Procurement Plan I. General 1. Bank’s approval Date of the procurement Plan Revision of Updated Procurement Plan, August 2017 2. Date of General Procurement Notice: October 10, 2016 3. Period covered by this procurement plan: 18 months II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Procurement Category Prior Review Threshold Comments US$ 1. Goods and >= US$2 million All 2. Works >= US$ 10 million All 3. (Non-Consultant Services) >= US$2 million All 2. Prequalification. _Not applicable. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: At sub-national levels (Commune/Sangkat and Community), provisions of the Project Implementation Manual (PIM) dated March 30, 2016 which has been agreed by the Bank will apply. The PIM provides for processes and procedures for procurement at sub-national levels. 4. Reference to (if any) Project Operational/Procurement Manual: the Project Implementation Manual (PIM) dated March 30, 2016 has been agreed by the Bank. 5. Summary of the Procurement Packages 1 2 3 4 5 6 7 Ref. Description Estimated Packages Domest Review Comments No. Cost ic by Bank US$ Prefere (Prior / Post) million nce (yes/no) LASE Upgrade 1.5 1 No Post NCB D/NC Earth Road to DDS/ Late-Rite W/NC Roads B/05/1 (106.96Km) 7 LASE Construction 1.3 1 No Post NCB D/NC of Late-Rite DDS/ Roads = W/NC 29km B/03/1 7 LASE Land 2.4 1 No Post NCB D/NC Preparation DDS/ Agriculture- W/NC Bulldozing, B/02/1 Leveling. 7 Total:2,355.5 0Ha LASE Construction 1.1 1 No Post NCB D/NC of 11 small DDS/ dams. W/NC B/06/1 7 LASE Construction 2.86 1 No Post NCB D/NC of earth roads DDS/ (130Km) W/NC B/04/1 7 LASE Household 0.12 1 No Post NCB D/NC Start-Up DDS/ Packages for G/NC Daung 700 B/12/1 HH (Solar 7 lamp, Tent plastic, mat, blanket, water jar, water filter) LASE Office 0.18 1 No Post NCB D/NC equipment DDS/ (computers & G/NC Photocopy B/03/1 Machines) 6 III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: 2. Selection Method Prior Review Threshold Comment 1. Competitive Methods (Firms) >= US$1,000,000 2. Individual >= US$ 300,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 4. Consultancy Assignments with Selection Methods 1 2 3 4 5 6 Ref. No. Description of Estimated Packages Review Comments Assignment Cost by Bank US$ (Prior / million Post) LASED/N Consulting 0.12 1 Post CQS CDDS/F/3 firm for 5/17 Irrigation Design (8 sites) LASED/N Baseline 0.07 1 Post CQS CDDS/IC/3 Survey in 0/17 year 2017 (Local Firm) LASED/N Impact 0.05 1 Post CQS CDDS/IC/3 Survey for 1/18 2nd year of the project/Mid- term review (Local Firm) LASED/N Final Impact 0.12 1 Post CQS CDDS/IC/3 Survey 2/21 PROCUREMENT Cambodia : KH-Land Allocation for Social and Economic Development Project II PLAN General Information Country: Cambodia Bank’s Approval Date of the Original Procurement Plan: 2016-08-18 2019-03-27 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P150631 GPN Date: 2016-10-10 Project Name: KH-Land Allocation for Social and Economic Development Project II Loan / Credit No: IDA / 58070 Executing Agency(ies): National Committee for Sub-National Democratic Development Secretariat WORKS Bid Evaluation Activity Reference No. Draft Pre- Draft Bidding Loan / Credit Market Procurement Prequalification Actual Process Prequalification Specific Procurement Bidding Documents Proposal Submission Report and / Description Component Review Type Method qualification Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Recommendation for Documents Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual COMMUNE NO 07/17 / Request for Single Stage - One Water well (Afredes) for IDA / 58070 Post Open - National 62,890.00 Signed 2017-06-06 2017-08-01 2018-08-01 Quotations Envelope Thmey 19 Units COMMUNE NO 08/17 / Request for Single Stage - One Water well (Afredes) for IDA / 58070 Post Open - National 9,900.00 Signed 2017-06-06 2017-08-01 2018-08-01 Quotations Envelope Chambak 6 Units COMMUNE NO 10/17 / House for Nurses & Teachers Ceramic tile floor Request for Single Stage - One (W=9.2m, L=16.2m, IDA / 58070 Post Open - National 34,750.00 Signed 2017-07-06 2017-08-31 2018-08-31 Quotations Envelope H=6.82m, 4 bed room, 4 rooms's W.C & 4 places of kitchend) for Tipo 1 QTY 1 Unit COMMUNE NO 11/17 / House for Nurses & Teachers Ceramic tile floor Request for Single Stage - One (W=9.2m, L=16.2m, IDA / 58070 Post Open - National 34,750.00 Signed 2017-07-06 2017-08-31 2018-08-31 Quotations Envelope H=6.82m, 4 bed room, 4 rooms's W.C & 4 places of kitchend) for Tipo 2 QTY 1 Unit COMMUNE NO 12/17 / House for Nurses & Teachers Ceramic tile floor Request for Single Stage - One (W=9.2m, L=16.2m, IDA / 58070 Post Open - National 34,400.00 Signed 2017-07-06 2017-08-31 2018-08-31 Quotations Envelope H=6.82m, 4 bed room, 4 rooms's W.C & 4 places of kitchend) for Choamkravien QTY 1 Unit COMMUNE NO 13/17 / House for Nurses & Teachers (8mx 20m Request for Single Stage - One x4Rooms, each room IDA / 58070 Post Open - National 32,400.00 Signed 2017-07-06 2017-08-31 2018-08-31 Quotations Envelope equipped with internal kitchen & bathroom) for Chambak QTY 1 Unit COMMUNE NO 14/17 / House for Nurses & Teachers Ceramic tile floor Request for Single Stage - One (W=9.2m, L=16.2m, IDA / 58070 Post Open - National 31,500.00 Signed 2017-07-06 2017-08-31 2018-08-31 Quotations Envelope H=6.82m, 4 bed room, 4 rooms's W.C & 4 places of kitchend) for Sambok QTY 1 Unit COMMUNE NO 15/17 / House for Nurses & Teachers Ceramic tile floor (W=9.2m, L=16.2m, Request for Single Stage - One IDA / 58070 Post Open - National 34,850.00 Signed 2017-07-06 2017-08-31 2018-08-31 H=6.82m, 4 bed room, 4 Quotations Envelope rooms's W.C & 4 places of kitchend) for Changkrang QTY 1 Unit COMMUNE NO 16/17 / House for Nurses & Teachers Ceramic tile floor Request for Single Stage - One (W=9.2m, L=16.2m, IDA / 58070 Post Open - National 34,700.00 Signed 2017-07-06 2017-08-31 2018-08-31 Quotations Envelope H=6.82m, 4 bed room, 4 rooms's W.C & 4 places of kitchend) for Thmey QTY 1 Unit COMMUNE NO 17/17 / House for Nurses & Teachers Ceramic tile floor Request for Single Stage - One (W=9.2m, L=16.2m, IDA / 58070 Post Open - National 30,400.00 Signed 2017-07-06 2017-08-31 2018-08-31 Quotations Envelope H=6.82m, 4 bed room, 4 rooms's W.C & 4 places of kitchend) for Dar QTY 1 Unit COMMUNE NO 18/17 / House for Nurses & Teachers Ceramic tile floor Request for Single Stage - One (W=9.2m, L=16.2m, IDA / 58070 Post Open - National 34,886.00 Signed 2017-07-06 2017-08-31 2018-08-31 Quotations Envelope H=6.82m, 4 bed room, 4 rooms's W.C & 4 places of kitchend) for Ksach Sar QTY 1 Unit COMMUNE NO 19/17 / House for Nurses & Teachers Ceramic tile floor Request for Single Stage - One (W=9.2m, L=16.2m, IDA / 58070 Post Open - National 34,720.00 Signed 2017-07-06 2017-08-31 2018-08-31 Quotations Envelope H=6.82m, 4 bed room, 4 rooms's W.C & 4 places of kitchend) for Sambok Kriel QTY 1 Unit COMMUNE NO 20/17 / House for Nurses & Teachers Ceramic tile floor Request for Single Stage - One (W=9.2m, L=16.2m, IDA / 58070 Post Open - National 34,869.00 Signed 2017-07-06 2017-08-31 2018-08-31 Quotations Envelope H=6.82m, 4 bed room, 4 rooms's W.C & 4 places of kitchend) for Peam QTY 1 Unit Page 1 COMMUNE NO 21/17 / House for Nurses & Teachers (8mx 20m Request for Single Stage - One x4Rooms, each room IDA / 58070 Post Open - National 34,800.00 Signed 2017-07-06 2017-08-31 2018-08-31 Quotations Envelope equipped with internal kitchen & bathroom) for Chhean Loeung QTY 1 Unit COMMUNE NO 22/17 / House for Nurses & Teachers Ceramic tile floor (W=9.2m, L=16.2m, Request for Single Stage - One IDA / 58070 Post Open - National 33,942.00 Signed 2017-07-06 2017-08-31 2018-08-31 H=6.82m, 4 bed room, 4 Quotations Envelope rooms's W.C & 4 places of kitchend) for Raksmey Samaki QTY 1 Unit COMMUNE NO 23/17 / Construction of Community Centre Ceramic tile floor Request for Single Stage - One IDA / 58070 Post Open - National 28,900.00 Signed 2017-06-06 2017-08-01 2018-07-31 (W=7.2m, L=17.2m, Quotations Envelope H=6.62m, Warehouse, 2 rooms's W.C) for Dar (1). Total: 1 Unit COMMUNE NO 24/17 / Construction of Community Centre Ceramic tile floor Request for Single Stage - One IDA / 58070 Post Open - National 28,950.00 Signed 2017-06-06 2017-08-01 2018-07-31 (W=7.2m, L=17.2m, Quotations Envelope H=6.62m, Warehouse, 2 rooms's W.C) for Thmey (1). Total: 1 Unit COMMUNE NO 25/17 / Construction of Community Centre Ceramic tile floor Request for Single Stage - One (W=7.2m, L=17.2m, IDA / 58070 Post Open - National 27,400.00 Signed 2017-06-06 2017-08-01 2018-07-31 Quotations Envelope H=6.62m, Warehouse, 2 rooms's W.C) for Chambak (1). Total: 1 Unit COMMUNE NO 26/17 / Construction of Community Centre Ceramic tile floor Request for Single Stage - One (W=7.2m, L=17.2m, IDA / 58070 Post Open - National 28,800.00 Signed 2017-06-06 2017-08-01 2018-07-31 Quotations Envelope H=6.62m, Warehouse, 2 rooms's W.C) for Choamkravien (1). Total: 1 Unit COMMUNE NO 27/17 / Construction of Community Centre Ceramic tile floor Request for Single Stage - One (W=7.2m, L=17.2m, IDA / 58070 Post Open - National 25,400.00 Signed 2017-06-06 2017-08-01 2018-08-01 Quotations Envelope H=6.62m, Warehouse, 2 rooms's W.C) for Tipo 2 (1). Total: 1 Unit COMMUNE NO 29/17 / Construction of Community Centre Ceramic tile floor Request for Single Stage - One IDA / 58070 Post Open - National 26,400.00 Signed 2017-06-06 2017-08-01 2018-08-01 (W=7.2m, L=17.2m, Quotations Envelope H=6.62m, Warehouse, 2 rooms's W.C) for Peam (1). Total: 1 Unit COMMUNE NO 30/17 / Construction of Community Centre Ceramic tile floor Request for Single Stage - One (W=7.2m, L=17.2m, IDA / 58070 Post Open - National 28,850.00 Signed 2017-06-06 2017-08-01 2018-08-31 Quotations Envelope H=6.62m, Warehouse, 2 rooms's W.C) for Chean Loeung (1). Total: 1 Unit COMMUNE NO 31/17 / Construction of Community Centre Ceramic tile floor Request for Single Stage - One (W=7.2m, L=17.2m, IDA / 58070 Post Open - National 28,780.00 Signed 2017-06-06 2017-08-01 2018-08-01 Quotations Envelope H=6.62m, Warehouse, 2 rooms's W.C) for Ksach Sor (1). Total: 1 Unit COMMUNE NO 32/17 / Construction of Community Centre Ceramic tile floor Request for Single Stage - One (W=7.2m, L=17.2m, IDA / 58070 Post Open - National 26,300.00 Signed 2017-06-06 2017-08-01 2018-08-01 Quotations Envelope H=6.62m, Warehouse, 2 rooms's W.C) for Chum Kreal (1). Total: 1 Unit COMMUNE NO 33/17 / Construction of Community Centre Ceramic tile floor Request for Single Stage - One (W=7.2m, L=17.2m, IDA / 58070 Post Open - National 27,565.00 Signed 2017-06-06 2017-08-01 2018-08-01 Quotations Envelope H=6.62m, Warehouse, 2 rooms's W.C) for Prey Thom (1). Total: 1 Unit LASED/NCDDS/W/NCB/02/1 7 / Land Preparation Agriculture-Buldozing, Leveling:LOT1: S.Kriel(100), Ksa.Sar(126.50),Peam(116.50) , Chh.loeung(103), Single Stage - One IDA / 58070 Post Request for Bids Open - National 1,913,405.75 Signed 2017-02-01 2017-02-06 2017-03-20 2017-04-19 2017-05-24 2017-11-20 Ra.Samaki(200), TP1(276), Envelope TP2 (226.50), S.bok(100), Ch.Krang(59), Dar(97), Thmey(174)&Chambak(277). LOT2:Daung (500).Grand Total:2,355.50Ha LASED/NCDDS/W/NCB/07/1 7 / Construction of Primary Schools (5Rooms, 4WCs, 1Well, 1Flag Pole) Incl. 250chairs connected with Single Stage - One tables, 5Tables & 5Chairs IDA / 58070 Post Request for Bids Open - National 693,314.40 Signed 2017-09-15 2017-09-20 2017-11-01 2017-12-01 2018-01-05 2018-07-04 Envelope and Whiteboards for: Tipo1, Chambak, Sambok, Raksmey Samaki (KSP), Ksach Sar (KCH), Choamkravien and Daung (2units) Total:8Units LASED/NCDDS/W/SP/01/17 / "Upgrade Earth Road to Late-Rite Roads Request for Single Stage - One IDA / 58070 Post Open - National 127,836.37 Signed 2017-12-20 2018-02-14 2018-08-13 (W4.5mxT0.15m): Main Quotations Envelope Road, KPT Tipo 1 and 2 = 11km. " Page 2 COMMUNE/KPT/W/37/18 / Upgrade Earth Road to Late-Rite Roads Pending Request for Single Stage - One (W4.5mxT0.15m):, Tipo 1 IDA / 58070 Post Open - National 0.00 Implementat 2018-08-06 2018-10-01 2019-03-30 Quotations Envelope (AR3=0.95km, ART=0.71km, ion AR2=1.26km, AR4=1,35) Total= 4.27km. (Package1) LASED/NCDDS/W/NCB/05/1 7 / Upgrade Earth Road to Late-Rite Roads(W4.5mxT0.15m):LOT 1: Tipo1(9.47km), Tipo2 (10.53km) and Main Road (11km). Total 31km. LOT Single Stage - One IDA / 58070 Post Request for Bids Open - National 0.00 Canceled 2017-09-01 2017-09-06 2017-10-18 2017-11-17 2017-12-22 2018-06-20 2: S.Kriel(19km), Envelope K.Sar(10.80km), Peam(11.44km), Chh.Loeung(13.72km) & Ra.Samaki(21km). Total: 75.96km. Grand Total 106.96Km LASED/NCDDS/W/NCB/03/1 7 / Construction of Lot 1. Late-Rite Roads Pending Single Stage - One (W5xT0.15xE0.5m) = 22km. IDA / 58070 Post Request for Bids Open - National 0.00 Implementat 2019-01-01 2019-01-06 2019-02-17 2019-03-19 2019-04-23 2019-10-20 Envelope Lot 2. Earth Roads ion (W5xT0.15xE0.5m) for Daung = 29km LASED/NCDDS/W/SP/09/17 / Build board Construction, Installation and Renew Banner (New bill board 3 Request for Single Stage - One IDA / 58070 Post Open - National 107,060.85 Signed 2018-04-07 2018-06-02 2018-11-29 sites at KSP, KPT and Quotations Envelope KCH) and Renews banner for existing bill board 9 sites. COMMUNE/KRT/W/54/18 / Construction of Health Posts (3 rooms, fense 400m, Request for Single Stage - One gate 1, well1, WC 2rooms, IDA / 58070 Post Open - National 34,900.00 Signed 2018-03-06 2018-05-01 2018-10-28 Quotations Envelope pipe culvert 1, incinerator 1, 200m of laterite road). 1 Unit for Da, KRT COMMUNE/KRT/W/55/18 / Construction of Health Posts (3 rooms, fense 400m, Request for Single Stage - One gate 1, well1, WC 2rooms, IDA / 58070 Post Open - National 36,200.00 Signed 2018-03-06 2018-05-01 2018-10-28 Quotations Envelope pipe culvert 1, incinerator 1, 200m of laterite road). 1 Unit for Thmey, KRT. LASED/NCDDS/W/NCB/08/1 7 / Construction of Health Posts (3 rooms, fense 400m, gate 1, well1, WC 2rooms, pipe culvert 1, incinerator Request for Single Stage - One IDA / 58070 Post Open - National 0.00 Canceled 2017-02-06 2017-04-03 2018-04-03 1, 200m of laterite road). Quotations Envelope Da (1 Unit), Thmey (1 Unit) Ksach Sar (1 Unit), Chhean Loeung (1 Unit) and Daung (1 Unit). Total 5 Units. LASED/NCDDS/W/NCB/01/1 7 / 1) Concrete Poles in Agriculture & Residential Lands (0.12 x 0.12 x 0.75m) = (5000 Poles), 2) Request for Single Stage - One Concrete Poles in Forestry IDA / 58070 Post Open - National 0.00 Canceled 2017-10-07 2017-12-02 2018-05-31 Quotations Envelope & in SLC Sites (0.3x0.3x0.4x1.5m) (150 Poles) and 3) Concrete Poles in Stream and Canal (0.2x0.2x1.5m) for Daung (200 Poles). LASED/NCDDS/W/NCB/09/1 8 / Upgrade Earth Road to Late-Rite Road(W4.5mxT0.15m):LOT1: KPT,Tipo=15 lines=15.73km,LOT2: KCH A) KrangLvea =22 Lines Single Stage - One IDA / 58070 Post Request for Bids Open - National 946,643.43 Signed 2018-08-22 2018-08-27 2018-10-08 2018-11-07 2018-12-12 2019-12-12 25.14km),B)Peam =17 Envelope Lines(11.44km),C)Chhean Loeung=10 Lines (9.57km)=46.15km & LOT3: KSP,RaksmeySamaki=5 Lines= 16.25km. GrandTotal=78.13Km. COMMUNE/KCH/W/42/18 / Upgrade Earth Road to Late-Rite Roads Pending (W4.5mxT0.15m): Sambok Request for Single Stage - One IDA / 58070 Post Open - National 0.00 Implementat 2018-05-23 2018-07-18 2019-01-14 Kriel, Krang Lvea Quotations Envelope ion Commune, KCH = (URR/5lines = 4.66km). (Package 2). COMMUNE/KCH/W/46/18 / Upgrade Earth Road to Late-Rite Roads Pending Request for Single Stage - One (W4.5mxT0.15m): Chhean IDA / 58070 Post Open - National 0.00 Implementat 2018-05-09 2018-07-04 2018-12-31 Quotations Envelope Loeung Commune, KCH = ion (URR/12lines) = 4.15km. (Package 1). COMMUNE/KCH/W/56/18 / Construction of Health Posts (3 rooms, fense 400m, Request for Single Stage - One gate 1, well1, WC 2rooms, IDA / 58070 Post Open - National 29,967.00 Signed 2018-04-22 2018-06-17 2018-12-14 Quotations Envelope pipe culvert 1, incinerator 1, 200m of laterite road). 1 Unit for Ksach Sar, KCH. COMMUNE/KCH/W/57/18 / Construction of Health Posts (3 rooms, fense 400m, Pending gate 1, well1, WC 2rooms, Request for Single Stage - One IDA / 58070 Post Open - National 0.00 Implementat 2018-04-22 2018-06-17 2018-12-14 pipe culvert 1, incinerator Quotations Envelope ion 1, 200m of laterite road). 1 Unit for Chhean Loeung, KCH. Page 3 COMMUNE/KCH/W/59/18 / Ploughing (2 Times) for Pending Request for Single Stage - One Peam Commune (116.5Ha), IDA / 58070 Post Open - National 0.00 Implementat 2018-05-23 2018-07-18 2019-01-14 Quotations Envelope Samaki Meanchey District, ion Kg. Chhnang COMMUNE/KCH/W/60/18 / Ploughing (2 Times) for Pending Request for Single Stage - One Chheanloeurng Commune IDA / 58070 Post Open - National 0.00 Implementat 2018-05-23 2018-07-18 2019-01-14 Quotations Envelope (103Ha), Samaki Meanchey ion District, Kg. Chhnang. COMMUNE/KSP/W/49/18 / Upgrade Earth Road to Late-Rite Roads (W4.5mxT0.15m): Raksmey Request for Single Stage - One Samaki, KSP = IDA / 58070 Post Open - National 67,345.00 Signed 2018-04-14 2018-06-09 2018-12-06 Quotations Envelope (Up1=3.40km, Up2=0.30 km, Up3=0.15 km, Up4=0.30 km, Up5=0.30 km, and Up6=0.30km) = 4.75km. (Package 1) COMMUNE/KPT/W/53/18 / Construction of Health Posts (3 rooms, fense 400m, Pending Request for Single Stage - One gate 1, well1, WC 2rooms, IDA / 58070 Post Open - National 0.00 Implementat 2018-11-20 2019-01-15 2019-07-14 Quotations Envelope pipe culvert 1, incinerator ion 1, 200m of laterite road). 