PROCUREMENT PLAN (Textual Part) Project information: Tonga, Tongafish Pathways P164941 Project Implementation agency: Ministry of Fisheries Date of the Procurement Plan: October 9, 2018 Period covered by this Procurement Plan: October 2018 – April 2020 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in Public Finance Management Act 2002 such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Not Applicable Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: [is not applicable]; Works: [is not applicable]; PROCUREMENT Tonga : Tonga: Pathway to Sustainable Oceans PLAN General Information Country: Tonga Bank’s Approval Date of the Original Procurement Plan: 2018-10-28 2019-11-20 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P164941 GPN Date: 2018-09-22 Project Name: Tonga: Pathway to Sustainable Oceans Loan / Credit No: / , IDA / D4480 Executing Agency(ies): Ministry of Fisheries WORKS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual TO-MOF-101041-CW-RFQ / Mabe pearls- small scale Strengthening the Pending industry support works Request for Single Stage - One / Knowledge Base for Post Open - National 50,000.00 0.00 Implementati 2021-03-06 2021-05-01 2021-10-28 program to be developed in Quotations Envelope Fisheries and Aquaculture on consultation with the Mabe Pearl Association Strengthening the Pending TO-MOF-101043-CW-RFQ / Request for Single Stage - One / Knowledge Base for Post Open - National 176,000.00 0.00 Implementati 2022-07-06 2022-08-31 2023-02-27 Upgrade of Sopu hatchery Quotations Envelope Fisheries and Aquaculture on Pending TO-MOF-101046-CW-RFQ / Supporting Effective Project Request for Single Stage - One / Post Open - National 66,000.00 0.00 Implementati 2022-09-06 2022-11-01 2023-04-30 Office refurbishment Management Quotations Envelope on GOODS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Pending MOF-GD-1 / Computers, Supporting Effective Project Request for Single Stage - One / Post Limited 24,581.00 0.00 Implementati 2018-11-05 2018-12-31 2019-06-29 printer and software Management Quotations Envelope on Pending MOF-GD-3 / Office Supporting Effective Project Request for Single Stage - One / Post Limited 22,000.00 0.00 Implementati 2019-02-06 2019-04-03 2019-09-30 rental/furniture Management Quotations Envelope on TO-MOF-100645-GO-RFQ / Strengthening the Pending Request for Open - Single Stage - One Buoys and Fish Aggregating / Knowledge Base for Post 207,768.00 0.00 Implementati 2019-12-06 2020-01-31 2020-07-29 Quotations International Envelope Devices (FAD) Fisheries and Aquaculture on TO-MOF-100650-GO-RFQ / Pending Strengthening Fisheries Request for Open - Single Stage - One Pilot for low cost monitoring / Post 30,000.00 0.00 Implementati 2020-08-06 2020-10-01 2021-03-30 Governance Quotations International Envelope and safety communications on TO-MOF-101003-GO-RFQ / Pending Strengthening Fisheries Request for Open - Single Stage - One Rugged tablets plus / Post 184,800.00 0.00 Implementati 2021-07-06 2021-08-31 2022-02-27 Governance Quotations International Envelope accessories on TO-MOF-101009-GO-RFQ / Strengthening the Pending Request for Open - Single Stage - One Survey equipment/Sampling / Knowledge Base for Post 194,000.00 0.00 Implementati 2019-07-06 2019-08-31 2020-02-27 Quotations International Envelope equipment and supplies Fisheries and Aquaculture on Page 1 TO-MOF-101011-GO-RFQ / Strengthening the Under Request for Open - Single Stage - One Mabe pearls and pearl / Knowledge Base for Post 84,000.00 0.00 Implementati 2020-09-06 2020-11-01 2021-04-30 Quotations International Envelope supplies Fisheries and Aquaculture on TO-MOF-101035-GO-RFB / Boats and safety equipment Pending Strengthening Fisheries Single Stage - One for Component 2.1.14 (3 / Prior Request