FOREST CONSERVATION AND SUSTAINABILITY IN THE HEART OF THE COLOMBIAN AMAZON PROJECT – TF018478 PROCUREMENT PLAN I. General 1. Bank’s approval Date of the procurement Plan 2. Date of General Procurement Notice: Dec 09, 2015 3. Period covered by this procurement plan: Until Dec 31, 2017 July 9, 2010 PROCUREMENT Colombia : Forest Conservation and Sustainability in the Heart of the Colombian Amazon PLAN General Information Country: Colombia Bank’s Approval Date of the Original Procurement Plan: 2017-08-04 2020-01-07 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P144271 GPN Date: Project Name: Forest Conservation and Sustainability in the Heart of the Colombian Amazon Loan / Credit No: TF / 18478, TF / A5789, TF / B1287 Executing Agency(ies):NATURAL HERITAGE FUND FOR BIODIVERSITY AND AREAS WORKS Bid Evaluation Activity Reference Estimated Actual Draft Pre- Draft Bidding Specific Proposal Loan / Market Procurement Prequalificati Process Prequalification Bidding Documents Report and Contract No. / Description Component Review Type Method Amount Amount qualification Document / Procurement Notice Submission / Signed Contract Credit No. Approach Process on (Y/N) Status Evaluation Report as Issued Recommendation Completion (US$) (US$) Documents Justification / Invitation Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CO-PNF-18003-CW-DIR / Component 1 - Protected Construcción Cabaña - Adquisición 2017-06- 2017-06- 2017-07- 2017-12- TF / 18478 Areas Management and Posterior Direct 29,200.00 27,614.48 Firmado Punto de Control en el directa 13 27 18 30 Financial Sustainability PNNSCH - Sector el Guamo CO-PNF-17813-CW-RFB / Construcción de un modulo Component 1 - Protected Solicitud de Single Stage - 2018-01- 2018-02- 2018-09- del centro de investigación TF / 18478 Areas Management and Posterior Limited 208,929.00 181,366.41 Firmado cotizaciones One Envelope 15 20 28 ubicado en Puerto Abeja - Financial Sustainability PNN Chiribiquete CO-PNF-31996-CW-RFB / Adecuación Sede Regional de San José del Guaviare Component 1 - Protected Solicitud de Single Stage - 2017-11- 2018-01- 2018-07- (Se excluye el tramite de TF / 18478 Areas Management and Posterior Limited 123,963.00 0.00 Cancelado cotizaciones One Envelope 25 20 19 licencia de demolición y Financial Sustainability construcción, estimadas en USD1.5000) GOODS Bid Evaluation Activity Reference Estimated Actual Draft Pre- Draft Bidding Specific Proposal Loan / Market Procurement Prequalificati Process Prequalification Bidding Documents Report and Contract No. / Description Component Review Type Method Amount Amount qualification Document / Procurement Notice Submission / Signed Contract Credit No. Approach Process on (Y/N) Status Evaluation Report as Issued Recommendation Completion (US$) (US$) Documents Justification / Invitation Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CO-PNF-17981-GO-RFQ / Component 2 - Forest Solicitud de Single Stage - 2017-03- 2017-05- 2017-12- Compra motores fuera de TF / 18478 Governance, Management Posterior Limited 21,482.00 11,124.04 Firmado cotizaciones One Envelope 17 24 20 borda PPI - 2017 and Monitoring CO-PNF-17822-GO-RFQ / DC-compra de hadware y Component 2 - Forest Solicitud de Single Stage - 2017-08- 2017-09- 2017-10- software CDS, para el TF / 18478 Governance, Management Posterior Limited 88,889.00 92,226.96 Firmado cotizaciones One Envelope 08 13 31 fortalecimiento del sistema and Monitoring de información ambiental CO-PNF-31988-GO-DIR / Component 2 - Forest Adquisición 2016-12- 2016-12- 2017-01- 2017-12- Adquisicion Imágenes de TF / 18478 Governance, Management Posterior Direct 62,963.00 57,631.70 Firmado directa 15 16 19 20 SR, equipos, software and Monitoring Component 2 - Forest CO-PNF-54228-GO-RFQ / Solicitud de Single Stage - En 2018-04- 2018-06- 2018-09- TF / 18478 Governance, Management Posterior Limited 150.00 0.00 adquisición de un GPS cotizaciones One Envelope ejecución 30 11 26 and Monitoring CO-PNF-54329-GO-RFQ / Component 2 - Forest Adquisición de 250 cajas Solicitud de Single Stage - 2018-04- 2018-06- 2018-12- TF / 18478 Governance, Management Posterior Limited 8,570.00 8,368.56 Firmado para muestras de 25 x 10 cotizaciones One Envelope 30 12 31 and Monitoring x 5 cms con tapa, en madera. CO-PNF-66548-GO-RFQ / ADQUISICIÓN DE EQUIPOS CÓMPUTO Y PERIFERICOS PARA Component 2 - Forest FORTALECIMIENTO DEL Solicitud de Single Stage - 2018-07- 2018-08- 2018-10- TF / 18478 Governance, Management Posterior Open - National 88,889.00 48,183.51 Firmado SIG. CORPORACIÓN cotizaciones One Envelope 03 16 18 and Monitoring PARA EL DESARROLLO SOSTENIBLE DEL NORTE Y ORIENTE AMAZÓNICO - CDA CO-PNF-41763-GO-RFQ / Adquisición de imágenes Component 3 - Sectoral Solicitud de Single Stage - 2018-01- 2018-03- 2018-09- de sensores remotos TF / 18478 Programs for Sustainable Posterior Limited 53,571.00 0.00 Cancelado cotizaciones One Envelope 28 25 21 (imagines satélitales, Landscape Management fotógrafas aéreas, radar y drones) CO-PNF-54230-GO-RFQ / Component 2 - Forest Solicitud de Single Stage - 2018-05- 2018-06- 2018-10- Radio y antena para el TF / 18478 Governance, Management Posterior Limited 2,150.00 0.00 Cancelado cotizaciones One Envelope 01 19 30 Rdo Mirití and Monitoring CO-PNF-17798-GO-RFQ / Adquisición e instalación Component 1 - Protected Solicitud de Single Stage - 2017-07- 2017-09- 2017-10- de equipos para garantizar TF / 18478 Areas Management and Posterior Limited 5,556.00 0.00 Cancelado cotizaciones One Envelope 26 06 06 la radiocomunicación de las Financial Sustainability Nuevas sedes del PNNSCH CO-PNF-17807-GO-RFQ / Component 2 - Forest Solicitud de Single Stage - 2017-08- 2017-09- 2017-12- Adquisición Equipos y TF / 18478 Governance, Management Posterior Limited 6,926.00 0.00 Cancelado cotizaciones One Envelope 01 06 05 Software - 2017 - IDEAM and Monitoring CO-PNF-38838-GO-RFQ / Component 2 - Forest Computadores portátiles, Solicitud de Single Stage - 2018-01- 2018-03- 2018-09- TF / 18478 Governance, Management Posterior Limited 6,071.00 0.00 Cancelado grabadoras de voz y cotizaciones One Envelope 20 17 13 and Monitoring cámaras CO-PNF-66788-GO-DIR / Adquisición de imágenes satelitales de muy alta resolución de las constelaciones PlanetScope, Component 3 - Sectoral DigitalGlobe, SkySat y/o Adquisición 2018-07- 2018-07- 2018-08- 2019-08- TF / 18478 Programs for Sustainable Posterior Direct 51,724.00 47,379.00 Firmado RapidEye hasta que se directa 16 21 27 26 Landscape Management complete el valor total definido en este contrato, con un precio unitario por km2 y por tipo de imagen de acuerdo CO-PNF-75475-GO-CP / Adquisición de muebles Component 2 - Forest para la exibición de las Prácticas Single Stage - 2018-09- 2018-09- 2018-10- 2018-10- 2018-11- 2018-12- TF / 18478 Governance, Management Posterior Limited 6,071.00 5,398.18 Firmado colecciones de madera con comerciales One Envelope 20 25 12 18 01 31 and Monitoring usos pedagogicos en diferentes regiones del país CO-PNF-78398-GO-CP / 5 kit campo: Carpa, aislante, Component 1 - Protected Prácticas Single Stage - 2018-10- 2018-10- 2018-11- 2018-11- 2018-11- 2019-01- estufa, linterna, morral, TF / 18478 Areas Management and Posterior Open - National 3,571.00 3,586.43 Firmado comerciales One Envelope 18 23 08 15 27 31 cantimplora, PNN Alto Financial Sustainability Fragua y SFFPMOIA. CO-PNF-78409-GO-RFQ / Adquisición de Bote y motor fuera de borda para 12 personas con Equipo de Salvamento para apoyar Component 3 - Sectoral las actividades de Solicitud de Single Stage - 2018-10- 2018-11- 2019-01- TF / A5789 Programs for Sustainable Posterior Open - National 18,000.00 14,376.96 Firmado implementación de los cotizaciones One Envelope 16 27 28 Landscape Management acuerdos de conservación, restauración y no deforestación, en el departamento de Caquetá - CORPOAMAZONIA CO-PNF-81065-GO-CP / Adquisición de reactivos para el procesamiento de muestras biológicas de Component 2 - Forest peces, sangre y cabello Prácticas Single Stage - 2018-10- 2018-10- 2018-11- 2018-11- 2018-12- 2019-01- TF / 18478 Governance, Management Posterior Open - National 7,143.00 6,782.39 Firmado (125 muestras de pecese comerciales One Envelope 25 30 15 21 06 16 and Monitoring para ser analizadas, 200 muestras de sangre y 200 muestras de cabello), para detectar la presencia de mercurio CO-PNF-78414-GO-CP / Adquisición de 3 Component 3 - Sectoral Prácticas Single Stage - En 2018-11- 2018-11- 2018-12- 2018-12- 2019-01- 2019-03- motocicletas (4 tiempos, TF / A5789 Programs for Sustainable Posterior Open - National 12,857.00 0.00 comerciales One Envelope ejecución 15 20 11 18 03 08 cilindraje 125cc, encendido Landscape Management eléctrico y pedal - CDA. CO-PNF-78379-GO-RFQ / ADQUISICIÓN DE COMPUTADORES PORTATILES, DE MESA, UPS, DISCOS DUROS Component 1 - Protected EXTERNOS Y UN VIDEO Solicitud de Single Stage - 2018-11- 2019-01- 2019-03- TF / 18478 Areas Management and Posterior Open - National 35,000.00 28,504.48 Firmado BEAM Y OTROS cotizaciones One Envelope 27 12 15 Financial Sustainability ELEMENTOS (CAMARAS TV) -PNN PARA CHIBIRIQUETE, LA PAYA Y ALTO FRAGUA, ACILAP Y CHURUMBELOS CO-PNF-78388-GO-CP / Component 1 - Protected ADQUISICIÓN DE 2 Prácticas Single Stage - 2018-11- 2018-11- 2018-12- 2018-12- 2018-12- 2019-02- TF / 18478 Areas Management and Posterior Open - National 7,143.00 5,783.92 Firmado MOTOCICLETAS PNN comerciales One Envelope 15 20 11 18 26 28 Financial Sustainability ALTO FRAGUA CO-PNF-81083-GO-CP / Component 2 - Forest Prácticas Single Stage - 2018-11- 2018-11- 2018-12- 2018-12- 2019-01- 2019-03- Stand para la conservación TF / 18478 Governance, Management Posterior Open - National 5,357.00 1,757.46 Firmado comerciales One Envelope 22 27 13 20 03 05 de las muestras de madera and Monitoring CO-PNF-85470-GO-RFQ / Adquisición de sillas y Component 2 - Forest muebles para las salas de Solicitud de Single Stage - 2018-11- 2019-01- 2019-03- TF / 18478 Governance, Management Posterior Open - National 18,929.00 15,211.10 Firmado reuniones, salas de juntas cotizaciones One Envelope 27 22 30 and Monitoring y auditorio en CORPOAMAZONIA. CO-PNF-85487-GO-CP / Component 1 - Protected Adquisición de 1 Prácticas Single Stage - 2018-11- 2018-11- 2018-12- 2018-12- 2019-01- 2019-02- TF / 18478 Areas Management and Posterior Open - National 2,000.00 2,345.79 Firmado motocicletas PNN Serranía comerciales One Envelope 22 27 18 25 15 28 Financial Sustainability de Churumbelos CO-PNF-89601-GO-DIR / Adquisición imágenes de Component 2 - Forest Adquisición 2019-01- 2019-02- 2019-02- 2020-01- Sensores Remotos: TF / A5789 Governance, Management Posterior Direct 47,464.00 40,000.24 Finalizado directa 28 02 15 15 Procalculo - Prosis. IDEAM and Monitoring - 2019 CO-PNF-99140-GO-CP / Component 2 - Forest Adquisición de un Motor 4 Prácticas Single Stage - 2019-03- 2019-03- 2019-03- 2019-03- 2019-04- 2019-05- TF / 18478 Governance, Management Posterior Open - National 4,516.00 4,090.64 Firmado tiempos de 20 H.P. y 3 comerciales One Envelope 01 06 22 29 01 15 and Monitoring Hélices. CO-PNF-109167-GO-CP / Adquisición equipos implementación estrategia de comunicación y difusión Component 1 - Protected (Cámaras fotográficas, Prácticas Single Stage - 2019-04- 2019-04- 2019-05- 2019-05- 2019-05- 2019-07- TF / 18478 Areas Management and Posterior Open - National 17,581.00 17,326.11 Firmado grabadoras de audio, comerciales One Envelope 25 30 14 21 31 01 Financial Sustainability micrófonos semi profesionales y profesionales, tripode profesional, tarjeta de memoria de 128 GB) Page 1 CO-PNF-109168-GO-RFQ / Adquisición de motocicletas Component 1 - Protected como apoyo a las Solicitud de Single Stage - 2019-04- 2019-06- 2019-07- TF / 18478 Areas Management and Posterior Open - National 23,226.00 20,084.33 Finalizado actividades de PVC áreas cotizaciones One Envelope 30 17 17 Financial Sustainability protegidas nacionales, sedes locales y regionales CDA y CAZ CO-PNF-109172-GO-CP / Adquisición de Drones como instrumentos de Component 1 - Protected registro, control y Prácticas Single Stage - En 2019-04- 2019-04- 2019-05- 2019-05- 2019-06- 2019-07- TF / 18478 Areas Management and Posterior Open - National 4,516.00 0.00 seguimiento de los recursos comerciales One Envelope ejecución 25 30 14 21 04 04 Financial Sustainability Naturales de la RFP y áreas protegidas regionales y nacionales del área del Proyecto. CO-PNF-109174-GO-CP / Component 2 - Forest Prácticas Single Stage - 2019-04- 2019-04- 2019-05- 2019-05- 2019-05- 2019-07- Adquisición e instalación TF / 18478 Governance, Management Posterior Open - National 5,806.00 2,711.86 Firmado comerciales One Envelope 25 30 14 21 31 01 aires acondicionados and Monitoring CO-PNF-109327-GO-RFQ / Botes en Aluminio tipo Arawana como apoyo a las actividades de PVC áreas Component 1 - Protected Solicitud de Single Stage - 2019-04- 2019-06- 2019-07- protegidas nacionales, TF / 18478 Areas Management and Posterior Open - National 74,839.00 69,488.64 Firmado cotizaciones One Envelope 30 19 19 sedes locales y regionales Financial Sustainability CDA y CAZ y fortalecimiento resguardos del área del Proyecto CO-PNF-109328-GO-RFQ / Motores fuera de borda Motor Fuera de Borda Pata Corta 40 HP, como Component 1 - Protected apoyo a las actividades de Solicitud de Single Stage - 2019-04- 2019-06- 2019-07- TF / 18478 Areas Management and Posterior Open - National 49,677.00 46,121.46 Firmado PVC áreas protegidas cotizaciones One Envelope 30 17 17 Financial Sustainability nacionales, sedes locales y regionales CDA y CAZ, y fortalecimiento resguardos indígenas. CO-PNF-109336-GO-RFQ / Kit materiales y bienes de seguridad alimentaria para fortalecimiento de las familias que hacer parte Component 3 - Sectoral Solicitud de Single Stage - 2019-04- 2019-06- 2019-07- de la Asociación TF / 18478 Programs for Sustainable Posterior Open - National 32,258.00 28,751.04 Firmado cotizaciones One Envelope 30 18 18 Campesina ACEFIN y Landscape Management conforman el Ramsar EFI, Jaula para aves, malla, palas, machetes, grapas, limas, semillas de pangoger (tomate, cilant CO-PNF-109338-GO-CP / Adquisición de herramientas diferenciales que permitan el Component 3 - Sectoral movimiento de grandes Prácticas Single Stage - 2019-04- 2019-04- 2019-05- 2019-05- 2019-05- 2019-07- TF / 18478 Programs for Sustainable Posterior Open - National 6,452.00 1,044.96 Firmado volúmenes y pesos, comerciales One Envelope 25 30 14 21 31 01 Landscape Management herramientas de corte de madera de corte fino y combustible para el funcionamiento de las herramientas. CO-PNF-103496-GO-CP / Component 1 - Protected Adquisición equipos de Solicitud de Single Stage - 2019-04- 2019-06- 2019-08- TF / 18478 Areas Management and Posterior Open - National 48,397.00 28,304.88 Firmado cómputo e impresoras y cotizaciones One Envelope 22 15 14 Financial Sustainability licencias CO-PNF-109340-GO-CP / Adquisición equipos para el fortalecimiento de la iniciativa de manejo sostenible y transformación Component 3 - Sectoral de la palma de Asai de la Prácticas Single Stage - 2019-04- 2019-04- 2019-05- 2019-05- 2019-05- 2019-07- TF / 18478 Programs for Sustainable Posterior Open - National 9,677.00 8,046.32 Firmado Comunidad Indígena Santa comerciales One Envelope 25 30 14 21 31 01 Landscape Management Lucia en Leticia - Amazonas como despulpadoras, licuadores , empacadoras, y demas equipos que se requiere CO-PNF-85459-GO-RFQ / Adquisición e instalación de un sistema de video Component 2 - Forest conferencia video-wall, Solicitud de Single Stage - 2019-05- 2019-07- 2019-09- TF / 18478 Governance, Management Posterior Open - National 41,935.00 38,762.25 Firmado monitor industrial, cotizaciones One Envelope 11 06 12 and Monitoring monitores led, compatible con sistema Lync de Microsoft en Corpoamazonia CO-PNF-109165-GO-CP / Component 1 - Protected Prácticas Single Stage - 2019-04- 2019-04- 2019-05- 2019-05- 2019-06- 2019-07- Adquisición de GPS y TF / 18478 Areas Management and Posterior Open - National 15,484.00 11,136.25 Firmado comerciales One Envelope 25 30 14 28 07 08 cámaras trampa Financial Sustainability CO-PNF-109163-GO-RFQ / Adquisición de equipos tecnológicos, licencias y estaciones de trabajo para el fortalecimiento de las Component 1 - Protected sedes administrativas de Solicitud de Single Stage - 2019-04- 2019-06- 2019-07- TF / 18478 Areas Management and Posterior Open - National 92,065.00 68,848.10 Firmado PNN, Dto de Putumayo cotizaciones One Envelope 30 14 31 Financial Sustainability Orito, Churumbelos y La paya, Dto Caquetá ,Alto fragua y Serrania