75398 PROCUREMENT PLAN FOR GRID STATION GOODS - IESCO Package 2 Package 3 Package 4 Package 5 Package 5 (A) Power/TF10/13 MVA 9 Nos. G/Station Material Al.Pipe/Conductor, Earthwire Al. Pipes, Earth Rods Earth Mast, Control / Relay Panels, AC/DC Aux Post Insulatios, Disc Insulators Power/TF 20/26 MVA 2 Nos. C.B.,CTs,PTs, Isolators, Assembly, Earth Mast/wire, Earthing Platform, Earthwire & Panels, Post Insulators, 132 KV/11 KV, (ICB-04 Lot-II & ICB-09 Lot-II Lightening Arrestors, Earthing Platform, Disc Insulator Earthwire Tension Assembly Connectors, Tension & G/Conductor, Beams, Procurement Steps for Goods Suspension Strings, Columns & Structures I/O Door Termination kits Method ICB-01 Method ICB-02 Method ICB-03 Method NCB-03 (A) Method ICB-04 Method ICB-04 (A) Prior Review Reqd Prior Review Reqd Prior Review Reqd Post Review Reqd Prior Review Reqd Prior Review Reqd Preparation of B/Documents/ 16-Jan-2007 16-Jan-2007 3-Apr-2007 20-Jan-2009 21-Aug-2007 25/Jul/2009 Submitted to bank Bank's No.Objection to Bidding Documents {for prior review 17-Apr-2007 5-Aug-2009 26-Jun-2007 4-Feb-2009 4-Oct-2007 5-Aug-2009 cases} Advertisement of Invitation for 12-Aug-2007 12-Oct-2009 21-Aug-2008 12-Oct-2009 11-Feb-2007 12-Oct-2009 Bids Bid submission/Opening Date 28-Nov-2007 16-Jan-2010 13-Oct-2008 25-Nov-2009 3-Mar-2008 19-Dec-2009 Completion of Evaluation and 5-Jan-2008 22-Apr-2010 12-Jan-2009 14-Jan-2010 31-May-2008 9-Feb-2010 Recommendations Evaluation Report submitted to Post reviewed by W.B. on 21-Jan-2008 28-Apr-2010 20-Jan-2009 16-Jun-2008 18-Feb-2010 World Bank 19-July-2010 Bank's No.Objection to Evaluation NCB-07 is prior reviewed by Bank and contract award (For prior 5-Jun-2008 17-Aug-2010 2-Feb-2009 and remaining NCBs will be post 04-Jul-2008 (For Lot-I) 16-Jul-2010 review cases only) reviewed by Bank PMU-26,27,29,30,32 &33 Lot-I: M/s ABB, Lahore on 21-12-2010 (PMU-32) Lot-II: M/s Sieyuan, China on 07-12-2010 (PMU-30) PMU-08 & PMU-09 PMU-15 & PMU-16 PMU-01 Lot-III: M/s Liaoning, China Lot-I with M/s Universal, PMU-07 PMU-31 Lot-I & III with M/s Powertech, (M/s HEC, Hattar) on 28-10-2010 (PMU-27) Karachi on 23-Jun-2009 & Lot-I with Network International Services Lot-I & II with Award of Contract Lahore on 11-Mar-2010 & 16-Jan-2009 (1st) Lot-IV: M/s Wenzhou Yikun, Lot-II with M/s Associated on 23-Jun-2009 M/s EMCO, Lahore on Lot-II & IV with M/s Transmark, 22-Apr-2009 (Final) China Technologies, Lahore on 13-Dec-2010 Lahore on 12-Mar-2010. on 30-11-2010 (PMU-29) 14-Jul-2009 Lot-V: M/s Powertech, Lahore on 31-12-210 (PMU-33) Lot-VI: M/s Assiciates, Lahore on 26-10-2010 (PMU-26) Lot -III & VI 12-Nov-2010 Copy of signed contract sent to 27-Jun-2009 (Lot-I) & 5-Jun-2009 Lot-I, II & IV 27-Dec-2010 19-Jul-2010 27-Jun-2009 27-Dec-2010 Bank (for prior review cases) 