PROCUREMENT PLAN (Textual Part) Project information: Tunisia Strengthening Foundations for Learning Project P162297 Project Implementation agency: Ministry of Education Date of the Procurement Plan: October 2019 Period covered by this Procurement Plan: October 2019 to October 2020 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in [insert appropriate references to the national procurement legislation], such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. List only the applicable conditions required to ensure consistency with paragraph 5.4 of the Procurement Regulations. If no conditions apply, delete the phrase “and the following conditions”. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is not applicable for those contracts identified in the Procurement Plan tables; Works: is not applicable for those contracts identified in the Procurement Plan tables PROCUREMENT Tunisia : Strengthening Foundations for Learning Project PLAN General Information Country: Tunisia Bank’s Approval Date of the Original Procurement Plan: 2019-10-11 2019-10-11 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P162297 GPN Date: Project Name: Strengthening Foundations for Learning Project Loan / Credit No: IBRD / 88630 Executing Agency(ies): UGPO/ Ministere de l'Education WORKS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GOODS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual TN-UGPO/ME-01-GO-RFB / Improving quality and Single Stage - One En attente Fournitures et matériels IBRD / 88630 increasing supply of public A posteriori Appel d'offres Open - National 880,000.00 0.00 2019-12-11 2019-12-16 2020-01-27 2020-03-27 2020-05-01 2020-07-30 Envelope d'exécution pour la classe préparatoire preschool education TN-UGPO/ME-02-GO-RFB / Improving quality and Single Stage - One En attente Équipement d'une salle de IBRD / 88630 increasing supply of public A posteriori Appel d'offres Open - National 200,000.00 0.00 2019-10-15 2019-10-20 2019-11-19 2019-12-19 2020-01-23 2020-04-22 Envelope d'exécution classe du préparatoire preschool education TN-UGPO/ME-03-GO-RFB / Improving quality and Single Stage - One En attente Équipement des aires de IBRD / 88630 increasing supply of public A posteriori Appel d'offres Open - National 90,000.00 0.00 2019-10-15 2019-10-20 2019-11-19 2019-12-19 2020-01-23 2020-04-22 Envelope d'exécution jeux preschool education TN-UGPO/ME-08-GO-RFB / Single Stage - One En attente IBRD / 88630 Project management A posteriori Appel d'offres Open - National 160,000.00 0.00 2019-10-15 2019-10-20 2019-11-19 2019-12-19 2020-01-23 2020-04-22 Achat de véhicules Envelope d'exécution NON CONSULTING SERVICES Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Market Contract Type Estimated Actual Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual TN-UGPO/ME-05-CS-INDV / Sélection fondée Assistance technique Improving learning sur les Open - En attente internationale pour IBRD / 88630 conditions in public primary A posteriori 200,000.00 0.00 2020-02-17 2020-03-09 2020-04-22 2020-05-22 2020-06-26 2020-12-23 qualifications des International d'exécution l'Élaboration d'une évaluation school consultants Teach Page 1 TN-UGPO/ME-11-CS-CQS / Assistance technique Sélection fondée Improving learning nationale pour la sur les En attente IBRD / 88630 conditions in public primary A posteriori Open - National 60,000.00 0.00 2020-08-24 2020-09-14 2020-10-28 2020-11-27 2021-01-01 2021-06-30 Numérisation et mise en qualifications des d'exécution school ligne des modules de consultants formation TN-UGPO/ME-21-CS-CQS / Sélection fondée Assistance technique Improving learning sur les Open - En attente internationale pour la IBRD / 88630 conditions in public primary A posteriori 16,000.00 0.00 2020-02-14 2020-03-06 2020-04-19 2020-05-19 2020-06-23 2020-12-20 qualifications des International d'exécution Formation des enseignants school consultants aux outils EGRA TN-UGPO/ME-22-CS-CQS / Sélection fondée Assistance technique Improving learning sur les En attente nationale pour la Formation IBRD / 88630 conditions in public primary A posteriori Open - National 24,000.00 0.00 2020-02-14 2020-03-06 2020-04-19 2020-05-19 2020-06-23 2020-12-20 qualifications des d'exécution