Procurement Plan for KRWSS (P121774) I. General 1. Bank’s approval Date of the procurement Plan [April 2017 ] 2. Date of General Procurement Notice: [30 August 2011 ] 3. Period covered by this procurement plan: January 2017 onwards II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: 2. Procurement Method Prior Review Threshold US$ 1. ICB and LIB (Goods) Above US$ 500,000 2. NCB (Goods) Above US$ 100,000 3. ICB (Works) Above US$ 40 million 4. NCB (Works) Above US$ 10 million 5. (Non-Consultant Services) Below US$ 100,000 2. Prequalification for Bidders _Not applicable_ 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: NA 4. Reference to (if any) Project Operational/Procurement Manual: Project Implementation Manual for World Bank Loan Project P121774 by Jalanidhi 5. Any Other Special Procurement Arrangements: In addition, the justification for all contracts to be issued on the basis of LIB, single-source or direct contracting (except for contracts less than US$50,000 in value) will be subject to prior review. Justification for all contracts to be issued on the basis of LIB, single-source or direct contracting (except for contracts less than US$50,000 in value) will be subject to prior review. III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Threshold 1. Competitive Methods (Firms) Above US$ 500,000 2. Single Source (Firms) Above US$ 50,000 3. Individual Above US$ 200,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. PROCUREMENT India : IN 2nd Kerala Rural Water Supply and Sanitation Project (Jalanidhi II) PLAN General Information Country: India Banks Approval Date of the Original Procurement Plan: 2016-07-22 Revised Plan Date(s): (comma delineated, leave blank if none) 2018-08-09 Project ID: P121774 GPN Date: Project Name: IN 2nd Kerala Rural Water Supply and Sanitation Project (Jalanidhi II) Loan / Credit No: IDA / 50270 Executing Agency(ies): Kerala Rural Water Supply and Sanitation Agency, Regional Management Project Unit Malappuram, Regional Project Management Unit Kannur WORKS Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 06/RPMU/MPM/KVKD- PLVTA/KVKD/NSP/16-17 / Design, supply, installation and commissioning of 2 Nos. of Iron removal plants, 2 Nos. of Request for Single Stage - One Under IDA / 50270 Infrastructure Development Post Limited 69,566.67 0.00 2017-04-04 2017-05-30 2017-11-26 Pressure sand filters and a Quotations Envelope Implementation chlorine dosser for Karuvarakund WSS and Pulvetta WSS in Karuvarakund GP in Malappuram district. IN-RPMUK-11618-CW-RFB / Single Stage - Two Pending IDA / 50270 Infrastructure Development Post Request for Bids Open - National 381,600.00 0.00 2017-04-05 2017-04-10 2017-05-22 2017-08-04 2017-09-08 2018-03-07 EAST ELERI LWSS Package III Envelope Implementation IN-RPMUK-14990-CW-RFB / Single Stage - Two Under LWSS - Pakage 2 Kaithakolly - IDA / 50270 Infrastructure Development Post Request for Bids Open - National 150,700.00 0.00 2017-05-12 2017-05-17 2017-06-28 2017-09-10 2017-10-15 2018-04-13 Envelope Implementation Thavinjal Gp IN-RPMUK-14994-CW-RFB / Single Stage - Two Under LWSS - Thavinjal GP , IDA / 50270 Infrastructure Development Post Request for Bids Open - National 265,500.00 0.00 2017-05-12 2017-05-17 2017-06-28 2017-09-10 2017-10-15 2018-04-13 Envelope Implementation Kappikalam IN-RPMUK-15071-CW-RFB / ALAKKODE - CONSTRUCTION Single Stage - Two Under IDA / 50270 Infrastructure Development Post Request for Bids Open - National 133,100.00 0.00 2017-05-19 2017-05-24 2017-07-05 2017-09-17 2017-10-22 2018-04-20 OF VENTED WEIR ACROSS Envelope Implementation RAYAROM RIVER IN-RPMUK-15223-CW-RFB / Single Stage - Two Under THONDERNAD - ADAI LWSS - IDA / 50270 Infrastructure Development Post Request for Bids Open - National 269,100.00 0.00 2017-05-15 2017-05-20 2017-07-01 2017-09-13 2017-10-18 2018-04-16 Envelope Implementation Package II IN-RPMUK-25809-CW-RFQ / Purchase and installation of Request for Single Stage - One Pending Water Treatment Plant at IDA / 50270 Infrastructure Development Post Open - National 18,150.00 0.00 2017-08-23 2017-08-23 2017-08-23 Quotations Envelope Implementation Cheruparamba WSS, Kunnothuparamba GP IN-RPMUK-25812-CW-RFQ / Purchase and installation of Request for Single Stage - One Pending IDA / 50270 Infrastructure Development Post Open - National 11,400.00 0.00 2017-08-23 2017-08-23 2017-08-23 Water Treatment Plant at Quotations Envelope Implementation Thonichal WSS, Edavaka G P IN-RPMUK-25814-CW-RFQ / Purchase and installation of Request for Single Stage - One Pending Water Treatment Plant at IDA / 50270 Infrastructure Development Post Open - National 21,000.00 0.00 2017-08-23 2017-08-23 2017-09-22 Quotations Envelope Implementation Thuvakunnu WSS, Kunnothuparamba G P IN-RPMUK-25817-CW-RFQ / Purchase and installation of Request for Single Stage - One Pending Water Treatment Plant at IDA / 50270 Infrastructure Development Post Open - National 27,500.00 0.00 2017-08-23 2017-08-23 2017-09-22 Quotations Envelope Implementation Varadhur WSS Kaniyambetta GP IN-RPMUK-26280-CW-RFQ / Purchase and installation of Request for Single Stage - One Pending IDA / 50270 Infrastructure Development Post Open - National 32,250.00 0.00 2017-08-26 2017-09-16 2017-10-16 Treatment Plant - Mahatma Quotations Envelope Implementation WSS - Edavaka GP IN-RPMUK-25819-CW-RFQ / Purchase and installation of Request for Single Stage - One Pending Water Treatment Plant at Ganga IDA / 50270 Infrastructure Development Post Open - National 19,000.00 0.00 2017-08-23 2017-08-23 2017-08-23 Quotations Envelope Implementation Mathamangalam BG, Poothadi G P IN-RPMUK-26281-CW-RFQ / Purchase and installation of Request for Single Stage - One Pending Water Treatment Plant - IDA / 50270 Infrastructure Development Post Open - National 21,900.00 0.00 2017-08-26 2017-09-16 2017-10-16 Quotations Envelope Implementation Koonanchal WSS, MUNDERI GRAMA PANCHAYATH 20/RPMU/MPM/MNKR/NCB/16- 17 / rehabilitation of water supply scheme in Mankara Single Stage - Two Pending Gramapanchayath with a IDA / 50270 Infrastructure Development Post Request for Bids Open - National 474,800.00 0.00 2017-09-22 2017-09-27 2017-11-08 2018-01-21 2018-02-25 2018-08-24 Envelope Implementation coverage of water supply to house holds in ward 1,2,3,4 and 14. IN-RPMUK-25831-CW-RFQ / Purchase and installation of Request for Single Stage - One Pending IDA / 50270 Infrastructure Development Post Open - National 19,500.00 0.00 2017-08-23 2017-08-23 2017-09-22 Water Treatment Plant at Quotations Envelope Implementation Padannottu WSS Mundery G P IN-RPMUK-25837-CW-RFQ / Purchase an installation of Water Request for Single Stage - One Pending IDA / 50270 Infrastructure Development Post Open - National 52,100.00 0.00 2017-08-23 2017-08-23 2017-09-22 Treatment Plant at Quotations Envelope Implementation Chadalapuzha WSS, Kadirur G Page 1 IN-RPMUK-25839-CW-RFQ / Purchase and installation of Request for Single Stage - One Pending Water Treatment Plant at Nila IDA / 50270 Infrastructure Development Post Open - National 17,100.00 0.00 2017-08-23 2017-09-13 2017-10-13 Quotations Envelope Implementation Ashankavala WSS, Poothadi G P IN-RPMUK-26278-CW-RFQ / Purchase and installation of Request for Single Stage - One Pending Water Treatment Plant at IDA / 50270 Infrastructure Development Post Open - National 39,150.00 0.00 2017-08-26 2017-08-26 2017-09-25 Quotations Envelope Implementation Santhwanam SLEC, Edavaka Gramapanhayath IN-RPMUK-25840-CW-RFQ / Purchase and installation of Request for Single Stage - One Pending Water Treatment Plant at IDA / 50270 Infrastructure Development Post Open - National 40,200.00 0.00 2017-08-23 2017-08-23 2017-09-22 Quotations Envelope Implementation Ellumannam WSS, Edavaka G P IN-RPMUK-26279-CW-RFQ / Purchase and installation of Request for Single Stage - One Pending Water Treatment Plant at IDA / 50270 Infrastructure Development Post Open - National 42,800.00 0.00 2017-08-26 2017-08-26 2017-09-25 Quotations Envelope Implementation Janasakthi SLEC, Edavaka Gramapanchayath KRWSA-PMU/3468/2017-TA- TECH / Batch I-Nenmeni GP- Augmentation of Water Supply Single Stage - Two Pending IDA / 50270 Infrastructure Development Post Request for Bids Open - National 784,615.00 0.00 2017-08-30 2017-09-04 2017-10-16 2017-12-29 2018-02-02 2018-08-01 Scheme to Nenmeni Envelope Implementation Sudhajalavitharana Padhathi- Jalanidhi I IN-RPMUK-16296-CW-RFB / CONSTRUCTION OF VENTED Single Stage - Two Under WEIR AT THANNIYADI RIVER, IDA / 50270 Infrastructure Development Post Request for Bids Open - National 462,500.00 0.00 2017-08-23 2017-08-23 2017-08-23 2017-08-23 2017-08-23 2018-07-04 Envelope Implementation PULLUR PERIYA GRAMA PANCHAYATH IN-RPMUK-34732-CW-RFB / Jalanidhi II - Batch III GP - RPMU Kannur - Kasargod District - Meenja GP -, Community Request for Single Stage - One Pending IDA / 50270 Infrastructure Development Post Open - National 18,400.00 0.00 2018-02-16 2018-02-16 2018-02-16 Contracting, Morthane Kajakodi Quotations Envelope Implementation Scheduled Tribe Water Supply Scheme. Total TS Amount Rs- 11,96,000/- IN-RPMUK-34733-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Meenja GP - Request for Single Stage - One Pending Thalekala BG - Community IDA / 50270 Infrastructure Development Post Open - National 46,300.00 0.00 2018-02-16 2018-02-16 2018-02-16 Quotations Envelope Implementation Contracting- Small Water Supply Scheme - Distribution System - Total TS Rs.30,09,500/- IN-RPMUK-34734-CW-RFB / Jalanidhi II - Batch III - RPMU Kannur - Kasargod District - Meenja GP - Pajinkar Santhadka Request for Single Stage - One Pending BG - Small Water Supply IDA / 50270 Infrastructure Development Post Open - National 58,300.00 0.00 2018-02-16 2018-02-16 2018-02-16 Quotations Envelope Implementation Scheme, Community Contracting. Distribution, Pumbing main etc. Total TS Amount 37,89,500/- IN-RPMUK-34667-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Menja GP - Battipadavu Morthana BG - Request for Single Stage - One Pending Community Contracting - Small IDA / 50270 Infrastructure Development Post Open - National 24,100.00 0.00 2018-02-16 2018-02-16 2018-02-16 Quotations Envelope Implementation Water Supply Scheme - source, pumb house, pumbing main, reservoir, distribution Total TS Rs. 15,66,170/- IN-RPMUK-34735-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Meenja GP - Santhdka BG - Community Request for Single Stage - One Pending IDA / 50270 Infrastructure Development Post Open - National 52,200.00 0.00 2018-02-16 2018-02-16 2018-02-16 Contracting- Small Water Supply Quotations Envelope Implementation Scheme Other than Distribution System - Total TS Rs.33,92,950/- IN-RPMUK-33602-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Menja GP - Dharmanagar BG - Community Request for Single Stage - One Pending Contracting - Small Water IDA / 50270 Infrastructure Development Post Open - National 37,000.00 0.00 2018-02-16 2018-02-16 2018-02-16 Quotations Envelope Implementation Supply Scheme - source, pumb house, pumbing main, reservoir, distribution Total TS Rs. 24,05,250/- IN-RPMUK-34824-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Meenja GP - Battipadavu Kundadka BG - Request for Single Stage - One Pending Community Contracting - Small IDA / 50270 Infrastructure Development Post Open - National 55,800.00 0.00 2018-02-16 2018-02-16 2018-02-16 Quotations Envelope Implementation Water Supply Scheme - source, pumb house, pumbing main, reservoir, distribution-Total TS Rs. 36,25,545/- IN-RPMUK-34920-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Meenja GP - Request for Single Stage - One Pending Daddangadi Konkodi BG - IDA / 50270 Infrastructure Development Post Open - National 7,700.00 0.00 2018-02-16 2018-02-16 2018-02-16 Quotations Envelope Implementation Community Contracting - Small Water Supply Scheme - reservoir Total TS Rs. 4,99,480 Page 2 IN-RPMUK-35746-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Meenja GP - Pammar Gudde BG- Community Request for Single Stage - One Pending Contracting - Small Water IDA / 50270 Infrastructure Development Post Open - National 34,200.00 0.00 2018-02-16 2018-02-16 2018-02-16 Quotations Envelope Implementation Supply Scheme - source, pumb house, pumbing main, distribution, reservoir Total TS Rs.22,20,910/- IN-RPMUK-35756-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Meenja GP - Gandhinagar UT Colony BG - Request for Single Stage - One Pending Community Contracting - Small IDA / 50270 Infrastructure Development Post Open - National 62,100.00 0.00 2018-02-16 2018-02-16 2018-02-16 Quotations Envelope Implementation Water Supply Scheme - Source, pumb house, reservoir, pumbing main, distribution Total TS Rs.40,31,510/- IN-RPMUK-35758-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Meenja GP - Majibail Kodde BG - Community Request for Single Stage - One Pending IDA / 50270 Infrastructure Development Post Open - National 52,500.00 0.00 2018-02-16 2018-02-16 2018-08-15 Contracting - Small Water Quotations Envelope Implementation Supply Scheme - source, reservoir, pumbing main, pumb house Total TS Rs.34,07,840/- - IN-RPMUK-35807-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Meenja GP - Kinnimar Moodambail BG - Request for Single Stage - One Pending Community Contracting - Small IDA / 50270 Infrastructure Development Post Open - National 46,400.00 0.00 2018-02-19 2018-02-19 2018-02-19 Quotations Envelope Implementation Water Supply Scheme -source, pumb house, pumbing main, reservoir, distribution- Total TS Rs. 30,13,020/- IN-RPMUK-35810-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Meenja GP - Chadipadavu BG - Community Request for Single Stage - One Pending Contracting - Small Water IDA / 50270 Infrastructure Development Post Open - National 30,200.00 0.00 2018-02-16 2018-02-16 2018-02-16 Quotations Envelope Implementation Supply Scheme -source, pumb house, pumbing main, reservoir, distribution- Total TS Rs. 19,58,260/- IN-RPMUK-35817-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Meenja GP - Berika BG - Community Request for Single Stage - One Pending IDA / 50270 Infrastructure Development Post Open - National 71,400.00 0.00 2018-02-16 2018-02-16 2018-02-16 Contracting- Small Water Supply Quotations Envelope Implementation Scheme- Construction well, pumbing main, Reservoir etc. Total TS Rs. 46,35,475/- IN-RPMUK-35818-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Meenja GP - Gandhinagar Morthadka BG - Request for Single Stage - One Pending Community Contracting - Small IDA / 50270 Infrastructure Development Post Open - National 44,200.00 0.00 2018-02-16 2018-02-16 2018-02-16 Quotations Envelope Implementation Water Supply Scheme -source, pumb house, pumbing main, reservoir, distribution- Total TS Rs. 28,68,385/- IN-RPMUK-35819-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Meenja GP - Request for Single Stage - One Pending Doomarkkad Bejjangala BG - IDA / 50270 Infrastructure Development Post Open - National 69,500.00 0.00 2018-02-16 2018-03-02 2018-03-02 Quotations Envelope Implementation Community Contracting - Well, Pumbing main, reservoir etc. Total TS Rs. 45,11,645/- IN-RPMUK-35820-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Meenja GP - Baliyur BG - Community Request for Single Stage - One Pending IDA / 50270 Infrastructure Development Post Open - National 75,500.00 0.00 2018-02-16 2018-02-16 2018-02-16 Contracting - Small Water Quotations Envelope Implementation Supply Scheme. reservoir, pumb house, well etc. Total TS Rs. 49,02,835/- IN-RPMUK-35823-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Meenja GP - Karibail Hosagadde BG - Request for Single Stage - One Pending Community Contracting - Small IDA / 50270 Infrastructure Development Post Open - National 55,800.00 0.00 2018-02-16 2018-02-16 2018-02-16 Quotations Envelope Implementation Water Supply Scheme Other than Distribution System-well, pumbing main, resevoir etc-. Total TS Rs. 36,22,930/- IN-RPMUK-35845-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Meenja GP - Request for Single Stage - One Pending Budriya BG - Community IDA / 50270 Infrastructure Development Post Open - National 23,000.00 0.00 2018-02-16 2018-02-16 2018-02-16 Quotations Envelope Implementation Contracting - Small Water Supply Scheme - Reservoir . Total TS Rs. 14,95,000/- IN-RPMUK-35850-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Kasaragod - Meenja GP - Eliyana BG - Request for Single Stage - One Pending IDA / 50270 Infrastructure Development Post Open - National 80,500.00 0.00 2018-02-16 2018-02-16 2018-02-16 Community Contracting - Small Quotations Envelope Implementation Water Supply Source, reservoir and Pumping Main - Total TS Rs. 52,30,340/- Page 3 IN-RPMUK-35852-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Meenja GP - Kuloor Poyyel BG - Community Request for Single Stage - One Pending IDA / 50270 Infrastructure Development Post Open - National 34,300.00 0.00 2018-02-16 2018-02-16 2018-02-16 Contracting - Small Water Quotations Envelope Implementation Supply Scheme Pumbing main, source, reservoir, KSEB Total TS Rs. 