Sample Procurement Plan (Text in italic font is meant for instruction to staff and should be deleted in the final version of the PP) (This is only a sample with the minimum content that is required to be included in the PAD. The detailed procurement plan is still mandatory for disclosure on the Bank’s website in accordance with the guidelines. The initial procurement plan will cover the first 18 months of the project and then updated annually or earlier as necessary). I. General 1. Bank’s approval Date of the procurement Plan [Original: December 2007]: Revision 15 of Updated Procurement Plan, June 2010] 2. Date of General Procurement Notice: Dec 24, 2006 3. Period covered by this procurement plan: The procurement period of project covered from year June 2010 to December 2012 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: [Thresholds for applicable procurement methods (not limited to the list below) will be determined by the Procurement Specialist /Procurement Accredited Staff based on the assessment of the implementing agency’s capacity.] Procurement Method Prior Review Threshold Comments US$ 1. ICB and LIB (Goods) Above US$ 500,000 All 2. NCB (Goods) Above US$ 100,000 First contract 3. ICB (Works) Above US$ 15 million All 4. NCB (Works) Above US$ 5 million All 5. (Non-Consultant Services) Below US$ 100,000 First contract [Add other methods if necessary] 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: [Refer to the relevant CDD project implementation document approved by the Bank or delete if not applicable] 4. Reference to (if any) Project Operational/Procurement Manual: Project Implementation Manual for World Bank Loan Project XYZ 04/01/2010 issued by July 9, 2010 5. Any Other Special Procurement Arrangements: [including advance procurement and retroactive financing, if applicable] 5 ICB works packages will be financed under retroactive financing 6. Summary of the Procurement Packages planned during the first 18 months after project effectiveness ( including those that are subject to retroactive financing and advanced procurement) [List the Packages which require Bank’s prior review first and then the other packages] 1 2 3 4 5 6 7 Ref. Description Estimated Packages Domest Review Comments No. Cost ic by Bank US$ Prefere (Prior / Post) million nce (yes/no) Summary of 82 5 No Prior the ICB (Works) Summary of 43.77 15 No Prior the ICB (Goods) Summary of 64.53 18 No Post 1st the NCB contract (Works) for Prior Review Summary of 1.86 4 No Post 1st the NCB contract (Goods) for Prior Review Summary of 0.45 1 No Prior the ICB (Non- Consultant Services) III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Threshold Comments 1. Competitive Methods (Firms) Above US$ 100,000 2. Single Source (Firms) All 3. Individual Above US$ 50,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise July 9, 2010 entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: [including advance procurement and retroactive financing, if applicable or delete if not applicable] 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Ref. No. Description of Estimated Packages Review Comments Assignment Cost by Bank US$ (Prior / million Post) Summary of 4.17 7 Prior number of contracts that will be let under QCBS Summary of 0.83 1 Prior CQS number of contracts that will be let under other methods July 9, 2010 PROCUREMENT Sao Tome and Principe : STP Power Sector Recovery Project PLAN General Information Country: Sao Tome and Principe Bank’s Approval Date of the Original Procurement Plan: 2016-07-21 2019-11-18 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P157096 GPN Date: 2016-09-29 Project Name: STP Power Sector Recovery Project Loan / Credit No: IDA / V0030, IDA / D1260 Executing Agency(ies): Project