1. Prior Review Threshold. Procurement decisions subject to prior review by the Bank as stated in Appendix 1 in the Procurement Guidelines. Table A.2.4 Prior Review Threshold Procurement Method Threshold Prior Review Threshold (US$) Procurement Method MODERATE RISK PROJECT (US$) Works 1. ICB > 7,000,000 > 15,000,000 2. NCB > 200,000–< 7000,000 As per Procurement Plan 3.. Shopping (small contracts) < 200,000 As per Procurement Plan 4. Direct contracting n.a. All Goods and non-consulting services (excluding consultants services) 1. ICB > 1,000,000 > 3,000,000 2. NCB >100,000 – <1,000,000 As per Procurement Plan 3. Shopping <100,000 As per Procurement Plan 4. Direct contracting n.a All 2. Procurement Packages Subject to World Bank Prior and Post Review with Selection Methods and Time Table A2.5. Procurement Packages Subject to World Bank Prior and Post Review Review Expected Estimated Procureme by Bid- Ref Contract Approach Cost nt Bank Opening No. (Description) to market (US$) Method (Prior/ Date Post) WORKS 1 Masunga MC - Sowa Water Request for Open Prior March 2019 Supply Master Plan 16,650,000 Bids Internationa (connection to Nata Cluster) l 2 Lobatse MC - Mmathethe Water Request for Open Prior December Supply 8,100,000 Bids Internationa 2017 l 3 Lobatse MC -Mokatako Water Request for Open Post June 2017 Supply 270,000 Proposals National 4 Selebi Phikwe MC -Selibi Phikwe - Request for Open Prior June 2017 Serule Water Transfer Scheme 18,000,000 Bids Internationa l 5 Masunga MC - North East/Tutume Request for Open Prior June 2017 Water Transfer Scheme 19,800,000 Bids Internationa l 6 Letlhakane MC - Boteti Southern Request for Open Prior June 2017 and Central Cluster Villages Water 18,000,000 Bids Internationa Supply Scheme l 7 Letlhakane MC – Mosu, Mokubilo Request for Open Post June 2017 270,000 and Mmea Villages Water Supply Proposals National 8 Ghanzi MC - Ghanzi Township Request for Open Prior November Water Supply Expansion 7,560,000 Bids National 2017 8 Ghanzi MC - Kuke Water Supply Request for Open Post November Master Plan Project 1,710,000 Bids National 2017 10 Ghanzi MC – Bere Settlement Request for Open Post November Water Supply Augmentation 630,000 Bids National 2017 Review Expected Estimated Procureme by Bid- Ref Contract Approach Cost nt Bank Opening No. (Description) to market (US$) Method (Prior/ Date Post) 11 Kanye MC - Kanye/Moshupa Request for Open Post April 2018 2,700,000 Water supply Project Bids National 12 Molepolole MC - - Request for Open Prior April 2018 Malwelwe/Molepolole/Thamaga 9,000,000 Bids Internationa Thebephatswa (Phase 2) l 13 Francistown MC - Mambo Waste Request for Open Prior July 2017 Water Treatment Plant 14,400,000 Proposals Internationa Rehabilitation l 14 Lobatse MC - Lobatse Waste Request for Open Post April 2018 Water Treatment Plant 585,000 Proposals National Rehabilitation 15 Letlhakane MC – Letlhakane Request for Open Post April 2018 Waste Water Treatment ponds 4,500,000 Proposals National expansion GOODS Request for Open Water quality monitoring April 2017 1 1,200,000 Bids Internationa Post equipment (WUC) l Request for Open Ground water monitoring April 2017 2 460,000 Bids Internationa Post equipment (WUC) l Request for Open November IWRM Equipment for surface and 3 2,000,000 Bids Internationa Prior 2017 groundwater monitoring l Request for Open November Equipment for Operational 4 2,600,000 Bids Internationa Prior 2017 Forecasting and Early Warning l NONCONSULTING SERVICES Request for Open Loss reduction support program 1,450,000 Bids Internationa Prior April 2017 l 3. Selection of Consultants 4. Prior Review Threshold. Selection decisions subject to prior review by World Bank as stated in appendix 1 to the Guidelines Selection and Employment of Consultants. Table A2.6. Prior Review Threshold for Consultants