22,29,260/- IN-RPMUK-35853-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Meenja GP - Honnakatte Berika BG - Request for Single Stage - One Pending IDA / 50270 Infrastructure Development Post Open - National 82,900.00 0.00 2018-02-16 2018-02-16 2018-02-16 Community Contracting - Small Quotations Envelope Implementation Water Supply Scheme Source, reservoir,pumbing main etc. Total TS Rs. 53,87,260/- IN-RPMUK-35854-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Meenja GP - Honnakatte Berika BG - Request for Single Stage - One Pending IDA / 50270 Infrastructure Development Post Open - National 32,000.00 0.00 2018-02-16 2018-02-16 2018-02-16 Community Contracting - Small Quotations Envelope Implementation Water Supply Scheme - reservoir, Pumping Main, source etc Total TS Rs. 20,76,000/- IN-RPMUK-35855-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Menja GP - Chigurpade BG - Community Request for Single Stage - One Pending Contracting - Small Water IDA / 50270 Infrastructure Development Post Open - National 72,100.00 0.00 2018-02-16 2018-02-16 2018-02-16 Quotations Envelope Implementation Supply Scheme -source, pumb house, pumbing main, reservoir, distribution- Total TS Rs. 46,85,580/- IN-RPMUK-35735-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Meenja GP - Durgipalla Gudde BG - Request for Single Stage - One Pending Community Contracting - Small IDA / 50270 Infrastructure Development Post Open - National 72,100.00 0.00 2018-02-16 2018-02-16 2018-02-16 Quotations Envelope Implementation Water Supply System - source, pumb house, pumbing main, reservoir, distribution Total TS Rs. 46,81,470/- IN-RPMUK-35741-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Meenja GP - IHDP Colony BG- Community Request for Single Stage - One Pending IDA / 50270 Infrastructure Development Post Open - National 25,100.00 0.00 2018-02-16 2018-02-16 2018-02-16 Contracting - Small Water Quotations Envelope Implementation Supply Scheme - source, pumb house, pumbing main, reservoir Total TS Rs.16,26,030/- IN-RPMUK-35822-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Meenja GP - Request for Single Stage - One Pending Baliyur BG - Community IDA / 50270 Infrastructure Development Post Open - National 41,800.00 0.00 2018-02-16 2018-02-16 2018-02-16 Quotations Envelope Implementation Contracting - Small Water Supply Scheme - Pumping Main. Total TS Rs. 27,18,000/- IN-RPMUK-35826-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Meenja GP - Budriya BG - Community Request for Single Stage - One Pending IDA / 50270 Infrastructure Development Post Open - National 69,700.00 0.00 2018-02-16 2018-02-16 2018-02-16 Contracting - Small Water Quotations Envelope Implementation Supply Scheme - Source,Pumphouse, Pumpset & KSEB. Total TS Rs. 45,29,284/- IN-RPMUK-35749-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Meenja GP - Kadambar BG - Community Request for Single Stage - One Pending IDA / 50270 Infrastructure Development Post Open - National 55,400.00 0.00 2018-02-16 2018-02-16 2018-02-16 Contracting - Small Water Quotations Envelope Implementation Supply Scheme - source, pumbing main, resevoir, etcTotal TS Rs. 35,95,870/- IN-RPMUK-35812-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Meenja GP - Sinthaje Korikar BG - Community Request for Single Stage - One Pending Contracting - Small Water IDA / 50270 Infrastructure Development Post Open - National 62,200.00 0.00 2018-02-16 2018-02-16 2018-02-16 Quotations Envelope Implementation Supply Scheme - source, pumb house, pumbing main, reservoir, distribution-Total TS Rs. 40,42,140/- IN-RPMUK-35813-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Meenja GP - Bolanthakodi BG - Community Request for Single Stage - One Pending Contracting - Small Water IDA / 50270 Infrastructure Development Post Open - National 28,500.00 0.00 2018-02-16 2018-02-16 2018-02-16 Quotations Envelope Implementation Supply Scheme - source, pumb house, pumbing main, reservoir, distribution-Total TS Rs. 18,51,010/- IN-RPMUK-35815-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Meenja GP - Adkathugiri WSS - Community Request for Single Stage - One Pending IDA / 50270 Infrastructure Development Post Open - National 11,100.00 0.00 2018-02-16 2018-02-16 2018-02-16 Contracting - Small Water Quotations Envelope Implementation Supply Scheme -Source, pumb house, reservoir, distribution- Total TS Rs. 7,17,970/- IN-RPMUK-35816-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Meenja GP - Bejja BG - Community Request for Single Stage - One Pending IDA / 50270 Infrastructure Development Post Open - National 41,400.00 0.00 2018-02-16 2018-02-16 2018-02-16 Contracting- Small Water Supply Quotations Envelope Implementation Scheme construction of Well, Pumbing main, Pumb house etc.. Total TS Rs. 26,91,240/- Page 4 IN-RPMUK-35809-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Meenja GP - Dargas Kadambar BG - Request for Single Stage - One Pending IDA / 50270 Infrastructure Development Post Open - National 45,600.00 0.00 2018-02-16 2018-02-16 2018-02-16 Community Contracting - Small Quotations Envelope Implementation Water Supply Scheme - Source, reservoir, Pumbing main Total TS Rs. 29,61,070/- IN-RPMUK-42517-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Kinanoor Karinthalam GP - Chayyom BG - Request for Single Stage - One Pending IDA / 50270 Infrastructure Development Post Open - National 86,800.00 0.00 2018-02-16 2018-02-16 2018-02-16 Community Contracting - Small Quotations Envelope Implementation Water Supply Scheme (Other Than Distribution). Total TS Amount is for Rs. 56,39,060/- IN-RPMUK-42527-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Kinanoor Karinthalam GP - Chayyom BG - Request for Single Stage - One Pending IDA / 50270 Infrastructure Development Post Open - National 99,000.00 0.00 2018-02-16 2018-02-16 2018-02-16 Community Contract - Small Quotations Envelope Implementation Water Supply Scheme - Distribution System . Total TS Amount is for Rs. 64,30,000/- IN-RPMUK-42548-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Kinanoor Karinthalam GP - Choyyamkode Request for Single Stage - One Pending Cheruva BG - Community IDA / 50270 Infrastructure Development Post Open - National 81,600.00 0.00 2018-02-16 2018-02-16 2018-02-16 Quotations Envelope Implementation Contracting - Small Water Supply Scheme (Other Than Distribution). Total TS Amount is for Rs. 53,03,558/- IN-RPMUK-42549-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Kinanoor Karinthalam GP - Choyyamkode Request for Single Stage - One Pending Cheruva BG -Community IDA / 50270 Infrastructure Development Post Open - National 77,300.00 0.00 2018-02-16 2018-02-16 2018-02-16 Quotations Envelope Implementation Contracting - Small Water Supply Scheme - Distribution System. Total TS Amount is for Rs. 50,20,000/- IN-RPMUK-42551-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Kinanoor Karinthalam GP - Choyyamkode Request for Single Stage - One Pending Pondiyil BG - Community IDA / 50270 Infrastructure Development Post Open - National 87,600.00 0.00 2018-02-16 2018-02-16 2018-02-16 Quotations Envelope Implementation Contracting - Small Water Supply Scheme Other Than Distribution - Total TS Amount is for Rs. 56,89,739/- IN-RPMUK-42571-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Kinanoor Karinthalam GP - Choyyamkode Request for Single Stage - One Pending IDA / 50270 Infrastructure Development Post Open - National 74,900.00 0.00 2018-02-16 2018-02-16 2018-02-16 Pondiyil - Community Contract - Quotations Envelope Implementation Small Water Supply Schemes - Distribution System - Total TS Amount Rs.48,65,000/- IN-RPMUK-42573-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Kinanoor Karinthalam GP - Koovatty BG - Request for Single Stage - One Pending IDA / 50270 Infrastructure Development Post Open - National 62,900.00 0.00 2018-02-16 2018-02-16 2018-02-16 Community Contract - Small Quotations Envelope Implementation Water Supply Schemes Other than Distribution - Total TS Amount Rs.40,87,976/- IN-RPMUK-42576-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Kinanoor Karinthalam GP - Kiliyalam Thotti Request for Single Stage - One Pending IDA / 50270 Infrastructure Development Post Open - National 16,000.00 0.00 2018-02-16 2018-02-16 2018-02-16 Michabhoomi - Community Quotations Envelope Implementation Contract - Small Water Supply Schemes - Distribution System - Total TS Amount Rs.10,38,840/- IN-RPMUK-42583-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Kinanoor Karinthalam GP - Kiliyalam Request for