Procurement Plan I. General 1. Bank’s approval Date of the procurement Plan Original: August 19, 2016; Updated Procurement Plan, April 2017 2. Date of General Procurement Notice: Dec 24, 2015 3. Period covered by this procurement plan: The procurement period of project covered from August 2016 – December 2017 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Procurement Method Prior Review Threshold Comments US$ 1. ICB Goods and Non-Consulting Above or equal to US$ All Services 2,000,000 2. NCB - Goods and Non-Consulting Below US$ 2,000,000 None Services 3. Shopping - Goods and Non-Consulting Below US$ 100,000 None Services 4. ICB (Works) Above US$ 10 million All 5. NCB (Works) Below US$ 10 million None 6. Shopping – (Works) Below US$ 100,000 None 2. Prequalification. Bidders for shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: 4. Reference to (if any) Project Operational/Procurement Manual: N/A at this stage 5. Any Other Special Procurement Arrangements: 5 ICB works packages are eligible to be financed under retroactive financing 6. Summary of the Procurement Packages planned during the first 18 months after project effectiveness ( including those that are subject to retroactive financing and advanced procurement) 1 2 3 4 5 6 7 Ref. Description Estimated Packages Domest Review Comments No. Cost ic by Bank US$ Prefere (Prior / Post) million nce (yes/no) Summary of 128.1 8 No Prior the ICB (Works) Summary of 1.8 1 No Prior the ICB (Goods) Summary of 19 3 No Post the NCB (Works) Summary of 4.8 1 No Prior the ICB (Non- Consultant Services) Summary of 0.27 1 No Post the Shopping (Goods) III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Threshold Comments 1. Competitive Methods (Firms) QCBS Above US$ 1,000,000 All 1. Competitive Methods (Firms) QCBS ≥ 300,000 - < 1,000,000 None 1. Competitive Methods (Firms) Below US$ 300,000 None CQS/FBS/LCS 2. Single Source (Firms) All All 3. Individual Above or equal to US$ All 200,000 4. Individual Below US$ 200,000 None 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $ 300,000 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 7. 3. Any Other Special Selection Arrangements: 5 QCBS works packages are eligible to be financed under retroactive financing 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Ref. No. Description of Estimated Packages Review Comments Assignment Cost by Bank US$ (Prior / million Post) Summary of 38.1 13 Prior number of contracts that will be let under QCBS Summary of 0.93 3 Prior CQS number of contracts that will be let under other methods Summary of 4.4 7 Prior number of contracts that will be let under ICS PROCUREMENT Angola : Second Water Sector Institutional Development Project PLAN General Information Country: Angola Bank’s Approval Date of the Original Procurement Plan: 2016-08-10 2020-01-20 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P151224 GPN Date: 2017-08-07 Project Name: Second Water Sector Institutional Development Project Loan / Credit No: IBRD / 87020, / , COFN / C1560 Executing Agency(ies): National Directorate of Water WORKS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 1W3/MALANJE/DNA/16 / Rehabilitation and Design and construction of Open - Single Stage - One IBRD / 87020 Expansion of Water Supply Prior Request for Bids 13,800,000.00 8,096,602.85 Signed 2016-09-07 2017-03-04 2017-05-27 2017-06-26 2017-02-27 2021-02-25 network and home International Envelope Production and Distribution connections in Malanje 2W3/DUNDO/DNA/16 / Rehabilitation and Design and construction of Open - Single Stage - One IBRD / 87020 Expansion of Water Supply Prior Request for Bids 16,050,000.00 12,836,980.85 Signed 2016-09-27 2016-10-02 2017-02-27 2017-03-29 2017-05-04 2021-05-03 network and home International Envelope Production and Distribution connections in Dundo 3W3/HUAMBO/DNA/16 / Design and construction of Rehabilitation and Open - Single Stage - One network and home IBRD / 87020 Expansion of Water Supply Prior Request for Bids 23,000,000.00 12,859,401.26 Signed 2016-10-12 2016-10-23 2017-02-19 2017-03-21 2017-05-10 2020-12-10 International Envelope connection for peri-urban Production and Distribution areas in Huambo 4W3/LUENA/DNA/16 / Rehabilitation and Design and construction of Open - Single Stage - One IBRD / 87020 Expansion of Water Supply Prior Request for Bids 17,250,000.00 9,849,128.19 Signed 2016-10-15 2017-05-25 2017-09-20 2017-10-20 2017-05-15 2021-05-14 network and home International Envelope Production and Distribution connections in Luena 5W3/UIGE/DNA/16 / Design Rehabilitation and and construction of network Open - Single Stage - One IBRD / 87020 Expansion of Water Supply Prior Request for Bids 11,500,000.00 10,368,081.40 Signed 2016-11-14 2016-11-19 2017-03-01 2017-03-31 2017-05-19 2021-05-18 and home connections in International Envelope Production and Distribution Uige 7W3/KUITO/DNA/16 / Rehabilitation and Design and construction of Single Stage - One IBRD / 87020 Expansion of Water Supply Post Request for Bids Open - National 5,000,000.00 4,071,186.08 Signed 2017-01-16 2017-01-21 2017-03-21 2017-04-20 2017-05-31 2020-06-01 network and home Envelope Production and Distribution