Public Disclosure Copy The World Bank Implementation Status & Results Report MULTI DONOR FACILIT Y - PH MINDANAO RECONSTRUCTION & DEVELOPMENT (P095173) MULTI DONOR FACILIT Y - PH MINDANAO RECONSTRUCTION & DEVELOPMENT (P095173) EAST ASIA AND PACIFIC | Philippines | Social, Urban, Rural and Resilience Global Practice Global Practice | Recipient Executed Activities | Specific Investment Loan | FY 2006 | Seq No: 14 | ARCHIVED on 31-Mar-2017 | ISR27505 | Implementing Agencies: Key Dates Key Project Dates Bank Approval Date:20-Jul-2005 Effectiveness Date:30-Mar-2006 Planned Mid Term Review Date:15-May-2009 Actual Mid-Term Review Date:15-May-2009 Original Closing Date:31-Dec-2015 Revised Closing Date:31-Mar-2017 Project Development Objectives Project Development Objective (from Project Appraisal Document) Project Development Objective Communities of conflict-affected areas, internally displaced people, and rebel returnees benefitfromvisible restoration of some basic services of their choice and sustained by more accountable Local Government Units (LGUs). Has the Project Development Objective been changed since Board Approval of the Project Objective? Yes Board Approved Revised Project Development Objective (If project is formally restructured)PHRPDODEL To improve social and economic recovery in targeted conflict-affected communities of Mindanao through activities which promote confidence- building, peace and demand-driven governance. Components Name BLOCK GRANTS:(Cost $14.12 M) CAPACITY-BUILDING:(Cost $13.01 M) IMPLEMENTATION SUPPORT AND TRAINING:(Cost $1.24 M) Overall Ratings Name Previous Rating Current Rating Progress towards achievement of PDO  Moderately Satisfactory  Moderately Satisfactory Overall Implementation Progress (IP)  Moderately Satisfactory  Moderately Satisfactory Overall Risk Rating  High  High 3/31/2017 Page 1 of 18 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report MULTI DONOR FACILIT Y - PH MINDANAO RECONSTRUCTION & DEVELOPMENT (P095173) Implementation Status and Key Decisions Progress towards achieving the project development objective has been moderately satisfactory. The project has delivered community-based infrastructure and livelihood support to 314 conflict-affected communities in Mindanao, exceeding the target of 277. Over 650,000 people (51 percent women) have benefited from water systems, access roads, post-harvest facilities and farming and fishing equipment, exceeding the target by 100,000. These subprojects have reduced travel time to market, increased agricultural productivity, reduced post-harvest costs and increased access to basic services. Activities are complete in the eleven target villages of the community-enterprise development component. Over 1,100 people in 42 business groups were trained and equipped to run micro-enterprises. While market linkages have been established and technical capacities built, the groups are only generating small profits so far, raising questions over long-term viability. At its core, the project aimed to build the capacity of the Bangsamoro Development Agency (BDA) and other agencies of the Moro Islamic Liberation Front (MILF) to prepare them for anticipated roles in government following the signing of peace agreements with the government of the Philippines in 2012 and 2014. The BDA and other MILF-affiliated agencies have acquired skills in development planning, budgeting, financial management, procurement and community organization that will equip them for their future role. The BDA has evolved through MTF support from an agency with no development experience to an organization with over 300 staff operating in seven offices across Mindanao. The project also generated achievements on social cohesion and confidence-building . In 2016 the project expanded into communities in the area of the Six Acknowledged Camps and 25 Base Camps of the MILF, as well as "mixed” communities (Christians, Muslims and Indigenous Peoples). The joint government-MILF project implementation structures have built and sustained important working relations between the parties. The community-based approach has supported cohesion between different community groups and between citizens and the state. Risks Systematic Operations Risk-rating Tool Risk Category Rating at Approval Previous Rating Current Rating Political and Governance  --  Moderate  Moderate Macroeconomic  --  Low  Low Sector Strategies and Policies  --  High  High Technical Design of Project or Program  --  Moderate  Moderate Institutional Capacity for Implementation and Sustainability  --  Substantial  Substantial Fiduciary  --  Substantial  Substantial