Single Stage - One Pending Mettakunnu BG - Community IDA / 50270 Infrastructure Development Post Open - National 65,900.00 0.00 2018-02-16 2018-02-16 2018-02-16 Quotations Envelope Implementation Contracting - Small Water Supply Schemes other than Distribution System - Total TS Rs 42,81,407/- IN-RPMUK-42588-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Kinanoor Karinthalam GP - Kiliyalam Request for Single Stage - One Pending Mettakunnu BG - Community IDA / 50270 Infrastructure Development Post Open - National 71,000.00 0.00 2018-02-16 2018-02-16 2018-02-16 Quotations Envelope Implementation Contracting - Small Water Supply Schemes -Distribution System - Total TS Rs 46,13,000/- IN-RPMUK-42643-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Kinanoor Karinthalam GP - Varanjoor Request for Single Stage - One Pending IDA / 50270 Infrastructure Development Post Open - National 21,700.00 0.00 2018-02-16 2018-02-16 2018-02-16 Thattu BG - Community Quotations Envelope Implementation Contracting - Small Water Supply Scheme - Total TS Rs. 14,11,410/- Page 5 IN-RPMUK-42644-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Kinanoor Request for Single Stage - One Pending Karinthalam GP - Community IDA / 50270 Infrastructure Development Post Open - National 25,700.00 0.00 2018-02-16 2018-02-16 2018-02-16 Quotations Envelope Implementation Contracting - Small Water Supply Scheme - Karalam BG - Total TS Rs. 16,70,000/- IN-RPMUK-42646-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Kinanoor Request for Single Stage - One Pending Karinthalam GP - Community IDA / 50270 Infrastructure Development Post Open - National 73,400.00 0.00 2018-02-16 2018-02-16 2018-02-16 Quotations Envelope Implementation Contracting - Small Water Supply Scheme - Kattipoil BG - Total TS Rs. 47,70,581/- IN-RPMUK-42647-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Kinanoor Karinthalam GP - Community Request for Single Stage - One Pending IDA / 50270 Infrastructure Development Post Open - National 40,600.00 0.00 2018-02-16 2018-02-16 2018-02-16 Contracting - Small Water Quotations Envelope Implementation Supply Scheme - Mekkaralapallam BG - Total TS Rs. 26,34,250/- IN-RPMUK-42649-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Kinanoor Karinthalam GP - Community Request for Single Stage - One Pending IDA / 50270 Infrastructure Development Post Open - National 55,600.00 0.00 2018-02-16 2018-02-16 2018-02-16 Contracting - Small Water Quotations Envelope Implementation Supply Scheme - Kadayamkayamthattu BG - Total TS Rs. 36,08,530/- IN-RPMUK-42650-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Kinanoor Request for Single Stage - One Pending Karinthalam GP - Community IDA / 50270 Infrastructure Development Post Open - National 68,100.00 0.00 2018-02-16 2018-02-16 2018-02-16 Quotations Envelope Implementation Contracting - Small Water Supply Scheme - Puliyamkulam BG - Total TS Rs. 44,21,701/- IN-RPMUK-42651-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Kinanoor Request for Single Stage - One Pending Karinthalam GP - Community IDA / 50270 Infrastructure Development Post Open - National 79,800.00 0.00 2018-02-16 2018-02-16 2018-02-16 Quotations Envelope Implementation Contracting - Small Water Supply Scheme - Kammadam BG - Total TS Rs. 51,87,250/- IN-RPMUK-42652-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur- Kinanoor Request for Single Stage - One Pending Karinthalam GP - Community IDA / 50270 Infrastructure Development Post Open - National 76,900.00 0.00 2018-02-16 2018-02-16 2018-02-16 Quotations Envelope Implementation Contracting - Small Water Supply Scheme - Parappa BG - Total TS Rs. 49,93,150/- IN-RPMUK-42653-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Kinanoor Karinthalam GP - Community Request for Single Stage - One Pending IDA / 50270 Infrastructure Development Post Open - National 69,900.00 0.00 2018-02-16 2018-02-16 2018-02-16 Contracting - Panniyerinhakolli Quotations Envelope Implementation BG - Small Water Supply Scheme Other than Distribution. Total TS Rs. 45,42,472/- IN-RPMUK-42654-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Kinanoor Karinthalam GP - Community Request for Single Stage - One Pending IDA / 50270 Infrastructure Development Post Open - National 83,400.00 0.00 2018-02-16 2018-02-16 2018-02-16 Contracting - Panniyerinhakolli Quotations Envelope Implementation BG - Small Water Supply Scheme Distribution. Total TS Rs. 54,30,000/- IN-RPMUK-42655-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Kinanoor Request for Single Stage - One Pending Karinthalam GP - Community IDA / 50270 Infrastructure Development Post Open - National 87,500.00 0.00 2018-02-16 2018-02-16 2018-02-16 Quotations Envelope Implementation Contracting - Small Water Supply Scheme Koolipara BG - Total TS Rs. 56,85,519/- IN-RPMUK-42662-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Kinanoor Karinthalam GP - Kaniyada Request for Single Stage - One Pending Moolak BG - Community IDA / 50270 Infrastructure Development Post Open - National 75,300.00 0.00 2018-02-16 2018-02-16 2018-02-16 Quotations Envelope Implementation Contracting - Small Water Supply Scheme Other Than Distribution - Total TS Rs. 48,93,630/- IN-RPMUK-42664-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Kinanoor Karinthalam GP - Kaniyada Request for Single Stage - One Pending IDA / 50270 Infrastructure Development Post Open - National 61,900.00 0.00 2018-02-16 2018-02-16 2018-02-16 Moolak BG - Community Quotations Envelope Implementation Contracting - Small Water Supply Scheme - Distribution - Total TS Rs. 40,20,000/- IN-RPMUM-43577-CW-RFB / Rehabilitation of existing water supply scheme for Mavettom Single Stage - Two Pending Sudhajala Vitharana Samithi in IDA / 50270 Infrastructure Development Post Request for Bids Open - National 367,080.00 0.00 2018-01-31 2018-02-05 2018-03-19 2018-06-01 2018-07-06 2019-01-02 Envelope Implementation Chakkittapara Grama Panchayath in Kozhikode district Kerla state. IN-RPMUM-29511-CW-RFB / Chorode- Package-2 - Providing distribution system and RCC Single Stage - Two Pending overhead Reservoir for zone1 and IDA / 50270 Infrastructure Development Post Request for Bids Open - National 558,000.00 0.00 2017-10-19 2017-10-24 2017-12-05 2018-02-17 2018-03-24 2018-09-20 Envelope Implementation zone2 in Chorode Gramapanchayath in Kozhikode district Page 6 IN-RPMUM-29504-CW-RFB / Bulk Water Supply Scheme for Chorode Gramapanchayath in Kozhikode district- Package-1 - Construction of Sump, compound Single Stage - Two Pending IDA / 50270 Infrastructure Development Post Request for Bids Open - National 348,000.00 0.00 2017-10-11 2017-10-16 2017-11-27 2018-02-09 2018-03-16 2018-09-12 wall, Pump house etc Providing Envelope Implementation Bulk water meter , Pump set and accessories. Laying of Pumping main and distribution system in zone-3. IN-RPMUK-43615-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Kinanoor Karinthalam GP - Vellarikundu Request for Single Stage - One Pending Mavullal BG - Community IDA / 50270 Infrastructure Development Post Open - National 65,800.00 0.00 2018-02-16 2018-02-16 2018-02-16 Quotations Envelope Implementation Contracting - Small Water Supply System Other than Distribution System - Total TS Rs - 42,77,389/- IN-RPMUK-43618-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Kinanoor Karinthalam GP - Vellarikundu Request for Single Stage - One Pending Mavullal BG - Community IDA / 50270 Infrastructure Development Post Open - National 52,000.00 0.00 2018-02-16 2018-02-16 2018-02-16 Quotations Envelope Implementation Contracting - Small Water Supply Scheme - Distribution System - Total TS Rs - 33,80,000/- IN-RPMUK-43647-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Kinanoor Karinthalam GP - Avullakode BG Request for Single Stage - One Pending IDA / 50270 Infrastructure Development Post Open - National 72,900.00 0.00 2018-02-16 2018-02-16 2018-02-16 - Community Contracting - Small Quotations Envelope Implementation Water Supply Scheme other than Distribution and Pumping Main - Total TS - 47,38,012/- IN-RPMUK-43649-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Kinanoor Request for Single Stage - One Pending Karinthalam GP - Avullakode BG IDA / 50270 Infrastructure Development Post Open - National 32,000.00 0.00 2018-02-16 2018-02-16 2018-02-16 Quotations Envelope Implementation - Community Contracting - Small Water Supply Scheme Pumping Main - Total TS - 20,80,000/- IN-RPMUK-43653-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Kinanoor Karinthalam GP - Avullakode BG Request for Single Stage - One Pending IDA / 50270 Infrastructure Development Post Open - National 53,900.00 0.00 2018-02-16 2018-02-16 2018-02-16 - Community Contracting - Small Quotations Envelope Implementation Water Supply Scheme Distribution Package I - Total TS - 35,00,000/- IN-RPMUK-43654-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Kinanoor Karinthalam GP - Avullakode BG Request for Single Stage - One Pending IDA / 50270 Infrastructure Development Post Open - National 53,100.00 0.00 2018-02-16 2018-02-16 2018-02-16 - Community Contracting - Small Quotations Envelope Implementation Water Supply Scheme Distribution Package II - Total TS - 34,50,000/- IN-RPMUK-43672-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Kinanoor Request for Single Stage - One Pending Karinthalam GP - Chembena BG IDA / 50270 Infrastructure Development Post Open - National 30,700.00 0.00 2018-02-16 2018-02-16 2018-02-16 Quotations Envelope Implementation - Community Contracting - Small Water Supply Scheme - Total TS Rs. 19,94,005/- IN-RPMUK-43899-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Kinanoor Karinthalam GP - Request for Single Stage - One Pending IDA / 50270 Infrastructure Development Post Open - National 63,000.00 0.00 2018-02-16 2018-02-16 2018-02-16 Puliyanadukkam BG - Quotations Envelope Implementation Community Contracting - Small Water Supply Scheme - Total TS Rs.40,90,057/- IN-RPMUK-43906-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Kinanoor Karinthalam GP - Kolamkulam Request for Single Stage - One Pending Melepoyil Omanganam BG - IDA / 50270 Infrastructure Development Post Open - National 46,000.00 0.00 2018-02-16 2018-02-16 2018-02-16 Quotations Envelope Implementation Community Contracting - Small Water Supply Scheme Other than Distribution - Total TS Rs.29,86,301/- IN-RPMUK-43907-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Kinanoor Karinthalam GP - Kolamkulam Request for Single Stage - One Pending Melepoyil Omanganam BG - IDA / 50270 Infrastructure Development Post Open - National 69,000.00 0.00 2018-02-16 2018-02-16 2018-02-16 Quotations Envelope Implementation Community Contracting - Small Water Supply Scheme - Distribution - Total TS Rs.44,85,000/- IN-RPMUK-43908-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Kinanoor Karinthalam GP - Kumbalapalli Request for Single Stage - One Pending IDA / 50270 Infrastructure Development Post Open - National 55,000.00 0.00 2018-02-16 2018-02-16 2018-02-16 Umichipoil BG - Community Quotations Envelope Implementation Contracting - Small Water Supply Scheme - Total TS Rs.35,70,480/- IN-RPMUK-43909-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Kinanoor Request for Single Stage - One Pending Karinthalam GP - Pallapara BG - IDA / 50270 Infrastructure Development Post Open - National 34,600.00 0.00 2018-02-16 2018-02-16 2018-02-16 Quotations Envelope Implementation Community Contracting - Small Water Supply Scheme - Total TS Rs.22,46,642/- Page 7 IN-RPMUK-43910-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Kinanoor Karinthalam GP - Mukkada BG - Request for Single Stage - One Pending IDA / 50270 Infrastructure Development Post Open - National 44,300.00 0.00 2018-02-16 2018-02-16 2018-02-16 Community Contracting - Small Quotations Envelope Implementation Water Supply Scheme Other than Distribution and Pumping main- Total TS Rs.28,73,998/- IN-RPMUK-43911-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Kinanoor Karinthalam GP - Mukkada BG - Request for Single Stage - One Pending IDA / 50270 Infrastructure Development Post Open - National 65,400.00 0.00 2018-02-16 2018-02-16 2018-02-16 Community Contracting - Small Quotations Envelope Implementation Water Supply Scheme Distribution and Pumping main- Total TS Rs.42,50,000/- IN-RPMUK-43912-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Kinanoor Karinthalam GP - Varayil Request for Single Stage - One Pending IDA / 50270 Infrastructure Development Post Open - National 55,800.00 0.00 2018-02-16 2018-02-16 2018-02-16 Palilotty BG - Community Quotations Envelope Implementation Contracting - Small Water Supply Scheme - Total TS Rs.36,25,874/- IN-RPMUK-43913-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Kinanoor Karinthalam GP - Kunhipara Request for Single Stage - One Pending Vadakkepuliyanoor BG - IDA / 50270 Infrastructure Development Post Open - National 63,600.00 0.00 2018-02-16 2018-02-16 2018-02-16 Quotations Envelope Implementation Community Contracting - Small Water Supply Scheme Other than Distribution - Total TS Rs.41,30,837/- IN-RPMUK-43914-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Kinanoor Karinthalam GP - Kunhipara Request for Single Stage - One Pending Vadakkepuliyanoor BG - IDA / 50270 Infrastructure Development Post Open - National 72,800.00 0.00 2018-02-16 2018-02-16 2018-02-16 Quotations Envelope Implementation Community Contracting - Small Water Supply Scheme - Distribution and pumping main - Total TS Rs.47,30,000/- IN-RPMUK-43915-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Kinanoor Karinthalam GP - Kayani Andol Request for Single Stage - One Pending IDA / 50270 Infrastructure Development Post Open - National 45,600.00 0.00 2018-02-16 2018-02-16 2018-02-16 BG - Community Contracting - Quotations Envelope Implementation Small Water Supply Scheme Other than Distribution - Total TS Rs.29,62,357/- IN-RPMUK-43917-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Kinanoor Karinthalam GP - Kayani Andol Request for Single Stage - One Pending IDA / 50270 Infrastructure Development Post Open - National 80,600.00 0.00 2018-02-16 2018-02-16 2018-02-16 BG - Community Contracting - Quotations Envelope Implementation Small Water Supply Scheme - Distribution and pumping main- Total TS Rs.52,35,000/- IN-RPMUK-43921-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Kinanoor Request for Single Stage - One Pending Karinthalam GP - Chimmathodu IDA / 50270 Infrastructure Development Post Open - National 26,900.00 0.00 2018-02-16 2018-02-16 2018-02-16 Quotations Envelope Implementation BG - Community Contracting - Small Water Supply Scheme - Total TS Rs. 17,46,790/- IN-RPMUK-43942-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Kinanoor Karinthalam GP - Omcheri Request for Single Stage - One Pending Parakkol BG - Community IDA / 50270 Infrastructure Development Post Open - National 45,900.00 0.00 2018-02-16 2018-02-16 2018-02-16 Quotations Envelope Implementation Contracting - Small Water Supply Scheme Other than Distribution - Total TS Rs. 29,78,359/- IN-RPMUK-43952-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Kinanoor Karinthalam GP - Omcheri Request for Single Stage - One Pending Parakkol BG - Community IDA / 50270 Infrastructure Development Post Open - National 75,200.00 0.00 2018-02-16 2018-02-16 2018-02-16 Quotations Envelope Implementation Contracting - Small Water Supply Scheme - Distribution & Pumping Main- Total TS Rs. 48,85,000/- IN-RPMUK-43954-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Kinanoor Karinthalam GP - Manjalamkkad Request for Single Stage - One Pending IDA / 50270 Infrastructure Development Post Open - National 59,300.00 0.00 2018-02-16 2018-02-16 2018-02-16 BG - Community Contracting - Quotations Envelope Implementation Small Water Supply Scheme - Other than Distribution - Total TS Rs. 38,54,483/- IN-RPMUK-43968-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Kinanoor Karinthalam GP - Manjalamkkad Request for Single Stage - One Pending IDA / 50270 Infrastructure Development Post Open - National 39,200.00 0.00 2018-02-16 2018-02-16 2018-02-16 BG - Community Contracting - Quotations Envelope Implementation Small Water Supply Scheme - Pumping Main - Total TS Rs. 25,44,000/- IN-RPMUK-43970-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Kinanoor Karinthalam GP - Manjalamkkad Request for Single Stage - One Pending IDA / 50270 Infrastructure Development Post Open - National 70,000.00 0.00 2018-02-16 2018-02-16 2018-02-16 BG - Community Contracting - Quotations Envelope Implementation Small Water Supply Scheme - Distribution System Total TS Rs. 45,49,000/- Page 8 IN-RPMUK-44127-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Kinanoor Karinthalam GP - Keezhamala Request for Single Stage - One Pending IDA / 50270 Infrastructure Development Post Open - National 45,100.00 0.00 2018-02-16 2018-02-16 2018-02-16 BG - Community Contracting - Quotations Envelope Implementation Small Water Supply Scheme Other than Distribution System - Total TS Rs. 29,28,590/- IN-RPMUK-44128-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Kinanoor