Chiribiquete. Adicionalmente regionales CO-PNF-123105-GO-CP / Adquisición e instalación de repuestos para el Component 1 - Protected mantenimiento del bote del Prácticas Single Stage - 2019-07- 2019-07- 2019-08- 2019-08- 2019-08- 2019-10- TF / A5789 Areas Management and Posterior Open - National 4,839.00 3,287.66 Firmado PNNSCH, como apoyo a la comerciales One Envelope 26 31 14 21 30 29 Financial Sustainability actividades de PVC del Sector dfe Cartagena del Chairá, Caquetá. CO-PNF-130048-GO-CP / Adquisición de Bote en Component 1 - Protected fibra de vidrio para la Prácticas Single Stage - 2019-09- 2019-09- 2019-10- 2019-10- 2019-10- 2019-12- TF / A5789 Areas Management and Posterior Open - National 4,354.00 4,024.89 Firmado Asociación de Cabildos comerciales One Envelope 20 25 09 16 25 23 Financial Sustainability Indígenas del pueblo Siona - ACIPS - APV PNN La paya CO-PNF-89870-GO-CP / Adquisición de materiales Component 3 - Sectoral para la construcción de Prácticas Single Stage - 2019-01- 2019-01- 2019-01- 2019-02- 2019-02- 2019-05- TF / A5789 Programs for Sustainable Posterior Open - National 8,929.00 0.00 Cancelado una balsa flotantes para comerciales One Envelope 10 15 29 05 15 16 Landscape Management labores de control y vigilancia en el área del Ramsar. CO-PNF-99144-GO-CP / Component 1 - Protected Adquisición de dos Prácticas Single Stage - 2019-03- 2019-03- 2019-03- 2019-03- 2019-04- 2019-05- TF / 18478 Areas Management and Posterior Open - National 4,516.00 0.00 Cancelado computadores portátiles y comerciales One Envelope 01 06 21 28 05 31 Financial Sustainability un computador de escritorio CO-PNF-109339-GO-CP / Adquisición de deshidratador solar para fruta fresca con capacidad de 50 kg, para el Component 3 - Sectoral Prácticas Single Stage - 2019-04- 2019-04- 2019-05- 2019-05- 2019-05- 2019-07- fortalecimiento de la TF / 18478 Programs for Sustainable Posterior Open - National 19,355.00 0.00 Cancelado comerciales One Envelope 25 30 14 21 31 01 iniciativa de manejo Landscape Management sostenible y transformación de la palma de Asai de la Comunidad Indígena Santa Lucia en Leticia - Amazonas. CO-PNF-103501-GO-CP / Compra de teléfonos fijos Component 1 - Protected IP para ser instalados en Prácticas Single Stage - 2019-03- 2019-03- 2019-04- 2019-04- 2019-04- 2019-08- TF / 18478 Areas Management and Posterior Open - National 645.00 0.00 Cancelado cada una de las oficina de comerciales One Envelope 15 20 03 10 24 23 Financial Sustainability coordinaciones de áreas y proyectos CO-PNF-109332-GO-RFQ / Adquisición materiales para fortalecimiendo chagras de los grupos de mujeres de los resguardo Component 2 - Forest Prácticas Single Stage - 2019-04- 2019-04- 2019-05- 2019-05- 2019-05- 2019-07- de Medio y Bajo rio TF / 18478 Governance, Management Posterior Open - National 12,903.00 0.00 Cancelado comerciales One Envelope 25 30 14 21 31 01 Caquetá. (Costales, and Monitoring cuchillos cocina, metros de angeo, valdes aluminio, timbos para almacenar alimentos, guantes, tapabocas, machetes mediano CO-PNF-109344-GO-CP / Elementos de ferreteria Component 1 - Protected para mantenimiento Prácticas Single Stage - 2019-04- 2019-04- 2019-05- 2019-05- 2019-05- 2019-09- TF / 18478 Areas Management and Posterior Open - National 11,290.00 0.00 Cancelado correctivo de la cubierta y comerciales One Envelope 25 30 14 21 31 30 Financial Sustainability cielo raso de la sede operativa PNN La Paya CO-PNF-109170-GO-RFQ / Kit de campo y kit de herramientas, áreas Component 1 - Protected Solicitud de Single Stage - 2019-04- 2019-06- 2019-07- protegidas del SPNN, APR, TF / 18478 Areas Management and Posterior Open - National 24,194.00 0.00 Cancelado cotizaciones One Envelope 30 17 17 Sitios Ramsar y zonas Financial Sustainability donde se desarrollará inventario forestal. CO-PNF-109334-GO-CP / Adquisición de bienes para fortalecimiendo chagras de los grupos de mujeres de Component 2 - Forest los resguardo de Medio y Prácticas Single Stage - 2019-04- 2019-04- 2019-05- 2019-05- 2019-05- 2019-07- TF / 18478 Governance, Management Posterior Open - National 12,903.00 0.00 Cancelado Bajo rio Caquetá (Tina comerciales One Envelope 25 30 14 21 31 01 and Monitoring Grande, Platones grandes de dos orejas, Ollas No. 60 y 40, pailas grandes para fariña, molinos) CO-PNF-137074-GO-RFQ / Adquisición de Kits de agricultura Orgánica para fortalecer a las familias que suscribirán los Component 1 - Protected Solicitud de Single Stage - En 2019-11- 2019-12- 2020-01- Acuerdos de Conservación TF / A5789 Areas Management and Posterior Open - National 45,000.00 0.00 cotizaciones One Envelope ejecución 04 23 22 con la CDA en el Financial Sustainability municipio de San José del Guaviare y Kit de campo y herramientas para los facilitadores locales del PNR Miraflores CO-PNF-78419-GO-CP / Dotación Sede Mesa Ramsar. Component 3 - Sectoral Prácticas Single Stage - 2018-10- 2018-10- 2018-11- 2018-11- 2018-11- 2018-12- (2 computadoras, 1 TF / A5789 Programs for Sustainable Posterior Open - National 3,786.00 0.00 Cancelado comerciales One Envelope 25 30 14 21 27 27 teléfono, 2 escritorios, 2 Landscape Management estantes, 30 sillas, 1 tablero, 1 video beam y 1 impresora) CO-PNF-78385-GO-CP / ADQUISICIÓN DE Component 1 - Protected Prácticas Single Stage - 2018-10- 2018-10- 2018-11- 2018-11- 2018-11- 2019-01- CAMARAS TF / 18478 Areas Management and Posterior Open - National 3,679.00 0.00 Cancelado comerciales One Envelope 09 14 01 08 22 22 FOTOGRAFICAS Y DOS Financial Sustainability GPS PNN- LA PAYA Y ALTO FRAGUA CO-PNF-54229-GO-RFQ / Un agrabadora de voz, Component 2 - Forest tipo periodista, digital, Solicitud de Single Stage - 2018-05- 2018-06- 2018-10- TF / 18478 Governance, Management Posterior Limited 1,700.00 0.00 Cancelado mp3 usb px440 4GB cotizaciones One Envelope 01 12 30 and Monitoring Dos camaras D5500 kit 18-55mm Page 2 CO-PNF-54221-GO-RFQ / Un Motor Peque Peque Component 2 - Forest Solicitud de Single Stage - 2018-04- 2018-05- 2018-10- 6,5HP cinco chalecos full TF / 18478 Governance, Management Posterior Limited 900.00 0.00 Cancelado cotizaciones One Envelope 25 29 30 thottle, secado rapido 40 and Monitoring por ciento, para adulto. CO-PNF-78408-GO-RFQ / Adquisición de computadores portátiles, computadores de Escritorio Component 3 - Sectoral Solicitud de Single Stage - 2018-11- 2019-01- 2019-03- + licencias Ofimáticas y de TF / A5789 Programs for Sustainable Posterior Open - National 28,214.00 0.00 Cancelado cotizaciones One Envelope 27 11 14 Antivirus, Impresora Landscape Management Multifuncional con tóner de repuestos, Videobeam, GPS y Table - CORPOAMAZONIA y CDA CO-PNF-78416-GO-CP / Elaboración y entrega de 100 kits (Bolsas ecologicas, calendario ambiental, Component 3 - Sectoral Prácticas Single Stage - 2019-10- 2019-10- 2019-11- 2019-11- 2019-12- 2020-02- agenda informativa, esfero TF / A5789 Programs for Sustainable Posterior Open - National 7,742.00 0.00 Cancelado comerciales One Envelope 21 26 16 23 06 04 ecologico, camibuso tipo Landscape Management polo, gorra y capa) para el evento de suscripción de acuerdos de conservación CO-PNF-123099-GO-CP / Adquisición materiales e insumos para la Component 3 - Sectoral Prácticas Single Stage - 2019-07- 2019-07- 2019-08- 2019-08- 2019-08- 2019-10- construcción de las TF / A5789 Programs for Sustainable Posterior Open - National 6,452.00 0.00 Cancelado comerciales One Envelope 26 31 14 21 30 29 cabañas de control y Landscape Management vigilancia en el sitio Ramsar Estrella Fluvial del Inírida - EFI CO-PNF-54227-GO-RFQ / Elementos de ferreteria: Ocho (8) timbos en plástico resistente con tapa, con Component 2 - Forest capacidad de 20 gls para Solicitud de Single Stage - 2018-04- 2018-06- 2018-10- TF / 18478 Governance, Management Posterior Limited 550.00 0.00 Cancelado el manejo de gasolina cotizaciones One Envelope 29 05 30 and Monitoring Cinco (5) carpas para lluvia Un kit de herramientas y un kit de repuestos básicos para motor pq pq CO-PNF-65527-GO-RFQ / Component 2 - Forest Solicitud de Single Stage - 2018-07- 2018-08- 2018-12- Adquisición de canoa de TF / 18478 Governance, Management Posterior Limited 1,100.00 0.00 Cancelado cotizaciones One Envelope 17 30 14 madera. and Monitoring CO-PNF-144829-GO-RFQ / Adquisición de Canoas en Aluminio y Motores FB 40 HP como apoyo a las actividades de PVC en Component 1 - Protected áreas protegidas, sedes Solicitud de Single Stage - Ejecución 2019-12- 2020-01- 2020-02- TF / A5789 Areas Management and Posterior Open - National 64,516.00 0.00 locales, regionales, CDA, cotizaciones One Envelope pendiente 04 20 20 Financial Sustainability CAZ y RAMSAR y resguardo de Santa Sofía- Leticia para el fortalecimiento de estrategia de monitoreo de recursos CO-PNF-109313-GO-RFQ / Adquisición equipos fortalecimiento sistema de información ambiental SISA - SIGAE, en la CDA: SERVIDOR NAS HPE Component 2 - Forest Solicitud de Single Stage - 2019-04- 2019-06- 2019-07- StoreEasy 1860, DISCOS TF / 18478 Governance, Management Posterior Open - National 51,613.00 0.00 Cancelado cotizaciones One Envelope 30 27 31 DUROS HPE 2.4TB SAS, and Monitoring SWITCH ADMINISTRABLE, COMPUTADOR TIPO PC TODO EN UNO, LICENCIAS, ACD-GOV 1- 24 Device 3 YR Initial S CO-PNF-137116-GO-RFQ / Dotación de equipos de cómputo, almacenamiento y comunicaciones, GPS, y Component 1 - Protected Solicitud de Single Stage - En 2019-12- 2020-01- 2020-02- equipos para difusión y TF / A5789 Areas Management and Posterior Open - National 49,032.00 0.00 cotizaciones One Envelope ejecución 04 19 18 comunicación para el Financial Sustainability desarrollo de las actividades inmersas en los componentes 1, 3 y 4. CO-PNF-109169-GO-CP / Dotación de muebles de oficina y enseres de las sedes de los parques, sedes CDA y CAZ para el Component 1 - Protected Solicitud de Single Stage - En 2019-05- 2019-07- 2019-08- fortalecimiento operativo a TF / A5789 Areas Management and Posterior Open - National 25,000.00 0.00 cotizaciones One Envelope ejecución 07 02 31 nivel local y regional: Financial Sustainability Muebles, escritorios, sillas ergonómicas y sillas auditorio, Mesas, Estantes, archivos, never CO-PNF-137112-GO-CP / Compra generador eléctrico para el Component 3 - Sectoral fortalecimiento de la Prácticas Single Stage - En 2019-11- 2019-12- 2019-12- 2019-12- 2020-01- 2020-02- TF / A5789 Programs for Sustainable Posterior Open - National 3,871.00 0.00 iniciativa de manejo comerciales One Envelope ejecución 29 04 17 23 03 02 Landscape Management sostenible del bosque en la comunidad indígena en Leticia CO-PNF-137108-GO-CP / Compra de bienes para el fortalecimiento de la Component 1 - Protected capacidad operativa del Prácticas Single Stage - En 2019-10- 2019-11- 2019-11- 2019-11- 2019-12- 2020-01- TF / A5789 Areas Management and Posterior Open - National 2,065.00 0.00 PNN la paya: Nevera comerciales One Envelope ejecución 30 04 18 25 05 03 Financial Sustainability para refrigeración de elementos perecederos y aire acondicionado, eventos PVC. CO-PNF-123101-GO-CP / Adquisición de una balsa para labores de control y vigilancia, en el sector de Component 3 - Sectoral Loretoyacú que contribuya Prácticas Single Stage - 2019-07- 2019-07- 2019-08- 2019-08- 2019-08- 2019-11- TF / A5789 Programs for Sustainable Posterior Open - National 9,677.00 0.00 Cancelado al fortalecimiento de la comerciales One Envelope 26 31 14 21 30 29 Landscape Management autoridad ambiental en el área Ramsar Tarapoto, entre Corpoamazonia y autoridades indígenas. CO-PNF-147769-GO-CP / Adquisición de Kit de campo, kit de pesca y Component 3 - Sectoral kit de herramientas para Prácticas Single Stage - Ejecución 2019-12- 2020-01- 2020-01- 2020-01- 2020-01- 2020-03- TF / A5789 Programs for Sustainable Posterior Open - National 12,258.00 0.00 el establecimiento de comerciales One Envelope pendiente 27 01 15 22 31 02 Landscape Management chagras y de una maloka pequeña en el terriotrio del resguardo indígena de Mesay CO-PNF-130043-GO-CP / Adquisición de elementos de seguridad y operación para Botes ( Botiquín Component 2 - Forest Básico para embarcación, Prácticas Single Stage - Ejecución 2019-12- 2019-12- 2019-12- 2020-01- 2020-01- 2020-03- TF / A5789 Governance, Management Posterior Open - National 6,452.00 0.00 Remo adaptable al tamaño comerciales One Envelope pendiente 06 11 25 01 13 13 and Monitoring del bote, Caja básica de herramientas (para motor fuera de borda), Extintor para embarcaciones. CO-PNF-137126-GO-RFQ / Adquisicion de elementos de construccion y ferreteria para mantenimiento correctivo y preventivo, Component 1 - Protected Solicitud de Single Stage - 2019-11- 2019-12- 2020-02- adecuacion y/o reparacion TF / A5789 Areas Management and Posterior Open - National 32,258.00 0.00 Cancelado cotizaciones One Envelope 04 23 21 de la sede del Parque la Financial Sustainability Paya y sus sedes operativas Laguna la paya y Naranjal en el municipio de leguizamon CO-PNF-144826-GO-CP / Dotación de muebles y enseres para las cabañas Component 3 - Sectoral Prácticas Single Stage - Ejecución 2020-01- 2020-01- 2020-02- 2020-02- 2020-02- 2020-03- de la Estrella Fluvial de TF / A5789 Programs for Sustainable Posterior Open - National 3,000.00 0.00 comerciales One Envelope pendiente 13 18 01 08 17 19 Inírida para el Landscape Management fortalecimiento de capacidad operativa sitio Ramsar CO-PNF-144828-GO-CP / Kit de campo para la dotación de cabañas de la Component 3 - Sectoral Prácticas Single Stage - Ejecución 2020-01- 2020-01- 2020-02- 2020-02- 2020-02- 2020-03- Estrella fluvial de Inírida TF / A5789 Programs for Sustainable Posterior Open - National 6,000.00 0.00 comerciales One Envelope pendiente 13 18 01 08 17 19 para el fortalecimiento de Landscape Management capacidad operativa sitio Ramsar CO-PNF-130046-GO-RFQ / Adquisición de elementos de construcción y ferretería, para el Component 1 - Protected Solicitud de Single Stage - Ejecución 2020-01- 2020-03- 2020-04- mantenimiento TF / A5789 Areas Management and Posterior Open - National 19,355.00 0.00 cotizaciones One Envelope pendiente 18 08 06 preventivo/correctivo y Financial Sustainability adecuación del auditorio de la Sede Administrativa ubicada en el Municipio de Leguízamo - la paya CO-PNF-150329-GO-RFQ / Adquisición de Kits de agricultura orgánica para Component 3 - Sectoral el fortalecimiento de las Solicitud de Single Stage - Ejecución 2020-01- 2020-02- 2020-03- TF / A5789 Programs for Sustainable Posterior Open - National 59,355.00 0.00 familias que hacer parte cotizaciones One Envelope pendiente 04 14 15 Landscape Management de la Asociación Campesina ACEFIN y viven en el Sitio Ramsar EFI CO-PNF-150333-GO-CP / Adquisición de cámaras de Component 1 - Protected Prácticas Single Stage - Ejecución 2019-12- 2020-01- 2020-01- 2020-01- 2020-02- 2020-03- seguridad para el PNN S TF / A5789 Areas Management and Posterior Open - National 1,129.00 0.00 comerciales One Envelope pendiente 30 04 18 25 01 02 Chiribiquete, sedes San Financial Sustainability José del Guaviare y Calamar NON CONSULTING SERVICES Bid Evaluation Activity Reference Estimated Actual Draft Pre- Draft Bidding Specific Proposal Loan / Market Procurement Prequalificati Process Prequalification Bidding Documents Report and Contract No. / Description Component Review Type Method Amount Amount qualification Document / Procurement Notice Submission / Signed Contract Credit No. Approach Process on (Y/N) Status Evaluation Report as Issued Recommendation Completion (US$) (US$) Documents Justification / Invitation Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CO-PNF-34495-NC-RFQ / Acopio de material audiovisual y reproducción de los vídeos generados como material de Component 3 - Sectoral capacitación de los talleres Solicitud de Single Stage - 2017-11- 2017-11- 2017-12- TF / 18478 Programs for Sustainable Posterior Limited 3,703.00 3,486.90 Firmado de la propuesta de la cotizaciones One Envelope 06 29 20 Landscape Management Gobernación del Guaviare - Frenar frontera agrícola (Unidades Ambientales para la Paz y la Prestación de servicio) CO-PNF-41744-NC-RFQ / Perfilar, tallar y preparar Component 2 - Forest las muestras de madera Solicitud de Single Stage - 2018-01- 2018-02- 2018-08- TF / 18478 Governance, Management Posterior Limited 8,571.00 0.00 Cancelado provenientes del Amazonas cotizaciones One Envelope 03 28 27 and Monitoring para el desarrollo de las colecciones de madera. Page 3 CO-PNF-41765-NC-RFQ / Prestación de servicios de Component 3 - Sectoral Solicitud de Single Stage - 2018-01- 2018-02- 2018-08- medios audiovisuales para TF / 18478 Programs for Sustainable Posterior Limited 3,571.00 0.00 Cancelado cotizaciones One Envelope 03 28 27 generación de mensajes a Landscape Management distintos sectores CO-PNF-75477-NC-CP / Diagramación e impresión de 500 cuadernillos Component 2 - Forest Prácticas Single Stage - 2018-09- 2018-09- 2018-10- 2018-10- 2018-11- 2018-12- explicativos del TF / 18478 Governance, Management Posterior Limited 3,570.00 1,959.26 Firmado comerciales One Envelope 20 25 10 17 01 31 conocimiento local de las and Monitoring maderas que acompaña las diferentes colecciones CO-PNF-89850-NC-CDD / Talleres y reuniones Component 1 - Protected consulta previa Solicitud de Single Stage - Ejecución 2019-02- 2019-04- 2019-12- TF / A5789 Areas Management and Posterior Limited 53,571.00 0.00 comunidades indígenas cotizaciones One Envelope pendiente 20 17 31 Financial Sustainability vecinas del Area Protegida Regional del bajo Caguan - CORPOAMAZONIA. CO-PNF-89851-NC-CDD / Talleres, reuniones, asambleas de resguardos y recorridos, desarrollo Component 2 - Forest planes de trabajo que se Solicitud de Single Stage - Ejecución 2019-02- 2019-04- 2019-12- TF / 18478 Governance, Management Posterior Limited 37,143.00 0.00 convinieron en el marco de cotizaciones One Envelope pendiente 20 17 31 and Monitoring la consulta previa de la primera ampliación del PNN SCH con los resguardos del medio río Caquetá. CO-PNF-89852-NC-CDD / Talleres institucionales y con ATICOYA, para socialización PM y concertación acciones plan Component 3 - Sectoral Solicitud de Single Stage - Ejecución 2019-02- 2019-04- 2019-12- de trabajo, gastos de viaje TF / A5789 Programs for Sustainable Posterior Limited 19,996.00 0.00 cotizaciones One Envelope pendiente 20 17 31 y desplazamiento Landscape Management Planeación y Seguimiento, proceso de socialización, ajuste e implementación del Plan de Manejo - Tarapoto. CO-PNF-89853-NC-CDD / Talleres y reuniones planeación, seguimiento y desarrollo del plan de Component 3 - Sectoral trabajo y construcción del Solicitud de Single Stage - Ejecución 2019-02- 2019-04- 2019-12- TF / A5789 Programs for Sustainable Posterior Limited 14,643.00 0.00 REM, en el marco de los cotizaciones One Envelope pendiente 20 17 31 Landscape Management acuerdos de consulta con el Resguardo Itilla, para la segunda ampliación del PNN SCH. CO-PNF-89798-NC-CDD / Talleres, reuniones, comités técnicos, operativos y Component 1 - Protected Solicitud de Single Stage - Ejecución 2019-02- 2019-04- 2019-12- coordinación, recorridos TF / A5789 Areas Management and Posterior Limited 62,066.00 0.00 cotizaciones One Envelope pendiente 20 17 31 cumplimiento acuerdos de Financial Sustainability uso y manejo con PNN Paya. CO-PNF-103502-NC-RFQ / Adquisición de los servicios de digitalización de mas de 2.400.000 folios Component 1 - Protected almacenados en GRM y en Solicitud de Single Stage - 2019-03- 2019-05- 2019-11- TF / 18478 Areas Management and Posterior Open - National 41,935.00 32,014.28 Firmado el archivo físico de la cotizaciones One Envelope 18 01 29 Financial Sustainability entidad, y cargue de la información a la nube y/o lugar de repositorio que disponga la entidad. CO-PNF-109175-NC-CP / ADECUACIÓN CENTRO DE DATOS EN LA SEDE CENTRAL DE LA CDA EN PUERTO INIRIDA, 50 PUNTOS DE RED DE Component 2 - Forest DATOS CATEGORÍA 6 Y Prácticas Single Stage - 2019-04- 2019-04- 2019-05- 2019-05- 2019-05- 2019-07- TF / 18478 Governance, Management Posterior Open - National 14,839.00 12,229.16 Firmado ENERGÍA REGULADA comerciales One Envelope 25 30 14 21 31 01 and Monitoring (INSTALADOS EN LA SEDE CENTRAL DE LA CDA EN PUERTO INIRIDA y SISTEMA DE AIRE ACONDICIONADO 24.000 BTU CO-PNF-109317-NC-RFQ / Análisis de maderas para definir la trazabilidad del Component 3 - Sectoral Solicitud de Single Stage - 2019-04- 2019-06- 2019-07- productos promisorios en el TF / 18478 Programs for Sustainable Posterior Open - National 29,032.00 26,832.74 Firmado cotizaciones One Envelope 30 28 31 sector de Capricho, en el Landscape Management marco del Programa de Foresteria Comunitaria. CO-PNF-130044-NC-CP / Fortalecimiento institucional mantenimiento y adecuación a todo costo Component 2 - Forest de puntos de red de datos Prácticas Single Stage - 2019-09- 2019-09- 2019-10- 2019-10- 2019-10- 2020-01- TF / A5789 Governance, Management Posterior Open - National 6,452.00 4,931.20 Firmado categoría 6 y energía comerciales One Envelope 20 25 09 16 25 24 and Monitoring regulada para las oficinas de la Subdirección de administración ambiental de CORPOAMAZONIA."- sede Mocoa CO-PNF-89883-NC-CP / Construcción de una balsa flotante para labores de control y vigilancia en la entrada a Caño Bocón, que Component 3 - Sectoral Prácticas Single Stage - 2019-01- 2019-01- 2019-02- 2019-02- 2019-03- 2019-06- permita el fortalecimiento TF / A5789 Programs for Sustainable Posterior Open - National 8,929.00 0.00 Cancelado comerciales One Envelope 10 24 07 19 01 03 de la autoridad ambiental Landscape Management en el área del Ramsar, entre CDA y acuerdo con las autoridades indígenas de ejercer este control. CO-PNF-89855-NC-RFQ / Component 3 - Sectoral Contratación Transporte Solicitud de Single Stage - 2019-01- 2019-02- 2020-02- TF / A5789 Programs for Sustainable Posterior Limited 18,571.00 0.00 Cancelado Fluvial desplazamiento cotizaciones One Envelope 15 20 19 Landscape Management comunidad EFI. CO-PNF-137118-NC-CP / Elaboración de mojones Component 1 - Protected Prácticas Single Stage - 2019-10- 2019-10- 2019-11- 2019-11- 2019-11- 2019-12- para materializar el límite TF / A5789 Areas Management and Posterior Open - National 3,226.00 2,888.19 Firmado comerciales One Envelope 21 26 08 15 25 25 de la RFP Serranía La Financial Sustainability Lindosa CO-PNF-109346-NC-RFQ / Elaboración e impresión de Component 1 - Protected Solicitud de Single Stage - Ejecución 2019-11- 2019-12- 2020-04- piezas comunicativas, TF / A5789 Areas Management and Posterior Open - National 38,710.00 0.00 cotizaciones One Envelope pendiente 04 22 19 material y actividades de Financial Sustainability divulgación CO-PNF-78417-NC-CP / Elaborar, suministrar, transportar e instalar vallas informativas y de Component 1 - Protected divulgación en el marco de Solicitud de Single Stage - En 2019-12- 2020-01- 2020-04- TF / A5789 Areas Management and Posterior Open - National 26,452.00 0.00 los componentes de gestión cotizaciones One Envelope ejecución 04 22 21 Financial Sustainability del Proyecto GEF CA, en el departamento de Guaviare, a cargo de la Corporación CDA. CO-PNF-78410-NC-CP / Contratación de actividades de divulgación y comunicación de los Component 3 - Sectoral avances y resultados Prácticas Single Stage - 2018-10- 2018-10- 2018-11- 2018-11- 2018-11- 2019-03- TF / A5789 Programs for Sustainable Posterior Limited 7,143.00 0.00 Cancelado (Programas radiales x 15 comerciales One Envelope 18 23 08 15 27 29 Landscape Management minutos semanales - 8 capsulas informáticas - elaboración y emisión de 8 cuñas radiales - CORPOAMAZONIA CO-PNF-71703-NC-RFQ / Adquisición e instalación de la Red Electrica para la Sede San Jose del Component 1 - Protected Solicitud de Single Stage - 2018-04- 2018-08- 2018-11- Guaviare (centros de TF / 18478 Areas Management and Posterior Limited 16,667.00 0.00 Cancelado cotizaciones One Envelope 29 21 22 transformación de energía Financial Sustainability eléctrica, tipo poste sobre un apoyo de hormigón de 750 kgf de carga de rotura. CO-PNF-17815-NC-RFB / Adquisición e instalación de la Red Electrica para la Sede San Jose del Guaviare (centros de Component 1 - Protected transformación de energía Solicitud de Single Stage - 2017-08- 2017-09- 2017-11- TF / 18478 Areas Management and Posterior Limited 16,667.00 0.00 Cancelado eléctrica, tipo poste sobre cotizaciones One Envelope 22 20 20 Financial Sustainability un apoyo de hormigón de 750 kgf de carga de rotura y transformador de potencia de 15 , tensiones de 13.2 k) CO-PNF-81067-NC-CP / Diagramación e impresión Component 2 - Forest Prácticas Single Stage - 2018-10- 2018-10- 2018-11- 2018-11- 2018-12- 2019-01- de cartillas sobre TF / 18478 Governance, Management Posterior Open - National 17,857.00 0.00 Cancelado comerciales One Envelope 26 31 15 22 06 08 recuperación de semillas de and Monitoring las chagras en Mirití CO-PNF-78420-NC-CP / Diseño, impresión de Component 3 - Sectoral Prácticas Single Stage - 2018-10- 2018-10- 2018-11- 2018-11- 2018-11- 2019-01- vallas, folletos en las 5 TF / A5789 Programs for Sustainable Posterior Open - National 7,286.00 0.00 Cancelado comerciales One Envelope 22 27 12 19 29 25 áreas priorizadas por CDA Landscape Management y Mesa Ramsar. CO-PNF-144843-NC-RFQ / Desarrollo de actividades de divulgación y comunicación de los avances y resultados en la Component 1 - Protected Solicitud de Single Stage - Ejecución 2019-12- 2020-01- 2020-07- suscripción e TF / A5789 Areas Management and Posterior Open - National 27,097.00 0.00 cotizaciones One Envelope pendiente 04 23 23 implementación de los Financial Sustainability acuerdos de conservación, restauración y no deforestación CDA y CORPOAMAZONIA ( Programas radiales) CO-PNF-137114-NC-CP / Sobrevuelos en áreas protegidas del piedemonte amazónico y Parque Component 1 - Protected Chiribiquete para apoyar Prácticas Single Stage - En 2019-11- 2019-12- 2019-12- 2019-12- 2020-01- 2020-07- TF / A5789 Areas Management and Posterior Open - National 8,871.00 0.00 ejercicios de prevención, comerciales One Envelope ejecución 29 04 18 25 04 06 Financial Sustainability vigilancia y control y monitoreo de presiones asociadas con actividades antrópicas CO-PNF-109349-NC-CP / Trasmisión de cuñas en Component 3 - Sectoral Prácticas Single Stage - En 2019-11- 2019-12- 2019-12- 2019-12- 2020-01- 2020-04- programas radiales en el TF / A5789 Programs for Sustainable Posterior Open - National 3,226.00 3,030.10 comerciales One Envelope ejecución 29 04 18 25 04 03 marco de las actividades Landscape Management del Proyecto. Page 4 CO-PNF-78415-NC-CP / Desarrollo de actividades de divulgación y comunicación de los avances y resultados en la Component 3 - Sectoral Prácticas Single Stage - 2019-10- 2019-10- 2019-11- 2019-11- 2019-11- 2020-03- suscripción e TF / A5789 Programs for Sustainable Posterior Limited 10,000.00 0.00 Cancelado comerciales One Envelope 21 26 10 17 28 29 implementación de los Landscape Management acuerdos de conservación, restauración y no deforestación CDA y CORPOAMAZONIA ( Programas radiales) CO-PNF-145248-NC-CP / Adecuación balsa del Resguardo Ticoya con la que se apoyará las labores de monitoreo, contro y Component 3 - Sectoral Prácticas Single Stage - Ejecución 2019-11- 2019-12- 2019-12- 2019-12- 2020-01- 2020-03- vigilancia, que  contribuya TF / A5789 Programs for Sustainable Posterior Open - National 4,194.00 0.00 comerciales One Envelope pendiente 29 04 18 25 06 06 al fortalecimiento de la Landscape Management autoridad ambiental en el área Ramsar Tarapoto, entre Corpoamazonia y autoridades indígenas. CO-PNF-99133-NC-CP / Impresión del Plan de manejo del Ramsar EFI y Component 3 - Sectoral divulgación a las Prácticas Single Stage - 2019-03- 2019-03- 2019-03- 2019-03- 2019-04- 2019-07- TF / A5789 Programs for Sustainable Posterior Open - National 13,226.00 0.00 Cancelado comunidades locales de la comerciales One Envelope 01 06 22 29 05 04 Landscape Management EFI y entidades gubernamentales y ONG vinculadas. CO-PNF-145680-NC-CP / Adquisición de un Kit de campo, un kit de pesca y un kit de herramientas Component 3 - Sectoral Prácticas Single Stage - 2019-11- 2019-12- 2019-12- 2019-12- 2020-01- 2020-02- para el establecimiento de TF / A5789 Programs for Sustainable Posterior Open - National 12,258.00 0.00 Cancelado comerciales One Envelope 29 04 18 25 03 02 chagras y de una maloka Landscape Management pequeña en el terriotrio del resguardo indígena de Mesay CO-PNF-144824-NC-RFQ / Análisis de laboratorio Fase 2 para definir la trabajabilidad de otras Component 3 - Sectoral Solicitud de Single Stage - Ejecución 2020-01- 2020-03- 2020-05- especies maderables en el TF / A5789 Programs for Sustainable Posterior Open - National 58,065.00 0.00 cotizaciones One Envelope pendiente 25 16 15 sector de Capricho, en el Landscape Management marco del Programa de Forestería Comunitaria ASOCAPRICHO CO-PNF-144823-NC-CP / Impresión de cartillas sobre el Programa intercambio de Component 3 - Sectoral Prácticas Single Stage - Ejecución 2021-01- 2021-01- 2021-02- 2021-02- 2021-02- 2021-03- conocimiento sobre Manejo TF / A5789 Programs for Sustainable Posterior Open - National 3,226.00 0.00 comerciales One Envelope pendiente 13 18 01 08 17 20 Forestal Sostenible - Landscape Management Propiedades técnicas de algunas especies maderables y no maderables de la Amazonia colombiana. CONSULTING FIRMS Activity Reference Estimated Actual Short List and Request for Opening of Combined Loan / Market Contract Type Process Expression of Evaluation of Contract No. / Description Component Review Type Method Amount Amount Terms of Reference Draft Request for Proposals as Technical Proposals Evaluation Report Signed Contract Credit No. Approach Status Interest Notice Technical Proposal Completion (US$) (US$) Proposals Issued / Minutes and Draft Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Negotiated Planned Actual Planned Actual Contract CO-PNF-17962-CS-LCS / Component 4 - Project Consultoria que adelante Selección Coordination, Management, 2017-08- 2017-08- 2017-09- 2017-09- 2017-09- 2017-09- 2017-11- la Auditoría Externa al TF / 18478 Posterior basada en el Open - National 16,667.00 8,938.80 Firmado 2017-08-01 Monitoring and Evaluation 01 15 14 15 20 30 29 Proyecto Corazón de la menor costo (M&E) Amazonia - 2017 CO-PNF-17980-CS-QCBS / Component 1 - Protected Selección Consultoría para analisis 2017-03- 2017-03- 2017-04- 2017-05- 2017-05- 2017-06- 2018-02- TF / 18478 Areas Management and Posterior basada en Open - National 111,111.00 0.00 Cancelado 2017-02-15 económico financiero del 01 31 30 07 19 10 05 Financial Sustainability calidad y costo PNN Chiribiquete FPN C1 CO-PNF-20949-CS-QCBS / Consultoría para la Identificación de áreas Component 3 - Sectoral Selección susceptibles para la 2017-09- 2017-09- 2017-10- 2017-10- 2017-11- 2017-11- 2018-03- TF / 18478 Programs for Sustainable Posterior basada en Open - National 111,111.00 0.00 Cancelado 2017-08-30 implementación de 13 23 23 30 10 21 21 Landscape Management calidad y costo compensaciones por pérdida de la biodiversidad en la jurisdicción de CDA. Component 4 - Project CO-PNF-41773-CS-LCS / Selección Coordination, Management, 2018-03- 2018-04- 2018-05- 2018-06- 2018-07- 2018-09- 2018-11- Auditoría externa al TF / 18478 Posterior basada en el Open - National 15,714.00 0.00 Cancelado 2018-02-20 Monitoring and Evaluation 13 26 24 23 28 01 30 proyecto año 2018 menor costo (M&E) CO-PNF-17957-CS-LCS / Consultoría para la elaboración de una Guía Component 3 - Sectoral Selección para el manejo ambiental 2017-09- 2017-09- 2017-10- 2017-11- 2017-11- 2017-12- 2018-05- TF / 18478 Programs for Sustainable Posterior basada en el Open - National 92,593.00 0.00 Cancelado 2017-09-01 para la construcción, 15 29 30 07 17 01 30 Landscape Management menor costo mantenimiento, rehabilitación y mejoramiento de vías de tercer orden. CO-PNF-17956-CS-QCBS / Evaluación ambiental Component 3 - Sectoral Selección estratégica de iniciativas 2017-09- 2017-09- 2017-11- 2017-11- 2017-11- 2017-12- 2018-08- TF / 18478 Programs for Sustainable Posterior basada en Open - National 103,704.00 0.00 Cancelado 2017-08-15 sectoriales (nacional y 14 25 09 14 20 04 01 Landscape Management calidad y costo territorial) en municipios arco de deforestación. CO-PNF-54338-CS-CQS / CONSULTORÍA PARA LLEVAR A CABO LA Selección ELABORACIÓN DE LA Component 3 - Sectoral basada en 2018-05- 2018-06- 2018-07- 2018-09- 2019-06- EVALUACIÓN TF / 18478 Programs for Sustainable Posterior Open - National 250,000.00 241,752.68 Firmado 2018-04-25 calificaciones de 16 29 29 02 30 AMBIENTAL Landscape Management consultores ESTRATÉGICA REGIONAL DEL ARCO NOROCCIDENTAL AMAZÓNICO" CO-PNF-54334-CS-QCBS / ELABORACIÓN DE LA GUÍA AMBIENTAL PARA LA IMPLEMENTACIÓN Component 3 - Sectoral Selección 2018-06- 2018-06- 2018-07- 2018-08- 2018-08- 2018-08- 2019-04- DEL CONPES 3857 DE TF / 18478 Programs for Sustainable Posterior basada en Open - National 92,595.00 0.00 En ejecución 2018-05-15 05 21 21 01 20 30 30 2016 LINEAMIENTOS DE Landscape Management calidad y costo POLÍTICA PARA LA GESTIÓN DE LA RED TERCIARIA CO-PNF-21283-CS-QCBS / Component 2 - Forest Selección Consultoría para 2017-09- 2017-11- 2017-11- 2017-12- 2018-02- 2018-03- 2018-09- TF / 18478 Governance, Management Posterior basada en Open - National 111,111.00 0.00 Cancelado 2017-09-04 fortalecimiento del sistema 18 01 29 29 02 09 05 and Monitoring calidad y costo de información SIGAE CO-PNF-17816-CS-QCBS / Fortalecimiento del SISA - Component 2 - Forest Selección 2017-08- 2017-09- 2017-10- 2017-10- 2017-10- 2017-11- 2018-05- Monitoreo para la TF / 18478 Governance, Management Posterior basada en Open - National 51,852.00 0.00 Cancelado 2017-08-08 23 06 06 11 23 07 06 trazabilidad de la madera and Monitoring calidad y costo - Corpoamazonia CO-PNF-75480-CS-CQS / Desarrollar una expedición científica en la ventana Mesay en el sector sur del Selección Component 1 - Protected Parque. Que a su vez basada en 2018-10- 2018-11- 2018-12- 2019-01- 2019-11- TF / 18478 Areas Management and Posterior Open - National 83,071.00 69,759.36 Firmado 2018-09-20 identifique oportunidades y calificaciones de 11 23 23 17 20 Financial Sustainability aporte elementos técnicos consultores que fortalezcan las líneas de investigación y el Programa de Monitoreo CO-PNF-103506-CS-QCBS Component 1 - Protected Selección / Elaboración del modelo 2019-06- 2019-07- 2019-09- 2019-09- 2019-10- 2019-10- 2020-04- TF / A5789 Areas Management and Posterior basada en Open - National 137,742.00 0.00 Cancelado 2019-06-14 de datos para el Sistema 28 22 06 15 06 26 26 Financial Sustainability calidad y costo Integrado de Gestión. CO-PNF-137107-CS-LCS / Formular el Plan de Manejo del área protegida Natural Regional Miraflores Picachos bajo Component 1 - Protected Selección un esquema de 2019-11- 2020-01- 2020-01- 2020-03- 2020-04- 2020-05- 2020-11- TF / A5789 Areas Management and Posterior basada en el Open - National 129,032.00 0.00 En ejecución 2019-10-30 coordinación 20 03 31 01 05 10 06 Financial Sustainability menor costo interinstitucional, participación comunitaria, concertación social y fortamecimiento de capacidades de las partes interesadas CO-PNF-137133-CS-CQS / Diseño de un Sistema integrado de gestión Selección Component 1 - Protected administrativa, financiera y basada en Ejecución 2019-11- 2019-12- 2020-01- 2020-02- 2020-10- TF / A5789 Areas Management and Posterior Open - National 17,419.00 0.00 2019-10-21 técnica para FPN: calificaciones de pendiente 11 25 24 28 26 Financial Sustainability levantamiento de consultores requerimientos internos y externos. INDIVIDUAL CONSULTANTS Activity Reference Estimated Actual Invitation to Loan / Market Contract Type Process Draft Negotiated Contract No. / Description Component Review Type Method Amount Amount Terms of Reference Identified/Selected Signed Contract Credit No. Approach Status Contract Completion (US$) (US$) Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CO-PNF-17988-CS-INDV / Profesional para la Component 3 - Sectoral 2017-02- 2017-03- 2017-03- 2017-12- coordinación y desarrollo TF / 18478 Programs for Sustainable Posterior Individual Limited 26,667.00 25,174.80 Firmado 2017-02-15 22 01 16 20 de las actividades del Landscape Management resultado 3.2 - 2017 CO-PNF-17984-CS-INDV / Consultoria para coordinar Component 3 - Sectoral la ruta de ampliación de 2017-02- 2017-03- 2017-03- 2017-12- TF / 18478 Programs for Sustainable Posterior Individual Limited 22,407.00 21,264.54 Finalizado 2017-02-15 PNN SCH en los 22 01 16 20 Landscape Management departamentos de Guaviare y Caqueta CO-PNF-17966-CS-INDV / Consultoría para preparar un documento de Component 4 - Project caracterización demográfica, Coordination, Management, 2017-07- 2017-07- 2017-08- 2017-09- TF / 18478 Posterior Individual Limited 3,704.00 3,580.40 Finalizado 2017-07-19 económica y del estado Monitoring and Evaluation 24 31 11 11 legal del territorio para el (M&E) polígono de intervención del GEF 6. CO-PNF-17967-CS-INDV / Consultoría para Identificar y definir el esquema conceptual y metodológico Component 4 - Project necesario para organizar Coordination, Management, 2017-07- 2017-07- 2017-08- 2017-09- TF / 18478 Posterior Individual Limited 3,704.00 3,580.40 Firmado 2017-07-19 una red de sitios Monitoring and Evaluation 24 31 14 13 intensivos de monitoreo (M&E) que genere información científica sobre el papel de los bosques naturales de la Amazonía. CO-PNF-18001-CS-INDV / Component 1 - Protected 2017-07- 2017-08- 2017-09- 2017-10- Interventoria adecuación TF / 18478 Areas Management and Posterior Individual Limited 12,393.00 11,699.49 Firmado 2017-07-21 26 16 20 10 sede San José del Financial Sustainability Guaviare Page 5 CO-PNF-18004-CS-INDV / Component 3 - Sectoral 2017-08- 2017-08- 2017-09- 2017-12- Profesionales SIG - CDA TF / 18478 Programs for Sustainable Posterior Individual Open 14,815.00 14,038.40 Finalizado 2017-06-13 01 22 26 20 Ordenamiento - 2017 Landscape Management CO-PNF-21090-CS-INDV / Consultor para la generación de cartografía de las actuaciones Component 3 - Sectoral 2017-08- 2017-08- 2017-08- 2017-10- adelantadas en el marco TF / 18478 Programs for Sustainable Posterior Individual Direct 4,074.00 3,337.07 Finalizado 2017-08-01 04 11 22 21 de la estrategia integral Landscape Management de control de la deforestación y la implementación de los acuerdos de paz. CO-PNF-21094-CS-INDV / Profesional para Component 2 - Forest seguimiento de actividades 2017-08- 2017-08- 2017-09- 2017-12- TF / 18478 Governance, Management Posterior Individual Open 8,000.00 22,657.32 Firmado 2017-08-01 técnicas y ejecución del 18 25 04 28 and Monitoring componente de monitoreo. Segundo semestre. CO-PNF-21481-CS-INDV / Consultoría para la generación de la cartografía de las actuaciones adelantadas en Component 3 - Sectoral 2017-09- 2017-10- 2017-10- 2018-01- el marco de la Estrategia TF / 18478 Programs for Sustainable Posterior Individual Limited 4,444.00 4,203.84 Firmado 2017-09-05 10 01 22 20 Integral de Control de la Landscape Management Deforestación en el Municipio de Calamar, El Retorno, San Vicente, Solano y Cartagena del Chairá. CO-PNF-17977-CS-CDS / Profesional en sistema de información geográfica y sensores remotos que Component 2 - Forest 2017-02- 2017-02- 2017-03- 2017-12- adelante el procesamiento TF / 18478 Governance, Management Posterior Individual Direct 18,578.00 3,426.57 Finalizado 2017-02-15 18 21 04 20 de imágenes y reporte de and Monitoring alertas tempranos de deforestacion - Guaviare CDA- 2017 CO-PNF-17991-CS-CDS / Component 2 - Forest Profesional para 2017-03- 2017-03- 2017-04- 2017-12- TF / 18478 Governance, Management Posterior Individual Direct 18,864.00 5,754.08 Finalizado 2017-02-15 coordinación y desarrollo 11 25 29 20 and Monitoring PPI PNN - 2017 CO-PNF-26455-CS-INDV / Profesional especializado en sistemas de información Component 2 - Forest geográfica, sensores 2017-01- 2017-02- 2017-02- 2017-12- TF / 18478 Governance, Management Posterior Individual Direct 41,280.00 24,572.67 Finalizado 2017-01-13 remotos, y monitoreo de 27 03 15 20 and Monitoring recursos naturales encargados en control Temático de Calidad - SYMBC - 2017 CO-PNF-26462-CS-INDV / Administración, Component 2 - Forest 2017-01- 2017-01- 2017-02- 2017-12- actualización y operación TF / 18478 Governance, Management Posterior Individual Direct 38,400.00 36,441.45 Finalizado 2017-01-09 23 30 15 20 de la plataforma and Monitoring tecnologica del SMBYC CO-PNF-26465-CS-INDV / Component 2 - Forest Experto en monitoreo 2017-01- 2017-02- 2017-02- 2017-12- TF / 18478 Governance, Management Posterior Individual Direct 36,000.00 34,163.86 Finalizado 2017-01-09 ,reporte y verificación - 25 02 15 20 and Monitoring MVR del SMBYC - 2017 CO-PNF-26466-CS-INDV / Profesional experto en estructurador de Información, que apoyara Component 2 - Forest la generación, 2017-01- 2017-02- 2017-02- 2017-12- TF / 18478 Governance, Management Posterior Individual Direct 21,778.00 20,512.97 Finalizado 2017-01-09 estandarización y 25 02 15 20 and Monitoring documentación de la información geográfica de deforestacion a nivel nacional y subnacional - 2017 CO-PNF-26464-CS-INDV / Profesional en ciencias naturales especializado en la Gestión de Áreas Component 3 - Sectoral 2017-01- 2017-02- 2017-03- 2017-09- Protegidas, como apoyo a TF / 18478 Programs for Sustainable Posterior Individual Direct 20,370.00 19,302.80 Firmado 2017-01-10 20 10 17 13 la Corporación para el Landscape Management Desarrollo Sostenible del Nor Oriente Amazónico- CDA - 2017 CO-PNF-26467-CS-INDV / Profesional en sistema de información geográfica y sensores remotos que Component 2 - Forest adelante el procesamiento 2017-01- 2017-02- 2017-02- 2017-12- TF / 18478 Governance, Management Posterior Individual Direct 18,578.00 17,441.13 Finalizado 2017-01-09 de imágenes y reporte de 25 02 15 20 and Monitoring alertas tempranos de deforestacion CORPOAMAZONIA- Caqueta - 2017 Component 2 - Forest CO-PNF-26459-CS-INDV / 2017-01- 2017-02- 2017-02- 2017-12- TF / 18478 Governance, Management Posterior Individual Direct 40,889.00 38,745.98 Finalizado 2017-01-09 Lider Temático de Carbono 25 02 15 20 and Monitoring CO-PNF-26461-CS-INDV / Component 1 - Protected 2017-01- 2017-02- 2017-02- 2017-12- Enlace PNN Serranía de TF / 18478 Areas Management and Posterior Individual Direct 30,531.00 28,822.63 Firmado 2017-01-09 25 02 15 20 Chiribiquete PNN - 2017 Financial Sustainability Component 4 - Project CO-PNF-26458-CS-INDV / Coordination, Management, 2017-01- 2017-02- 2017-02- 2017-12- Profesional seguimiento - TF / 18478 Posterior Individual Direct 40,422.00 38,360.53 Firmado 2017-01-09 Monitoring and Evaluation 26 03 23 20 2017 (M&E) CO-PNF-26463-CS-INDV / Component 4 - Project GEF 6. Consolidación Coordination, Management, 2016-10- 2016-10- 2016-11- 2016-12- plan de adquisiciones, TF / 18478 Posterior Individual Direct 1,019.00 1,923.08 Firmado 2016-10-01 Monitoring and Evaluation 17 23 02 30 elaboración manual (M&E) operativo, borrador acuerdo interinstitucional Component 4 - Project CO-PNF-31993-CS-INDV / Coordination, Management, 2017-01- 2017-01- 2017-02- 2017-12- Especialista financiero - TF / 18478 Posterior Individual Direct 27,685.00 26,195.80 Firmado 2017-01-02 Monitoring and Evaluation 10 15 23 20 2017 VF (M&E) CO-PNF-32008-CS-INDV / Profesional para seguimiento de actividades Component 2 - Forest 2017-01- 2017-01- 2017-02- 2017-12- administrativas y TF / 18478 Governance, Management Posterior Individual Direct 24,000.00 22,775.90 Finalizado 2017-01-02 12 17 15 20 financieras del componente and Monitoring de Monitoreo de Bosques y Carbono Component 4 - Project CO-PNF-31987-CS-INDV / Coordination, Management, 2017-01- 2017-01- 2017-02- 2017-12- Coordinador general del TF / 18478 Posterior Individual Direct 52,311.00 49,643.04 Finalizado 2017-01-20 Monitoring and Evaluation 25 30 23 02 proyecto - 2017 (M&E) Component 4 - Project CO-PNF-31985-CS-INDV / Coordination, Management, 2016-12- 2017-01- 2017-01- 2017-12- Asistente administrativo - TF / 18478 Posterior Individual Direct 9,333.00 4,296.36 Firmado 2016-12-29 Monitoring and Evaluation 31 01 04 20 2017 (M&E) CO-PNF-31995-CS-INDV / Profesional en ciencias Component 2 - Forest naturales para seguimiento 2017-01- 2017-01- 2017-02- 2017-12- TF / 18478 Governance, Management Posterior Individual Direct 14,000.00 22,775.90 Firmado 2017-01-02 de actividades técnicas y 07 12 15 20 and Monitoring ejecucion del componente de Monitoreo - 2017 CO-PNF-31983-CS-INDV / Profesional en sistema de información geográfica y sensores remotos que Component 2 - Forest 2017-01- 2017-01- 2017-01- 2017-12- adelante el procesamiento TF / 18478 Governance, Management Posterior Individual Direct 18,578.00 17,441.13 Finalizado 2017-01-02 07 12 19 20 de imágenes y reporte de and Monitoring alertas tempranos de deforestacion - Guaviare CDA- 2017 CO-PNF-31984-CS-INDV / Profesional Component 2 - Forest acompañamiento resguardos 2017-04- 2017-04- 2017-05- 2017-12- TF / 18478 Governance, Management Posterior Individual Direct 11,852.00 11,188.80 Firmado 2017-03-28 indigenas plan cultural de 07 12 15 20 and Monitoring ordenamiento y manejo y sistematización de chagras 2017 CO-PNF-32010-CS-INDV / Component 1 - Protected 2017-01- 2017-01- 2017-02- 2017-12- Profesional Administrativo TF / 18478 Areas Management and Posterior Individual Direct 21,400.00 20,687.55 Firmado 2017-01-01 11 16 15 20 PNN_DTAM - 2017 Financial Sustainability CO-PNF-34497-CS-INDV / Profesional SIG PNNSCH, Brindar los apoyos técnicos en sistemas de información geográfica para la Component 1 - Protected 2017-11- 2017-11- 2017-12- 2018-08- generación de insumos TF / 18478 Areas Management and Posterior Individual Direct 8,587.00 21,005.57 Firmado 2017-11-15 19 24 08 10 cartográficos, análisis Financial Sustainability espaciales y elaboración de aportes técnicos al equipo involucrado en el proyecto GEF y la DTAM Component 4 - Project CO-PNF-17963-CS-INDV / Coordination, Management, 2017-08- 2017-08- 2017-09- 2018-09- Especialista de TF / 18478 Posterior Individual Limited 44,444.00 42,062.40 Firmado 2017-07-26 Monitoring and Evaluation 19 24 01 01 Adquisiciones - 2017 (M&E) CO-PNF-17979-CS-INDV / Component 1 - Protected 2017-02- 2017-03- 2017-03- 2017-12- Profesional SIG PNNSCH - TF / 18478 Areas Management and Posterior Individual Limited 22,131.00 20,974.49 Finalizado 2017-02-15 22 01 16 20 2017 Financial Sustainability CO-PNF-34457-CS-INDV / Experto análisis de conectividad ecosístemica- Formular una metodología Component 3 - Sectoral 2017-11- 2017-12- 2018-01- 2018-05- homologada para realizar TF / 18478 Programs for Sustainable Posterior Individual Limited 17,778.00 16,984.80 Firmado 2017-11-15 30 14 02 30 los estudios de Landscape Management conectividad ecológica del paisaje regional , subregional y local. CO-PNF-17997-CS-CDS / Consultoria Generacion de Component 2 - Forest Selección 2017-07- 2017-09- 2018-01- información de campo TF / 18478 Governance, Management Posterior directa de Direct 83,988.00 81,192.17 Firmado 2017-06-13 23 03 31 relacionada con el and Monitoring consultores monitoreo del Carbono CO-PNF-26457-CS-INDV / Profesional en ciencias Component 3 - Sectoral naturales especializado en 2017-03- 2017-03- 2017-04- 2017-12- TF / 18478 Programs for Sustainable Posterior Individual Direct 25,000.00 23,689.80 Finalizado 2017-03-02 la Gestión de Áreas 18 28 18 20 Landscape Management Protegidas, como apoyo a Corpoamazonía CO-PNF-26460-CS-INDV / Profesional especializado en sistema de informacion Component 2 - Forest geográfica, sensores 2017-01- 2017-02- 2017-02- 2017-12- TF / 18478 Governance, Management Posterior Individual Direct 41,280.00 24,536.32 Finalizado 2017-01-17 remotos / monitoreo de 31 05 15 20 and Monitoring recursos naturales que lidera el procesamiento digital de imagenes - 2017 Page 6 CO-PNF-26456-CS-INDV / Component 3 - Sectoral 2017-01- 2017-02- 2017-02- 2017-12- Experto en Áreas TF / 18478 Programs for Sustainable Posterior Individual Direct 30,531.00 28,822.63 Finalizado 2017-01-09 25 02 23 20 Protegidas PNN - 2017 Landscape Management CO-PNF-34496-CS-INDV / Component 1 - Protected 2017-11- 2017-11- 2017-12- 2018-09- Interventoria centro de TF / 18478 Areas Management and Posterior Individual Limited 21,667.00 20,247.80 Firmado 2017-11-06 21 26 11 07 investigación Puerto Abeja Financial Sustainability CO-PNF-38842-CS-INDV / Component 1 - Protected PNN-Profesional de enlace 2017-12- 2017-12- 2018-01- 2018-06- TF / 18478 Areas Management and Posterior Individual Direct 15,750.00 15,419.57 Firmado 2017-11-30 entre PNN DTAM y áreas 10 15 03 30 Financial Sustainability protegidas-2018 CO-PNF-38845-CS-INDV / Líder junior en Component 2 - Forest procesamiento digital para 2017-12- 2017-12- 2018-01- 2018-12- TF / 18478 Governance, Management Posterior Individual Direct 26,503.00 25,825.93 Firmado 2017-11-30 capacitación y transferencia 10 15 03 20 and Monitoring del SMBYC a autoridades ambientales - 2018 CO-PNF-38849-CS-INDV / Profesional especializado en sistema de información Component 2 - Forest geográfica, sensores 2017-12- 2017-12- 2018-01- 2018-12- TF / 18478 Governance, Management Posterior Individual Direct 42,591.00 41,308.83 Firmado 2017-11-30 remotos / monitoreo de 10 15 03 20 and Monitoring recursos naturales que lidera el procesamiento digital de imágenes - 2018 CO-PNF-38851-CS-INDV / Component 2 - Forest Experto en Monitoreo, 2017-12- 2018-01- 2018-01- 2018-12- TF / 18478 Governance, Management Posterior Individual Limited 37,144.00 22,261.68 Firmado 2017-11-30 Reporte y Verificación - 30 04 21 20 and Monitoring MVR -2018 CO-PNF-38854-CS-INDV / Component 