for Bids Open - National 921,360.00 0.00 Implementati 2021-07-01 2021-07-06 2021-08-17 2021-09-16 2021-10-21 2022-04-19 Governance Envelope boats) 2.1.15 (1 boat) 2.3.8.1 on (20 boats) TO-MOF-105824-GO-RFB / Pending Boats and safety equipment Strengthening Fisheries Open - Single Stage - One / Post Request for Bids 396,000.00 0.00 Implementati 2021-07-01 2021-07-06 2021-08-17 2021-09-16 2021-10-21 2022-04-19 for Component 1.3.1 (3 Governance International Envelope on boats) for MCS patrol Under TO-MOF-100649-GO-RFQ / Strengthening Fisheries Request for Open - Single Stage - One IDA / D4480 Post 8,800.00 0.00 Implementati 2019-07-31 2019-09-09 2019-12-10 Purchase 1 x Drone. Governance Quotations International Envelope on TO-MOF-101040-GO-RFQ / Under Supporting Effective Project Request for Single Stage - One Purchase 2 x Video IDA / D4480 Post Open - National 28,600.00 0.00 Implementati 2019-07-31 2019-09-09 2019-12-10 Management Quotations Envelope conference equipment on Pending MOF-GD-2 / Supply of 2 x Supporting Effective Project Request for Single Stage - One IDA / D4480 Post Limited 80,000.00 0.00 Implementati 2018-11-28 2019-01-23 2019-07-22 Vehicle, PMU. Management Quotations Envelope on TO-MOF-134096-GO-RFQ / Investing in Sustainable Pending Supply of 2 x Vehicles, Request for Single Stage - One IDA / D4480 Fisheries Management and Post Limited 80,000.00 0.00 Implementati 2019-10-30 2019-12-25 2020-06-22 Compliance Division Quotations Envelope Development on Subcomponent 1.3.2 TO-MOF-101010-GO-RFQ / Strengthening the Pending Request for Open - Single Stage - One Diving gear (8 sets) and Air IDA / D4480 Knowledge Base for Post 30,600.00 0.00 Implementati 2020-02-16 2020-04-12 2020-10-09 Quotations International Envelope compressors Fisheries and Aquaculture on NON CONSULTING SERVICES Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Market Contract Type Estimated Actual Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Strengthening the Consultant MOF-CS-IND-10 / SMA Open - Pending / Knowledge Base for Post Qualification 74,800.00 0.00 2018-10-04 2018-10-25 2018-12-08 2019-01-07 2019-02-11 2019-08-10 Monitoring Program International Implementation Fisheries and Aquaculture Selection MOF-CS-IND-12 / Consultant Strengthening Fisheries Open - Management Info System / Post Qualification 44,000.00 0.00 Canceled 2018-10-08 2018-10-29 2018-12-12 2018-12-22 2019-01-26 2019-07-25 Governance International Development Selection MOF-CS-FIRM-1 / PMU Strengthening the Consultant Open - Establishment and Corporate / Knowledge Base for Post Qualification 195,140.00 0.00 Canceled 2018-11-19 2018-12-10 2019-01-23 2019-02-22 2019-03-29 2019-09-25 International Support Fisheries and Aquaculture Selection Page 2 TO-MOF-101050-CS-CQS / E-monitoring and E- Consultant Strengthening Fisheries Open - Pending reporting feasibility / Post Qualification 132,800.00 0.00 2020-01-20 2020-02-10 2020-03-25 2020-04-24 2020-05-29 2020-11-25 Governance International Implementation study/Review and update of Selection observer program manual TO-MOF-101053-CS-CQS / Development of Competent Investing in Sustainable Consultant Open - Pending Authority Development Plan / Fisheries Management and Post Qualification 76,400.00 0.00 2022-09-01 2022-09-22 2022-11-05 2022-12-05 2023-01-09 2023-07-08 International Implementation and prepare SOP for FMP Development Selection procedures TO-MOF-101055-CS-CQS / Review and update Tonga Consultant Strengthening Fisheries Open - Pending National Plan of Action, and / Post Qualification 50,000.00 0.00 2020-08-01 2020-08-22 2020-10-05 2020-11-04 2020-12-09 2021-06-07 Governance International Implementation Operational Compliance Selection Strategy TO-MOF-100648-CS-CQS / Investing in Sustainable Consultant Open - Pending Master Plan and Feasibility IDA / D4480 Fisheries Management and Post Qualification 264,000.00 0.00 2019-11-28 2019-12-19 2020-02-01 2020-03-02 2020-04-06 2020-10-03 International Implementation Study Development Selection TO-MOF-141208-CS-CQS / Consultant Strengthening Fisheries Open - Pending MIS and IT Support IDA / D4480 Post Qualification 70,000.00 0.00 2019-11-01 2019-11-22 2020-01-23 2020-02-22 2020-03-28 2020-09-24 Governance International Implementation Services Selection INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Market Contract Type Estimated Actual Draft Negotiated Description Component Review Type Method Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Strengthening the Individual TO-MOF-78423-CS-INDV / / Knowledge Base for Post Consultant Open 50,000.00 0.00 Canceled 2018-10-02 2018-11-15 2018-12-06 2019-01-10 2019-07-09 Fisheries consultant 2 Fisheries and Aquaculture Selection Individual MOF-CS-IND-7 / IT and Supporting Effective Project / Post Consultant Open 7,762.00 0.00 Canceled 2018-10-19 2018-12-07 2018-12-28 2019-02-01 2019-07-31 systems support Management Selection Strengthening the Individual MOF-CS-IND-11 / SMA / Knowledge Base for Post Consultant Open 15,400.00 0.00 Canceled 2018-10-19 2018-12-03 2018-12-13 2019-01-02 2019-07-01 Lead Fisheries and Aquaculture Selection TO-MOF-100647-CS-INDV / Individual Strengthening Fisheries Fisheries Compliance Officer IDA / D4480 Post Consultant Open 115,000.00 0.00 Canceled 2019-08-01 2019-09-19 2019-10-10 2019-11-14 2022-11-13 Governance 1 Selection TO-MOF-101545-CS-INDV / SMA compliance options Individual study and manual and Strengthening Fisheries Pending / Post Consultant Open 118,800.00 0.00 2021-09-01 2021-10-20 2021-11-10 2021-12-15 2022-06-13 design licencing system Governance Implementation Selection licencing system for fishers and/or vessels TO-MOF-101546-CS-INDV / Design licencing system/ Individual program for fishers and/or Strengthening Fisheries Pending / Post Consultant Open 112,800.00 0.00 2020-07-01 2020-08-19 2020-09-09 2020-10-14 2021-04-12 vessels and supply chain Governance Implementation Selection and establish rights based management system TO-MOF-101548-CS-INDV / Strengthening the Individual Pending Design and deliver training / Knowledge Base for Post Consultant Open 70,000.00 0.00 2020-02-01 2020-03-21 2020-04-11 2020-05-16 2020-11-12 Implementation in Marine Science Fisheries and Aquaculture Selection Page 3 Strengthening the Individual TO-MOF-101553-CS-INDV / Under / Knowledge Base for Post Consultant Open 114,684.00 0.00 2020-02-01 2020-03-21 2020-04-11 2020-05-16 2020-11-12 Science component lead Implementation Fisheries and Aquaculture Selection Strengthening the Individual TO-MOF-101554-CS-INDV / Pending / Knowledge Base for Post Consultant Open 26,400.00 0.00 2020-07-01 2020-08-19 2020-09-09 2020-10-14 2021-04-12 Laboratory Specialist Implementation Fisheries and Aquaculture Selection TO-MOF-101556-CS-INDV / Strengthening the Individual Pending Coastal Fisheries Science / Knowledge Base for Post Consultant Open 61,600.00 0.00 2020-07-01 2020-08-19 2020-09-09 2020-10-14 2021-04-12 Implementation Specialist Fisheries and Aquaculture Selection Strengthening the Individual TO-MOF-101557-CS-INDV / Pending / Knowledge Base for Post Consultant Open 61,600.00 0.00 2020-07-01 2020-08-19 2020-09-09 2020-10-14 2021-04-12 Data Collection Specialist Implementation Fisheries and Aquaculture Selection Strengthening the Individual TO-MOF-101559-CS-INDV / Under / Knowledge Base for Post Consultant Open 114,684.00 0.00 2020-03-01 2020-04-19 2020-05-10 2020-06-14 2020-12-11 Aquaculture component lead Implementation Fisheries and Aquaculture Selection TO-MOF-101560-CS-INDV / Strengthening the Individual Pending