Sample Procurement Plan (Text in italic font is meant for instruction to staff and should be deleted in the final version of the PP) (This is only a sample with the minimum content that is required to be included in the PAD. The detailed procurement plan is still mandatory for disclosure on the Bank’s website in accordance with the guidelines. The initial procurement plan will cover the first 18 months of the project and then updated annually or earlier as necessary). I. General 1. Bank’s approval Date of the procurement Plan [Original: December 2007]: Revision 15 of Updated Procurement Plan, June 2010] 2. Date of General Procurement Notice: Dec 24, 2006 3. Period covered by this procurement plan: The procurement period of project covered from year June 2010 to December 2012 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: [Thresholds for applicable procurement methods (not limited to the list below) will be determined by the Procurement Specialist /Procurement Accredited Staff based on the assessment of the implementing agency’s capacity.] Procurement Method Prior Review Threshold Comments US$ 1. ICB and LIB (Goods) Above US$ 500,000 All 2. NCB (Goods) Above US$ 100,000 First contract 3. ICB (Works) Above US$ 15 million All 4. NCB (Works) Above US$ 5 million All 5. (Non-Consultant Services) Below US$ 100,000 First contract [Add other methods if necessary] 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: [Refer to the relevant CDD project implementation document approved by the Bank or delete if not applicable] 4. Reference to (if any) Project Operational/Procurement Manual: Project Implementation Manual for World Bank Loan Project XYZ 04/01/2010 issued by July 9, 2010 5. Any Other Special Procurement Arrangements: [including advance procurement and retroactive financing, if applicable] 5 ICB works packages will be financed under retroactive financing 6. Summary of the Procurement Packages planned during the first 18 months after project effectiveness ( including those that are subject to retroactive financing and advanced procurement) [List the Packages which require Bank’s prior review first and then the other packages] 1 2 3 4 5 6 7 Ref. Description Estimated Packages Domest Review Comments No. Cost ic by Bank US$ Prefere (Prior / Post) million nce (yes/no) Summary of 82 5 No Prior the ICB (Works) Summary of 43.77 15 No Prior the ICB (Goods) Summary of 64.53 18 No Post 1st the NCB contract (Works) for Prior Review Summary of 1.86 4 No Post 1st the NCB contract (Goods) for Prior Review Summary of 0.45 1 No Prior the ICB (Non- Consultant Services) III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Threshold Comments 1. Competitive Methods (Firms) Above US$ 100,000 2. Single Source (Firms) All 3. Individual Above US$ 50,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise July 9, 2010 entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: [including advance procurement and retroactive financing, if applicable or delete if not applicable] 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Ref. No. Description of Estimated Packages Review Comments Assignment Cost by Bank US$ (Prior / million Post) Summary of 4.17 7 Prior number of contracts that will be let under QCBS Summary of 0.83 1 Prior CQS number of contracts that will be let under other methods July 9, 2010 PROCUREMENT Bangladesh : Bangladesh NATP-2: National Agricultural Technology Program - Phase II Project PLAN General Information Country: Bangladesh Bank’s Approval Date of the Original Procurement Plan: 2017-03-09 2020-02-11 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P149553 GPN Date: Project Name: Bangladesh NATP-2: National Agricultural Technology Program - Phase II Project Loan / Credit No: IDA / 56650 Executing Agency(ies): Department of Fisheries WORKS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual WD4-1 / Post-Harvest Service Center at Natore- Establishment of fish landing center- 01 - Supporting Agricultural Under Construction of landing Single Stage - One IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 96,774.19 0.00 Implementati 2018-12-10 2018-12-10 2018-12-31 2019-01-21 2019-02-25 2019-08-24 platform, ice plant, water Envelope Development on supply facility, insulated cold storage for temporary preservation of ice or iced fish etc.