2 - Forest 2017-12- 2017-12- 2018-01- 2018-12- Líder Temático en Carbono- TF / 18478 Governance, Management Posterior Individual Direct 39,429.00 38,780.21 Firmado 2017-11-30 10 15 03 20 2018 and Monitoring CO-PNF-38855-CS-INDV / Profesional especializado en SIG, sensores remotos, y Component 2 - Forest 2017-12- 2017-12- 2018-01- 2018-12- monitoreo de recursos TF / 18478 Governance, Management Posterior Individual Direct 32,057.00 31,462.68 Firmado 2017-11-30 10 15 03 20 naturales encargados en and Monitoring control Temático de Calidad - SYMBC- 2018- CO-PNF-38857-CS-INDV / COORDINADOR Component 2 - Forest 2017-12- 2017-12- 2018-01- 2018-12- DESARROLLO DE TF / 18478 Governance, Management Posterior Individual Direct 33,364.00 33,010.89 Firmado 2017-11-30 10 15 03 20 PLANES DE PUEBLOS and Monitoring INDÍGENAS- 2018 CO-PNF-38860-CS-INDV / PROFESIONAL Component 2 - Forest FORMULACIÓN PLAN 2017-12- 2017-12- 2018-01- 2018-11- TF / 18478 Governance, Management Posterior Individual Direct 19,643.00 19,319.85 Firmado 2017-11-30 CULTURAL DE MANEJO 10 15 03 20 and Monitoring Y SISTEMATIZACION DE CHAGRAS- 2018 CO-PNF-38868-CS-INDV / Component 2 - Forest Consultoría para el diseño 2017-12- 2017-12- 2018-01- 2018-05- TF / 18478 Governance, Management Posterior Individual Direct 8,929.00 8,741.25 Firmado 2017-11-30 del diplomado gobernanza 07 12 02 30 and Monitoring y gobierno propio CO-PNF-38870-CS-INDV / Consultoría para el diseño del componente pedagógico Component 2 - Forest y didáctico de los 2017-12- 2017-12- 2018-01- 2018-05- TF / 18478 Governance, Management Posterior Individual Direct 8,929.00 8,758.00 Firmado 2017-11-30 diplomados para la 10 17 02 30 and Monitoring formación en gobernanza indígena y diálogo de saberes CO-PNF-38986-CS-INDV / Consultoría para el diseño Component 2 - Forest de una plataforma para 2017-12- 2017-12- 2018-01- 2018-04- TF / 18478 Governance, Management Posterior Individual Direct 16,071.00 15,734.25 Firmado 2017-12-01 la formación en 11 18 02 26 and Monitoring gobernanza indígena y gestión del conocimiento de los bosques CO-PNF-38990-CS-INDV / Consultoria para el diseño Component 2 - Forest del diplomado en proyectos 2017-12- 2017-12- 2018-01- 2018-05- TF / 18478 Governance, Management Posterior Individual Direct 8,929.00 8,741.25 Firmado 2017-12-01 productivos y alternativas 11 18 02 30 and Monitoring locales generadoras de ingresos. CO-PNF-38991-CS-INDV / Consultoría para el diseño Component 2 - Forest 2017-12- 2017-12- 2018-01- 2018-05- del diplomado en TF / 18478 Governance, Management Posterior Individual Direct 8,929.00 8,741.25 Firmado 2017-12-01 11 18 02 30 estrategias para la and Monitoring convivencia y el buen vivir. CO-PNF-38995-CS-INDV / Profesional CDA Ruta Declaratoria 2018- Liderar en representación de la CDA el proceso de Component 3 - Sectoral 2017-12- 2017-12- 2018-01- 2018-12- implementación de la ruta TF / 18478 Programs for Sustainable Posterior Individual Direct 11,464.00 11,764.65 Firmado 2017-12-01 11 18 02 20 declaratoria de nuevas Landscape Management áreas protegidas regionales y la gestión de las prioridades y estrategias de conservación existentes en el departame CO-PNF-39001-CS-INDV / Profesional de apoyo para Component 3 - Sectoral la implementación de 2017-12- 2017-12- 2018-01- 2018-12- TF / 18478 Programs for Sustainable Posterior Individual Direct 33,017.00 32,324.44 Firmado 2017-12-01 acuerdos con el sector de 11 18 02 20 Landscape Management infraestructura e hidrocarburos CO-PNF-39002-CS-INDV / Consultoria jurídica para Component 3 - Sectoral la inclusión de corredores 2017-12- 2017-12- 2018-01- 2018-12- TF / 18478 Programs for Sustainable Posterior Individual Direct 42,857.00 41,958.00 Firmado 2017-12-04 de conectividad ecológica 14 21 02 20 Landscape Management como determinante ambiental en evaluación de proyectos Component 4 - Project CO-PNF-39009-CS-INDV / Coordination, Management, 2017-12- 2017-12- 2018-01- 2018-12- Profesional de seguimiento TF / 18478 Posterior Individual Direct 41,704.00 40,829.33 Firmado 2017-12-01 Monitoring and Evaluation 11 16 02 20 y monitoreo- 2018 (M&E) Component 4 - Project CO-PNF-39010-CS-INDV / Coordination, Management, 2017-12- 2017-12- 2018-01- 2018-12- Coordinación general del TF / 18478 Posterior Individual Direct 57,857.00 56,784.24 Firmado 2017-12-01 Monitoring and Evaluation 11 16 04 20 proyecto- 2018 (M&E) Component 4 - Project CO-PNF-39014-CS-INDV / Coordination, Management, 2017-12- 2017-12- 2018-01- 2018-12- Especialista financiera- TF / 18478 Posterior Individual Direct 32,036.00 31,508.92 Firmado 2017-12-01 Monitoring and Evaluation 11 16 02 20 2018 (M&E) CO-PNF-43099-CS-INDV / Consultoría para la elaboración de los procedimientos que le compete adelantar a la Component 3 - Sectoral 2018-01- 2018-02- 2018-03- 2019-02- CDA, en materia de TF / 18478 Programs for Sustainable Posterior Individual Limited 17,679.00 17,491.32 Firmado 2018-01-16 24 14 21 21 evaluación y seguimiento Landscape Management ambiental y ejercicio de control y vigilancia de intervención en el Departamento del Guaviare CO-PNF-43106-CS-INDV / Consultoría para la elaboración de procedimientos que le compete adelantar a CORMACARENA, en Component 3 - Sectoral 2018-01- 2018-02- 2018-03- 2019-02- materia de evaluación y TF / 18478 Programs for Sustainable Posterior Individual Limited 17,679.00 17,491.32 Firmado 2018-01-16 24 14 21 21 seguimiento ambiental y Landscape Management ejercicio de control y vigilancia de intervenciones en infraestructura de transporte en el Departamento Sur del Me CO-PNF-43111-CS-INDV / Consultoría para la elaboración de procedimientos que le compete adelantar a CORPOAMAZONIA, en Component 3 - Sectoral 2018-01- 2018-02- 2018-03- 2019-02- materia de evaluación y TF / 18478 Programs for Sustainable Posterior Individual Limited 17,769.00 17,491.32 Firmado 2018-01-16 24 14 21 21 seguimiento ambiental y Landscape Management ejercicio de control y vigilancia de intervenciones en infraestructura de transporte en el Departamento Putumayo CO-PNF-41751-CS-INDV / Consultoría para la elaboración de un estudio Component 3 - Sectoral de caracterización del 2018-01- 2018-01- 2018-02- 2018-04- TF / 18478 Programs for Sustainable Posterior Individual Limited 3,571.00 0.00 Cancelado 2017-12-29 potencial de producción y 03 24 28 29 Landscape Management mercadeo de especies maderables y no maderables de bosque. CO-PNF-41752-CS-INDV / Consultoría para el diseño del arreglo institucional Component 3 - Sectoral (roles de autoridades 2018-01- 2018-01- 2018-02- 2018-04- TF / 18478 Programs for Sustainable Posterior Individual Limited 3,571.00 0.00 Cancelado 2017-12-29 ambientales y territoriales, 03 24 28 29 Landscape Management organizaciones sociales) para el fomento del manejo forestal sostenible CO-PNF-41749-CS-INDV / Consultoría para la Component 3 - Sectoral 2018-01- 2018-01- 2018-02- 2018-05- evaluación de TF / 18478 Programs for Sustainable Posterior Individual Limited 6,429.00 0.00 Cancelado 2017-12-29 03 17 21 22 prefactibilidad de una Landscape Management iniciativa de manejo diversificado del bosque CO-PNF-55711-CS-INDV / servicios profesionales para realizar la caracterización Component 4 - Project biofísica de los motores Coordination, Management, 2018-05- 2018-05- 2018-06- 2018-10- TF / 18478 Posterior Individual Limited 10,714.00 10,509.60 Firmado 2018-04-26 de fragmentación, agentes, Monitoring and Evaluation 01 22 26 26 causas directas y énfasis (M&E) en causas subyacentes a nivel regional. CO-PNF-55712-CS-INDV / Realizar la caracterización social de los motores de fragmentación, agentes, causas directas y énfasis Component 3 - Sectoral 2018-04- 2018-05- 2018-06- 2018-10- en causas subyacentes a TF / 18478 Programs for Sustainable Posterior Individual Limited 10,714.00 10,509.60 Firmado 2018-04-25 30 21 25 26 nivel regional y la Landscape Management identificación de oportunidades para atenuar los riesgos frente a la fragmentación y potenciar las fortaleza Page 7 CO-PNF-55713-CS-INDV / Servicios profesionales para aplicar herramientas de análisis espacial e interpretación de Component 3 - Sectoral 2018-04- 2018-05- 2018-06- 2018-10- coberturas de la tierra, TF / 18478 Programs for Sustainable Posterior Individual Limited 10,714.00 10,509.60 Firmado 2018-04-25 30 21 25 25 para realizar el control de Landscape Management calidad de la interpretación de coberturas de la tierra según metodología Corine Land Cover, de acuerdo a los p CO-PNF-55714-CS-INDV / Prestar los servicios profesionales para realizar la gestión, análisis y modelación de la Component 3 - Sectoral 2018-04- 2018-05- 2018-06- 2018-10- información TF / 18478 Programs for Sustainable Posterior Individual Limited 10,714.00 10,509.60 Firmado 2018-04-25 30 21 25 25 georreferenciada, para Landscape Management realizar el análisis de conectividad y motores de fragmentación con énfasis en causas subyacentes a nivel regional. CO-PNF-54326-CS-CDS / Component 4 - Project Selección AUDITORIA EXTERNA Coordination, Management, 2018-06- 2018-08- 2018-11- TF / 18478 Posterior directa de Direct 12,600.00 0.00 En ejecución 2018-05-24 PARA EL PROYECTO Monitoring and Evaluation 03 16 30 consultores GEF-CA AÑO 2018 (M&E) CO-PNF-63402-CS-INDV / Coordinar, orientar y liderar la implementación Component 3 - Sectoral 2018-07- 2018-07- 2018-08- 2019-08- de los acuerdos de TF / 18478 Programs for Sustainable Posterior Individual Limited 28,965.00 27,140.40 Firmado 2018-07-02 07 21 13 12 conservación, restauración Landscape Management y no deforestación - CORPOAMAZONIA CO-PNF-17965-CS-INDV / Consultoria para realizar Component 4 - Project la Misión de Evaluación de Coordination, Management, 2018-05- 2018-05- 2018-06- 2018-07- TF / 18478 Posterior Individual Open 16,071.00 0.00 Cancelado 2018-04-08 Medio Término del Monitoring and Evaluation 04 19 02 02 Proyecto GEF Corazón de (M&E) la Amazonia CO-PNF-38992-CS-INDV / Coordinación editorial y diseño, edición y diagramación- Component 2 - Forest 2017-12- 2017-12- 2018-01- 2018-06- estructuración de la TF / 18478 Governance, Management Posterior Individual Limited 14,286.00 0.00 Cancelado 2017-12-01 07 21 19 19 plataforma intercultural and Monitoring para la formación de gobernanza indígena y diálogo de saberes. CO-PNF-54443-CS-INDV / Profesional en mercadeo, comercio exterior, ciencias económicas o carreras afines que formule la Component 3 - Sectoral 2018-09- 2018-09- 2018-10- 2019-05- estrategia de mercadeo y TF / 18478 Programs for Sustainable Posterior Individual Limited 14,814.00 11,561.20 Finalizado 2018-08-30 04 25 30 01 de encadenamiento Landscape Management productivo de maderables y no maderables priorizados en el área de jurisdicción de ASOCAPRICHO. CO-PNF-54442-CS-INDV / Profesional en biólogía o carreras afines que Component 3 - Sectoral 2018-08- 2018-09- 2018-10- 2019-04- realicela caracterización TF / 18478 Programs for Sustainable Posterior Individual Limited 14,444.00 12,600.90 Firmado 2018-08-16 21 11 16 17 faunística y sitios de Landscape Management ecoturismo en las veredas de jurisdicción de ASOCAPRICO. CO-PNF-55709-CS-INDV / Profesional en comunicación social que genere contenidos para los Component 4 - Project distintos medios de Coordination, Management, 2018-08- 2018-08- 2018-09- 2019-08- TF / 18478 Posterior Individual Limited 25,715.00 17,447.40 Firmado 2018-08-16 comunicación, en el marco Monitoring and Evaluation 21 28 13 30 de la estrategia de (M&E) comunicación local de Visión Amazonia, que permitan mostrar avances y resultados del Proyecto. CO-PNF-55710-CS-INDV / Formulación de escenarios de gobernanza para el manejo integrado de estrategias de conservación Component 1 - Protected 2018-08- 2018-09- 2018-10- 2019-05- y producción sostenible, en TF / 18478 Areas Management and Posterior Individual Limited 14,285.00 8,829.87 Finalizado 2018-08-15 20 05 03 21 el ámbito de los mosaicos Financial Sustainability Corazón de la Amazonia y Piedemonte, definidos por Herencia Colombia, a partir de la caracterización terr CO-PNF-41747-CS-INDV / Consultoría para la construcción de criterios ambientales para la Component 3 - Sectoral 2018-01- 2018-01- 2018-02- 2019-02- elegibilidad y priorización TF / 18478 Programs for Sustainable Posterior Individual Limited 19,286.00 0.00 Cancelado 2017-12-29 03 17 21 21 de proyectos de la red Landscape Management básica/modos y logística del Plan Maestro de Transporte Intermodal. CO-PNF-41748-CS-INDV / Consultoría para la construcción de criterios ambientales para la Component 3 - Sectoral 2018-01- 2018-01- 2018-02- 2019-02- elegibilidad y priorización TF / 18478 Programs for Sustainable Posterior Individual Limited 19,286.00 0.00 Cancelado 2017-12-29 03 24 28 28 de proyectos de la red de Landscape Management integración/modos logística del Plan Maestro de Transporte intermodal. CO-PNF-41755-CS-INDV / Análisis actualizado del estado de la conectividad Component 3 - Sectoral ecosistémica Andes- 2018-01- 2018-01- 2018-02- 2018-06- TF / 18478 Programs for Sustainable Posterior Individual Limited 10,714.00 0.00 Cancelado 2017-12-29 Amazonia y Orinoquia, útil 03 24 28 28 Landscape Management para la generación de alertas y la comunicación incidente con autorid CO-PNF-21088-CS-INDV / Experto en SIG - Análisis espacial para el ordenamiento ambiental Component 3 - Sectoral 2017-08- 2017-08- 2017-09- 2017-11- territorial dirigida a TF / 18478 Programs for Sustainable Posterior Individual Limited 5,093.00 0.00 Cancelado 2017-08-01 08 23 04 18 prevenir deforestación y Landscape Management aportar a la conectividad ecosistémica. Municipio de Miraflores. CO-PNF-20986-CS-INDV / Profesional en SIG - Interpretación de imágenes Component 3 - Sectoral 2017-08- 2017-08- 2017-09- 2017-11- satelitales como insumo TF / 18478 Programs for Sustainable Posterior Individual Limited 5,093.00 0.00 Cancelado 2017-08-01 08 23 04 18 para el ordenamiento Landscape Management ambiental territorial. Municipio de Miraflores CO-PNF-41772-CS-INDV / Elaboración de diseños Component 3 - Sectoral novedosos de ingeniería 2018-08- 2018-09- 2018-10- 2019-01- TF / 18478 Programs for Sustainable Posterior Individual Limited 8,036.00 11,844.75 Firmado 2018-08-23 para pasos de fauna y 28 18 23 21 Landscape Management señalización vial, en red vial de la Amazonia CO-PNF-41771-CS-INDV / Identificación y valoración de impactos, costos y Component 3 - Sectoral beneficios socio-económicos 2018-08- 2018-09- 2018-10- 2019-04- TF / 18478 Programs for Sustainable Posterior Individual Limited 13,393.00 11,842.13 Firmado 2018-08-22 de las vías priorizadas en 27 17 22 20 Landscape Management los departamentos del Guaviare, Caquetá y sur del Meta. CO-PNF-41770-CS-INDV / Diseño de indicadores para valoración de impactos de la red vial terciaria, Component 3 - Sectoral formulación de planes de 2018-08- 2018-09- 2018-10- 2019-04- TF / 18478 Programs for Sustainable Posterior Individual Limited 13,393.00 11,907.75 Firmado 2018-08-23 mejoramiento de la 28 18 23 21 Landscape Management conectividad e integridad ecosistémicas y diseño de pasos de fauna y señalética en infraestructura verde CO-PNF-41768-CS-INDV / Valoración de impactos de proyectos viales (carreteros Component 3 - Sectoral y fluviales) en la 2018-08- 2018-09- 2018-10- 2019-03- TF / 18478 Programs for Sustainable Posterior Individual Limited 13,393.00 11,907.75 Firmado 2018-08-16 Amazonia colombiana, con 21 11 16 15 Landscape Management énfasis en deforestación, cambios de uso, mercado de tierras y economías locales CO-PNF-41767-CS-INDV / Análisis espacial de Component 3 - Sectoral 2018-08- 2018-09- 2018-10- 2019-04- conglomerados viales e TF / 18478 Programs for Sustainable Posterior Individual Limited 16,071.00 10,320.05 Firmado 2018-08-23 28 18 23 21 impactos ambientales y Landscape Management sociales. CO-PNF-41764-CS-INDV / Análisis territorial y ambiental de la inversión pública en vías de segundo y tercer orden, realizada Component 3 - Sectoral 2018-08- 2018-09- 2018-10- 2019-04- por la nación, el TF / 18478 Programs for Sustainable Posterior Individual Limited 8,036.00 11,842.13 Firmado 2018-08-22 27 17 22 20 departamento y los Landscape Management municipios, en el sur del Meta y el Departamento del Caquetá, en el periodo 2014-2020 CO-PNF-64186-CS-INDV / Liderar la continuidad en la operación del componente de monitoreo del carbono del SMBYC, Component 2 - Forest 2018-07- 2018-08- 2018-08- 2019-01- que permita la generación TF / 18478 Governance, Management Posterior Individual Limited 19,286.00 0.00 Cancelado 2018-07-12 17 01 26 26 de información temática de and