57080 net for the poor in selected rural Post Limited 3,483.87 3,474.90 Signed 2017-07-18 2017-04-26 2017-07-28 2017-08-22 2017-11-02 2017-08-25 2017-11-06 2019-11-23 des données du TMDH sur MIS Selection areas (coresponsabilités, mise à jour) DRT12CISAI17002 / Opérateur Component 1: Building a safety de saisie : chargé de la saisie Individual Consultant IDA / 57080 net for the poor in selected rural Post Limited 3,483.87 3,474.90 Signed 2017-07-18 2017-04-26 2017-07-28 2017-08-22 2017-11-02 2017-08-25 2017-11-06 2019-11-23 des données du TMDH sur MIS Selection areas (coresponsabilités, mise à jour) DRT12CISAI17003 / Opérateur Component 1: Building a safety de saisie : chargé de la saisie Individual Consultant IDA / 57080 net for the poor in selected rural Post Limited 3,483.87 3,335.90 Signed 2017-07-18 2017-04-26 2017-07-28 2017-08-22 2017-11-02 2017-08-25 2017-11-06 2019-11-23 des données du TMDH sur MIS Selection areas (coresponsabilités, mise à jour) DRT12CISAI17004 / Opérateur Component 1: Building a safety de saisie : chargé de la saisie Individual Consultant IDA / 57080 net for the poor in selected rural Post Limited 3,483.87 2,640.92 Signed 2017-07-18 2017-04-26 2017-07-28 2017-08-22 2017-11-02 2017-08-25 2017-11-06 2019-11-23 des données du TMDH sur MIS Selection areas (coresponsabilités, mise à jour) DRT12CISAI17005 / Opérateur Component 1: Building a safety de saisie : chargé de la saisie Individual Consultant IDA / 57080 net for the poor in selected rural Post Limited 3,483.87 3,474.90 Signed 2017-07-18 2017-04-26 2017-07-28 2017-08-22 2017-11-02 2017-08-25 2017-11-06 2019-11-23 des données du TMDH sur MIS Selection areas (coresponsabilités, mise à jour) DRT12CISAI17006 / Opérateur Component 1: Building a safety de saisie : chargé de la saisie Individual Consultant IDA / 57080 net for the poor in selected rural Post Limited 3,483.87 3,608.28 Signed 2017-07-18 2017-04-26 2017-07-28 2017-08-22 2017-11-02 2017-08-25 2017-11-06 2019-11-23 des données du TMDH sur MIS Selection areas (coresponsabilités, mise à jour) Component 1: Building a safety DRP81CISAI17001 / CI Individual Consultant IDA / 57080 net for the poor in selected rural Post Limited 1,600.00 1,373.00 Signed 2017-07-21 2017-04-27 2017-08-06 2017-10-16 2017-08-14 2017-10-16 2017-08-17 2017-10-17 2018-02-13 OPERATEUR DE SAISIE SUD 1 Selection areas Component 1: Building a safety DRP81CISAI17002 / CI Individual Consultant IDA / 57080 net for the poor in selected rural Post Limited 1,600.00 1,373.00 Signed 2017-07-21 2017-04-27 2017-08-06 2017-12-07 2017-08-14 2017-12-07 2017-08-17 2017-12-08 2018-02-13 OPERATEUR DE SAISIE SUD 2 Selection areas Component 1: Building a safety DRP81CISAI17003 / CI Individual Consultant IDA / 57080 net for the poor in selected rural Post Limited 1,600.00 1,373.00 Signed 2017-07-21 2017-04-27 2017-08-06 2017-10-16 2017-08-14 2017-10-16 2017-08-17 2017-10-17 2018-02-13 OPERATEUR DE SAISIE SUD 3 Selection areas Component 1: Building a safety DRP81CISAI17004 / CI Individual Consultant IDA / 57080 net for the poor in selected rural Post Limited 1,600.00 1,373.00 Signed 2017-07-21 2017-04-27 2017-08-06 2017-10-16 2017-08-14 2017-10-16 2017-08-17 2017-10-17 2018-02-13 OPERATEUR DE SAISIE SUD 4 Selection areas Component 1: Building a safety DRP81CISAI17005 / CI Individual Consultant IDA / 57080 net for the poor in selected rural Post Limited 1,600.00 1,373.00 Signed 2017-07-21 2017-04-27 2017-08-06 2017-10-16 2017-08-14 2017-10-23 2017-08-17 2017-10-17 2018-02-13 OPERATEUR DE SAISIE SUD 5 Selection areas MG-MPPSPF-33831-CS-CDS / Component 3: Building the Développement et acquisition institutional capacity for Under logiciel en gestion financière IDA / 57080 coordination, monitoring and Post Direct Selection Direct 8,500.00 0.00 2017-10-25 2017-10-25 2017-10-26 2017-10-31 2018-11-26 Implementation TOM² PRO V2 et contrat de evaluation of the social maintenance protection syst em MG-MPPSPF-33966-CS-INDV / Recrutement de formateur pour Component 3: Building the renforcement de capacités du institutional capacity for Individual Consultant Under personnel de MPPSPF en IDA / 57080 coordination, monitoring and Post Open 2,500.00 0.00 2017-10-26 2017-10-25 2017-11-30 2017-12-11 2017-12-13 2018-03-16 Selection Implementation Nouvelle Technologie de evaluation of the social l'Information et de la protection syst em Communication (NTIC) Component 3: Building the MG-MPPSPF-36021-CS-INDV / institutional capacity for Renforcement de compétence Individual Consultant Pending IDA / 57080 coordination, monitoring and Post Open 5,000.00 