des enseignants aux outils school consultants EGRA TN-UGPO/ME-23-CS-CQS / Assistance technique Sélection fondée Improving learning internationale pour la mise sur les Open - En attente IBRD / 88630 conditions in public primary A posteriori 10,000.00 0.00 2020-03-16 2020-04-06 2020-05-20 2020-06-19 2020-07-24 2021-01-20 en place d'un Protocole qualifications des International d'exécution school SSME incluant des consultants observations de leçons TN-UGPO/ME-24-CS-CQS / Assistance technique Sélection fondée Improving learning nationale pour la mise en sur les En attente IBRD / 88630 conditions in public primary A posteriori Open - National 45,000.00 0.00 2020-03-16 2020-04-06 2020-05-20 2020-06-19 2020-07-24 2021-01-20 place d'un Protocole SSME qualifications des d'exécution school incluant des observations de consultants leçons TN-UGPO/ME-25-CS-CQS / Sélection fondée Assistance technique Improving learning sur les Open - En attente internationale pour une IBRD / 88630 conditions in public primary A posteriori 50,000.00 0.00 2020-03-16 2020-04-06 2020-05-20 2020-06-19 2020-07-24 2021-01-20 qualifications des International d'exécution Étude complémentaire sur la school consultants lecture TN-UGPO/ME-26-CS-CQS / Sélection fondée Assistance technique Improving learning sur les En attente nationale pour une Étude IBRD / 88630 conditions in public primary A posteriori Open - National 45,000.00 0.00 2020-03-16 2020-04-06 2020-05-20 2020-06-19 2020-07-24 2021-01-20 qualifications des d'exécution complémentaire sur la school consultants lecture TN-UGPO/ME-27-CS-CQS / Sélection fondée Assistance technique Improving learning sur les Open - En attente internationale pour la IBRD / 88630 conditions in public primary A posteriori 25,000.00 0.00 2019-11-15 2019-12-06 2020-01-19 2020-02-18 2020-03-24 2020-09-20 qualifications des International d'exécution Constitution d'une banque school consultants d'items TN-UGPO/ME-28-CS-CQS / Sélection fondée Assistance technique Improving learning sur les En attente nationale pour la IBRD / 88630 conditions in public primary A posteriori Open - National 45,000.00 0.00 2019-12-25 2020-01-15 2020-02-28 2020-03-29 2020-05-03 2020-10-30 qualifications des d'exécution Constitution d'une banque school consultants d'items INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Market Contract Type Estimated Actual Draft Negotiated Description Component Review Type Method Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual TN-UGPO/ME-01-CS-INDV / Assistance technique Improving learning En attente nationale pour le IBRD / 88630 conditions in public primary A posteriori Individuel Open 21,000.00 0.00 2020-01-15 2020-03-04 2020-03-25 2020-04-29 2020-10-26 d'exécution Développement de modules school de formation Page 2 TN-UGPO/ME-02-CS-INDV / Improving learning Assistance technique En attente IBRD / 88630 conditions in public primary A posteriori Individuel Open 20,000.00 0.00 2020-01-15 2020-03-04 2020-03-25 2020-04-29 2020-10-26 nationale pour la formation d'exécution school des formateurs TN-UGPO/ME-03-CS-INDV / Assistance technique Improving learning En attente nationale pour le IBRD / 88630 conditions in public primary A posteriori Individuel Open 30,000.00 0.00 2020-01-15 2020-03-04 2020-03-25 2020-04-29 2020-10-26 d'exécution Développement d'application school de gestion d'école TN-UGPO/ME-04-CS-INDV / Improving learning Assistance technique En attente IBRD / 88630 conditions in public primary A posteriori Individuel Open 9,000.00 0.00 2020-02-10 2020-03-30 2020-04-20 2020-05-25 2020-11-21 nationale pour l'Évaluation d'exécution school de l'expérience pilote TN-UGPO/ME-07-CS-INDV / Assistance technique Improving learning En attente nationale pour le Test de IBRD / 88630 conditions in public primary A posteriori Individuel Open 100,000.00 0.00 2020-05-15 2020-07-03 2020-07-24 2020-08-28 2021-02-24 d'exécution positionnement des school enseignants TN-UGPO/ME-06-CS-INDV / Assistance technique Improving learning En attente internationale pour le Test IBRD / 88630 conditions in public primary A posteriori Individuel Open 16,000.00 0.00 2020-02-17 2020-04-06 2020-04-27 2020-06-01 2020-11-28 d'exécution de positionnement des school enseignants