Monitoring monitoreo de los bosques, estimaciones de contenidos y flujos de carbono y estimaciones de emisiones producto de CO-PNF-41753-CS-INDV / Diseño y aplicación de una metodología homologada para realizar los estudio Component 3 - Sectoral de conectividad ecológica el 2018-01- 2018-01- 2018-02- 2018-08- TF / 18478 Programs for Sustainable Posterior Individual Limited 17,143.00 0.00 Cancelado 2017-12-29 paisaje (tanto estructural 03 24 28 27 Landscape Management como funcional) en tres ámbitos de alcance: regional (Amazonía colombiana), subregional y local. Page 8 CO-PNF-41754-CS-INDV / Caracterización sociocultural de los motores, agentes, causas Component 3 - Sectoral 2018-01- 2018-01- 2018-02- 2018-06- directas y causas TF / 18478 Programs for Sustainable Posterior Individual Limited 10,714.00 0.00 Cancelado 2017-12-29 03 24 28 28 subyacentes de Landscape Management fragmentación de la conectividad ecosistémica, a nivel regional, e identificar oportunidades par CO-PNF-41743-CS-INDV / Realizar la interlocución con las comunidades indígenas, establecer Component 2 - Forest mecanismos de 2018-01- 2018-01- 2018-02- 2018-07- TF / 18478 Governance, Management Posterior Individual Limited 5,357.00 0.00 Cancelado 2017-12-29 relacionamiento y realizar 13 20 17 17 and Monitoring el acompañamiento en campo para el desarrollo de las investigaciones locales que darán los insumos para los diplomados CO-PNF-41757-CS-INDV / Caracterización biofísica de los motores de Component 3 - Sectoral 2018-01- 2018-01- 2018-02- 2018-06- fragmentación, agentes, TF / 18478 Programs for Sustainable Posterior Individual Limited 10,714.00 0.00 Cancelado 2017-12-29 03 24 28 28 causas directas y énfasis Landscape Management en causas subyacentes, a nivel regional. CO-PNF-41766-CS-INDV / Análisis jurídico de los proyectos de Component 3 - Sectoral construcción,mantenimiento 2018-02- 2018-02- 2018-04- 2018-09- TF / 18478 Programs for Sustainable Posterior Individual Limited 8,036.00 0.00 Cancelado 2018-01-31 y recuperación y de lso 05 26 02 29 Landscape Management procedimientos de licenciamiento de proyectos viales CO-PNF-41758-CS-INDV / Control de calidad de la interpretación de coberturas de la tierra, de las áreas priorizadas por Component 3 - Sectoral la Mesa Técnica Ambiental 2018-01- 2018-01- 2018-02- 2018-06- TF / 18478 Programs for Sustainable Posterior Individual Limited 10,714.00 0.00 Cancelado 2017-12-29 para la Formulación de 03 24 28 28 Landscape Management Recomendaciones sobre Infraestructura y Actividades Sectoriales en la Amazonia, de acuerdo con los protocolos CO-PNF-62962-CS-INDV / Estructurar un Manual Operativo que establezca la gobernanza, procesos y Component 1 - Protected procedimientos de HECO, 2018-10- 2018-10- 2018-11- 2019-02- TF / 18478 Areas Management and Posterior Individual Limited 21,429.00 0.00 Cancelado 2018-10-01 con base en las 06 20 10 08 Financial Sustainability condiciones de desembolso, metas e indicadores de desempeño acordados entre los actores de HECO. CO-PNF-75459-CS-CDS / Profesional para la generación de la versión Component 2 - Forest Selección 2018-09- 2018-11- 2019-01- 1.0 del mapa actualizado TF / 18478 Governance, Management Posterior directa de Direct 7,500.00 6,785.10 Firmado 2018-09-20 30 01 31 de coberturas de la tierra and Monitoring consultores a escala 1:1000.000 - IDEAM - JAVIER ESPEJO CO-PNF-75469-CS-INDV / Prestar los servicios profesionales para realizar Component 2 - Forest 2018-09- 2018-10- 2018-11- 2019-01- la actualización de TF / 18478 Governance, Management Posterior Individual Limited 4,821.00 3,890.57 Finalizado 2018-09-20 25 10 01 31 coberturas de la tierra a and Monitoring escala 1:100.000 para la región de la Amazonia, CO-PNF-75474-CS-INDV / Intérprete para el análisis multitemporal de accesos terrestres, asentamientos, pistas y aeropuertos en Component 2 - Forest 2018-09- 2018-10- 2018-11- 2019-02- áreas seleccionadas TF / 18478 Governance, Management Posterior Individual Limited 6,429.00 5,232.96 Firmado 2018-09-20 25 10 01 28 complementarias de los and Monitoring departamentos de Caquetá, Sur del Meta, Guaviare, Putumayo, Amazonas, Vaupés y Guainía IDEAM CO-PNF-75479-CS-INDV / Diseñar y diagramar los contenidos visuales y las Component 4 - Project piezas de comunicación y Coordination, Management, 2018-09- 2018-10- 2018-11- 2019-10- divulgación que se TF / 18478 Posterior Individual Limited 17,143.00 15,241.92 Firmado 2018-09-20 Monitoring and Evaluation 25 12 01 31 requieran para presentar (M&E) los informes y resultados que se generen en la implementación del Proyecto. CO-PNF-81059-CS-INDV / Formular un plan de acción para la implementación del Sistema de Información de Component 2 - Forest 2018-10- 2018-11- 2018-12- 2019-01- Seguimiento Ambiental TF / 18478 Governance, Management Posterior Individual Limited 3,571.00 2,907.20 Finalizado 2018-10-25 30 14 03 03 SISA en CDA, con base en and Monitoring el diagnóstico de la infraestructura tecnológica y de los procedimientos de gestión de la información de la entidad CO-PNF-81061-CS-INDV / Lineamientos de política pública ambiental para la actualización de los Component 2 - Forest 2018-10- 2018-11- 2018-12- 2019-03- instrumentos de TF / 18478 Governance, Management Posterior Individual Limited 9,643.00 9,947.39 Firmado 2018-10-25 30 13 05 05 ordenamiento territorial, en and Monitoring cumplimiento en cumplimiento de la sentencia 4360 de 2018. CO-PNF-81066-CS-INDV / Elaboración de guión, toma Component 2 - Forest 2018-10- 2018-11- 2018-12- 2019-01- de imágenes y edición un TF / 18478 Governance, Management Posterior Individual Limited 2,857.00 2,300.80 Finalizado 2018-10-25 30 15 13 14 video sobre gestión de and Monitoring conocimiento de los bosques CO-PNF-81062-CS-INDV / Consolidación y actualización del PBOT de San José del Guaviare, de Component 2 - Forest 2018-11- 2018-12- 2018-12- 2019-07- conformidad con los TF / 18478 Governance, Management Posterior Individual Direct 8,750.00 7,130.73 Finalizado 2018-11-14 24 05 24 22 lineamiento definidos por and Monitoring el MADS para el cumplimiento de la STC 4360 de 2018. Deyanira Vanegas CO-PNF-81064-CS-INDV / Sistematización de la implementación y los Component 2 - Forest 2018-11- 2018-12- 2018-12- 2019-02- resultados de los Planes TF / 18478 Governance, Management Posterior Individual Direct 3,786.00 6,218.06 Firmado 2018-11-13 23 04 24 24 de Pueblos Indígenas- and Monitoring KATTERINE BETANCOURT GARCÍA CO-PNF-85473-CS-INDV / Revisión y conceptualización de los planes de ordenamiento Component 2 - Forest 2018-11- 2018-12- 2019-01- 2019-06- territorial (Departamental TF / 18478 Governance, Management Posterior Individual Limited 16,071.00 12,079.20 Firmado 2018-11-22 27 18 22 21 y municipales), en la etapa and Monitoring de concertación entre la CDA, alcaldias y gobernación del Guavaire. CO-PNF-89582-CS-INDV / Component 4 - Project Coordinación general del Coordination, Management, 2018-12- 2018-12- 2019-01- 2019-12- TF / 18478 Posterior Individual Direct 61,329.00 50,693.46 Finalizado 2018-12-14 proyecto- 2019. Doris Monitoring and Evaluation 24 27 02 31 Ochoa Jaramillo - Miembro (M&E) UCP CO-PNF-89585-CS-INDV / Component 4 - Project Profesional de seguimiento Coordination, Management, 2018-12- 2018-12- 2019-01- 2019-12- y monitoreo- 2019. Luz TF / 18478 Posterior Individual Direct 44,209.00 36,318.29 Finalizado 2018-12-14 Monitoring and Evaluation 24 27 02 31 Adriana Rodriguez Porras - (M&E) Miembro UCP CO-PNF-89586-CS-INDV / Component 4 - Project Especialista financiera- Coordination, Management, 2018-12- 2018-12- 2019-01- 2019-12- TF / 18478 Posterior Individual Direct 33,958.00 29,709.75 Firmado 2018-12-14 2019. Doris Fajardo Monitoring and Evaluation 24 27 02 31 Rodriguez - Miembro UCP (M&E) CO-PNF-89587-CS-INDV / Component 4 - Project Especialista de Coordination, Management, 2018-12- 2018-12- 2019-01- 2019-12- TF / 18478 Posterior Individual Direct 45,429.00 36,979.58 Finalizado 2018-12-14 Adquisiciones - 2019. Monitoring and Evaluation 24 27 02 31 Fredy Mojica - Miembro (M&E) UCP CO-PNF-89588-CS-INDV / Consultoría jurídica y gestión interinstitucional de apoyo a los procesos Component 3 - Sectoral que requieran las 2018-12- 2018-12- 2019-01- 2019-07- TF / 18478 Programs for Sustainable Posterior Individual Direct 22,714.00 24,881.17 Firmado 2018-12-14 entidades SINA en el 24 27 02 01 Landscape Management cumplimiento de la Sentencia y concreción de acuerdos sectoriales. Eugenia Ponce de León - Miembro UCP CO-PNF-89589-CS-INDV / Profesional de Enlace Component 3 - Sectoral 2018-12- 2018-12- 2019-01- 2019-12- DTAM - 5 áreas TF / A5789 Programs for Sustainable Posterior Individual Direct 36,429.00 29,659.56 Firmado 2018-12-14 24 27 02 31 protegidas. Maria Cristina Landscape Management Pacheco - Miembro UCP CO-PNF-89590-CS-INDV / Profesional de apoyo para la implementación de Component 3 - Sectoral 2018-12- 2018-12- 2019-01- 2019-12- acuerdos con el sector de TF / A5789 Programs for Sustainable Posterior Individual Direct 34,998.00 28,933.76 Firmado 2018-12-14 24 27 02 31 infraestructura vial. Camilo Landscape Management Rodríguez Pava - Miembro UCP CO-PNF-89591-CS-INDV / Profesional que coordine y oriente la implementación de los acuerdos de Component 3 - Sectoral conservación, restauración 2018-12- 2018-12- 2019-01- 2019-12- TF / 18478 Programs for Sustainable Posterior Individual Direct 23,571.00 18,981.60 Firmado 2018-12-14 y no deforestación en las 24 27 02 31 Landscape Management áreas de intervención priorizadas por la CDA. Gina Fernanda Vera - Miembro UCP CO-PNF-89592-CS-INDV / Profesional Especializado Áreas Protegidas de enlace Component 1 - Protected 2018-12- 2018-12- 2019-01- 2019-12- CDA - Mesa TF / A5789 Areas Management and Posterior Individual Direct 24,304.00 20,103.24 Firmado 2018-12-14 24 27 02 31 Interinstitucional - Financial Sustainability Comunidades Guaviare. Arelis Arciniegas. Page 9 CO-PNF-89593-CS-INDV / Profesional para el acompañamiento a los resguardos indígenas en el Component 3 - Sectoral 2018-12- 2018-12- 2019-01- 2019-06- manejo y sistematización TF / A5789 Programs for Sustainable Posterior Individual Direct 9,464.00 7,823.07 Finalizado 2018-12-14 24 27 02 01 de las iniciativas de Landscape Management Chagras que desarrollen los grupos de mujeres. Katterine Betancourt. CO-PNF-89594-CS-INDV / Profesional apoyo plan de Component 2 - Forest 2018-12- 2018-12- 2019-01- 2019-04- manejo resguardos del TF / 18478 Governance, Management Posterior Individual Direct 4,543.00 3,757.62 Firmado 2018-12-14 24 27 02 01 medio Caquetá. Erick and Monitoring López Vanegas CO-PNF-89595-CS-INDV / Líder junior en procesamiento digital para Component 2 - Forest 2018-12- 2018-12- 2019-01- 2019-12- capacitación y transferencia TF / 18478 Governance, Management Posterior Individual Direct 28,114.00 23,097.24 Firmado 2018-12-14 24 27 02 31 del SMBYC a autoridades and Monitoring ambientales - 2019. Juan Carlos Rubiano. CO-PNF-89596-CS-INDV / Profesional especializado en sistema de información geográfica, sensores Component 2 - Forest 2018-12- 2018-12- 2019-01- 2019-12- remotos / monitoreo de TF / 18478 Governance, Management Posterior Individual Direct 45,171.00 34,664.44 Finalizado 2018-12-14 24 27 02 31 recursos naturales que and Monitoring lidera el procesamiento digital de imágenes - 2019. Gustavo Galindo CO-PNF-89597-CS-INDV / Experto en Monitoreo, Component 2 - Forest 2018-12- 2018-12- 2019-01- 2019-12- Reporte y Verificación - TF / 18478 Governance, Management Posterior Individual Direct 39,000.00 32,040.37 Firmado 2018-12-14 24 27 02 31 MVR -2019. José Julian and Monitoring González CO-PNF-89598-CS-INDV / Profesional especializado en SIG, sensores remotos, y Component 2 - Forest monitoreo de recursos 2018-12- 2018-12- 2019-01- 2019-12- TF / 18478 Governance, Management Posterior Individual Direct 33,986.00 30,806.15 Firmado 2018-12-14 naturales encargados en 24 27 02 31 and Monitoring control Temático de Calidad - SYMBC- 2019. Katherine Vergara CO-PNF-89599-CS-INDV / Profesional en Manejo de Sistemas de Información Component 2 - Forest 2018-12- 2018-12- 2019-01- 2019-12- que Genere las Alertas TF / 18478 Governance, Management Posterior Individual Direct 23,829.00 21,599.27 Firmado 2018-12-14 24 27 02 31 Tempranas de and Monitoring Deforestación - PDI 1 - 2019. Cristian Forero. CO-PNF-89600-CS-INDV / Profesional en Manejo de Component 2 - Forest Sistemas de Información 2018-12- 2018-12- 2019-01- 2019-12- TF / 18478 Governance, Management Posterior Individual Direct 23,829.00 21,599.27 Firmado 2018-12-14 que Genere las Alertas 24 27 02 31 and Monitoring Tempranas de Deforestación - PDI 2 - 2019. Diana Lara. Component 4 - Project CO-PNF-89777-CS-INDV / Coordination, Management, 2018-12- 2019-01- 2019-01- 2020-01- Profesional apoyo TF / 18478 Posterior Individual Limited 21,429.00 0.00 Cancelado 2018-12-14 Monitoring and Evaluation 19 08 16 15 adquisiciones (M&E) CO-PNF-89782-CS-INDV / Profesional apoyo a la Component 3 - Sectoral gestión territorial y de 2018-12- 2019-01- 2019-02- 2020-01- TF / 18478 Programs for Sustainable Posterior Individual Limited 21,429.00 20,931.84 Firmado 2018-12-20 seguimiento a la 25 08 04 31 Landscape Management planeación y ejecución operativa regional (Caquetá). CO-PNF-89786-CS-INDV / Profesional que generé información espacial para Component 3 - Sectoral 2018-12- 2019-01- 2019-02- 2020-01- la implementación de los TF / A5789 Programs for Sustainable Posterior Individual Limited 17,143.00 13,954.56 Firmado 2018-12-20 25 09 04 31 acuerdos de conservación, Landscape Management restauración y no deforestación - CAZ CO-PNF-89788-CS-INDV / Profesional para coordinar y facilitar la implementación de los Component 3 - Sectoral planes de trabajo definidos 2018-12- 2019-01- 2019-02- 2020-01- TF / A5789 Programs for Sustainable Posterior Individual Limited 27,636.00 25,245.44 Firmado 2018-12-20 con los resguardos 25 09 04 31 Landscape Management Indígenas vecinos del PNNSCH y los que suscribieron los acuerdos de voluntades con el PNN La Paya. CO-PNF-89790-CS-INDV / Profesional para realizar el Component 1 - Protected 2018-12- 2019-01- 2019-02- 2020-01- enlace técnico para la TF / A5789 Areas Management and Posterior Individual Limited 15,714.00 12,654.40 Finalizado 2018-12-20 25 09 04 02 gestión comunitaria del Financial Sustainability APR Bajo Caguán CO-PNF-89793-CS-INDV / Profesional Apoyo proceso Component 1 - Protected formulación de plan de 2018-12- 2019-01- 2019-02- 2020-01- TF / A5789 Areas Management and Posterior Individual Limited 21,429.00 17,604.60 Finalizado 2018-12-20 manejo de la nueva APR 25 10 04 31 Financial Sustainability Páramo de Miraflores - Picachos CO-PNF-99123-CS-INDV / Coordinar el proceso de asesoría técnica a municipios, gobernaciones, Component 3 - Sectoral CDS y organizaciones de 2019-02- 2019-03- 2019-03- 2020-01- TF / 18478 Programs for Sustainable Posterior Individual Limited 25,807.00 23,257.60 Firmado 2019-02-18 apoyo, para llevar a 23 07 20 15 Landscape Management término el ajuste excepcional de los POT, de conformidad con lo ordenado en la Sentencia STC 4360-2018. CO-PNF-99124-CS-INDV / Diseñar e implementar la estrategia de coordinación y concertación con las autoridades territoriales, Component 3 - Sectoral 2019-02- 2019-03- 2019-03- 2020-01- sectoriales y ambientales, TF / 18478 Programs for Sustainable Posterior Individual Direct 25,807.00 23,632.80 Firmado 2019-02-18 28 12 20 20 para el ajuste excepcional Landscape Management de los POT de 15 municipios de la Amazonia colombiana. César Augusto Rey Angel CO-PNF-99126-CS-INDV / Profesional Especializado que Lidere el proceso de comunicación y gestión del Component 4 - Project conocimiento de la Coordination, Management, 2019-02- 2019-03- 2019-03- 2020-03- Iniciativa GEF Corazón de TF / 18478 Posterior Individual Direct 34,839.00 31,904.28 Firmado 2019-02-18 Monitoring and Evaluation 28 12 18 17 la Amazonia, entre las (M&E) entidades socias y actores interesados a nivel nacional y regional . Marcela Rodríguez Salguero CO-PNF-99128-CS-INDV / Diseñar y desarrollar los contenidos gráficos multiformato requeridos Component 4 - Project para la implementación de Coordination, Management, 2019-02- 2019-03- 2019-03- 2020-03- TF / 18478 Posterior Individual Direct 30,968.00 28,167.36 Firmado 2019-02-18 la Estrategia de Monitoring and Evaluation 28 12 21 20 comunicaciones y gestión (M&E) del conocimiento de la Iniciativa.. Andrés Urquina Sánchez CO-PNF-99135-CS-INDV / Prestar sus servicios profesionales para apoyar la ejecución de los