Prior Review Threshold Selection Method MODERATE RISK PROJECT Selection Method Threshold (US$) (US$) 1. QCBS and QBS ≥ $300,000 >1m 2. FBS, QBS, LCS, and CQS < $300,000 >1m 3. Single Source (Firms) n.a. All 4. Individual Consultants n.a. >300,000 5. Single Source (Individual n.a. All Consultants) Note: QCBS = Quality-and-Cost-Based Selection (Section II of the Consultants’ Guidelines); LCS = Least-Cost Selection (Para 3.6, of the Guidelines); CQS = Selection based on the Consultants’ Qualifications (Para 3.7 of the Guidelines); FBS= Selection under a Fixed Budget (Para 3.5 of the Guidelines); QBS = Quality-Based Selection (Para 3.2 of the Guidelines) 5. Short list comprising entirely of national consultants. Short list of consultants for services, estimated to cost less than US$300,000 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of Paragraph 2.7 of the Consultant Guidelines. All terms of reference irrespective of the value of the consultancy assignment are subject to prior review. Table A2.7 Consultancy Assignments with Selection Methods and Time Schedule Prior Expected Estimate Procureme or Proposal Ref d Approach Description nt/Selection Post Submissio No. Amount to market Method Revie n/Opening (US$) w Date Review and Roll out of Non-Revenue Open Water Strategy (WUC) QCBS Internationa Prior June 2018 900,000 l Open Review of Billing and Collection strategies, June 2018 CQS National Post including benchmarking (WUC) 100,000 Review of water supply and (sanitation) Open January wastewater manual (WUC) CQS National Post 2018 200,000 Energy reduction Strategy – with focus on Open January climate change mitigation, solar pumping CQS National Post 2018 and biogas utilization (WUC) 100,000 Engineering Services for Masunga MC - Open Sowa Water Supply Master Plan 1,850,00 QCBS Internationa Prior June 2018 (connection to Nata Cluster)(WUC) 0 l Engineering Services for Lobatse MC - Open October Mmathethe Water Supply (WUC) QCBS Internationa Prior 2017 900,000 l Engineering Services for Lobatse MC - Open Mokatako Water Supply (WUC) CQS National Post Mayy 2017 30,000 Engineering Services for Selebi-Phikwe Open MC - Selibi Phikwe - Serule Water Transfer 2,000,00 QCBS Internationa Prior May 2017 Scheme (WUC) 0 l Engineering Services for Masunga MC - Open North East/Tutume Water Transfer 2,200,00 QCBS Internationa Prior Mayy 2017 Scheme (WUC) 0 l Engineering Services for Letlhakane MC - Open Boteti Southern and Central Cluster Water 2,000,00 QCBS Internationa Prior May 2017 Supply (WUC) 0 l Engineering Services for Letlhakane MC - Open Mosu Water Supply (WUC) CQS National Post May 2017 30,000 Engineering Services for Ghanzi MC - Open Ghanzi Township Water Supply QCBS Internationa Prior July 2017 Expansion(WUC) 840,000 l Engineering Services for Ghanzi MC – Open Kuke Water Supply Master Plan project CQS National Post May 2017 (WUC) 190,000 Engineering Services for Ghanzi MC –Bere Open Water Supply Augmentation (WUC) CQS National Post May 2017 70,000 Engineering Services for Kanye MC - Open Kanye/Moshupa Water Supply (WUC) CQS National Post July 2017 300,000 Engineering Services for Molepolole MC - Open Malwelwe/Molepolole/Thamaga July 2017 QCBS Internationa Prior Thebephatswa Water Supply (Phase 2) 1,000,00 l (WUC) 0 Engineering Services for Francistown - Open August Mambo Waste Water Treatment Plant 1,600,00 QCBS Internationa Prior 2017 Refurbishment (WUC) 0 l Engineering Services for Lobatse Waste Open November Water Treatment Ponds Rehabilitation CQS National Post 2017 (WUC) 65,000 Engineering Services for Letlhakane Open November Waste Water Treatment Ponds Expansion QCBS National Prior 2017 (WUC) 500,000 Water and Sanitation Policy dissemination IC Open program (MLWS)/DWA) National Post June 2017 50,000 Water Act Training and outreach facilitator IC Open December and