connections in Kuito 9W3/NDALATANDO/DNA/16 / Design and construction for Rehabilitation and refurbishment of the WTW, Open - Single Stage - One / Expansion of Water Supply Prior Request for Bids 10,500,000.00 0.00 Canceled 2017-05-11 2017-05-16 2017-07-17 2017-08-16 2017-09-28 2020-09-28 construction of distribution International Envelope Production and Distribution centers and 1.6 km trunk mains for Ndalatando 33W3-B/HUAMBO/DAS/17 / Rehabilitation and Construction of Network and IBRD / 87020 Expansion of Water Supply Prior Direct Selection Direct 5,757,583.00 5,827,776.58 Signed 2017-05-19 2017-05-24 2017-06-28 2019-02-18 Home Connections for the Production and Distribution City of Huambo-Lot 2 13W3/KUITO/DNA/17 / Rehabilitation and Supply and installation of IBRD / 87020 Expansion of Water Supply Post Direct Selection Direct 400,000.00 0.00 Canceled 2017-09-01 2017-09-06 2017-10-11 2018-04-09 valves and fittings for Kuito Production and Distribution Water Supply System Page 1 12W3/NDALATANDO/DNA/17 / Supply and installation of Rehabilitation and Single Stage - One bulk meters and valves for IBRD / 87020 Expansion of Water Supply Post Request for Bids Open - National 400,000.00 0.00 Canceled 2017-09-12 2017-09-17 2017-10-29 2017-11-28 2018-01-02 2018-07-01 Envelope Ndalatando water supply Production and Distribution system 6W3-R/DAS/17 / Repairs to Rehabilitation and the Network and Home Single Stage - One IBRD / 87020 Expansion of Water Supply Post Request for Bids Open - National 770,000.00 1,619,865.27 Signed 2018-10-22 2018-10-27 2018-12-08 2019-01-07 2019-02-11 2019-08-10 Connections in the City of Envelope Production and Distribution Ndalatando 8W3/NDALATANDO/DNA/16 / Design and construction of a new water source, WTW, Rehabilitation and Open - Single Stage - One pumping station, raw water IBRD / 87020 Expansion of Water Supply Prior Request for Bids 30,000,000.00 0.00 Canceled 2018-05-28 2018-08-09 2018-08-12 2018-06-15 2018-09-03 2018-10-03 2018-11-26 2023-06-26 International Envelope pipeline, distribution centers Production and Distribution and trunk mains for Ndalatando 9W3/LUBANGO/DNA/18 / Rehabilitation and Construction of Water Single Stage - One IBRD / 87020 Expansion of Water Supply Post Request for Bids Open - National 700,000.00 1,795,215.05 Signed 2018-09-06 2018-09-11 2018-10-23 2018-11-22 2018-12-27 2019-06-25 Production Boreholes in Envelope Production and Distribution Lubango 8W3A/NDALATANDO/DNA/18 / Design and construction of a new water source, WTW, Rehabilitation and Under Request for Open - pumping station, raw water IBRD / 87020 Expansion of Water Supply Prior Multi Stage 50,000,000.00 0.00 Implementati 2018-07-10 2018-10-05 2018-10-05 2018-07-25 2018-12-24 2019-04-22 2019-05-27 2020-11-17 Proposals International pipeline, distribution centers Production and Distribution on and trunk mains for Ndalatando 10W3/LUBANGO/DNA/16 / Rehabilitation and Open - Single Stage - One Design and Construction of IBRD / 87020 Expansion of Water Supply Prior Request for Bids 11,121,500.00 4,134,900.98 Signed 2018-12-12 2018-12-17 2019-03-07 2019-04-06 2019-05-11 2021-04-30 International Envelope reservoirs in Lubango Production and Distribution 45W3/MALANJE/DNA/18 / Rehabilitation and Single Stage - One Repair works to connections IBRD / 87020 Expansion of Water Supply Post Request for Bids Open - National 2,500,000.00 0.00 Canceled 2018-10-31 2018-11-05 2019-01-14 2019-02-13 2019-03-20 2020-03-14 Envelope in Malanje Production and Distribution 46W3/CUITO/DNA/18 / Rehabilitation and Pending Design and Construction of Single Stage - One COFN / C1560 Expansion of Water Supply Post Request for Bids Open - National 3,500,000.00 0.00 Implementati 2020-06-29 2020-07-04 2020-08-15 2020-09-14 2020-10-19 2022-04-12 Network and Household Envelope Production and Distribution on Connections in Cuito-Phase 2 44W3/LUBANGO/DNA/18 / Rehabilitation and Pending Design and Construction of Single Stage - One COFN / C1560 Expansion of Water Supply Post Request for Bids Open - National 3,500,000.00 0.00 Implementati 2020-04-16 2020-04-21 2020-06-02 2020-07-02 2020-08-06 2022-01-28 Network and Household Envelope Production and Distribution on Connections in Lubango 6W3/NAMIBE/DNA/16 / Rehabilitation and Under Design and construction of Open - Single Stage - One COFN / C1560 Expansion of Water Supply Post Request for Bids 9,000,000.00 0.00 Implementati 2019-05-23 2019-05-28 2019-09-10 2019-10-10 2019-11-16 2023-11-10 network and home International Envelope Production and Distribution on connections in Namibe 11W3/LUBANGO/DNA/16 / Rehabilitation and Pending Single Stage - One Design and construction of COFN / C1560 Expansion of Water Supply Post Request for Bids Open - National 8,000,000.00 0.00 Implementati 2020-10-30 2020-11-04 2020-12-16 2021-01-15 2021-02-19 2022-02-19 Envelope boreholes in Lubango Production and Distribution on 74W3/UIGE/19 / Design and construction of a new Rehabilitation and Under water source, WTW, Request for Open - COFN / C1560 Expansion of Water Supply Prior Multi Stage 35,000,000.00 0.00 Implementati 2019-07-25 2019-10-20 2019-10-20 2019-08-09 2020-01-08 2020-05-06 2020-06-10 2023-05-26 