TN-UGPO/ME-08-CS-INDV / Assistance technique Improving learning En attente internationale pour IBRD / 88630 conditions in public primary A posteriori Individuel Open 50,000.00 0.00 2020-05-15 2020-07-03 2020-07-24 2020-08-28 2021-02-24 d'exécution l'Élaboration des modules de school formation TN-UGPO/ME-09-CS-INDV / Improving learning Assistance technique En attente IBRD / 88630 conditions in public primary A posteriori Individuel Open 45,000.00 0.00 2020-05-15 2020-07-03 2020-07-24 2020-08-28 2021-02-24 nationale pour l'Élaboration d'exécution school des modules de formation TN-UGPO/ME-10-CS-INDV / Improving learning Assistance technique En attente IBRD / 88630 conditions in public primary A posteriori Individuel Open 6,000.00 0.00 2020-06-15 2020-08-03 2020-08-24 2020-09-28 2021-03-27 nationale pour le Suivi et d'exécution school évaluation des formations TN-UGPO/ME-12-CS-INDV / Improving learning Assistance technique En attente IBRD / 88630 conditions in public primary A posteriori Individuel Open 6,000.00 0.00 2020-07-15 2020-09-02 2020-09-23 2020-10-28 2021-04-26 nationale pour le Suivi et d'exécution school évaluation des formations TN-UGPO/ME-13-CS-INDV / Assistance technique Improving learning En attente internationale pour la IBRD / 88630 conditions in public primary A posteriori Individuel Open 28,000.00 0.00 2020-01-15 2020-03-04 2020-03-25 2020-04-29 2020-10-26 d'exécution Conception et l'élaboration school des modules de formation TN-UGPO/ME-14-CS-INDV / Assistance technique Improving learning En attente nationale pour la IBRD / 88630 conditions in public primary A posteriori Individuel Open 21,000.00 0.00 2020-01-15 2020-03-04 2020-03-25 2020-04-29 2020-10-26 d'exécution Conception et l'élaboration school des modules de formation TN-UGPO/ME-15-CS-INDV / Assistance technique Improving learning En attente internationale pour le IBRD / 88630 conditions in public primary A posteriori Individuel Open 24,000.00 0.00 2020-03-15 2020-05-03 2020-05-24 2020-06-28 2020-12-25 d'exécution Développement des nouveaux school outils d'inspection Page 3 TN-UGPO/ME-16-CS-INDV / Assistance technique Improving learning En attente nationale pour le IBRD / 88630 conditions in public primary A posteriori Individuel Open 12,000.00 0.00 2020-03-15 2020-05-03 2020-05-24 2020-06-28 2020-12-25 d'exécution Développement des nouveaux school outils d'inspection TN-UGPO/ME-17-CS-INDV / Assistance technique Improving learning En attente nationale pour l'Élaboration IBRD / 88630 conditions in public primary A posteriori Individuel Open 7,500.00 0.00 2020-01-15 2020-03-04 2020-03-25 2020-04-29 2020-10-26 d'exécution du manuel de l'entretien school préventif TN-UGPO/ME-18-CS-INDV / Improving learning Assistance technique En attente IBRD / 88630 conditions in public primary A posteriori Individuel Open 6,000.00 0.00 2020-04-15 2020-06-03 2020-06-24 2020-07-29 2021-01-25 nationale pour la Formation d'exécution school sur l'entretien préventif TN-UGPO/ME-29-CS-INDV / Assistance technique Improving learning internationale pour la En attente IBRD / 88630 conditions in public primary A posteriori Individuel Open 20,000.00 0.00 2020-08-24 2020-10-12 2020-11-02 2020-12-07 2021-06-05 Documentation des d'exécution school procédures de rédaction d’item TN-UGPO/ME-30-CS-INDV / Assistance technique internationale pour la Improving learning En attente Formation des inspecteurs, IBRD / 88630 conditions in public primary A posteriori Individuel Open 16,000.00 0.00 2020-08-24 2020-10-12 2020-11-02 2020-12-07 2021-06-05 d'exécution assistants pédagogiques et school enseignants à la rédaction d’items TN-UGPO/ME-31-CS-INDV / Assistance technique internationale pour En attente l'élaboration d'un Guide pour IBRD / 88630 Project management A posteriori Individuel Open 12,000.00 0.00 2020-08-24 2020-10-12 2020-11-02 2020-12-07 2021-06-05 d'exécution la remédiation et l’exploitation pédagogique des données TN-UGPO/ME-32-CS-INDV / Assistance technique nationale pour l'élaboration En attente IBRD / 88630 Project management A posteriori Individuel Open 6,000.00 0.00 2020-08-24 2020-10-12 2020-11-02 2020-12-07 2021-06-05 d'un Guide pour la d'exécution remédiation et l’exploitation pédagogique des données Page 4