Environment and Social  --  Low  Low Stakeholders  --  Substantial  Substantial Other  --  Substantial  Substantial Overall  --  High  High Results Project Development Objective Indicators 3/31/2017 Page 2 of 18 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report MULTI DONOR FACILIT Y - PH MINDANAO RECONSTRUCTION & DEVELOPMENT (P095173) PHINDPDOTBL  Communities report better access to basic services (time, distance and cost) (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 50.00 Date 01-Jan-2006 21-Feb-2017 31-Mar-2017 31-Mar-2017 Comments This will be measured in the 2017 independent Impact Assessment. PHINDPDOTBL  Percentage of beneficiaries who receive entrepreneurship training and support who establish a new enterprise (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 91.00 91.00 50.00 Date 11-Dec-2012 25-Nov-2016 31-Dec-2016 31-Dec-2016 Comments The 91% figure includes all members of the groups, though it needs to be acknowledged that some are more active than others. PHINDPDOTBL  Increase in number of community members reporting trust in other members/groups within their community (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 5.00 Date 01-Jan-2006 22-Feb-2017 31-Mar-2017 31-Mar-2017 Comments This will be measured in the 2017 independent Impact Assessment. 3/31/2017 Page 3 of 18 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report MULTI DONOR FACILIT Y - PH MINDANAO RECONSTRUCTION & DEVELOPMENT (P095173) PHINDPDOTBL  Increase in number of community members who think their opinion counts in what needs to be done in their community (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 10.00 Date 01-Jul-2012 22-Feb-2017 31-Mar-2017 31-Mar-2017 Comments This will be measured in the 2017 independent Impact Assessment. In the 2012 Impact Assessment, 46% of respondents stated that the community was the main decision-maker on subproject choices for the project. The 2017 impact assessment will attempt to capture data on broader influence over decision-making at the community level. PHINDPDOTBL  Increase in number of community members confident that the BDA/MILF and the government of the Philippines can work together for the benefit of the community (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 10.00 Date 01-Jul-2012 22-Feb-2017 31-Mar-2017 31-Mar-2017 Comments This will be measured in the 2017 independent Impact Assessment. The 2012 Impact Assessment gathered qualitative data that indicated major gains on this indicator. This will be supplemented by quantitative data in the 2017 Assessment. PHINDPDOTBL  The economic internal rate of return for community sub-projects will be at or beyond 12%. (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 12.90 12.90 12.00 Date 03-Apr-2006 22-Feb-2017 31-Mar-2017 31-Mar-2017 Comments The current data comes from the 2009 Assessment. This will be supplemented by additional data from the 2017 assessment. 3/31/2017 Page 4 of 18 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report MULTI DONOR FACILIT Y - PH MINDANAO RECONSTRUCTION & DEVELOPMENT (P095173) PHINDPDOTBL  Direct project beneficiaries (Number, Core) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 506,500.00 682,370.00 550,000.00 Date 01-Jan-2006 22-Feb-2017 29-Mar-2017 31-Mar-2017 Comments This figure could be revised either downwards or upwards after all subprojects are completed and following final data validation as part of project completion reporting. PHINDPDOTBL  Female beneficiaries (Percentage, Core Supplement) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 256,424.00 353,740.00 275,000.00 Overall Comments Three of the seven PDO indicators have data and in all cases the targets have been met or exceeded. Data for the other indicators will be supplied by the ongoing impact assessment. Intermediate Results Indicators PHINDIRITBL  Beneficiaries experiencing greater security in project areas (%) (Percentage, Core) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 5.00 Date 01-Jan-2006 22-Feb-2017 29-Mar-2017 31-Mar-2017 Comments This will be measured in the 2017 independent Impact Assessment. 