Strengthening the National Rural Transport Program (P132750) Since this is an ongoing project, that started in April 2014, submission of a separate summary procurement plan is irrelevant at this stage. PROCUREMENT Nepal : Project for Strengthening the National Rural Transport Program PLAN General Information Country: Nepal Bank’s Approval Date of the Original Procurement Plan: 2017-10-18 2019-09-17 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P132750 GPN Date: Project Name: Project for Strengthening the National Rural Transport Program Loan / Credit No: IDA / 53360, IDA / H8990 Executing Agency(ies): Department of Local Infrastructure WORKS Bid Evaluation Activity Reference No. Draft Pre- Draft Bidding Loan / Credit Market Procurement Prequalification Actual Process Prequalification Specific Procurement Bidding Documents Proposal Submission Report and / Description Component Review Type Method qualification Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Recommendation for Documents Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SNRTP-KAN-W-NCB-10.04- Component A: Institutional UG-070-71 / Kanchanpur: Single Stage - One IDA / 53360 Strengthening, T.A., and Prior Request for Bids Open - National 181,111.90 Signed Rajmarg-Budha- Jhaipura- Envelope Monitoring Gauji-Bridhasharam Road SNRTP-ARG-W-NCB-1-16- Component B: PM-074-75 / Periodic Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 45,793.00 Signed 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Maintenance of Amarai Envelope and rehabilitation Jukena Road (8 Km) SNRTP-DHA-W-NCB-6-04- PM-074-75 / Periodic Component B: Single Stage - One Maintenance of IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 70,357.35 Signed 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Envelope Bhimdhunga-Lamidanda- and rehabilitation Galchi (11 Km) SNRTP-GUL-W-NCB-8-08 - PM-074-75 / Periodic Component B: Single Stage - One Maintenance of Shantipur- IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 90,548.37 Signed 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Envelope Harrachaur-Olibang- and rehabilitation Sindurghanse Road(12 Km) SNRTP-KAN-W-NCB-10-08- PM-073-74 / Periodic Component B: Single Stage - One Maintenance of Bansamiti- IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 0.00 Canceled 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Envelope Pipalladi-Jonpuri-Ranipur and rehabilitation Road ( 10 KM) SNRTP-KAI-W-NCB-9-08- Component B: PM-074-75 / Periodic Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 126,039.36 Signed 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Maintenance of Geta- Envelope and rehabilitation Murkatti Road (12.60 KM) SNRTP-NAW-W-NCB-15-14- Component B: PM-074-75 / Periodic Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 0.00 Canceled 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Maintenance of Manjariya- Envelope and rehabilitation Jamuniya Road (9.00 km) SNRTP-KAP-W-NCB-11-10- PM-074-75 / Periodic Component B: Maintenance of Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 253,899.85 Signed 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Krishnanagar- Shisirwa - Envelope and rehabilitation Gugauli -Shivgadi Road (25Km) SNRTP-NAW-W-NCB-15-15- PM-074-75 / Periodic Component B: Single Stage - One Maintenance of Arunkhola- IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 11,643.24 Signed 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Envelope Rakachuli-Mityal Road and rehabilitation (11.50 km) SNRTP-PAR-W-NCB-18-09- PM-074-75 / Periodic Component B: Single Stage - One Maintenance of Ramghadwa- IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 0.00 Canceled 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Envelope Jagarnathpur-Milanchowk and rehabilitation Road (9 Km) SNRTP-PAR-W-NCB-18-13- PM-074-75 / Periodic Maintenance of Mudli - Tulsi barwa-Road (6 Km), Component B: Muldi tindubiya-sabithawa Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 0.00 Canceled 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 road(6 km), bedhihari birta Envelope and rehabilitation basantapur road (6 km) padamsadak-bahuwari (6km) and baghi patelchok road (9 km) SNRTP-RAS-W-NCB-20-06- Component B: PM-074-75 / Periodic Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 0.00 Canceled 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Maintenance of Sole- Envelope and rehabilitation Bhimali-Hakubesi Road (5 Km) SNRTP-RAS-W-NCB-20-08- PM-074-75 / Periodic Component B: Single Stage - One Maintenance of Dasmure IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 0.00 Canceled 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Envelope Seti-Devi Ma Vi. Dhuseni and rehabilitation Road (5 Km) SNRTP-RAU-W-NCB-21-14- Component B: PM-074-75 / Periodic Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 0.00 Canceled 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Maintenance of Prempur Envelope and rehabilitation Gonahi MHW Road (22Km) SNRTP-RAU-W-NCB-21-15- PM-074-75 / Periodic Component B: Single Stage - One Maintenance of Gamhariya IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 61,964.29 Signed 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Envelope Birta(BHW) Ragnapur Road and rehabilitation (12Km) Page 1 SNRTP-RAU-W-NCB-21-16- PM-074-75 / Periodic Component B: Maintenance of Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 49,759.00 Signed 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Sukdevchowk Khesaraiya Envelope and rehabilitation Shivnagar Road (9Km) and nahar bridge 30m, Rautahat SNRTP-SAR-W-NCB-25-08- PM-074-75 / Periodic Maintenance of Baghchaur- Component B: Single Stage - One Kotmaula-Patihalna Rural IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 79,114.86 Signed 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Envelope Road( Phulparasi-Simara- and rehabilitation India Border Road) Maintenance (8 Km) SNRTP-SAR-W-NCB-25-11- PM-074-75 / Periodic Component B: Maintenance of Raniganj Single Stage - One IDA / H8990 Maintenance, upgrading, Post Request for Bids Open - National 153,128.41 Signed 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Parwanipur Road (10 Km) Envelope and rehabilitation Parsa Riterchor (13 km) Sarlahi SNRTP-SIR-W-NCB-26-16- PM-074-75 / Periodic Component B: Single Stage - One Maintenance of Mirchaiya IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 130,853.73 Signed 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Envelope Kalyanpur Siraha Road (23 and rehabilitation km): SNRTP-TAN-W-NCB-29-15- PM-074-75 / Periodic Component B: Maintenance of Bhagwati Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 119,202.66 Signed 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Rangapath (Chhirken- Envelope and rehabilitation Maiwal-Nabrung- Tanahunsur-Barbhanjyang ) (13 Km) SNRTP-UDA-W-NCB-30-14- PM-074-75 / Periodic Component B: Single Stage - One Maintenance of Basaha IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 207,377.59 Signed 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Envelope Chaudani Ranitar Road (24 and rehabilitation Km) SNRTP-BHOJ-W-NCB-31- 08-PM-074-75 / Periodic Component B: Maintenance of Taksar- Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 149,210.76 Signed 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Gumba -Dalgaun- Okhare - Envelope and rehabilitation Dodhalekhani Rd II Pkg (15 Km) SNRTP-BHOJ-W-NCB-31- 09-PM-074-75 / Periodic Component B: Maintenance of Tiwari- Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 159,652.90 Signed 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Bhanjyang-Chyangre-Bastim Envelope and rehabilitation Thulogaon Duma Sano Duma Road Rd II Pkg (16 Km) SNRTP-SANK-W-NCB-32- 01-PM-074-75 / Periodic Component B: Single Stage - One Maintenance of Khadbari- IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 195,019.99 Signed 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Envelope Ramche-Lebrang-Dake- and rehabilitation Bharabise Rd (16 Km) SNRTP-TER-W-NCB-33-02- Component B: PM-074-75 / Periodic Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 208,807.79 Signed 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Maintenance of Serma- Envelope and rehabilitation jaljale-Isibu Sadak Rd (19 Km) SNRTP-SIND-W-NCB-34-03- PM-074-75 / Periodic Component B: Single Stage - One Maintenance of Dauchet- IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 148,968.33 Signed 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Envelope Keureni-Banskharka-Jatatn- and rehabilitation Baruwa Rd (19 Km) SNRTP-GOR-W-NCB-35-04- PM-074-75 / Periodic Component B: Single Stage - One Maintenance of Abuwa -B IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 0.00 Canceled 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Envelope irdi-Pauwatar-Kalamata- and rehabilitation Airport Road (8 Km) SNRTP-UDA-W-NCB-30-15- PM-074-75 / Periodic Component B: Single Stage - One Maintenance of Murkuchi IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 188,476.80 Signed 2017-11-26 2017-12-01 2017-12-31 2018-01-30 2018-02-21 2019-02-21 Envelope Puwarebhanjyang Bhutar and rehabilitation Road 23 Km SNRTP-BAR-W-NCB-3-07- PM-074-75 / Periodic Maintenance of Bridge Component B: Single Stage - One along Kalaiya- IDA / H8990 