17-Jul-2009 (Lot-II) Lot-V 12-Jan-2011 Lot-I 25-May-2012 Lot-II 25-May-2012 Lot-I: 07-Feb-2011 Lot-III 30-Sep-2011 Lot-I 03-Dec-2009 Delivery Schedule 31-Oct-2009 Lot-III: 19-Oct-2010 4-Jan-2010 21-Sep-2011 Lot-IV 24-Sep-2011 Lot-II 03-Oct-2009 Lot-II & IV 03-Sep-2010 Lot-V 20-Feb-2012 Lot-VI 23-Feb-2011 Delivery Latest Status Completed Completed Completed Completed Completed Completed PROCUREMENT PLAN FOR GRID STATION GOODS - IESCO Package 6 Package 7 Package 8 Package 9 Package 10 Batteries & Battery Chargers 200 KVA Pad Mounted 11 Kv Switchgears Control & Power Cables Cartridges & Moulds (110V DC) Trasnformers Incoming/Outgoing (25KA), Bus Coupler Procurement Steps for Goods Method NCB-01 Method NCB-02 Method ICB-05 Method ICB-06 Method NCB-03 Post Review Reqd Post Review Reqd Prior Review Reqd Prior Review Reqd Post Review Reqd Preparation of B/Documents/ B/D Preparation 25-Oct-2006 B/D Preparation 25-Oct-2006 3-Apr-2007 25-Jul-2009 B/D Preparation 25-Oct-2006 Submitted to bank Bank's No.Objection to NCB-07 is prior reviewed by Bank and NCB-07 is prior reviewed by Bank and NCB-07 is prior reviewed by Bank Bidding Documents {for prior remaining NCBs will be post reviewed remaining NCBs will be post reviewed 1-Jun-2007 5-Aug-2009 and remaining NCBs will be post review cases} by Bank by Bank reviewed by Bank Advertisement of Invitation for 29-Apr-2009 29-Apr-2009 15-Apr-2008 12-Oct-2009 29-Apr-2009 Bids Bid submission/Opening Date 30-May-2009 30-May-2009 9-Jun-2008 19-Dec-2009 30-May-2009 Completion of Evaluation and 7-Aug-2009 12-Aug-2009 22-Dec-2008 12-Mar-2010 1-Aug-2009 Recommendations Evaluation Report submitted 3-Jan-2009 16-Mar-2010 to World Bank Post reviewed by W.B. on Post reviewed by W.B. on Post reviewed by W.B. on Bank's No.Objection to 19-July-2010 19-July-2010 19-July-2010 Evaluation and contract award 28-Jan-2009 19-Mar-2010 (For prior review cases only) PMU-12 & PMU-14 PMU-21 & PMU-22 PMU-06 Item-I with M/s Exide Karachi PMU-19 Lot-I with M/s Universal PMU-13 with M/s AREVA Lahore Award of Contract on 03-Mar-2010 & with M/s Transfopower, Lahore on on 28-Apr-2010 & for with M/s Waheed Naeem & Co., on 22-May-2009 Item-II with M/s Electroways Lahore 19-Apr-2010 Lot-II with M/s Newage Lahore on 03-Mar-2010 on 04-Mar-2010 on 30-Apr-2010 Copy of signed contract sent to 4-Mar-2010 19-May-2010 28-May-2009 19-May-2010 5-Mar-2010 Bank (for prior review cases) Item-I 6-Jul-2010 Lot-I 22-Jan-2011 Delivery Schedule 21-Oct-2010 31-Oct-2009 1-Jun-2010 Item-II 6-Sep-2010 Lot-II 24-Sep-2010 Delivery Latest Status Completed Completed Completed Completed Completed PROCUREMENT PLAN FOR TRANSMISSION LINE GOODS - IESCO Package 11 Package12 Package 13 Package 14 Package 15 Package 16 Package 17 Package 18 132 KV Transmission 132 KV Transmission Line Hardware for