3/31/2017 Page 5 of 18 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report MULTI DONOR FACILIT Y - PH MINDANAO RECONSTRUCTION & DEVELOPMENT (P095173) PHINDIRITBL  Total beneficiaries - female (number) (Number, Core Supplement) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 256,424.00 353,740.00 275,000.00 PHINDIRITBL  Total beneficiaries - male (number) (Number, Core Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 249,976.00 328,630.00 275,000.00 Date 01-Jan-2006 22-Feb-2017 29-Mar-2017 31-Mar-2017 PHINDIRITBL  Beneficiaries experiencing greater security in project areas – female (number) (Number, Core Supplement) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 13,750.00 PHINDIRITBL  Beneficiaries experiencing greater security in project areas – male (number) (Number, Core Supplement) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 13,760.00 3/31/2017 Page 6 of 18 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report MULTI DONOR FACILIT Y - PH MINDANAO RECONSTRUCTION & DEVELOPMENT (P095173) PHINDIRITBL  Increase in number of community members reporting communications with members of a different group (ethnic, religious or different sub-village) (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 25.00 Date 01-Jul-2012 22-Feb-2017 29-Mar-2017 31-Mar-2017 Comments This will be measured in the 2017 independent Impact Assessment. PHINDIRITBL  Community-wide meetings achieve at least 60% participation of households (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 20.00 Date 01-Jan-2006 31-Mar-2017 31-Mar-2017 31-Mar-2017 Comments This target has not been met and was, in retrospect, set unreasonably high. As the development arm of the MILF, the BDA often encountered resistance from some members of the community. At the same time, the failure to even come close to reaching this target is also indicative of weaknesses in social mobilization on the part of BDA. PHINDIRITBL  Number of community-wide meetings in which at least 50% of participants are women (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 9.62 9.62 80.00 Date 01-Jan-2006 22-Feb-2017 31-Mar-2017 31-Mar-2017 Comments Data seemingly has not been systematically captured on this indicator over the last 18 months, making it impossible to accurately update the figures from 2015. 3/31/2017 Page 7 of 18 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report MULTI DONOR FACILIT Y - PH MINDANAO RECONSTRUCTION & DEVELOPMENT (P095173) PHINDIRITBL  Communities with improved local infrastructure facilities and/or livelihood activities implemented by the project (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 243.00 314.00 277.00 Date 01-Jan-2006 22-Feb-2017 29-Mar-2017 31-Mar-2017 Comments The project was able to reach a much larger number of communities in the MILF Camps and Base Camps over the last 15 months than had initially been expected. PHINDIRITBL  Beneficiaries that feel project investments reflected their needs (percentage) (Percentage, Core) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 86.00 86.00 60.00 Date 01-Jan-2006 22-Feb-2017 29-Mar-2017 31-Mar-2017 Comments This figure is from the 2012 Impact Assessment and will be updated during the 2017 assessment. PHINDIRITBL  Beneficiaries that feel project inv. reflected their needs - female (number) (Number, Core Supplement) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 220,524.00 304,216.00 134,054.00 3/31/2017 Page 8 of 18 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report MULTI DONOR FACILIT Y - PH MINDANAO RECONSTRUCTION & DEVELOPMENT (P095173) PHINDIRITBL  Total beneficiaries - female (number) (Number, Core Supplement) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 256,424.00 353,740.00 223,424.00 PHINDIRITBL  Total beneficiaries - male (number) (Number, Core Supplement) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 250,076.00 328,630.00 213,584.00 PHINDIRITBL  Beneficiaries that feel project inv. reflected their needs - male (number) (Number, Core Supplement) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 215,065.00 282,622.00 128,150.00 PHINDIRITBL  Communities with sub-project investments that match one of top three identified priorities (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 100.00 100.00 30.00 Date 01-Jan-2006 22-Feb-2017 29-Mar-2017 31-Mar-2017 Comments This figure is from the 2012 Impact Assessment. Data will be supplemented by the 2017 assessment. 3/31/2017 Page 9 of 18 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report MULTI DONOR FACILIT Y - PH MINDANAO RECONSTRUCTION & DEVELOPMENT (P095173) PHINDIRITBL  Number of people's organization members who are women (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 45.74 45.74 40.00 Date 01-Oct-2006 22-Feb-2017 29-Mar-2017 31-Mar-2017 PHINDIRITBL  Number of people's organizations with female officers (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 92.00 92.00 92.00 Date 01-Jan-2006 22-Feb-2017 29-Mar-2017 31-Mar-2017 PHINDIRITBL  Community members who reported participation in a collective effort and also reported improved well being (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 38.00 