Maintenance, upgrading, Post Request for Bids Open - National 90,724.43 Signed 2017-11-27 2017-12-02 2018-01-01 2018-01-31 2018-02-22 2018-08-21 Envelope Ganjbhabanipur (Bridge and rehabilitation Maintenance) and Kholbi Maduwa Road 9km, Bara SNRTP-MAK-W-NCB-14-07- PM-074-75 / Pulkomukh- Indrayanichaur - Chalti Component B: Single Stage - One (Agrakhola Road) 25 km IDA / H8990 Maintenance, upgrading, Post Request for Bids Open - National 370,953.95 Signed 2017-11-26 2017-12-01 2017-12-31 2018-01-15 2018-02-06 2019-02-06 Envelope and GAirigaon pakani and rehabilitation manahari road (20 km), Makwanpur SNRTP-SIR-W-NCB-26-14- PM-074-75 / Periodic Component B: Single Stage - One Maintenance of Dhangadi IDA / H8990 Maintenance, upgrading, Post Request for Bids Open - National 95,679.16 Signed 2017-11-26 2017-12-01 2017-12-31 2018-01-30 2018-02-21 2019-02-21 Envelope Patari-Jijhaul Road (25 and rehabilitation KM), Siraha SNRTP-SIND-W-NCB-34-04- PM-074-75 / Periodic Component B: Single Stage - One maintenance of Naubise IDA / H8990 Maintenance, upgrading, Post Request for Bids Open - National 382,179.93 Signed 2017-12-03 2017-12-08 2018-01-07 2018-02-06 2018-02-28 2019-02-28 Envelope Chautara Melamchi, and rehabilitation Sindhupalchok Page 2 SNRTP-NCB-W-25-12-PM- 074-75 / Periodic Component B: Maintenance of Single Stage - One IDA / H8990 Maintenance, upgrading, Post Request for Bids Open - National 0.00 Canceled 2017-11-26 2017-12-01 2017-12-31 2018-01-30 2018-02-21 2019-02-21 Dangrakhola Bridge and Envelope and rehabilitation causeway along salanpurhirapur Road (30 m bridge, 10 m causeway) SNRTP-LAM-W-NCB-36-02- UG-074-75 / Karputar- Component B: Single Stage - One Daduwa-Gilung- IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 0.00 Canceled 2017-12-25 2017-12-30 2018-01-29 2018-02-28 2018-03-22 2019-06-25 Envelope Salmebhanjyang (23.4km), and rehabilitation Lamjung SNRTP-UDA-W-NCB-30-07- Component B: BRI-074-75 / Babiya Khola Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 0.00 Canceled 2018-01-15 2018-01-30 2018-03-01 2018-03-31 2018-04-22 2019-04-22 Bridge at gaighat fattepur Envelope and rehabilitation Road 28 Km (50 m) SNRTP-SAP-W-NCB-24-08- Component B: BRI-074-75 / Jita Khola-I Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 256,685.60 Signed 2018-01-15 2018-01-30 2018-03-01 2018-03-31 2018-04-22 2019-04-22 Bridge at ch23+000 Envelope and rehabilitation (Jandaul-Kushaha Road, 24.55 km) SNRTP-BHOJ-W-NCB-31- 06-BRI-074-75 / Pikhuwa Component B: Single Stage - One Khola Bridge at Bhojpur- IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 0.00 Canceled 2018-01-15 2018-02-04 2018-03-06 2018-04-05 2018-04-27 2019-05-02 Envelope Manebhanjyang-Ranibas- and rehabilitation Ghoretar Road, (77.6 m) SNRTP-BAN-W-NCB-2-06- Component B: BRI-074-75 / Duduwa Nala Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 0.00 Canceled 2018-01-15 2018-02-09 2018-03-11 2018-04-10 2018-05-02 2019-05-02 Bridge at ch 0+500 Envelope and rehabilitation (Betahani road),(51 m) SNRTP-GUL-W-NCB-8-13- Component B: Single Stage - One BRI-074-75 / Tribeni Khola IDA / H8990 Maintenance, upgrading, Post Request for Bids Open - National 0.00 Canceled 2018-01-15 2018-01-30 2018-03-01 2018-03-31 2018-04-22 2019-04-22 Envelope Bridge,26 m Gulmi and rehabilitation SNRTP-GUL-W-NCB-8-14- Component B: Single Stage - One BRI-074-75 / Lung Khola IDA / H8990 Maintenance, upgrading, Post Request for Bids Open - National 0.00 Canceled 2018-01-15 2018-01-30 2018-03-01 2018-03-31 2018-04-22 2019-04-22 Envelope Bridge, 16 m, Gulmi and rehabilitation SNRTP-TER-W-NCB-33-03- PM-074-75 / Periodic Component B: Maintenance of Fakchamara- Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 81,112.89 Signed 2018-01-15 2018-02-19 2018-03-21 2018-04-20 2018-05-12 2019-05-12 Panchkanya-Pokari Road Envelope and rehabilitation and Chaparichowk Angdim Sadak,9 km , Terathum SNRTP-DHAN-W-NCB-7-18- PM-074-75 / Periodic Component B: Single Stage - One maintenance of Nunapatti IDA / H8990 Maintenance, upgrading, Post Request for Bids Open - National 93,948.58 Signed 2017-11-26 2017-12-01 2017-12-31 2018-01-30 2018-02-20 2019-02-20 Envelope Barfi Duhabi Road (13.5) and rehabilitation km SNRTP-DHAN-W-NCB-7-20- PM-074-75 / Periodic Component B: Single Stage - One Maintenance of Bisharbohar IDA / H8990 Maintenance, upgrading, Post Request for Bids Open - National 70,045.85 Signed 2018-03-05 2018-03-10 2018-04-09 2018-04-24 2018-05-15 2019-05-15 Envelope Durbakot thadi road (13 and rehabilitation Km) SNRTP-RUP-W-NCB-22-12- BRI-074-75 / Ghamaha Component B: Single Stage - One Khola Bridge (Buddhanagar- IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 628,246.39 Signed 2018-03-05 2018-03-10 2018-04-09 2018-05-09 2018-05-31 2019-05-31 Envelope Serawa-Kisauli-Suryapura and rehabilitation Road)(51m), Rupandehi SNRTP-PAL-W-NCB-17-05- BRI-074-75 / Amlihan Component B: Single Stage - One Bridge at 5+560 (Bastari- IDA / H8990 Maintenance, upgrading, Post Request for Bids Open - National 583,673.90 Signed 2018-03-05 2018-03-15 2018-04-14 2018-04-29 2018-05-21 2019-05-21 Envelope Jhadewa-Gothadi Road, and rehabilitation 24.940 km) (32 m) SNRTP-GOR-W-NCB-35-05- BRI-074-75 / Ludi Khola Component B: Bridge at 3+00 (Laxmibazar- Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 305,003.42 Signed 2018-03-05 2018-03-20 2018-04-19 2018-05-19 2018-06-10 2019-06-10 Tinmane-Jumlichautara- Envelope and rehabilitation Rainas-Butar Road, (22 m) Gorkha SNRTP-SYA-W-NCB-28-09- BRI-074-75 / Jugle Khola Component B: Bridge at 9+100 of Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 200,114.92 Signed 2018-03-05 2018-03-10 2018-05-11 2018-06-10 2018-07-02 2019-07-02 Naudanda-Bicharichautara- Envelope and rehabilitation Karkineta Rural Road, (23m), Syangja SNRTP-PYU-W-NCB-19-07- Component B: Single Stage - One BRI-074-75 / Hariya Khola IDA / H8990 Maintenance, upgrading, Post Request for Bids Open - National 206,460.90 Signed 2018-01-15 2018-01-30 2018-03-01 2018-03-31 2018-04-22 2019-04-22 Envelope Bridge,26 m, Pyuthan and rehabilitation SNRTP-SIR-W-NCB-26-09- BRI-074-75 / Mainawati Component B: Under Single Stage - One Khola Bridge at ch 2+700 IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 0.00 Implementat 2018-03-05 2018-03-10 2018-04-09 2018-04-24 2018-05-16 2019-05-16 Envelope Siraha-Sukhipur Road,18.96 and rehabilitation ion km (35 m) SNRTP-GUL-W-NCB-8-12- BRI-074-75 / Harewa Khola Component B: Single Stage - One Bridge at 13+500 ( IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 323,645.34 Signed 2018-03-05 2018-03-10 2018-04-09 2018-04-24 2018-05-16 2019-05-16 Envelope Chorkate-Shantipur Road) and rehabilitation (26 m), Gulmi SNRTP-RAU-W-NCB-21-09- BRI-074-75 / Aduwa (Aruwa) Khola Component B: Under Single Stage - One Bridge,Malahi ghat at IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 233,424.99 Implementat 2018-03-05 2018-03-10 2018-04-09 2018-04-24 2018-05-16 2019-05-16 Envelope 7+530 (Gaur-Kathariya- and rehabilitation ion Santapur-Dostiya- Petbharwa(bara border) Road 25 m, Rautahat Page 3 SNRTP-KAN-W-NCB-10-05- BRI-074-75 / Construction Component B: of Malaria Khola Bridge.( Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 222,122.98 Signed 2018-01-15 2018-02-14 2018-03-16 2018-04-15 2018-05-07 2019-05-07 25 m span) across Dadthan- Envelope and rehabilitation Baliban Road, KANCHANPUR SNRTP-SANK-W-NCB-32- 06-BRI-074-75 / Pangma Component B: Khola Bridge at 7+120 Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 224,079.00 Signed 2018-03-05 2018-03-10 2018-04-09 2018-04-24 2018-05-16 2019-05-16 (Khandbari-Kalchebesi- Envelope and rehabilitation Pangtha-Dake-Sabhapokhar Road) (26m), Sankhuwasabha SNRTP-ARG-W-NCB-01-11- BRI-074-75 / Samne Khola Component B: Single Stage - One Bridge at Sandhikhark- IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 155,320.27 Signed 2018-01-15 2018-01-30 2018-03-01 2018-03-31 2018-04-21 2019-04-21 Envelope Pakale-Dharapani- and rehabilitation Chujathanti Road,(11 m),Argakhachi SNRTP-SANK-W-NCB-32- Component B: 07-BRI-074-75 / Malta Single Stage - One IDA / H8990 Maintenance, upgrading, Post Request for Bids Open - National 238,431.92 Signed 2018-03-05 2018-03-10 2018-04-09 2018-04-24 2018-05-16 2019-05-16 Khola Bridge, 26 m , Envelope and rehabilitation Sankhuwasabha, SNRTP-MAK-W-NCB-14-08- BRI-074-075 / Dubu Khola, Component B: Single Stage - One Ch 9+800 along Chuniya- IDA / H8990 Maintenance, upgrading, Post Request for Bids Open - National 223,624.77 Signed 2018-03-05 2018-03-10 2018-04-09 2018-04-24 2018-05-16 2019-05-16 Envelope Namtar-Bharta-Khairang and rehabilitation Road, 20 m Makwanpur SNRTP-PAR-W-NCB-18-08- Component B: BRI-074-075 / Dharar Single Stage - One IDA / H8990 Maintenance, upgrading, Post Request for Bids Open - National 0.00 Canceled 2018-03-05 2018-03-10 2018-04-09 2018-04-24 2018-05-16 2019-05-16 Khola Bridge,CH 13+130 Envelope and rehabilitation along Janata Road, 20 m , Parsa SNRTP-SAR-W-NCB-25-09- BRI-074-075 / Component B: Single Stage - One Gadauli(Godar) Bridge,Ch IDA / H8990 Maintenance, upgrading, Post Request for Bids Open - National 240,919.11 Signed 2018-03-05 2018-03-10 2018-04-09 2018-04-24 2018-05-16 2019-05-16 Envelope 2+190 along Karmaiya- and rehabilitation Hathiyol