0.00 2017-11-08 2017-12-27 2017-12-28 2017-12-29 2018-03-02 sur les techniques de mise à jour Selection Implementation evaluation of the social du site web protection syst em A4-VAM AMBOVOMBE / Appui Component 3: Building the des Associations/ONG institutional capacity for partenaires dans le Secteur Pending IDA / D1450 coordination, monitoring and Post Direct Selection Direct 64,000.00 0.00 2017-11-14 2017-11-24 2018-01-28 2020-09-28 Nutrition et Santé dans les zones Implementation evaluation of the social d'intervention du Projet VAM protection syst em AMBOVOMBE A4-ECAR TSIHOMBE / Appui Component 3: Building the des Associations/ONG institutional capacity for partenaires dans le Secteur Pending IDA / D1450 coordination, monitoring and Post Direct Selection Direct - National 46,000.00 0.00 2017-11-14 2017-11-14 2017-11-14 2020-07-15 Nutrition et Santé dans les zones Implementation evaluation of the social d'intervention du Projet ECAR - protection syst em TSIHOME A4-MANDRESY BEKILY / Appui Component 3: Building the des Associations/ONG institutional capacity for partenaires dans le Secteur Pending IDA / D1450 coordination, monitoring and Post Direct Selection Direct - National 46,000.00 0.00 2017-11-14 2017-11-14 2017-11-14 2020-07-15 Nutrition et Santé dans les zones Implementation evaluation of the social d'intervention du Projet protection syst em MANDRESY - BEKILY DRT12CICIB1701 / Consultant Component 1: Building a safety Individuel Socio-organisateur Individual Consultant IDA / 57080 net for the poor in selected rural Post Limited 2,258.06 2,169.33 Signed 2017-11-14 2017-11-16 2017-11-22 2017-12-13 2018-01-16 2017-12-18 2018-01-16 2018-02-06 chargé de l'enregistrement des Selection areas é iciaires bénf DRT12CICIB1702 / Consultant Component 1: Building a safety Individuel Socio-organisateur Individual Consultant IDA / 57080 net for the poor in selected rural Post Limited 2,258.06 2,174.85 Signed 2017-11-14 2017-11-16 2017-11-22 2017-12-13 2018-01-16 2017-12-18 2018-01-16 2018-02-06 chargé de l'enregistrement des Selection areas é iciaires bénf DRT12CICIB1703 / Consultant Component 1: Building a safety Individuel Socio-organisateur Individual Consultant IDA / 57080 net for the poor in selected rural Post Limited 2,258.06 2,069.77 Signed 2017-11-14 2017-11-16 2017-11-22 2017-12-13 2018-01-16 2017-12-18 2018-01-16 2018-02-06 chargé de l'enregistrement des Selection areas é iciaires bénf DRK12CIACC17001 / Component 1: Building a safety Individual Consultant Under ACCOMPAGNATEUR IDA / 57080 net for the poor in selected rural Post Open 5,806.45 0.00 2017-11-22 2017-12-09 2017-12-10 2017-12-12 2018-12-12 Selection Implementation SPÉCIALISE MANAKARA areas DRK12CIACC17002 / Component 1: Building a safety Individual Consultant Under ACCOMPAGNATEUR IDA / 57080 net for the poor in selected rural Post Open 5,806.45 0.00 2017-11-22 2017-12-09 2017-12-10 2017-12-12 2018-12-12 Selection Implementation SPÉCIALISE MANAKARA areas DRK12CIACC17003 / Component 1: Building a safety Individual Consultant Under ACCOMPAGNATEUR IDA / 57080 net for the poor in selected rural Post Open 5,806.45 0.00 2017-11-22 2017-09-22 2017-12-09 2017-12-10 2017-12-12 2018-12-12 Selection Implementation SPÉCIALISE MANAKARA areas DRK12CICMP17005 / CIBLAGE Component 1: Building a safety Individual Consultant Under - ENQUÊTE - IDA / 57080 net for the poor in selected rural Post Open 343.75 0.00 2017-11-23 2017-12-10 2017-12-11 2017-12-13 2018-01-12 Selection Implementation ENREGISTREMENT areas É ICIAIRES BÉNF MANAKARA DRK12CICMP17006 / CIBLAGE Component 1: Building a safety Individual Consultant Under - ENQUÊTE - IDA / 57080 net for the poor in selected rural Post Open 196.88 0.00 2017-11-23 2017-12-10 2017-12-11 2017-12-13 2018-01-12 Selection Implementation ENREGISTREMENT areas MANAKARA Page 11 DRK12CICMP17007 / CIBLAGE Component 1: Building a safety Individual Consultant Under - ENQUÊTE - IDA / 57080 net for the poor in selected rural Post Open 196.88 0.00 2017-11-23 2017-12-10 2017-12-11 2017-12-13 2018-01-12 Selection Implementation ENREGISTREMENT areas É ICIAIRES BÉNF MANAKARA DRK12CICMP17008 / CIBLAGE Component 1: Building a safety Individual Consultant Under - ENQUÊTE - IDA / 57080 net for the poor in selected rural Post Open 196.88 0.00 2017-11-23 2017-12-10 2017-12-11 2017-12-13 2018-01-12 Selection Implementation ENREGISTREMENT areas É ICIAIRES BÉNF MANAKARA DRK12CICMP17009 / CIBLAGE Component 1: Building a safety Individual Consultant Under - ENQUÊTE - IDA / 57080 net for the poor in selected rural Post Open 196.88 0.00 2017-11-23 2017-12-10 