pumping station, raw water Proposals International Production and Distribution on pipeline, distribution centers and trunk mains for Uige GOODS Page 2 Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 4G4/DNA/16 / Implementation of a Management and Request for Single Stage - One Financial Management / Post Limited 70,000.00 0.00 Canceled 2017-08-08 2017-10-03 2018-04-01 Engineering Support Quotations Envelope System (Primavera software) 47G1/CITIES/DNA/18 / Water Supply Institutional Single Stage - One Water meters, pipes valves IBRD / 87020 Strengthening and Capacity Prior Request for Bids Open - National 800,000.00 2,844,379.74 Signed 2018-07-20 2018-07-25 2018-09-05 2018-10-05 2018-11-09 2019-05-08 Envelope and fittings for six cities Development 53G1/CITIES/DNA/18 / Water Supply Institutional Workstations and printers Single Stage - One IBRD / 87020 Strengthening and Capacity Post Request for Bids Open - National 300,000.00 370,492.32 Signed 2018-05-30 2018-06-04 2018-07-19 2018-08-18 2018-09-22 2019-03-21 for Utilities in Huila, Envelope Development Malanje and Cuanza Norte 2G4/DNA/16 / Computers Rehabilitation and Request for Single Stage - One and IT equipment for the IBRD / 87020 Expansion of Water Supply Post Limited 100,000.00 97,808.86 Signed 2019-02-17 2019-04-14 2019-10-11 Quotations Envelope Project Production and Distribution 3G4/DNA/16 / Furniture Management and Request for Single Stage - One IBRD / 87020 Post Limited 100,000.00 63,269.83 Signed 2019-03-05 2019-04-30 2019-10-27 shopping Engineering Support Quotations Envelope 71G3/UIGE/DNA/18 / Power Rehabilitation and Pending Request for Single Stage - One Transformer for Uige Water IBRD / 87020 Expansion of Water Supply Post Limited 50,000.00 0.00 Implementati 2019-01-28 2019-03-25 2019-09-21 Quotations Envelope Supply System Production and Distribution on 70CS2/INRH/18 / Purchase and installation of 15 remote Pending satellite communication Water Resource Single Stage - One COFN / C1560 Post Request for Bids Open - National 750,000.00 0.00 Implementati 2020-05-13 2020-05-18 2020-06-29 2020-07-29 2020-09-02 2021-03-01 equipment and Management Envelope on meteorological sensors for hydrometric stations 1G4/DNA/16 / Education Water Supply Institutional Pending Open - Single Stage - One and laboratory equipment for COFN / C1560 Strengthening and Capacity Post Request for Bids 1,800,000.00 0.00 Implementati 2020-09-01 2020-09-06 2020-10-18 2020-11-17 2021-01-15 2022-01-15 International Envelope Onga Zanga training center Development on 48/G1/CITIES/DNA/18 / Water Supply Institutional Single Stage - One Workshop and maintenance IBRD / 87020 Strengthening and Capacity Post Request for Bids Open - National 250,000.00 0.00 Canceled 2018-06-20 2018-06-25 2018-08-06 2018-09-05 2018-10-10 2019-04-08 Envelope equipment Development NON CONSULTING SERVICES Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 56NC1/UIGE/DNA/18 / Water Supply Institutional Under Open - Single Stage - Two Management Support IBRD / 87020 Strengthening and Capacity Prior Request for Bids 4,500,000.00 0.00 Implementati 2018-06-01 2018-08-17 2018-08-17 2018-06-06 2018-10-26 2019-01-08 2019-02-12 2022-02-11 International Envelope Services Contract for Uige Development on 11CS1/DAS/18 / Operation Water Supply Institutional and Management of Kuito IBRD / 87020 Strengthening and Capacity Prior Direct Selection Direct 1,135,505.42 1,209,504.20 Signed 2018-06-06 2018-06-11 2018-07-01 2018-12-28 and Kunje Water Supply Development System 93CS1/DAS/18 / Operation Water Supply Institutional and Management of Huambo IBRD / 87020 Strengthening and Capacity Prior Direct Selection Direct 1,091,728.00 1,470,480.00 Signed 2018-06-06 2018-06-11 2018-07-01 2018-12-28 Water Supply System Development Page 3 20CS1/DAS/18 / Operation Water Supply Institutional and Management of Malanje IBRD / 87020 Strengthening and Capacity Prior Direct Selection Direct 835,532.08 1,019,169.96 Signed 2018-06-06 2018-06-11 2018-07-01 2018-12-28 Water Supply System Development 94CS1/DAS/18 / Operation Water Supply Institutional and Management of Uige IBRD / 87020 Strengthening and Capacity Prior Direct Selection Direct 934,905.00 1,202,407.00 Signed 2018-06-06 2018-06-11 2018-07-01 2018-12-28 Water Supply System Development 59CS1/DAS/15 / Operation Water Supply Institutional and Management of Lubango IBRD / 87020 Strengthening and Capacity Prior Direct Selection Direct 2,235,904.99 2,200,875.50 Signed 2018-06-06 2018-06-11 2018-07-01 2018-12-28 Water Supply System Development 95CS1/DAS/18 / Operation Water Supply Institutional and Management of IBRD / 87020 Strengthening and Capacity Post Direct Selection Direct 782,000.00 1,180,071.55 Signed 2018-08-20 2018-08-25 2018-09-14 2019-03-13 N´dalatando Water Supply Development System 58NC1/NDALATANDO/DNA/1 Water Supply Institutional Under 8 / Management Support Open - Single Stage - Two COFN / C1560 Strengthening and Capacity Prior Request for Bids 6,000,000.00 0.00 Implementati 2019-05-02 2019-05-07 2019-06-18 2019-08-31 2019-10-05 2024-09-08 Services Contract for International Envelope Development on Ndalatando 1NC1/LUENA/DNA/16 / Water Supply Institutional Open - Single Stage - Two Management Contract for COFN / C1560 Strengthening and Capacity Post Request for Bids 800,000.00 938,762.16 Signed 2019-07-24 2019-07-29 2019-09-30 2019-12-13 2020-01-17 2023-02-14 International Envelope Luena Development 54NC1/CUITO/DNA/18 / Water Supply Institutional Under Open - Single Stage - Two Management Support COFN / C1560 Strengthening and Capacity Prior Request for Bids 6,000,000.00 0.00 Implementati 2019-05-06 2019-05-11 2019-06-22 2019-09-04 2019-10-09 2024-09-12 International Envelope Services Contract for Cuito Development on 55NC1/HUAMBO/DNA/18 / Water Supply Institutional Under Management Support Open - Single Stage - Two COFN / C1560 Strengthening and Capacity Prior Request for Bids 6,000,000.00 0.00 Implementati 2019-05-13 2019-05-18 2019-06-29 2019-09-11 2019-10-16 2024-09-19 Services Contract for International Envelope Development on Huambo 57NC1/MALANJE/DNA/18 / Water Supply Institutional Under Management Support Open - Single Stage - Two COFN / C1560 Strengthening and Capacity Prior Request for Bids 6,000,000.00 0.00 Implementati 2019-05-17 2019-05-22 2019-07-03 2019-09-15 2019-10-20 2020-04-17 Services Contract for International Envelope Development on Malanje 73NC1/LUBANGO/18 / Water Supply Institutional Management Support Open - Single Stage - Two COFN / C1560 Strengthening and Capacity Prior Request for Bids 6,000,000.00 0.00 Canceled 2019-06-03 2019-06-08 2019-07-20 2019-10-02 2019-11-06 2024-10-10 Services Contract for International Envelope Development Lubango 78NC1/HUILA/19 / Water Supply Institutional Under Management Support Open - Single Stage - Two COFN / C1560 Strengthening and Capacity Prior Request for Bids 6,000,000.00 0.00 Implementati 2019-08-05 2019-08-10 2019-09-21 2019-12-04 2020-01-08 2024-12-12 Services Contract for Huíla International Envelope Development on Province CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Market Contract Type Estimated Actual Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 1CS3/DNA/16 / Design checking and works Rehabilitation and Quality And Cost- Open - Supervision of Network and IBRD / 87020 Expansion of Water Supply Prior 3,000,000.00 1,934,914.78 Signed 2016-08-16 2016-09-06 2016-10-20 2016-11-17 2016-12-17 2017-01-21 2017-02-25 2020-09-25 Based Selection International Home Connections for Production and Distribution Peirurban areas of Malanje Page 4 2CS3/DNA/16 / Design Rehabilitation and checking and works Quality And Cost- Open - IBRD / 87020 Expansion of Water Supply Prior 3,200,000.00 2,328,726.00 Signed 2016-08-16 2016-10-03 2016-11-10 2017-01-24 2017-02-23 2017-03-30 2017-05-04 2021-06-04 Supervision of Network and Based Selection International Production and Distribution Home Connections for Dundo 3CS3/DNA/16 / Design checking and works Rehabilitation and Quality And Cost- Open - Supervision of Network and IBRD / 87020 Expansion of Water Supply Prior 3,000,000.00 2,081,534.79 Signed 2016-08-17 2016-10-04 2016-11-10 2017-01-30 2017-03-01 2017-04-05 2017-05-10 2020-12-10 Based Selection International Home Connections for Production and Distribution Huambo (1st phase) 4CS3/DNA/16 / Design Rehabilitation and checking and works Quality And Cost- Open - IBRD / 87020 Expansion of Water Supply Prior 3,000,000.00 1,680,971.28 Signed 2016-08-18 2016-10-05 2016-11-18 2017-02-02 2017-03-04 2017-04-08 2017-05-13 2020-12-14 Supervision of Network and Based Selection International Production and Distribution Home Connections for Luena 5CS3/DNA/16 / Design Rehabilitation and checking and works Quality And Cost- Open - IBRD / 87020 Expansion of Water Supply Prior 2,700,000.00 2,194,207.00 Signed 2016-08-19 2016-10-06 2016-11-19 2017-02-08 2017-03-10 2017-04-14 2017-05-19 2020-12-21 Supervision of Network and Based Selection International Production and Distribution Home Connections for Uige 6CS3/DNA/16 / Design checking and works Rehabilitation and Quality And Cost- Open - Supervision of Network and IBRD / 87020 Expansion of Water Supply Prior 2,900,000.00 2,060,259.00 Signed 2016-08-20 2016-10-07 2016-11-20 2017-02-14 2017-03-16 2017-04-20 2017-05-25 2020-12-25 Based Selection International Home Connections for Production and Distribution Namibe 7CS3/DNA/16 / Design checking and works Rehabilitation and Quality And Cost- Open - Supervision of Network and IBRD / 87020 Expansion of Water Supply Prior 2,400,000.00 994,220.00 Signed 2016-08-21 2016-10-08 2016-11-21 2017-02-20 2017-03-22 2017-04-26 2017-05-31 2020-12-28 Based Selection International Home Connections for Kuito Production and Distribution (1st phase) 8CS3/NDALATANDO/DNA/16 / Design checking and works Rehabilitation and supervision for the Quality And Cost- Open - Under COFN / C1560 Expansion of Water Supply Prior 3,300,000.00 0.00 2017-02-01 2017-02-22 2017-04-07 2017-06-05 2017-07-05 2017-08-09 2017-09-13 2020-09-14 construction of a new water Based Selection International Implementation Production and Distribution source and pipeline in Ndalatando 10CS3/LUBANGO/DNA/16 / Rehabilitation and Design checking and works Quality And Cost- Open - IBRD / 87020 Expansion of Water Supply Prior 1,500,000.00 736,287.70 Signed 2017-03-03 2017-05-18 