Sample Procurement Plan (Text in italic font is meant for instruction to staff and should be deleted in the final version of the PP) (This is only a sample with the minimum content that is required to be included in the PAD. The detailed procurement plan is still mandatory for disclosure on the Bank’s website in accordance with the guidelines. The initial procurement plan will cover the first 18 months of the project and then updated annually or earlier as necessary). I. General 1. Bank’s approval Date of the procurement Plan [June 19, 2015]: Revision Oct 23, 2017] 2. Date of General Procurement Notice: Oct 18, 2015 3. Period covered by this procurement plan: Oct 2017-Oct 2018 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: [Thresholds for applicable procurement methods (not limited to the list below) will be determined by the Procurement Specialist /Procurement Accredited Staff based on the assessment of the implementing agency’s capacity.] Contracts at or above the threshold set below(USD Million) are subject to the Bank's Prior Review US$Million Works (including turnkey, supply & installation of plant and equipment, and PPP) 2.0 Goods, information technology and non-consulting services 0.5 Consultants: firms 0.5 Consultants: individuals 0.3 2. Oct 31, 2017 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: [Refer to the relevant CDD project implementation document approved by the Bank or delete if not applicable] 4. Reference to (if any) Project Operational/Procurement Manual: Project Operational Manual that includes a Procurement Section was approved in Sept 17, 2015 5. Any Other Special Procurement Arrangements: [including advance procurement and retroactive financing, if applicable] NONE 6. Summary of the Procurement Packages planned during the first 18 months after project effectiveness ( including those that are subject to retroactive financing and advanced procurement) [List the Packages which require Bank’s prior review first and then the other packages] III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Threshold Comments 1. Competitive Methods (Firms) Above US$ 100,000 2. Single Source (Firms) All 3. Individual Above US$ 50,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: [including advance procurement and retroactive financing, if applicable or delete if not applicable] Oct 31, 2017 4. Consultancy Assignments with Selection Methods and Time Schedule (works, goods, services) Procurement Category: Works 1 2 3 4 5 Proc ID Contract (Description) Estimate Cost Procurement UPDATED STATUS Review by Bank (US$ million) Method PLANNED 2.423 NCB Prior PREPSamoa/W01 (Negotiations Oct 2015) Construction of National (Modernization of the Emergency Operations REVISED (20/12/2016) 2.423 NCB Prior Observation Infrastructure, Center of some 1000 sq m Data Management Systems, (Cost Table: SC1.1.2.D1) REVISED (17/06/2017) 3.125 NCB Prior Forecasting and Warning Systems) ACTUAL 4.870 NCB Prior PLANNED 0.920 Shopping Prior PREPSamoa/W02 (Negotiations Oct 2015) (Modernization of the Extension of Seismic Observation Infrastructure, Operations Center (at Data Management Systems, Mulinu'u) (Cost Table: REVISED (20/12/2016) 0.820 NCB Post Forecasting and Warning SC1.1.2.D2) Systems) ACTUAL 0.000 NCB Post Procurement Category: Goods 1 2 3 