2017-12-11 2017-12-13 2018-01-12 Selection Implementation ENREGISTREMENT areas É ICIAIRES BÉNF MANAKARA DRK12CICMP17010 / CIBLAGE Component 1: Building a safety Individual Consultant Under - ENQUÊTE - IDA / 57080 net for the poor in selected rural Post Open 196.88 0.00 2017-11-23 2017-12-10 2017-12-11 2017-12-13 2018-01-12 Selection Implementation ENREGISTREMENT areas É ICIAIRES BÉNF MANAKARA DRK12CICMP17011 / CIBLAGE Component 1: Building a safety Individual Consultant Under - ENQUÊTE - IDA / 57080 net for the poor in selected rural Post Open 196.88 0.00 2017-11-23 2017-12-10 2017-12-11 2017-12-13 2018-01-12 Selection Implementation ENREGISTREMENT areas É ICIAIRES BÉNF MANAKARA DRK12CICMP17012 / CIBLAGE Component 1: Building a safety Individual Consultant Under - ENQUÊTE - IDA / 57080 net for the poor in selected rural Post Open 196.88 0.00 2017-11-23 2017-12-10 2017-12-11 2017-12-13 2018-01-12 Selection Implementation ENREGISTREMENT areas É ICIAIRES BÉNF MANAKARA DRK12CICMP17013 / CIBLAGE Component 1: Building a safety Individual Consultant Under - ENQUÊTE - IDA / 57080 net for the poor in selected rural Post Open 196.88 0.00 2017-11-23 2017-12-10 2017-12-11 2017-12-13 2018-01-12 Selection Implementation ENREGISTREMENT areas É ICIAIRES BÉNF MANAKARA Component 1: Building a safety DRU12CISAI17005 / opérateur Individual Consultant IDA / 57080 net for the poor in selected rural Post Open 900.00 0.00 Canceled 2017-11-28 2017-12-23 2017-12-28 2018-01-02 2019-01-02 de saisie novembre 01 Selection areas Component 1: Building a safety DRU12CISAI17006 / opérateur Individual Consultant IDA / 57080 net for the poor in selected rural Post Open 900.00 0.00 Canceled 2017-11-28 2017-12-23 2017-12-28 2018-01-02 2018-01-05 de saisie novembre 02 Selection areas DRU12CICMP17006 / TMDH CISO ciblage, enquête, Component 1: Building a safety Individual Consultant é iciaires enregistrement bénf IDA / 57080 net for the poor in selected rural Post Open 210.00 508.43 Signed 2017-11-30 2017-04-10 2017-12-20 2017-12-07 2018-01-07 2017-12-18 2018-01-10 2018-01-10 2018-02-17 Selection nouvelles communes novembre areas 01 DRU12CICMP17007 / TMDH CISO ciblage, enquête, Component 1: Building a safety Individual Consultant é iciaires enregistrement bénf IDA / 57080 net for the poor in selected rural Post Open 210.00 586.15 Signed 2017-11-29 2017-04-10 2017-12-19 2017-12-07 2018-01-06 2017-12-18 2018-01-09 2018-01-10 2018-02-16 Selection nouvelles communes novembre areas 01 DRU12CICMP7008 / TMDH CISO ciblage, enquête, Component 1: Building a safety Individual Consultant é iciaires enregistrement bénf IDA / 57080 net for the poor in selected rural Post Open 210.00 785.65 Signed 2017-11-29 2017-04-10 2017-12-19 2017-12-07 2018-01-06 2017-12-18 2018-01-09 2018-01-10 2018-02-16 Selection nouvelles communes novembe areas 01 DRU12CICMP17009 / TMDH CISO ciblage, enquête, Component 1: Building a safety Individual Consultant é iciaires enregistrement bénf IDA / 57080 net for the poor in selected rural Post Open 210.00 793.60 Signed 2017-11-29 2017-04-10 2017-12-19 2017-12-07 2018-01-06 2017-12-18 2018-01-09 2018-01-10 2018-02-16 Selection nouvelles communes novembre areas 01 DRU12CICMP17010 / TMDH CISO ciblage, enquête, Component 1: Building a safety Individual Consultant é iciaires enregistrement bénf IDA / 57080 net for the poor in selected rural Post Open 210.00 640.52 Signed 2017-11-29 2017-04-10 2017-12-19 2017-12-07 2018-01-06 2017-12-18 2018-01-09 2018-01-10 2018-02-16 Selection nouvelles communes novembre areas 01 DRU12CICMP17011 / TMDH CISO ciblage, enquête, Component 1: Building a safety Individual Consultant Under é iciaires enregistrement bénf IDA / 57080 net for the poor in selected rural Post Open 210.00 720.97 2017-11-29 2017-04-10 2017-12-19 2017-12-07 2018-01-06 2017-12-18 2018-01-09 2018-02-16 Selection Implementation nouvelles communes novembre areas 01 DRU12CICMP17012 / TMDH CISO ciblage, enquête, Component 1: Building a safety Individual Consultant Under é iciaires enregistrement bénf IDA / 57080 net for the poor in selected rural Post Open 210.00 660.44 2017-11-29 2017-04-10 2017-12-19 2017-12-07 2018-01-06 2017-12-18 2018-01-09 2018-02-16 Selection Implementation nouvelles communes novembre areas 01 DRU12CICMP17013 / TMDH CISO ciblage, enquête, Component 1: Building a safety Individual Consultant é iciaires enregistrement bénf IDA / 57080 net for the poor in selected rural Post Open 210.00 675.03 Signed 2017-11-29 2017-04-10 2017-12-19 2017-12-07 2018-01-06 2017-12-18 2018-01-09 2018-01-10 2018-02-16 Selection nouvelles