The World Bank Report No: ISR9144 Implementation Status & Results Indonesia Bekasi Landfill Gas Flaring (P099679) Public Disclosure Copy Operation Name: Bekasi Landfill Gas Flaring (P099679) Project Stage: Implementation Seq.No: 2 Status: ARCHIVED Archive Date: 10-Mar-2013 Country: Indonesia Approval FY: 2008 Product Line: Carbon Offset Region: EAST ASIA AND PACIFIC Lending Instrument: Implementing Agency(ies): Key Dates Board Approval Date 15-Feb-2008 Original Closing Date Last Archived ISR Date 22-Jun-2012 Effectiveness Date Revised Closing Date Overall Ratings Previous Rating Current Rating Progress towards achievement of PDO Moderately Unsatisfactory Moderately Satisfactory Overall Implementation Progress (IP) Moderately Unsatisfactory Moderately Satisfactory Overall Risk Rating Implementation Status Overview The project was registered with the UNFCCC on July 26, 2009. Construction and commissioning of the landfill gas component at the project site have been completed by the project developer/Project entity (PE). In the beginning of project implementation, project developer experienced some difficulties with the landfill has capture engineering design which resulted in lower than projected amounts of emission reductions (ERs). However, with technical advices from Chinese and Danish source to overcome flaws in the original design, the design was improved and resulted in increasing landfill gas capture. The new design (vertical wells) is working well, leachate is well managed and not interfering with gas generation. Additional wells installation within cell 1, 2 , and 3 has successfully increased the gas flow rate to be 900m3/hr. At current, the flare operation is maintained at its optimum condition (900m3/hr @ approx 50% CH4). Wells tuning and leachate pumping on each individual well will be made as necessary. Verification of ERs is in progress for 1st and 2nd monitoring periods. The last (3rd) verification process is expected to start March 2013. Public Disclosure Copy Locations Country First Administrative Division Location Planned Actual Indonesia West Java West Java ✔ Indonesia Not Entered Desa Sumurbatu Key Decisions Regarding Implementation N/A Related Projects Page 1 of 2 The World Bank Report No: ISR9144 There are no related projects. Public Disclosure Copy Public Disclosure Copy Page 2 of 2