4 5 Oct 31, 2017 Proc. ID Contract (Description) Estimat Cost Procurement Review by Bank (US$ million) Method PREPSamoa/Goods 01 Stockpiling of emergency (Enhancement of the MHEWS goods to enhance Service and Preparedness preparedness and response Delivery System) (Cost Table: SC1.1.3.B5) PREPSamoa/Goods 01A Chainsaws (5Nos) PLANNED 5Nos rolls (length: 80m per 0.25 Shopping Post (Negotiations Oct 2015) roll) Nylon/synthetic fibre PREPSamoa/Goods 01B Ropes (18mm diameter and accessories) 5 Nos Water Tanks (capacity PREPSamoa/Goods 01C 10 000litres each) REVISED (20/12/2016) 0.03 Shopping Post PREPSamoa/Goods 01A Chainsaws (5Nos) 0.0085 Shopping Post 5Nos rolls (length: 80m per roll) Nylon/synthetic fibre PREPSamoa/Goods 01B 0.0012 Shopping Post Ropes (18mm diameter and ACTUAL accessories) 5 Nos Water Tanks (capacity PREPSamoa/Goods 01C 10 000litres each) 0.0097 Shopping Post PLANNED Office Equipment ( 3Nos (Negotiations Oct 2015) computers, 2 Nos digital PREPSamoa/Goods 02 camera and1 No printer/scanner/fax with REVISED (20/12/2016) 0.01 Shopping Post accessories) ACTUAL 0.01 Shopping Post PLANNED (Negotiations Oct 2015) Office furniture ( office PREPSamoa/Goods 03 desks, filing cabinets with locks and office chairs) REVISED (20/12/2016) 0.005 Shopping Post ACTUAL 0.005 Shopping Post Oct 31, 2017 PLANNED 0.450 Direct Contracting Prior PREPSamoa/Goods 04 (Negotiations Oct 2015) GSM connection for 18 Nos (Modernization of the rainfall and 16 Nos Observation Infrastructure, REVISED (20/12/2016) 0.450 Direct Contracting Post hydrological sub stations Data Management Systems, (Cost Table: SC1.1.2.A1 & Forecasting and Warning ACTUAL 0.247 Direct Contracting Post SC1.1.2.B1) Systems) EXTENSION 0.00 Direct Contracting Post Bid Package (BP2 with Lots PREPSamoaTonga/Goods/BP2 for Samoa and Lots Tonga PLANNED (REGIONAL (PSU) with separate contracts) - 1.10 ICB Prior (Negotiations Oct 2015) PROCUREMENT) regional procurement by SPC Samoa Lot A (Modernization of the Data management Observation Infrastructure, Equipment system, including TBA TBA TBA TBA Data Management Systems, back up at NEOC Forecasting and Warning (Cost Ta ble: SC1.1.2.B2) Systems) Samoa Lot B (Modernization of the Forecasting platform Observation Infrastructure, Equipment backup at NEOC TBA TBA TBA TBA Data Management Systems, (Cost Table: SC1.1.2.B3) Forecasting and Warning Systems) Computers, software for drought and flood Samoa Lot C monitoring, storm surges, (Modernization of the coastal inundation Observation Infrastructure, forecasting and hydrological TBA TBA TBA TBA Data Management Systems, forecasting (3 independent Forecasting and Warning systems), visual tools for Systems) MHEWS at Met Dept (Cost Table: SC1.1.2.C1) Oct 31, 2017 Computers, software, Samoa Lot D furniture, generators for (Modernization of the NEOC and Seimic Observation Infrastructure, Operations Center (warning TBA TBA TBA TBA Data Management Systems, dissemination) with back up Forecasting and Warning system at NEOC (Cost Systems) Table: SC1.1.2.C3) ACTUAL TBA TBA TBA Procurement Category: Consultant 1 2 3 4 5 Proc. ID Description of Assignment Estimate Cost Selection Review by Bank UPDATED STATUS (US$ million) Method PLANNED (Negotiation 0.100 ICS Prior 2015) Institutional strengthening, REVISED (20/12/2016) 0.100 