communes novembre areas 01 DRU12CICMP17014 / TMDH CISO ciblage, enquête, Component 1: Building a safety Individual Consultant é iciaires enregistrement bénf IDA / 57080 net for the poor in selected rural Post Open 210.00 673.26 Signed 2017-11-29 2017-04-10 2017-12-19 2018-01-05 2018-01-06 2018-01-09 2018-01-09 2018-01-10 2018-02-16 Selection nouvelles communes novembre areas 01 DRU12CICMP17015 / TMDH CISO ciblage, enquête, Component 1: Building a safety Individual Consultant Pending é iciaires enregistrement bénf IDA / 57080 net for the poor in selected rural Post Open 210.00 0.00 2017-11-29 2017-12-19 2018-01-06 2018-01-09 2018-02-16 Selection Implementation nouvelles communes novembre areas 01 DRU12CICMP17016 / TMDH CISO ciblage, enquête, Component 1: Building a safety Individual Consultant Pending é iciaires enregistrement bénf IDA / 57080 net for the poor in selected rural Post Open 210.00 0.00 2017-11-29 2017-12-19 2018-01-06 2018-01-09 2018-02-16 Selection Implementation nouvelles communes novembre areas 01 DRU12CICMP17017 / TMDH CISO ciblage, enquête, Component 1: Building a safety Individual Consultant Pending é iciaires enregistrement bénf IDA / 57080 net for the poor in selected rural Post Open 210.00 0.00 2017-11-29 2017-12-19 2018-01-06 2018-01-09 2018-02-16 Selection Implementation nouvelles communes novembre areas 01 DRU12CICMP17018 / TMDH CI Chef d'Equipe ciblage, enquête, Component 1: Building a safety Individual Consultant Pending é iciaires enregistrement bénf IDA / 57080 net for the poor in selected rural Post Open 366.67 0.00 2017-11-29 2017-12-19 2018-01-06 2018-01-09 2018-02-16 Selection Implementation nouvelles communes novembre areas 01 DRU12CICMP17019 / TMDH CI Chef d'Equipe ciblage,enquête, Component 1: Building a safety Individual Consultant Pending é iciaires enregistrement bénf IDA / 57080 net for the poor in selected rural Post Open 366.67 0.00 2017-11-29 2017-12-19 2018-01-06 2018-01-09 2018-02-16 Selection Implementation nouvelles communes novembre areas 01 DRU12CIACC17001 / TMDH Component 1: Building a safety Accompagnateur Spécialisé Individual Consultant Under IDA / 57080 net for the poor in selected rural Post Open 7,000.00 0.00 2017-11-29 2017-09-22 2017-12-19 2018-01-06 2018-01-09 2019-01-09 nouvelles communes novembre Selection Implementation areas 01 Component 1: Building a safety DRU12CIACC17002 / TMDH CI Individual Consultant Pending IDA / 57080 net for the poor in selected rural Post Open 2,600.00 0.00 2017-12-10 2018-01-22 2018-02-12 2018-03-01 2018-08-28 Marché multiple novembre 01 Selection Implementation areas DRA12CIACC17002 / Component 1: Building a safety ACCOMPAGNATEUR Individual Consultant IDA / 57080 net for the poor in selected rural Post Open 8,360.91 5,238.95 Signed 2017-11-20 2017-09-22 2017-12-07 2018-02-02 2017-12-08 2018-02-06 2017-12-10 2018-02-14 2018-12-10 SPECIALISE DISTRICT Selection areas TOAMASINA II DRA12CIACC18001 / Component 1: Building a safety Individual Consultant ACCOMPAGNATEUR IDA / 57080 net for the poor in selected rural Post Open 8,360.91 5,053.55 Signed 2018-01-17 2017-09-20 2018-02-01 2018-02-02 2018-02-03 2018-02-14 2018-02-06 2018-02-14 2018-12-31 Selection SPECIALISE areas DRT11CIANIM1801 / Consultant Component 1: Building a safety Individual Consultant Pending Individuel animateur de l'ACTP IDA / 57080 net for the poor in selected rural Post Open 3,735.48 0.00 2018-01-17 2018-02-06 2018-02-13 2018-02-24 2018-12-03 Selection Implementation ans les 18 UTB à Antanifotsy. areas DRT12CIACC1801 / Consultant Individuel chargé du renforcement de capacité des Mères Leaders Component 1: Building a safety Individual Consultant Under et des accompagnements des IDA / 57080 net for the poor in selected rural Post Open 6,397.85 0.00 2018-02-20 2018-04-06 2018-03-31 2018-04-05 2018-04-09 2019-04-30 Selection Implementation Espaces de bien-être du projet areas de Protection Sociale du FID (Accompagnateur) BETAFO 1 DRT12CIACC1802 / Consultant Individuel chargé du renforcement de capacité des Mères Leaders Component 1: Building a safety Individual Consultant Under et des accompagnements des IDA / 57080 net for the poor in selected rural Post Open 6,397.85 0.00 2018-02-20 2018-04-06 2018-03-31 2018-04-05 2018-04-09 2019-04-30 Selection Implementation Espaces de bien-être du projet areas de Protection Sociale du FID (Accompagnateur) BETAFO 2 Page 12 DRT12CIACC1803 / Consultant Individuel chargé du renforcement de capacité des Mères Leaders Component 1: Building a safety Individual Consultant Under et des accompagnements des IDA / 57080 net for the