The World Bank Implementation Status & Results Report ODRA-VISTULA FLOOD MANAGEMENT PROJECT (P147460) ODRA-VISTULA FLOOD MANAGEMENT PROJECT (P147460) EUROPE AND CENTRAL ASIA | Poland | Water Global Practice | IBRD/IDA | Investment Project Financing | FY 2016 | Seq No: 9 | ARCHIVED on 19-Jun-2019 | ISR37427 | Implementing Agencies: Ministry of Environment, Republic of Poland, Ministry of Interior and Administration Key Dates Key Project Dates Bank Approval Date: 23-Jul-2015 Effectiveness Date: 04-Nov-2015 Planned Mid Term Review Date: 15-Dec-2019 Actual Mid-Term Review Date: -- Original Closing Date: 15-Dec-2023 Revised Closing Date: 15-Dec-2023 pdoTable Project Development Objectives Project Development Objective (from Project Appraisal Document) The project development objectives are to increase access to flood protection for people living in selected areas of the Odra Riverand the Upper Vistula River basins and to strengthen the institutional capacity of the Borrower to mitigate the impact of floods more effectively. Has the Project Development Objective been changed since Board Approval of the Project Objective? No Components Table Name Component 1: Flood Protection of the Middle and Lower Odra:(Cost $542.00 M) Component 2: Flood Protection of the Nysa Kłodzka Valley:(Cost $290.00 M) Component 3: Flood Protection of the Upper Vistula:(Cost $242.00 M) Component 4: Institutional strengthening and Enhanced Forecasting:(Cost $141.00 M) Component 5: Project management and studies:(Cost $95.00 M) Overall Ratings Name Previous Rating Current Rating Progress towards achievement of PDO Moderately Satisfactory Moderately Unsatisfactory Overall Implementation Progress (IP) Moderately Satisfactory Moderately Unsatisfactory Overall Risk Rating Substantial Substantial Implementation Status and Key Decisions Overall Summary Status: Although there has been limited progress since the last mission, due to delayed procurement processing and weak contract management, there is continued and stronger commitment from both the Ministry of Maritime Economy and Inland Navigation (MMEIN) and Polish Waters to provide strict oversight and supervision, to ensure improved project implementation. For this to happen however, there is need for quicker preparation of new contracts and diligent contract management for running contracts by all PIUs, as well as stronger coordination and monitoring by the PCU. Strict and diligent contract monitoring by all PIUs and the PCU will ensure improved project implementation as well as expenditure and disbursements. The current disbursement rate is only 15% in the fourth year of project implementation. With the hiring of a Project 6/19/2019 Page 1 of 6 The World Bank Implementation Status & Results Report ODRA-VISTULA FLOOD MANAGEMENT PROJECT (P147460) Director and staffing reinforcement in the PIUs over the last couple of months, as well as the proposed reorganization within the PCU to strengthen coordination and communication with PIUs, the project implementation trajectory for the next FY is positive. The proposed contract management and safeguards e.g. stakeholder engagement trainings, will help to further strengthen capacity of the implementing units and ensure continued improved project implementation. Overall 18 contracts are in place with a total commitment of over 295 million EUR (including the three Technical Assistance (TA) consultancies and two for Flood Risk Master Plans), representing 26.2% of the total project cost. In addition, over 198 million EUR is currently ongoing tender procedures (3 ICB and 2 QCBS), 82.87 million EUR at the preparation stage and expected to be launched by the end of 2019 (reaching 51.1% of the total project cost). Almost all project funds are expected to be committed into contracts by the end of 2020. Risks Systematic Operations Risk-rating Tool Risk Category Rating at Approval Previous Rating Current Rating Political and Governance Moderate Substantial Substantial Macroeconomic Moderate Moderate Moderate Sector Strategies and Policies Moderate Moderate Moderate Technical Design of Project or Program Substantial Substantial Substantial Institutional Capacity for Implementation and Sustainability Moderate Substantial Substantial Fiduciary Moderate Moderate Moderate Environment and Social Moderate Substantial Substantial Stakeholders Substantial Substantial Substantial Other -- -- -- Overall Moderate Substantial Substantial Results PDO Indicators by Objectives / Outcomes To increase access to flood protection for people living in selected project areas IN00711323 ►Direct