1 Unit for Daung, KPT. COMMUNE NO 05/17 / Pending Water well (Afredes) for Request for Single Stage - One IDA / 58070 Post Open - National 0.00 Implementat 2018-09-19 2018-11-14 2019-05-13 Daung (Site I) : Total: 18 Quotations Envelope ion Units COMMUNE/KSP/W/61/18 / Ploughing (2 Times) for Request for Single Stage - One Reaksmey Samaki IDA / 58070 Post Open - National 21,600.00 Signed 2018-05-23 2018-07-18 2019-01-14 Quotations Envelope Commune (200Ha), Oral District, Kg. Speu. COMMUNE/KPT/W/62/18 / Ploughing (2 Times) Tipo 1 Pending = 354.44Ha & Tipo 2 Request for Single Stage - One IDA / 58070 Post Open - National 0.00 Implementat 2018-05-23 2018-07-18 2019-01-14 =226.5Ha, Total = 580.94Ha Quotations Envelope ion for Tipo Commune, Suntuk District, Kg. Thom. COMMUNE/KRT/W/67/18 / Pending Ploughing (2 Times) for Request for Single Stage - One IDA / 58070 Post Open - National 0.00 Implementat 2018-05-23 2018-07-18 2019-01-14 Thmey Commune (174Ha), Quotations Envelope ion Chetr Borey, Kratie. COMMUNE/KRT/W/68/18 / Pending Ploughing (2 Times) for Request for Single Stage - One IDA / 58070 Post Open - National 0.00 Implementat 2018-05-23 2018-07-18 2019-01-14 Chambak Commune Quotations Envelope ion (277Ha), Prek Prasab, Kratie. COMMUNE/KPT/W/63/18 / Pending Ploughing (2 Times) for Request for Single Stage - One IDA / 58070 Post Open - National 0.00 Implementat 2019-02-06 2019-04-03 2019-09-30 Daung Commune (500Ha), Quotations Envelope ion Suntuk District, Kg. Thom. COMMUNITY/KCH/W/45/18 / Planting in Agriculture Community Land (Sowing Seed or IDA / 58070 Post Driven Open - National 0.00 Canceled 2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2019-03-27 Planting Seedling cover Development crop) for community in Sambok Kriel (100Ha), KCH. COMMUNITY/KCH/W/46/18 / Planting in Agriculture Community Land (Sowing Seed or IDA / 58070 Post Driven Open - National 0.00 Canceled 2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2019-03-27 Planting Seedling cover Development crop) for community in Ksach Sar (126.50Ha), KCH. COMMUNITY/KCH/W/47/18 / Planting in Agriculture Community Land (Sowing Seed or IDA / 58070 Post Driven Open - National 0.00 Canceled 2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2019-03-27 Planting Seedling cover Development crop) for community in Peam (116.50Ha), KCH. COMMUNITY/KCH/W/48/18 / Planting in Agriculture Community Land (Sowing Seed or IDA / 58070 Post Driven Open - National 0.00 Canceled 2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2019-03-27 Planting Seedling cover Development crop) for community in Chheanloeung (103Ha), KCH. COMMUNITY/KSP/W/49/18 / Planting in Agriculture Land (Sowing Seed or Community Planting Seedling cover IDA / 58070 Post Driven Open - National 0.00 Canceled 2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2019-03-27 crop) for community in Development Raksmey Samaki (200Ha), KSP. COMMUNITY/KPT/W/42/18 / Planting in Agriculture Community Land (Sowing Seed or IDA / 58070 Post Driven Open - National 0.00 Canceled 2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2019-03-27 Planting Seedling cover Development crop) for community in Tipo 1, KPT (354.44Ha) COMMUNITY/KPT/W/43/18 / Planting in Agriculture Community Land (Sowing Seed or IDA / 58070 Post Driven Open - National 0.00 Canceled 2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2019-03-27 Planting Seedling cover Development crop) for community in Tipo 2 , KPT (226.50Ha) COMMUNITY/KRT/W/50/18 / Planting in Agriculture Land (Sowing Seed or Community Planting Seedling cover IDA / 58070 Post Driven Open - National 0.00 Canceled 2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2019-03-27 crop) for community in Development Sambok, KRT (100Ha+120Ha=220Ha). Page 4 COMMUNITY/KRT/W/51/18 / Planting in Agriculture Land (Sowing Seed or Community Planting Seedling cover IDA / 58070 Post Driven Open - National 0.00 Canceled 2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2019-03-27 crop) for community in Development Changkrang, KRT (59Ha+80Ha=139Ha) COMMUNITY/KRT/W/52/18 / Planting in Agriculture Community Land (Sowing Seed or IDA / 58070 Post Driven Open - National 0.00 Canceled 2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2019-03-27 Planting Seedling cover Development crop) for community in Dar, KRT (97Ha) COMMUNITY/KRT/W/53/18 / Planting in Agriculture Community Land (Sowing Seed or IDA / 58070 Post Driven Open - National 0.00 Canceled 2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2019-03-27 Planting Seedling cover Development crop) for community in Thmey, KRT (174Ha) COMMUNITY/KRT/W/54/18 / Planting in Agriculture Community Land (Sowing Seed or IDA / 58070 Post Driven Open - National 0.00 Canceled 2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2019-03-27 Planting Seedling cover Development crop) for community in Chambak, KRT (277Ha) COMMUNITY/KPT/W/44/18 / Planting in Agriculture Community Land (Sowing Seed or IDA / 58070 Post Driven Open - National 0.00 Canceled 2019-05-08 2019-05-13 2019-06-24 2019-07-24 2019-08-28 2020-02-24 Planting Seedling cover Development crop) for community in Daung, KPT (500Ha) COMMUNE NO 06/17 / Pending Water well (Afredes) for Request for Single Stage - One IDA / 58070 Post Open - National 0.00 Implementat 2019-01-20 2019-03-17 2019-09-13 Daung (Site II): Total: 17 Quotations Envelope ion Units COMMUNE/KPT/W/34/18 / Concrete Poles in Pending Request for Single Stage - One Agriculture Lands (0.12 x IDA / 58070 Post Open - National 0.00 Implementat 2019-01-20 2019-03-17 2019-09-13 Quotations Envelope 0.12 x 0.75m) = (3600 ion Poles) for Daung, KPT. COMMUNE/KPT/W/35- 36/18 / Concrete Poles in Residential Lands (0.12 x 0.12 x 0.75m= 1400 Poles) Pending and Concrete Poles in Request for Single Stage - One IDA / 58070 Post Open - National 0.00 Implementat 2018-09-22 2018-11-17 2019-05-16 Forestry (0.3x0.3x0.4x1.5m Quotations Envelope ion = 150 Poles) and Concrete Poles in Stream and Canal (0.2x0.2x1.5m = 200 Poles) for Daung, KPT. COMMUNITY/KPT/W/39/18 / Instalation Concrete Poles Community Pending in Agriculture Lands (0.12 IDA / 58070 Post Driven Open - National 0.00 Implementat 2019-01-15 2019-01-20 2019-03-03 2019-04-02 2019-05-07 2019-11-03 x 0.12 x 0.75m) = (3600 Development ion Poles) for Daung, KPT. COMMUNE NO 09/17 / House for Nurses & Teachers Ceramic tile floor Pending Request for Single Stage - One (W=9.2m, L=16.2m, IDA / 58070 Post Open - National 0.00 Implementat 2018-12-19 2019-02-13 2019-08-12 Quotations Envelope H=6.82m, 4 bed room, 4 ion rooms's W.C & 4 places of kitchend) for Daung QTY 1 Unit COMMUNE NO 28/17 / Construction of Community Pending Centre Ceramic tile floor Request for Single Stage - One IDA / 58070 Post Open - National 0.00 Implementat 2019-01-02 2019-02-27 2019-08-26 (W=7.2m, L=17.2m, Quotations Envelope ion H=6.62m, Warehouse, 2 rooms's W.C) for Daung (1). Total: 1 Unit COMMUNE NO 01/17 / Repair Earth Roads for Request for Single Stage - One IDA / 58070 Post Open - National 21,614.12 Signed 2018-05-29 2018-07-24 2019-07-24 Sambok (6.6km). Total: Quotations Envelope 6.6Km COMMUNE NO 02/17 / Repair Earth Roads for Request for Single Stage - One IDA / 58070 Post Open - National 21,576.00 Signed 2018-05-29 2018-07-24 2019-07-24 Changkrang (6.6km) Total: Quotations Envelope 6.6Km COMMUNE NO 03/17 / Request for Single Stage - One Repair Earth Roads for IDA / 58070 Post Open - National 9,934.00 Signed 2018-05-29 2018-07-24 2019-07-24 Quotations Envelope Thmey (4km). Total: 4Km COMMUNE NO 04/17 / Request for Single Stage - One Repair Earth Roads for Dar IDA / 58070 Post Open - National 25,497.00 Signed 2018-05-29 2018-07-24 2019-07-24 Quotations Envelope (7.8km). Total: 7.8 Km COMMUNE/KRT/W/64/18 / Ploughing (2 Times) for Pending Request for Single Stage - One Sambok Commune IDA / 58070 Post Open - National 0.00 Implementat 2018-05-23 2018-07-18 2019-01-14 Quotations Envelope (100Ha+120Ha=220Ha), ion Chetr