Road, 25 m Sarlahi SNRTP-SAR-W-NCB-25-12- PM-074-75 / Periodic Component B: Maintenance of Single Stage - One IDA / H8990 Maintenance, upgrading, Post Request for Bids Open - National 30,930.46 Signed 2018-03-05 2018-03-10 2018-04-09 2018-04-26 2018-05-18 2019-05-18 Dangrakhola Bridge and Envelope and rehabilitation causeway along salanpurhirapur Road (30 m bridge, 10 m causeway) SNRTP-BRD-W-NCB-4-08- PM-074-75 / Periodic Component B: Single Stage - One Maintenance of Ghorpitta - IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 0.00 Canceled 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Envelope Baniyabhar - MRM Road (9 and rehabilitation km) SNRTP-KAS-W-NCB-12-19- PM-074-75 / Periodic Component B: Maintenance of Rakhi- Single Stage - One IDA / H8990 Maintenance, upgrading, Post Request for Bids Open - National 243,124.96 Signed 2018-05-08 2018-05-13 2018-06-12 2018-06-27 2018-07-11 2019-07-11 Mijauri - Gahate -Toshi Envelope and rehabilitation Road (27.1 Km.) including causeway, Kaski SNRTP-BAR-W-NCB-3-08- PM-074-75 / Periodic Component B: Maintenance of Kuduwa- Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 113,664.06 Signed 2018-05-08 2018-05-13 2018-06-12 2018-06-27 2018-07-11 2019-07-11 Langada Chowk-Bazar Envelope and rehabilitation (Bargadhi), Bara ( 0+000 to 13+326, Length- 13.326 km) SNRTP-KAP-W-NCB-11-11- PM-074-75 / Periodic Component B: Maintenance of Jahadi- Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 85,190.93 Signed 2018-05-08 2018-05-13 2018-06-12 2018-06-27 2018-07-11 2019-07-11 Bikuli-Bugchi Road, Envelope and rehabilitation Kapilvastu ( 0+000 to 9+500, Lenght 9.5km) SNRTP-KAP-W-NCB-11-13- PM-074-75 / Periodic Component B: Maintenance of Jhanda- Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 102,074.76 Signed 2018-05-08 2018-05-13 2018-06-12 2018-06-27 2018-07-11 2019-07-11 Bangai-Motipur-Dohate Envelope and rehabilitation Road, Kapilvastu (0+000 to 14+400, Length 11.05 km) SNRTP-DHAN-W-NCB-7-21- PM-074-75 / Periodic Maintenance of Component B: Dhanushadham-Sarsa- Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 32,005.09 Signed 2018-05-08 2018-05-13 2018-06-12 2018-06-27 2018-07-11 2019-07-11 Laxmipur-Kesharpatti- Envelope and rehabilitation Bhimanchowk- Road, Dhanusha(0+000 to 7+500, Length-7.50 km) SNRTP-KAP-W-NCB-11-14- PM-074-75 / Periodic Maintenance of Component B: Mahendrakot Bhelai-Kapasi- Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 97,341.86 Signed 2018-05-08 2018-05-13 2018-06-12 2018-06-27 2018-07-11 2019-07-11 Purena-Gorusinghe- Envelope and rehabilitation Bakadariya-Chetradehi- Tilaurakot Road, Kapilvastu (0+000 to 20+000, Length 13.9 km) SNRTP-SYA-W-NCB-28-01- Component B: PM-074-75 / Periodic Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 49,057.94 Signed 2018-05-08 2018-05-13 2018-06-12 2018-06-27 2018-07-11 2019-07-11 Maintenance of PUtalikhet- Envelope and rehabilitation Pachamul-Aruchour Road SNRTP-BRD-W-NCB-4-09- PM-074-75 / Periodic Maintenance of PCO Component B: Single Stage - One Chouk (Kakoura)-Damouli- IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 0.00 Canceled 2018-05-08 2018-05-13 2018-06-12 2018-06-27 2018-07-11 2019-07-11 Envelope Juraina-Pachasa Road, and rehabilitation Bardiya (0+000 to 11+1000, Length 11.1 km) Page 4 SNRTP-DHAN-W-NCB-7-22- PM-074-75 / Periodic Maintenance of Laxmipur- Component B: Bagewa-Gopalpur-Baniniya- Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 104,108.61 Signed 2018-05-08 2018-05-13 2018-06-12 2018-06-27 2018-07-11 2019-07-11 Ramdaiya-Bhabadi-Tarapati- Envelope and rehabilitation Sirsiya-Road, Dhanusha (0+000 to 13+440, Length 13.44 km) SNRTP-BRD-W-NCB-4-10- PM-074-75 / Periodic Component B: Maintenance of Puspachouk- Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 0.00 Canceled 2018-05-08 2018-05-13 2018-06-12 2018-06-27 2018-07-11 2019-07-11 Bholagoudi-Danfe Raod, Envelope and rehabilitation Bardiya (0+000 to 22+851, Length 22.85km) SNRTP-DHAN-W-NCB-7-23- PM-074-75 / Periodic Maintenance of Hariharpur- Component B: Single Stage - One Bateshwar-Bhuchakrapur- IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 43,800.83 Signed 2018-05-08 2018-05-13 2018-06-12 2018-06-27 2018-07-11 2019-07-11 Envelope Laxminibas-Road, Dhanusha and rehabilitation (0+000 to 10+030, Length- 10.03) SNRTP-GOR-W-NCB-35-05- PM-074-75 / Periodic Component B: Maintenance of Nayapul- Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 75,016.07 Signed 2018-05-08 2018-05-13 2018-06-12 2018-06-27 2018-07-11 2019-07-11 Biruwarat-Pauwatar Road, Envelope and rehabilitation Gorkha (0+000 to 8+790, Length 8.79km) SNRTP-SAR-W-NCB-25-13- PM-074-75 / Periodic Component B: Single Stage - One Maintenance of Salempur- IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 95,238.76 Signed 2018-05-08 2018-05-13 2018-06-12 2018-06-27 2018-07-11 2019-07-11 Envelope Hirapur-Road, Sarlahi and rehabilitation (0+000 to 15+000, Length- 15 km) SNRTP-KAS-W-NCB-12-21- PM-074-75 / Periodic Maintenance of Baidam Component B: Single Stage - One Pame Raod including IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 111,182.86 Signed 2018-05-08 2018-05-13 2018-06-12 2018-06-27 2018-07-11 2019-07-11 Envelope crossing structures, Kaski and rehabilitation (3+000 to 12+064, Length 9.06km and 100m) SNRTP-SIR-W-NCB-26-17- PM-074-75 / Periodic Component B: Maintenance of Lahan- Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 40,912.81 Signed 2018-05-08 2018-05-13 2018-06-12 2018-06-27 2018-07-11 2019-07-11 Tarengana Road, Siraha Envelope and rehabilitation (1+500 to 0+100, Length-7.6 km) SNRTP-KAS-W-NCB-12-22- PM-074-75 / Periodic Maintenance of Kaure- Component B: Single Stage - One Jyamdung-Tanting Road IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 128,715.90 Signed 2018-05-08 2018-05-13 2018-06-12 2018-06-27 2018-07-11 2019-07-11 Envelope along with causeway, Kaski and rehabilitation (0+000 to 17+320, Length 17.32 km and 40m) SNRTP-SIR-W-NCB-26-18- PM-074-75 / Periodic Component B: Maintenance of Lahan- Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 125,049.63 Signed 2018-05-08 2018-05-13 2018-06-12 2018-06-27 2018-07-11 2019-07-11 Rameshchowk-Jhajpatti- Envelope and rehabilitation Road, Siraha (0+000 to 19+000, Length-19km) SNRTP-KAS-W-NCB-12-23- PM-074-75 / Periodic Component B: Maintenance of Ghattekhola Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 64,698.80 Signed 2018-05-08 2018-05-13 2018-06-12 2018-06-27 2018-07-11 2019-07-11 Dhampush Khanigaun Envelope and rehabilitation Raod, Kaski (0+000 to 7+500), Length 7.5km SNRTP-SAP-W-NCB-24-15- PM-074-75 / Periodic Component B: Maintenance of Chapin- Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 30,930.76 Signed 2018-05-08 2018-05-13 2018-06-12 2018-06-27 2018-07-11 2019-07-11 Khola Bridge (Kharchuiya Envelope and rehabilitation Kachan Road), Saptari (3+450 to 3+477, Length- 27.35m) SNRTP-DAN-W-NCB-5-14- PM-074-75 / Periodic Component B: Maintenance of Simthana- Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 60,844.77 Signed 2018-05-08 2018-05-13 2018-06-12 2018-06-27 2018-07-11 2019-07-11 Khaireni Jumlekula Road, Envelope and rehabilitation Dang (0+000 to 8+5000, Length 8.5km) SNRTP-SAP-W-NCB-24-16- PM-074-75 / Periodic Component B: Maintenance of Hariharpur- Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 74,298.62 Signed 2018-05-08 2018-05-13 2018-06-12 2018-06-27 2018-07-11 2019-07-11 Pakari-Bishahariya-Tilanthi- Envelope and rehabilitation Road, Saptari (0+000 to 10+000, Length-10 km) SNRTP-DAN-W-NCB-5-15- PM-074-75 / Periodic Component B: Maintenance of Tarigaun- Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 48,785.18 Signed 2018-05-08 2018-05-13 2018-06-12 2018-06-27 2018-07-11 2019-07-11 Bhojpur-Khausapur Rural Envelope and rehabilitation Road, Dang (0+000 to 5+000, Length 5km) SNRTP-DAN-W-NCB-5-16- PM-074-75 / Periodic Component B: Maintenance of Sarra- Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 103,072.62 Signed 2018-05-08 2018-05-13 2018-06-12 2018-06-27 2018-07-11 2019-07-11 Saudiyar-Dharna-Duruwa Envelope and rehabilitation Raod, Dang (0+000 to 15+5000),Length 15.5km SNRTP-BAR-W-NCB-3-09- PM-074-75 / Periodic Component B: Maintenance of Kolbi- Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 100,543.90 Signed 2018-05-08 2018-05-13 2018-06-12 2018-06-27 2018-07-11 2019-07-11 Baragadhi-Lautan- Road , Envelope and rehabilitation Bara (0+000 to 11+571, Length-11.571 km) Page 5 SNRTP-ARG-W-NCB-1-17- PM-074-75 / Periodic Maintenance of Chutrabesi- Component B: Single Stage - One Pakle-DharapanipRajame- IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 132,387.54 Signed 2018-05-08 2018-05-13 2018-06-12 2018-06-27 2018-07-11 2019-07-11 Envelope Pyutha Road, Arghakhanchi and rehabilitation (0+250 to 25+500, Length 25.25km) SNRTP-DHA-W-NCB-6-06- UG-074-75 / Upgrading of Component B: Pending Single Stage - One Dhadingbeshi-Sankosh- IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 0.00 Implementat 2018-05-08 2018-05-13 2018-06-12 2018-06-27 2018-07-11 2019-07-11 Envelope Tipling Road, Dhading and rehabilitation ion (Length 2 km) SNRTP-SUR-W-NCB-27-16- PM-074-75 / Periodic Maintenance of Baddichaur- Guthu-Bijaura-Benighat-Doti- Component B: Single Stage - One Road (Babiyachaur-Guthu- IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 0.00 Canceled 2018-05-08 2018-05-13 2018-06-12 2018-06-27 2018-07-11 2019-07-11 Envelope Section), Surkhet (17+600 and rehabilitation to 29+657, Length- 12.057km, Crossing Structure-1+100 to 9+900, Length-69 m) SNRTP-BAN-W-NCB-2-09- PM-074-75 / Periodic Maintenance of Chaulika Component B: Single Stage - One Chowk (RRM)- IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 0.00 Canceled 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Envelope Mahendranagar-Hirminiya- and rehabilitation Holiya (Nayabasti Border) Road (6km) SNRTP-BAN-W-NCB-2-09- PM-074-75-2 / Periodic Maintenance of Chaulika Component B: Single Stage - One Chowk (RRM)- IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 0.00 Canceled 2018-06-05 2018-06-09 2018-07-09 2018-08-08 2018-08-22 2019-06-18 Envelope Mahendranagar-Hirminiya- and rehabilitation Holiya (Nayabasti Border) Road (6km) SNRTP-BAN-W-NCB-2-10- PM-074-75 / Periodic Maintenance of Chandani Component B: Chowk(MRM)-Titihiriya- Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 0.00 Canceled 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Simalghari(Sonpur)- Envelope and rehabilitation Udharapur-Gaughat Road (12km) SNRTP-BAN-W-NCB- 2-10-PM-074-75 SNRTP-BAN-W-NCB-2-10- PM-074-75-2 / Periodic Maintenance of Chandani Component B: Single Stage - One Chowk(MRM)-Titihiriya- IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 114,532.98 Signed 2018-06-06 2018-06-10 2018-07-10 2018-08-09 2018-08-23 2019-06-19 Envelope Simalghari(Sonpur)- and rehabilitation Udharapur-Gaughat Road (12km) SNRTP-PYU-W-NCB-19-09- PM-074-75 / Periodic Component B: Single Stage - One Maintenance of Kumaltar- IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 0.00 Canceled 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Envelope Kondrachaur-Ratapani and rehabilitation Road(10 Km) SNRTP-PYU-W-NCB-19-09- PM-074-75-2 / Periodic Component B: Single Stage - One Maintenance of Kumaltar- IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 119,292.69 Signed 2018-06-06 2018-06-10 2018-07-10 2018-08-09 2018-08-23 2019-06-19 Envelope Kondrachaur-Ratapani and rehabilitation Road(10 Km) SNRTP-RUP-W-NCB-22-13- PM-074-75 / Periodic Component B: Maintenance of Patkhouli- Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 0.00 Canceled 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Lothpura-Gauri- Envelope and rehabilitation S shaniya-PartitoIe- Ramnagar Road (12 km) SNRTP-RUP-W-NCB-22-13- PM-074-75-2 / Periodic Component B: Maintenance of Patkhouli- Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 60,964.57 Signed 2018-06-06 2018-06-10 2018-07-10 2018-08-09 2018-08-23 2019-06-19 Lothpura-Gauri- Envelope and rehabilitation Sisaniya-PartitoIe-Ramnagar Road (12 km) SNRTP-RUP-W-NCB-22-14- PM-074-75 / Periodic Component B: Single Stage - One Maintenance of Bansghadi- IDA / H8990 Maintenance, upgrading, Post Request for Bids Open - National 0.00 Canceled 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Envelope Gaj edi- Suryapura Road and rehabilitation (11 km), Rupendehi SNRTP-RUP-W-NCB-22-14- PM-074-75-2 / Maintenance Component B: Single Stage - One of Bansghadi-Gajedi- IDA / H8990 Maintenance, upgrading, Post Request for Bids Open - National 92,883.60 Signed 2018-06-06 2018-06-10 2018-07-10 2018-08-09 2018-08-23 2019-06-19 Envelope Suryapura Road (11 km), and rehabilitation Rupendehi SNRTP-RUP-W-NCB-22-15- PM-074-75 / Periodic Component B: Single Stage - One Maintenance of Bhangaiya IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 0.00 Canceled 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Envelope Thu. Piprahawa Karauta and rehabilitation Semara Road (20km) SNRTP-RUP-W-NCB-22-15- PM-074-75-2 / Periodic Component B: Single Stage - One Maintenance of Bhangaiya IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 168,570.30 Signed 2018-06-06 2018-06-10 2018-07-10 2018-08-09 2018-08-23 2019-06-19 Envelope Thu- Piprahawa Karauta and rehabilitation Semara Road (20km) SNRTP-RUP-W-NCB-22-16- PM-074-75 / Periodic Component B: Maintenance of Tunihawa Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 0.00 Canceled 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Mukundagadh Envelope and rehabilitation Rayapur(semara) Road (19km) Page 6 SNRTP-RUP-W-NCB-22-16- PM-074-75-2 / Periodic Component B: Maintenance of Tunihawa Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 159,854.20 Signed 2018-06-06 2018-06-10 2018-07-10 2018-08-09 2018-08-23 2019-06-19 Mukundagadh Envelope and rehabilitation Rayapur(semara) Road (19km) SNRTP-BAN-W-NCB-2-07- Component B: BRI-074-75 / Gandhiyanala Single Stage - One IDA / H8990 Maintenance, upgrading, Post Request for Bids Open - National 0.00 Canceled 2018-03-05 2018-03-10 2018-04-09 2018-04-24 2018-05-16 2019-05-16 Bridge at puraina,11 m Envelope and rehabilitation Banke SNRTP-BAN-W-NCB-2-07- Component B: BRI-074-75-2 / Gandhaila Single Stage - One IDA / H8990 Maintenance, upgrading, Post Request for Bids Open - National 100,631.40 Signed 2018-06-06 2018-06-11 2018-07-11 2018-08-10 2018-08-24 2019-07-15 Nala Bridge at Puraina,11 Envelope and rehabilitation m Banke SNRTP-PYU-W-NCB-19-07- UG-074-75 / Upgrading of Component B: Single Stage - One Cherneta-Puranthanti- IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 0.00 Canceled 2018-05-08 2018-05-13 2018-06-12 2018-06-27 2018-07-11 2019-07-11 Envelope Jogitari Road,Pyuthan ( and rehabilitation Length 2.45km ) SNRTP-PYU-W-NCB-19-08- UG-074-75 / Upgrading of Component B: Single Stage - One Chujathati- Argakhachi IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 224,146.95 Signed 2018-06-25 2018-06-30 2018-07-30 2018-08-14 2018-08-28 2019-07-09 Envelope Road,Pyuthan ( Length and rehabilitation 2.45km ) SNRTP-KAP-W-NCB-11-12- PM-074-75 / Periodic Maintenence of Component B: Single Stage - One Chakarchauda-Siswa- IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 90,580.12 Signed 2018-06-25 2018-06-30 2018-07-30 2018-08-14 2018-08-28 2019-07-09 Envelope Autkoniya-Dohani Road and rehabilitation (0+000 to 10+500, Length 10.5km) SNRTP-UDA-W-NCB-30-16- PM-074-75 / Periodic Component B: Maintenance of Nepaltar- Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 113,802.79 Signed 2018-06-25 2018-06-30 2018-07-30 2018-08-14 2018-08-28 2019-07-09 Udayapur-Gadhi- Road , Envelope and rehabilitation Udayapur (0+000 to 15+000, Length- 15 km) SNRTP-KAS-W-NCB-12-20- PM-074-75 / Periodic Component B: Maintenance of Lamachaur- Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 76,344.94 Signed 2018-06-25 2018-06-30 2018-07-30 2018-08-14 2018-08-28 2019-07-09 Machhapuchhre Road, Envelope and rehabilitation Kaski (8+5000 to 18+000, Length 9.5km) SNRTP-TER-W-NCB-33-02- UG-074-75 / Upgrading of Component B: Pending Single Stage - One Myanglung-Okhre-Sukrabare- IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 0.00 Implementat 2018-06-25 2018-06-30 2018-07-30 2018-08-14 2018-08-28 2019-07-09 Envelope Chaparichowk-Dagappa and rehabilitation ion Road , Length 12 km SNRTP-PAR-W-NCB-18-09- PM-074-75-2 / Periodic Component B: Single Stage - One Maintenance of Ramghadwa- IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 54,881.73 Signed 2018-12-05 2018-12-09 2019-01-08 2019-01-23 2019-02-14 2019-07-14 Envelope Jagarnathpur-Milanchowk and rehabilitation Road (9 Km) SNRTP-PAR-W-NCB-18-13- PM-074-75-2 / Periodic Maintenance of Mudli - Tulsi barwa-Road (6 Km), Component B: Muldi tindubiya-sabithawa Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 245,760.63 Signed 2018-12-05 2018-12-09 2019-01-08 2019-01-23 2019-02-14 2019-07-14 road(6 km), bedhihari birta Envelope and rehabilitation basantapur road (6 km) padamsadak-bahuwari (6km) and baghi patelchok road (9 km) SNRTP-PAR-W-NCB-18-08- BRI-074-075-2 / Dharar Component B: Pending Single Stage - One Khola Bridge,CH 13+130 IDA / H8990 Maintenance, upgrading, Post Request for Bids Open - National 0.00 Implementat 2018-12-05 2018-12-10 2019-01-09 2019-01-24 2019-02-15 2019-07-15 Envelope along Janata Road, 20 m , and rehabilitation ion Parsa SNRTP-GOR-W-NCB-35-04- PM-074-75-2 / Periodic Component B: Single Stage - One Maintenance of Abuwa - IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 75,016.07 Signed 2018-12-12 2018-12-16 2019-01-15 2019-01-30 2019-02-21 2019-07-15 Envelope Birdi-Pauwatar-Kalamata- and rehabilitation Airport Road (8 Km) SNRTP-BAN-W-NCB-2-09- PM-074-75-2-2 / Periodic Maintenance of Chaulika Component B: Single Stage - One Chowk (RRM)- IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 51,311.77 Signed 2018-12-12 2018-12-16 2019-01-15 2019-01-30 2019-02-13 2019-07-13 Envelope Mahendranagar-Hirminiya- and rehabilitation Holiya (Nayabasti Border) Road (6 km) SNRTP-KAN-W-NCB-10-08- PM-073-74-2 / Periodic Component B: Single Stage - One Maintenance of Bansamiti- IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 78,313.32 Signed 2018-12-12 2018-12-16 2019-01-15 2019-01-30 2019-02-21 2019-07-15 Envelope Pipalladi-Jonpuri-Ranipur and rehabilitation Road ( 10 KM) SNRTP-NAW-W-NCB-15-14- Component B: PM-074-75-2 / Periodic Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 0.00 Canceled 2018-12-12 2018-12-16 2019-01-15 2019-01-30 2019-02-21 2019-07-15 Maintenance of Manjariya- Envelope and