2017-07-01 2017-08-28 2017-09-27 2017-11-01 2017-12-06 2020-12-07 Supervision of Construction Based Selection International Production and Distribution of reservoirs in Lubango 12CS2/INRH/DNA/16 / TA to develop Integrated Basin Water Resource Quality And Cost- Open - / Prior 2,200,000.00 0.00 Canceled 2017-09-01 2017-11-03 2017-12-17 2018-03-05 2018-04-04 2018-05-09 2018-06-13 2019-06-13 Management Plan for River Management Based Selection International Basins in Benguela 13CS2/INRH/DNA/16 / TA to develop Integrated Basin Water Resource Quality And Cost- Open - / Prior 2,200,000.00 0.00 Canceled 2017-02-03 2017-04-24 2017-06-07 2017-08-06 2017-09-05 2017-10-10 2017-11-14 2018-11-14 Management Plan for Keve Management Based Selection International e Longa Basins 14CS4/NAMIBE/DNA/16 / Management and Quality And Cost- Open - Salt water intrusion study / Post 500,000.00 0.00 Canceled 2017-06-01 2017-08-01 2017-09-14 2017-11-12 2017-12-12 2018-01-16 2018-09-20 2019-09-20 Engineering Support Based Selection International at Namibe 15CS1/IRSEA/DNA/16 / TA Water Supply Institutional Quality And Cost- Open - Water and Electricity IBRD / 87020 Strengthening and Capacity Prior 6,300,000.00 4,058,664.03 Signed 2017-02-08 2017-04-27 2017-06-10 2017-08-09 2017-09-08 2017-10-13 2017-11-17 2020-12-17 Based Selection International Regulator (IRSEA) Development 16CS1/DNA/17 / External Management and Least Cost Open - IBRD / 87020 Post 130,000.00 64,705.88 Signed 2017-04-17 2017-05-08 2017-05-10 2017-06-07 2017-07-07 2017-08-11 2017-09-15 2021-09-14 Audit Engineering Support Selection International Page 5 35CS4/DNA/17 / Project Management and Least Cost Open - IBRD / 87020 Post 250,000.00 171,122.99 Signed 2017-10-18 2017-11-08 2017-12-22 2018-01-19 2018-02-18 2018-03-25 2018-04-29 2021-04-13 Internal Audit Engineering Support Selection International 39CS1/DNA/17 / AUDIT OF FINANCIAL STATEMENTS Water Supply Institutional Least Cost Open - FOR SIX BENEFICIARY IBRD / 87020 Strengthening and Capacity Post 200,000.00 197,326.20 Signed 2018-01-24 2018-02-14 2018-04-06 2018-05-04 2018-06-03 2018-07-08 2018-08-12 2021-09-10 Selection International WATER SUPPLY AND Development SANITATION UTILITIES 42CS2/TA/INRH/17 / Technical Assistance to Water Resource Quality And Cost- Open - IBRD / 87020 Prior 3,000,000.00 1,904,569.06 Signed 2018-03-30 2018-04-20 2018-06-03 2018-07-01 2018-07-31 2018-09-04 2018-10-09 2021-10-08 INRH (National Water Management Based Selection International Resources Institute) 49CS3/UIGE/DNA/18 / Rehabilitation and Environmental and Social Quality And Cost- IBRD / 87020 Expansion of Water Supply Post Open - National 200,000.00 117,948.37 Signed 2018-07-03 2018-07-24 2018-09-06 2018-10-04 2018-11-03 2018-12-08 2019-01-12 2020-01-12 Impact Assessment for Uige Based Selection Production and Distribution Water Supply System 60CS1/DNA/18 / Review of Water Supply Institutional the Legal and Institutional Quality And Cost- Open - IBRD / 87020 Strengthening and Capacity Prior 663,000.00 540,132.05 Signed 2018-05-16 2018-06-06 2018-07-20 2018-08-17 2018-09-16 2018-10-21 2018-11-25 2019-08-22 Frameworks of the Angola Based Selection International Development Water Sector 65CS1/IRSEA/18 / Water Supply Institutional Quality And Cost- Open - Under Consultancy for beneficiary IBRD / 87020 Strengthening and Capacity Post 600,000.00 0.00 2019-04-25 2019-05-16 2019-06-29 2019-07-27 2019-08-26 2019-09-30 2019-11-04 2020-11-03 Based Selection International Implementation assessment Development 66CS1/IRSEA/18 / Consultancy for the design Water Supply Institutional Quality And Cost- Under and implementation of an IBRD / 87020 Strengthening and Capacity Post Open - National 150,000.00 0.00 2019-04-17 2019-05-08 2019-06-21 2019-07-19 2019-08-18 2019-09-22 2019-10-27 2020-04-24 Based Selection Implementation information management Development system 67CS2/INRH/18 / Development of National Water Resource Quality And Cost- Pending IBRD / 87020 Post Open - National 150,000.00 0.00 2019-05-29 2019-06-19 2019-08-02 2019-08-30 2019-09-29 2019-11-03 2019-12-08 2020-06-05 Water Resources Information Management Based Selection Implementation and Use System 9CS3/NDALATANDO/DNA/16 / Design checking and works supervision for the Rehabilitation and Quality And Cost- Open - refurbishment of the / Expansion of Water Supply Prior 2,400,000.00 0.00 Canceled 2017-02-16 2017-03-09 2017-04-22 2017-06-20 2017-07-20 2017-08-24 2017-09-28 2020-09-28 Based Selection International treatment plant and Production and Distribution construction of distribution centers in Ndalatando 72CS4/UCP/18 / Support to Management and Least Cost the recruitment process of IBRD / 87020 Prior Open - National 50,000.00 503,072.65 Signed 2018-09-27 2018-10-18 2018-12-01 2018-12-29 2019-01-28 2019-03-04 2019-04-08 2019-10-05 Engineering Support Selection young professionals 64CS1/IRSEA/18 / Water Supply Institutional Quality And Cost- Consultancy for the baseline IBRD / 87020 Strengthening and Capacity Post Open - National 200,000.00 0.00 Canceled 2019-05-30 2019-06-20 2019-08-03 2019-08-31 2019-09-30 2019-11-04 2019-12-09 2020-06-06 Based Selection for the sector Development 