T/Line Transmission Line 132 KV Transmission 132 KV Towers 132 KV Landative 132 KV Landative Line Towers with Towers & Tubler Poles, Conductors & Line ZM-30 Towers & ZM-30 Stubs Towers L-30 Towers L-60 Steel Tubler Pole Accessories Disc Insulators, Grounding Earthwire 132KV SPA, SPD & SPG Steel Tubler Poles Sets Method ICB-07 Method ICB-08 Method ICB-09 Method ICB-10 Method ICB-23 Method RFQ-03 Method RFQ-01 Method RFQ-02 Prior Review Reqd Prior Review Reqd Prior Review Reqd Prior Review Reqd Prior Review Reqd Preparation of B/Documents/ Submitted to bank 18-May-2007 9-Jan-2008 16-Jan-2007 25-Jul-2009 15-Aug-2012 Nil Nil Nil Bank's No.Objection to Bidding Documents {for prior 20-Aug-2007 19-03-2008 20-Mar-2007 5-Aug-2009 3-Sep-2012 NIl Nil Nil review cases} Advertisement of Invitation for Bids 6-Jan-2008 26-Jun-2008 25-Jun-2007 12-Oct-2009 10-Sep-2012 09.05.12 13.12.11 1/24/2012 Bid submission/Opening Date 3-Mar-2008 28-Aug-2008 16-Aug-2007 19-Dec-2009 30-Oct-2012 15.05.12 19.12.11 2/2/2012 Completion of Evaluation and Recommendations 20-May-2008 21-Jan-2009 10-Nov-2007 3-Mar-2010 10-Dec-2012 28.05.12 26.12.11 3/7/2012 Bid Evaluationa Report submited to World Bank 26-May-2008 23-Jan-2009 2-May-2008 8-Mar-2010 13-Dec-2012 Nil Nil Nil Bank's No.Objection to Evaluation and contract award 03-Apr-2009 (1st) 15-Apr-2009 5-Aug-2008 26-Mar-2010 26-Dec-2012 Nil Nil Nil (For prior review cases only) 25-Jun-2010 (2nd) (Lot-I & III) PMU-04 PMU-23 PMU-24 PMU-10 wih M/s PECO-METRO with M/s Newage Cables Award of Contract with M/s Shaanxi, China with M/s SA-RA, Turkey on 4-Feb-13 31.05.12 30.12.11 19.03.12 (JV), Lahore Lahore on on 03-Aug-2010 15-Jul-2009 on 14-Mar-2009 15-Jun-2010 Copy of signed contract sent to Bank (for prior review 4-Jan-2009 12-Aug-2010 17-Jul-2009 16-Jun-2010 12-Feb-2013 Nil Nil Nil cases) Delivery Schedule 6-Sep-2009 19-Jan-2011 29-Mar-2010 9-Dec-2010 13-May-2013 14.07.12 30.03.12 19.06.12 Delivery Latest Status Completed Completed Completed Completed Completed Completed Completed PROCUREMENT PLAN FOR ELR GOODS - IESCO Package 1 Package 2 Package 3 Package 4 Package 5 Package 6 Distribution Single & 3 Phase HT / LT Structures & Conductors, Cables LT Spool Insulators, 11 KV D-Fuse Fittings & Fuses (Lot-II) 11 KV Auto Line Transformers Digital Meters HT / LT PC Poles & G.S.Wires Pin/Disc Insulators, Hardware (Part of Lot III of ICB-21) Sectionalizer Procurement Steps for Material & HT/LT Capacitors (Lot-II of ICB-21-A) Goods ICB-11 Method ICB-12 Method ICB-13 Method ICB-14 Method ICB-21 Method ICB-21 (A) Method ICB-21 (B) Prior Review Reqd Prior Review Reqd Prior Review Reqd Prior Review Reqd Prior Review Reqd Prior Review Reqd Prior Review Reqd Preparation of 01-Feb-2011 / B/Documents/ Submitted to 11-Mar-2008 3-Apr-2007 18-Mar-2009 4-Oct-2007 