dissemination program (MLWS)/DWA) National Post 2017 50,000 National Conservation strategy advisory IC Open November and technical assistance (MLWS)/DWA) National Post 2018 50,000 Update of the 1968 Water Act, including CQS Open alignment/amendment of related pieces of National Post June 2017 statutes (MLWS)/DWA) 50,000 Finalization and dissemination of National CQS Open December Water Conservation and Demand National Post 2017 Management Study (MLWS)/DWA) 50,000 Development of water abstraction and QCBS Open December pricing strategy (MLWS)/DWA) Internationa Prior 2017 450,000 l Regulatory Capacity Building QCBS Open December (MLWS)/DWA) Internationa Prior 2017 500,000 l Water quality monitoring programs QCBS Open December (MLWS)/DWA) National Post 2017 300,000 Demarcation of catchment areas study CQS Open November (MLWS)/DWA) National Post 2018 200,000 Study and design of aquifer recharge QCBS Open December options (MLWS)/DWA) Internationa Prior 2017 400,000 l Study and design of saline groundwater QCBS Open December use options (MLWS)/DWA) Internationa Prior 2017 400,000 l Support for implementation of Institutional QCBS Open December Strengthening (WUC) Internationa Prior 2017 300,000 l Development of WSS capital investment QCBS Open September book, business strategy, financial recovery Internationa Prior 2017 plan, and WSS services strategies l (including stand posts, sanitation), (WUC) 800,000 Optimization of WSS treatment processes QCBS Open November (WUC) 1,350,00 Internationa Prior 2017 0 l Support for development of Public Private CQS Open November Partnerships (WUC) Internationa Post 2017 280,000 l Western Region Master Plans - Tsabong, QCBS Open November Ghanzi and Maun (WUC) 1,800,00 Internationa Prior 2017 0 l Pre-feasibility studies and technical QCBS Open November assistance for Chobe-Zambesi Transfer Internationa Prior 2017 Scheme (MLWS) 525,000 l Pre-feasibility studies and technical QCBS Open November assistance for Lesotho-Botswana Transfer Internationa Prior 2017 Scheme (MLWS) 525,000 l Study on Effluent Reuse options at CQS Open December institutional level (MLWS)/DWA) 200,000 Internationa Post 2018 l Groundwater desalination options and CQS Open December feasibility study (MLWS)/DWA) Internationa Post 2018 200,000 l PPP technical implementation support, QCBS Open transaction advice (WUC) Internationa Prior June 2017 800,000 l Audits (technical, financial, procurement) LC Open December National Post 2017 100,000 Economic and financial review consultant IC Open National Post June 2017 100,000 Project Operational Manual consultant IC Open National Post March 2017 10,000 Project procurement systems consultant IC Open National Prior June 2017 50,000 Financial management systems consultant IC Open National Prior June 2017 50,000 Environmental and Social Safeguards IC Open instruments, Resettlement Policy Internationa June 2017 Prior Framework Dam Safety Action Plan l monitoring (WUC) 450,000 Project monitoring, reporting and ICR IC Open January consultant National Post 2021 100,000 Communication consultant (WUC) IC Open October National Post 2017 200,000 Community consultation and development CQS Open of Grievance Management Systems National Post June 2017 (WUC) 100,000 Project Management (WUC and DWA) IC Open 3,000,00 National Prior June 2017 0 PROCUREMENT Botswana : Emergency Water Security and Efficiency Project PLAN General Information Country: Botswana Bank’s Approval Date of the Original Procurement Plan: 2017-08-23 2020-02-06 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P160911 GPN Date: 2017-08-23 Project Name: Emergency Water Security and Efficiency Project Loan / Credit No: IBRD / 87190 Executing Agency(ies): Water Utilities Corporation WORKS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual WUC 019 2018 / Design, Component 