- Lot 1 WD4-2 / Post-Harvest Service Center at Mymenshing-Establishment of fish landing center- 02- Supporting Agricultural Pending Construction of landing Single Stage - One IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 96,774.19 0.00 Implementati 2018-12-10 2018-12-10 2018-12-31 2019-01-21 2019-02-25 2019-08-24 platform, ice plant, water Envelope Development on supply facility, insulated cold storage for temporary preservation of ice or iced fish etc.- Lot 2 NATP-2/DOF/WD-1 / Repair & renovation of 01 Supporting Agricultural Under Single Stage - One Computer room, 02 Training IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 54,426.03 0.00 Implementati 2020-01-23 2020-01-23 2020-02-06 2020-02-18 2020-03-24 2020-07-22 Envelope rooms and 35 rooms of Development on dormitory of Faridpur FTEC NATP-2/DOF/WD-2 / Repair & renovation of 01 Supporting Agricultural Under Single Stage - One Computer room, 01 Training IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 38,035.50 0.00 Implementati 2020-01-23 2020-01-23 2020-02-06 2020-02-18 2020-03-24 2020-07-22 Envelope rooms and 19 rooms of Development on dormitory of Savar FTA NATP-2/DOF/WD-3 / Repair Supporting Agricultural Under & renovation of 01 Training Single Stage - One IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 13,266.27 0.00 Implementati 2020-01-23 2020-01-23 2020-02-06 2020-02-18 2020-03-24 2020-07-22 room and 04 rooms of Envelope Development on dormitory of Raipur FHTC NATP-2/DOF/WD-4 / Repair & renovation of 01 Training Supporting Agricultural Under Single Stage - One rooms and 07 rooms of IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 12,497.04 0.00 Implementati 2020-01-23 2020-01-23 2020-02-06 2020-02-18 2020-03-24 2020-07-22 Envelope dormitory of Natore Sadar Development on FSMF NATP-2/DOF/WD-5 / Repair & renovation of 01 Supporting Agricultural Under Computer room, 01 Training Single Stage - One IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 21,893.49 0.00 Implementati 2020-01-23 2020-01-23 2020-02-06 2020-02-18 2020-03-24 2020-07-22 rooms and 10 rooms of Envelope Development on dormitory of Parbatipur FTEC Page 1 NATP-2/DOF/WD-6.A / Establishment of fish landing center at Singra, Natore (construction of Supporting Agricultural Under Single Stage - One landing platform, ice plant, IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 88,757.39 0.00 Implementati 2020-01-23 2020-01-23 2020-02-06 2020-02-18 2020-03-24 2020-10-20 Envelope water supply facility, Development on insulated cold storage for temporary preservation of ice/iced fish etc.) NATP-2/DOF/WD-6.B / Establishment of fish landing center at Trishal, Mymensingh (construction Supporting Agricultural Under Single Stage - One of landing platform, ice IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 88,757.39 0.00 Implementati 2020-01-23 2020-01-23 2020-02-06 2020-02-18 2020-03-24 2020-10-20 Envelope plant, water supply facility, Development on insulated cold storage for temporary preservation of ice/iced fish etc.) NATP-2/DOF/WD-7 / Supporting Agricultural Pending Habitat improvement of Single Stage - One IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 5,907.00 0.00 Implementati 2020-02-10 2020-02-10 2020-02-24 2020-03-07 2020-04-11 2020-06-10 Charan beel of Kalihati Envelope Development on Upazila, Tangail NATP-2/DOF/WD-8.A / Supporting Agricultural Pending Habitat improvement of Beel Single Stage - One IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 5,907.37 0.00 Implementati 2020-02-10 2020-02-10 2020-02-24 2020-03-07 2020-04-11 2020-06-10 haria, of Itna Upazila, Envelope Development on Kishoreganj NATP-2/DOF/WD-8.B / Supporting Agricultural Pending Habitat improvement of Single Stage - One IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 5,907.37 0.00 Implementati 2020-02-10 2020-02-10 2020-02-24 2020-03-07 2020-04-11 2020-06-10 Sadia kunia beel of Tarail Envelope Development on Upazila, Kishoreganj NATP-2/DOF/WD-8.C / Supporting Agricultural Pending Habitat improvement of Single Stage - One IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 5,907.37 0.00 Implementati 2020-02-10 2020-02-10 2020-02-24 2020-03-07 