Aquaculture hatchery design / Knowledge Base for Post Consultant Open 80,000.00 0.00 2021-09-01 2021-10-20 2021-11-10 2021-12-15 2022-06-13 Implementation (Sopu and Outer Islands) Fisheries and Aquaculture Selection TO-MOF-101562-CS-INDV / Individual Supporting Effective Project Pending Staff training and capacity IDA / D4480 Post Consultant Open 75,000.00 0.00 2020-09-01 2020-10-20 2020-11-10 2020-12-15 2021-06-13 Management Implementation building Selection TO-MOF-101567-CS-INDV / Strengthening the Individual Pending Local SMA output-based / Knowledge Base for Post Consultant Open 150,000.00 0.00 2019-09-01 2019-10-20 2019-11-10 2019-12-15 2020-06-12 Implementation consultants Fisheries and Aquaculture Selection TO-MOF-101570-CS-INDV / SMA monitoring program Strengthening the Individual Pending development and SMA / Knowledge Base for Post Consultant Open 102,800.00 0.00 2019-09-01 2019-10-20 2019-11-10 2019-12-15 2020-06-12 Implementation procedures and training Fisheries and Aquaculture Selection provision Investing in Sustainable Individual TO-MOF-101573-CS-INDV / Under / Fisheries Management and Post Consultant Open 114,862.00 0.00 2019-07-01 2019-08-19 2019-09-09 2019-10-14 2020-04-11 Fisheries Management Lead Implementation Development Selection TO-MOF-101574-CS-INDV / Review of fisheries Investing in Sustainable Individual management plans and Pending / Fisheries Management and Post Consultant Open 116,600.00 0.00 2020-11-01 2020-12-20 2021-01-10 2021-02-14 2021-08-13 develop coastal fisheries Implementation Development Selection framework and Code of Conduct TO-MOF-101584-CS-INDV / Develop tuna and snapper Investing in Sustainable Individual marketing strategies/small Pending / Fisheries Management and Post Consultant Open 164,400.00 0.00 2021-02-01 2021-03-22 2021-04-12 2021-05-17 2021-11-13 scale fishing strategy and Implementation Development Selection market strategy including market survey TO-MOF-101589-CS-INDV / Protocol for hatchery Strengthening the Individual Pending practice, animal health, and / Knowledge Base for Post Consultant Open 35,200.00 0.00 2021-09-01 2021-10-20 2021-11-10 2021-12-15 2022-06-13 Implementation aquaculture biosecurity for Fisheries and Aquaculture Selection mabe pearl and giant clam TO-MOF-101543-CS-INDV / Individual Component 1.9 Evaluate the Strengthening Fisheries Pending / Post Consultant Open 30,000.00 0.00 2021-09-01 2021-10-20 2021-11-10 2021-12-15 2022-06-13 pilot program, and develop Governance Implementation Selection rollout Page 4 TO-MOF-101558-CS-INDV / Update mabe industry Strengthening the Individual development plan/feasibility Pending / Knowledge Base for Post Consultant Open 180,800.00 0.00 2020-06-01 2020-07-20 2020-08-10 2020-09-14 2021-03-13 study for mabe pearl and Implementation Fisheries and Aquaculture Selection giant clam with potential and aquaculture materials TO-MOF-101580-CS-INDV / Investing in Sustainable Individual Pending Component 3.6 Improved / Fisheries Management and Post Consultant Open 50,000.00 0.00 2020-11-01 2020-12-20 2021-01-10 2021-02-14 2021-08-13 Implementation economic modeling Development Selection TO-MOF-101586-CS-INDV / Review aquaculture Investing in Sustainable Individual Pending commodity development plan / Fisheries Management and Post Consultant Open 129,200.00 0.00 2023-04-01 2023-05-20 2023-06-10 2023-07-15 2024-01-11 Implementation and Investment Strategy for Development Selection mabe pearl and giant clam Individual TO-MOF-108747-CS-INDV / Supporting Effective Project / Post Consultant Open 185,011.00 79,827.50 Signed 2019-04-03 2019-07-02 2019-07-23 2019-08-27 2020-02-23 Project Coordinator Management Selection Individual MOF-CS-IND-1 / Project Supporting Effective Project / Post Consultant Open 14,553.00 0.00 