1: Improve Pending Supply, and Installation of Request for Open - Single Stage - Two IBRD / 87190 Availability of Water Supply Prior 600,000.00 0.00 Implementati 2018-10-08 2018-10-15 2018-11-26 2019-03-01 2019-04-05 2019-12-01 Water Treatment Plant At Proposals International Envelope and Efficiency of Services on Borehole (BH 7955) at Mosu BW-WUC-78241-CW-RFB / Component 1: Improve Pending Design and Construction of Request for Single Stage - One IBRD / 87190 Availability of Water Supply Prior Open - National 300,000.00 0.00 Implementati 2018-11-02 2018-11-07 2018-12-19 2019-01-18 2019-02-22 2019-08-21 One Booster Pump Station, Proposals Envelope and Efficiency of Services on 50m3 Sump at Mokatako BW-WUC-78252-CW-RFP / Component 2: Improve Lobatse wastewater Single Stage - One IBRD / 87190 Wastewater and Sludge Prior Request for Bids Open - National 650,000.00 0.00 Canceled 2019-04-30 2019-05-05 2019-06-16 2019-07-16 2019-08-20 2020-02-16 Treatment Plant Envelope Management Rehabilitation BW-WUC-78242-CW-RFP / Design and Build Services Component 1: Improve Under for Connection of Boreholes Request for Open - Single Stage - Two IBRD / 87190 Availability of Water Supply Prior 10,000,000.00 0.00 Implementati 2019-04-15 2019-07-01 2019-07-01 2019-04-20 2019-09-09 2019-11-22 2020-01-05 2021-02-28 to Malwelwe/ Molepolole/ Proposals International Envelope and Efficiency of Services on Thamaga Thebephatswa and Associated Works BW-WUC-111841-CW-RFB / CONSTRUCTION OF THE Component 1: Improve Pending Open - Single Stage - One SELEBI PHIKWE - IBRD / 87190 Availability of Water Supply Prior Request for Bids 32,000,000.00 0.00 Implementati 2019-05-10 2019-05-15 2019-06-26 2019-08-14 2019-09-14 2020-12-15 International Envelope SERULE WATER and Efficiency of Services on TRANSFER SCHEME BW-WUC-111844-CW-RFB / CONSTRUCTION UPGRADE AND REMEDIAL WORKS Component 1: Improve Under Open - Single Stage - One FOR THE NORTH EAST- IBRD / 87190 Availability of Water Supply Prior Request for Bids 29,000,000.00 0.00 Implementati 2019-04-30 2019-05-05 2019-06-16 2019-08-04 2019-09-04 2021-01-26 International Envelope TUTUME SUB-DISTRICT and Efficiency of Services on VILLAGES WATER SUPPLY SCHEME GOODS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BW-WUC-68386-GO-DIR / Component 3: Sector Reform Laboratory Information IBRD / 87190 and Institutional Prior Direct Selection Direct 450,000.00 0.00 Canceled 2018-07-13 2018-08-10 2018-12-14 2019-07-12 Management System Strengthening Upgrade Page 1 BW-WUC-76717-GO-RFB / Lot 5 to 7 Total Organic Carbon (TOC) Analyzer X 2 Component 3: Sector Reform Inductively Coupled Plasma - Open - Single Stage - One IBRD / 87190 and Institutional Prior Request for Bids 1,551,930.00 0.00 Canceled 2018-09-28 2018-10-03 2018-11-14 2018-12-14 2019-01-18 2019-07-17 Optical Emission International Envelope Strengthening Spectrometer (ICP-OES) X 3 Inductively Coupled Plasma - Mass Spectrometer (ICP-MS) x 1 BW-WUC-74927-GO-RFB / Component 3: Sector Reform Open - Single Stage - One (Lot 1 to 4) Water Quality IBRD / 87190 and Institutional Prior Request for Bids 1,600,000.00 0.00 Canceled 2018-09-28 2018-10-03 2018-11-14 2018-12-14 2019-01-18 2019-07-17 International Envelope Monitoring Equipment. Strengthening BW-WUC-76717-GO-RFB-2 / SUPPLY AND INSTALLATION OF WATER Component 3: Sector Reform Under Open - Single Stage - One QUALITY MONITORING IBRD / 87190 and Institutional Prior Request for Bids 1,600,000.00 0.00 Implementati 2019-11-15 2019-11-20 2020-01-22 2020-03-25 2020-04-29 2020-10-26 International Envelope EQUIPMENT FOR WATER Strengthening on UTILITIES CORPORATION LOTS 5 TO 7 BW-WUC-74927-GO-RFB-2 / SUPPLY AND INSTALLATION OF WATER Component 3: Sector Reform Under Open - Single Stage - One QUALITY MONITORING IBRD / 87190 and Institutional Prior Request for Bids 