poor in selected rural Post Open 6,397.85 0.00 2018-02-20 2018-04-06 2018-03-31 2018-04-05 2018-04-09 2019-04-30 Selection Implementation Espaces de bien-être du projet areas de Protection Sociale du FID (Accompagnateur) BETAFO 3 Component 2: Strengthening DG20CFFTOM1808 / Formation safety net administration, des RSE en Logiciel IDA / 57080 Post Direct Selection Direct 743.37 741.77 Completed 2018-02-01 2018-02-05 2018-02-08 2018-02-08 2018-02-14 2018-02-16 2018-02-24 2018-03-19 monitoring and social TOMPORTAIL accountability DG20CFLOGRH1812 / Component 2: Strengthening Conception Logiciel pour la safety net administration, IDA / 57080 Post Direct Selection Direct 20,685.35 20,584.06 Signed 2018-01-30 2017-11-03 2018-01-30 2017-11-13 2018-02-09 2018-02-26 2018-03-11 gestion des Ressources monitoring and social Humaines accountability DRF12CIAS17001 / ACCOMPAGNATEUR Component 1: Building a safety Individual Consultant Under SPECIALISE POUR : CU IDA / 57080 net for the poor in selected rural Post Open 7,722.66 8,247.60 2018-01-30 2017-09-20 2018-02-12 2017-11-08 2018-02-14 2017-11-07 2018-02-19 2019-02-14 Selection Implementation AMBOHIMAHASOA - CR areas MORAFENO - CR BEFETA Component 2: Strengthening DG20CIFSQL1810 / Formation safety net administration, Individual Consultant Pending IDA / 57080 Post Limited 743.37 0.00 2018-05-15 2018-05-20 2018-06-10 2018-07-15 2018-07-30 des RSE en SQL monitoring and social Selection Implementation accountability DRA12CIACC17001 / Component 1: Building a safety ACCOMPAGNATEUR Individual Consultant IDA / 57080 net for the poor in selected rural Post Open 8,360.91 5,275.89 Signed 2017-11-20 2017-09-20 2017-12-07 2018-01-15 2017-12-08 2018-01-17 2017-12-10 2018-01-26 2018-12-10 SPÉCIALISE DISTRICT Selection areas MAHANORO Component 3: Building the A14 FSS ED GEOPORTAIL institutional capacity for MAINTENANCE / Consultant en Individual Consultant Pending IDA / D1450 coordination, monitoring and Post Direct 6,000.00 0.00 2018-03-23 2018-04-02 2018-04-16 2018-05-21 2019-05-16 charge de la maintenance du Selection Implementation evaluation of the social système Geoportail protection syst em Component 3: Building the A13 FSS ED PECMAM ECD / institutional capacity for Deux consultants individuels Individual Consultant Pending IDA / D1450 coordination, monitoring and Post Direct 12,000.00 0.00 2018-03-23 2018-04-02 2018-04-16 2018-05-21 2019-05-16 chargés du suivi et supervision Selection Implementation evaluation of the social de la PECMAM protection syst em A16 FSS ED MIS Component 3: Building the MAINTENANCE / Consultant en institutional capacity for Individual Consultant Pending charge de la mise à jour et IDA / D1450 coordination, monitoring and Post Direct 5,000.00 0.00 2018-03-23 2018-04-02 2018-04-16 2018-05-21 2019-05-16 Selection Implementation maintenance du système de evaluation of the social collecte de données MIS protection syst em DRT12CICIB1704 / Consultant Component 1: Building a safety individuel Socio-organisateur Individual Consultant IDA / 57080 net for the poor in selected rural Post Limited 2,258.06 2,187.89 Signed 2018-03-14 2017-11-16 2018-03-14 2018-03-30 2018-01-15 2018-04-02 2018-01-16 2018-05-22 chargé de l'enregistrement des Selection areas é iciaires bénf DRT12CICIB1705 / Consultant Component 1: Building a safety individuel Socio-organisateur Individual Consultant IDA / 57080 net for the poor in selected rural Post Limited 2,258.06 1,934.14 Signed 2018-03-14 2017-11-16 2018-03-14 2018-03-30 2018-01-15 2018-04-02 2018-01-16 2018-05-22 chargé de l'enregistrement des Selection areas é iciaires bénf DRK11CISAI18001 / SAISI DES DONNÉES DANS LE MIS Component 1: Building a safety Individual Consultant Under CONCERNANT LES MÉNAGES IDA / 57080 net for the poor in selected rural Post Open 2,419.37 0.00 2018-03-15 2018-04-14 2018-04-17 2018-04-21 2018-10-18 Selection Implementation É ICIAIRES BÉNF ACTP areas MANAKARA DRK12CISAI18002 / SAISI DES Component 1: Building a safety DONNÉES DANS LE MIS DES Individual Consultant Under IDA / 57080 net for the poor in selected rural Post Open 2,419.35 0.00 2018-03-15 2018-04-14 2018-04-17 2018-04-21 2018-10-18 É ICIAIRES BÉNF TMDH Selection Implementation areas VOHIPENO DRP81CIOS18001 / CI Component 1: Building a safety Individual Consultant Pending OPERATEUR DE SAISIE SUD18 IDA / D1450 net for the poor in selected rural Post Limited 2,000.00 0.00 2018-04-24 2018-04-24 2018-05-09 2018-05-11 2018-12-31 Selection Implementation 1 areas DRP81CIOS18002 / CI Component 1: Building a safety Individual Consultant Pending OPERATEUR