Niger : Projet Eau et Assainissement en Milieu Urbain (PEAMU) Numéro d’identification du Projet : P117365 Sample Procurement Plan Overall Risk: Substantial I. General 1. Bank’s approval Date of the procurement Plan February 2011: Revision 15 of Updated Procurement Plan, May 2017] Commented [LL1]: Indiquer le mois et l’année de la révision 2. Date of General Procurement Notice: June 15, 2011 3. Period covered by this procurement plan: The procurement period of project covered from year May 2017 to April 2018 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review revised by the Bank in 2017as stated in Appendix 1 to the Guidelines for Procurement 2. Procurement Method Prior Review Threshold Comments US$ 1. ICB and LIB (Goods) Above US$ 2,000,000 The ICB mode starts from US$ 500,000 2. NCB (Goods) Below US$ 500,000 3. ICB (Works) Above US$ 10 million The ICB mode starts from US$ 5,000.000 4. NCB (Works) Below US$ 5 million 5. (Non-Consultant Services) Above US$ 2 million 6 Consultant Services Above US$ 1 million 7 Individual Consultant Selection Above US$ 300,000 2. Prequalification:. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: 4. Reference to (if any) Project Operational/Procurement Manual: Project Implementation Manual for World Bank Loan Project PEAMU 04/01/2010 issued by M.E.C, and revised in May 2016. 5. Any Other Special Procurement Arrangements N/A AugustJuly 928, 20107 6. Summary of the Procurement Packages planned during the first 18 months after project effectiveness 1 2 3 4 5 6 7 Ref. Description Estimated Packages Domestic Review Comments No. Cost Preference by Bank US$ (yes/no) (Prior / million Post) Summary of 45.85 4 No Prior Commented [LL2]: Veuillez donner le détail des 4 contrats à the ICB passer. Idem pour les travaux AON et les 4 contrats de services. (Works) Summary of - - - - - the ICB (Goods) Summary of 6.9 4 n/a Post the NCB (Works) Summary of - - - - - the NCB (Goods) Summary of 6.9 4 n/a Post - the ICB (Non- Consultant Services) III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Threshold Comments 1. Competitive Methods (Firms) Above /Equal US$ 1,000,000 Advertisement in the UNDB, when the estimated amount is above US$ 300,000 2. Single Source (Firms) All 3. Individual Above / equal US$ 300,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: n/a AugustJuly 928, 20107 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Ref. Description of Estimated Packages Review Comments No. Assignment Cost by Bank US$ million (Prior / Post) Summary of 1.55 4 Post Commented [LL3]: Veuillez donner le détail des contrats à passer dans cette catégorie. Idem pour les autres contrats. number of contracts that will be let under QCBS Summary of 0.84 9 Post CQS number of contracts that will be let under other methods AugustJuly 928, 20107 PROCUREMENT Niger : Urban Water and Sanitation Project PLAN General Information Country: Niger Bank’s Approval Date of the Original Procurement Plan: 2017-08-28 2019-11-21 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P117365 GPN Date: Project Name: Urban Water and Sanitation Project Loan / Credit No: IDA / 58810 Executing Agency(ies): Projet d'Eau et d'Assainissement en Milieu Urbain (PEAMU) WORKS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PEAMU-2017-22 / Projet d'extension et densification Open - Single Stage - One du réseau de distribution IDA / 58810 1. Urban water supply A priori Appel d'offres 23,500,000.00 6,130,200.33 Signé 2017-11-15 2017-11-20 2018-01-01 2018-01-31 2018-03-07 2018-09-03 International Envelope d'eau potable de la ville de Zinder PEAMU-2017-27 / Open - Single Stage - One En cours Construction d'une 2eme IDA / 58810 2. Urban Sanitation A posteriori