rehabilitation Jamuniya Road (9.00 km) SNRTP-RAU-W-NCB-21-14- Component B: PM-074-75-2 / Periodic Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 188,456.93 Signed 2018-12-12 2018-12-16 2019-01-15 2019-01-30 2019-02-21 2019-07-15 Maintenance of Prempur Envelope and rehabilitation Gonahi MHW Road (22Km) Page 7 SNRTP-RAU-W-NCB-21-16- BRI-075-76 / Ajagaili Box Component B: Pending Single Stage - One Bridge along Gaur-Banjarha- IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 0.00 Implementat 2018-12-20 2018-12-25 2019-01-24 2019-02-08 2019-03-02 2019-07-15 Envelope Auriya-Dumariya- and rehabilitation ion Bishanpatti-Inerwari Road SNRTP-RAS-W-NCB-20-06- Component B: PM-074-75-2 / Periodic Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 36,200.53 Signed 2018-12-16 2018-12-20 2019-01-19 2019-02-03 2019-02-25 2019-07-15 Maintenance of Sole- Envelope and rehabilitation Bhimali-Hakubesi Road (5 Km) SNRTP-BHOJ-W-NCB-31- 10-PM-075-76 / Periodic Component B: Maintenance of Kulung- Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 107,924.97 Signed 2019-02-24 2019-02-28 2019-03-30 2019-04-14 2019-04-28 2019-10-25 Chaukidanda-Khattamma Envelope and rehabilitation Road, Bhojpur (0+000 to 7+500, Length 7.50 km) SNRTP-BHOJ-W-NCB-31- 11-PM-075-76 / Periodic Component B: maintenance of Khairang Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 109,375.07 Signed 2019-02-24 2019-02-28 2019-03-30 2019-04-14 2019-04-28 2019-10-25 Patalepani Hasanpur Road, Envelope and rehabilitation Bhojpur (0+000 to 8+780, Length 8.78 km) SNRTP-SANK-W-NCB-32- 09-PM-075-76 / Periodic maintenance of Khandbari Component B: Single Stage - One Badrebi Wana Liglig IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 395,758.17 Signed 2019-02-24 2019-03-01 2019-03-31 2019-04-15 2019-04-29 2019-10-26 Envelope Chainpur Road, and rehabilitation Shankhuwasabha (0+000 to 28+000, Length 28.00 km) SNRTP-SANK-W-NCB-32- 10-PM-075-76 / Periodic maintenance of Khadabari Component B: Single Stage - One Kalchebesi Pangtha Dake IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 196,535.53 Signed 2019-02-24 2019-03-01 2019-03-31 2019-04-15 2019-04-29 2019-10-26 Envelope Barhabise, and rehabilitation Shankhuwasabha(0+000 to 17+000, Length 17.00 km) SNRTP-MAH-W-NCB-13-08- PM-075-76 / Periodic Component B: Maintenance of Highway - Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 0.00 Canceled 2019-02-24 2019-03-01 2019-03-31 2019-04-15 2019-04-29 2019-10-26 Khairmara Road, Mahottari Envelope and rehabilitation (0+000 to 4+622, Length 4.62 km) SNRTP-MAH-W-NCB-13-09- PM-075-76 / Periodic Maintenance of Bagada- Component B: Single Stage - One Anaharban-dharampur- IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 46,851.67 Signed 2019-02-24 2019-03-01 2019-03-31 2019-04-15 2019-04-29 2019-10-26 Envelope Singyahi Road, Mahottari and rehabilitation (0+000 to 7+703, Length 7.71 km) SNRTP-SAR-W-NCB-25-13- PM-075-76 / Periodic Component B: Under Single Stage - One Maintenance of Phuljhor IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 0.00 Implementat 2019-02-24 2019-03-01 2019-03-31 2019-04-15 2019-04-29 2019-10-26 Envelope KalinjorRoad, Sarlahi and rehabilitation ion (0+000 to 9+000, Length- 9.00 km) SNRTP-SAR-W-NCB-25-14- PM-075-76 / Periodic Component B: Under Maintenance of Sirsiya Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 0.00 Implementat 2019-02-24 2019-03-01 2019-03-31 2019-04-15 2019-04-29 2019-10-26 Hempur Barahthaya Road, Envelope and rehabilitation ion Sarlahi (0+000 to 6+360, Length- 6.36 km) SNRTP-SAP-W-NCB-24-17- PM-075-76 / Periodic Component B: Under Maintenance of Mahuli Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 0.00 Implementat 2019-02-24 2019-03-01 2019-03-31 2019-04-15 2019-04-29 2019-10-26 khola Bridge of Bhardaha Envelope and rehabilitation ion Danada Pakari Road, Saptari ( Length- 13.5 m) SNRTP-ARG-W-NCB-1-18- PM-075-76 / Periodic Component B: maintenance of Gachchhe- Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 0.00 Canceled 2019-02-24 2019-02-28 2019-03-30 2019-04-14 2019-04-28 2019-10-25 Dhikura-Dhanchaur-Tamatal Envelope and rehabilitation road (length 19.50 km) Arghakhanchi district SNRTP-ARG-W-NCB-1-19- PM-075-76 / Periodic Component B: maintenance of Ghumti- Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 0.00 Canceled 2019-02-24 2019-02-28 2019-03-30 2019-04-14 2019-04-28 2019-10-25 Tingire-palpa road (length Envelope and rehabilitation 26.96 km), Arghakhanchi district SNRTP-ARG-W-NCB-1-20- PM-075-76 / Periodic maintenance of Chutrabeshi- Component B: Single Stage - One Kura-Nuwakot-jinji-Asurkot- IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 0.00 Canceled 2019-02-24 2019-02-28 2019-03-30 2019-04-14 2019-04-28 2019-10-25 Envelope Jogitari-Pyuthan and rehabilitation road (length 24.39 km) Arghakhanchi district SNRTP-ARG-W-NCB-1-21- PM-075-71 / Periodic maintenance of Sandhikharka - Arga - Component B: Single Stage - One Maidan - Dharampani - IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 84,392.45 Signed 2019-02-24 2019-02-28 2019-03-30 2019-04-14 2019-04-28 2019-10-25 Envelope Hile (Chutrabeshi- and rehabilitation Dharampani-Maidan- Raikhande )Road (length 9.80 km) Arghakhanchi district SNRTP-ARG-W-NCB-1-22- PM-075-71 / Periodic maintenance of Component B: Single Stage - One Chyandanada-Dirvan-Khana- IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 0.00 Canceled 2019-02-24 2019-02-28 2019-03-30 2019-04-14 2019-04-28 2019-10-25 Envelope Khandaha-Sabdanda- and rehabilitation Dadakatari (length 23.52 km) Arghakhanchi district Page 8 SNRTP-PYU-W-NCB-19-10- PM-075-76 / Periodic Component B: Single Stage - One maintenance of Bijuwa- IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 70,196.05 Signed 2019-02-24 2019-02-28 2019-03-30 2019-04-14 2019-04-28 2019-10-25 Envelope Dungethani road (length and rehabilitation 6.90 km) Pythan district SNRTP-SAL-W-NCB-23-08- PM-075-76 / Periodic Component B: Pending Single Stage - One maintenance of Luham- IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 0.00 Implementat 2019-02-24 2019-02-28 2019-03-30 2019-04-14 2019-04-28 2019-10-25 Envelope Kavre-Rampur road (length and rehabilitation ion 14.77 km) Salyan district. SNRTP-PAL-W-NCB-17-08- PM-075-76 / Periodic Component B: Single Stage - One Maintenance of Mumin IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 84,158.91 Signed 2019-02-24 2019-02-28 2019-03-30 2019-04-14 2019-04-28 2019-10-25 Envelope Devinagar Japla Road, and rehabilitation Palpa ( Length-10 km) SNRTP-KAS-W-NCB-12-09- UG-075-76 / Component B: Pending Upgrading/Rehabilitation of Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 0.00 Implementat 2019-04-26 2019-05-03 2019-06-02 2019-06-17 2019-07-01 2019-11-30 Chhorepatan-Kirsti- Envelope and rehabilitation ion Nirmalpokhari-Bhartpokhari Road (Pkg II) SNRTP-BRD-W-NCB-4-09- PM-074-75 -2 / Periodic Maintenance of PCO Component B: Single Stage - One Chouk (Kakoura)-Damouli- IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 102,528.73 Signed 2019-04-23 2019-04-28 2019-05-28 2019-06-12 2019-06-26 2019-11-30 Envelope Juraina-Pachasa Road, and rehabilitation Bardiya (0+000 to 11+1000, Length 11.1 km) SNRTP-NAW-W-NCB-15-14- Component B: PM-074-75-2-2 / Periodic Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 81,258.40 Signed 2019-04-23 2019-04-27 2019-05-27 2019-06-11 2019-07-03 2019-11-30 Maintenance of Manjariya- Envelope and rehabilitation Jamuniya Road (9.00 km) SNRTP-ARG-W-NCB-1-18- PM-075-76-2 / Periodic Component B: Pending maintenance of Gachchhe- Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 0.00 Implementat 2019-07-09 2019-07-10 2019-08-09 2019-08-24 2019-09-07 2019-12-31 Dhikura-Dhanchaur-Tamatal Envelope and rehabilitation ion road (length 19.50 km) Arghakhanchi district SNRTP-ARG-W-NCB-1-19- PM-075-76-2 / Periodic Component B: Pending maintenance of Ghumti- Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 0.00 Implementat 2019-07-09 2019-07-10 2019-08-09 2019-08-24 2019-09-07 2019-12-31 Tingire-palpa road (length Envelope and rehabilitation ion 26.96 km), Arghakhanchi district SNRTP-ARG-W-NCB-1-20- PM-075-76-2 / Periodic maintenance of Chutrabeshi- Component B: Pending Single Stage - One Kura-Nuwakot-jinji-Asurkot- IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 0.00 Implementat 2019-07-09 2019-07-10 2019-08-09 2019-08-24 2019-09-07 2019-12-31 Envelope Jogitari-Pyuthan road and rehabilitation ion (length 24.39 km) Arghakhanchi district SNRTP-ARG-W-NCB-1-22- PM-075-71-2 / Periodic maintenance of Component B: Pending Single Stage - One Chyandanada-Dirvan-Khana- IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 0.00 Implementat 2019-07-09 2019-07-10 2019-08-09 2019-08-24 2019-09-07 2019-12-31 Envelope Khandaha-Sabdanda- and rehabilitation ion Dadakatari (length 23.52 km) Arghakhanchi district SNRTP-MAH-W-NCB-13-08- PM-075-76-2 / Periodic Component B: Under Maintenance of Highway - Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 0.00 Implementat 2019-07-12 2019-07-14 2019-08-13 2019-08-28 2019-09-11 2019-12-31 Khairmara Road, Mahottari Envelope and rehabilitation ion (0+000 to 4+622, Length 4.62 km) SNRTP-SAP-W-NCB-24-18- PM-075-76 / Periodic Component B: Maintenance of