Canceled 2018-08-31 2018-11-29 2018-12-20 2019-01-24 2019-07-23 Manager Management Selection TO-MOF-108750-CS-INDV / Individual Strengthening Fisheries Safeguards and Stakeholder / Post Consultant Open 114,682.00 49,485.28 Signed 2019-04-03 2019-07-02 2019-07-23 2019-08-27 2020-02-23 Governance Engagement officer Selection Individual MOF-CS-IND-4 / Safeguards Strengthening Fisheries / Post Consultant Open 9,055.00 0.00 Canceled 2018-08-31 2018-11-29 2018-12-20 2019-01-24 2019-07-23 officer Governance Selection Individual TO-MOF-108752-CS-INDV / Strengthening Fisheries / Post Consultant Open 114,682.00 49,485.28 Signed 2019-04-03 2019-06-28 2019-07-19 2019-08-23 2020-02-19 Procurement officer Governance Selection Individual MOF-CS-IND-2 / Strengthening Fisheries / Post Consultant Open 9,055.00 0.00 Canceled 2018-08-31 2018-11-25 2018-12-16 2019-01-20 2019-07-19 Procurement officer Governance Selection TO-MOF-108753-CS-INDV / Individual Supporting Effective Project Under Monitoring and Evaluation / Post Consultant Open 114,682.00 0.00 2019-04-03 2019-06-27 2019-07-18 2019-08-22 2020-02-18 Management Implementation officer Selection Individual MOF-CS-IND-5 / Monitoring Supporting Effective Project / Post Consultant Open 9,055.00 0.00 Canceled 2018-08-31 2018-11-24 2018-12-15 2019-01-19 2019-07-18 and eval officer Management Selection Individual TO-MOF-108755-CS-INDV / Supporting Effective Project / Post Consultant Open 114,682.00 49,485.28 Signed 2019-04-03 2019-07-01 2019-07-22 2019-08-26 2020-02-22 Finance officer Management Selection Individual MOF-CS-IND-3 / Supporting Effective Project / Post Consultant Open 9,055.00 0.00 Canceled 2018-08-31 2018-11-28 2018-12-19 2019-01-23 2019-07-22 Accountant Management Selection Individual MOF-CS-IND-8 / Deputy Supporting Effective Project Pending / Post Consultant Open 148,122.00 0.00 2018-10-19 2018-12-07 2018-12-28 2019-02-01 2019-07-31 Project Coordinator Management Implementation Selection TO-MOF-107823-CS-INDV / Strengthening the Individual Under SMA sub-component lead- IDA / D4480 Knowledge Base for Post Consultant Open 114,682.00 0.00 2019-07-26 2019-09-02 2019-09-09 2019-09-30 2022-06-25 Implementation Vava'u Fisheries and Aquaculture Selection Page 5 TO-MOF-107824-CS-INDV / Strengthening the Individual Under SMA sub-component lead- IDA / D4480 Knowledge Base for Post Consultant Open 114,682.00 0.00 2019-07-26 2019-09-02 2019-09-09 2019-09-30 2022-06-25 Implementation Ha'apai Fisheries and Aquaculture Selection TO-MOF-101564-CS-INDV / Strengthening the Individual Under SMA sub-component lead- IDA / D4480 Knowledge Base for Post Consultant Open 114,682.00 0.00 2019-07-26 2019-09-02 2019-09-09 2019-09-30 2022-06-25 Implementation Tongatapu Fisheries and Aquaculture Selection Investing in Sustainable Individual TO-MOF-134088-CS-INDV / Pending IDA / D4480 Fisheries Management and Post Consultant Open 114,682.00 0.00 2019-09-25 2019-11-13 2019-12-04 2020-01-08 2020-07-06 Compliance Leads Tongatapu Implementation Development Selection Investing in Sustainable Individual TO-MOF-134093-CS-INDV / Pending IDA / D4480 Fisheries Management and Post Consultant Open 114,682.00 0.00 2019-09-25 2019-11-13 2019-12-04 2020-01-08 2020-07-06 Compliance Leads Ha'apai Implementation Development Selection Investing in Sustainable Individual TO-MOF-134094-CS-INDV / Pending IDA / D4480 Fisheries Management and Post Consultant Open 114,682.00 0.00 2019-10-17 2020-01-11 2020-02-01 2020-03-07 2020-09-03 Compliance Leads Vava'u Implementation Development Selection Individual MOF-CS-IND-6 / Training Strengthening Fisheries Pending IDA / D4480 Post Consultant Open 114,682.00 0.00 2019-02-04 2019-03-25 2019-04-15 2019-05-20 2019-11-16 and development officer Governance Implementation Selection Page 6