PROCUREMENT PLAN(2012-13) IV PHASE TAMIL NADU IAMWARM PROJECT ENVIRONMENTAL ACTIVITIES IN ADYAR SUB-BASIN OF CHENNAI BASIN (SSS) STATEMENT - 1A Name of Consultant / Nationality & Zip RFP Final Draft to be forwarded to the -------------------------------------------------- TOR/ Shortlist to be finalised (Date) Method of Procurement (Shopping) ---------------------------------------------- Advertising for shortlisting (Date) No objection from bank for TOR/ Services to be completed (Date) Date of commencement of work Proposals to be received by the Estimate of cost (Rs in Lakhs) ---------------------------------------- Contract Number, Value and Method of selection through Shortlist / Final RFP (Date) Date of completionof work Evaluation to be finalised No objection by the Bank project Authorities (Date) --------------------------------- Date of contract signing Description of Services ---------------------------- Bid inivitation date RFP Issued (date) Bid opening date Code,If USA Package No consultancy bank (Date) **WBR No Currency Remarks S.No 1 2 3 4 5 5A 6 7 8 9 10 11 12 13 14 15 16 18 17 1 Environmental and Social DPR for IV Phase sub knowledge base analysis and basins prepared for 3 development (By fixing nodel years i.e (2010-13). agency or any educational Since the instituition) Administrative 01 / IAMWARM Consulting services for Sanction obtained / WRD - EC / Preparation of Environmental during September ADYAR and social Impact Assessment 2011,the Procurement /consultancy/ report with expert analysis @ Plan on Environmental 4.00 SSS _ N.R N.R N.R N.R 15.5.12 28.5.12 31.5.12 N.R N.A N.A 31.3.2013 N.A activities for Adyarsub IV / 2012 -2013 every 6 months and documentation for Project and basin has been non Project investment prepared upto the (1.00 lakhs× 4 reports) project closing period 2 Transfer of technical know how of 03/2013. for solid waste management system including source segregation, recycle of dry waste and linkage with user agencies. (By fixing nodel agency or any educational instituition) 02 a / Consulting services for Motivating IAMWARM / the local bodies for Soild waste WRD - EC / management project and Sewage ADYAR treatment plants to prevent /consultancy/ pollution of water sources and IV / 2012 -2013 using for irrigation by transfering 1.00 SSS _ N.R N.R N.R N.R 15.5.12 28.5.12 31.5.12 N.R N.A N.A 31.3.2013 N.A technical know how through demonstration Documentary film and Technical visit ( Rs. 0.50 lakhs × 2 Nos ) 02 b / Consulting services for Promoting DPR for IV Phase sub IAMWARM / Entrepreneurship Policy for basins prepared for 3 WRD - EC / Eradication of weeds by setting years i.e (2010-13). ADYAR / up Bio gas Plant / Vermi compost Since the consultancy/ IV By WUA through Awareness Administrative 1.00 SSS _ N.R N.R N.R N.R 15.5.12 28.5.12 31.5.12 N.R N.A N.A 31.3.2013 N.A / 2012 -2013 creation, Demonstration and Sanction obtained consultative meeting and pilot during September study.( Rs. 1.00 lakhs ×1 no) 2011,the Procurement Plan on Environmental activities for Adyarsub 02 c / Impact Assesment of basin has been IAMWARM / Environmental Degradation due prepared upto the WRD - EC / to Tannery industries in and project closing period ADYAR around Adyar River (Rs 0.75 2.50 SSS _ N.R N.R N.R N.R 15.5.12 28.5.12 31.5.12 N.R N.A N.A 31.3.2013 N.A of 03/2013. /consultancy/ lakhs X 2 reports) and (Rs 1.00 IV / 2012 -2013 lakh X 1 no for final report(ie) (third report ) 3 Conducting Environmental and social Awareness meeting, programme, workshop,demonstration and Exhibitions on various environmental and social related issues including capacity building ie., Propogating ,preparing and publishing Environmental Atlas, Exposure to field visit and documentation(By fixing nodel agency or any educational instituition) 03 a / Consulting services for IAMWARM / Conducting Awareness Programs WRD - EC / for Public 3.00 SSS _ N.R N.R N.R N.R 15.5.12 28.5.12 31.5.12 N.R N.A N.A 31.3.2013 N.A ADYAR / ( Rs. 1.00 lakhs X 3 Nos ) consultancy/ IV / 2012 -2013 03 b / Consulting services for DPR for IV Phase sub IAMWARM / Conducting Meetings for WRO basins prepared for 3 WRD - EC / officials / line department officials. years i.e (2010-13). ADYAR / ( Rs. 0.20 lakhs X 2 nos ) 0.40 SSS _ N.R N.R N.R N.R 15.5.12 28.5.12 31.5.12 N.R N.A N.A 31.3.2013 N.A Since the consultancy/ IV Administrative / 2012 -2013 Sanction obtained during September 03 c / Consulting services for 2011,the Procurement IAMWARM / Conducting Meetings in School/ Plan on Environmental WRD - EC / Institution ADYAR / ( Rs. 0.20 lakhs X 3 Nos ) 0.60 SSS _ N.R N.R N.R N.R 15.5.12 28.5.12 31.5.12 N.R N.A N.A 31.3.2013 N.A activities for Adyarsub basin has been consultancy/ IV prepared upto the / 2012 -2013 project closing period 03 d / Consulting services for of 03/2013. IAMWARM / Conducting Workshop at sub WRD - EC / basin level 1.00 SSS _ N.R N.R N.R N.R 15.5.12 28.5.12 31.5.12 N.R N.A N.A 31.3.2013 N.A ADYAR / ( Rs. 1.00 lakhs X 1 no ) consultancy/ IV / 2012 -2013 project closing period of 03/2013. 