9-Sep-2009 18-Jan-2010 24-Feb-2011 bank Bank's No.Objection to Bidding Documents {for 1-May-2008 13-Jun-2007 26-Mar-2009 20-Mar-2008 12-Jun-2009 25-Feb-2010 4-Mar-2011 prior review cases} Advertisement of Invitation 23-May-2008 11-Dec-2007 4-Aug-2009 28-Jun-2008 4-Aug-2009 14-Nov-2010 22-May-2011 for Bids Bid submission/Opening 23-Jul-2008 20-Mar-2008 17-Sep-2009 28-Aug-2008 10-Oct-2009 29-Dec-2010 7-Jul-2011 Date Completion of Evaluation 17-Sep-2008 21-May-2008 4-Nov-2009 5-Dec-2008 5-Jan-2010 18-Feb-2011 16-Aug-2011 and Recommendations Bid Evaluation Report 26-Sep-2008 16-Jun-2008 10-Nov-2009 18-Dec-2008 8-Jan-2010 24-Feb-2011 8-Sep-2011 submitted to World Bank Bank's No.Objection to 27-Oct-2011 (Lot-II) Evaluation and contract 08-June-2010 (Lot-I) 25-Feb-2010 (Lot-II & IV) 21-Mar-2011 (Lot-II) (LOI issued to M/s ENTEC, 3-Dec-2008 30-Jun-2008 20-Jan-2009 (Lot-I) award (For prior review 01-Sep-2010 (Lot-II) 01-Jun-2011 (Lot-III) Korea on 15-12-2011) cases only) PMU-18, PMU-20 & PMU-36 PMU-25 & PMU-28 Lot-II with M/s EMCO, Lahore PMU-02 Lot-I with M/s Vision, PMU-03 PMU-05 on 20-Apr-2010 & PMU-35 PMU-37 with M/s SBEEC, Lahore on 12-Aug-2010 & with M/s Newage Award of Contract with M/s Eaglerise, Lot-IV with M/s Khawaja, Lahore with M/s Creative Engineering, with M/s ENTEC, Korea Lahore on Lot-II with M/s MREC- Cables, Lahore on China on 08-Apr-2009 on 19-Apr-2010 Lahore on 05-May-2011 on 08-Feb-2012 17-Feb-2009 REDCO (J.V), Lahore 24-Feb-2009 Lot-III: with M/s Creative on 23-Nov-2010 on 09-07-2011 Copy of signed contract sent Lot-I on 18-Aug-2010 & to Bank (for prior review 4-Aug-2009 3-Feb-2009 3-Dec-2009 22-Mar-2010 (Lot-I & II) 9-May-2011 13-Feb-2012 Lot-II on 27-Dec-2010. cases) Lot-II 5-Oct-2010 Lot-I 4-Dec-2010 Delivery Schedule 4-Mar-2010 12-Jan-2010 22-Aug-2009 Lot-IV 15-Oct-2010 26-Sep-11 06-Jun-2012 (120 days) Lot-II 13-Apr-2011 Lot-III 27-01-2012 Delivery Latest Status Completed Completed Completed Completed Completed Completed Under shipment PROCUREMENT PLAN FOR ELR GOODS - IESCO Package 7 Package 8 Package 10 Package 11 Pick up 4x2 Single Cabin Augur Fitted Crane Laser Printers Laptops & Desktop Computer 2400-3000 CC (Complete) Procurement Steps for Goods Method RFQ-04 (Shoping Method) Method NCB-05 Method NCB-07 Method NCB-07 (A) Prior Review Reqd Post Review Reqd Prior Review Reqd Prior Review Reqd Preparation of B/Documents/ Submitted 1-Mar-2010 B/D Preparation 25-Oct-2006 28/Jan/2009 01-Feb-2011 / 24-Feb-2011 to bank NCB-07 is prior reviewed by Bank and Bank's No.Objection to Bidding 3-May-2010 remaining NCBs will be post reviewed 4/Feb/2009 10-Oct-2011 (Revised) Documents {for prior review cases} by Bank Advertisement of Invitation for Bids 28/Sep/2010 8/Sep/2009 29/Apr/2009 20-Oct-2011 (Revised) Bid submission/Opening Date 18/Oct/2010 