Borey, Kratie. COMMUNE/KRT/W/65/18 / Ploughing (2 Times) for Pending Request for Single Stage - One Changkrang Commune IDA / 58070 Post Open - National 0.00 Implementat 2018-05-23 2018-07-18 2019-01-14 Quotations Envelope (59Ha+80Ha=139Ha), Chetr ion Borey, Kratie. COMMUNE/KRT/W/66/18 / Pending Ploughing (2 Times) for Request for Single Stage - One IDA / 58070 Post Open - National 0.00 Implementat 2018-05-23 2018-07-18 2019-01-14 Dar Commune (97Ha), Quotations Envelope ion Chetr Borey, Kratie. Page 5 COMMUNITY/KCH/W/07A/1 8 / 1) Concrete Poles in Agriculture & Residential Community Pending Lands (0.12x0.12x0.75m) = IDA / 58070 Post Driven Open - National 0.00 Implementat 2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2019-03-27 (700 Poles) and 2) Concrete Development ion Poles in Forestry & in SLC Sites (0.3x 0.3x 0.4x 1.5m) for Sambok Kriel (20 Poles). COMMUNITY/KCH/W/08A/1 8 / Concrete Poles in Community Pending Agriculture & Residential IDA / 58070 Post Driven Open - National 0.00 Implementat 2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2019-03-27 Lands (0.12x0.12x0.75m) for Development ion Ksach Sar (400 Poles). COMMUNITY/KCH/W/09A/1 8 / 1) Concrete Poles in Agriculture & Residential Community Pending Lands (0.12x0.12x0.75m) = IDA / 58070 Post Driven Open - National 0.00 Implementat 2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2019-03-27 (400 Poles) and Concrete Development ion Poles in Forestry & in SLC Sites (0.3x0.3x0.4x1.5m) for Peam (30 Poles). COMMUNITY/KCH/W/34A/1 Community Pending 8 / Construction of Pipe IDA / 58070 Post Driven Open - National 0.00 Implementat 2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2019-03-27 Culverts (H1xL6m) for Development ion Sambok Kriel: 10 Units. COMMUNITY/KCH/W/35A/1 Community Pending 8 / Construction of Pipe IDA / 58070 Post Driven Open - National 0.00 Implementat 2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2019-03-27 Culverts (H1xL6m) for Development ion Ksach Sar: 15 Units COMMUNITY/KCH/W/36A/1 Community Pending 8 / Construction of Pipe IDA / 58070 Post Driven Open - National 0.00 Implementat 2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2019-03-27 Culverts (H1xL6m) for Development ion Peam: 5 Units COMMUNITY/KCH/W/37A/1 Community Pending 8 / Construction of Pipe IDA / 58070 Post Driven Open - National 0.00 Implementat 2018-06-06 2018-06-11 2018-07-23 2018-08-22 2018-09-26 2019-03-25 Culverts (H1xL6m) for Development ion Chhean Loeun: 10 Units. COMMUNITY/KSP/W/10A/18 / 1) Concrete Poles in Forestry & in SLC Sites Community Pending (0.3x0.3x0.4x1.5m) (20 IDA / 58070 Post Driven Open - National 0.00 Implementat 2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2018-12-27 Poles) and 2) Concrete Development ion Poles in Stream and Canal (0.2x0.2x1.5m) for Raksmey Samaki (26 Poles). COMMUNITY NO 10/18 / 1) Concrete Poles in Forestry & in SLC Sites (0.3x0.3x0.4x1.5m) (20 Request for Single Stage - One IDA / 58070 Post Open - National 0.00 Canceled 2018-06-06 2018-08-01 2019-08-01 Poles) and 2) Concrete Quotations Envelope Poles in Stream and Canal (0.2x0.2x1.5m) for Raksmey Samaki (26 Poles) COMMUNITY/KSP/W/38A/18 Community Pending / Construction of Pipe IDA / 58070 Post Driven Open - National 0.00 Implementat 2018-06-15 2018-06-20 2018-08-01 2018-08-31 2018-10-05 2019-01-03 Culverts (H1xL6m) for Development ion Raksmey Samaki: 15 Units COMMUNITY NO 38/18 / Construction of Pipe Request for Single Stage - One IDA / 58070 Post Open - National 0.00 Canceled 2018-06-06 2018-08-01 2019-01-28 Culverts (H1xL6m) for Quotations Envelope Raksmey Samaki: 15 Units COMMUNITY NO 17/18 / Planting Grass of Earth Request for Single Stage - One IDA / 58070 Post Open - National 0.00 Canceled 2018-03-06 2018-05-01 2018-10-28 Roads (W5xT0.15xE0.5m) Quotations Envelope for Tipo 1 (15Km) COMMUNITY/KPT/W/17A/18 Community Pending / Planting Grass of Earth IDA / 58070 Post Driven Open - National 0.00 Implementat 2019-03-15 2019-03-20 2019-05-01 2019-05-31 2019-07-05 2019-10-03 Roads (W5xT0.15xE0.5m) Development ion for Tipo 1 (15Km) COMMUNITY NO 18/18 / Planting Grass of Earth Request for Single Stage - One IDA / 58070 Post Open - National 0.00 Canceled 2018-03-06 2018-05-01 2018-10-28 Roads (W5xT0.15xE0.5m) Quotations Envelope for Tipo 2 (12Km) COMMUNITY/KPT/W/18A/18 Community Pending / Planting Grass of Earth IDA / 58070 Post Driven Open - National 0.00 Implementat 2019-03-15 2019-03-20 2019-05-01 2019-05-31 2019-07-05 2019-10-03 Roads (W5xT0.15xE0.5m) Development ion for Tipo 2 (12Km) COMMUNITY NO 32/18 / Construction of Pipe Request for Single Stage - One IDA / 58070 Post Open - National 0.00 Canceled 2018-06-06 2018-08-01 2019-01-28 Culverts (H1xL6m) for Tipo Quotations Envelope 1 (10), Kg. Thom: 11 Units. COMMUNITY/KPT/W/32A/18 Community Pending / Construction of Pipe IDA / 58070 Post Driven Open - National 0.00 Implementat 2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2019-03-27 Culverts (H1xL6m) for Tipo Development ion 1 (10), Kg. Thom: 11 Units. COMMUNITY/KPT/W/33A/18 / Construction of Pipe Community Pending Culverts (H1xL6m) for Tipo IDA / 58070 Post Driven Open - National 0.00 Implementat 2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2019-03-27 2 (10), Kg. Thom. Total: 11 Development ion Units. COMMUNITY NO 01/18 / Concrete Poles and Installation in Agriculture Request for Single Stage - One IDA / 58070 Post Open - National 0.00 Canceled 2018-06-06 2018-08-01 2019-08-01 & Residential Lands Quotations Envelope (0.12x0.12x0.75m) for Sambok, Kratie (708 Poles). Page 6 COMMUNITY/KRT/W/01A/18 / Concrete Poles and Community Pending Installation in Agriculture IDA / 58070 Post Driven Open - National 0.00 Implementat 2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2019-03-27 & Residential Lands Development ion (0.12x0.12x0.75m) for Sambok, Kratie (708 Poles). COMMUNITY NO 02/18 / Concrete Poles in Request for Single Stage - One Agriculture & Residential IDA / 58070 Post Open - National 0.00 Canceled 2018-06-06 2018-08-01 2019-08-01 Quotations Envelope Lands (0.12x0.12x0.75m) for Changkrang (700 Poles). COMMUNITY/KRT/W/02A/18 / Concrete Poles in Community Pending Agriculture & Residential IDA / 58070 Post Driven Open - National 0.00 Implementat 2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2019-03-27 Lands (0.12x0.12x0.75m) for Development ion Changkrang (700 Poles). COMMUNITY NO 05/18 / Concrete Poles in Agriculture & Residential Lands (0.12x0.12x0.75m) = Request for Single Stage - One IDA / 58070 Post Open - National 0.00 Canceled 2018-06-06 2018-08-01 2019-08-01 (250 Poles) and Concrete Quotations Envelope Poles in Forestry & in SLC Sites (0.3x0.3x0.4x1.5m) for Thmey (10 Poles) COMMUNITY/KRT/W/05A/18 / Concrete Poles in Agriculture & Residential Community Pending Lands (0.12x0.12x0.75m) = IDA / 58070 Post Driven Open - National 0.00 Implementat 2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2019-03-27 (250 Poles) and Concrete Development ion Poles in Forestry & in SLC Sites (0.3x0.3x0.4x1.5m) for Thmey (10 Poles) COMMUNITY NO 06/18 / Concrete Poles in Request for Single Stage - One Agriculture & Residential IDA / 58070 Post Open - National 0.00 Canceled 2018-06-06 2018-08-01 2019-08-01 Quotations Envelope Lands (0.12x0.12x0.75m) for Chambak (270 Poles). COMMUNITY/KRT/W/06A/18 / Concrete Poles in Community Pending Agriculture & Residential IDA / 58070 Post Driven Open - National 0.00 Implementat 2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2019-03-27 Lands (0.12x0.12x0.75m) for Development ion Chambak (270 Poles). COMMUNITY NO 07/18 / 1) Concrete Poles in Agriculture & Residential Lands (0.12x0.12x0.75m) = Request for Single Stage - One IDA / 58070 Post Open - National 0.00 Canceled 2018-06-06 2018-08-01 2019-08-01 (700 Poles) and 2) Concrete Quotations Envelope Poles in Forestry & in SLC Sites (0.3x 0.3x 0.4x 1.5m) for Sambok Kriel (20 Poles) COMMUNITY NO 08/18 / Concrete Poles in Request for Single Stage - One Agriculture & Residential IDA / 58070 Post Open - National 0.00 Canceled 2018-06-06 2018-08-01 2019-08-01 Quotations Envelope Lands (0.12x0.12x0.75m) for Ksach Sar (400 Poles). COMMUNITY NO 09/18 / 1) Concrete Poles in Agriculture & Residential Lands (0.12x0.12x0.75m) = Request for Single Stage - One IDA / 58070 Post Open - National 0.00 Canceled 2018-06-06 2018-08-01 2019-08-01 (400 Poles) and Concrete Quotations Envelope Poles in Forestry & in SLC Sites (0.3x0.3x0.4x1.5m) for Peam (30 