50CS3/LUBANGO/DNA/18 / Design checking and works Rehabilitation and Quality And Cost- Open - Pending Supervision of Network and COFN / C1560 Expansion of Water Supply Post 900,000.00 0.00 2020-01-03 2020-02-02 2020-03-02 2020-03-30 2020-04-29 2020-06-03 2020-07-08 2021-12-30 Based Selection International Implementation Home Connections for Production and Distribution Lubango (1st phase) 52CS3/KUITO/DNA/18 / Design checking and works Rehabilitation and Quality And Cost- Open - Pending Supervision of Network and COFN / C1560 Expansion of Water Supply Post 800,000.00 0.00 2020-02-05 2020-02-26 2020-04-10 2020-05-08 2020-06-07 2020-07-12 2020-08-16 2021-08-16 Based Selection International Implementation Home Connections for Kuito Production and Distribution (2nd phase) Page 6 51CS3/MALANJE/DNA/18 / Design Checking and Rehabilitation and Quality And Cost- Open - Supervision of Repairs to IBRD / 87020 Expansion of Water Supply Prior 1,000,000.00 0.00 Canceled 2018-07-27 2018-08-17 2018-09-30 2018-10-28 2018-11-27 2019-01-01 2019-02-05 2020-02-05 Based Selection International Household Connections at Production and Distribution Malanje 69CS2/INRH/18 / Survey of water users and assessment Water Resource Quality And Cost- Open - Pending COFN / C1560 Prior 1,500,000.00 0.00 2020-03-20 2020-04-10 2020-05-24 2020-06-21 2020-07-21 2020-08-25 2020-09-29 2021-09-29 of volume of water demand Management Based Selection International Implementation in Cuanza river basin 68CS2/INRH/18 / Water Resource Quality And Cost- Open - Pending Development and Application COFN / C1560 Prior 1,500,000.00 0.00 2020-04-23 2020-05-14 2020-06-27 2020-07-25 2020-08-24 2020-09-28 2020-11-02 2021-11-02 Management Based Selection International Implementation of Water Rights 75CS3/UIGE/19 / Design checking and works Rehabilitation and Quality And Cost- Open - Under supervision for the COFN / C1560 Expansion of Water Supply Prior 2,400,000.00 0.00 2019-06-26 2019-07-17 2019-08-30 2019-10-28 2019-11-27 2020-01-01 2020-02-05 2024-01-15 Based Selection International Implementation construction of a new bulk Production and Distribution water supply system at Uige 59CS3/LUBANGO/DNA/18 / Hydrogeological survey and Management and Quality And Cost- Open - Under prospection of new COFN / C1560 Prior 4,800,000.00 0.00 2018-05-24 2018-06-14 2018-07-28 2018-08-25 2018-09-24 2018-10-29 2018-12-03 2019-12-03 Engineering Support Based Selection International Implementation production boreholes in Lubango 76CS3/LUBANGO/18 / Consultancy Services for Rehabilitation and Consultant Environmental and Social Open - COFN / C1560 Expansion of Water Supply Post Qualification 200,000.00 180,599.43 Signed 2019-04-22 2019-05-13 2019-06-11 2019-06-25 2019-07-30 2020-01-26 Impact Assessment for International Production and Distribution Selection Water Supply Reservoirs at Lubango 79CS1/UCP/19 / Water Supply Institutional Independent Verification Quality And Cost- Open - Under COFN / C1560 Strengthening and Capacity Prior 2,000,000.00 0.00 2019-08-25 2019-09-15 2019-10-29 2019-11-26 2019-12-26 2020-01-30 2020-03-05 2025-02-07 Agent for the Management Based Selection International Implementation Development Contracts 84CS4/EPAL/19 / Management and Quality And Cost- Open - Under Independent Technical Audit COFN / C1560 Prior 1,800,000.00 0.00 2019-08-11 2019-09-01 2019-10-15 2019-11-12 2019-12-12 2020-01-16 2020-02-20 2023-02-19 Engineering Support Based Selection International Implementation of BITA Project 85CS4/EPAL/19 / Management and Quality And Cost- Open - Under Independent Safeguards COFN / C1560 Post 700,000.00 0.00 2019-08-11 2019-09-01 2019-10-15 2019-11-12 2019-12-12 2020-01-16 2020-02-20 2023-02-19 Engineering Support Based Selection International Implementation Auditor of BITA Project 73CS2/INRH/19 / Economic Water Resource Quality And Cost- Open - Pending and Financial Regime of the COFN / C1560 Post 500,000.00 0.00 2019-11-29 2019-12-20 2020-02-02 2020-03-01 2020-03-31 2020-05-05 2020-06-09 2020-12-09 Management Based Selection International Implementation Use of Water Resources 89CS1/UCP/19 / Technical Water Supply Institutional Quality And Cost- Open - Pending Assistance to National Water COFN / C1560 Strengthening and Capacity Prior 4,000,000.00 0.00 2020-06-30 2020-07-21 2020-09-03 2020-10-01 2020-10-31 2020-12-05 2021-01-09 2021-01-19 Based Selection International Implementation Directorate (DNA) Development 14ACS4/NAMIBE/19 / Salt Management and Quality And Cost- Open - Pending water intrusion study at COFN / C1560 Post 500,000.00 0.00 2020-05-20 2020-07-20 2020-09-02 2020-10-31 2020-11-30 2021-01-04 2021-09-08 2022-09-08 Engineering Support Based Selection International Implementation Namibe 90CS1/IRSEA/19 / Analysis of alternatives to subsidise Water Supply Institutional Quality And Cost- Open - Under low income population and COFN / C1560 Strengthening and Capacity Post 300,000.00 0.00 2020-02-20 2020-03-12 2020-04-25 2020-05-23 2020-06-22 2020-07-27 2020-08-31 2021-02-27 Based Selection International Implementation identification of potential Development beneficiaries Page 7 86CS5/UCP/19 / Sanitation Piloting Small-Scale Master Plans for Cuito, Quality