Appel d'offres 5,480,000.00 0.00 2018-04-15 2018-04-20 2018-06-01 2018-07-01 2018-08-05 2019-02-01 International Envelope d'exécution STBV à Niamey PEAMU-2017-23 / Fourniture et Installation d'une unité compacte de Single Stage - One traitement et de production IDA / 58810 1. Urban water supply A posteriori Appel d'offres Open - National 4,000,000.00 3,022,023.06 Signé 2017-10-25 2017-10-30 2017-12-11 2018-01-10 2018-02-14 2018-08-13 Envelope d'eau potable de 15,000 m3/j (Programmae d'urgence) Usine de Goudel Niamey PEAMU-2017-25 / Travaux Single Stage - One de réhabilitation des AEP de IDA / 58810 1. Urban water supply A posteriori Appel d'offres Open - National 850,000.00 1,122,354.64 Signé 2017-09-15 2017-09-20 2017-11-01 2017-12-01 2018-01-05 2018-07-04 Envelope Mainé, Gouré et Say PEAMU-2017-26 / Travaux de construction de latrines et de dispositifs de lavage Single Stage - One des mains dans les IDA / 58810 2. Urban Sanitation A posteriori Appel d'offres Open - National 1,112,000.00 2,658,739.12 Signé 2018-03-15 2018-03-20 2018-05-01 2018-05-31 2018-07-05 2019-01-01 Envelope établissements scolaires du primaire des villes de Dosso, Niamey et Tillabéri (10 lots) PEAMU-2017-34 / Réatribution du marché pour la réalisation des travaux de Passation de l'AEP de Galmi (aprés IDA / 58810 1. Urban water supply A posteriori marché de gré à Direct 712,000.00 616,498.99 Signé 2017-12-05 2017-12-10 2018-01-14 2018-07-13 résiliation du marché initial gré N° 029/DPI/SPEN2014 du Groupement FGT/SOSAF ) PEAMU-2017-40 / Projet de renforcement de système de Open - Single Stage - One IDA / 58810 1. Urban water supply A priori Appel d'offres 7,793,000.00 17,671,489.68 Signé 2018-06-21 2018-06-26 2018-08-07 2018-09-06 2018-10-11 2019-04-09 production de la ville International Envelope d'Agadez PEAMU-2017-41 / Projet de construction d'une nouvelle station de traitement d'eau Open - Single Stage - One IDA / 58810 1. Urban water supply A posteriori Appel d'offres 9,072,000.00 8,879,204.74 Signé 2018-06-15 2018-06-20 2018-08-01 2018-08-31 2018-10-05 2019-04-03 de la ville de Tillabery - International Envelope Station extensible de 30 000 m3/j Page 1 PEAMU-2017-21 / Projet de renforcement de système de production de la ville d'Agadez LORS DES NEGOCIATIONS DES FONDS ADDITIONNELS, IL Single Stage - One IDA / 58810 1. Urban water supply A priori Appel d'offres Open - National 7,793,000.00 0.00 Annulé 2017-11-30 2017-12-05 2018-01-16 2018-02-15 2018-03-22 2018-09-18 A ETE CONVENU QUE Envelope CETTE ACTIVITE FERA L'OBJET D'UNE REVUE A PRIORI MALGRE QUE LE SEUL NE SOIT PAS ATTEINT) PEAMU-2017-24 / Projet de construction d’une nouvelle station de traitement d’eau Open - Single Stage - One IDA / 58810 1. Urban water supply A priori Appel d'offres 9,072,000.00 0.00 Annulé 2017-11-26 2017-12-01 2018-01-12 2018-02-11 2018-03-18 2018-09-14 de la ville de Tillabery - International Envelope Station extensible de 30 000 m3/ PEAMU-2018-003 / Aménagement et bitumage Single Stage - One des voies intérieures IDA / 58810 2. Urban Sanitation A posteriori Appel d'offres Open - National 200,000.00 288,053.56 Signé 2018-08-29 2018-09-03 2018-10-15 2018-11-14 2018-12-19 2019-06-17 Envelope prioritaires, dans l'enceinte de la STBV - 1 de Niamey PEAMU-2018-006 / Construction d'un hangar destiné au séchage et Single Stage - One stockage des boues IDA / 58810 2. Urban Sanitation A posteriori Appel d'offres Open - National 250,000.00 313,054.64 Signé 2018-09-24 2018-09-29 2018-11-10 2018-12-10 2019-01-14 2019-07-13 Envelope séchées/traitées, à la Station de Traitement des Boues de Vidange (STBV) de Niamey PEAMU-2017-20 / Travaux de réhabiltation des conduites et pièces spéciales pour la maitrise des