ICS Post development of a legal and PREPSamoa/CON 01 regulatory framework for (Strengthening Early Warning MHEWS including and Preparedness) development of SOPs,etc ACTUAL 0.05 ICS Post (Cost Table: SC1.1.1.A1) EXTENSION 0.00 ICS Post INCL. AS DELIVERABLE INCL. AS FOR DELIVERABLE FOR PLANNED (Negotiation 0.300 QCBS Prior PREPSamoaTonga/CON01 PREPSamoaTonga/CON01 Oct 2015) SIC SIC PREPSamoa/CON 02 Improvement of service Oct 31, 2017 (Enhancement of the MHEWS delivery to communities Regional Proc. Regional Proc. Regional Proc. Service and Preparedness including development and REVISED (20/12/2016) PREPSamoaTonga/CON PREPSamoaTonga/CON PREPSamoaTonga/CON 01 SIC 01 SIC 01 SIC Delivery System) introduction of mobile applications (warnings, Regional Proc. Regional Proc. Regional Proc. water and food security) ACTUAL PREPSamoaTonga/CON PREPSamoaTonga/CON PREPSamoaTonga/CON 01 SIC 01 SIC 01 SIC (Cost Table: SC1.1.3.A2) PLANNED (Negotiation 0.100 ICS Post Oct 2015) PREPSamoa/CON 03 Survey of warning utility (Enhancement of the MHEWS with public and other sectors REVISED (20/12/2016) 0.10 ICS Post Service and Preparedness (Cost Table: SC1.1.3.A3) Delivery System) ACTUAL 0.00 ICS Post PREPSamoa/CON 04 PLANNED (Negotiation Feasibility study for 0.500 QCBS Prior (Risk Reduction and Resilient Oct 2015) Investments Phase 2 Investment Planning and (Cost Table: SC2.1.1) REVISED (20/12/2016) 0.50 QCBS Prior Preparation) ACTUAL 0.00 QCBS Prior PLANNED (Negotiation 0.125 ICS Prior PREPSamoa/CON 05 2015) DRF Capacity Building (Disaster risk financing (Cost Table: SC3.1.3) REVISED (20/12/2016) 0.125 ICS Post instruments) ACTUAL ToR2 0.00 ICS Post PLANNED (Negotiation 0.250 ICS Post Oct 2015) PREPSamoa/CON 06 Project Manager REVISED (20/12/2016) 0.25 ICS Post (Project management) (Cost Table: SC4.1.1) ACTUAL 0.105 ICS Post RE-TENDER 0.00 ICS Post PLANNED (Negotiation PREPSamoa/CON 07 Procurement Officer 0.175 ICS Prior Oct 2015) (Project management) (Cost Table: SC4.1.2) REVISED (20/12/2016) 0.175 ICS Post Oct 31, 2017 ACTUAL 0.105 ICS Post PLANNED (Negotiation 0.250 ICS Prior Oct 2015) Implementation Support REVISED (20/12/2016) 0.25 ICS Post PREPSamoa/CON 08 Specialist (Project management) (Cost Table: SC4.1.3) ACTUAL 0.073 ICS Post EXTENSION 0.433 ICS Post PLANNED (Negotiation 0.125 ICS Post Oct 2015) PREPSamoa/CON 09 M&E Officer REVISED (20/12/2016) 0.125 ICS Post (Project management) (Cost Table: SC4.1.4) ACTUAL 0.00 ICS Post PLANNED (Negotiation 0.10 CQS Prior Oct 2015) Design and Supervision and REVISED (20/12/2016) 0.10 CQS Post EIA study for the extension PREPSamoa/CON 10 of the Seismic Operations Center at Mulinu'u REVISED (28/02/2017) 0.16 CQS Post ACTUAL 0.00 CQS Post Design and Develop PLANNED (Negotiation 0.02 ICS Post Technical specifications for Oct 2015) PREPSamoa/CON 11 the upgrading of the Microwave links at Aleisa, Fagalii and Mt Fiamoe REVISED (20/12/2016) 0.02 ICS Post Oct 31, 2017 ACTUAL 0.025 ICS Post PLANNED (Negotiation 0.10 CQS Prior Oct 2015) Assessment, Design and Supervision (including EIA) REVISED (20/12/2016) 0.10 CQS Post of ‘school building’ PREPSamoa/CON 12 structures in 3 target communities; Taelefaga, Uafato in Fagaloa/Upolu and REVISED (20/07/2017) 0.247 CQS Post Falealupo in Savaii ACTUAL 0.00 QCBS Post PLANNED (Negotiation