And Cost- Open - Pending COFN / C1560 Sanitation Service Delivery Prior 1,600,000.00 0.00 2019-10-30 2019-11-20 2020-01-03 2020-01-31 2020-03-01 2020-04-05 2020-05-10 2021-11-01 Dundo, Huambo, Luena Based Selection International Implementation in Peri-Urban Areas Moçamedes and N´dalatando 80CS1/UCP/19 / PPP Water Supply Institutional Quality And Cost- Open - Pending Transaction Advisor for COFN / C1560 Strengthening and Capacity Prior 1,400,000.00 0.00 2019-12-02 2019-12-23 2020-02-20 2020-03-19 2020-04-18 2020-05-23 2020-06-27 2021-06-27 Based Selection International Implementation Cabinda Development INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Market Contract Type Estimated Actual Draft Negotiated Description Component Review Type Method Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Individual 11CS4/DNA/16 / Management and / Prior Consultant Direct 400,000.00 0.00 Canceled 2017-02-23 2017-03-05 2017-03-26 2017-04-30 2018-04-30 Hydrogeology specialist Engineering Support Selection Water Supply Institutional Individual 17CS4/DNA/17 / Senior IBRD / 87020 Strengthening and Capacity Prior Consultant Open 700,000.00 802,786.25 Signed 2017-04-17 2017-06-03 2017-06-17 2017-06-27 2017-12-24 FCMU Coordinator Development Selection 18CS4/DNA/17 / Senior Water Supply Institutional Individual Financial Management IBRD / 87020 Strengthening and Capacity Prior Consultant Open 700,000.00 809,328.48 Signed 2017-04-24 2017-06-10 2017-06-24 2017-07-04 2020-07-03 Specialist Development Selection Water Supply Institutional Individual 19CS4/DNA/17 / Financial IBRD / 87020 Strengthening and Capacity Prior Consultant Open 700,000.00 515,059.06 Signed 2017-04-24 2017-06-10 2017-06-24 2017-07-04 2020-07-03 Management Specialist-DNA Development Selection Water Supply Institutional Individual 20CS4/DNA/17 / Senior IBRD / 87020 Strengthening and Capacity Prior Consultant Open 700,000.00 803,171.16 Signed 2017-04-28 2017-06-14 2017-06-28 2017-07-08 2020-07-07 Procurement Specialist Development Selection Water Supply Institutional Individual 21CS4/DNA/17 / Senior IBRD / 87020 Strengthening and Capacity Prior Consultant Open 500,000.00 645,406.98 Terminated 2017-04-28 2017-06-14 2017-06-28 2017-07-08 2019-07-08 Procurement Specialist Development Selection Water Supply Institutional Individual 22CS4/DNA/17 / Senior IBRD / 87020 Strengthening and Capacity Prior Consultant Open 700,000.00 405,940.19 Signed 2017-04-28 2017-06-14 2017-06-28 2017-07-08 2020-07-07 Procurement Specialist-DNA Development Selection 23CS4/DNA/17 / Water Water Supply Institutional Individual Utility Management IBRD / 87020 Strengthening and Capacity Prior Consultant Open 700,000.00 683,580.67 Signed 2017-07-21 2017-09-15 2017-10-06 2017-11-10 2019-05-04 Specialist Development Selection Individual 26CS4/DNA/17 / Management and IBRD / 87020 Prior Consultant Open 250,000.00 211,571.46 Signed 2017-09-15 2017-11-03 2017-11-24 2017-12-29 2020-12-28 Procurement officer (1) Engineering Support Selection Individual 27CS4/DNA/17 / Management and IBRD / 87020 Prior Consultant Open 250,000.00 211,571.46 Signed 2017-09-15 2017-11-03 2017-11-24 2017-12-29 2020-12-28 Procurement Officer (2) Engineering Support Selection 28CS4/DNA/17 / Individual Management and Design/Environmental Expert IBRD / 87020 Prior Consultant Open 385,000.00 398,564.28 Signed 2017-11-01 2017-12-20 2018-01-10 2018-02-14 2019-08-08 Engineering Support to Support DNA/FCMU Selection Individual 24CS4/DNA/17 / Senior Management and IBRD / 87020 Prior Consultant Open 500,000.00 516,810.01 Signed 2017-09-15 2017-11-03 2017-11-24 2017-12-29 2019-12-29 Design Engineer Engineering Support Selection Page 8 Individual 25CS4/DNA/17 / Senior Management and IBRD / 87020 Prior Consultant Open 500,000.00 434,172.00 Signed 2017-12-08 2018-01-26 2018-02-16 2018-03-23 2020-03-22 Environmental Specialist Engineering Support Selection 29CS4/DNA/17 / Technical Individual Management and Assistance to support IBRD / 87020 Prior Consultant Open 350,000.00 574,577.39 Signed 2017-09-28 2017-11-16 2017-12-07 2018-01-11 2019-07-05 Engineering Support DNA/FCMU Selection Individual 30CS4/DNA/17 / Project Management and IBRD / 87020 Prior Consultant Open 320,000.00 303,884.13 Signed 2017-10-20 2017-12-08 2017-12-29 2018-02-02 2019-07-27 Accountant Engineering Support Selection Individual 31CS4/DNA/17 / Financial Management and IBRD / 87020 Post Consultant Open 170,000.00 67,344.69 Signed 2017-10-20 2017-12-08 2017-12-29 2018-02-02 2019-07-27 Assistant (1) Engineering Support Selection Individual 32CS4/DNA/17 / Financial Management and IBRD / 87020 Post Consultant Open 170,000.00 67,344.69 Signed 2017-10-20 2017-12-08 2017-12-29 2018-02-02 2019-07-27 Assistant (2) Engineering Support Selection Individual 33CS4/DNA/17 / MIS Management and Pending IBRD / 87020 Post Consultant Open 60,000.00 0.00 2017-11-30 2018-01-18 2018-02-08 2018-03-15 2018-06-13 Consultant Engineering Support Implementation Selection 34CS4/DNA/17 / Consultant to Support the Individual Management and Implementation of the IBRD / 87020 Post Consultant Direct 45,000.00 42,000.00 Signed 2017-11-30 2017-12-10 2017-12-31 2018-02-04 2018-08-03 Engineering