Procurement Plan (This is only a sample with the minimum content that is required to be included in the PAD. The detailed procurement plan is still mandatory for disclosure on the Bank’s website in accordance with the guidelines. The initial procurement plan will cover the first 18 months of the project and then updated annually or earlier as necessary). I. General 1. Bank’s approval Date of the procurement Plan [Original: October 2017] 2. Date of General Procurement Notice: Oct, 2017 3. Period covered by this procurement plan: The procurement period of project covered from year October 2017 to December 2017 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: [Thresholds for applicable procurement methods (not limited to the list below) will be determined by the Procurement Specialist /Procurement Accredited Staff based on the assessment of the implementing agency’s capacity.] Procurement Method Prior Review Threshold Comments US$ 1. ICB and LIB (Goods) Above US$ 500,000 All 2. NCB (Goods) Above US$ 100,000 First contract 3. ICB (Works) Above US$ 15 million All 4. NCB (Works) Above US$ 5 million All 5. (Non-Consultant Services) Below US$ 100,000 First contract [Add other methods if necessary] 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: 4. Reference to (if any) Project Operational/Procurement Manual: Project Implementation Manual for World Bank Loan Project XYZ 04/01/2010 issued by 5. Any Other Special Procurement Arrangements: [including advance procurement and retroactive financing, if applicable] 5 ICB works packages will be financed under retroactive financing July 9, 2010 6. Summary of the Procurement Packages planned during the first 18 months after project effectiveness ( including those that are subject to retroactive financing and advanced procurement) [List the Packages which require Bank’s prior review first and then the other packages] 1 2 3 4 5 6 7 Ref. Description Estimated Packages Domest Review Comments No. Cost ic by Bank US$ Prefere (Prior / Post) million nce (yes/no) Summary of the ICB (Works) Summary of the ICB (Goods) Summary of the NCB (Works) Summary of 0.237 1 YES Post the NCB (Goods) Summary of the ICB (Non- Consultant Services) Summary of 0.02 2 YES Post the Shopping III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Threshold Comments 1. Competitive Methods (Firms) Above US$ 100,000 2. Single Source (Firms) All 3. Individual Above US$ 50,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: [including advance procurement and retroactive financing, if applicable or delete if not applicable] 4. Consultancy Assignments with Selection Methods and Time Schedule July 9, 2010 1 2 3 4 5 6 Ref. No. Description of Estimated Packages Review Comments Assignment Cost by Bank US$ (Prior / million Post) Summary of 0.4 1 Prior number of contracts that will be let under QCBS Summary of 1.868 13 Prior CQS number of contracts that will be let under other methods Summary of 0.0128 4 Prior IC number of contracts that will be let under other methods July 9, 2010 PROCUREMENT China : GEF Mainstreaming Integrated Water and Environment Management PLAN General Information Country: China Bank’s Approval Date of the Original Procurement Plan: 2018-03-21 2019-05-24 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P145897 GPN Date: Project Name: GEF Mainstreaming Integrated Water and Environment Management Loan / Credit No: TF / A2428 Executing Agency(ies): Foreign Economic Cooperation Office, Ministry of Environmental Protection WORKS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GOODS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NON CONSULTING SERVICES Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Market Contract Type Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Approach (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Consultant MEP-C-4-9 / Project Under TF / A2428 Post Qualification Open - National 0.00 2018-11-16 2018-12-07 2019-01-20 2019-02-19 2019-03-26 2019-09-22 monitoring and evaluation Implementation Selection MEP-3-10 / Hai River Basin/MEP: Annual M&E on scaling-up IWEM Approach Consultant Under in Water Pollution Areas TF / A2428 Post Qualification Open - National 0.00 2018-12-28 2019-01-18 2019-03-03 2019-04-02 2019-05-07 2019-11-03 Implementation selected (in Cities of Xing- Selection Tai, Tang-Shan and Lang- Fang) MEP-C-3-3 / Assessment on Effectiveness of Water Consultant Pollution Prevention moving TF / A2428 Post Qualification Open - National 0.00 Under Review 2019-01-04 2019-01-25 2019-03-10 2019-04-09 2019-05-14 2019-11-10 towards River Basin District Selection (RBD) Approach (Pilot in Chengde) MEP-C-3-2A / Development,Operations and Quality And Cost- Open - Pending Management of Pollution TF / A2428 Prior 0.00 2019-06-28 2019-07-19 2019-09-01 2019-09-29 2019-10-29 2019-12-03 2020-01-07 2021-01-06 Based Selection International Implementation Control Technology Extension Platform (3iPET) Page 1 MEP-C-3-2B / Development of big data analysis tool of Consultant Pending International Platform for TF / A2428 Post Qualification Open - National 0.00 2019-05-27 2019-06-17 2019-07-31 2019-08-30 2019-10-04 2020-04-01 Implementation Environment Technology ( Selection 3iPET) MEE-4-6-1 / Technical Consultant Pending assistance for project TF / A2428 Post Qualification Open - National 0.00 2019-05-27 2019-06-17 2019-07-31 2019-08-30 2019-10-04 2020-04-01 Implementation procurement and monitoring. Selection INDIVIDUAL CONSULTANTS Page 2