2020-04-11 2020-06-10 Nobodia beel of Pakundia Envelope Development on Upazila, Kishoreganj NATP-2/DOF/WD-8.D / Habitat improvement of Supporting Agricultural Pending Single Stage - One Chotodigha beel of IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 5,907.37 0.00 Implementati 2020-02-10 2020-02-10 2020-02-24 2020-03-07 2020-04-11 2020-06-10 Envelope Mithamoin Upazila, Development on Kishoreganj NATP-2/DOF/WD-9 / Supporting Agricultural Pending Habitat improvement of Single Stage - One IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 5,907.37 0.00 Implementati 2020-02-10 2020-02-10 2020-02-24 2020-03-07 2020-04-11 2020-06-10 Zazira beel of Sadar Envelope Development on Upazila, Madaripur NATP-2/DOF/WD-10.B / Supporting Agricultural Pending Habitat improvement of Single Stage - One IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 5,907.37 0.00 Implementati 2020-02-10 2020-02-10 2020-02-24 2020-03-07 2020-04-11 2020-06-10 Hiron beel of Kotalipara Envelope Development on Upazila, Gopalganj NATP-2/DOF/WD-10.A / Supporting Agricultural Pending Habitat improvement of Single Stage - One IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 5,907.37 0.00 Implementati 2020-02-10 2020-02-10 2020-02-24 2020-03-07 2020-04-11 2020-06-10 Baghiar beel of Kotalipara Envelope Development on Upazila, Gopalganj NATP-2/DOF/WD-11.A / Supporting Agricultural Pending Habitat improvement of Single Stage - One IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 5,907.37 0.00 Implementati 2020-02-10 2020-02-10 2020-02-24 2020-03-07 2020-04-11 2020-06-10 Kashian beel of Kendua Envelope Development on Upazila, Netrokona NATP-2/DOF/WD-11.B / Supporting Agricultural Pending Habitat improvement of Single Stage - One IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 5,907.37 0.00 Implementati 2020-02-10 2020-02-10 2020-02-24 2020-03-07 2020-04-11 2020-06-10 Nakdhora beel of Madan Envelope Development on Upazila, Netrokona Page 2 NATP-2/DOF/WD-11.C / Habitat improvement of Supporting Agricultural Pending Single Stage - One Bisorpasha haor of IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 5,907.37 0.00 Implementati 2020-02-10 2020-02-10 2020-02-24 2020-03-07 2020-04-11 2020-06-10 Envelope Kalmakanda Upazila, Development on Netrokona NATP-2/DOF/WD-11.D / Supporting Agricultural Pending Habitat improvement of Single Stage - One IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 5,907.37 0.00 Implementati 2020-02-10 2020-02-10 2020-02-24 2020-03-07 2020-04-11 2020-06-10 Dharam beel of Barhatta Envelope Development on Upazila, Netrokona NATP-2/DOF/WD-15.A / Supporting Agricultural Pending Habitat improvement of Beel Single Stage - One IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 5,907.37 0.00 Implementati 2020-02-10 2020-02-10 2020-02-24 2020-03-07 2020-04-11 2020-06-10 Chatra of Atgharia Upazila, Envelope Development on Pabna NATP-2/DOF/WD-15.B / Supporting Agricultural Pending Habitat improvement of Single Stage - One IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 5,907.37 0.00 Implementati 2020-02-10 2020-02-10 2020-02-24 2020-03-07 2020-04-11 2020-06-10 Shaowladaha beel of Envelope Development on Chatmohor Upazila, Pabna GOODS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Supporting Agricultural GD/DOF-08 / Office Single Stage - One IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 12,905.00 10,632.39 Completed 2017-03-02 2017-03-12 2017-03-27 2017-04-12 2017-05-15 2017-06-14 Furniture for PIU and ICT Envelope Development Supporting Agricultural GD/DOF-28 / Office Request for Single Stage - One IDA / 56650 Technology for Fisheries Post Limited 3,900.00 2,981.18 Completed 2017-03-15 2017-05-09 2017-05-29 supplies and consumables Quotations Envelope Development GD/DOF-25 / Preparation and printing of pond record Supporting Agricultural Single Stage - One book, CIG saving books, IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 38,700.00 17,552.59 Completed 2008-03-10 2008-03-15 2008-04-07 2008-04-20 2008-05-23 2008-06-22 Envelope leaflet, aquaculture advice Development slip pad etc. GD/DOF-24 / Reagent and Supporting Agricultural chemicals for Quality Single Stage - One IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 38,709.00 