Rupnagar Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 0.00 Canceled 2019-02-24 2019-03-01 2019-03-31 2019-04-15 2019-04-29 2019-10-26 Sarwanpur Goghanpur Envelope and rehabilitation Road, Saptari (0+000 to 9+760, Length-9.76km) SNRTP-MAH-W-NCB-13-07- PM-075-76 / Periodic Maintenance of Component B: Ragunathpur - Sonama - Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 0.00 Canceled 2019-02-24 2019-03-01 2019-03-31 2019-04-15 2019-04-29 2019-10-26 Sundarpur - Bharatpur - Envelope and rehabilitation Laksminiya(Highway), Mahottari (0+000 to 18+980, Length 18.98 km) SNRTP-SANK-W-NCB-32- 08-PM-075-076 / Periodic Maintenance of Component B: Single Stage - One Manebhanjyang-Sitalpati- IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 0.00 Canceled 2019-02-24 2019-03-01 2019-03-31 2019-04-15 2019-04-29 2019-10-26 Envelope Heluwabeshi Road, and rehabilitation Shankhuwasabha (0+000 to 14+000, Length 14.00 km) SNRTP-SIND-W-NCB-34-06- PM-075-76 / Periodic Component B: Maintenance of Sunkoshi Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 0.00 Canceled 2019-02-24 2019-02-28 2019-03-30 2019-04-14 2019-04-28 2019-10-25 Dhuskun Piskar Road, Envelope and rehabilitation Sindhupalchwok (0+000 to 14+750, Length-14.75 km) SNRTP-SIND-W-NCB-34-05- PM-075-76 / Periodic Component B: Maintenance of Okhreni Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 0.00 Canceled 2019-02-24 2019-02-28 2019-03-30 2019-04-14 2019-04-28 2019-10-25 Selang Golchhe Road, Envelope and rehabilitation Sindhupalchwok (0+000 to 10+000, Length-10 km) Page 9 SNRTP-RAS-W-NCB-20-08- PM-074-75-2 / Periodic Component B: Single Stage - One Maintenance of Dasmure IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 0.00 Canceled 2018-12-16 2018-12-20 2019-01-19 2019-02-03 2019-02-25 2019-07-15 Envelope Seti-Devi Ma Vi. Dhuseni and rehabilitation Road (5 Km) SNRTP-SAP-W-NCB-24-14- PM-074-75 / Periodic Component B: Single Stage - One Maintenance of kalyanpur- IDA / H8990 Maintenance, upgrading, Post Request for Bids Open - National 0.00 Canceled 2017-11-27 2017-12-02 2018-01-01 2018-01-31 2018-02-21 2019-02-21 Envelope Phulbariya-Banaula Banauli and rehabilitation Kushaha Road, Saptari GOODS Bid Evaluation Activity Reference No. Draft Pre- Draft Bidding Loan / Credit Market Procurement Prequalification Actual Process Prequalification Specific Procurement Bidding Documents Proposal Submission Report and / Description Component Review Type Method qualification Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Recommendation for Documents Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SNRTP-CPCU-G-DP-17-074- Component A: Institutional 75 / Purchase of Laptop, IDA / H8990 Strengthening, T.A., and Post Direct Selection Direct 3,760.65 Completed 2018-01-15 2018-01-30 2018-02-02 2018-03-04 Tablet and Desktop set Monitoring (one nos Each) SNRTP-CPCU-G-DP-18-074- Component A: Institutional 75 / Purchase of Smart TV IDA / H8990 Strengthening, T.A., and Post Direct Selection Direct 1,678.17 Completed 2018-01-15 2018-01-20 2018-01-23 2018-02-22 for meeting HAll Monitoring Component A: Institutional SNRTP-CPCU-U-DP-16-074- IDA / H8990 Strengthening, T.A., and Post Direct Selection Direct 4,362.08 Completed 2018-01-15 2018-01-20 2018-02-10 2018-04-11 75 / Purchase of AC 4 Nos Monitoring SNRTP-CPCU-G-RFQ-19- 075-76 / Purchase of Component A: Institutional Request for Single Stage - One Desktop Computer : 2 set; IDA / H8990 Strengthening, T.A., and Post Limited 3,096.73 Completed 2019-06-25 2019-08-20 2019-12-31 Quotations Envelope Laser Printer: 2 set and Monitoring Photocopy machine 1 set SNRTP-CPCU-G-RFQ-20- Component A: Institutional Request for Single Stage - One 075-76 / Purchase of IDA / H8990 Strengthening, T.A., and Post Limited 3,590.65 Completed 2019-06-25 2019-08-20 2019-12-31 Quotations Envelope Laptop : 3 sets Monitoring SNRTP-CPCU-G-RFQ-21- Component A: Institutional Request for Single Stage - One 075-76 / Purchase of Sofa IDA / H8990 Strengthening, T.A., and Post Limited 2,114.90 Completed 2019-06-25 2019-08-13 2019-12-31 Quotations Envelope set, Carpet and Revolving Monitoring chair. SNRTP-CPCU-G-RFQ-22- Component A: Institutional 075-76 / Purchase of Request for Single Stage - One IDA / H8990 Strengthening, T.A., and Post Limited 624.83 Completed 2019-06-25 2019-08-20 2019-12-31 Digital Camera : 2 nos. Quotations Envelope Monitoring and Scanner: 2 nos. NON CONSULTING SERVICES Bid Evaluation Activity Reference No. Draft Pre- Draft Bidding Loan / Credit Market Procurement Prequalification Actual Process Prequalification Specific Procurement Bidding Documents Proposal Submission Report and / Description Component Review Type Method qualification Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Recommendation for Documents Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SNRTP-CPCU-S-SSS-45-072- 073 / NOL to Minutes of Negotiations and Draft Component A: Institutional Negotiated Contract with IDA / H8990 Strengthening, T.A., and Prior Direct Selection Direct 2,572,163.00 Signed ILO for three(03) new Monitoring districts( Lamjung, Gorkha and Sindhupalchowk), Single Source Selection SNRTP-CPCU-S-SSS-25-070- 071 / Contract variation - Consultancy Services for Component A: Institutional Providing Technical Support IDA / H8990 Strengthening, T.A., and Prior Direct Selection Direct 7,400,265.00 Canceled to Routine Maintenance Monitoring System of Rural Roads and Bridges SNRTP-CPCU-S-DS-60-074- Component A: Institutional 75 / Financial Management IDA / H8990 Strengthening, T.A., and Post Direct Selection Direct 8,918.78 Signed 2017-11-26 2017-12-01 2017-12-12 2019-12-12 Assistant for 2 years: Monitoring SNRTP-CPCU-NC-DP-13- 074-75 / Safeguard Training Component A: Institutional for Safeguard IDA / H8990 Strengthening, T.A., and Post Direct Selection Direct 15,334.40 Completed 2018-01-15 2018-02-14 2018-03-17 2018-04-16 team(Logistic,Meal and Monitoring Residency), one training to be organized in at each PMU cluster. SNRTP-CPCU-NC-RFQ-12- Component A: Institutional Request for Single Stage - One 074-75 / Bio- engineering IDA / 53360 Strengthening, T.A., and Post Limited 20,938.54 Completed 2018-05-14 2018-06-19 2018-08-18 Quotations Envelope Training to District Team Monitoring SNRTP-CPCU-NC-DP-12- Component A: Institutional 074-75 / Soil/bio IDA / H8990 Strengthening, T.A., and Post Direct Selection Direct 0.00 Canceled 2018-01-15 2018-02-14 2018-04-01 2018-05-31 Engineering Training to Monitoring District Team SNRTP-CPCU-NCS-RFB-70- Component A: Institutional Single Stage - One 07 / VCDP and GAP IDA / H8990 Strengthening, T.A., and Post Request for Bids Open - National 0.00 Canceled 2018-05-11 2018-05-18 2018-06-17 2018-07-02 2018-07-16 2019-03-18 Envelope training for Eastern Cluster Monitoring SNRTP-CPCU-NCS-IFB-71- Component A: Institutional 074-75 / VCDP and GAP Single Stage - One IDA / 53360 Strengthening, T.A., and Post Request for Bids Open - National 0.00 Canceled 2018-05-11 2018-05-18 2018-06-17 2018-07-02 2018-07-16 2019-03-18 Training for western Envelope Monitoring Cluster SNRTP-CPCU-NCS-RFB-70- Component A: Institutional Single Stage - One 07-2 / VCDP and GAP IDA / H8990 Strengthening, T.A., and Post Request for Bids Open - National 147,623.96 Signed 2018-10-12 2018-10-19 2018-11-18 2018-12-03 2018-12-17 2019-07-15 Envelope training for Eastern Cluster Monitoring Page 10 SNRTP-CPCU-NCS-IFB-71- Component A: Institutional 074-75-2 / VCDP and GAP Single Stage - One IDA / 53360 Strengthening, T.A., and Post Request for Bids Open - National 167,982.12 Signed 2018-10-12 2018-10-19 2018-11-18 2018-12-03 2018-12-17 2019-07-15 Training for western Envelope Monitoring Cluster CONSULTING FIRMS Activity Reference No. Short List and Draft Combined Evaluation Loan / Credit Market Contract Type Actual Amount Expression of Request for Opening of Technical Evaluation of / Description Component Review Type Method Process Status Terms of Reference Request for Report and Draft Signed Contract Contract Completion No. Approach (US$) Interest Notice Proposals as Issued Proposals / Minutes Technical Proposal Proposals Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SNRTP-CPCU-CS-CQS-36- 074-75 / Procurement of Component A: Institutional Consultant Consulting Firm for Market IDA / H8990 Strengthening, T.A., and Post Qualification Open - National 0.00 Canceled 2018-06-28 2018-07-13 2018-08-27 2018-09-11 2018-10-03 2019-04-01 infrastructure investment Monitoring Selection study SNRTP-CPCU-CS-QCBS-47- Component A: Institutional 074-75 / Procurement of Quality And Cost- IDA / H8990 Strengthening, T.A., and Prior Open - National 0.00 Canceled 2017-12-03 2017-12-18 2018-02-01 2018-03-03 2018-03-18 2018-04-16 2018-05-08 2019-11-09 NGO for Beneficiary Based Selection Monitoring Monitoring for PMU West SNRTP-CPCU-CS-QCBS-46- Component A: Institutional 074-75 / Procurement of Quality And Cost- IDA / H8990 Strengthening, T.A., and Prior Open - National 0.00 Canceled 2017-12-03 2017-12-18 2018-02-01 2018-03-03 2018-03-18 2018-04-17 2018-05-09 2019-11-10 NGO for Beneficiary Based Selection Monitoring Monitoring for PMU East SNRTP-CPCU-CS-QCBS-48- Component A: Institutional 074-75 / Procurement of Quality And Cost- IDA / H8990 Strengthening, T.A., and Post Open - National 0.00 Canceled 