38.00 30.00 Date 01-Jan-2006 31-Mar-2017 29-Mar-2017 31-Mar-2017 Comments This data is from the 2012 assessment and will be updated in the 2017 assessment. PHINDIRITBL  Number of project-facilitated meetings conducted without incidents of conflict (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 621.00 621.00 454.00 Date 01-Oct-2006 22-Feb-2017 29-Mar-2017 31-Mar-2017 3/31/2017 Page 10 of 18 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report MULTI DONOR FACILIT Y - PH MINDANAO RECONSTRUCTION & DEVELOPMENT (P095173) PHINDIRITBL  Local communities, poeple's organizations and local government units perceive BDA to be a credible development partner (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 67.00 67.00 75.00 Date 01-Jan-2006 22-Feb-2017 29-Mar-2017 31-Mar-2017 Comments This data is from the 2012 assessment and will be updated in the 2017 assessment. PHINDIRITBL  Number of BDA and Sajahatra Bangsamoro Project Management Team staff participating in capacity-building sessions (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 378.00 378.00 377.00 Date 01-Jan-2007 22-Feb-2017 29-Mar-2017 31-Mar-2017 PHINDIRITBL  Program partnerships forged by BDA with other organizations (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 13.00 17.00 15.00 Date 01-Jan-2006 22-Feb-2017 29-Mar-2017 31-Mar-2017 Comments This covers organizations with whom the BDA has forged financial and/or technical cooperation after the MTF, as an indication of institutional maturity, as the MTF was for many years the only donor that was prepared to work with the BDA. Partnerships have been established with the following organizations: 1 . JICA 2 . WFP 3 . UNICEF 4 . IOM 5 . Japanese Embassy 6 . Turkish NGO – IHH 7 . Turkish NGO - TDV 8 . ADB 9 . Mindanao Development Authority 10 . Autonomous Region in Muslim Mindanao 3/31/2017 Page 11 of 18 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report MULTI DONOR FACILIT Y - PH MINDANAO RECONSTRUCTION & DEVELOPMENT (P095173) 11 . Australian Embassy 12 . EU 13 . UNFPA 14 . UNDP 15 . Asia Foundation 16 . UNHCR 17 . Smart Communications PHINDIRITBL  Percentage of sub-projects with adequate workmanship (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 75.00 76.00 80.00 Date 01-Jan-2006 22-Feb-2017 29-Mar-2017 31-Mar-2017 Comments This figure could be revised upwards by project closure if remaining technical work is properly undertaken. PHINDIRITBL  Regular monthly and quarterly reports delivered on time by BDA (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 5.00 5.00 10.00 Date 01-Jan-2006 22-Feb-2017 30-Mar-2017 31-Mar-2017 PHINDIRITBL  Grievances registered related to delivery of project benefits addressed (%) (Percentage, Core) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 95.20 95.20 100.00 Date 01-Jan-2006 22-Feb-2017 29-Mar-2017 31-Mar-2017 3/31/2017 Page 12 of 18 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report MULTI DONOR FACILIT Y - PH MINDANAO RECONSTRUCTION & DEVELOPMENT (P095173) PHINDIRITBL  Grievances related to delivery of project benefits that are addressed (number) (Number, Core Supplement) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 21.00 21.00 30.00 PHINDIRITBL  Training sessions provided to people's organizations (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 2,414.00 2,444.00 2,172.00 Date 01-Jan-2006 22-Feb-2017 29-Mar-2017 31-Mar-2017 Comments Training includes financial management, procurement, values transformation, project monitoring, operations and maintenance, benefit- sharing, etc. Training has been a mix of classroom and exp PHINDIRITBL  Number of PO members trained in training sessions (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 5,717.00 5,717.00 5,033.00 Date 01-Jan-2006 22-Feb-2017 29-Mar-2017 31-Mar-2017 Comments This figure will be further validated during preparation of the completion reports. 3/31/2017 Page 13 of 18 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report MULTI DONOR FACILIT Y - PH MINDANAO RECONSTRUCTION & DEVELOPMENT (P095173) PHINDIRITBL  Community members perceiving people's organizations as a functional organization (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 84.70 84.70 50.00 Date 01-Jan-2006 22-Feb-2017 29-Mar-2017 31-Mar-2017 Comments This data is from the 2012 assessment and will be updated in the 2017 assessment. PHINDIRITBL  Bangsamoro Development Plan delivered with at least five community consultations (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 1.00 1.00 1.00 Date 14-Nov-2013 22-Feb-2017 29-Mar-2017 31-Mar-2017 PHINDIRITBL  Number of people receiving entrepreneurship training and support (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 1,178.00 1,178.00 805.00 Date 11-Dec-2012 30-Dec-2016 30-Dec-2016 30-Dec-2016 PHINDIRITBL  Increase in income for those who start a new enterprise (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 25.00 25.00 50.00 Date 11-Dec-2012 30-Dec-2016 30-Dec-2016 30-Dec-2016 Comments This data comes from BDA reporting but possibly only includes active members, as opposed to those who are either inactive or less active. The data will be updated following receipt of the ILO completion report and an independent impact assessment. 