8/Oct/2009 30/May/2009 24-Nov-2011 (Revised) Completion of Evaluation and 02-11-2010 10/Dec/2009 21/Aug/2009 19-Jan-2012 (Revised) Recommendations Bid Evaluation Report submitted to World 4/Nov/2010 16/Sep/2009 24-Jan-2012 (Revised) Bank Post reviewed by W.B. on Bank's No.Objection to Evaluation and 19-July-2010 contract award (For prior review cases 15/Nov/2010 18-Nov-2009 (Lot-II) 22-Feb-2012 (Revised) only) PMU-34 PMU-17 PMU-11 PMU-38 Award of Contract with M/s Toyota Rawal Motors, with M/s Burhani, Karachi on with M/s DWP Technologies with M/s ORA-TECH Systems (Pvt.) Rawalpindi on 12-Jan-2011 15-Mar-2010 Islamabad on 16-Dec-2009 Ltd., Islamabad on 29-March-2012 Copy of signed contract sent to Bank (for 15/Jan/2011 19/Jul/2010 19/Dec/2009 4/Apr/2012 prior review cases) Delivery Schedule 9/May/2011 19/Oct/2010 19/Apr/2010 08-Jun-2012 (120 days) Delivery Latest Status Completed Completed Completed Completed PROCUREMENT PLAN FOR GRID STATION WORKS-IESCO Package 1 04 No. New Grid Stations on Supply & Installation basis 132 kv Grid Station Gangal 132 KV Grid Station Adyala Road 132 KV Grid Station MES 132 KV Grid Station Bahter More Procurement Steps for Goods Method ICB-20 Method ICB-17 Method ICB-18 Method ICB-19 Prior Review Reqd Prior Review Reqd Planned Date Prior Review Reqd Prior Review Reqd Planned Date Preparation of B/Documents/ 01-Aug-2011/25-Aug-2011 01-Aug-2010 / 16-Sep-2010 01-Jul-2010 / 18-Aug-2010 01-Jun-2011 / 21-Jun-2011 Submitted to bank Bank's No.Objection to Bidding Documents {for prior 8/Sep/2011 9/Jul/2010 11/Jan/2011 1/Jul/2011 review cases} Advertisement of Invitation for 18/Sep/2011 24/Sep/2010 25/Jan/2011 8/Jul/2011 Bids Bid submission/Opening Date 1/Nov/2011 7/Dec/2010 25/Mar/2011 10/Sep/2011 Completion of Evaluation and 5/Jan/2012 9/Feb/2011 8/Jun/2011 16/Nov/2011 Recommendations Evaluation Report submitted to 16/Jan/2012 11/Feb/2011 15/Jun/2011 12/Dec/2011 W. Bank Bank's No.Objection to Evaluation and contract award 17/Feb/2012 26/Jul/2011 16/Aug/2011 16/Jul/2012 (For prior review cases only) 06-Sep-2011 (W-16) 02-Nov-2011 (W-19) 15-May-2012 (W-23) M/s ALSTOM G/S Karachi M/s ALSTOM G/S Karachi Award of Contract M/s Transmark-LEEEC 25/Aug/2012 (Consortium) Copy of signed contract sent to 27/May/2012 28/Sep/2011 4/Nov/2011 30/Aug/2012 Bank (for prior review cases) Completion Schedule 07-Aug-2013 (450 days) 29-Nov-2012 (450 days) 27-Oct-2012 (360 days) 18-Nov-2013 (450 days) Completion Status Work in Progress Work in Progress Work in Progress NOA will be issued soon. PROCUREMENT PLAN FOR WORKS - IESCO CONSTRUCTION OF COLONIES OF G. STATIONS/ CONVERSION OF GRID STATIONS / ELR COMPONENTS Package W-5 Package W-6 Package W-7 Conversion of 04 Grid Stations (Dandot , Minhasa, Conversion of 03 Grid Stations (Pinanwal, Hajira & Construction