The World Bank Implementation Status & Results Report Preparation of a Program Towards Sustainable Flood Management in the Greater Metro Manila Area Project (P145237) Preparation of a Program Towards Sustainable Flood Management in the Greater Metro Manila Area Project (P145237) EAST ASIA AND PACIFIC | Philippines | Water Global Practice | Recipient Executed Activities | Investment Project Financing | FY 2015 | Seq No: 8 | ARCHIVED on 10-Feb-2020 | ISR40516 | Implementing Agencies: Department of Public Works and Highways, Department of Finance Key Dates Key Project Dates Bank Approval Date: 16-Sep-2014 Effectiveness Date: 19-Jun-2015 Original Closing Date: 31-Jan-2017 Revised Closing Date: 30-Jun-2020 pdoTable Project Development Objectives Project Development Objective (from Project Appraisal Document) The objective is to prepare priority projects, identified by the flood management master plan, that aim to improve flood management and resilience in and around Metro Manila. Has the Project Development Objective been changed since Board Approval of the Project Objective? No Overall Ratings Name Previous Rating Current Rating Progress towards achievement of PDO Moderately Satisfactory Moderately Satisfactory Overall Implementation Progress (IP) Moderately Satisfactory Moderately Satisfactory Implementation Status and Key Decisions Consultant have been recruited to prepare a feasibility study and subsequently the design of the selected option for flood management improvement in the Pasig-Marikina River Basin. Alternatives have been analyzed and a feasibility study was prepared as per terms of reference. Based on the review of the study report and technical discussions a preferred solution - a retention basin - was selected. The design of this solution will be prepared by June 30, 2020. Environmental and social consultants are preparing relevant safeguards documents. Risks Overall Risk Rating Risk Category Rating at Approval Previous Rating Current Rating Overall -- Moderate Moderate 5. Results 2/10/2020 Page 1 of 3 The World Bank Implementation Status & Results Report Preparation of a Program Towards Sustainable Flood Management in the Greater Metro Manila Area Project (P145237) Project Development Objective Indicators IN00802497 ►Proposals for Upper Marikina River structural measures fully designed that are technically, economically, socially, and environmentally sound and that are ready for appraisal. (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 2.00 Date 22-Dec-2014 31-Dec-2019 31-Dec-2019 30-Jun-2020 IN00802498 ►Proposals for an integrated flood forecasting and early warning system fully designed and ready for appraisal. (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 1.00 Date 22-Dec-2014 31-Dec-2019 31-Dec-2019 30-Apr-2020 IN00802499 ►Proposals for institutional arrangements for sustainable flood management in the Greater Metro Manila Area acceptable to the Government of the Philippines and key stakeholders and ready for implementa (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 1.00 Date 22-Dec-2014 31-Dec-2019 31-Dec-2019 30-Jun-2020 Intermediate Results Indicators IN00802526 ►Feasibility study for the proposed interventions in Upper Marikina River completed. (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 1.00 1.00 2.00 Date 22-Dec-2014 31-May-2019 31-May-2019 29-Feb-2020 IN00802500 ►Mid-term report with draft proposals for institutional arrangements for sustainable flood management completed. (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 1.00 Date 22-Dec-2014 31-Dec-2019 31-Dec-2019 30-Apr-2020 Data on Financial Performance Disbursements (by loan) 2/10/2020 Page 2 of 3 The World Bank Implementation Status & Results Report Preparation of a Program Towards Sustainable Flood Management in the Greater Metro Manila Area Project (P145237) Project Loan/Credit/TF Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P145237 TF-18611 Effective USD 2.73 2.73 0.00 0.52 2.21 19% Key Dates (by loan) Project Loan/Credit/TF Status Approval Date Signing Date Effectiveness Date Orig. Closing Date Rev. Closing Date P145237 TF-18611 Effective 04-Jun-2015 19-Jun-2015 19-Jun-2015 31-Jan-2017 30-Jun-2020 Cumulative Disbursements Restructuring History Level 2 Approved on 24-Jan-2017 ,Level 2 Approved on 30-Jan-2018 ,Level 2 Approved on 31-Jan-2020 Related Project(s) There are no related projects. 2/10/2020 Page 3 of 3