1,600,000.00 0.00 Implementati 2019-11-14 2019-11-19 2020-01-21 2020-03-24 2020-04-28 2020-10-25 International Envelope EQUIPMENT FOR WATER Strengthening on UTILITIES CORPORATION - LOTS 1 TO 4 NON CONSULTING SERVICES Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BW-WUC-154294-NC-RFB / Component 3: Sector Reform Pending Upgrade of the Laboratory Single Stage - One IBRD / 87190 and Institutional Post Request for Bids Open - National 600,000.00 0.00 Implementati 2020-02-16 2020-02-21 2020-04-03 2020-04-17 2020-05-22 2020-08-20 Information Management Envelope Strengthening on System (LIMS) CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Market Contract Type Estimated Actual Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BW-WUC-27697-CS-QCBS / PROCUREMENT OF PROJECT MANAGEMENT CONSULTANCY FIRM TO Component 3: Sector Reform PROVIDE SERVICES FOR Quality And Cost- Under IBRD / 87190 and Institutional Prior Open - National 3,000,000.00 0.00 2017-09-07 2017-09-07 2017-09-07 2017-09-07 2017-09-07 2017-09-22 2017-09-29 2019-10-07 DEDICATED EXPERTS FOR Based Selection Implementation Strengthening THE WATER UTILITIES CORPORATION BOTSWANA WATER SECURITY AND EFFICIENCY PROJECTS BW-WUC-25685-CS-QCBS / Feasibility Study,Tender Component 2: Improve Management and Quality And Cost- Open - IBRD / 87190 Wastewater and Sludge Prior 2,000,000.00 1,866,007.03 Signed 2017-08-22 2017-09-21 2017-10-04 2017-11-02 2017-11-06 2017-11-10 2017-12-06 2020-12-07 Construction Supervision for Based Selection International Management Mambo Wastewater Treatment Plant Page 2 WUC 041 2017 / Component 2: Improve Engineering Services for Quality And Cost- Open - IBRD / 87190 Wastewater and Sludge Prior 500,000.00 976,100.00 Signed 2018-01-10 2018-02-01 2018-03-17 2018-03-31 2018-04-30 2018-05-28 2018-07-09 2019-07-09 Letlhakane Waste Water Based Selection International Management Treatment Ponds Expansion WUC028 2018 / CONSULTING SERVICES FORTHE DESIGN REVIEW, TENDER MANAGEMENT AND DOCUMENTATION, Component 1: Improve Quality And Cost- Open - Under AND CONSTRUCTION IBRD / 87190 Availability of Water Supply Prior 2,000,000.00 1,413,386.48 2018-04-11 2018-04-30 2018-06-13 2018-07-11 2018-08-10 2018-09-14 2018-10-19 2019-10-19 Based Selection International Implementation SUPERVISION OF THE and Efficiency of Services BOTETI SOUTHERN AND CENTRAL CLUSTER VILLAGES WATER SUPPLY SCHEME BW-WUC-78240-CS-QCBS / LOBATSE WASTEWATER TREATMENT WORKS: Component 2: Improve Quality And Cost- Open - FEASIBILITY STUDY- To IBRD / 87190 Wastewater and Sludge Prior 400,000.00 530,914.15 Signed 2018-10-01 2018-10-22 2018-12-05 2019-01-02 2019-02-01 2019-03-08 2019-04-12 2020-04-11 Based Selection International determine the immediate Management works, remedial works and long term up to 2035 BW-WUC-78238-CS-QCBS / Design Review,Tender Documentation & Component 1: Improve Quality And Cost- Open - Under Management and IBRD / 87190 Availability of Water Supply Prior 1,850,000.00 0.00 2018-10-29 2018-11-19 2019-01-02 2019-01-30 2019-03-01 2019-04-05 2019-05-10 2020-05-09 Based Selection International Implementation Construction Supervision for and Efficiency of Services Sowa Water Supply Masterplan BW-WUC-81459-CS-QCBS / Design Review,Tender Component 1: Improve Documentation & Quality And Cost- Open - Under IBRD / 87190 Availability of Water Supply Prior 900,000.00 0.00 2018-10-16 2018-11-06 2018-12-20 2019-01-17 2019-02-16 2019-03-23 2019-04-27 2020-04-26 Management and Based Selection International Implementation and Efficiency of Services Construction Supervision for Mmathethe Water Supply WUC 120 2018 / Component 1: Improve ENGINEERING SERVICES- Quality And Cost- Open - IBRD / 87190 Availability of Water Supply Post 900,000.00 0.00 Canceled 2018-12-10 2019-01-24 2019-03-09 2019-03-23 2019-04-22 2019-05-20 2019-07-01 