of 07 No. Line Bays at (F/Jang, Plandri) P/Wadhai) Ahmadal & Pindi Gheb) - 4 Lots (Azad Pattan, Trar Khel) - 3 Lots Civil work through Contractor & Errection/ installation (C.S.Shah) Procurement Steps for Works Whole work through contractor etc. Departmentally 03-Lots Method NCB-102 Method NCB-101 Method NCB-103 Post Review Reqd Post Review Reqd Post Review Reqd Preparation of Bidding Documents/ Submitted to 29-Jul-2010 / 15-Mar-2011 3/Feb/2011 15/Mar/2011 Bank Bank's No.Objection to Bidding Documents (for 19/Apr/2011 Post review required Post review required prior review cases) Advertisement of Invitation for Bids 25/Apr/2011 27/May/2011 27/Mar/2011 Bid submission/Opening Date 31/May/2011 19/Jul/2011 5/May/2011 Completion of Evaluation and Recommendations 26/Jul/2011 12/Sep/2011 22/Jun/2011 Bid Evaluation Report submitted to World Bank Bank's NOL not required Bank's NOL not required being post review by bank Bank's NOL not required being post review by bank Bank's No.Objection to Evaluation and contract being post review by bank award (For prior review cases only) PMU/W-20, W-21 & W-18 Lot-I: Transmark-Mecons (J.V) - dated 15-11-2011 05-Sep-2011 (W-20) PMU/W-8, W-9 & W-10 Award of Contract W-11, W-12, W-13 & W-14 Lot-II: Al-Hussain Traders, LHR dated 15-11-2011 Lot-I to III: M/s M/s Amin Brothers Engineers, Lahore Lot-I to IV with M/s Saeed Contractor, Faisalabad (W-21) on 18-July-2011 Lot-III:Netracon Technologies, Lhr 27-10-2011 (W-18) Copy of signed contract sent to Bank (for prior - - - review cases) Lot-I: 17-May-2012 (255 days) Lot-I: 15 Sep-2012 (300 days) Lot-II: 17-May-2012 (255 days) Lot-I & II: 12-Feb-2012 (210 days) Completion Schedule Lot-II: 29 Sep-2012 (300 days) Lot-III: 17-May-2012 (255 days) Lot-III: 13-Jan-2012 (180 days) Lot-III: 22 Aug-2012 (300 days) Lot-IV: 10-Apr-2012 (225 days) Lot-I & II: Work in Progress Lot-I : Work in Progress Lot-I & III completed. Completion Status Lot-III & IV: Ready for commissioning Lot-III& III Ready for commissioning Lot-II - work stopped due to hard rock PROCUREMENT PLAN FOR WORKS - IESCO TRANSMISSION LINES COMPONENTS Package W-9 Package W-10 Package W-11 Package W-12 i. 132kv SDT T/Line i. 132kv SDT T/Line Murree - Minhasa i. 132kv D/C T/Line i. 132kv D/C T/Line C.S.Shah - Dandot (Feed for Minhasa G/S) In & Out of Rawat - Chakri Pirwadhai to MES (Feed for Dandot G/S) ii. 132kv S/C T/Line Tarar Khel - Hajeera (Feed for Adyala Road G/S) (Feed for MES G/S) ii. 132kv SDT T/Line (Feed for Hajeera G/S) ii. Wah-Fateh Jang, T/Line ii. 132kv D/C T/Line Dandot - Pinanwal iii. 132kv SDT T/Line Tarar Khel - Plandri (F/F Bahtre More G/S) (Feed for Gangal G/S) (Feed for Pinanwal G/S) (Feed for Plandri G/S) only one T/T (Lot-II: Decided work will be done by Procurement Steps for Works iii. 132kv D/C T/Line iii. 