Karinthalam GP - Keezhamala Request for Single Stage - One Pending IDA / 50270 Infrastructure Development Post Open - National 54,000.00 0.00 2018-02-16 2018-02-16 2018-08-15 BG - Community Contracting - Quotations Envelope Implementation Small Water Supply Scheme - Distribution System - Total TS Rs. 35,05,000/- IN-RPMUK-44130-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Kinanoor Karinthalam GP - Request for Single Stage - One Pending IDA / 50270 Infrastructure Development Post Open - National 34,600.00 0.00 2018-02-16 2018-02-16 2018-02-16 Vadakkamkunnu Pannithadam Quotations Envelope Implementation BG - Community Contracting - Rain Water Harvesting - Total TS Rs. 22,45,000/- IN-RPMUK-44132-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Kinanoor Karinthalam GP - Koovatty BG - Request for Single Stage - One Pending IDA / 50270 Infrastructure Development Post Open - National 21,900.00 0.00 2018-02-16 2018-02-16 2018-02-16 Community Contract - Small Quotations Envelope Implementation Water Supply Schemes - Pumping Main - Total TS Amount Rs.14,20,000/- IN-RPMUK-44133-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Kinanoor Karinthalam GP - Koovatty BG - Request for Single Stage - One Pending IDA / 50270 Infrastructure Development Post Open - National 55,900.00 0.00 2018-02-16 2018-02-16 2018-02-16 Community Contract - Small Quotations Envelope Implementation Water Supply Schemes - Distribution System - Total TS Amount Rs.36,30,000/- IN-RPMUK-44306-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Meenja GP - Thalekala BG - Community Request for Single Stage - One Pending IDA / 50270 Infrastructure Development Post Open - National 71,200.00 0.00 2018-02-16 2018-02-16 2018-02-16 Contracting- Small Water Supply Quotations Envelope Implementation Scheme -Distribution and Pumping main - Total TS Rs.46,25,000/- IN-RPMUK-44308-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Meenja GP - Santhdka BG - Community Request for Single Stage - One Pending IDA / 50270 Infrastructure Development Post Open - National 74,900.00 0.00 2018-02-16 2018-02-16 2018-02-16 Contracting- Small Water Supply Quotations Envelope Implementation Scheme - Distribution and Pumping main - Total TS Rs.48,66,000/- IN-RPMUK-44309-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Meenja GP - Bejja BG - Community Request for Single Stage - One Pending IDA / 50270 Infrastructure Development Post Open - National 62,000.00 0.00 2018-02-16 2018-02-16 2018-02-16 Contracting- Small Water Supply Quotations Envelope Implementation Scheme - Distribution and Pumping main. Total TS Rs. 40,25,000/- IN-RPMUK-44310-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Meenja GP - Berika BG - Community Request for Single Stage - One Pending IDA / 50270 Infrastructure Development Post Open - National 75,700.00 0.00 2018-02-16 2018-02-16 2018-02-16 Contracting - Small Water Quotations Envelope Implementation Supply Scheme -Distribution & Pumping Main. Total TS Rs. 49,17,000/- IN-RPMUK-44311-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Meenja GP - Doomarkkad Bejjangala BG - Request for Single Stage - One Pending IDA / 50270 Infrastructure Development Post Open - National 81,200.00 0.00 2018-02-16 2018-02-16 2018-02-16 Community Contracting - Small Quotations Envelope Implementation Water Supply Scheme - Distribution & Pumping Main. Total TS Rs. 52,75,000/- IN-RPMUK-44319-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Meenja GP - Baliyur BG - Community Request for Single Stage - One Pending IDA / 50270 Infrastructure Development Post Open - National 62,800.00 0.00 2018-02-16 2018-02-16 2018-02-16 Contracting - Small Water Quotations Envelope Implementation Supply Scheme - Distribution System. Total TS Rs. 40,83,000/- IN-RPMUK-44329-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Meenja GP - Karibail Hosagadde BG - Request for Single Stage - One Pending IDA / 50270 Infrastructure Development Post Open - National 66,700.00 0.00 2018-02-16 2018-02-16 2018-02-16 Community Contracting - Small Quotations Envelope Implementation Water Supply Scheme - Distribution & Pumping Main. Total TS Rs. 43,38,000/- IN-RPMUK-44338-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Meenja GP - Request for Single Stage - One Pending Budriya BG - Community IDA / 50270 Infrastructure Development Post Open - National 31,300.00 0.00 2018-02-16 2018-02-16 2018-02-16 Quotations Envelope Implementation Contracting - Small Water Supply Scheme - Pumping Main. Total TS Rs. 20,33,000/- Page 9 IN-RPMUK-44339-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Meenja GP - Budriya BG - Community Request for Single Stage - One Pending IDA / 50270 Infrastructure Development Post Open - National 62,500.00 0.00 2018-02-16 2018-02-16 2018-02-16 Contracting - Small Water Quotations Envelope Implementation Supply Scheme - Distribution Package I. Total TS Rs. 40,62,000/- IN-RPMUK-44340-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Meenja GP - Budriya BG - Community Request for Single Stage - One Pending IDA / 50270 Infrastructure Development Post Open - National 64,600.00 0.00 2018-02-16 2018-02-16 2018-02-16 Contracting - Small Water Quotations Envelope Implementation Supply Scheme - Distribution Package II. Total TS Rs. 42,00,000/- IN-RPMUK-44343-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Meenja GP - Kuloor Poyyel BG - Community Request for Single Stage - One Pending IDA / 50270 Infrastructure Development Post Open - National 74,900.00 0.00 2018-02-16 2018-02-16 2018-02-16 Contracting - Small Water Quotations Envelope Implementation Supply Scheme - Distribution & Pumping Main. Total TS Rs. 48,65,000/- IN-RPMUK-44346-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Meenja GP - Honnakatte Berika BG - Request for Single Stage - One Pending IDA / 50270 Infrastructure Development Post Open - National 46,500.00 0.00 2018-02-16 2018-02-16 2018-02-16 Community Contracting - Small Quotations Envelope Implementation Water Supply Scheme - Distribution Package I Total TS Rs. 30,25,000/- IN-RPMUK-44349-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Meenja GP - Honnakatte Berika BG - Request for Single Stage - One Pending IDA / 50270 Infrastructure Development Post Open - National 60,000.00 0.00 2018-02-16 2018-02-16 2018-02-16 Community Contracting - Small Quotations Envelope Implementation Water Supply Scheme - Distribution Package II Total TS Rs. 30,25,000/- IN-RPMUK-45677-CW-RFB / Jalanidhi Project II - Batch III - RPMU Kannur - Kasaragod - Meenja GP - Eliyana BG - Request for Single Stage - One Pending IDA / 50270 Infrastructure Development Post Open - National 77,700.00 0.00 2018-02-16 2018-02-16 2018-02-16 Community Contracting - Small Quotations Envelope Implementation Water Supply - Distribution System and Pumping Main - Total TS Rs. 50,51,000/- . IN-RPMUK-49040-CW-RFB / Jalanidhi II - Batch II - RPMU Kannur - Kasargod District - Construction of Check Dam Single Stage - Two Pending across Payassini River at Kuntar IDA / 50270 Infrastructure Development Post Request for Bids Open - National 461,600.00 0.00 2018-03-23 2018-03-28 2018-05-09 2018-07-22 2018-08-26 2019-02-22 Envelope Implementation in Karadka Grama Panchayath. Sustainability of source of Bellur LWSS in Bellur Gramapanchayath. GOODS Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 2696/PROC/2016/KRWSA / Request for Single Stage - One IDA / 50270 Institution Building Post Open - National 1,000.00 308.56 Completed 2016-08-21 2016-10-16 2016-08-04 2017-04-14 2016-09-08 Procurement of chair Quotations Envelope 2775/PROC/2016/KRWSA / Request for Single Stage - One IDA / 50270 Institution Building Post Open - National 1,000.00 126.55 Completed 2016-08-21 2016-10-16 2016-08-23 2017-04-14 2016-09-09 Procurement of UPS Quotations Envelope 3196/PROC/2012/KRWSA / Request for Single Stage - One Printing of Mbook (2000 Nos.) IDA / 50270 Infrastructure Development Post Open - National 2,000.00 1,571.59 Signed 2017-02-05 2017-04-02 2016-10-21 2017-09-29 Quotations Envelope and Site Order Books (300 Nos.) 087/PROC/2017/KRWSA / High Request for Single Stage - One Speed Document Scanner- 4 IDA / 50270 Institution Building Post Limited 5,000.00 2,139.22 Completed 2017-02-27 2017-01-30 2017-03-20 2017-03-01 2017-09-16 2017-06-03 Quotations Envelope Nos for e-office (PMU & RPMUs) 087/PROC/2017/KRWSA_1 / Procurement of Network Switch- Request for Single Stage - One IDA / 50270 Institution Building Post Limited 5,000.00 5,617.24 Completed 2017-02-27 2017-01-30 