DE SAISIE SUD18 IDA / D1450 net for the poor in selected rural Post Limited 2,000.00 0.00 2018-04-24 2018-04-24 2018-05-09 2018-05-11 2018-12-31 Selection Implementation 2 areas DRP81CIOS18003 / CI Component 1: Building a safety Individual Consultant Pending OPERATEUR DE SAISIE SUD18 IDA / D1450 net for the poor in selected rural Post Limited 2,000.00 0.00 2018-04-24 2018-04-24 2018-05-09 2018-05-11 2018-12-31 Selection Implementation 3 areas DRP81CIOS18004 / CI Component 1: Building a safety Individual Consultant Pending OPERATEUR DE SAISIE SUD18 IDA / D1450 net for the poor in selected rural Post Limited 2,000.00 0.00 2018-04-24 2018-04-24 2018-05-09 2018-05-11 2018-12-31 Selection Implementation 4 areas DRP81CIOS18005 / CI Component 1: Building a safety Individual Consultant Pending OPERATEUR DE SAISIE SUD18 IDA / D1450 net for the poor in selected rural Post Limited 2,000.00 0.00 2018-04-24 2018-04-24 2018-05-09 2018-05-11 2018-12-31 Selection Implementation 5 areas DRP81CIOS18006 / CI Component 1: Building a safety Individual Consultant Pending OPERATEUR DE SAISIE SUD18 IDA / D1450 net for the poor in selected rural Post Limited 2,000.00 0.00 2018-04-24 2018-04-24 2018-05-09 2018-05-11 2018-12-31 Selection Implementation 6 areas DRT12CIACC1804 / Consultant Individuel chargé du renforcement de capacité des Mères Leaders Component 1: Building a safety Individual Consultant Pending et des accompagnements des IDA / 57080 net for the poor in selected rural Post Open 7,741.94 0.00 2018-04-25 2018-05-18 2018-05-23 2018-06-05 2019-06-30 Selection Implementation Espaces de bien-être du projet areas de Protection Sociale du FID (Accompagnateur) BETAFO 4 DRT12CIACC1805 / Renforcements de capacité des Mères Leaders et des Component 1: Building a safety Individual Consultant Pending accompagnements des Espaces IDA / 57080 net for the poor in selected rural Post Open 7,741.94 0.00 2018-04-26 2018-05-18 2018-05-23 2018-06-05 2019-06-30 Selection Implementation de bien-être du projet de areas Protection Sociale du FID (Accompagnateur) BETAFO 5 DRT12CIACC1806 / Renforcements de capacité des Mères Leaders et des Component 1: Building a safety Individual Consultant Pending accompagnements des Espaces IDA / 57080 net for the poor in selected rural Post Open 7,741.94 0.00 2018-04-26 2018-05-18 2018-05-23 2018-06-05 2019-06-30 Selection Implementation de bien-être du projet de areas Protection Sociale du FID (Accompagnateur) BETAFO 6 DRT12CIACC1807 / Renforcements de capacité des Mères Leaders et des Component 1: Building a safety Individual Consultant Pending accompagnements des Espaces IDA / 57080 net for the poor in selected rural Post Open 7,741.94 0.00 2018-04-26 2018-05-18 2018-05-23 2018-06-05 2019-06-30 Selection Implementation de bien-être du projet de areas Protection Sociale du FID (Accompagnateur) BETAFO 7 DRT12CIACC1808 / Renforcements de capacité des Mères Leaders et des Component 1: Building a safety Individual Consultant Pending accompagnements des Espaces IDA / 57080 net for the poor in selected rural Post Open 7,741.94 0.00 2018-04-26 2018-05-18 2018-05-23 2018-06-05 2019-06-30 Selection Implementation de bien-être du projet de areas Protection Sociale du FID (Accompagnateur) BETAFO 8 DRF12CISAI17004 / SAISIE DANS LA BASE DE DONNÉES Component 1: Building a safety Individual Consultant Pending LES INFORMATIONS IDA / 57080 net for the poor in selected rural Post Limited 218.75 0.00 2018-04-27 2018-04-29 2018-05-09 2018-05-12 2018-12-19 Selection Implementation CONCERNANT LES MÉNAGES areas É ICIAIRES BÉNF TMDH DRT11CIASS1801 / Recrutement de consultant individuel accompagnateur Component 1: Building a safety spécialisé pour la mise en Suvre Individual Consultant Pending IDA / 57080 net for the poor in selected rural Post Open 8,225.80 0.00 2018-06-05 2018-06-27 2018-07-06 2018-07-13 2019-10-13 du développement de la petite Selection Implementation areas enfance intensifié et l'éducation des ménages du programme ACTP DRT11CIASS1802 / Recrutement de consultant individuel accompagnateur Component 1: Building a safety spécialisé pour la mise en Suvre Individual Consultant Pending IDA / 57080 net for the poor in selected rural Post Open 5,483.80 0.00 2018-06-05 2018-06-27 2018-07-06 2018-07-13 2019-05-13 du développement de la petite Selection Implementation areas enfance intensifié et l'éducation des ménages du programme ACTP Page 13 DRT11CIASS1803 / Recrutement de consultant individuel accompagnateur Component 1: Building a safety spécialisé pour la mise en Suvre Individual Consultant Pending IDA / 57080 net for