Fiduciary and Administrative Agency WORKS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 03/W/PSR/2016 / Investing in enhanced Reabilitation and expansion reliability of electricity Single Stage - One of access roads in Ponta IDA / D1260 Post Request for Bids Open - National 480,000.00 0.00 Canceled 2017-05-16 2017-05-21 2017-07-02 2017-08-01 2017-09-05 2018-03-04 generation, transmission and Envelope Figo to the water channels distribution and load chamber 04/W/PSR/2016 / Investing in enhanced Rehabilitation of key Pending reliability of electricity Open - Single Stage - One components of Contador IDA / D1260 Post Request for Bids 900,000.00 0.00 Implementati 2017-11-23 2017-11-28 2018-01-09 2018-02-08 2018-03-15 2018-09-11 generation, transmission and International Envelope transmission line and on distribution equipment 19/W/PSR/2016 / Project Implementation Request for Single Stage - One Rehabilitation of a new IDA / D1260 Post Limited 41,000.00 61,655.34 Signed 2017-02-28 2017-04-25 2017-10-22 Support Quotations Envelope AFAP's office 32/W/PSR/2018 / Obstacle Strengthening operational Request for Single Stage - One clearance in the canal IDA / D1260 performance and governance Post Open - National 320,000.00 430,602.88 Signed 2018-03-27 2018-05-22 2018-11-18 Quotations Envelope access to Contador of EMAE 01/W/PSR/2016 / Investing in enhanced Under Rehabilitation and expansion reliability of electricity Open - Single Stage - One IDA / D1260 Prior Request for Bids 14,600,000.00 0.00 Implementati 2018-12-21 2019-03-08 2019-03-08 2018-12-26 2019-05-17 2019-06-16 2019-07-21 2021-01-11 of the Contador Hydropwer generation, transmission and International Envelope on Plant and access road distribution GOODS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 02/S/PSR/2016 / Purchase Strengthening operational and installation of 3000 Open - Single Stage - One IDA / D1260 performance and governance Prior Request for Bids 1,200,000.00 0.00 Canceled 2017-10-18 2017-10-23 2017-12-04 2018-01-03 2018-02-07 2018-08-06 power meters for large International Envelope of EMAE customers 04/S/PSR/2016 / Purchase and installation of 2000 3- Strengthening operational Open - Single Stage - One phase power meters for IDA / D1260 performance and governance Prior Request for Bids 3,700,000.00 0.00 Canceled 2018-03-18 2018-03-23 2018-05-04 2018-06-03 2018-07-08 2019-01-04 International Envelope large customers and 16000 of EMAE single phase power meters Investing in enhanced 01/G/PSR/2016 / Purchase Under reliability of electricity Request for Single Stage - One of three double cabin 4WD IDA / D1260 Post Limited 99,000.00 0.00 Implementati 2016-11-10 2017-01-30 2017-07-29 generation, transmission and Quotations Envelope pickups on distribution Page 1 23/G/PSR/2016 / Purchase Pending Project Implementation Request for Single Stage - One of fourniture for the new IDA / D1260 Post Open - National 50,000.00 0.00 Implementati 2017-02-28 2017-04-25 2017-10-22 Support Quotations Envelope AFAP's office on 03/S/PSR/2016 / Purchase Strengthening operational Open - Single Stage - One and installation of 170 IDA / D1260 performance and governance Post Request for Bids 300,000.00 0.00 Canceled 2017-10-18 2017-10-23 2017-12-04 2018-01-03 2018-02-07 2018-08-06 International Envelope statistical meters of EMAE Investing in enhanced 38/G/2018 / Purchase and Pending reliability of electricity Open - Single Stage - One installation of turbines at IDA / D1260 Prior Request for Bids 2,300,000.00 0.00 Implementati 2020-02-17 2020-02-22 2020-04-04 2020-05-04 2020-06-08 2020-12-05 generation, transmission and International Envelope the Contador Plant on distribution NON CONSULTING SERVICES Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 