consommations d'eau de Single Stage - One IDA / 58810 1. Urban water supply A posteriori Appel d'offres Open - National 1,000,000.00 0.00 Annulé 2017-11-15 2017-11-20 2018-01-01 2018-01-31 2018-03-07 2018-09-03 l'Etat et des abonnés Envelope cautioaunés, sur base de l'application du plan d'action de l'Etude Financée par l'AFD PEAMU-2017-20A / Travaux de réhabilitation des conduites et pièces spéciales pour la maîtrise des Passation de consommations d'eau de En attente IDA / 58810 1. Urban water supply A posteriori marché de gré à Direct 1,000,000.00 0.00 2018-10-02 2018-10-07 2018-11-11 2019-05-10 l'Etat et des abonnés d'exécution gré cautionnés, sur base de l'application du plan d'action de l'Etude Financée par l'AFD PEAMU-2019-008 / Single Stage - One En attente Réalisation de deux (02) IDA / 58810 1. Urban water supply A posteriori Demande de prix Open - National 200,000.00 0.00 2019-11-23 2020-01-18 2020-07-16 Envelope d'exécution forages à N'guigmi PEAMU-2019-009 / Réalisation de branchements Passation de En attente sociaux (BS), bornes IDA / 58810 1. Urban water supply A posteriori marché de gré à Direct 1,000,000.00 0.00 2019-11-19 2019-11-24 2019-12-29 2020-06-26 d'exécution fontaines (BF), et petites gré extensions (Pe) GOODS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 2 PEAMU-2017-28 / Achat de fournitures de bureau, 3. Institutional consommables informatiques Single Stage - One En attente IDA / 58810 strengthening and capacity A posteriori Demande de prix Open - National 32,500.00 0.00 2017-10-20 2017-12-15 2018-06-13 et produits d'entretien pour Envelope d'exécution building 4eme trimestre 2017(Achats echelonnés dans l'année) PEAMU-2017-32 / Achat de 3. Institutional cartes telephoniques- Single Stage - One En attente IDA / 58810 strengthening and capacity A posteriori Demande de prix Open - National 4,410.00 0.00 2017-10-20 2017-12-15 2018-06-13 prépayées, pour le dernier Envelope d'exécution building trimestre 2017 PEAMU-2017-33 / 3. Institutional Fourniture et installation Single Stage - One En attente IDA / 58810 strengthening and capacity A posteriori Demande de prix Open - National 6,000.00 0.00 2017-12-10 2018-02-04 2018-08-03 d'appareils telephoiques dans Envelope d'exécution building 9 bureaux PEAMU-2018-004 / Fourniture, pose d'un groupe de secours de 50KVA plus le raccordemment au Single Stage - One réseau, et la réalisation de IDA / 58810 2. Urban Sanitation A posteriori Demande de prix Open - National 60,000.00 60,881.93 Signé 2018-09-05 2018-10-31 2019-04-29 Envelope travaux d'éléctrification et d'eclairage, à la station de traitement de boues de vidange de Niamey PEAMU-2018-005 / Fourniture, pose d'un château d'eau (2 cuves PEHD de 2 x 15 m3) sur pieds plus l'installation Single Stage - One d'un réseau d'irrigation IDA / 58810 2. Urban Sanitation A posteriori Demande de prix Open - National 80,000.00 77,735.07 Signé 2018-10-03 2018-11-28 2019-05-27 Envelope californien comportant conduite principale, conduite tertiaire, vannerie, y compris terrassement, pièces de raccordement NON CONSULTING SERVICES Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PEAMU-2017-29 / Entretien 3. Institutional Single Stage - One En attente et maintenance des réseaux IDA / 58810 strengthening and capacity A posteriori Demande de prix Open - National 10,000.00 0.00 2017-11-15 2018-01-10 2018-07-09 Envelope d'exécution internet et télephonique building CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Market Contract Type Estimated Actual Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PEAMU-2017-03 / Etudes, Contrôle et surveillance des Sélection fondée Open - travaux de station de IDA / 58810 1. Urban water supply A