the poor in selected rural Post Open 5,483.80 0.00 2018-06-05 2018-06-27 2018-07-06 2018-07-13 2019-05-13 du développement de la petite Selection Implementation areas enfance intensifié et l'éducation des ménages du programme ACTP DRT11CIASS1804 / Recrutement de consultant individuel accompagnateur Component 1: Building a safety spécialisé pour la mise en Suvre Individual Consultant Pending IDA / 57080 net for the poor in selected rural Post Open 5,483.80 0.00 2018-06-05 2018-06-27 2018-07-06 2018-07-13 2019-05-13 du développement de la petite Selection Implementation areas enfance intensifié et l'éducation des ménages du programme ACTP DRT11CISUP18001 / Mise à jour Component 1: Building a safety Individual Consultant Pending PAMO et supervision des travaux IDA / 57080 net for the poor in selected rural Post Limited 7,612.90 0.00 2018-06-07 2018-06-12 2018-06-19 2018-06-25 2019-06-30 Selection Implementation dans 6 UTB ACTP à Antanifotsy areas DRT11CISEC18001 / Mise en Component 1: Building a safety é aluation Suvre du suivi v Individual Consultant Pending IDA / 57080 net for the poor in selected rural Post Limited 2,022.58 0.00 2018-06-07 2018-06-12 2018-06-19 2018-06-25 2019-06-30 communautaire (SEC) sur 6 UTB Selection Implementation areas de l'ACTP à Antanifotsy DRA12CIASS18003 / ACCOMPAGNEMENT Component 1: Building a safety Individual Consultant Pending BENEFICIARES - ACTIVITES IDA / 57080 net for the poor in selected rural Post Open 8,225.80 0.00 2018-06-05 2018-06-27 2018-07-06 2018-07-13 2019-10-06 Selection Implementation DE SENSIBILISATION - MISE areas EN RUVRE DPE ET EP DRA12CIASS18004 / ACCOMPAGNEMENT Component 1: Building a safety Individual Consultant Pending BENEFICIARES - ACTIVITES IDA / 57080 net for the poor in selected rural Post Open 5,483.87 0.00 2018-06-05 2018-06-27 2018-07-06 2018-07-13 2019-05-14 Selection Implementation DE SENSIBILISATION - MISE areas EN RUVRE DPE ET EP DRA12CIPAMO18005 / MISE A JOUR PAMO ET Component 1: Building a safety Individual Consultant Pending SUPERVISIONS DES TRAVAUX IDA / 57080 net for the poor in selected rural Post Limited 6,106.45 0.00 2018-06-05 2018-06-10 2018-06-17 2018-06-23 2019-06-28 Selection Implementation DANS 06 UTB ACT P DISTRICT areas DE VATOMANDRY DRA12CIPAMO18006 / MISE A JOUR PAMO ET SUPERVISION Component 1: Building a safety Individual Consultant Pending DES TRAVAUX DANS 06 UTB IDA / 57080 net for the poor in selected rural Post Limited 6,106.45 0.00 2018-06-06 2018-06-11 2018-06-18 2018-06-24 2019-06-29 Selection Implementation ACT P DISTRICT DE areas VATOMANDRY DRA12CISEC18007 / MISE EN Component 1: Building a safety RUVRE DE SUIVI EVALUATION Individual Consultant Pending IDA / 57080 net for the poor in selected rural Post Limited 2,021.61 0.00 2018-06-06 2018-06-11 2018-06-18 2018-06-24 2019-06-29 COMMUNAUTAIRE ( SEC) dans Selection Implementation areas 04 UTB ACT P VATOMANDRY DRA12CISEC18008 / MISE EN Component 1: Building a safety RUVRE DE SUIVI EVALUATION Individual Consultant Pending IDA / 57080 net for the poor in selected rural Post Limited 2,021.61 0.00 2018-06-06 2018-06-11 2018-06-18 2018-06-24 2019-06-29 COMMUNAUTAIRE ( SEC) dans Selection Implementation areas 04 UTB ACT P VATOMANDRY DRA12CISEC1809 / MISE EN Component 1: Building a safety RUVRE DE SUIVI EVALUATION Individual Consultant Pending IDA / 57080 net for the poor in selected rural Post Limited 2,021.61 0.00 2018-06-06 2018-06-11 2018-06-18 2018-06-24 2019-06-29 COMMUNAUTAIRE ( SEC) dans Selection Implementation areas 04 UTB ACT P VATOMANDRY DRA12CISAI18001 / MISE A JOURS INFORMATIONS DES Component 1: Building a safety É ICIAIRES BÉNF ET SAISI DE Individual Consultant Pending IDA / 57080 net for the poor in selected rural Post Limited 1,935.48 0.00 2018-06-06 2018-06-11 2018-06-18 2018-06-29 2019-06-29 FICHE DE PRÉSENCE DES Selection Implementation areas TRAVAILLEURS ACTP DISTRICT VATOMANDRY DRA12CISAI18002 / MISE A JOURS INFORMATIONS DES Component 1: Building a safety É ICIAIRES BÉNF ET SAISI DE Individual Consultant Pending IDA / 57080 net for the poor in selected rural Post Limited 1,935.48 0.00 2018-06-06 2018-06-11 2018-06-18 2018-06-29 2019-06-29 FICHE DE PRESENCE DES Selection Implementation areas TRAVAILLEURS ACTP DISTRICT VATOMANDRY DRF11CIAS18001 / RECRUTEMENT DE CONSULTANT INDIVIDUEL ACCOMPAGNATEUR SPÉCIALISÉ POUR LA MISE Component 1: Building a safety Individual Consultant Pending EN RUVRE DU IDA / 57080 net for the poor in selected rural Post Open 5,483.87 0.00 2018-06-11 2018-06-24 2018-06-26 2018-07-01 2019-06-26 Selection Implementation DÉVELOPPEMENT