PREPSamoa/CON 13 Design and Technical 0.02 ICS Post Oct 2015) (Modernization of the specifications for the seismic Observation Infrastructure, station (volcanic monitoring Data Management Systems, at Savaii, Matavanu) Forecasting and Warning (Cost Table SC1.1.2. A2; REVISED (20/12/2016) 0.02 ICS Post Systems) SC1.1.2.A3) ACTUAL 0.027 ICS Post PREPSamoaTonga/CON 01 SYSTEM INTEGRATOR (REGIONAL (PSU) CONSULTANT (Regional- PROCUREMENT) Tonga + Samoa) Detailed Design of the MHEWS system, PLANNED (Negotiation 0.90 QCBS Prior Development, improvement Oct 2015) Samoa Lot A and operationalization of (Institutional Strengthening, production of basic and Capacity Building and specialized information Implementation Support) products, Development of SOPs, warning protocols and REVISED (20/12/2016) 1.2 QCBS Prior signals (Cost Table: SC1.1.1.A1; SC1.1.1.B1; ACTUAL QCBS Prior 1.275 Oct 31, 2017 SC1.1.1.B2; SC1.1.1.C1; SC1.1.3.A1; SC1.1.3.A2; SC1.1.3.B1); Oct 31, 2017 PROCUREMENT Samoa : PACIFIC RESILIENCE PROJECT UNDER PACIFIC RESILIENCE PROGRAM PLAN General Information Country: Samoa Bank’s Approval Date of the Original Procurement Plan: 2017-10-31 2019-12-17 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P154839 GPN Date: Project Name: PACIFIC RESILIENCE PROJECT UNDER PACIFIC RESILIENCE PROGRAM Loan / Credit No: IDA / D0770, IDA / D3800 Executing Agency(ies): Ministry of Natural Resources and Environment; Disaster Management Office WORKS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual WS-MNRE DMO-33428-CW- RFB / Modernisation of the Observation Infrastructure, Data Management System, Component 1: Single Stage - One Forecasting and Warning IDA / D0770 Strengthening Early Prior Request for Bids Open - National 4,870,000.00 0.00 Canceled 2017-10-24 2017-10-29 2017-12-10 2018-01-09 2018-03-01 2019-05-25 Envelope System / Construction of Warning and Preparedness National Emergency Operations Center of some 100sq.m WS-MNRE DMO-33428-CW- RFB-2 / PREPSamoaW01 / Component 1: Construction of the National Single Stage - One IDA / D0770 Strengthening Early Prior Request for Bids Open - National 3,125,000.00 2,466,811.04 Signed 2018-03-21 2018-06-04 2018-07-23 2018-08-22 2018-10-01 2019-11-25 Emergency Operations Envelope Warning and Preparedness Center of some 1000 sq meter WS-MNRE DMO-68707-CW- RFB / PREPSamoaW03 Component 2: Risk Pending Single Stage - One /Construction of School IDA / D0770 Reduction and Resilient Post Request for Bids Open - National 350,000.00 0.00 Implementati 2020-04-02 2020-05-15 2020-05-18 2020-07-03 2020-08-03 2021-03-03 Envelope Building for Vaigaga Investments on Primary School WS-MNRE DMO-33432-CW- RFB / PREPSamoaW02 / Component 1: Pending Single Stage - One Construction of the Seismic IDA / D0770 Strengthening Early Post Request for Bids Open - National 820,000.00 0.00 Implementati 2020-08-31 2020-10-12 2020-10-15 2020-11-10 2020-12-04 2021-09-04 Envelope Operations Center at Warning and Preparedness on Mulinuu GOODS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual WS-MNRE DMO-36271-GO- RFQ / Modernization of the Observation Infrastructure, Data Management Systems, Component 1: Under Forecasting and Warning Request for Open - Single Stage - One IDA / D0770 Strengthening Early Post 3,300.00 0.00 Implementati 2017-12-16 