posteriori sur la qualité et 250,000.00 847,159.97 Signé 2016-12-02 2016-12-23 2017-02-05 2017-03-05 2017-04-04 2017-05-09 2017-06-13 2018-06-13 International traitement Tillabery (1ère le coût phase) Page 3 PEAMU-2017-04 / Contrôle Sélection fondée et surveillance des travaux sur les Open - En cours de réhabilitation des 3 CS IDA / 58810 1. Urban water supply A posteriori 200,000.00 0.00 2016-09-11 2016-10-02 2016-11-15 2016-12-15 2017-01-19 2017-07-18 qualifications des International d'exécution (AEP de Mainé, Gouré et consultants Say) PEAMU-2017-05 / Maîtrise d'œuvre pour les études et le suivi-contrôle des travaux Sélection fondée Open - de construction et la mise IDA / 58810 2. Urban Sanitation A posteriori sur la qualité et 300,000.00 565,657.57 Signé 2016-08-07 2016-08-28 2016-10-11 2016-11-08 2016-12-08 2017-01-12 2017-02-16 2018-02-16 International en gestion d'une (1) Station le coût de Traitement de Boues de Vidange à Niamey PEAMU-2017-09 / Contrôle Sélection fondée de la maitrise des sur les En attente IDA / 58810 1. Urban water supply A posteriori Open - National 100,000.00 0.00 2017-08-27 2017-09-17 2017-10-31 2017-11-30 2018-01-04 2018-07-03 consommations d'eau des qualifications des d'exécution administrations consultants Sélection fondée 3. Institutional PEAMU-2017-10 / Audit sur les IDA / 58810 strengthening and capacity A posteriori Open - National 74,000.00 0.00 Annulé 2017-08-27 2017-09-17 2017-10-31 2017-11-30 2018-01-04 2018-07-03 technique du PEAMU qualifications des building consultants PEAMU-2017-16 / Controle et surveillance pour la fourniture et Installation Sélection fondée d'une unité compacte de sur les En attente IDA / 58810 1. Urban water supply A posteriori Open - National 100,000.00 0.00 2017-11-25 2017-12-16 2018-01-29 2018-02-28 2018-04-04 2018-10-01 traitement et de production qualifications des d'exécution d'eau potable de 15,000 m3/j consultants (Programmae d'urgence) Usine de Goudel Niamey PEAMU-2017-18 / Sélection fondée Campagne de Communication sur les En attente sur la Réduction des IDA / 58810 1. Urban water supply A posteriori Open - National 60,000.00 0.00 2017-11-01 2017-11-22 2018-01-05 2018-02-04 2018-03-11 2018-09-07 qualifications des d'exécution Consommations d’Eau de consultants l’Administration (SPEN) PEAMU-2017-19 / Sélection fondée 3. Institutional Recrutement d'un Cabinet de sur les Open - IDA / 58810 strengthening and capacity A posteriori 50,000.00 38,856.50 Signé 2017-09-15 2017-10-06 2017-11-19 2017-12-19 2018-01-23 2018-07-22 formation groupée sur le tas qualifications des International building en Passation des marchés consultants PEAMU-2017-35 / Recrutement d'une ONG chargée de l'intermédiation Sélection fondée sociale dans le cadre de la IDA / 58810 2. Urban Sanitation A posteriori sur la qualité et Open - National 120,000.00 228,123.55 Signé 2017-12-15 2018-01-05 2018-02-18 2018-03-18 2018-04-17 2018-05-22 2018-06-26 2019-06-26 maitrise d'œuvre de la le coût construction des latrines scolaires à Dosso, Niamey et Tillabery PEAMU-2017-38 / Contrôle Sélection fondée Open - En cours et surveillance des travaux IDA / 58810 1. Urban water supply A posteriori sur la qualité et 500,000.00 283,534.23 2018-01-11 2018-02-01 2018-03-17 2018-04-14 2018-05-14 2018-06-18 2018-07-23 2019-07-23 International d'exécution d'AEP de la ville d' Agadez le coût PEAMU-2017-39 / Etudes, Contrôle et surveillance des Sélection fondée Open - travaux d'extension et de IDA / 58810 1. Urban water supply A posteriori sur la qualité et 500,000.00 445,244.79 Signé 2018-01-25 2018-02-15 2018-03-31 2018-04-28 2018-05-28 2018-07-02 2018-08-06 2019-08-06 International densification du réseau d'eau le coût potable de la