05/S/PSR/2016 / Update of Under Project Implementation the AFAP's existing IDA / D1260 Prior Direct Selection Direct 30,000.00 0.00 Implementati 2016-11-18 2016-11-23 2016-12-28 2017-06-26 Support management software on 10/S/PSR/2016 / Technical Pending assistance for designer and Project Implementation Request for Single Stage - One IDA / D1260 Post Open - National 15,000.00 0.00 Implementati 2017-02-28 2017-04-25 2017-10-22 supervision of the new Support Quotations Envelope on AFAP's office 01/S/PSR/2016 / Acquisition, installation and configuration Strengthening operational Pending Open - Single Stage - One of the management IDA / D1260 performance and governance Prior Request for Bids 1,000,000.00 0.00 Implementati 2017-07-31 2017-08-05 2017-09-16 2017-10-16 2017-11-20 2018-05-19 International Envelope Information System in of EMAE on EMAE Investing in enhanced Under 34/S/PSR/2018 / Topographic reliability of electricity Single Stage - One IDA / D1260 Post Request for Bids Limited 90,000.00 0.00 Implementati 2018-03-26 2018-03-31 2018-05-12 2018-06-11 2018-07-16 2019-01-12 surveying study generation, transmission and Envelope on distribution Investing in enhanced 35/S/PSR/2018 / Apoio a reliability of electricity realização do levantamento IDA / D1260 Post Direct Selection Direct 25,000.00 17,092.54 Signed 2018-08-27 2018-09-01 2018-10-06 2019-04-04 generation, transmission and topográfico distribution CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Market Contract Type Estimated Actual Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 01/C/EPPF/16 / Feasibility Investing in enhanced study for the rehabilitation reliability of electricity Quality And Cost- Open - IDA / V0030 Prior 275,000.00 1,024,787.20 Signed 2016-07-21 2016-07-27 2016-09-09 2016-10-07 2016-11-06 2016-12-11 2017-01-15 2018-01-15 of the Contador Hydro generation, transmission and Based Selection International Power Plant distribution Investing in enhanced 03/C/EPPF/16 / Technical Consultant reliability of electricity Open - Assistance to elaborate the IDA / V0030 Prior Qualification 90,000.00 212,935.00 Signed 2016-10-07 2016-10-28 2016-12-11 2017-01-10 2017-02-14 2017-08-13 generation, transmission and International Environmental impact Study Selection distribution 01/C/PSR/2016 / Project Project Implementation Least Cost Open - IDA / D1260 Post 80,000.00 41,160.00 Signed 2016-11-24 2016-12-15 2017-01-28 2017-02-25 2017-03-27 2017-05-01 2017-06-05 2017-12-02 audit Support Selection International Page 2 02/C/PSR/2016 / Development of integrated Support to institutional Quality And Cost- Open - Least Cost Power IDA / D1260 Prior 400,000.00 190,957.50 Completed 2017-01-27 2017-02-17 2017-04-02 2017-04-30 2017-05-30 2017-07-04 2017-08-08 2018-08-08 reform and sector planning Based Selection International Development Plan for Sao Tome and Principe 03/C/PSR/2016 / Project Investing in enhanced planning and work Consultant reliability of electricity supervision for rehabilitation IDA / D1260 Post Qualification Open - National 80,000.00 0.00 Canceled 2017-01-08 2017-01-29 2017-03-14 2017-04-13 2017-05-18 2017-11-14 generation, transmission and work of access roads to Selection distribution Contador facility Strengthening operational Consultant 08/C/PSR/2016 / Tariff Open - IDA / D1260 performance and governance Prior Qualification 200,000.00 0.00 Canceled 2017-12-07 2017-12-28 2018-02-10 2018-03-12 2018-04-16 2018-10-13 Study International of EMAE Selection Investing in enhanced 09/C/PSR/2016 / Technical reliability of electricity Quality And Cost- Open - Assistance to prepare the IDA / D1260 Prior 600,000.00 0.00 Canceled 2018-02-01 2018-02-22 2018-04-07 2018-05-05 2018-06-04 2018-07-09 