Poles). COMMUNITY/KRT/W/13A/18 Community Pending / Planting Grass of Earth IDA / 58070 Post Driven Open - National 0.00 Implementat 2019-01-08 2019-01-13 2019-02-24 2019-03-26 2019-04-30 2019-07-29 Roads (W5xT0.15xE0.5m). Development ion for Sambok (6km). COMMUNITY NO 13/18 / Planting Grass of Earth Request for Single Stage - One IDA / 58070 Post Open - National 0.00 Canceled 2018-03-06 2018-05-01 2018-10-28 Roads (W5xT0.15xE0.5m). Quotations Envelope for Sambok (6km). COMMUNITY NO 14/18 / Planting Grass of Earth Request for Single Stage - One IDA / 58070 Post Open - National 0.00 Canceled 2018-03-06 2018-05-01 2018-10-28 Roads (W5xT0.15xE0.5m) Quotations Envelope for Changkrang (6km). COMMUNITY/KRT/W/15A/18 Community Pending / Planting Grass of Earth IDA / 58070 Post Driven Open - National 0.00 Implementat 2019-01-08 2019-01-13 2019-02-24 2019-03-26 2019-04-30 2019-07-29 Roads (W5xT0.15xE0.5m) Development ion for Da (8km). COMMUNITY/KRT/W/19A/18 Community Pending / Construction of Box IDA / 58070 Post Driven Open - National 0.00 Implementat 2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2018-12-27 Culverts (2x3x6m) for Development ion Sambok (1 Unit) COMMUNITY/KRT/W/20A/18 Community Pending / Construction of Box IDA / 58070 Post Driven Open - National 0.00 Implementat 2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2018-12-27 Culverts (2x3x6m) for Development ion Changkrang (1 Unit) COMMUNITY/KRT/W/21A/18 Community Pending / Construction of Box IDA / 58070 Post Driven Open - National 0.00 Implementat 2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2018-12-27 Culverts (2x3x6m) for Dar Development ion (1 Unit) COMMUNITY/KRT/W/22A/18 Community Pending / Construction of Box IDA / 58070 Post Driven Open - National 0.00 Implementat 2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2018-12-27 Culverts (2x3x6m) for Development ion Thmey (2 Units) COMMUNITY/KRT/W/23A/18 Community Pending / Construction of Box IDA / 58070 Post Driven Open - National 0.00 Implementat 2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2018-12-27 Culverts (2x3x6m) for Development ion Chambak. Phase 1 (2 Units) Page 7 COMMUNITY/KRT/W/24A/18 Community Pending / Construction of Box IDA / 58070 Post Driven Open - National 0.00 Implementat 2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2018-12-27 Culverts (2x3x6m) for Development ion Chambak. Phase 2 (2 Units) COMMUNITY/KRT/W/25A/18 Community Pending / Construction of Box IDA / 58070 Post Driven Open - National 0.00 Implementat 2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2018-12-27 Culverts (2x3x6m) for Development ion Chambak. Phase 3 (2 Units) COMMUNITY/KRT/W/26A/18 Community Pending / Construction of Pipe IDA / 58070 Post Driven Open - National 0.00 Implementat 2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2018-12-27 Culverts (H1xL6m) for Development ion Sambok, Kratie: 8 Units COMMUNITY/KRT/W/27A/18 Community Pending / Construction of Pipe IDA / 58070 Post Driven Open - National 0.00 Implementat 2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2018-12-27 Culverts (H1xL6m) for Development ion Changkrang, Kratie: 8 Units COMMUNITY/KRT/W/28A/18 Community Pending / Construction of Pipe IDA / 58070 Post Driven Open - National 0.00 Implementat 2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2018-12-27 Culverts (H1xL6m) for Dar, Development ion Kratie: 6 Units COMMUNITY/KRT/W/29A/18 Community Pending / Construction of Pipe IDA / 58070 Post Driven Open - National 0.00 Implementat 2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2018-12-27 Culverts (H1xL6m) for Development ion Thmey, Kratie: 7 Units COMMUNITY/KRT/W/30A/18 Community Pending / Construction of Pipe IDA / 58070 Post Driven Open - National 0.00 Implementat 2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2018-12-27 Culverts (H1xL6m) for Development ion Chambak, Kratie: 4 Units COMMUNITY/KTM/W/11A/1 Community Pending 8 / Concrete Poles in IDA / 58070 Post Driven Open - National 0.00 Implementat 2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2019-03-27 Stream and Canal Development ion (0.2x0.2x1.5m) for Chaomkravien (350 Poles). COMMUNITY/KTM/W/16A/1 Community Pending 8 / Planting Grass of Earth IDA / 58070 Post Driven Open - National 0.00 Implementat 2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2018-12-27 Roads (W5xT0.15xE0.5m) Development ion for Choamkravien (5Km) COMMUNITY/KTM/W/31A/1 8 / Construction of Pipe Community Pending Culverts (H1xL6m) for IDA / 58070 Post Driven Open - National 0.00 Implementat 2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2018-12-27 Choamkravien, Kg. Cham: 8 Development ion Units COMMUNE/KCH/W/58/18 / Ploughing (2 Times) for Sambok Kriel (100Ha) and Pending Request for Single Stage - One for Ksach Sar (126.50Ha), IDA / 58070 Post Open - National 0.00 Implementat 2018-05-23 2018-07-18 2019-01-14 Quotations Envelope Total 226.50 Ha, ion Kranglovea Commune, Samaki Meanchey District, Kg. Chhnang. COMMUNITY/KPT/W/41/18 / Instalation Concrete Poles in in Residential Lands (0.12 x 0.12 x 0.75m = Community Pending 1400 Poles) and Concrete IDA / 58070 Post Driven Open - National 0.00 Implementat 2018-09-17 2018-09-22 2018-11-03 2018-12-03 2019-01-07 2019-07-06 Poles in Forestry Development ion (0.3x0.3x0.4x1.5m = 150 Poles) and Concrete Poles in Stream and Canal (0.2x0.2x1.5m = 200 Poles) for Daung, KPT. COMMUNE/KPT/W/38/18 / Upgrade Earth Road to Late-Rite Roads (W4.5mxT0.15m): Tipo 1 Request for Single Stage - One IDA / 58070 Post Open - National 0.00 Canceled 2018-08-06 2018-10-01 2019-03-30 (AR6=1.30km, AR=14km, Quotations Envelope AR16=0.85km, AR18=0.46, and AA1= 1.42) Total= 5.2km. (Package2) COMMUNE/KPT/W/39/18 / Upgrade Earth Road to Late-Rite Roads (W4.5mxT0.15m): Tipo 2 Request for Single Stage - One IDA / 58070 Post Open - National 0.00 Canceled 2018-07-07 2018-09-01 2019-02-28 (AR01=1.10km, Quotations Envelope AR02=1.20km, AR03=1.20km, AR04=1.13km, ARAR05=1.25km)= Total:5.88km (Package 1) COMMUNE/KPT/W/40/18 / Upgrade Earth Road to Late-Rite Roads (W4.5mxT0.15m): Tipo 2 Request for Single Stage - One IDA / 58070 Post Open - National 0.00 Canceled 2018-07-07 2018-09-01 2019-02-28 (AR06=1.10km, Quotations Envelope AR07=1.15km, AR08=1.00km, AR09=0.60km, AR10=0.80km)= Total:4.65km (Package 2) COMMUNE/KCH/W/41/18 / Upgrade Earth Road to Late-Rite Roads Request for Single Stage - One IDA / 58070 Post Open - National 0.00 Canceled 2018-04-07 2018-06-02 2018-11-29 (W4.5mxT0.15m): Sambok Quotations Envelope Kriel = (URR/7lines = 5.34km). (Package 1) COMMUNE/KCH/W/43/18 / Upgrade Earth Road to Late-Rite Roads Request for Single Stage - One IDA / 58070 Post Open - National 0.00 Canceled 2018-04-07 2018-06-02 2018-11-29 (W4.5mxT0.15m): Ksach Sar Quotations Envelope = (URR/2lines & UAR/6lines = 4.8km). COMMUNE/KCH/W/44/18 / Upgrade Earth Road to Late-Rite Roads Request for Single Stage - One IDA / 58070 Post Open - National 0.00 Canceled 2018-04-07 2018-06-02 2018-11-29 (W4.5mxT0.15m): Peam = Quotations Envelope (URR/9lines) = 5.67km. (Package 1) Page 8 COMMUNE/KCH/W/45/18 / Upgrade Earth Road to Late-Rite Roads Request for Single Stage - One IDA / 58070 Post Open - National 0.00 Canceled 2018-06-06 2018-08-01 2019-01-28 (W4.5mxT0.15m): Peam = Quotations Envelope (URR/5lines & UAR/3lines). Total = 5.77km. (Package 2) COMMUNE/KCH/W/47/18 / Upgrade Earth Road to Late-Rite Roads Request for Single Stage - One IDA / 58070 Post Open - National 0.00 Canceled 2018-07-07 2018-09-01 2019-02-28 (W4.5mxT0.15m):Chhean Quotations Envelope Loeung = (UAR/4lines). Total = 4.40km. (Package 2) COMMUNE/KCH/W/48/18 / Upgrade Earth Road to Late-Rite Roads Request for Single Stage - One IDA / 58070 Post Open - National 0.00 Canceled 2018-07-07 2018-09-01 2019-02-28 (W4.5mxT0.15m):Chhean Quotations Envelope Loeung = (UAR/6lines). Total = 5.17km. (Package 3) COMMUNE/KSP/W/50/18 / Upgrade Earth Road to Late-Rite Roads Request for Single Stage - One (W4.5mxT0.15m): Raksmey IDA / 58070 Post Open - National 0.00 Canceled 2018-02-06 2018-04-03 2018-09-30 Quotations Envelope Samaki, KSP = (Up7=3.50 km, and Up9=1.75km) = 5.25km. (Package 2) COMMUNE/KSP/W/51/18 / Upgrade Earth Road to Late-Rite Roads Request for Single Stage - One (W4.5mxT0.15m): Raksmey IDA / 58070 Post Open - National 0.00 Canceled 2018-02-06 2018-04-03 2018-09-30 Quotations Envelope Samaki, KSP = (Up8=1.65 km, and Up10=3.50km) = 5.15km. (Package 3) COMMUNE/KSP/W/52/18 / Upgrade Earth Road