DE LA areas PETITE ENFANCE INTENSIFIÉ ET L'ÉDUCATION DES MÉNAGES DU PROGRAMME ACTP 01 DRF11CIAS18002 / RECRUTEMENT DE CONSULTANT INDIVIDUEL ACCOMPAGNATEUR SPÉCIALISÉ POUR LA MISE Component 1: Building a safety Individual Consultant Pending EN RUVRE DU IDA / 57080 net for the poor in selected rural Post Open 5,483.87 0.00 2018-06-11 2018-06-24 2018-06-26 2018-07-01 2019-06-26 Selection Implementation DÉVELOPPEMENT DE LA areas PETITE ENFANCE INTENSIFIÉ ET L'ÉDUCATION DES MÉNAGES DU PROGRAMME ACTP02 DRF11CIAS18003 / RECRUTEMENT DE CONSULTANT INDIVIDUEL ACCOMPAGNATEUR SPÉCIALISÉ POUR LA MISE Component 1: Building a safety Individual Consultant Pending EN RUVRE DU IDA / 57080 net for the poor in selected rural Post Open 8,225.81 0.00 2018-06-11 2018-06-24 2018-06-26 2018-07-01 2019-09-24 Selection Implementation DÉVELOPPEMENT DE LA areas PETITE ENFANCE INTENSIFIÉ ET L'ÉDUCATION DES MÉNAGES DU PROGRAMME ACTP03 Component 2: Strengthening DG20CFFTOMAF1810 / safety net administration, Pending FORMATION RECYCLAGE EN IDA / 57080 Post Direct Selection Direct 700.00 0.00 2018-06-11 2018-06-14 2018-06-25 2018-07-10 monitoring and social Implementation TOM2PRO EQUIPE SAF accountability DG20CICOMMDPEI1811 / CONSULTANT EN Component 1: Building a safety COMMUNICATION DANS LES Individual Consultant Pending IDA / 57080 net for the poor in selected rural Post Open 13,859.00 0.00 2018-06-06 2018-06-29 2018-07-01 2018-07-05 2019-01-01 MESURES Selection Implementation areas D'ACCOMPAGNEMENT DES TRANSFERTS MONETAIRES DRK11CIAS18001 / RECRUTEMENT Component 1: Building a safety ACCOMPAGNATEUR Individual Consultant Pending IDA / 57080 net for the poor in selected rural Post Open 8,225.67 0.00 2018-06-07 2018-06-24 2018-06-25 2018-06-27 2019-09-20 SPÉCIALISÉ DE Selection Implementation areas SENSIBILISATION ACTP MANAKARA DRK11CIAS18002 / RECRUTEMENT Component 1: Building a safety ACCOMPAGNATEUR Individual Consultant Pending IDA / 57080 net for the poor in selected rural Post Open 5,483.78 0.00 2018-06-07 2018-06-24 2018-06-25 2018-06-27 2019-04-23 SPÉCIALISÉ DE Selection Implementation areas SENSIBILISATION ACTP MANAKARA DRK11CIAS18003 / RECRUTEMENT Component 1: Building a safety ACCOMPAGNATEUR Individual Consultant Pending IDA / 57080 net for the poor in selected rural Post Open 5,483.78 0.00 2018-06-07 2018-06-24 2018-06-25 2018-06-27 2019-04-23 SPÉCIALISÉ DE Selection Implementation areas SENSIBILISATION ACTP MANAKARA DRK11CIAS18004 / RECRUTEMENT Component 1: Building a safety ACCOMPAGNATEUR Individual Consultant Pending IDA / 57080 net for the poor in selected rural Post Open 5,483.78 0.00 2018-06-07 2018-06-24 2018-06-25 2018-06-27 2019-04-23 SPÉCIALISÉ DE Selection Implementation areas SENSIBILISATION ACTP MANAKARA DRU12CIASS18001 / Recrutement de consultant individuel accompagnateur Component 1: Building a safety spécialisé pour la mise en Suvre Individual Consultant Pending IDA / 57080 net for the poor in selected rural Post Open 8,226.00 0.00 2018-06-07 2018-06-29 2018-07-08 2018-07-15 2019-10-08 du développement de la petite Selection Implementation areas enfance intensifié et l'éducation des ménages du programme ACTP Page 14 DRU12CIASS18002 / Recrutement de consultant Component 1: Building a safety Individual Consultant Pending individuel accompagnateur IDA / 57080 net for the poor in selected rural Post Open 5,484.00 0.00 2018-06-07 2018-06-29 2018-07-08 2018-07-15 2019-05-16 Selection Implementation spécialisé pour la suivi des areas sensibilisations Component 2: Strengthening DG20CIFORMGOUV1812 / safety net administration, Individual Consultant Pending Formation en Gouvernance IDA / 57080 Post Limited 120.00 0.00 2018-06-07 2018-06-12 2018-06-30 2018-07-07 2018-07-22 monitoring and social Selection Implementation citoyenne accountability Component 2: Strengthening DG20CFFORMAUD1813 / safety net administration, Pending FORMATION EN AUDIT IDA / 57080 Post Direct Selection Direct 300.00 0.00 2018-10-01 2018-10-11 2018-11-05 2018-11-20 monitoring and social Implementation INTERNE accountability Component 2: Strengthening DG20CFFORMPERMA1816 / safety net administration, Pending FORMATION EN IDA / 57080 Post Direct Selection Direct 1,489.00 0.00 2018-06-17 2018-06-24 2018-07-17 2018-08-01 monitoring and social Implementation PERMACULTURE accountability Component 2: Strengthening DG20CFFORMEDACT1817 / safety net administration, Pending FORMATION EN METHODE IDA / 57080 Post Direct Selection Direct 2,977.00 0.00 2018-06-17 2018-06-24 2018-07-17 2018-08-01 monitoring and social Implementation D'EDUCATION ACTIVE accountability Page 15