2018-08-13 2019-08-13 generation, transmission and Based Selection International network protection distribution 04/C/PSR/2017 / Technical Assistance to modernize and Support to institutional Quality And Cost- Open - harmonize legal and IDA / D1260 Post 250,000.00 283,345.90 Signed 2017-10-11 2017-10-12 2017-10-30 2017-11-27 2017-12-27 2018-01-31 2018-03-07 2019-03-07 reform and sector planning Based Selection International regulatory framework of the energy sector 04/C/PSR/2016 / Technical Assistance to modernize and Support to institutional Quality And Cost- Open - harmonize legal and IDA / D1260 Prior 250,000.00 0.00 Canceled 2017-02-06 2017-02-27 2017-04-12 2017-05-10 2017-06-09 2017-07-14 2017-08-18 2018-08-18 reform and sector planning Based Selection International regulatory framework of the energy sector 06/C/PSR/2016 / Strengthening operational Consultation and Quality And Cost- IDA / D1260 performance and governance Prior Open - National 400,000.00 0.00 Canceled 2017-09-28 2017-10-19 2017-12-02 2017-12-30 2018-01-29 2018-03-05 2018-04-09 2019-04-09 communication Strategy to Based Selection of EMAE end users 05/C/PSR/2016 / Preparation Strengthening operational Quality And Cost- Open - of management Improvement IDA / D1260 performance and governance Prior 400,000.00 0.00 Canceled 2017-06-15 2017-07-06 2017-08-19 2017-09-16 2017-10-16 2017-11-20 2017-12-25 2018-12-25 Based Selection International Plan for EMAE of EMAE Strengthening operational Consultant 33/C/PSR/2018 / Inventory Under IDA / D1260 performance and governance Post Qualification Open - National 100,000.00 0.00 2018-03-01 2018-03-22 2018-05-05 2018-06-04 2018-07-09 2019-01-05 of EMAE's Assets Implementation of EMAE Selection 30/C/PSR/2018 / Strengthening operational Consultant Consultation and IDA / D1260 performance and governance Post Qualification Open - National 150,000.00 239,213.72 Signed 2018-02-23 2018-03-16 2018-04-29 2018-05-29 2018-07-03 2018-12-30 Comunication Startegy to of EMAE Selection end users 41/C/PRS/2019 / Recruitment of a Human Strengthening operational Consultant resource consultant to Open - Under IDA / D1260 performance and governance Post Qualification 170,000.00 0.00 2019-08-18 2019-09-08 2019-10-22 2019-11-21 2019-12-26 2020-06-23 support the selection of International Implementation of EMAE Selection EMAE Top Level Executive Officers INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Market Contract Type Estimated Actual Draft Negotiated Description Component Review Type Method Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 3 06/C/EPPF/16 / Technical assistance to elaborate the Project Implementation IDA / V0030 Prior Direct Selection Direct 29,000.00 0.00 Canceled 2016-08-17 2016-08-27 2016-09-21 2017-03-20 operating, administrative and Support financial procedure manuals 05/C/EPPF/16 / Upgrade of Investing in enhanced Individual the study on the water reliability of electricity IDA / V0030 Post Consultant Limited 50,500.00 0.00 Canceled 2016-09-26 2016-10-01 2016-10-22 2016-11-26 2017-05-25 potential of Sao Tome and generation, transmission and Selection Principe distribution Investing in enhanced Individual 25/C/PSR/2016 / reliability of electricity IDA / D1260 Post Consultant Limited 25,000.00 76,154.87 Signed 2017-02-28 2017-03-05 2017-03-26 2017-04-30 2017-10-27 Topographic surveying study generation, transmission and Selection distribution Investing in enhanced 26/C/PSR/2016 / Preparation Individual reliability of electricity of Geological surface IDA / D1260 Post Consultant Limited 30,000.00 32,706.01 Signed 2017-02-26 2017-03-03 2017-03-24 2017-04-28 2017-10-25 generation, transmission and mapping Selection distribution 27/C/PSR/2016 / Assessment Investing in