132kv SDT T/Line iv. 132kv SDT T/Line Azad Pattan - Plandri IESCO itself) Remodeling/Reconductring of 132kv existing T/Line F/Jang - Ahmadal - Pindigheb (Feed for Plandri G/S) University Nilore (Feed for Ahmadal/Pindigheb G/S) v. 132kv SDT T/Line Kotli - Dhudyal Construction thrgouh contractor (Against Repl. of Chaksawari -Kotli T/L) (Feed for Kotli G/S) Method NCB-11 Method NCB-08 Method NCB-09 Method NCB-10 Post Review Reqd Post Review Reqd Prior Review Reqd Prior Review Reqd Planned Date Planned Date Preparation of Bidding Documents/ Submitted to Bank 04-Sep-2009 / 06-Apr-2010 01-Aug-2010 / 06-Sep-2010 5/Mar/2011 7-Dec-11 Bank's No.Objection to Bidding Documents {for prior 12/Apr/2010 21/Oct/2010 Post review required Post review required review cases} Advertisement of Invitation for Bids 28/Oct/2010 27/Mar/2011 18-Dec-11 Bid submission/Opening Date 29/Jun/2010 29/Nov/2010 3/May/2011 24-Jan-12 29-Sep-2010 (1st) Completion of Evaluation and Recommendations 19/Jan/2011 07-Jul-2011 (Lot-I) 7-Mar-12 24-May-2011 (Rev.) 21-Oct-2010 (1st) 24-Jan-2011 Bid Evaluation Report submitted to W. Bank 30-May-2011 (Rev.) 09-Feb-2011 (Rev) 21-Mar-2011 (NOC) Bank's NOL not required being post review by bank Bank's NOL not required being post review by bank 26-Dec-2011 (Lot-III) NOIs issued on 26-03-2011 to for: Bank's No.Objection to Evaluation and contract award 31-Jan-2011 (Lot-II) Lot-I & IV: M.R.Electric - Al-Abdullah (J.V), Lahore {For prior review cases only} 17-June-2011 (Lot-I) Lot-II: National Heritage, Lahore Lot-III & V:Mecons, Lahore PMU/W-17,W-2 & W-1 PMU/W-3, W-4, W-5, W-6 & W-7 PMU/W-25, W-24, W-22 Lot-I & IV: M/s M.R.Electric - Al-Abdullah (J.V), Lahore Lot-I: with M/s Saeed, Faisalabad on 10-Jul-2012 Lot-I: M/s Mecons, Lahore on 20-Sep-11 on 15-Apr-2011 PMU/W-15 Award of Contract Lot-II: with M/s NPCC on Lot-II: M/s Mecons, Lahore on 22-Feb-11 Lot-II: M/s National Heritage Constructors, Lahore on 05- Lot-I: with Mehrban & Sons on 07-Sep-2011 21-May-2012 Lot-III: M/s NEIE, China on 29-Jan-11 & May-2011 Lot-III: with M/s Saeed, Faisalabad on 09-May-2012 Lot-III & V: M/s MECONS, Lahore on 18-05-2011 Lot-II: 10-Mar-2011 Copy of signed contract sent to Bank {for prior review Lot-II: 16-May-2011 Lot-II: BD under preparation by IESCO. The work will Lot-III: 22-Feb-2011 - cases} Lot-III & V: 21-May-2011 be executed by IESCO through its own resources. Lot-I: Prior Review Lot-I: 16-Mar-2013 Lot-I: 15-June-2012 (270 days) Lot-I & IV : 08-Jul-2012 (450 days) Lot-II: 15-Jan-2013 Completion Schedule Lot-II: 21-Feb-2012 (365 days) Lot-II: 26-Jul-2012 (450 days) 19-May-2012 (255 days) Lot-III: 03-Jan-2013 Lot-III: 22-Apr-2012 (450 days) Lot-III & V: 09-Aug-2012 (450 days) (240 days) Completion Status Work in progress. Work in progress. Work in progress. Work in progress.