2018-03-03 2018-05-02 System / Network Server Quotations International Envelope Warning and Preparedness on (for Water Resource Division to enable proper data communication / data logger without interference0 Page 1 WS-MNRE DMO-68714-GO- RFQ / PREPSamoaGoods09A Component 1: Under / Increase of Stockpiling of Request for Single Stage - One IDA / D0770 Strengthening Early Post Open - National 8,500.00 0.00 Implementati 2018-09-22 2018-11-29 2018-12-27 emergency goods to enhance Quotations Envelope Warning and Preparedness on preparedness and response / 5 Chainsaws WS-MNRE DMO-68717-GO- RFQ / PREPSamoaGoods09B / Increase of Stockpiling of Component 1: Under Request for Single Stage - One emergency goods to enhance IDA / D0770 Strengthening Early Post Open - National 1,200.00 0.00 Implementati 2018-09-22 2018-11-29 2018-12-27 Quotations Envelope preparedness and response / Warning and Preparedness on 5 rolls nylon or synthetic fibre ropes WS-MNRE DMO-68718-GO- RFQ / PREPSamoaGoods09C / Increase stockpiling of Component 1: Under Request for Single Stage - One emergency goods to enhance IDA / D0770 Strengthening Early Post Open - National 10,000.00 0.00 Implementati 2018-09-22 2018-11-29 2018-12-27 Quotations Envelope preparedness and response / Warning and Preparedness on 5 water tanks (capacity 10000L each) WS-MNRE DMO-89353-GO- Component 1: Under RFQ / PREPSamoaGoods09d Request for Single Stage - One IDA / D0770 Strengthening Early Post Open - National 5,700.00 0.00 Implementati 2018-12-17 2019-03-11 2022-03-10 / Increase of Stockpile Goods Quotations Envelope Warning and Preparedness on / Generators (5units) WS-MNRE DMO-89354-GO- Component 1: Under RFQ / PREPSamoaGoods9e - Request for Single Stage - One IDA / D0770 Strengthening Early Post Open - National 4,000.00 0.00 Implementati 2018-12-17 2019-03-11 2022-03-10 Increase of Stockpile Goods - Quotations Envelope Warning and Preparedness on Water Pumps WS-MNRE DMO-89356-GO- Component 1: Under RFQ / PREPSamoaGoods09f Request for Single Stage - One IDA / D0770 Strengthening Early Post Open - National 2,560.00 0.00 Implementati 2018-12-17 2019-03-11 2022-03-10 - Increase in stockpile goods Quotations Envelope Warning and Preparedness on - Brushcutters (5units) WS-MNRE DMO-103711-GO- DIR / PREPSamoaGoods10 / Supply of UPS (8 x Component 4: Project and 1600VAUPS Server) for IDA / D0770 Post Direct Selection Direct 2,500.00 0.00 Canceled 2019-03-04 2019-03-09 2019-04-13 2019-05-25 Program Management Climate Service and Forecasting Sitement Equipment WS-MNRE DMO-103711-GO- DIR-2 / PREPSamoaGoods10 / SUPPLY OF UPS (8 X Component 1: Pending Request for Single Stage - One 1600VA UPS SERVER) FOR IDA / D0770 Strengthening Early Post Limited 2,500.00 0.00 Implementati 2019-06-23 2019-08-18 2020-02-14 Quotations Envelope CLIMATE SERVICE AND Warning and Preparedness on FORECASTING SERVER EQUIPMENT WS-MNRE DMO-122696-GO- DIR / PREPSamoaGoods04A / EXTENSION OF Component 1: Under TELEMETRY NETWORK IDA / D0770 Strengthening Early Post Direct Selection Direct 240,000.00 0.00 Implementati 2019-11-29 2020-01-13 2020-03-05 2020-07-03 UPGRADES AND SPARE Warning and Preparedness on PARTS FOR HYDROLOGICAL STATIONS WS-MNRE DMO-68709-GO- RFQ / PREPSamoaGoods06 / Component 1: Request for Single Stage - One Communication IDA / D0770 