to Late-Rite Roads Request for Single Stage - One (W4.5mxT0.15m): Raksmey IDA / 58070 Post Open - National 0.00 Canceled 2018-03-06 2018-05-01 2018-10-28 Quotations Envelope Samaki, KSP - Main = (Up11=5.85km) = 5.85km. (Package 4) LASED/NCDDS/W/SP/02/18 / "Upgrade Earth Road to Late-Rite Roads (W4.5mxT0.15m): Main Request for Single Stage - One IDA / 58070 Post Open - National 0.00 Canceled 2018-08-06 2018-10-01 2019-03-30 Road KCH Quotations Envelope Sambokreal = 9km and Khsach Sor = 6km. (Total = 15km)" COMMUNITY NO 33/18 / Construction of Pipe Request for Single Stage - One Culverts (H1xL6m) for Tipo IDA / 58070 Post Open - National 0.00 Canceled 2018-06-06 2018-08-01 2019-01-28 Quotations Envelope 2 (10), Kg. Thom. Total: 11 Units COMMUNITY NO 15/18 / Planting Grass of Earth Request for Single Stage - One IDA / 58070 Post Open - National 0.00 Canceled 2018-03-06 2018-05-01 2018-10-28 Roads (W5xT0.15xE0.5m) Quotations Envelope for Da (8km). COMMUNITY NO 19/18 / Construction of Box Request for Single Stage - One IDA / 58070 Post Open - National 0.00 Canceled 2018-06-06 2018-08-01 2019-01-28 Culverts (2x3x6m) for Quotations Envelope Sambok (1) COMMUNITY NO 20/18 / Construction of Box Request for Single Stage - One IDA / 58070 Post Open - National 0.00 Canceled 2018-06-06 2018-08-01 2019-01-28 Culverts (2x3x6m) for Quotations Envelope Changkrang (1 Unit) COMMUNITY NO 21/18 / Construction of Box Request for Single Stage - One IDA / 58070 Post Open - National 0.00 Canceled 2018-06-06 2018-08-01 2019-01-28 Culverts (2x3x6m) for Dar Quotations Envelope (1 Unit) COMMUNITY NO 22/18 / Construction of Box Request for Single Stage - One IDA / 58070 Post Open - National 0.00 Canceled 2018-06-06 2018-08-01 2019-01-28 Culverts (2x3x6m) for Quotations Envelope Thmey (2 Units) COMMUNITY NO 23/18 / Construction of Box Request for Single Stage - One IDA / 58070 Post Open - National 0.00 Canceled 2018-06-06 2018-08-01 2019-01-28 Culverts (2x3x6m) for Quotations Envelope Chambak. Phase 1 (2 Units) COMMUNITY NO 24/18 / Construction of Box Request for Single Stage - One IDA / 58070 Post Open - National 0.00 Canceled 2018-06-06 2018-08-01 2019-01-28 Culverts (2x3x6m) for Quotations Envelope Chambak. Phase 2 (2 Units) COMMUNITY NO 25/18 / Construction of Box Request for Single Stage - One IDA / 58070 Post Open - National 0.00 Canceled 2018-06-06 2018-08-01 2019-01-28 Culverts (2x3x6m) for Quotations Envelope Chambak. Phase 3 (2 Units) COMMUNITY NO 26/18 / Construction of Pipe Request for Single Stage - One IDA / 58070 Post Open - National 0.00 Canceled 2018-06-06 2018-08-01 2019-01-28 Culverts (H1xL6m) for Quotations Envelope Sambok, Kratie: 8 Units COMMUNITY NO 27/18 / Construction of Pipe Request for Single Stage - One IDA / 58070 Post Open - National 0.00 Canceled 2018-06-06 2018-08-01 2019-01-28 Culverts (H1xL6m) for Quotations Envelope Changkrang, Kratie: 8 Units COMMUNITY NO 28/18 / Construction of Pipe Request for Single Stage - One IDA / 58070 Post Open - National 0.00 Canceled 2018-06-06 2018-08-01 2019-01-28 Culverts (H1xL6m) for Dar, Quotations Envelope Kratie: 6 Units COMMUNITY NO 29/18 / Construction of Pipe Request for Single Stage - One IDA / 58070 Post Open - National 0.00 Canceled 2018-06-06 2018-08-01 2019-01-28 Culverts (H1xL6m) for Quotations Envelope Thmey, Kratie: 7 Units Page 9 COMMUNITY NO 30/18 / Construction of Pipe Request for Single Stage - One IDA / 58070 Post Open - National 0.00 Canceled 2018-06-06 2018-08-01 2019-01-28 Culverts (H1xL6m) for Quotations Envelope Chambak, Kratie: 4 Units COMMUNITY NO 31/18 / Construction of Pipe Request for Single Stage - One Culverts (H1xL6m) for IDA / 58070 Post Open - National 0.00 Canceled 2018-06-06 2018-08-01 2019-01-28 Quotations Envelope Choamkravien, Kg. Cham: 8 Units COMMUNITY NO 16/18 / Planting Grass of Earth Request for Single Stage - One IDA / 58070 Post Open - National 0.00 Canceled 2018-08-06 2018-10-01 2019-03-30 Roads (W5xT0.15xE0.5m) Quotations Envelope for Choamkravien (5Km) COMMUNITY NO 11/18 / Concrete Poles in Stream Request for Single Stage - One IDA / 58070 Post Open - National 0.00 Canceled 2018-06-06 2018-08-01 2019-08-01 and Canal (0.2x0.2x1.5m) Quotations Envelope for Chaomkravien (350 Poles). COMMUNITY NO 34/18 / Construction of Pipe Request for Single Stage - One IDA / 58070 Post Open - National 0.00 Canceled 2018-06-06 2018-08-01 2019-01-28 Culverts (H1xL6m) for Quotations Envelope Sambok Kriel: 10 Units COMMUNITY NO 35/18 / Construction of Pipe Request for Single Stage - One IDA / 58070 Post Open - National 0.00 Canceled 2018-06-06 2018-08-01 2019-01-28 Culverts (H1xL6m) for Quotations Envelope Ksach Sar: 15 Units COMMUNITY NO 36/18 / Construction of Pipe Request for Single Stage - One IDA / 58070 Post Open - National 0.00 Canceled 2018-06-06 2018-08-01 2019-01-28 Culverts (H1xL6m) for Quotations Envelope Peam: 5 Units COMMUNITY NO 37/18 / Construction of Pipe Request for Single Stage - One IDA / 58070 Post Open - National 0.00 Canceled 2018-06-06 2018-08-01 2019-01-28 Culverts (H1xL6m) for Quotations Envelope Chhean Loeun: 10 Units COMMUNITY/KRT/W/14A/18 Community Pending / Planting Grass of Earth IDA / 58070 Post Driven Open - National 0.00 Implementat 2019-01-08 2019-01-13 2019-02-24 2019-03-26 2019-04-30 2019-07-29 Roads (W5xT0.15xE0.5m) Development ion for Changkrang, KRT (6km). COMMUNE/TKM/W/69/19 / Construction of community Pending market (size 5m x 6m roof Request for Single Stage - One IDA / 58070 Post Open - National 0.00 Implementat 2019-03-06 2019-05-01 2019-10-28 zine and concrete basement) Quotations Envelope ion in Choamkravien, TKM. Toatl: 1 Unit COMMUNE/KCH/W/70/19 / Construction of community Pending market (size 5m x 6m roof Request for Single Stage - One IDA / 58070 Post Open - National 0.00 Implementat 2019-03-06 2019-05-01 2019-10-28 zine and concrete basement) Quotations Envelope ion in Peam, KCH. Total: 1 Unit COMMUNE/KPT/W/71/19 / Construction of community Pending Request for Single Stage - One market (size 5m x 6m roof IDA / 58070 Post Open - National 0.00 Implementat 2019-03-06 2019-05-01 2019-10-28 Quotations Envelope zine and concrete basement) ion in Tipo, KPT. Total: 1 Unit COMMUNE/KRT/W/72/19 / Construction of community Pending Request for Single Stage - One market (size 5m x 6m roof IDA / 58070 Post Open - National 0.00 Implementat 2019-03-06 2019-05-01 2019-10-28 Quotations Envelope zine and concrete basement) ion in Dar, KRT. Total: 1 Unit COMMUNE/KRT/W/73/19 / Repair Existing Earth Road in SAMBOK (A006 (AT001)=0.70km, Pending A004b=0.48km, Request for Single Stage - One IDA / 58070 Post Open - National 0.00 Implementat 2019-03-15 2019-05-10 2019-11-06 A010=1.26km, Quotations Envelope ion A001b=1.55km, S007=1.940km, A007=0.780km, A024=1.015km, A034=1.300km) in KRT- Total=9.03Km COMMUNE/KRT/W/74/19 / Repair Existing Earth Road in CHANGKRANG (La Or Pending Request for Single Stage - One village=4.10km, IDA / 58070 Post Open - National 0.00 Implementat 2019-03-16 2019-05-11 2019-11-07 Quotations Envelope S029=0.650km, ion A013b=1.13km, A15b=1.10km) in KRT- Total=6.98Km COMMUNE/KRT/W/75/19 / Repair Existing Earth Road Pending Request for Single Stage - One in DAR (S004=1.32km, IDA / 58070 Post Open - National 0.00 Implementat 2019-03-25 2019-05-20 2019-11-16 Quotations Envelope A007=1.00km, S012=0.40km) ion - in KRT. Total=2.72Km COMMUNE/KRT/W/76/19 / Repair Existing Earth Road in THMEI (A002a=1.07km, Pending A012a=1.39km, S006A = Request for Single Stage - One IDA / 58070 Post Open - National 0.00 Implementat 2019-03-25 2019-05-20 2019-11-16 0.467 KM, A006a=1.703, Quotations Envelope ion S004a=0.467km, Boeung Svay Chrum road=3.50km) - in KRT. Total= 8.59Km LASED/NCDDS/W/NCB/04/1 7 / Construction Earth Roads(W5xT0.15xE0.5m):LO T1:Sambok(14.975),Ch.krang( 6),Dar(8),Thmey(10), Pending Chambak(29.091),Choamkrav Single Stage - One IDA / 58070 Post Request for Bids Open - National 0.00 Implementat 2019-02-20 2019-02-25 2019-04-08 2019-05-08 2019-06-12 2019-12-09 ien- Envelope ion TKM(5),TP1(15),TP2(12).Tota l:100.410km.LOT2:S.Kriel(14) , Ks.Sar(14),Peam(14),Chh.Loe ung(7),Ra.Samaki(7).Total:29. 