2018-08-24 2018-08-27 2018-09-20 2018-10-21 2018-11-04 2018-11-14 2018-12-06 2019-07-14 NGO for Beneficiary Based Selection Monitoring Monitoring for PMU West SNRTP-CPCU-CS-QCBS-49- Component A: Institutional 074-75 / Procurement of Quality And Cost- IDA / H8990 Strengthening, T.A., and Post Open - National 0.00 Canceled 2018-08-24 2018-08-27 2018-09-20 2018-10-21 2018-11-04 2018-11-14 2018-12-06 2019-07-14 NGO for Beneficiary Based Selection Monitoring Monitoring for PMU East SNRTP-CPCU-CS-CQS-35- Component A: Institutional Consultant 074-75 / Procurement of IDA / H8990 Strengthening, T.A., and Post Qualification Open - National 0.00 Canceled 2017-11-30 2017-12-15 2018-01-29 2018-02-13 2018-03-07 2018-09-03 Consulting Firm for Monitoring Selection Baseline Study SNRTP-CPCU-CS-QCBS-50- Component A: Institutional 075/76 / Pocurement of Quality And Cost- Under IDA / 53360 Strengthening, T.A., and Post Open - National 0.00 2018-09-17 2018-09-21 2018-10-15 2018-11-15 2018-11-29 2018-12-11 2019-01-02 2019-07-16 Consulting firm for Impact Based Selection Implementation Monitoring Study SNRTP-CPCU-CS-CQS-37- 075-76 / Hiring of Component A: Institutional Consultant Under Consulting Firm for IDA / H8990 Strengthening, T.A., and Post Qualification Open - National 0.00 2019-07-14 2019-07-28 2019-08-03 2019-08-31 2019-09-17 2020-01-15 Implementation Beneficiary Engagement Monitoring Selection Study INDIVIDUAL CONSULTANTS Activity Reference No. Invitation to Loan / Credit Market Actual Amount Draft Negotiated / Description Component Review Type Method Contract Type Process Status Teams of Reference Identified/Selected Signed Contract Contract Completion No. Approach (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SNRTP-CPCU-S-IC-25-070- 71 / Consulting Services for Component A: Institutional Providing Technical Support IDA / 53360 Strengthening, T.A., and Prior Direct Selection Direct 7,400,265.00 Signed to Routine Maintenance Monitoring System of Rural Roads and Bridges SNRTP-CPCU-S-SSS-28 / Component A: Institutional Individual Hiriing of Procurement IDA / 53360 Strengthening, T.A., and Prior Consultant Open 16,312.70 Signed Management Expert Monitoring Selection SNRTP-CPCU-CS-IND-73- 074-75 / Procurement of Component A: Institutional Individual Environmental Safeguard IDA / H8990 Strengthening, T.A., and Post Consultant Open 4,118.47 Signed 2017-12-03 2018-01-21 2018-02-05 2018-02-27 2018-04-28 Expert for Environmental Monitoring Selection Safeguard Audit SNRTP-CPCU-CS-IND-74- Component A: Institutional Individual 074-75 / Procurement of IDA / H8990 Strengthening, T.A., and Post Consultant Open 6,533.81 Completed 2017-12-03 2018-01-21 2018-02-05 2018-02-27 2018-04-28 Socail Safeguard Expert for Monitoring Selection Social Safeguard Audit SNRTP-CPCU-S-SSS-75-074- Component A: Institutional 75 / Social Development IDA / H8990 Strengthening, T.A., and Post Direct Selection Direct 12,433.72 Completed 2017-12-20 2017-12-30 2018-01-20 2018-07-19 Expert for 6 months Monitoring SNRTP-CPCU-S-SSS-74-074- Component A: Institutional 75 / Environment IDA / H8990 Strengthening, T.A., and Post Direct Selection Direct 12,433.72 Completed 2017-12-20 2017-12-30 2018-01-20 2018-07-19 Management Expert for 6 Monitoring months SNRTP-CPCU-S-IC-61-074- Component A: Institutional Individual 75 / Procurement IDA / H8990 Strengthening, T.A., and Prior Consultant Open 15,840.78 Signed 2017-11-20 2018-01-03 2018-01-24 2018-02-15 2019-08-09 Management Expert For Monitoring Selection intermittent input of 6 Month. SNRTP-CPCU-S-IC-67-074- 75 / Hiring of Inspector of Component A: Institutional Individual Works for Project IDA / H8990 Strengthening, T.A., and Post Consultant Open 0.00 Canceled 2017-11-26 2018-01-15 2018-01-20 2018-01-30 2019-08-03 Districts for 2 years (40 Monitoring Selection Nos) SNRTP-CPCU-CS-IND-77/1- 8-074-75 / Procurement of 8 Component A: Institutional Individual (Eight) Project Support IDA / 53360 Strengthening, T.A., and Post Consultant Open 70,804.52 Signed 2018-04-24 2018-05-28 2018-06-04 2018-06-18 2019-07-15 Engineers for 14 months Monitoring Selection input 1 each at individual district. Page 11 SNRTP-CPCU-IND-75/1-5- 074-75 / Procurement of Component A: Institutional Individual Social Safeguard Consultant IDA / 53360 Strengthening, T.A., and Post Consultant Open 33,543.22 Signed 2018-04-24 2018-05-28 2018-06-04 2018-06-18 2019-07-15 SSC 5 numbers for 14 Monitoring Selection months 1-1 each at districts SNRTP-CPCU-CS-IND-76/1- 2-074-75 / Procurement of 2 Component A: Institutional Individual (Two) Environment IDA / 53360 Strengthening, T.A., and Post Consultant Open 7,418.21 Signed 2018-04-24 2018-05-28 2018-06-04 2018-06-18 2019-07-15 safeguard Consultant for 14 Monitoring Selection months input 1-1 each at individual district. SNRTP-CPCU-CS-IND-78- 074-75 / Procurement of 1 Component A: Institutional Individual (one) Bridge Design IDA / 53360 Strengthening, T.A., and Post Consultant Open 18,389.23 Signed 2018-04-24 2018-05-28 2018-06-04 2018-06-18 2019-07-15 Consultant at CPCU for 14 Monitoring Selection months. SNRTP-PMU-CS-IND-79- Component A: Institutional Individual 074-75 / Procurement of IDA / 53360 Strengthening, T.A., and Post Consultant Open 18,160.98 Signed 2018-04-24 2018-05-28 2018-06-04 2018-06-18 2019-07-15 Quality Monitoring Monitoring Selection Specialist for 14 months at PMU SNRTP-CPCU-CS-IND-80- Component A: Institutional Individual 074-75 / Procurement of IDA / 53360 Strengthening, T.A., and Post Consultant Open 24,174.94 Signed 2018-04-24 2018-05-28 2018-06-04 2018-06-18 2019-07-15 Quality Management Expert Monitoring Selection at CPCU for 14 months SNRTP-CPCU-S-IC-65-074- Component A: Institutional Individual 75 / Social Safeguard IDA / H8990 Strengthening, T.A., and Post Consultant Open 0.00 Canceled 2018-04-26 2018-05-28 2018-06-04 2018-06-18 2019-07-15 Expert for 14 months Monitoring Selection regular input at CPCU SNRTP-CPCU-S-IC-64-074- Component A: Institutional Individual 75 / Environmental IDA / H8990 Strengthening, T.A., and Post Consultant Open 23,594.39 Signed 2018-04-26 2018-05-28 2018-06-04 2018-06-18 2019-07-15 Safeguard Expert for 14 Monitoring Selection months regular input at CPCU SNRTP-CPCU-S-SSS-61-074- 75 / Hiring Softwel Pvt. Component A: Institutional Ltd., New Baneshwor for Under IDA / 53360 Strengthening, T.A., and Post Direct Selection Direct 0.00 2018-05-16 2018-05-26 2018-07-01 2019-07-01 upgraing and system Implementation Monitoring support services for RuTIMS software. SNRTP-CPCU-CS-SSS-81- 075/76 / Hiring Mr. Component A: Institutional Individual Jamuna Bahadur Shrestha IDA / 53360 Strengthening, T.A., and Post Consultant Direct 12,921.09 Signed 2018-10-22 2018-11-01 2018-11-22 2018-12-27 2019-06-25 as Procurement Monitoring Selection Management Expert for Six months regular input. SNRTP-CPCU-CS-IND-81- Component A: Institutional Individual 075/76 / Procurement of IDA / 53360 Strengthening, T.A., and Post Consultant Limited 17,739.21 Signed 2018-09-25 2018-09-30 2018-10-14 2018-11-05 2019-07-16 Social Development Expert Monitoring Selection SNRTP-CPCU-S-SSS-77-075- Component A: Institutional 76 / Hiring Environment IDA / H8990 Strengthening, T.A., and Post Direct Selection Direct 16,481.04 Signed 2018-12-16 2018-12-26 2019-01-16 2019-07-15 Specialist for PMU, East Monitoring for 6 months SNRTP-CPCU-CS-SSS-78- Component A: Institutional 075-76 / Hiring of Social IDA / H8990 Strengthening, T.A., and Post Direct Selection Direct 0.00 Canceled 2018-12-16 2018-12-26 2019-01-16 2019-07-15 Development Expert for Monitoring PMU West for 6 months SNRTP-CPCU-CS-SSS-78- Component A: Institutional 075-76 -2 / Hiring of Social IDA / H8990 Strengthening, T.A., and Post Direct Selection Direct 9,119.51 Signed 2018-12-25 2018-12-31 2019-01-16 2019-07-15 Development Specialist at Monitoring PMU for Six months. SNRTP-CPCU-S-IC-66-074- 75 / Procurement and Component A: Institutional Individual Contract Management IDA / H8990 Strengthening, T.A., and Prior Consultant Open 0.00 Canceled 2018-02-01 2018-02-26 2018-03-03 2018-03-13 2019-03-08 Specialist for 1.5 years at Monitoring Selection cluster PMU 2: SNRTP-CPCU-S-IC-63-074- Component A: Institutional Individual 75 / Environmental IDA / H8990 Strengthening, T.A., and Post Consultant Open 0.00 Canceled 2017-11-26 2018-01-15 2018-01-20 2018-02-10 2019-08-14 Safeguard Specialist for Monitoring Selection 1.5 years regular input at CPCU SNRTP-CPCU-S-SSS-76-074- Component A: Institutional 75 / Procurement of an IDA / H8990 Strengthening, T.A., and Prior Direct Selection Direct 0.00 Canceled 2017-12-20 2017-12-30 2018-02-20 2019-07-05 Independent Procurement Monitoring Specialist (IPS) SNRTP-CPCU-CS-SSS-82-1- SSC-075-76 / Hiring of Component A: Institutional Mr.Bipul Pokharel as Social IDA / H8990 Strengthening, T.A., and Post Direct Selection Direct 5,858.75 Signed 2019-02-24 2019-02-27 2019-03-14 2019-09-10 Safeguard Consultant for Monitoring 6 months. SNRTP-CPCU-CS-SSS-82-2- SSC-075-76 / Hiring of Ms. Component A: Institutional Sirjana Rijal as Social IDA / H8990 Strengthening, T.A., and Post Direct Selection Direct 5,858.75 Signed 2019-02-24 2019-03-02 2019-03-23 2019-09-19 Safeguard Consultant for 6 Monitoring months. SNRTP-CPCU-CS-SSS-82-3- SSC-075-76 / Hiring of Mr. Component A: Institutional Diganta Adhikari as Social IDA / H8990 Strengthening, T.A., and Post Direct Selection Direct 5,858.75 Signed 2019-02-24 2019-02-27 2019-03-14 2019-09-10 Safeguard Consultant for 6 Monitoring months. SNRTP-CPCU-CS-SSS-82-4- SSC-075-76 / Hiring of Mr. Component A: Institutional Santosh Bhandari as Social IDA / H8990 Strengthening, T.A., and Post Direct Selection Direct 5,858.75 Signed 2019-02-24 2019-03-02 2019-03-23 2019-09-19 Safeguard Consultant for 6 Monitoring months. Page 12 SNRTP-CPCU-CS-SSS-82-5- SSC-075-76 / Hiring of Mr. Component A: Institutional Gopal Basel as Social IDA / H8990 Strengthening, T.A., and Post Direct Selection Direct 5,858.75 Signed 2019-02-24 2019-02-27 2019-03-14 2019-09-10 Safeguard Consultant for 6 Monitoring months. SNRTP-CPCU-CS-SSS-82-6- SSC-075-76 / Hiring of Ms. Component A: Institutional Laxmi Pokhrel as Social IDA / H8990 Strengthening, T.A., and Post Direct Selection Direct 5,858.75 Signed 2019-02-24 2019-02-27 2019-03-14 2019-09-10 Safeguard Consultant for 6 Monitoring months. SNRTP-CPCU-CS-SSS-82-7- SSC-075-76 / Hiring of Mr. Component A: Institutional Krishna Prasad Adhikari as IDA / H8990 Strengthening, T.A., and Post Direct Selection Direct 5,858.75 Signed 2019-02-24 2019-02-27 2019-03-14 2019-09-10 Social Safeguard Consultant Monitoring for 6 months. SNRTP-CPCU-CS-SSS-82-8- SSC-075-76 / Hiring of Mr. Component A: Institutional Dinesh Khanal as Social IDA / H8990 Strengthening, T.A., and Post Direct Selection Direct 5,858.75 Signed 2019-02-24 2019-02-28 2019-03-16 2019-09-12 Safeguard Consultant for 6 Monitoring months SNRTP-CPCU-CS-SSS-82-9- SSC-075-76 / Hiring of Mr. Component A: Institutional Yam Lal Khatri as Social IDA / H8990 Strengthening, T.A., and Post Direct Selection Direct 5,858.75 Signed 2019-02-24 2019-03-02 2019-03-23 2019-09-19 Safeguard Consultant for 6 Monitoring months SNRTP-CPCU-CS-SSS-82- 10-SSC-075-76 / Hiring of Component A: Institutional Mr. Subarna Chand as IDA / H8990 Strengthening, T.A., and Post Direct Selection Direct 5,858.75 Signed 2019-02-24 2019-03-02 2019-03-23 2019-09-19 Social Safeguard Consultant Monitoring for 6 months SNRTP-CPCU-CS-SSS-82- 11-SSC-075-76 / Hiring of Component A: Institutional Under Mr. Hark Singh Dhami as IDA / H8990 Strengthening, T.A., and Post Direct Selection Direct 5,835.86 2019-02-24 2019-02-27 2019-03-14 2019-09-10 Implementation Social Safeguard Consultant Monitoring for 6 months SNRTP-CPCU-CS-SSS-83- 075-76 / Hiring of Aviyaan Component A: Institutional Consulting (p) Ltd. for GIS IDA / H8990 Strengthening, T.A., and Post Direct Selection Direct 0.00 Canceled 2019-04-22 2019-04-25 2019-05-16 2019-09-13 based Road Accessibility Monitoring study of SNRTP project . SNRTP-CPCU-CS-SSS-84- 075-76 / Hiring of Aviyaan Component A: Institutional Consulting (p) Ltd. for IDA / H8990 Strengthening, T.A., and Post Direct Selection Direct 0.00 Canceled 2019-04-22 2019-04-25 2019-05-16 2019-09-13 Road Condition Survey of Monitoring SNRTP Roads SNRTP-CPCU-CS-SSS-85-1- PSE-075-76 / Hiring of Mr. Component A: Institutional Individual Under Sulav Nepal as Project IDA / H8990 Strengthening, T.A., and Post Consultant Direct 0.00 2019-04-22 2019-04-25 2019-05-02 2019-05-16 2019-11-17 Implementation Support Engineer-1 for 6 Monitoring Selection months. SNRTP-CPCU-CS-SSS-85-2- PSE-075-76 / Hiring of Component A: Institutional Individual Under Dinesh Prasad Mandal as IDA / H8990 Strengthening, T.A., and Post Consultant Direct 0.00 2019-04-22 2019-04-25 2019-05-02 2019-05-16 2019-11-17 Implementation Project Support Engineer Monitoring Selection for 6 months SNRTP-CPCU-CS-SSS-86- PMQME-075-76 / Hiring of Component A: Institutional Individual Mr. Sujit Dhital as Project Under IDA / H8990 Strengthening, T.A., and Post Consultant Direct 0.00 2019-04-22 2019-04-25 2019-05-02 2019-05-16 2019-11-17 Management and Quality Implementation Monitoring Selection Monitoring Expert for 6 months SNRTP-CPCU-CS-SSS-85-3- PSE-075-76 / Hiring of Mr. Component A: Institutional Individual Under Prabin Basnet as Project IDA / H8990 Strengthening, T.A., and Post Consultant Direct 0.00 2019-04-22 2019-04-25 2019-05-02 2019-05-16 2019-11-17 Implementation Support Engineer (PSE I) Monitoring Selection for 6 months SNRTP-CPCU-CS-SSS-87- 075-76 / Hiring of Aviyaan Component A: Institutional Consulting (p) Ltd. for GIS IDA / H8990 Strengthening, T.A., and Post Direct Selection Direct 0.00 Under Review 2019-05-06 2019-05-09 2019-05-30 2020-01-15 based Road Accessibility Monitoring study and Road Condition Survey of SNRTP project CPCU-CS-IND-SDS-87-075- Component A: Institutional Individual 76 / Procurement of Social Under IDA / 53360 Strengthening, T.A., and Post Consultant Limited 0.00 2019-07-14 2019-07-17 2019-07-31 2019-08-22 2019-12-31 Development Specialist for Implementation Monitoring Selection PMU SNRTP-CPCU-CS-SSS-88-1- Component A: Institutional Individual PSE-075-76 / Hiring of Under IDA / H8990 Strengthening, T.A., and Post Consultant Direct 0.00 2019-07-14 2019-07-17 2019-07-24 2019-08-07 2019-12-31 Dilip Upreti as Project Implementation Monitoring Selection Support Engineer I SNRTP-CPCU-CS-SSS-88-2- Component A: Institutional Individual PSE-075-76 / Hiring of Under IDA / H8990 Strengthening, T.A., and Post Consultant Direct 0.00 2019-07-14 2019-07-17 2019-07-24 2019-08-07 2019-12-31 Surendra Poudel as Project Implementation Monitoring Selection Support Engineer- I SNRTP-CPCU-CS-SSS-89- EME-076-77 / Hiring of Mr. Component A: Institutional Individual Under Sitaram Kandel as IDA / H8990 Strengthening, T.A., and Post Consultant Direct 0.00 2019-09-05 2019-09-09 2019-09-12 2019-09-20 2020-01-10 Implementation Environmental Management Monitoring Selection Expert SNRTP-CPCU-CS-SSS-92- BDC-076-77 / Hiring of Mr. Component A: Institutional Individual Under Suman Nakarmi as Bridge IDA / H8990 Strengthening, T.A., and Post Consultant Direct 0.00 2019-09-05 2019-09-09 2019-09-12 2019-09-20 2020-01-10 Implementation Design Consultant (BDC) Monitoring Selection through SSS method. Page 13 SNRTP-CPCU-CS-SSS-91- QME-076-77 / Hiring of Component A: Institutional Individual Under Mr. Khilendra Karna as IDA / H8990 Strengthening, T.A., and Post Consultant Direct 0.00 2019-09-05 2019-09-09 2019-09-12 2019-09-20 2020-01-10 Implementation Quality Management Expert Monitoring Selection (QME) for CPCU. SNRTP-CPCU-CS-SSS-94/2- PSE I-076-77 / Hiring of Component A: Institutional Individual Under Mr. Suman Kumar IDA / H8990 Strengthening, T.A., and Post Consultant Direct 0.00 2019-09-05 2019-09-09 2019-09-12 2019-09-20 2020-01-10 Implementation Shrestha as Project Support Monitoring Selection Engineer (PSE) Grade -I. SNRTP-CPCU-CS-SSS-94/3- PSE I-076-77 / Hiring of Component A: Institutional Individual Mr. Dev Kant Baruwa as Under IDA / H8990 Strengthening, T.A., and Post Consultant Direct 0.00 2019-09-05 2019-09-09 2019-09-12 2019-09-20 2019-12-31 Project Support Engineer Implementation Monitoring Selection (PSE) Grade -I by SSS method. SNRTP-CPCU-CS-SSS-94/5- PSE I-076-77 / Hiring of Component A: Institutional Individual Mr. Ashok Duwadi as Under IDA / H8990 Strengthening, T.A., and Post Consultant Direct 0.00 2019-09-05 2019-09-09 2019-09-12 2019-09-20 2020-01-10 Project Support Engineer Implementation Monitoring Selection (PSE) Grade-I by SSS method. SNRTP-PMU-CS-SSS-93- QMS-076-77 / Hiring of Mr. Component A: Institutional Individual Under Bijendra Pasache as IDA / H8990 Strengthening, T.A., and Post Consultant Direct 0.00 2019-09-05 2019-09-09 2019-09-12 2019-09-20 2020-01-10 Implementation Quality Monitoring Monitoring Selection Specialist for PMU. SNRTP-CPCU-CS-SSS-95- PSE-II-076-77 / Hiring of Component A: Institutional Individual Mr. Sandesh Adhikari as Under IDA / H8990 Strengthening, T.A., and Post Consultant Direct 0.00 2019-09-05 2019-09-09 2019-09-12 2019-09-20 2020-01-10 Project Support Engineer Implementation Monitoring Selection (PSE) grade-II by SSS method. SNRTP-CPCU-CS-SSS-90- Component A: Institutional Individual SDE-076-77 / Hiring of Mr. Under IDA / H8990 Strengthening, T.A., and Post Consultant Direct 0.00 2019-09-05 2019-09-09 2019-09-12 2019-09-20 2020-01-10 Binod Pant as Social Implementation Monitoring Selection Development Expert SNRTP-CPCU-CS-SSS-94/1- PSE I-076-77 / Hiring of Component A: Institutional Individual Mr. Sanjaya Subedi as Under IDA / H8990 Strengthening, T.A., and Post Consultant Direct 0.00 2019-09-05 2019-09-09 2019-09-12 2019-09-20 2020-01-10 Project Support Engineer Implementation Monitoring Selection (PSE) Grade -I by SSS method. SNRTP-CPCU-CS-SSS-94/4- PSE I-076-77 / Hiring of Component A: Institutional Individual Mr. Prakash Adhikari as Under IDA / H8990 Strengthening, T.A., and Post Consultant Direct 0.00 2019-09-05 2019-09-13 2019-09-20 2019-09-22 2020-01-10 Project Support Engineer Implementation Monitoring Selection (PSE) Grade -I by SSS method. SNRTP-CPCU-CS-SSS-96- FMC-076-77 / Hiring of Mr. Component A: Institutional Individual Pending Kulchandara Sharma as IDA / H8990 Strengthening, T.A., and Post Consultant Direct 0.00 2019-09-13 2019-09-21 2019-09-22 2019-09-26 2020-01-15 Implementation Financial Management Monitoring Selection Consultant by SSS method Page 14