Strengthening Early Post Open - National 130,000.00 0.00 Canceled 2018-07-14 2018-10-27 2019-04-25 Quotations Envelope Infrastructure Equipment Warning and Preparedness and Software (FOSS) WS-MNRE DMO-68711-GO- Component 1: Request for Single Stage - One RFQ / PREPSamoaGoods07 / IDA / D0770 Strengthening Early Post Open - National 380,000.00 0.00 Canceled 2018-07-30 2018-11-24 2019-05-23 Quotations Envelope Seismic Upgrade Warning and Preparedness Page 2 NON CONSULTING SERVICES Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual WS-MNRE DMO-76202-NC- DIR / PREPSamoaNCS01 / Pacific Catastrophe Risk Component 3: Disaster Risk IDA / D0770 Prior Direct Selection Direct 500,000.00 0.00 Canceled 2018-08-30 2018-09-04 2018-10-19 2019-10-19 Insurance Company - Pacific Financing Island Countries, Parametric Insurance Policy WS-MNRE DMO-89355-NC- DIR / PREPSamoaNCS02 - Component 3: Disaster Risk IDA / D3800 Prior Direct Selection Direct 2,500,000.00 1,130,000.00 Signed 2018-12-05 2018-12-10 2019-01-12 2023-10-11 Parametric-type disaster risk Financing insurance CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Market Contract Type Estimated Actual Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual WS-MNRE DMO-33427-CS- CQS / Design and Component 1: Consultant supervision, EIA study for Open - IDA / D0770 Strengthening Early Post Qualification 160,000.00 0.00 Canceled 2017-10-24 2017-11-14 2017-12-28 2018-01-27 2018-03-12 2019-06-05 the extension of the Seismic International Warning and Preparedness Selection Operations Center at Mulinuu WS-MNRE DMO-47817-CS- QCBS / PREPSamoaCON14 / System Integrator Consultant (SIC)/ Detailed Design of the MHEWS system, Component 1: Development, improvement Quality And Cost- Open - IDA / D0770 Strengthening Early Prior 1,300,000.00 1,326,615.62 Signed 2018-02-07 2018-02-12 2018-02-22 2018-02-27 2018-03-04 2018-03-30 2018-05-21 2020-12-31 and operationalization of Based Selection International Warning and Preparedness production of basic and speacialise information products, Development SOPs , warning protocols and signals WS-MNRE DMO-33378-CS- QCBS / Structural Assessment, design and supervision (including EIA) Component 2: Risk Quality And Cost- Open - of school building structures IDA / D0770 Reduction and Resilient Post 100,000.00 0.00 Canceled 2017-10-24 2017-11-14 2017-12-28 2018-01-25 2018-02-24 2018-04-09 2018-05-23 2019-08-21 Based Selection International in 3 target communities, Investments Taelefaga, Uafato in Fagaloa, Upolu and Neiafu in Savaii WS-MNRE DMO-33427-CS- CQS-2 / PREPSamoaCON10 Component 1: Consultant Open - Under / Design , Supervision of IDA / D0770 Strengthening Early Post Qualification 160,000.00 0.00 2019-06-13 2019-06-27 2019-08-26 2019-09-25 2019-11-15 2020-05-13 International Implementation the Seismic Operations Warning and Preparedness Selection Center (SOC). WS-MNRE DMO-78864-CS- QCBS / PREPSamoaCON12 / Structural Assessment, Design and Supervision Component 2: Risk Quality And Cost- Open - (including EIA) of school IDA / D0770 Reduction and Resilient Post 247,000.00 0.00 Canceled 2018-09-20 2018-09-25 2018-10-05 2018-10-10 2018-11-09 2018-12-14 2019-01-27 2020-04-21 Based Selection International building structures in 3 Investments target communities, Taelefaga, Uafato and