procesos de adquisiciones y Component 4 - Project contrataciones que se Coordination, Management, 2019-02- 2019-03- 2019-03- 2020-02- TF / 18478 Posterior Individual Direct 23,226.00 22,889.52 Firmado 2019-02-15 requieran de acuerdo con Monitoring and Evaluation 21 01 01 29 lo establecido en el (M&E) Acuerdo Legal de Donación, el Manual Operativo del Proyecto, el Plan de Adquisiciones y las CO-PNF-99138-CS-INDV / Formular recomendaciones respecto de las acciones prioritarias para la prevención y la mitigación Component 3 - Sectoral de impactos de los 2019-02- 2019-03- 2019-03- 2019-06- TF / 18478 Programs for Sustainable Posterior Individual Limited 10,000.00 12,744.34 Firmado 2019-02-15 proyectos de 20 05 15 30 Landscape Management infraestructura de transporte (vial y fluvial), con base en la parametrización de modelos de deforestación en áreas seleccion CO-PNF-103416-CS-INDV / Gestionar información y aportar criterios y documentos técnicos para la incorporación del manejo Component 3 - Sectoral 2019-03- 2019-04- 2019-04- 2019-10- forestal sostenible y la TF / 18478 Programs for Sustainable Posterior Individual Limited 11,613.00 10,465.92 Firmado 2019-03-15 20 03 10 07 ordenación forestal de las Landscape Management Corporaciones en los POT de los 15 municipios citados por la Corte en la Sentencia STC 4360. CO-PNF-103421-CS-INDV / Generar y procesar información para análisis asociados a la variabilidad Component 3 - Sectoral y adaptación al cambio 2019-03- 2019-04- 2019-05- 2019-10- TF / 18478 Programs for Sustainable Posterior Individual Limited 13,548.00 12,184.62 Finalizado 2019-03-15 climático para los 15 20 03 01 28 Landscape Management municipios citados de manera expresa por la Corte en la Sentencia STC 4360. CO-PNF-103492-CS-INDV / Gestionar información y aportar criterios y documentos técnicos asociados a la Component 3 - Sectoral consolidacion y manejo de 2019-03- 2019-04- 2019-04- 2019-08- TF / 18478 Programs for Sustainable Posterior Individual Limited 11,613.00 10,634.76 Firmado 2019-03-15 la estructura ecológica 20 03 15 14 Landscape Management principal, manejo adecuado del suelo, restauración y uso de la biodiversidad, para incorporarlos en los POT de los 15 municipi CO-PNF-103503-CS-INDV / Profesional que generé información espacial para Component 3 - Sectoral 2019-04- 2019-04- 2019-05- 2020-01- la implementación de los TF / A5789 Programs for Sustainable Posterior Individual Limited 13,065.00 11,561.20 Firmado 2019-04-01 06 19 03 31 acuerdos de conservación, Landscape Management restauración y no deforestación Page 10 CO-PNF-113781-CS-INDV / Profesional que oriente técnicamente los procesos de coordinación institucional y concertación Component 3 - Sectoral social necesarios para el 2019-05- 2019-05- 2019-06- 2020-06- TF / A5789 Programs for Sustainable Posterior Individual Limited 27,097.00 24,369.24 Firmado 2019-05-13 establecimiento y 21 31 07 06 Landscape Management mantenimiento de los acuerdos de conservación, restauración y no deforestación, en las áreas definidas por CORPOAMAZ CO-PNF-118099-CS-CDS / Profesional de apoyo CORPOAMAZONIA para Component 3 - Sectoral Selección 2019-06- 2019-07- 2020-01- la incorporación de TF / A5789 Programs for Sustainable Posterior directa de Direct 9,232.00 8,322.12 Firmado 2019-06-10 20 23 19 criterios ambientales para Landscape Management consultores proyectos de red vial terciarias- Jairo Cárdenas CO-PNF-118100-CS-CDS / Profesional de apoyo CDA para la incorporación de Component 3 - Sectoral Selección 2019-06- 2019-07- 2020-01- criterios ambientales para TF / A5789 Programs for Sustainable Posterior directa de Direct 9,232.00 8,272.04 Firmado 2019-06-10 20 19 15 proyectos de red vial Landscape Management consultores terciarias. - Enrique Caballero CO-PNF-118102-CS-CDS / Component 4 - Project Selección Coordinación General del Coordination, Management, 2019-06- 2019-07- 2020-07- TF / A5789 Posterior directa de Direct 54,194.00 21,330.41 Firmado 2019-06-07 proyecto - Luz Adriana Monitoring and Evaluation 17 17 15 consultores Rodríguez (M&E) CO-PNF-118103-CS-CDS / Component 4 - Project Selección Especialista de Coordination, Management, 2019-06- 2019-07- 2020-07- TF / A5789 Posterior directa de Direct 34,839.00 31,215.24 Firmado 2019-06-07 adquisiciones- Viviana Monitoring and Evaluation 17 17 15 consultores Sánchez Quintero (M&E) CO-PNF-118104-CS-INDV / Orientar los procesos de planificación, ordenamiento Component 3 - Sectoral y gestión de turismo de 2019-06- 2019-07- 2019-07- 2020-07- TF / A5789 Programs for Sustainable Posterior Individual Limited 17,419.00 11,817.90 Firmado 2019-06-14 naturaleza en las áreas 19 03 19 17 Landscape Management seleccionadas de la jurisdicción de la CDA, Guaviare CO-PNF-118105-CS-INDV Component 4 - Project / Profesional de Coordination, Management, 2019-06- 2019-07- 2019-07- 2020-07- TF / A5789 Posterior Individual Limited 38,710.00 32,408.64 Firmado 2019-06-14 seguimiento, monitoreo y Monitoring and Evaluation 19 03 19 17 evaluación del proyecto (M&E) CO-PNF-75462-CS-INDV / Analista espacial para la revisión, corrección, Component 2 - Forest complementación y Ejecución 2018-09- 2018-10- 2018-11- 2019-03- TF / A5789 Governance, Management Posterior Individual Limited 6,429.00 0.00 2018-09-20 unificación de la pendiente 25 16 13 15 and Monitoring información de accesibilidad, interpretada en la Amazonía colombiana- IDEAM CO-PNF-113782-CS-CDS / AUDITORIA EXTERNA DEL PROYECTO "CONSERVACIÓN DE BOSQUES Y Component 4 - Project Selección SOSTENIBILIDAD EN EL Coordination, Management, 2019-07- 2019-08- 2020-02- TF / A5789 Posterior directa de Direct 28,525.00 0.00 En ejecución 2019-06-03 CORAZÓN DE LA Monitoring and Evaluation 24 08 04 consultores AMAZONIA" BAJO EL (M&E) (P144271- TF018478) Y FINANCIACIÓN ADICIONAL (P158003- TF0A5789) CO-PNF-123107-CS-INDV / Realizar la sustentación técnica y apoyo del proceso de construcción y Component 1 - Protected validación social e 2019-07- 2019-08- 2019-08- 2019-12- TF / A5789 Areas Management and Posterior Individual Limited 7,742.00 4,682.29 Firmado 2019-07-26 institucional para la 31 14 28 27 Financial Sustainability declaratoria de la nueva área protegida regional en el de departamento del Guaviare en Jurisdicción de la CDA. CO-PNF-123080-CS-CDS / Coordinar la revisión y ajuste del esquema de ordenamiento del municipio de Miraflores en todos sus Component 3 - Sectoral Selección componentes conforme con 2019-08- 2019-08- 2019-11- TF / A5789 Programs for Sustainable Posterior directa de Direct 6,774.00 6,503.18 Firmado 2019-07-26 los lineamientos nacionales 05 26 22 Landscape Management consultores (MADS), departamentales y determinantes ambientales de la CDA para el cumplimiento de la STC 4360/2018 CO-PNF-123079-CS-CDS / Profesional que sistematice la experiencia y documente Component 4 - Project la implementación del Selección Coordination, Management, 2019-08- 2019-08- 2020-08- proyecto GEF Corazón de TF / A5789 Posterior directa de Direct 21,290.00 19,075.98 Firmado 2019-07-26 Monitoring and Evaluation 05 26 25 la Amazonia y realice consultores (M&E) seguimiento a la aplicación de los instrumentos de salvaguardas sociales. CO-PNF-130031-CS-INDV / Actualizar el componente ambiental del PDS de la Component 3 - Sectoral 2019-09- 2019-10- 2019-10- 2020-04- ZRC cuenca del río Pato y TF / A5789 Programs for Sustainable Posterior Individual Limited 7,742.00 7,272.24 Firmado 2019-09-20 27 11 25 22 valle de Balsillas, y Landscape Management actualización del estudio de sustracción del Bajo Pato. CO-PNF-130033-CS-INDV / Generar la base cartográfica para la a actualización del Plan de Desarrollo Sostenible (PDS) Component 3 - Sectoral de la zona de Reserva 2019-09- 2019-10- 2019-10- 2020-04- TF / A5789 Programs for Sustainable Posterior Individual Limited 7,742.00 6,966.72 Firmado 2019-09-20 Campesina (ZRC) cuenca 27 11 25 22 Landscape Management del Río Pato y Valle de Balsillas, precisión de límites y ampliación de la zona del bajo Pato y el estudio para sustr CO-PNF-130035-CS-INDV / Actualizar el componente socioeconómico del PDS de Component 3 - Sectoral 2019-09- 2019-10- 2019-10- 2020-02- la ZRC de la cuenca del TF / A5789 Programs for Sustainable Posterior Individual Limited 5,161.00 4,555.04 Firmado 2019-09-20 27 11 25 21 río Pato y Valle de Landscape Management Balsillas, y actualización del estudio de sustracción del Bajo Pato. CO-PNF-130038-CS-CDS / Elaborar la cartilla marco de referencia para la toma de decisiones para la implementación de pasos Component 3 - Sectoral Selección 2019-09- 2019-10- 2020-01- de fauna en proyectos de TF / A5789 Programs for Sustainable Posterior directa de Direct 7,258.00 0.00 En ejecución 2019-09-20 30 21 17 infraestructura carretera Landscape Management consultores existentes o proyectados en la región amazónica y proveer criterios económicos para la incorporación de CO-PNF-123077-CS-CDS / Apoyar técnicamente la concertación y formalización de acuerdos en Áreas y temas de Component 3 - Sectoral Selección Interés común con los 2019-09- 2019-10- 2020-04- TF / A5789 Programs for Sustainable Posterior directa de Direct 11,613.00 10,663.20 Firmado 2019-09-20 resguardos colindantes al 30 21 20 Landscape Management consultores Parque Nacional Serranía de Chiribiquete que contribuyan al mejoramiento de la gobernanza ambiental del territorio. CO-PNF-130041-CS-INDV / Apoyar técnicamente a las autoridades indígenas de los resguardos de Andoque de Aduche, Miriti- Component 3 - Sectoral 2019-09- 2019-10- 2019-10- 2020-02- Paraná, Monochoa ,Puerto TF / A5789 Programs for Sustainable Posterior Individual Limited 6,452.00 5,805.60 Firmado 2019-09-20 27 11 25 21 Zábalo los Monos y Landscape Management Nonuya de Villazul en el proceso de incorporación de las áreas de interés común, en los planes culturales de manejo CO-PNF-130032-CS-INDV / Realizar propuesta de ordenamiento productivo y actualización del Component 3 - Sectoral 2019-09- 2019-10- 2019-10- 2020-04- componente productivo del TF / A5789 Programs for Sustainable Posterior Individual Limited 7,742.00 7,003.20 Firmado 2019-09-20 27 11 25 22 PDS de la ZRC cuenca del Landscape Management río Pato y valle de Balsillas, y actualización del estudio de sustracción del Bajo Pato. CO-PNF-130030-CS-INDV / Coordinar el proceso de actualización del Plan de Desarrollo Sostenible de la Component 3 - Sectoral Zona de Reserva 2019-09- 2019-10- 2019-10- 2020-05- TF / A5789 Programs for Sustainable Posterior Individual Limited 11,290.00 10,605.35 Firmado 2019-09-20 Campesina cuenca del río 27 11 25 25 Landscape Management Pato y Valle de Balsillas, la precisión de límites, y actualización del estudio de sustracción del Bajo Pato. CO-PNF-134080-CS-CDS / Prestar sus servicios profesionales para apoyar la ejecución de los procesos de adquisiciones y Component 4 - Project Selección contrataciones que se Coordination, Management, 2019-09- 2019-10- 2020-10- TF / A5789 Posterior directa de Direct 20,516.00 18,804.61 Firmado 2019-09-20 requieran de acuerdo con Monitoring and Evaluation 30 23 22 consultores lo establecido en el (M&E) Acuerdo Legal de Donación, el Manual Operativo del Proyecto, el Plan de Adquisiciones y las CO-PNF-81085-CS-INDV / Planificación, ordenamiento Component 3 - Sectoral y gestión del turismo de 2019-06- 2019-07- 2019-07- 2020-06- TF / A5789 Programs for Sustainable Posterior Individual Limited 17,679.00 0.00 Cancelado 2019-06-14 naturaleza, en áreas 19 05 26 19 Landscape Management seleccionadas de la jurisdicción de CDA. CO-PNF-99131-CS-INDV / Experto que facilite los talleres que se definan con Component 3 - Sectoral 2019-02- 2019-03- 2019-03- 2020-01- ATICOYA, en aspectos TF / A5789 Programs for Sustainable Posterior Individual Limited 5,806.00 0.00 Cancelado 2019-02-18 23 08 20 15 legales y normativos, Landscape Management aprovechamiento de recursos naturales y otros temas Page 11 CO-PNF-99129-CS-INDV / Experto que facilite los talleres que se definan con Component 3 - Sectoral la Mesa Ramsar EFI en 2019-02- 2019-03- 2019-03- 2020-01- TF / A5789 Programs for Sustainable Posterior Individual Limited 3,629.00 0.00 Cancelado 2019-02-18 aspectos legales y 23 08 20 17 Landscape Management normativos, aprovechamiento de recursos naturales y otros temas CO-PNF-96464-CS-INDV / Profesional que realice los estudios técnicos para la declaración de reservas Component 1 - Protected 2019-02- 2019-03- 2019-03- 2019-09- naturales de la sociedad TF / A5789 Areas Management and Posterior Individual Limited 9,677.00 0.00 Cancelado 2019-02-15 20 01 08 04 civil en el área de Financial Sustainability amortiguamiento del APR Páramo de Mirafores Picachos CO-PNF-109350-CS-INDV Component 3 - Sectoral / Diseño participativo de 2019-05- 2019-05- 2019-06- 2019-09- TF / 18478 Programs for Sustainable Posterior Individual Open 4,839.00 0.00 Cancelado 2019-04-25 una estrategia de 14 28 14 11 Landscape Management comunicaciones para ASOCAPRICHO Component 4 - Project CO-PNF-109352-CS-INDV Coordination, Management, 2019-05- 2019-06- 2019-07- 2020-03- / Especialista de TF / 18478 Posterior Individual Open 27,355.00 0.00 Cancelado 2019-04-25 Monitoring and Evaluation 29 19 10 03 Adquisiciones - 2019 (M&E) CO-PNF-96466-CS-INDV / Profesional que incorporé los lineamientos de OT del MADS, la CDA y Gobernación del Guaviare, Component 3 - Sectoral en los OT municipales de 2019-02- 2019-02- 2019-03- 2019-06- TF / 18478 Programs for Sustainable Posterior Individual Limited 13,548.00 0.00 Cancelado 2019-01-29 Retorno, Calamar, 03 18 01 30 Landscape Management Miraflores y Depto del Guaviare y complemente planes de acción con acciones de mitigación al cc y control a la defores CO-PNF-96467-CS-INDV / Profesional que incorporé los ajustes cartográficos en los OT municipales de Retorno, Calamar, Component 3 - Sectoral Miraflores y Depto del 2019-02- 2019-02- 2019-03- 2019-06- TF / 18478 Programs for Sustainable Posterior Individual Limited 13,548.00 0.00 Cancelado 2019-01-29 Guaviare y complemente 03 18 01 30 Landscape Management planes de acción con acciones de mitigación al cc y control a la deforestación, en cumplimiento de la Sentencia. CO-PNF-118114-CS-CDS / Consolidación y actualización de los Esquemas de Ordenamiento Territorial Component 3 - Sectoral Selección de El Retorno, Calamar y 2019-06- 2019-07- 2019-12- TF / A5789 Programs for Sustainable Posterior directa de Direct 12,097.00 0.00 Cancelado 2019-06-14 Miraflores, de conformidad 24 24 23 Landscape Management consultores con los lineamientos definidos por el MADS para el cumplimiento de la STC 4360 de 2018 y coordinar con las Alcaldías de El Retorn CO-PNF-123084-CS-CDS / Coordinar la revisión y ajuste de los esquemas de ordenamiento de los municipios de El Retorno Component 3 - Sectoral Selección y Calamar y elaborar el 2019-08- 2019-08- 2019-11- TF / A5789 Programs for Sustainable Posterior directa de Direct 6,774.00 0.00 Cancelado 2019-07-26 componente general, 05 26 25 Landscape Management consultores conforme con los lineamientos nacionales (MADS), departamentales y determinantes ambientales de la CDA para el cumpl CO-PNF-123086-CS-CDS / Elaborar la revisión y ajuste del componente rural de los esquemas de ordenamiento de los Component 3 - Sectoral Selección municipios de El Retorno 2019-08- 2019-08- 2019-11- TF / A5789 Programs for Sustainable Posterior directa de Direct 6,290.00 0.00 Cancelado 2019-07-26 y Calamar conforme con 05 26 25 Landscape Management consultores los lineamientos nacionales (MADS), departamentales y determinantes ambientales de la CDA para el cumplimiento de la CO-PNF-123087-CS-CDS / Realizar la compilación, armonización e integración de todos los documentos que conforman los Component 3 - Sectoral Selección 2019-08- 2019-08- 2019-11- esquemas de ordenamiento, TF / A5789 Programs for Sustainable Posterior directa de Direct 4,839.00 0.00 Cancelado 2019-07-26 05 26 21 EOT (General, urbano y Landscape Management consultores rural) de acuerdo a la norma y redacción requerida para los EOTy los requisitos de la CDA. Leidy Bernal Vargas CO-PNF-123088-CS-CDS / Realizar la revisión y ajuste de los documentos del Plan Departamental de Ordenamiento Territorial - Component 3 - Sectoral Selección PDOT, acorde a los 2019-08- 2019-08- 2019-10- TF / A5789 Programs for Sustainable Posterior directa de Direct 4,516.00 0.00 Cancelado 2019-07-26 lineamientos nacionales 05 26 25 Landscape Management consultores (MADS), departamentales y determinantes ambientales de la CDA para el cumplimiento de la STC 4360/2018 y garan CO-PNF-123091-CS-INDV / Liderar y desarrollar