3/31/2017 Page 14 of 18 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report MULTI DONOR FACILIT Y - PH MINDANAO RECONSTRUCTION & DEVELOPMENT (P095173) PHINDIRITBL  Number of people who receive employment skills training (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 60.00 Date 11-Dec-2012 30-Dec-2016 30-Dec-2016 30-Dec-2016 Comments Given major issues the project faced with the community enterprise groups, it was decided to drop the wage employment activities and focus on trying to enhance the sustainability prospects of the 42 enterprise groups in the 11 target villages. PHINDIRITBL  Percentage of those who receive employment skills training who secure wage employment (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 70.00 Date 11-Dec-2012 30-Dec-2016 30-Dec-2016 30-Dec-2016 Comments Given major issues the project faced with the community enterprise groups, it was decided to drop the wage employment activities and focus on trying to enhance the sustainability prospects of the 42 enterprise groups in the 11 target villages. 3/31/2017 Page 15 of 18 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report MULTI DONOR FACILIT Y - PH MINDANAO RECONSTRUCTION & DEVELOPMENT (P095173) PHINDIRITBL  Increase in income for those who secure wage employment (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 50.00 Date 11-Dec-2012 30-Dec-2016 30-Dec-2016 30-Dec-2016 Comments Given major issues the project faced with the community enterprise groups, it was decided to drop the wage employment activities and focus on trying to enhance the sustainability prospects of the 42 enterprise groups in the 11 target villages. PHINDIRITBL  Number of common facilities constructed and being used by the community (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 8.00 8.00 11.00 Date 11-Dec-2012 30-Dec-2016 30-Dec-2016 30-Dec-2016 Overall Comments Data on Financial Performance Disbursements (by loan) Project Loan/Credit/TF Status Currency Original Revised Cancelled Disbursed Undisbursed Disbursed P095173 TF-13118 Closed USD 2.43 2.43 0.00 2.43 0.00 100% P095173 TF-56041 Closed USD 1.41 1.40 0.00 1.40 0.00 100% P095173 TF-57067 Closed USD 0.60 0.56 0.04 0.56 0.00 100% P095173 TF-90481 Closed USD 1.14 0.76 0.39 0.65 0.00 85% P095173 TF-91794 Closed USD 0.61 0.60 0.00 0.60 0.00 100% 3/31/2017 Page 16 of 18 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report MULTI DONOR FACILIT Y - PH MINDANAO RECONSTRUCTION & DEVELOPMENT (P095173) P095173 TF-93781 -- USD 10.01 10.01 0.00 8.51 1.50 85% P095173 TF-95308 Closed USD 1.15 1.12 0.03 1.13 0.00 101% P095173 TF-95941 -- USD 9.22 9.22 0.00 9.09 0.13 99% Key Dates (by loan) Project Loan/Credit/TF Status Approval Date Signing Date Effectiveness Date Orig. Closing Date Rev. Closing Date P095173 TF-13118 Closed 03-Dec-2012 03-Dec-2012 03-Dec-2012 31-Dec-2015 31-Dec-2016 P095173 TF-56041 Closed 29-Dec-2005 29-Dec-2005 30-Mar-2006 31-Dec-2010 31-Dec-2010 P095173 TF-57067 Closed 20-Sep-2006 20-Sep-2006 20-Sep-2006 28-Feb-2010 28-Feb-2010 P095173 TF-90481 Closed 29-Jun-2007 29-Jun-2007 29-Jun-2007 18-Oct-2007 18-Oct-2007 P095173 TF-91794 Closed 21-Apr-2008 21-Apr-2008 21-Apr-2008 29-Oct-2010 31-Oct-2011 P095173 TF-93781 -- 09-Mar-2009 17-Mar-2009 17-Mar-2009 30-Jun-2010 31-Mar-2017 P095173 TF-95308 Closed 26-Oct-2009 18-Nov-2009 18-Nov-2009 30-Sep-2012 30-Jun-2013 P095173 TF-95941 -- 08-Jan-2010 13-Jan-2010 13-Jan-2010 30-Jun-2010 31-Mar-2017 Cumulative Disbursements Restructuring History 3/31/2017 Page 17 of 18 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report MULTI DONOR FACILIT Y - PH MINDANAO RECONSTRUCTION & DEVELOPMENT (P095173) Level Approved on 30-Jun-2011 ,Level Approved on 16-Aug-2012 ,Level Approved on 28-Sep-2012 ,Level 2 Approved on 08-Feb-2017 Related Project(s) P132238-Multi Donor Facility - PH Mindanao Reconstruction & Development ,P147008-Multi Donor Facility - PH Mindanao Reconstruction & Development ,P157966-Multi Donor Facility - PH Mindanao Reconstruction & Development 3/31/2017 Page 18 of 18 Public Disclosure Copy