project beneficiaries (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 10,000.00 12,400,000.00 Date 26-Jan-2015 06-Dec-2018 11-Jun-2019 15-Dec-2023 IN00711324 Female beneficiaries (Percentage, Custom Supplement) Baseline Actual (Previous) Actual (Current) End Target 6/19/2019 Page 2 of 6 The World Bank Implementation Status & Results Report ODRA-VISTULA FLOOD MANAGEMENT PROJECT (P147460) Value 0.00 0.00 5.00 100.00 IN00711325 ►Total area in the 1% flood plain benefiting from enhanced protection and operational forecasts (Hectare(Ha), Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 81,626.00 Date 26-Jan-2015 06-Dec-2018 11-Jun-2019 15-Dec-2023 IN00711326 ►Total Population benefiting from enhanced protection and operational forecasts (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 12.40 Date 06-Feb-2014 06-Dec-2018 11-Jun-2019 29-Dec-2023 IN00711327 ►Flood Operation Centers established and functional (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 2.00 Date 12-Feb-2015 06-Dec-2018 11-Jun-2019 29-Dec-2023 Intermediate Results Indicators by Components Component 1: Flood Protection of the Middle and Lower Odra IN00711328 ►Length of enhanced protection in the Zachodniopomorskie Province (Component 1A) (Kilometers, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 9.80 Date 26-Jan-2015 06-Dec-2018 11-Jun-2019 15-Dec-2023 IN00711331 ►Modernizing and reconstructing the middle and lower Odra river systems to upgrade to a Class III waterway (Yes/No, Custom) Baseline Actual (Previous) Actual (Current) End Target Value No No No Yes Date 12-Feb-2015 06-Dec-2018 11-Jun-2019 29-Dec-2023 IN00711335 ►Extension and construction of flood embankments to protect Slubice City (Kilometers, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 12.80 6/19/2019 Page 3 of 6 The World Bank Implementation Status & Results Report ODRA-VISTULA FLOOD MANAGEMENT PROJECT (P147460) Date 12-Feb-2015 06-Dec-2018 11-Jun-2019 29-Dec-2023 Component 2: Flood Protection of the Nysa Kłodzka Valley IN00711329 ►Construction of dry polders in the Nysa Klodzka Valley (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 4.00 Date 26-Jan-2015 06-Dec-2018 11-Jun-2019 15-Dec-2023 IN00711332 ►Length of enhanced protection in the Nysa Klodzka Valley (Kilometers, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 177.00 Date 12-Feb-2015 06-Dec-2018 11-Jun-2019 29-Dec-2023 Component 3: Flood Protection of the Upper Vistula IN00711333 ►Construction of dry polders to protect Upper Vistula towns and Krakow (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 3.00 Date 26-Jan-2015 06-Dec-2018 11-Jun-2019 29-Dec-2023 IN00711337 ►Length of enhanced protection for Sandomierz and Tarnobrzeg (Kilometers, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 3.00 9.87 46.34 Date 12-Feb-2015 06-Dec-2018 11-Jun-2019 29-Dec-2023 IN00711339 ►Length of enhanced protection for the San Sub-basin (Kilometers, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 1.60 Date 12-Feb-2015 06-Dec-2018 11-Jun-2019 29-Dec-2023 Component 4: Institutional strengthening and Enhanced Forecasting IN00711334 ►Flash flood systems for sub-basins operational (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target 6/19/2019 Page 4 of 6 The World Bank Implementation Status & Results Report ODRA-VISTULA FLOOD MANAGEMENT PROJECT (P147460) Value 0.00 0.00 0.00 2.00 Date 26-Jan-2015 06-Dec-2018 11-Jun-2019 29-Dec-2023 Component 5: Project management and studies IN00711330 ►RBMPs or Investment Prioritization Plans drafted for Vistula sub-basins (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 2.00 Date 26-Jan-2015 06-Dec-2018 11-Jun-2019 29-Dec-2023 IN00711336 ►% of project-supported RBMPs and investments informed by citizen feedback through consultations (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 10.00 20.00 20.00 100.00 Date 12-Feb-2015 03-May-2019 11-Jun-2019 29-Dec-2023 Data on Financial Performance Disbursements (by loan) Project Loan/Credit/TF Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P147460 IBRD-85240 Effective USD 504.04 504.04 0.00 77.68 427.79 15% Key Dates (by loan) Project Loan/Credit/TF Status Approval Date Signing Date Effectiveness Date Orig. Closing Date Rev. Closing Date P147460 IBRD-85240 Effective 23-Jul-2015 10-Sep-2015 04-Nov-2015 15-Dec-2023 15-Dec-2023 Cumulative Disbursements 6/19/2019 Page 5 of 6 The World Bank Implementation Status & Results Report ODRA-VISTULA FLOOD MANAGEMENT PROJECT (P147460) Restructuring History There has been no restructuring to date. Related Project(s) There are no related projects. 6/19/2019 Page 6 of 6