2017-03-20 2017-03-01 2017-09-16 2017-06-03 24 Port- 4 Nos for e-office (PMU Quotations Envelope & RPMUs) 087/PROC/2017/KRWSA_2 / Request for Single Stage - One Procurement of Router 5 Nos. for IDA / 50270 Institution Building Post Limited 15,000.00 11,267.49 Completed 2017-02-27 2017-01-30 2017-03-20 2017-03-01 2017-09-16 2017-06-03 Quotations Envelope e-office (for PMU & RPMUs) 087/PROC/2017/KRWSA_3 / Request for Single Stage - One Procurement of Network Rack 2 IDA / 50270 Institution Building Post Limited 666.00 278.68 Completed 2017-02-27 2017-01-30 2017-03-20 2017-03-01 2017-09-16 2017-05-19 Quotations Envelope Nos. for e-office (RPMUs) 399/PROC/2017/KRWSA / Request for Single Stage - One IDA / 50270 Institution Building Post Limited 667.00 651.02 Completed 2017-02-27 2017-02-08 2017-04-03 2017-03-04 2017-09-30 2017-03-29 Procurement of Almirah - 2 Nos . Quotations Envelope 522/PROC/2017/KRWSA / Procurement of Desktop Request for Single Stage - One IDA / 50270 Institution Building Post Limited 13,750.00 11,854.97 Completed 2017-02-27 2017-02-22 2017-04-18 2017-03-21 2017-10-15 2017-05-26 Computers for PMU & RPMUs- Quotations Envelope 15 Nos. 04/RPMU/MPM/04/BATCH-II GPST FRCHR/E5 / Supply of Request for Single Stage - One Under IDA / 50270 Infrastructure Development Post Limited 3,175.00 0.00 2017-04-04 2017-05-30 2017-11-26 office furniture for batch-II GPST's Quotations Envelope Implementation in Malappuram district. Page 10 08/RPMU/MPM/042011/BATCH- II GPST/E5/2016 / Supply of Request for Single Stage - One Under Desktop computers and IDA / 50270 Infrastructure Development Post Limited 2,500.00 0.00 2017-04-04 2017-05-30 2017-11-26 Quotations Envelope Implementation accessories for Vengara and Urakam batch -II GPST office. 924/PROC/2017/KRWSA / Procurement of electronic Request for Single Stage - One IDA / 50270 Institution Building Post Limited 1,670.00 0.00 Canceled 2017-03-20 2017-05-15 2017-11-11 dipmeter for deep borewell(water Quotations Envelope level indicator)-two numbers 05/RPMU/MPM/04/BATCH- IIIGPST FRCHR/E5 / Supply of office furniture for GPST office of Kottur, Naduvannur, villyapally, Request for Single Stage - One Pending Purameri, Ayancheri, IDA / 50270 Infrastructure Development Post Open - National 10,000.00 0.00 2017-04-04 2017-05-30 2017-11-26 Quotations Envelope Implementation Chakkitapara, Chorode, Moonniyur, Mankara, Parali and Koduvayur Gramapanchayaths in batch 3 . KRWSA-PMU/3101/2017-DD Request for Single Stage - One PROC / Procurement of IDA / 50270 Infrastructure Development Post Limited 250.00 155.84 Signed 2017-06-07 2017-05-30 2017-08-02 2017-06-15 2018-01-29 Quotations Envelope Executive chair for DFA-1 No. KRWSA-PMU/3059/2017-DBSA / Procurement of LCD Projector Request for Single Stage - One Under Screen,Projector mounting kit IDA / 50270 Infrastructure Development Post Limited 500.00 0.00 2017-06-05 2017-07-31 2018-01-27 Quotations Envelope Implementation and presenter for the use of Conference hall in PMU-reg 1151/PROC/2017/KRWSA / Procurement of multifunction Request for Single Stage - One IDA / 50270 Institution Building Post Limited 1,700.00 0.00 Canceled 2017-04-08 2017-04-04 2017-06-03 2017-11-30 printer for RPMU Malappuram-1 Quotations Envelope number 559/PROC/2017/KRWSA / Request for Single Stage - One Procurement of Multifunction IDA / 50270 Institution Building Post Limited 250.00 0.00 Canceled 2017-04-09 2017-06-04 2017-12-01 Quotations Envelope printer for PMU-1 number KRWSA-PMU/3234/2017-DBSA / Supply and setting up of a Request for Single Stage - One Under Document Management Solution IDA / 50270 Institution Building Post Open - National 27,231.00 0.00 2017-10-25 2017-12-20 2018-06-18 Quotations Envelope Implementation for KRWSA-1 No. (both Hardware and Software) KRWSA-PMU/3514/2017-TA- TECH / Procurement of Dip Request for Single Stage - One Pending IDA / 50270 Institution Building Post Open - National 635.00 0.00 2017-11-13 2018-01-08 2018-02-28 Meter/Water Level Indicator for Quotations Envelope Implementation RPMU Idukki - 1 No. KRWSA-PMU/3579/2017-TA- PROC / Procurement of Printer Request for Single Stage - One Under IDA / 50270 Institution Building Post Open - National 335.00 0.00 2017-11-13 2018-01-08 2018-04-07 (Table top) for Finance section- Quotations Envelope Implementation PMU-1 No. KRWSA-PMU/3578/2017-TA- PROC / Procurement of Multi Request for Single Stage - One Under IDA / 50270 Institution Building Post Open - National 4,923.00 0.00 2017-11-15 2018-01-10 2018-03-09 Function Printer for KRWSA Quotations Envelope Implementation (PMU) - 1 No. IN-RPMUK-35443-GO-RFQ / Purchase of 100Ah Batteries 10 Request for Single Stage - One Pending IDA / 50270 Institution Building Post Open - National 1,770.00 0.00 2017-11-05 2017-12-04 2018-06-02 Numbers f or UPS, due to the Quotations Envelope Implementation damage of existing batteries. NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual IN-RPMUM-26582-NC-RFQ / Printing of bimonthly news letter- Request for Single Stage - One Pending Jalatharangam consisting of 8 IDA / 50270 Infrastructure Development Post Limited 170.00 0.00 2017-09-27 2017-11-22 2018-05-21 Quotations Envelope Implementation pages (double side printing) November issue 1000 Copies . 09/RPMU/MPM/PRINT/IEC/E5/2 13/2017 / Printing of Bimonthly news letter -Jalatharangam Request for Single Stage - One Pending IDA / 50270 Infrastructure Development Post Limited 1,000.00 0.00 2017-09-27 2017-11-22 2018-05-21 consisting of 8 pages (double Quotations Envelope Implementation side printing) 6000 copies -6 issues CONSULTING FIRMS Activity Reference No. / Combined Evaluation Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Technical Description Loan / Credit No. Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual WBR No. 3 / Selection of Independent Construction Quality Institution Building & Surveillance Consultancy for Infrastructure Development Quality And Cost- Batch I, II and Tribal IDA / 50270 Prior Open - International N 0.00 720,405.90 Signed 2014-01-31 2014-05-01 2014-07-30 2014-08-29 2014-10-13 2014-10-22 2014-12-12 2014-10-14 2015-12-07 Technical Assistance to Based Selection Gramapanchayaths of Jalanidhi Implementing Agencies phase II under RPMU Malappuram, Idukki and Kannur WBR No. 13 / Consultancy Institution Building Services for preparing Rural Infrastructure Development Quality Based IDA / 50270 Prior Open - International N 0.00 265,251.96 Signed 2016-03-02 2016-02-10 Water Supply Sector Technical Assistance to Selection Development Plan Implementing Agencies 2272/PROC/2015/KRWSA / Consultancy for hiring of media Technical Assistance to Quality And Cost- Under /advertising agency for Jalanidhi II IDA / 50270 Prior Open - National 675,000.00 0.00 2016-08-10 2017-01-30 2016-08-31 2016-10-14 2016-11-11 2016-12-11 2017-01-15 2017-08-23 2017-02-19 2018-02-19 Implementing Agencies Based Selection Implementation for various audio/visual campaigns Page 11 2879/PROC/2016/KRWSA / Consultancy to conduct the Second Round of Study on Technical Assistance to Quality Based Under IDA / 50270 Post Open - National 90,000.00 0.00 2016-08-16 2016-08-05 2016-09-06 2016-10-20 2017-01-27 2016-11-17 2017-02-14 2016-12-17 2017-03-07 2017-01-16 2017-04-04 2017-02-20 2018-02-20 Domestic Water and Sanitation Implementing Agencies Selection Implementation Service Levels in the State of Kerala 3555/TECH/2015/KRWSA / Consultancy for the preparation of Detailed Project Report and bid documents for the distribution Technical Assistance to Quality Based Under IDA / 50270 Post Open - National 100,000.00 0.00 2016-08-12 2016-07-07 2016-09-02 2016-10-16 2016-11-13 2016-12-13 2017-01-12 2017-02-16 2018-02-16 system of the multi GP WSS to Implementing Agencies Selection Implementation Cheekode and adjoining villages in Malappuram District following Jalanidhi principles 3634/TECH/2015/KRWSA / Consultancy for Modernisation and Service Delivery Improvement Consultant Technical Assistance to Under of Kodakkaparamba water IDA / 50270 Post Qualification Open - National 24,000.00 0.00 2016-08-12 2016-03-30 2016-09-02 2016-10-16 2016-11-15 2016-12-20 2017-06-18 Implementing Agencies Implementation services in Alipparamba Grama Selection panchayath in Malappuram District 721/PROC/2016/KRWSA / Consultancy for conducting Audit of Project Accounts of Consultant Gramapanchayaths and Technical Assistance to Under IDA / 50270 Post Qualification Open - National 50,000.00 0.00 2016-08-16 2016-05-06 2016-09-06 2016-10-20 2016-07-20 2016-11-19 2016-08-03 2016-12-24 2017-06-22 Beneficiary groups of Jalanidhi II- Implementing Agencies Implementation Selection Batch III under RPMU Malappuram, Kannur and Idukki (2 packages) 3911/PROC/2016/KRWSA / Consultancy Service for Process Technical Assistance to Quality And Cost- Documentation of Large Water IDA / 50270 Post Open - National 37,000.00 34,262.17 Signed 2016-11-18 2016-11-04 2016-11-30 2017-07-07 2017-01-13 2017-02-04 2017-02-10 2017-03-03 2017-03-12 2017-03-27 2017-04-16 2017-03-30 2017-05-21 2017-04-22 2018-05-21 Implementing Agencies Based Selection Supply Schemes of Jalanidhi II Project 3032/PROC/2016/KRWSA / Consultancy Service to conduct Technical Performance and Technical Assistance to Quality And Cost- IDA / 50270 Post Open - National 150,000.00 184,065.84 Signed 2016-11-30 2016-08-30 2016-12-21 2017-07-27 2017-02-03 2017-01-24 2017-03-03 2017-03-09 2017-04-02 2017-03-20 2017-05-07 2017-04-21 2017-06-11 2017-05-06 2018-06-11 Service Delivery of 10 Multi GP Implementing Agencies Based Selection rural drinking water supply schemes in the State of Kerala. 