590km.GrandTotal:130Km Page 10 LASED/NCDDS/W/NCB/10/1 9 / Construction of Community Rain Water Storage at Thmey 1 line (L:600m, TW:5m, Laterite Pending Layer, 1 Double Box Single Stage - One IDA / 58070 Post Request for Bids Open - National 0.00 Implementat 2019-02-15 2019-02-20 2019-04-03 2019-05-03 2019-06-07 2019-12-04 Culvert with lifting Gates) Envelope ion and Chambak 1 line (L:160m, TW:5m,Laterite Layer, 1 Double Box Culvert with Lifting Gates) in KRT. Total: 2 lines. LASED/NCDDS/W/NCB/11/1 9 / Construction of Community Natural Live Stream Storage at Tipo Pending Commune 1 line (L:600m, Single Stage - One IDA / 58070 Post Request for Bids Open - National 0.00 Implementat 2019-02-20 2019-02-25 2019-04-08 2019-05-08 2019-06-12 2019-12-09 TW:5m, Laterite Layer, Envelope ion Double Box Culvert with lifting Gates, and One line of Spillway structure of 45 m) in KPT. Total: 1 line LASED/NCDDS/W/NCB/12/1 9 / Construction of Community Natural Live Stream Storage 1 line: Pending Dyke (L:200m, TW:5m, Single Stage - One IDA / 58070 Post Request for Bids Open - National 0.00 Implementat 2019-06-30 2019-07-05 2019-08-16 2019-09-15 2019-10-20 2020-04-17 Laterite Layer, Double Box Envelope ion Culvert with lifting Gates, One line of Spillway structure of 45m) at Prey Thom, KSP, Total: 1 line LASED/NCDDS/W/NCB/13/1 9 / Construction of Community Rain Water Storage at 1)Ksach Sar 1 line(L:200m, TW:5m), 2) Pending Single Stage - One Kiri Aphivath 1 line IDA / 58070 Post Request for Bids Open - National 0.00 Implementat 2019-06-20 2019-06-25 2019-08-06 2019-09-05 2019-10-10 2020-04-07 Envelope (L:150m,TW:5m), 3) Sambok ion Kreal 1 line (Dyke L:80m, TW:5m) and 4) Pond at Sok Senchey (80mx50m) in KCH. Total: 3 lines & 1 Pond. LASED/NCDDS/W/NCB/06/1 7 / Small Dam(W4xSite Slop1:2, average embankment, length depends on each site,1spill way 20m,water double gates Single Stage - One IDA / 58070 Post Request for Bids Open - National 0.00 Canceled 2018-09-03 2018-09-08 2018-10-20 2018-11-19 2018-12-24 2019-06-22 (2x2m=4m):Lot Envelope 1:S.bok(1),Ch.krang(1), Thmey(1),Chambak(1),TP1(1) ,TP2(1)&Daung(1).Lot 2:Sb.Kriel(1),Ks.Sar(1),Peam( 1) and R.Samaki(1).Total: 11Unit COMMUNITY/KRT/W/55/19 Pending / Planting Grass of Earth IDA / 58070 Post Direct Selection Direct 0.00 Implementat 2019-06-17 2019-06-22 2019-07-27 2020-01-23 Roads (W5xT0.15xE0.5m). ion for SAMBOK, (9.03km) COMMUNITY/KRT/W/56/19 Pending / Planting Grass of Earth IDA / 58070 Post Direct Selection Direct 0.00 Implementat 2019-03-20 2019-03-25 2019-04-29 2019-10-26 Roads (W5xT0.15xE0.5m) ion for CHANGKRANG (6.98km) COMMUNITY/KRT/W/57/19 Pending / Planting Grass of Earth IDA / 58070 Post Direct Selection Direct 0.00 Implementat 2019-06-20 2019-06-25 2019-07-30 2020-01-26 Roads (W5xT0.15xE0.5m) ion for DAR (2.72km) COMMUNITY/KRT/W/58/19 Pending / Planting Grass of Earth IDA / 58070 Post Direct Selection Direct 0.00 Implementat 2019-06-20 2019-06-25 2019-07-30 2020-01-26 Roads (W5xT0.15xE0.5m) ion for THMEI (8.59km) COMMUNITY/KRT/W/59/19 Pending / Repair health post in IDA / 58070 Post Direct Selection Direct 0.00 Implementat 2019-03-20 2019-03-25 2019-04-29 2019-10-26 CHAMBAK which was built ion during LASED I COMMUNITY/KRT/W/60/19 Pending / Fence for health post in IDA / 58070 Post Direct Selection Direct 0.00 Implementat 2019-03-15 2019-03-20 2019-04-24 2019-10-21 CHAMBAK 300m ion GOODS Bid Evaluation Activity Reference No. Draft Pre- Draft Bidding Loan / Credit Market Procurement Prequalification Actual Process Prequalification Specific Procurement Bidding Documents Proposal Submission Report and / Description Component Review Type Method qualification Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Recommendation for Documents Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual LASED/NCDDS/G/NCB/07/16 / OfficeFurniture:Nat.+3NewPr ovi:(30MeetChr, 28Desks, 58Chr, 4MeetTab, 2Filingcabi,3SlidingCabi,6Fili Request for Single Stage - One ngCabi). 3Distr:(15Des, IDA / 58070 Post Open - National 37,270.50 Signed 2017-02-06 2017-04-03 2018-04-03 Quotations Envelope 45Chr, 3SlidingCabi, 3FilingCabi, 3MeetTab) 5NewHP:(10Des,10Char,5Slid ingCabi,5FilingCabi+4Draw, 5Connected 3Cha,10Bed,5WaterFilter) LASED/NCDDS/G/SP/10/17 / GPS Mapping+Licenses: NCDDS 2, GSSLC 4, GDA 5, (KCH,KSP,TBM) 3, Total GPS:14 units. Concrete Test Hammer for 3 new Request for Single Stage - One IDA / 58070 Post Open - National 42,260.00 Signed 2017-02-06 2017-04-03 2017-09-30 provinces 3 & for NCDDS Quotations Envelope 1. Dynamic Cone Penetrometer(DCP) for new provinces 3 and NCDDS 1. Topography Survey for new provinces 3 &NCDDS 1. Page 11 LASED/NCDDS/G/NCB/01/16 / Vehicles : 9 Pickup Single Stage - One IDA / 58070 Post Request for Bids Open - National 243,531.00 Signed 2016-11-14 2016-11-19 2016-12-31 2017-01-30 2017-03-06 2017-09-02 Trucks for National Level Envelope and Sub-National. LASED/NCDDS/G/SP/06/16 Request for Single Stage - One / Software (GIS, IDA / 58070 Post Open - National 15,760.00 Signed 2016-11-26 2017-01-21 2018-01-21 Quotations Envelope Accounting) for NCDDS, GSSLC & GDA LASED/NCDDS/G/NCB/02/16 / Motorcycles: for Province(KSP: 10, KCH: 10, TBK: 10), for District: (SMC: 5, OR: 5, PBL:5), for Single Stage - One IDA / 58070 Post Request for Bids Open - National 100,170.00 Signed 2016-12-31 2017-01-05 2017-02-16 2017-03-18 2017-04-22 2018-04-22 Communes: (CL:1, PM:1, Envelope RSMSK:1, DG:1, KLV:1), for NCDDS: 3 Units, GSSLC: 3 Units, GDA: 7 Units. Total 63 Units LASED/NCDDS/G/NCB/03/16 / Computer&Photocopy Machine: Lot 1: Nat.: 37Laptops,3LaserJet Printers, 4Scaners. Provi.: 49Laptops, 5LaserJet Single Stage - One Printer & 5Scaner. IDA / 58070 Post Request for Bids Open - National 191,151.40 Signed 2016-11-30 2016-12-05 2017-01-16 2017-02-15 2017-03-22 2018-03-22 Envelope Distr.:14Laptops, 7LaserJet Printers.Lot 2: Nat.: 3Photocopy, 4LCD Projector+Screen, Provi.:5Photocopy & 5LCD Projector+Screen LASED/NCDDS/G/SP/08/16 Request for Single Stage - One IDA / 58070 Post Limited 0.00 Canceled 2017-02-06 2017-04-03 2017-10-03 / Soil Testing Kits (16 kits) Quotations Envelope LASED/NCDDS/G/SP/01A/17 Request for Single Stage - One / 1 Pickup Trucks for IDA / 58070 Post Open - National 27,000.00 Signed 2017-10-06 2017-12-01 2018-04-03 Quotations Envelope National Level. LASED/NCDDS/G/SP/05/16 / Building new networking data center for LASED- Request for Single Stage - One NCDDS (1 server machine, IDA / 58070 Post Open - National 0.00 Canceled 2016-12-06 2017-01-31 2018-01-31 Quotations Envelope fiber optic cable, and network accessory) and Internet Service Provider LASED/NCDDS/G/NCB/03A/1 8 / Laptop for National and Sub-National Level (4 for GDH, 2 for GDA and 27 Request for Single Stage - One IDA / 58070 Post Open - National 55,220.00 Signed 2018-03-06 2018-05-01 2018-07-30 for NCDDS and 5 Quotations Envelope Provinces) and 1 Desktop for (Large Monitor) for GDH. Total: 34 units LASED/NCDDS/G/SP/04/16 / Camera Equipment. A) National level: 1) Professional Camera (3 units) and Professional Request for Single Stage - One Video Camera (3 units) for IDA / 58070 Post Open - National 16,900.00 Signed 2018-04-07 2018-06-02 2018-08-31 Quotations Envelope LASED-GSSLC Communication, LASED- NCDDS & GDA. B) Provincial: 1) Camera (5 units); 2) Aircon (6 units). LASED/NCDDS/G/SP/05A/16 / Building new networking data center for LASED- Pending NCDDS (1 server, Back up Request for Single Stage - One IDA / 58070 Post Open - National 0.00 Implementat 2018-05-06 2018-07-01 2018-09-29 Storage 4TB, UPS, Other Quotations Envelope ion Software license, Internet service 4 years) and Android Tablet (50 Tablets) LASED/NCDDS/G/SP/09/17 / 1). Mobile loud speaker (Loud Speaker, Stand, Transmitter and Receiver) for LASED GSSLC, NCDDS Request for Single Stage - One and GDA. Toal: 3 sets. 2). IDA / 58070 Post Limited 11,950.00 Signed 2018-04-07 2018-06-02 2018-11-29 Quotations Envelope Loud Speaker ( Loud Speaker, Microphone, Ampli, Battery and Electrical line) for 12 SLC Community Toal: 14 sets. LASED/NCDDS/G/NCB/11/17 / Agriculture Start-Up Pending Packages for Daung 700 Single Stage - One IDA / 58070 Post Request for Bids Open - National 0.00 Implementat 2018-06-01 2018-06-06 2018-07-18 2018-08-17 2018-09-21 2019-09-21 HH (Agri kits 8 items, rice Envelope ion 200kg/HH, vegetable seeds 6 items, plants 5 items) LASED/NCDDS/G/NCB/12/17 / Household Start-Up Pending Packages for Daung 700 Single Stage - One IDA / 58070 Post Request for Bids Open - National 0.00 Implementat 2018-07-02 2018-07-07 2018-08-18 2018-09-17 2018-10-22 2019-04-20 HH (Solar lamp, Tent Envelope ion plastic, mat, blanket, water jar, water filter) LASED/NCDDS/G/NCB/13/17 Pending / Shelter Construction Single Stage - One IDA / 58070 Post Request for Bids Open - National 0.00 