2020-12-30 MMATHETHE WATER Based Selection International and Efficiency of Services SUPPLY SCHEME WUC027 2019 / Component 1: Improve ENGINEERING SERVICES Quality And Cost- Open - Under IBRD / 87190 Availability of Water Supply Prior 1,850,000.00 0.00 2019-05-24 2019-06-14 2019-07-28 2019-09-08 2019-09-29 2019-11-03 2019-12-08 2023-02-02 FOR SOWA WATER Based Selection International Implementation and Efficiency of Services SUPPLY SCHEME WUC026 2019 / ENGINEERING SERVICES Component 1: Improve FOR THE FRANCISTOWN Quality And Cost- Open - Under IBRD / 87190 Availability of Water Supply Prior 300,000.00 0.00 2019-05-24 2019-06-07 2019-07-21 2019-09-01 2019-10-01 2019-11-05 2019-12-10 2021-01-31 WATER SUPPLY Based Selection International Implementation and Efficiency of Services INFRASTRUCTURE UPGRADING BW-WUC-133546-CS-CQS / DEVELOPMENT OF THE CORPORATION WATER Component 3: Sector Reform Consultant Pending RESOURCES, WATER IBRD / 87190 and Institutional Post Qualification Open - National 200,000.00 0.00 2019-10-04 2019-10-25 2019-12-24 2020-01-23 2020-02-27 2021-02-26 Implementation SUPPLY & WASTEWATER Strengthening Selection DESIGN STANDARD MANUAL BW-WUC-134996-CS-QCBS / Engineering services for Component 1: Improve Quality And Cost- Open - Under Ghanzi Water Supply IBRD / 87190 Availability of Water Supply Post 840,000.00 0.00 2019-10-17 2019-11-07 2020-01-02 2020-03-02 2020-03-23 2020-05-18 2020-06-22 2023-06-22 Based Selection International Implementation Distribution Network and Efficiency of Services Rehabilitation,Phase II Page 3 INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Market Contract Type Estimated Actual Draft Negotiated Description Component Review Type Method Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 1: Improve BW-WUC-25682-CS-CDS / IBRD / 87190 Availability of Water Supply Prior Direct Selection Direct 2,000,000.00 0.00 Canceled 2017-08-23 2017-09-02 2017-11-06 2018-05-05 Design review and Efficiency of Services WUC 010 2017 / Design Review, Tender Component 1: Improve Documentation and IBRD / 87190 Availability of Water Supply Prior Direct Selection Direct 2,000,000.00 2,141,504.64 Signed 2017-09-07 2017-09-07 2017-10-06 2020-04-30 Construction Supervision for and Efficiency of Services Selibe Phikwe-Serule Water Transfer Scheme WUC 011 2017 / DESIGN REVIEW,TENDER DOCUMENTATION & MANAGEMENT AND Component 1: Improve CONSTRUCTION IBRD / 87190 Availability of Water Supply Prior Direct Selection Direct 2,200,000.00 2,108,175.72 Signed 2017-09-08 2017-09-08 2017-10-06 2020-04-30 SUPERVISION FOR NORTH and Efficiency of Services -EAST -TUTUME SUB- DISTRICT VILLAGES WATER SUPPLY SCHEME WUC 018 2017 / PREPARATION OF A Component 3: Sector Reform Individual Under PROJECT IBRD / 87190 and Institutional Post Consultant Limited 10,000.00 0.00 2017-09-07 2017-09-07 2017-09-08 2017-09-15 2017-10-30 Implementation IMPLEMENTATION Strengthening Selection MANUAL WUC 046 2017 / CONSULTANCY SERVICES Component 3: Sector Reform Individual FOR RAPID ASSESSMENT IBRD / 87190 and Institutional Prior Consultant Open 100,000.00 90,239.38 Signed 2017-10-13 2018-01-06 2018-01-27 2018-02-24 2018-06-24 OF SCOPE OF NON- Strengthening Selection REVENUE WATER REDUCTION PROGRAM WUC 046 2017SOUTH / Consultancy services for Component 3: Sector Reform Individual Rapid Assessment of Scope IBRD / 87190 and Institutional Post Consultant Open 50,000.00 0.00 Canceled 2017-12-07 2018-03-20 2018-04-10 2018-05-15 2018-11-11 of Non_Revenue Water Strengthening Selection Reduction Program -South BW-WUC-130025-CS-CDS / Component 3: Sector Reform Technical Advisory Services Under IBRD / 87190 and Institutional Prior Direct Selection Direct 100,000.00 0.00 2019-09-06 2019-09-25 2019-12-09 2021-12-08 for the Non Revenue Water Implementation Strengthening Reduction Advisory Services Page 4