2747/TECH/2016/KRWSA / Consultancy for Service Delivery Consultant Technical Assistance to Improvement of Nenmeni WSS in IDA / 50270 Post Qualification Open - National 17,000.00 0.00 Canceled 2016-08-12 2016-09-02 2016-10-16 2016-11-15 2016-12-20 2017-06-18 Implementing Agencies Nenmeni GP by converting the Selection schem into a 24x7 system 3982/PROC/2016/KRWSA / Selection of Supporting Organisations for Nedumbassery & adjoining GPs - Multi GP Scheme. Technical Assistance to Fixed Budget (4 Grama panchayaths - IDA / 50270 Post Open - National 200,000.00 0.00 Canceled 2016-11-29 2016-12-20 2017-02-02 2017-03-02 2017-04-01 2017-05-06 2017-06-10 2018-06-10 Implementing Agencies Selection Nedumbassery & Chegamanad / Kanjoor & Sreemulangararm, 2 Supporting Organisation are proposed to be selected one each for two GPs ). 794/PROC/2017/KRWSA / Consultant Selection of consultancy service Technical Assistance to Under IDA / 50270 Post Qualification Open - National 69,230.70 0.00 2017-03-03 2017-03-24 2017-05-07 2017-06-06 2017-07-11 2018-01-07 to monitor Sustainability Implementing Agencies Implementation Selection Evaluation Exercise(SEE-2) 3983/PROC/2016/KRWSA / Consultant Selection of Supporting Technical Assistance to Pending IDA / 50270 Post Qualification Open - National 100,000.00 0.00 2017-03-03 2017-03-03 2017-03-03 2017-04-02 2017-05-07 2017-11-03 organisation for Nedumbassery Implementing Agencies Implementation Selection and Chengamanad GPs 3984/PROC/2016/KRWSA / Consultant Selection of supporting Technical Assistance to Pending IDA / 50270 Post Qualification Open - National 100,000.00 0.00 2017-03-03 2017-03-03 2017-03-03 2017-04-02 2017-05-07 2017-11-03 organisation for Kanjoor and Implementing Agencies Implementation Selection Sreemoolanagaram GPs 1243/PROC/2017/KRWSA / Selection of supporting Consultant organisation for community Technical Assistance to Under IDA / 50270 Post Qualification Open - National 40,000.00 0.00 2017-04-12 2017-04-11 2017-04-12 2017-04-29 2017-04-12 2017-04-12 2017-05-03 2017-10-30 mobilization activities in Implementing Agencies Implementation Selection Ooragam and Vengara GPs in Malappuram KRWSA-PMU/3016/2017- TA/PROC / Selection of Independent Construction Quality and Surveillance for balance non commissioned schemes of Batch Technical Assistance to Quality And Cost- Pending II WSS, GWR works,and IDA / 50270 Post Open - National 295,000.00 0.00 2017-06-02 2017-06-02 2017-07-16 2017-08-13 2017-09-12 2017-10-17 2017-11-21 2018-11-21 Implementing Agencies Based Selection Implementation sanitation schemes implemented in General and tribal GPs of Batch III Multi GP WSS under RPMU Malappuram,Kannur and Idukki KRWSA-PMU/3016/2017 / Selection of Independent ,Construction,Quality & surveillance consultancy for balance non commissioned Technical Assistance to Quality And Cost- schemes s of batch II,WSS IDA / 50270 Post Open - National 295,000.00 0.00 Canceled 2017-04-25 2017-04-03 2017-04-25 2017-06-08 2017-07-06 2017-08-05 2017-09-09 2017-10-14 2018-10-14 Implementing Agencies Based Selection ,GWR works and sanitation schemes implemented in general and tribal GPs of Batch III and multi GP WSS under three RPMUs 1152/PROC/2017/KRWSA / Consultant Procurement of consultancy for IDA / 50270 Institution Building Post Qualification Open - National 15,000.00 0.00 Canceled 2017-04-03 2017-03-31 2017-04-24 2017-06-07 2017-07-07 2017-08-11 2018-02-07 website restructuring including Selection AMC Page 12 KRWSA-PMU/12/2018-TA-ME / Consultant Consultancy Service for Technical Assistance to Pending IDA / 50270 Post Qualification Open - National 50,769.00 0.00 2018-01-19 2018-02-14 2018-03-14 2018-03-22 2018-03-31 2018-06-29 Sustainability Evaluation Implementing Agencies Implementation Selection Exercise (SEE III) for KRWSA KRWSA-PMU/3043/2017-AC3- FIN / Consultancy service to conduct Audit of Annual Project Technical Assistance to Quality And Cost- Pending IDA / 50270 Post Open - National 12,500.00 0.00 2018-06-29 2018-06-29 2018-06-29 2018-06-29 2018-06-29 2018-06-29 2018-06-29 2018-06-29 Financial Statements of the Implementing Agencies Based Selection Implementation Jalanidhi II project for the Financial year 2016-17. INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Contract Type Estimated Actual Amount Draft Negotiated Description Loan / Credit No. Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual WBR No. 14 / CONSULTING SERVICES FOR THE PREPARATION OF DPR FOR Institution Building THE DISTRIBUTION SYSTEM Infrastructure Development IDA / 50270 Prior Direct Selection Direct N 0.00 55,584.77 Signed 2015-12-01 OF THE MULTI GP WATER Technical Assistance to SUPPLY SCHEME TO Implementing Agencies CHEEKODE AND ADJOINING VILLAGES IN MALAPPURAM. WBR No. 16 / Consultancy for the preparation of Evaluation report and Detailed Project Institution Building Report for distribution system of Infrastructure Development IDA / 50270 Prior Direct Selection Direct N 0.00 107,623.61 Signed 2016-02-05 the multi GP Water Supply Technical Assistance to Scheme to Nedumbassery and Implementing Agencies adjoining GPS in Ernakulam District 3686/PROC/2016/KRWSA / Selection of Consultant Technical Assistance to Under IDA / 50270 Prior Direct Selection Direct 4,500.00 0.00 2016-11-19 2017-03-08 2016-11-29 2016-11-29 2017-02-02 2017-08-01 (Procurement) for a period of 3 Implementing Agencies Implementation months 3913/PROC/2016/KRWSA / Selection of Consultant (Individual/Organisation)for Technical Assistance to Individual Consultant IDA / 50270 Post Open 6,670.00 0.00 Canceled 2016-11-30 2017-01-18 2017-02-08 2017-03-15 2017-09-11 conducting Software Implementing Agencies Selection Programming for modification in the customised Tally software. KRWSA-PMU/3093/2017-DBSA / Consultancy service for Under Design,Development and IDA / 50270 Institution Building Prior Direct Selection Direct 7,262.00 6,351.77 2017-10-31 2017-11-13 2017-12-01 2018-01-31 Implementation Maintenance of Website for KRWSA (Website revamping) KRWSA-PMU/3563/2017/AC-3 / Consultancy service for development of New Finance IDA / 50270 Institution Building Prior Direct Selection Direct 36,308.00 36,837.59 Signed 2017-10-31 2017-11-13 2017-12-05 2018-01-01 2018-06-04 Management Information System for KRWSA KRWSA-PMU/31/2018-TA-ME / Consultancy for Mobile Under IDA / 50270 Institution Building Post Direct Selection Direct 7,300.00 0.00 2018-02-19 2018-02-26 2018-03-15 2018-11-30 Application for Service Delivery Implementation Monitoring for KRWSA KRWSA-PMU/58/2018-TA- PROC / Consultancy for carrying out pending audit ( Internal Audit) Technical Assistance to Under of utilization of funds by IDA / 50270 Post Direct Selection Direct 8,000.00 0.00 2018-03-13 2018-03-19 2018-03-30 2018-12-31 Implementing Agencies Implementation participating Batch II GPs & BGs of Jalanidhi II project under 3 RPMUs. KRWSA-PMU/3043/2017- AC3/FIN/II / Consultancy service to conduct Audit of Annual Technical Assistance to Pending IDA / 50270 Post Direct Selection Direct 8,200.00 0.00 2018-07-06 2018-07-11 2018-07-24 2018-10-22 Project Financial Statements of Implementing Agencies Implementation the Jalanidhi II project for the Financial year 2017-18. KRWSA-PMU/136/2018-TA-ME / Consultancy service for the development of Additional Module Pending IDA / 50270 Institution Building Post Direct Selection Direct 2,500.00 0.00 2018-08-08 2018-08-12 2018-08-23 2018-09-12 in the Mobile App for Service Implementation Delivery Monitoring of Jalanidhi schemes Page 13