Implementat 2018-05-01 2018-05-06 2018-06-17 2018-07-17 2018-08-21 2019-02-17 Materials (40 Zincs/HH) for Envelope ion Daung 700HH COMMUNE/KCH/G/03A/18 / Supply Cover Crops ( Mug bean = 20kgs/Ha and Pending Request for Single Stage - One Cashew = 210 IDA / 58070 Post Open - National 0.00 Implementat 2018-05-23 2018-07-18 2018-10-16 Quotations Envelope Seedlings/Ha) for Peam ion Commune (116.5Ha), Samaki Meanchey District, Kg. Chhnang. Page 12 COMMUNE/KCH/G/04A/18 / Supply Cover Crops ( Mug bean = 20kgs/Ha and Pending Cashew = 210 Request for Single Stage - One IDA / 58070 Post Open - National 0.00 Implementat 2018-05-23 2018-07-18 2018-10-16 Seedlings/Ha) for Quotations Envelope ion Chheanloeurng Commune (103Ha), Samaki Meanchey District, Kg. Chhnang. COMMUNE/KSP/G/05- 06A/18 / Supply Cover Crops ( Mug bean = Request for Single Stage - One 20kgs/Ha and Cashew = IDA / 58070 Post Open - National 33,120.00 Signed 2018-05-23 2018-07-18 2019-01-14 Quotations Envelope 210 Seedlings/Ha) for Reaksmey Samaki Commune (200Ha), Oral District, Kg. Speu. COMMUNE/KPT/G/07- 11A/18 / Supply Cover Crops ( Mug bean = 20kgs/Ha and Cashew = Pending Request for Single Stage - One 210 Seedlings/Ha) Tipo 1 = IDA / 58070 Post Open - National 0.00 Implementat 2018-05-23 2018-07-18 2019-01-14 Quotations Envelope 354.44Ha & Tipo 2 ion =226.5Ha, Total = 580.94Ha for Tipo Commune, Suntuk District, Kg. Thom. COMMUNE/KRT/G/12A/18 / Supply Cover Crops ( Mug bean = 20kgs/Ha and Pending Request for Single Stage - One Cashew = 210 IDA / 58070 Post Open - National 0.00 Implementat 2018-05-23 2018-07-18 2019-01-14 Quotations Envelope Seedlings/Ha) for Sambok ion Commune (100Ha+120Ha=220Ha), Chetr Borey, Kratie. COMMUNE/KRT/G/15- 16A/18 / Supply Cover Crops ( Mug bean = Request for Single Stage - One 20kgs/Ha and Cashew = IDA / 58070 Post Open - National 28,779.60 Signed 2018-05-23 2018-07-18 2019-01-14 Quotations Envelope 210 Seedlings/Ha) for Thmey Commune (174Ha), Chetr Borey, Kratie. COMMUNE/KRT/G/17- 19A/18 / Supply Cover Crops ( Mug bean = Pending Request for Single Stage - One 20kgs/Ha and Cashew= 210 IDA / 58070 Post Open - National 0.00 Implementat 2018-05-23 2018-07-18 2019-01-14 Quotations Envelope Seedlings/Ha) for Chambak ion Commune (277Ha), Prek Prasab, Kratie. COMMUNE/KPT/G/20- 24A/18 / Supply Cover Crops ( Mug bean = Pending Request for Single Stage - One 20kgs/Ha and Cashew= 210 IDA / 58070 Post Open - National 0.00 Implementat 2019-02-06 2019-04-03 2019-09-30 Quotations Envelope Seedlings/Ha) for Daung ion Commune (500Ha), Suntuk District, Kg. Thom. COMMUNE/KCH/G/01- 02A/18 / Supply Cover Crops ( Mug bean = 20kgs/Ha and Cashew = Pending 210 Seedlings/Ha) for Request for Single Stage - One IDA / 58070 Post Open - National 0.00 Implementat 2018-05-23 2018-07-18 2018-10-16 Sambok Kriel (100Ha)and Quotations Envelope ion for Ksach Sar (126.50Ha), Total 226.50 Ha, Kranglovea Commune, Samaki Meanchey District, Kg. Chhnang COMMUNE/G/02/18 / Planting in Agriculture Land (Ploughing and Seedling for Cover Crop) Request for Single Stage - One IDA / 58070 Post Open - National 0.00 Canceled 2018-01-06 2018-03-03 2018-08-30 for Ksach Sar (126.50Ha), Quotations Envelope Kranglovea Commune, Samaki Meanchey District, Kg. Chhnang COMMUNE/G/23/18 / Planting in Agriculture Land (Ploughing and Request for Single Stage - One Seedling for Cover Crop) IDA / 58070 Post Open - National 0.00 Canceled 2018-01-06 2018-03-03 2018-08-30 Quotations Envelope for Daung Commune, Prasad Balang, Kg. Thom. PHASE 4 (100Ha) of 500Ha COMMUNE/KRT/G/13A/18 / Supply Cover Crops ( Mug bean = 20kgs/Ha and Pending Request for Single Stage - One Cashew= 210 Seedlings/Ha) IDA / 58070 Post Open - National 0.00 Implementat 2018-05-23 2018-07-18 2019-01-14 Quotations Envelope for Changkrang Commune ion (59Ha+80Ha=139Ha), Chetr Borey, Kratie COMMUNE/KRT/G/14A/18 / Supply Cover Crops ( Mug bean = 20kgs/Ha and Request for Single Stage - One IDA / 58070 Post Open - National 15,729.52 Signed 2018-05-23 2018-07-18 2019-01-14 Cashew = 210 Quotations Envelope Seedlings/Ha) for Dar Commune (97Ha), Chetr Borey, Kratie. LASED/NCDDS/G/UN/01/19 Pending / Vehicles (SUV) for GDH, UN Agencies IDA / 58070 Post Direct 0.00 Implementat 2019-02-01 2019-02-06 2019-03-13 2019-09-09 NCDDS & GDA, total = 3 (Direct) ion units LASED/NCDDS/G/SP/11/19 Pending Request for Single Stage - One / Solar Panel for teacher IDA / 58070 Post Open - National 0.00 Implementat 2019-03-06 2019-05-01 2019-10-28 Quotations Envelope and nurse house, total = 9 ion sets LASED/NCDDS/G/SP/12/19 / DGPS for KRT and KPT, total = 2 units Pending Request for Single Stage - One GPS for GDH (2 units), IDA / 58070 Post Open - National 0.00 Implementat 2019-03-20 2019-05-15 2019-11-11 Quotations Envelope GDA (4 units) , and 5 ion units for KCH, KRT, KPT, KSP and TKM), toal = 11 units LASED/NCDDS/G/SP/13/19 / Tape Recorder (3 units Pending Request for Single Stage - One for NCDDS, GDH, and IDA / 58070 Post Open - National 0.00 Implementat 2019-03-25 2019-05-20 2019-11-16 Quotations Envelope GDA and 5 units for 5 ion provinces), total = 8 units Page 13 LASED/NCDDS/G/SP/14/19 / Agriculture Materials:Lot 1: Soil Auger (ឧបករណ៌ខួងដី) for GDA, Total = 2 units Lot 2: Hatchery Machine (ម៉ Pending Request for Single Stage - One ាស៊ីនភ្ញាស់ពងមាន់) (2 units fo IDA / 58070 Post Open - National 0.00 Implementat 2019-04-15 2019-06-10 2019-12-07 Quotations Envelope r Sambok, 2 units for Chan ion gkrang, 2 units of Chamkra vien, 2 units for Tipo, 2 un its for Rasmey Samaki) Tot al = 10 units COMMUNE/KSP/G/20/19 / Pending Water tank with supporter Request for Single Stage - One IDA / 58070 Post Open - National 0.00 Implementat 2019-03-06 2019-05-01 2019-07-30 and tube (Rasmey Samaki, Quotations Envelope ion KSP), Total = 3 units COMMUNE/KPT/G/21/19 / Pending Water tank for health post Request for Single Stage - One IDA / 58070 Post Open - National 0.00 Implementat 2019-04-15 2019-06-10 2019-09-08 in Dong SLC, KPT, total = Quotations Envelope ion 1 units NON CONSULTING SERVICES Bid Evaluation Activity Reference No. Draft Pre- Draft Bidding Loan / Credit Market Procurement Prequalification Actual Process Prequalification Specific Procurement Bidding Documents Proposal Submission Report and / Description Component Review Type Method qualification Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Recommendation for Documents Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual LASED/NCDDS/IC/35/17 / Insurance (Group Personal Accident and Health Pending Single Stage - One Insurance and Vehicle IDA / 58070 Post Request for Bids Open - National 0.00 Implementat 2017-03-01 2017-03-06 2017-04-17 2017-05-17 2017-06-21 2021-12-31 Envelope Insurance (Third Party ion Liability Driver and Passenger) CONSULTING FIRMS Activity Reference No. Short List and Draft Combined Evaluation Loan / Credit Market Contract Type Actual Amount Process Expression of Request for Opening of Technical Evaluation of / Description Component Review Type Method Terms of Reference Request for Report and Draft Signed Contract Contract Completion No. Approach (US$) Status Interest Notice Proposals as Issued Proposals / Minutes Technical Proposal Proposals Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual LASED/NCDDS/IC/30/17 / Consultant Baseline Survey in year IDA / 58070 Post Qualification Open - National 69,998.05 Signed 2017-01-31 2017-02-21 2017-04-06 2017-05-06 2017-06-10 2018-06-10 2017 (Local Firm) Selection LASED/NCDDS/F/35/17 / Consultant Consulting firm for IDA / 58070 Post Qualification Open - National 119,997.50 Signed 2017-09-15 2017-10-06 2017-11-19 2017-12-19 2018-01-23 2018-06-12 Irrigation Design (8 sites) Selection LASED/NCDDS/IC/31/18 / Consultant Impact Survey for 2nd year Pending IDA / 58070 Post Qualification Open - National 0.00 2018-07-10 2018-07-31 2018-09-13 2018-10-13 2018-11-17 2019-11-17 of the project/Mid-term Implementation Selection review (Local Firm) Consultant LASED/NCDDS/IC/32/21 / Open - Pending IDA / 58070 Post Qualification 0.00 2021-07-13 2021-08-03 2021-09-16 2021-10-16 2021-11-20 2022-07-12 Final Impact Survey International Implementation Selection LASED/NCDDS/IC/34/17 / Service Provider for Quality Based Open - Under Implementation Community IDA / 58070 Post 0.00 2018-06-01 2018-06-22 2018-08-05 2018-09-02 2018-10-02 2018-11-01 2018-12-06 2023-04-30 Selection International Implementation Development Fund (for 5 years) INDIVIDUAL CONSULTANTS Page 14