Neiafu in SAvaii Page 3 WS-MNRE DMO-33246-CS- QCBS / Risk Reduction and Component 2: Risk Resilient Investment Quality And Cost- Open - IDA / D0770 Reduction and Resilient Prior 500,000.00 0.00 Canceled 2017-10-23 2017-11-13 2017-12-27 2018-01-24 2018-02-23 2018-03-30 2018-05-04 2019-05-04 Planning and Preparation Based Selection International Investments (Feasibility Study for Investments Phase 2) WS-MNRE DMO-150065-CS- CQS / PREPSamoaCON12B / Component 2: Risk Consultant Verification of Design and Pending IDA / D0770 Reduction and Resilient Post Qualification Open - National 40,000.00 0.00 2019-12-17 2020-01-08 2020-02-05 2020-03-06 2020-03-29 2021-01-23 Supervision of the Implementation Investments Selection Construction of Vaigaga Primary School INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Market Contract Type Estimated Actual Draft Negotiated Description Component Review Type Method Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual WS-MNRE DMO-33222-CS- INDV / Enhancement of the Component 1: Individual MHEWS Service & IDA / D0770 Strengthening Early Post Consultant Open 100,000.00 31,260.96 Signed 2017-10-23 2017-12-20 2018-01-10 2018-02-14 2018-12-14 Preparedness delivery system Warning and Preparedness Selection / Warning Survey with public and other sectors WS-MNRE DMO-33282-CS- Individual INDV / Project Management Component 4: Project and IDA / D0770 Post Consultant Open 125,000.00 32,965.07 Signed 2017-10-23 2017-12-11 2018-01-10 2018-02-23 2020-08-21 / Monitoring and Evaluation Program Management Selection Officer WS-MNRE DMO-33422-CS- INDV / Modernisation of the Observation Infrastructure, Data Management Systems, Component 1: Individual Forecasting and Warning IDA / D0770 Strengthening Early Post Consultant Open 30,000.00 26,702.13 Signed 2017-10-24 2017-10-30 2017-11-29 2018-01-10 2018-07-09 Systems (Design and Warning and Preparedness Selection Technical specifications for the seismic station (volcanic monitoring of Savaii, Matavanu) WS-MNRE DMO-33434-CS- Individual INDV / Project Management Component 4: Project and IDA / D0770 Post Consultant Open 73,000.00 260,131.20 Signed 2017-10-24 2017-12-12 2018-01-11 2018-02-24 2020-10-21 / Implementation Support Program Management Selection Specialist WS-MNRE DMO-33442-CS- INDV / Disaster risk Individual Component 3: Disaster Risk financing instruments / IDA / D0770 Post Consultant Open 125,000.00 143,418.75 Signed 2017-10-24 2017-12-12 2018-01-11 2018-02-24 2020-11-20 Financing Disaster Risk Financing Selection (DRF) Capacity Building WS-MNRE DMO-36268-CS- Individual INDV / Project Management Component 4: Project and IDA / D0770 Post Consultant Open 250,000.00 95,450.00 Signed 2017-11-30 2018-01-18 2018-02-17 2018-04-02 2020-12-02 / PREPSamoaCON06 - Program Management Selection Project Manager WS-MNRE DMO-55371-CS- Component 1: CDS / PREPSamoaCON15 / IDA / D0770 Strengthening Early Post Direct Selection Direct 57,000.00 75,078.08 Signed 2018-04-19 2018-06-09 2018-09-07 2019-11-01 Supervision for Construction Warning and Preparedness of NEOC WS-MNRE DMO-146406-CS- Component 4: Project and Under CDS / PREPSamoaCON16 / IDA / D0770 Post Direct Selection Direct 20,000.00 0.00 2019-12-05 2019-12-16 2020-01-20 2020-07-17 Program Management Implementation SAFEGUARD SPECIALIST Page 4