enhanced Individual of the water resources reliability of electricity IDA / D1260 Post Consultant Limited 40,000.00 19,058.54 Signed 2017-02-27 2017-03-04 2017-03-25 2017-04-29 2017-10-26 available for energy generation, transmission and Selection production at Contador SHP distribution 12/C/PSR/2016 / Project Implementation Recruitment of Financial IDA / D1260 Post Direct Selection Direct 66,000.00 2,750.00 Signed 2016-11-30 2016-12-10 2017-02-13 2017-08-12 Support manager 18/C/PSR/2016 / Project Implementation Recruitment of IDA / D1260 Post Direct Selection Direct 24,000.00 1,000.00 Signed 2016-11-30 2016-12-10 2017-02-13 2017-08-12 Support Administrative Assistant 24/C/PSR/2016 / Preparation of TOR's for: Topographic Investing in enhanced surveying, geological surface reliability of electricity mapping and assessment of IDA / D1260 Post Direct Selection Direct 17,400.00 17,400.00 Signed 2016-12-16 2016-12-26 2017-03-01 2017-08-28 generation, transmission and the watert resources distribution available for energy production at Contador SHP 11/C/PSR/2016 / Project Implementation Recruitment of AFAP IDA / D1260 Post Direct Selection Direct 98,400.00 0.00 Canceled 2016-11-30 2016-12-10 2017-02-13 2017-08-12 Support Coordinator 13/C/PSR/2016 / Project Implementation IDA / D1260 Post Direct Selection Direct 66,000.00 2,750.00 Signed 2016-11-30 2016-12-10 2017-02-13 2017-08-12 Recruitment of Procurement Support 16/C/PSR/2016 / Project Implementation IDA / D1260 Post Direct Selection Direct 36,000.00 2,750.00 Signed 2016-11-30 2016-12-10 2017-02-13 2017-08-12 Recruitment of Accountant Support 15/C/PSR/2016 / Individual Recruitment of Monitoring, Project Implementation IDA / D1260 Post Consultant Open 55,200.00 6,900.00 Signed 2017-02-28 2017-04-18 2017-05-09 2017-06-13 2017-12-10 environmental safeguards Support Selection and indicators technician Strengthening operational Individual 07/C/PSR/2016 / Demand IDA / D1260 performance and governance Post Consultant Open 95,000.00 0.00 Canceled 2017-01-13 2017-03-03 2017-03-24 2017-04-28 2017-10-25 Forecast Study of EMAE Selection 28/C/PSR/2017 / Individual Project Implementation Recruitment of Procurement IDA / D1260 Prior Consultant Direct 55,200.00 13,800.00 Signed 2017-03-22 2017-04-01 2017-04-22 2017-05-27 2017-11-23 Support Assistant Selection Page 4 10/C/PSR/2016 / Technical Individual Support to institutional Assistance to structure the IDA / D1260 Post Consultant Limited 70,000.00 0.00 Canceled 2018-01-24 2018-01-29 2018-02-19 2018-03-26 2018-09-22 reform and sector planning PPP strategy for AGER Selection Investing in enhanced 09/C/PSR/2017 / Technical Individual reliability of electricity Assistance to prepare the IDA / D1260 Post Consultant Open 60,000.00 74,000.00 Signed 2017-08-18 2017-10-06 2017-10-27 2017-12-01 2018-05-30 generation, transmission and network protection Selection distribution 14/C/PSR/2016 / Individual Project Implementation Recruitment of Technical IDA / D1260 Post Consultant Open 66,000.00 2,320.00 Signed 2017-10-11 2017-11-29 2017-12-20 2018-01-24 2018-07-23 Support Advisor Selection 14/C/PRS/2016 / Project Implementation Recruitment of Technical IDA / D1260 Post Direct Selection Direct 66,000.00 0.00 Canceled 2016-11-30 2016-12-10 2017-02-13 2017-08-12 Support Advisor 29/C/PSR/2018 / Preparation Strengthening operational Individual of Management Improvement IDA / D1260 performance and governance Post Consultant Limited 60,000.00 34,100.00 Completed 2018-03-30 2018-04-04 2018-04-25 2018-05-30 2018-11-26 Plan for EMAE of EMAE Selection 31/C/PSR/2018 / Individual Independent legal opinion on Support to institutional IDA / D1260 Post Consultant Limited 60,000.00 0.00 Canceled 2018-03-14 2018-03-19 2018-04-09 