Support Primavera Accounting Selection System Rehabilitation and Individual 36CS4/DNA/17 / Monitoring IBRD / 87020 Expansion of Water Supply Prior Consultant Open 250,000.00 236,000.00 Signed 2018-05-24 2018-07-12 2018-08-02 2018-09-06 2019-03-05 Evaluation Specialist Production and Distribution Selection Rehabilitation and Individual 37CS4/DNA/17 / Supervision IBRD / 87020 Expansion of Water Supply Prior Consultant Open 700,000.00 647,470.59 Signed 2018-06-03 2018-07-22 2018-08-12 2018-09-16 2021-08-31 Engineer Production and Distribution Selection Rehabilitation and Individual 38CS4/DNA/17 / Senior Pending IBRD / 87020 Expansion of Water Supply Prior Consultant Open 500,000.00 0.00 2018-03-13 2018-05-01 2018-05-22 2018-06-26 2021-06-10 Environmental Specialist Implementation Production and Distribution Selection 40CS4/DNA/17 / Rehabilitation and Individual Stakeholder Engagement e IBRD / 87020 Expansion of Water Supply Prior Consultant Open 700,000.00 375,340.78 Signed 2018-04-20 2018-06-08 2018-06-29 2018-08-03 2020-07-23 Social Specialist Production and Distribution Selection Individual 41CS4/DNA/17 / Management and IBRD / 87020 Prior Consultant Open 200,000.00 170,677.58 Signed 2018-01-08 2018-02-26 2018-03-19 2018-04-23 2021-04-07 Information Technology Engineering Support Selection 43CS1/IRSEA/18 / SHORT Water Supply Institutional Individual TERM TECHNICAL IBRD / 87020 Strengthening and Capacity Post Consultant Open 80,000.00 121,613.80 Signed 2018-03-19 2018-04-28 2018-05-08 2018-05-18 2018-11-14 ASSISTANCE TO IRSEA Development Selection Individual 11ACS4/DNA/18 / Management and IBRD / 87020 Post Consultant Direct 180,000.00 196,161.51 Signed 2018-04-16 2018-04-26 2018-05-17 2018-06-21 2019-12-13 Hydrogeology specialist Engineering Support Selection 61CS4/DNA/18 / Consultant Individual to prepare the TORs for Management and IBRD / 87020 Post Consultant Open 80,000.00 0.00 Canceled 2018-07-02 2018-08-20 2018-09-10 2018-10-15 2019-01-13 the Updates of the Master Engineering Support Selection Plans in 9 Cities 102CS2/DAS/18 / Short Individual Water Resource Term Technical Assistance to IBRD / 87020 Post Consultant Direct 100,000.00 104,762.41 Signed 2018-06-11 2018-06-21 2018-07-12 2018-08-16 2019-02-12 Management INRH Selection Page 9 52CS3/DAS/18 / DESIGN CHECKING AND WORK SUPERVISION OF Rehabilitation and NETWORK AND HOUSE IBRD / 87020 Expansion of Water Supply Prior Direct Selection Direct 850,000.00 818,938.69 Signed 2018-06-11 2018-06-13 2018-07-01 2018-12-28 CONNECTIONS IN THE Production and Distribution CITY OF HUAMBO - LOT 2 Water Supply Institutional Individual 21ACS4/DNA/18 / Senior IBRD / 87020 Strengthening and Capacity Prior Consultant Limited 450,000.00 683,681.52 Signed 2018-06-13 2018-06-18 2018-07-09 2018-08-13 2020-08-02 Procurement Specialist Development Selection 18ACS4/DNA/18 / SENIOR Water Supply Institutional Individual FINANCIAL MANAGEMENT IBRD / 87020 Strengthening and Capacity Prior Consultant Limited 700,000.00 701,993.30 Signed 2018-07-20 2018-08-04 2018-08-09 2018-08-29 2021-08-13 SPECIALIST Development Selection Individual 63CS4/UCP/18 / Senior Management and IBRD / 87020 Prior Consultant Open 450,000.00 0.00 Canceled 2018-08-22 2018-10-10 2018-10-31 2018-12-05 2020-12-04 Sanitation Specialist Engineering Support Selection Individual 77CS4/UCP/19 / Second Management and COFN / C1560 Prior Consultant Open 400,000.00 389,156.32 Signed 2019-06-28 2019-08-16 2019-09-06 2019-10-11 2021-10-10 Senior Works Supervisor Engineering Support Selection Individual 82CS4/UCP/19 / Second Management and Under COFN / C1560 Prior Consultant Open 400,000.00 0.00 2019-09-16 2019-11-04 2019-11-25 2019-12-30 2021-12-29 Senior Design Engineer Engineering Support Implementation Selection Rehabilitation and Individual 83CS3/UCP/19 / Dispute Under COFN / C1560 Expansion of Water Supply Prior Consultant Limited 50,000.00 0.00 2019-09-15 2019-09-20 2019-10-11 2019-11-15 2022-11-14 Board Member Implementation Production and Distribution Selection 81CS4/UCP/19 / Project Individual Management and Under Financial and Administrative COFN / C1560 Prior Consultant Open 400,000.00 0.00 2019-08-30 2019-10-18 2019-11-08 2019-12-13 2021-12-12 Engineering Support Implementation Officer Selection Rehabilitation and Individual 83ACS3/UCP/19 / Dispute COFN / C1560 Expansion of Water Supply Post Consultant Limited 50,000.00 0.00 Canceled 2019-10-30 2019-11-04 2019-11-25 2019-12-30 2022-12-29 Board Member Production and Distribution Selection Individual 20ACS4/UCP/19 / Senior Management and Under COFN / C1560 Prior Consultant Open 500,000.00 0.00 2019-10-04 2019-11-20 2019-12-04 2019-12-14 2021-12-13 Procurement Specialist Engineering Support Implementation Selection Individual 63ACS4/UCP/19 / Sanitation Management and Under COFN / C1560 Prior Consultant Open 400,000.00 0.00 2019-10-04 2019-11-22 2019-12-13 2020-01-17 2022-01-16 Specialist Engineering Support Implementation Selection Individual 88CS4/UCP/19 / Financial Management and Under COFN / C1560 Post Consultant Open 70,000.00 0.00 2019-11-19 2020-01-07 2020-01-28 2020-03-03 2021-08-25 Assistant (3) Engineering Support Implementation Selection Page 10