ville de Zinder PEAMU-2017-01 / Contrôle et surveillance des travaux à Sélection fondée Agadez (NB: au moment des Open - IDA / 58810 1. Urban water supply A priori sur la qualité et 500,000.00 0.00 Annulé 2016-11-25 2016-12-16 2017-01-29 2017-02-26 2017-03-28 2017-05-02 2017-06-06 2018-06-06 négociations du FA, il a été International le coût retenu que le contrôle sera à priori) Page 4 PEAMU-2017-02 / Etudes, Contrôle et surveillance des Sélection fondée Open - travaux d'extension et de IDA / 58810 1. Urban water supply A priori sur la qualité et 500,000.00 0.00 Annulé 2016-12-02 2016-12-23 2017-02-05 2017-03-05 2017-04-04 2017-05-09 2017-06-13 2018-06-13 International densification du réseau d'eau le coût potable de la ville de Zinder PEAMU-2018-002 / Recrutement d'un consultant chargé de la Maitrise Sélection fondée d'Oeuvre pour la sur les IDA / 58810 2. Urban Sanitation A posteriori Open - National 100,000.00 85,853.99 Signé 2018-04-30 2018-05-21 2018-07-04 2018-08-03 2018-09-07 2019-03-06 construction d'un hangar de qualifications des stockage de boues sechees, consultants et pour d'autres travaux a la STBV de Niamey Sélection fondée PEAMU-2017-06 / Etudes sur les Open - d'impact environnemental et IDA / 58810 2. Urban Sanitation A posteriori 92,900.00 81,817.78 Signé 2018-08-31 2018-09-21 2018-11-04 2018-12-04 2019-01-08 2019-07-07 qualifications des International social 2ème STBV consultants Sélection fondée PEAMU-2017-07 / Etudes sur les d'impact environnemental et IDA / 58810 1. Urban water supply A posteriori Open - National 92,900.00 76,137.89 Signé 2018-08-30 2018-09-20 2018-11-03 2018-12-03 2019-01-07 2019-07-06 qualifications des social AEP Tillabery consultants Sélection fondée PEAMU-2017-08 / Etudes sur les d'impact environnemental et IDA / 58810 1. Urban water supply A posteriori Open - National 93,332.00 78,237.23 Signé 2018-08-31 2018-09-21 2018-11-04 2018-12-04 2019-01-08 2019-07-07 qualifications des social AEP Zinder consultants Sélection fondée PEAMU-2017-10B / Audit 3. Institutional sur les Open - technique des activités du IDA / 58810 strengthening and capacity A posteriori 250,000.00 128,641.92 Signé 2018-08-13 2018-09-03 2018-10-17 2018-11-16 2018-12-21 2019-06-19 qualifications des International PEAMU building consultants Sélection fondée PEAMU-2017-10A / Audit 3. Institutional sur les Open - technique des activités du IDA / 58810 strengthening and capacity A posteriori 125,000.00 0.00 Annulé 2018-06-12 2018-07-03 2018-08-16 2018-09-15 2018-10-20 2019-04-18 qualifications des International PEAMU building consultants PEAMU-2019-001 / Etudes, contrôle et la surveillance de la réalisation de 15 forages Sélection fondée et 2 piézomètres dans le sur les En cours cadre du projet de IDA / 58810 1. Urban water supply A posteriori Open - National 120,000.00 0.00 2019-05-22 2019-06-12 2019-07-26 2019-08-25 2019-09-29 2020-03-27 qualifications des d'exécution renforcement et d'extension consultants du système d'alimentation en eau potable de la ville de Zinder PEAMU-2019-007 / Audit des comptes du PEAMU , et des états financiers de la 3. Institutional Société de Patrimoine des Sélection au En cours IDA / 58810 strengthening and capacity A posteriori Open - National 62,000.00 0.00 2019-10-18 2019-11-08 2019-12-22 2020-01-19 2020-02-18 2020-03-24 2020-04-28 2020-10-25 Eaux du Niger (SPEN) pour moindre coût d'exécution building les exercices clos les 31 Décembre 2019 et du 1er Janvier au 31 Octobre 2020 INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Market Contract Type Estimated Actual Draft Negotiated Description Component Review Type Method Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 5 PEAMU-2017-11 / Evaluation