el proceso de construcción y validación social, institucional y técnica a Component 1 - Protected 2019-07- 2019-08- 2019-08- 2020-08- nivel local y regional para TF / A5789 Areas Management and Posterior Individual Limited 27,097.00 0.00 Cancelado 2019-07-26 31 15 29 28 la declaración del APR Financial Sustainability Bajo Caguán, y oriente las acciones a desarrollar en el PNR Miraflores Picachos, Caquetá. CO-PNF-130037-CS-INDV / Apoyar la incorporación de la información espacial relacionada con la adaptación al cambio Component 3 - Sectoral climático en las 2019-09- 2019-10- 2019-10- 2020-02- TF / A5789 Programs for Sustainable Posterior Individual Limited 5,161.00 0.00 Cancelado 2019-09-20 determinantes ambientales 27 11 25 21 Landscape Management de las corporaciones de la región Amazonía Colombiana, la cual corresponde a 42 subzonas hidrográficas que abarcan los 15 CO-PNF-134917-CS-INDV / Profesional Apoyo proceso Component 1 - Protected formulación de plan de 2018-12- 2019-01- 2019-02- 2019-08- TF / A5789 Areas Management and Posterior Individual Limited 21,429.00 17,691.00 Firmado 2018-12-20 manejo de la nueva APR 25 15 19 18 Financial Sustainability Páramo de Miraflores - Picachos CO-PNF-137120-CS-INDV / Profesional para consolidación y reporte de Component 3 - Sectoral información de sistemas 2019-10- 2019-11- 2019-11- 2020-11- TF / A5789 Programs for Sustainable Posterior Individual Limited 13,548.00 11,970.42 Firmado 2019-10-21 agroforestales, plantaciones 29 13 29 27 Landscape Management , movilización y aprovechamiento forestal al SNIF (SIAC)- Corpoamazonia CO-PNF-137125-CS-INDV / Realizar la preproduccion, produccion y pos Component 3 - Sectoral produccion de un video en 2019-10- 2019-11- 2019-12- 2020-02- TF / A5789 Programs for Sustainable Posterior Individual Limited 6,452.00 5,708.00 Firmado 2019-10-21 formato HD y registro 28 11 02 03 Landscape Management fotografico profesional que de cuenta de los resultados de GEF CA Financiamiento Original CO-PNF-103505-CS-INDV / Diseño de un Sistema integrado de gestión Component 1 - Protected administrativa, financiera y 2019-03- 2019-04- 2019-04- 2019-08- TF / A5789 Areas Management and Posterior Individual Limited 17,419.00 0.00 Cancelado 2019-03-15 técnica para FPN: 29 03 15 14 Financial Sustainability levantamiento de requerimientos internos y externos. CO-PNF-71707-CS-INDV / Estructurar un Manual Operativo que establezca la gobernanza, procesos y Component 1 - Protected procedimientos de HECO, 2018-08- 2018-09- 2018-10- 2019-02- TF / 18478 Areas Management and Posterior Individual Limited 21,429.00 0.00 Cancelado 2018-08-16 con base en las 21 11 16 28 Financial Sustainability condiciones de desembolso, metas e indicadores de desempeño acordados entre los actores de HECO. CO-PNF-62961-CS-INDV / Liderar la implementación de la estrategia de Component 1 - Protected comunicaciones de 2018-07- 2018-08- 2018-08- 2019-07- TF / 18478 Areas Management and Posterior Individual Limited 24,643.00 0.00 Cancelado 2018-07-13 HERENCIA COLOMBIA 18 01 22 13 Financial Sustainability como un factor estratégico al momento de consolidad esta iniciativa de país CO-PNF-78406-CS-INDV / Estudios y documentación Component 1 - Protected 2018-10- 2018-11- 2018-12- 2019-04- técnica de la nueva Área TF / A5789 Areas Management and Posterior Individual Limited 8,571.00 0.00 Cancelado 2018-10-15 20 10 06 08 Protegida Regional Bajo Financial Sustainability Caguán - CORPOAMAZONIA CO-PNF-41762-CS-INDV / Diseñar una estrategia de comunicación lúdico- pedagógica y desarrollar Component 3 - Sectoral herramientas audiovisuales 2018-07- 2018-08- 2018-09- 2018-12- TF / 18478 Programs for Sustainable Posterior Individual Limited 5,357.00 0.00 Cancelado 2018-07-20 y piezas comunicativas 25 15 19 20 Landscape Management para la difusión de los resultados de los análisis de conectividad y fragmentación de ecosistemas CO-PNF-78421-CS-INDV / Consultoría en ecoturismo que formule la estrategia de turismo y realice 3 Component 3 - Sectoral talleres con la comunidad 2018-10- 2018-11- 2018-11- 2019-03- TF / A5789 Programs for Sustainable Posterior Individual Limited 7,143.00 0.00 Cancelado 2018-10-18 para su concertación. en el 23 07 28 29 Landscape Management marco de la línea sistemas producción no tradicionales (ecoturismo) del Plan de Manejo Page 12 CO-PNF-78407-CS-INDV / Estudios y documentación Component 1 - Protected técnica de la nueva Área 2018-10- 2018-11- 2018-12- 2019-04- TF / A5789 Areas Management and Posterior Individual Limited 12,143.00 0.00 Cancelado 2018-10-15 Protegida Regional Páramo 20 10 06 05 Financial Sustainability de Miraflores - Picachos - CORPOAMAZONIA CO-PNF-89794-CS-INDV / CORPOAMAZONIA: Component 3 - Sectoral 2018-12- 2019-01- 2019-02- 2020-01- Consultor Asesoría Montaje TF / A5789 Programs for Sustainable Posterior Individual Limited 42,857.00 0.00 Cancelado 2018-12-20 25 10 04 31 del modelo integrado de Landscape Management desarrollo forestal. CO-PNF-123093-CS-INDV / Facilitar y gestionar como enlace técnico y operativo local, los procesos Component 1 - Protected que se adelante en la ruta 2019-07- 2019-08- 2019-08- 2020-08- TF / A5789 Areas Management and Posterior Individual Limited 15,484.00 0.00 Cancelado 2019-07-26 declaratoria del APR de 31 15 29 28 Financial Sustainability Bajo Caguán, Caquetá, con las comunidades (productores e indígenas) y actores institucionales. CO-PNF-123097-CS-INDV / Construcción Estrategia de difusión y divulgación Component 3 - Sectoral Sitio Ramsar Estrella Ejecución 2019-12- 2020-01- 2020-01- 2020-04- TF / A5789 Programs for Sustainable Posterior Individual Limited 6,452.00 0.00 2019-12-20 Fluvial del Inírida - EFI, pendiente 25 08 22 22 Landscape Management con la Mesa Ramsar EFI y articulada a la Estrategia de Comunicaciones de GEF CA. CO-PNF-144811-CS-INDV / Profesional que coordine el componente Plan de Acción de Control a la Deforestación y promoción Component 3 - Sectoral 2019-12- 2019-12- 2019-12- 2020-09- para la incorporación de TF / A5789 Programs for Sustainable Posterior Individual Limited 11,613.00 0.00 En ejecución 2019-11-29 04 09 23 23 las determinantes Landscape Management ambientales en los POT en el marco del cumplimiento a la Sentencia Amazonia No. 4360/2018, en la jurisdicción de Cor CO-PNF-144814-CS-INDV / Profesional que desarrolle de los temas de aprovechamiento forestal, planes de manejo y Component 3 - Sectoral ordenación forestal, para 2019-12- 2019-12- 2019-12- 2020-09- TF / A5789 Programs for Sustainable Posterior Individual Limited 11,613.00 0.00 En ejecución 2019-11-29 apoyar la implementación 04 10 24 21 Landscape Management de las acciones a corto plazo en el marco del cumplimiento a la Sentencia Amazonia No. 4360/2018, en la jurisdicción CO-PNF-144816-CS-INDV / Profesional que desarrolle actividades de seguimiento, orientación, articulación y desarrollo de procesos Component 3 - Sectoral jurídicos y legales, en 2019-12- 2019-12- 2019-12- 2020-09- TF / A5789 Programs for Sustainable Posterior Individual Limited 11,613.00 0.00 En ejecución 2019-11-29 cumplimiento de la 04 09 23 20 Landscape Management sentencia STC4360-2018, conforme al Plan de Acción para la lucha contra la deforestación en jurisdicción d CO-PNF-89769-CS-INDV / Profesionales de apoyo al monitoreo de efectividad en Component 2 - Forest 2019-01- 2019-01- 2019-02- 2020-01- la reducción de la TF / A5789 Governance, Management Posterior Individual Limited 24,544.00 0.00 Cancelado 2018-12-27 01 09 04 30 deforestación y análisis de and Monitoring conectividad a nivel de paisaje. MDF1 CO-PNF-89775-CS-INDV / Profesionales de apoyo al monitoreo de efectividad en Component 2 - Forest 2019-01- 2019-01- 2019-02- 2020-01- la reducción de la TF / A5789 Governance, Management Posterior Individual Limited 24,544.00 0.00 Cancelado 2018-12-27 01 03 04 31 deforestación y análisis de and Monitoring conectividad a nivel de paisaje. MDF2 CO-PNF-89780-CS-INDV / Profesional de seguimiento Component 3 - Sectoral 2019-01- 2019-01- 2019-02- 2020-01- y apoyo a la planeación y TF / 18478 Programs for Sustainable Posterior Individual Limited 21,429.00 0.00 Cancelado 2018-12-27 01 15 04 31 ejecución operativa regional Landscape Management (Guaviare) CO-PNF-145712-CS-CDS / Realización análisis de cadenas de valor de Productos Maderables y No Maderables del Bosque Component 3 - Sectoral Selección identificados con potencial 2019-12- 2020-01- 2020-07- TF / A5789 Programs for Sustainable Posterior directa de Direct 19,355.00 0.00 Bajo Revision 2019-12-13 comercial para el programa 23 22 20 Landscape Management consultores de Forestería Comunitaria de Asocapricho, con el fin de valorar inversiones y acciones estratégicas por real CO-PNF-96470-CS-INDV / Profesional de Apoyo gestión técnica, operativa y Component 3 - Sectoral 2019-02- 2019-02- 2019-03- 2019-09- comunitaria de actividades TF / A5789 Programs for Sustainable Posterior Individual Limited 9,677.00 0.00 Cancelado 2019-01-29 03 20 08 04 de control y vigilancia de Landscape Management Corpoamazonia en Ramsar Tarapoto. CO-PNF-137123-CS-INDV / Coordinar la formulación del plan de manejo del Component 1 - Protected PNN Serrania de 2019-10- 2019-11- 2019-11- 2020-05- TF / A5789 Areas Management and Posterior Individual Limited 13,161.00 0.00 Cancelado 2019-10-21 Chiribiquete de manera 29 13 29 27 Financial Sustainability participativa y de acuerdo a los lineamientos institucionales de Parques Nacionales CO-PNF-103495-CS-INDV / Apoyar la elaboración de documentos técnicos de las determinantes ambientales asociadas a la reducción a Component 3 - Sectoral cero deforestación y la 2019-03- 2019-04- 2019-04- 2019-08- TF / 18478 Programs for Sustainable Posterior Individual Limited 7,742.00 0.00 Cancelado 2019-03-15 adaptación al cambio 20 02 15 14 Landscape Management climático de las Corporaciones y realizar la evaluación de los POT de los municipios del Guaviare, en cu CO-PNF-63403-CS-INDV / Coordinar, orientar y Component 3 - Sectoral liderar la implementación 2018-07- 2018-08- 2018-08- 2019-02- TF / 18478 Programs for Sustainable Posterior Individual Limited 17,500.00 0.00 Cancelado 2018-07-13 de los acuerdos de 18 01 29 25 Landscape Management conservación, restauración y no deforestación - CDA CO-PNF-118107-CS-INDV / Construir y desarrollar una guía de investigación preestructurada en Component 3 - Sectoral Ejecución 2020-02- 2020-03- 2020-03- 2020-06- educación, gestión y TF / A5789 Programs for Sustainable Posterior Individual Limited 3,871.00 0.00 2020-02-12 pendiente 17 02 18 17 conservación de uso Landscape Management sostenible del territorio siguiendo los lineamientos pedagógicos ONDAS CO-PNF-118108-CS-INDV / Consultor social de la Component 4 - Project evaluación de medio Coordination, Management, Ejecución 2019-12- 2020-01- 2020-01- 2020-04- término de la iniciativa TF / A5789 Posterior Individual Limited 9,677.00 0.00 2019-12-18 Monitoring and Evaluation pendiente 23 06 22 22 Conservación de bosques y (M&E) sostenibilidad en el corazón de la amazonia CO-PNF-123094-CS-INDV Component 4 - Project / Consultor que lidere la Coordination, Management, Ejecución 2019-12- 2020-01- 2020-01- 2020-05- evaluación de medio TF / A5789 Posterior Individual Limited 15,484.00 0.00 2019-12-18 Monitoring and Evaluation pendiente 23 06 20 20 término de GEF Corazón (M&E) de la Amazonia. CO-PNF-150129-CS-INDV Component 4 - Project / Especialista en cadena de Coordination, Management, Ejecución 2020-01- 2020-01- 2020-01- 2020-05- TF / B1287 Posterior Individual Limited 10,000.00 0.00 2020-01-06 valor productiva sostenible Monitoring and Evaluation pendiente 11 16 30 29 PPG. (M&E) Component 4 - Project CO-PNF-150130-CS-INDV Coordination, Management, Ejecución 2020-01- 2020-01- 2020-01- 2020-10- TF / B1287 Posterior Individual Limited 36,000.00 0.00 2020-01-06 / Coordinador de la PPG Monitoring and Evaluation pendiente 11 16 30 26 (M&E) Component 4 - Project CO-PNF-150302-CS-CDS / Selección Coordination, Management, 2020-01- 2020-01- 2021-01- Coordinación General del TF / A5789 Posterior directa de Direct 50,496.00 0.00 Bajo Revision 2019-12-30 Monitoring and Evaluation 09 30 24 Proyecto- 2020. consultores (M&E) Component 4 - Project CO-PNF-150304-CS-CDS / Selección Coordination, Management, 2020-01- 2020-01- 2021-01- Especialista Financiera- TF / A5789 Posterior directa de Direct 35,535.00 0.00 Bajo Revision 2019-12-30 Monitoring and Evaluation 09 30 24 2020. consultores (M&E) CO-PNF-150306-CS-CDS / Coordinación técnica acciones asociadas con la implementación de Component 1 - Protected Selección 2020-01- 2020-01- 2021-01- Herencia Colombia - GEF TF / A5789 Areas Management and Posterior directa de Direct 34,219.00 0.00 Bajo Revision 2019-12-30 09 30 24 Corazón Amazonia y la Financial Sustainability consultores DTAM - PNN y CORPOAMAZONIA y apoyo a la preparación GEF7 CA. CO-PNF-150310-CS-CDS / Profesional de apoyo para Component 3 - Sectoral Selección 2020-01- 2020-01- 2021-01- la implementación de TF / A5789 Programs for Sustainable Posterior directa de Direct 32,876.00 0.00 Bajo Revision 2019-12-30 09 30 24 acuerdos con el sector de Landscape Management consultores infraestructura vial. CO-PNF-150313-CS-CDS / Profesional apoyo a la Component 3 - Sectoral Selección CDA en la incorporación 2020-01- 2020-01- 2021-01- TF / A5789 Programs for Sustainable Posterior directa de Direct 19,204.00 0.00 Bajo Revision 2019-12-30 de criterios ambientales 09 30 24 Landscape Management consultores para proyectos de red vial terciarias - 2020. CO-PNF-150315-CS-CDS / Profesional apoyo a la Corpoamazonia en la Component 3 - Sectoral Selección Ejecución 2020-01- 2020-01- 2021-01- incorporación de criterios TF / A5789 Programs for Sustainable Posterior directa de Direct 19,204.00 0.00 2019-12-30 pendiente 09 30 24 ambientales para proyectos Landscape Management consultores de red vial terciarias - 2020. CO-PNF-150316-CS-CDS / Profesional apoyo a la gestión territorial y de Component 3 - Sectoral Selección 2020-01- 2020-01- 2021-01- seguimiento a la TF / A5789 Programs for Sustainable Posterior directa de Direct 32,206.00 0.00 Bajo Revision 2019-12-30 09 30 24 planeación y ejecución Landscape Management consultores operativa regional (Caquetá - Putumayo) - 2020. Page 13 CO-PNF-150320-CS-CDS / Profesional que coordine y oriente la implementación de acuerdos de Component 3 - Sectoral Selección Ejecución 2020-01- 2020-01- 2021-01- conservación, restauración TF / A5789 Programs for Sustainable Posterior directa de Direct 27,097.00 0.00 2019-12-30 pendiente 09 30 24 y no deforestación en las Landscape Management consultores áreas de intervención CDA y demás líneas de acción que adelanta la CDA. CO-PNF-150321-CS-CDS / Profesional apoyo a la Component 3 - Sectoral Selección gestión territorial y de 2020-01- 2020-01- 2021-01- TF / A5789 Programs for Sustainable Posterior directa de Direct 27,097.00 0.00 Bajo Revision 2019-12-30 seguimiento a la 09 30 24 Landscape Management consultores planeación y ejecución operativa regional (Guaviare). CO-PNF-150322-CS-CDS / Profesional agroforestal implementación de Component 3 - Sectoral Selección 2020-01- 2020-01- 2021-01- acuerdos de conservación, TF / A5789 Programs for Sustainable Posterior directa de Direct 22,142.00 0.00 Bajo Revision 2019-12-30 09 30 24 restauración y no Landscape Management consultores deforestación en las áreas de intervención CDA. CO-PNF-150325-CS-INDV / Profesional que defina el Component 3 - Sectoral plan de negocio y Ejecución 2020-01- 2020-01- 2020-02- 2021-01- TF / A5789 Programs for Sustainable Posterior Individual Limited 19,355.00 0.00 2019-12-30 priorización de productos pendiente 07 22 06 31 Landscape Management para el encadenamiento productivo CO-PNF-150327-CS-INDV / Profesional que coordine la implementación de acciones de seguimiento y Component 1 - Protected monitoreo, sostenibilidad Ejecución 2020-01- 2020-01- 2020-02- 2021-02- TF / A5789 Areas Management and Posterior Individual Limited 34,839.00 0.00 2019-12-30 financiera y operación pendiente 07 22 07 01 Financial Sustainability técnica, en los mosaicos priorizados para la fase 1 de Herencia Colombia, en el marco de Corazón Amazonia. CO-PNF-118109-CS-INDV / Consultor financiero de Component 4 - Project la evaluación de medio Coordination, Management, Ejecución 2020-01- 2020-01- 2020-02- 2020-05- término de la Iniciativa TF / A5789 Posterior Individual Limited 9,677.00 0.00 2020-01-03 Monitoring and Evaluation pendiente 08 22 07 08 Conservación de bosques (M&E) y sostenibilidad en el Corazón de la Amazonia Page 14