33,429.33 Completed 2017-09-25 2017-09-30 2017-11-07 2017-12-03 2018-01-07 2018-07-06 Assurance Laboratories Envelope Development under DoF. GD/DOF-26 / Printing of Supporting Agricultural Request for Single Stage - One leaflets on project IDA / 56650 Technology for Fisheries Post Limited 6,450.00 4,618.42 Completed 2017-09-01 2017-10-27 2018-04-25 Quotations Envelope intervensions and AIF Development Supporting Agricultural GD/DOF-13 / Water Single Stage - One IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 525,484.00 412,993.89 Completed 2017-02-23 2017-02-23 2017-03-06 2017-03-20 2017-04-22 2017-06-21 Analyzing Kit Envelope Development Supporting Agricultural GD/DOF- 17 / Sound Single Stage - One IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 12,903.00 11,765.69 Completed 2017-09-28 2017-10-03 2017-11-14 2017-12-14 2018-01-18 2018-07-17 System with Accessories Envelope Development Supporting Agricultural GD/DOF-30_1 / Printing of Single Stage - One IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 12,905.00 3,089.76 Completed 2017-10-20 2017-10-25 2017-12-06 2018-01-05 2018-02-09 2018-08-08 aquaculture manual Envelope Development Page 3 GD/DOF-29 / Procuremet, installation and reconfiguration of router for Supporting Agricultural Request for Single Stage - One Internet connectivity at IDA / 56650 Technology for Fisheries Post Limited 3,490.00 2,666.03 Completed 2017-10-22 2017-12-13 2018-06-11 Quotations Envelope 9th,10th and other floors of Development Matsha Bhaban, Ramna, Dhaka. GD/DOF-30 / Procurement Supporting Agricultural of training materials for Single Stage - One IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 32,300.00 17,249.99 Completed 2017-10-31 2017-11-05 2017-12-17 2018-01-16 2018-02-20 2018-08-19 training to be conducted Envelope Development cetrally by PIU, NATP, DoF Supporting Agricultural GD/DOF-31 / Mobile Tablet Single Stage - One IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 756,129.03 532,304.63 Signed 2018-02-18 2018-02-23 2018-03-30 2018-04-29 2018-06-03 2018-09-01 SIM with 3G Connectivity Envelope Development GD/DOF-32 / Printing and Supporting Agricultural Request for Single Stage - One binding of Fisheries Master IDA / 56650 Technology for Fisheries Post Limited 2,900.00 2,071.01 Completed 2018-01-30 2018-03-15 2018-09-11 Quotations Envelope Plan Development GD/DOF-33 / Upgrading the connectivity of DoF by Fiber Optic Backbone Network Supporting Agricultural (1st, 3rd, 4th and 9th floor) Single Stage - One IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 17,690.00 15,672.21 Completed 2018-04-30 2018-05-03 2018-05-24 2018-06-21 2018-07-19 2019-01-15 and Wi-Fi Internet Envelope Development connectivity from 1st to 8th floor of Matshya Bhaban, Dhaka GD/DOF- 16 / Preparation Supporting Agricultural Request for Single Stage - One of video on aquaculture IDA / 56650 Technology for Fisheries Post Open - National 6,387.09 5,889.35 Completed 2018-05-28 2018-07-02 2018-12-29 Quotations Envelope technologies Development GD/DOF- 27 / Preparation Supporting Agricultural of Video on project Request for Single Stage - One IDA / 56650 Technology for Fisheries Post Open - National 6,451.62 3,569.30 Completed 2018-05-28 2018-07-02 2018-12-29 interventions and support for Quotations Envelope Development rural fish farmers GD/DOF-24-1 / Reagents Supporting Agricultural and chemicals for quality Single Stage - One IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 38,709.68 0.00 Canceled 2018-09-25 2018-09-25 2018-10-16 2018-11-06 2018-12-11 2019-02-19 assurance laboratories under Envelope Development DoF GD/DOF-34 / Procurement Supporting Agricultural Request for Single Stage - One of Office Supplies & IDA / 56650 Technology for Fisheries Post Limited 3,225.81 2,935.63 Completed 2018-08-30 2018-09-30 2018-10-30 Quotations Envelope Consumable for FY 2018-19 Development Supporting Agricultural Single Stage - One GD/DOF-18 / Fishing Net IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 1,056,774.19 762,468.86 Signed 2018-08-30 2018-08-30 2018-09-27 2018-10-25 2018-11-29 2019-04-28 Envelope Development GD/DOF-23 / Fish Feed Supporting Agricultural Single Stage - One and Ingredient Testing Lab IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 