2018-05-14 2018-11-10 the concession of Catchment- reform and sector planning Selection basin Investing in enhanced 36/C/PSR/2018 / Supervision Individual reliability of electricity of Obstacle clearance in the IDA / D1260 Post Consultant Limited 12,500.00 0.00 Canceled 2018-09-13 2018-09-18 2018-10-09 2018-11-13 2019-05-12 generation, transmission and canal access to Contador Selection distribution ST-AFAP-87635-CS-CDS / Strengthening operational Alternatives for urgent IDA / D1260 performance and governance Post Direct Selection Direct 50,000.00 76,000.00 Completed 2018-12-14 2018-12-24 2019-02-27 2019-08-26 solution of the power deficit of EMAE in Sao Tome 39/C/PSR/16 / Technical assistance to elaborate the Project Implementation IDA / V0030 Post Direct Selection Direct 29,000.00 0.00 Canceled 2016-09-06 2016-09-16 2016-11-20 2017-05-19 operating, administrative and Support financial procedure manuals 40/C/PSR/2019 / Consultancy Service for Fuel Investing in enhanced Individual Control and Monitoring reliability of electricity IDA / D1260 Post Consultant Limited 40,000.00 32,760.00 Signed 2019-06-17 2019-06-22 2019-07-13 2019-08-17 2020-02-13 Improvement Plan of generation, transmission and Selection EMAE's Diesel Thermal distribution Generation Plants 50/C/PRS/2019 / Temporary Project Implementation IDA / D1260 Post Direct Selection Direct 6,000.00 0.00 Canceled 2019-10-04 2019-10-14 2019-12-18 2020-06-15 Procurement Assistant Support 51/C/PRS/2019 / Accountant Project Implementation IDA / D1260 Post Direct Selection Direct 13,992.00 0.00 Canceled 2019-10-08 2019-10-18 2019-12-22 2020-06-19 Assistant Support 53/C/PRSE/2019 / Project Implementation Administrative Assistant of IDA / D1260 Post Direct Selection Direct 13,992.00 0.00 Canceled 2019-10-08 2019-10-18 2019-12-22 2020-06-19 Support AFAP 54/C/PRSE/2019 / Project Implementation IDA / D1260 Post Direct Selection Direct 20,988.00 0.00 Canceled 2019-10-08 2019-10-18 2019-12-22 2020-06-19 Accountant Support 58/C/PSR/2018 / Project Implementation Pending Recruitment of a IDA / D1260 Prior Direct Selection Direct 32,181.60 0.00 2018-12-03 2018-12-13 2019-01-07 2020-01-07 Support Implementation Procurement Officer Page 5 Project Implementation Pending 56/C/PSR/2018 / Accountant IDA / D1260 Post Direct Selection Direct 20,988.00 0.00 2018-12-03 2018-12-13 2019-01-07 2019-02-12 Support Implementation 50/C/PSRE/2019 / Project Implementation Pending Temporary Procurement IDA / D1260 Post Direct Selection Direct 6,000.00 0.00 2018-06-03 2018-06-13 2018-07-14 2018-10-12 Support Implementation Assistant 55/C/PSR/2018 / Project Implementation Pending Recruitment of AFAP IDA / D1260 Post Direct Selection Direct 98,400.00 0.00 2018-12-03 2018-12-13 2019-01-12 2020-01-12 Support Implementation Coordinator 59/C/PSR/2018 / Project Implementation Pending Administrative Assistant of IDA / D1260 Post Direct Selection Direct 13,992.00 0.00 2018-12-03 2018-12-13 2019-01-07 2020-01-07 Support Implementation AFAP 13/C/EPPF/2016 / Technical assistance to elaborate the Project Implementation Pending IDA / D1260 Post Direct Selection Direct 29,000.00 0.00 2016-07-05 2016-07-15 2016-08-19 2017-02-15 operating, administrative and Support Implementation financial procedure manuals 57/C/PSR/2018 / Accountant Project Implementation Pending IDA / D1260 Post Direct Selection Direct 13,992.00 0.00 2018-12-03 2018-12-13 2019-01-07 2020-01-07 Assistant Support Implementation 42/C/PRSE/2019 / T.A. FOR Strengthening operational Individual LED BULB DEPLOYMENT Pending IDA / D1260 performance and governance Post Consultant Open 100,000.00 0.00 2019-11-07 2019-12-26 2020-01-16 2020-02-20 2020-08-18 PROGRAMING SAO TOME Implementation of EMAE Selection AND PRINCIPE Page 6