sociale, et le Plan d’Action de IDA / 58810 2. Urban Sanitation A posteriori Individuel Open 22,000.00 25,989.22 Signé 2017-10-28 2017-12-16 2018-01-06 2018-02-10 2018-08-09 Réinstallations des populations affectées STBV 2 de Niamey PEAMU-2017-12 / Evaluation sociale, et PAR IDA / 58810 1. Urban water supply A posteriori Individuel Open 22,000.00 23,486.25 Signé 2017-10-29 2017-12-17 2018-01-07 2018-02-11 2018-08-10 AEP de Niamey PEAMU-2017-13 / Evaluation sociale, et PAR IDA / 58810 1. Urban water supply A posteriori Individuel Open 22,000.00 23,160.92 Signé 2017-11-30 2018-01-18 2018-02-08 2018-03-15 2018-09-11 AEP d’Agadez PEAMU-2017-14 / En attente Evaluation sociale, et PAR IDA / 58810 1. Urban water supply A posteriori Individuel Open 22,000.00 0.00 2017-10-31 2017-12-19 2018-01-09 2018-02-13 2018-08-12 d'exécution AEP de Zinder PEAMU-2017-17 / Recrutement du consultant, Sélection de en vue d'appuyer la En attente IDA / 58810 1. Urban water supply A posteriori consultants par Direct 40,000.00 0.00 2017-10-15 2017-10-25 2017-12-29 2018-06-27 SPEN/SEEN dans les d'exécution entente directe negociations du prix exploitant (Pe) PEAMU-2017-37 / Recrutement d'un consultant 3. Institutional En attente individuel, chargé des IDA / 58810 strengthening and capacity A posteriori Individuel Open 36,000.00 0.00 2017-12-11 2018-01-29 2018-02-19 2018-03-26 2018-09-22 d'exécution questions sociales au building PEAMU PEAMU-2018-001 / Recrutement d'un consultant pour l'étude sur les 3. Institutional arrangements institutionnels, IDA / 58810 strengthening and capacity A posteriori Individuel Open 100,000.00 83,648.80 Signé 2018-02-16 2018-04-06 2018-04-27 2018-06-01 2018-11-28 dans un contexte de building dévolution aux collectivités territoriales. PEAMU-2018-007 / Evaluation sociale, et PAR En attente des trois Centres IDA / 58810 1. Urban water supply A posteriori Individuel Open 24,000.00 0.00 2018-02-05 2018-03-26 2018-04-16 2018-05-21 2018-11-17 d'exécution Secondaires (Say, Gouré et Mainé) PEAMU-2017-14-BIS / En attente Evaluation sociale, et PAR IDA / 58810 1. Urban water supply A posteriori Individuel Open 22,000.00 0.00 2019-03-18 2019-05-06 2019-05-27 2019-07-01 2019-12-28 d'exécution AEP de Tillabéry PEAMU-2019-002 / Revue des évaluations sociales de : - Sous projet d'AEP de Niamey, Maradi, Zinder de PE, BF, BS et Unité En cours compacte de traitement de IDA / 58810 2. Urban Sanitation A posteriori Individuel Open 6,000.00 0.00 2019-05-12 2019-06-30 2019-07-21 2019-08-25 2020-02-21 d'exécution l'eau du fleuve à Niamey, - Renforcement du système de production d'eau potable et d'extension du réseau d'AEP de la ville PEAMU-2019-003 / Audit En cours des consommations d'eau des IDA / 58810 2. Urban Sanitation A posteriori Individuel Open 60,000.00 0.00 2019-05-14 2019-07-02 2019-07-23 2019-08-27 2020-02-23 d'exécution administrations publiques PEAMU-2019-004 / Recrutement d'un consultant En attente en vue de l'élaboration d'un IDA / 58810 2. Urban Sanitation A posteriori Individuel Open 6,000.00 0.00 2019-05-16 2019-07-04 2019-07-25 2019-08-29 2020-02-25 d'exécution manuel de gestion des plaintes Page 6 PEAMU-2019-006 / Recrutement d'un consultant chargé de la conception- réalisation d'un Compendium En attente IDA / 58810 1. Urban water supply A posteriori Individuel Open 65,000.00 0.00 2019-06-17 2019-08-05 2019-08-26 2019-09-30 2020-03-28 sur la mise en œuvre du d'exécution Projet Eau et Assainissement en Milieu Urbain (PEAMU) PEAMU-2019-005 / En attente Recrutement d'un(e) ou d'une IDA / 58810 1. Urban water supply A posteriori Individuel Open 18,000.00 0.00 2019-06-10 2019-07-29 2019-08-19 2019-09-23 2020-03-21 d'exécution Assistant (e) Comptable Page 7