258,064.52 235,437.43 Completed 2019-01-30 2019-01-30 2019-02-27 2019-03-27 2019-05-01 2019-08-29 Envelope Equipment Development GD/DOF-24-1-2 / Reagents Supporting Agricultural and Chemicals for Quality Single Stage - One IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 38,709.67 35,313.59 Completed 2019-07-22 2019-07-22 2019-08-12 2019-09-02 2019-10-07 2019-12-16 Assurance Laboratories Envelope Development under DoF NATP-2/DOF/GD-24.1.2 / Supply of Reagents and Supporting Agricultural Under Single Stage - One Chemicals for quality IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 35,502.95 0.00 Implementati 2020-01-23 2020-01-23 2020-02-06 2020-02-18 2020-03-24 2020-06-22 Envelope assurance laboratories under Development on DoF Page 4 NATP-2/DOF/GD-42 / Supporting Agricultural Under Single Stage - One Supply & Installation of IDA / 56650 Technology for Fisheries Post Request for Bids Open - National 142,011.83 0.00 Implementati 2020-01-23 2020-01-23 2020-02-06 2020-02-18 2020-03-24 2020-06-22 Envelope Fish Feed Pelleting Machine Development on NON CONSULTING SERVICES Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GD/DOF-16 / Preparation Supporting Agricultural Request for Single Stage - One ov Video on Aquaculture IDA / 56650 Technology for Fisheries Post Limited 6,450.00 0.00 Canceled 2017-10-03 2017-11-28 2018-05-27 Quotations Envelope Technologies. Development GD/DOF-27 / Preparation of Supporting Agricultural Video on project Request for Single Stage - One IDA / 56650 Technology for Fisheries Post Limited 3,900.00 0.00 Canceled 2017-09-15 2017-11-10 2018-01-09 interventions and supports Quotations Envelope Development for rural fish farmers. CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Market Contract Type Estimated Actual Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BD-DOF-26634-CS-QCBS / Supporting Agricultural Quality And Cost- Market Access and Supply IDA / 56650 Technology for Fisheries Post Open - National 263,664.00 0.00 Canceled 2017-10-25 2017-11-15 2017-12-29 2018-01-26 2018-02-25 2018-04-01 2018-05-06 2021-05-05 Based Selection Chain Service Provider Development SD/DOF/F-04 / Market Supporting Agricultural Quality And Cost- access and supply chain IDA / 56650 Technology for Fisheries Post Open - National 263,664.52 213,196.35 Signed 2018-10-14 2018-11-04 2019-01-09 2019-02-06 2019-03-08 2019-04-12 2019-05-10 2020-05-09 Based Selection service provider Development SD/DOF/F-05 / Development Supporting Agricultural Quality And Cost- of Website under DoF for IDA / 56650 Technology for Fisheries Post Open - National 25,806.45 23,597.85 Signed 2018-12-06 2018-12-27 2019-03-11 2019-04-08 2019-05-08 2019-06-12 2019-07-10 2020-07-09 Based Selection Fish Farmers Development INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Market Contract Type Estimated Actual Draft Negotiated Description Component Review Type Method Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Supporting Agricultural Individual SD DOF/IC-04 / Assistant IDA / 56650 Technology for Fisheries Post Consultant Open 160,000.00 146,226.38 Signed 2017-02-23 2017-03-10 2017-03-20 2017-04-20 2021-09-30 Manager (Accounts) Development Selection Supporting Agricultural Individual SD DOF/IC-05 / Training & IDA / 56650 Technology for Fisheries Post Consultant Open 270,000.00 742,924.35 Signed 2017-02-23 2017-02-28 2017-03-10 2017-04-23 2021-10-09 Communication Expert Development Selection Supporting Agricultural Individual SD DOF/IC-07 / Monitoring IDA / 56650 Technology for Fisheries Post Consultant Open 270,000.00 247,641.45 Signed 2017-02-24 2017-03-11 2017-03-27 2017-04-27 2021-10-06 and Evaluation Expart Development Selection Supporting Agricultural Individual SD DOF/IC-06 / ICT IDA / 56650 Technology for Fisheries Post Consultant Open 160,000.00 146,226.38 Signed 2017-02-24 2017-03-11 2017-03-21 2017-04-21 2021-09-30 Specialist Development Selection Page 5 SD/DOF/IC- 08 / Market Supporting Agricultural Individual Access and Supply Chain IDA / 56650 Technology for Fisheries Post Consultant Open 22,258.00 22,376.17 Signed 2017-08-26 2017-10-29 2017-11-19 2017-12-24 2018-06-22 Specialist (Short term Development Selection individual consultant) Page 6