03 e / Consulting services for Exposure IAMWARM / to field visit and Eco-friendly WRD - EC / practices and environmental ADYAR monitoring 1.00 SSS _ N.R N.R N.R N.R 15.5.12 28.5.12 31.5.12 N.R N.A N.A 31.3.2013 N.A /consultancy/ ( Rs.1.00 lakh × 1 No ) IV / 2012 -2013 03 f / Consulting services for IAMWARM / Environmental fair / exhibition, WRD - EC / benchmarking, recognition of ADYAR good eco friendly practices, green 1.00 SSS _ N.R N.R N.R N.R 15.5.12 28.5.12 31.5.12 N.R N.A N.A 31.3.2013 N.A /consultancy/ awards. IV / 2012 -2013 ( Rs. 1.00 lakh X 1 No ) Superintending Engineer,PWD,WRD, Environmental Cell Circle,Trichy-20 PROCUREMENT PLAN(2012-13) IV PHASE TAMIL NADU IAMWARM PROJECT ENVIRONMENTAL ACTIVITIES IN ADYAR SUB-BASIN OF CHENNAI BASIN (NS ) STATEMENT - 1B Name of Consultant / Nationality & Zip RFP Final Draft to be forwarded to the -------------------------------------------------- TOR/ Shortlist to be finalised (Date) Method of Procurement (Shopping) ---------------------------------------------- Advertising for shortlisting (Date) No objection from bank for TOR/ Services to be completed (Date) Date of commencement of work Proposals to be received by the Estimate of cost (Rs in Lakhs) ---------------------------------------- Contract Number, Value and Method of selection through Shortlist / Final RFP (Date) Date of completionof work Evaluation to be finalised No objection by the Bank project Authorities (Date) --------------------------------- Date of contract signing Description of Services ---------------------------- Bid inivitation date RFP Issued (date) Bid opening date Code,If USA Package No consultancy bank (Date) **WBR No Currency Remarks S.No 1 2 3 4 5 5A 6 7 8 9 10 11 12 13 14 15 16 17 18 1 Conducting Environmental DPR for IV Phase and social Awareness sub basins prepared meeting, programme, for 3 years i.e (2010- workshop,demonstration 13). Since the and Exhibitions on various Administrative environmental and social Sanction obtained related issues including during September capacity building ie., 2011,the Propogating ,preparing and Procurement Plan publishing Environmental on Environmental Atlas, Exposure to field activities for visit and documentation(By Adyarsub basin has fixing nodel agency or any been prepared for educational instituition) the project closing period of 03/2013. 01a / IAMWARM / Preparing and publishing WRD - EC / Environmental Atlas for the ADYAR / goods/ IV Sub Basin for the use of Line / 2012 -2013 departments / Institutions for 1.50 _ NS N.R N.R N.R N.R 4.6.12 15.6.12 20.6.12 N.R N.A N.A 31.3.2013 N.A better Management of Sub basin 01 b / IAMWARM / Printing Stickers, Pamphlets, WRD - EC / Tin sheets, Providing ADYAR / goods/ IV Banners for Propagating / 2012 -2013 Environmental Awareness 0.20 _ NS N.R N.R N.R N.R 4.6.12 15.6.12 20.6.12 N.R N.A N.A 31.3.2013 N.A among public 01 c / IAMWARM / Environmental related books/ WRD - EC / journal, publishing, Annual ADYAR /goods/ IV report for the sub basin 0.10 _ NS N.R N.R N.R N.R 4.6.12 15.6.12 20.6.12 N.R N.A N.A 31.3.2013 N.A / 2012 -2013 01d / IAMWARM / Formation of Herbal garden WRD - EC / 0.30 _ NS N.R N.R N.R N.R 4.6.12 15.6.12 20.6.12 N.R N.A N.A 31.3.2013 N.A ADYAR /goods/ IV / 2012 -2013 Superintending Engineer,PWD,WRD, Environmental Cell Circle,Trichy-20 PROCUREMENT PLAN(2012-13) IV PHASE TAMIL NADU IAMWARM PROJECT ENVIRONMENTAL ACTIVITIES IN CHEYYAR-KILIYAR SUB-BASIN OF PALAR BASIN (SSS) STATEMENT - 1A Name of Consultant / Nationality & Zip RFP Final Draft to be forwarded to the -------------------------------------------------- TOR/ Shortlist to be finalised (Date) Method of Procurement (Shopping) ---------------------------------------------- Advertising for shortlisting (Date) No objection from bank for TOR/ Services to be completed (Date) Date of commencement of work Proposals to be received by the Estimate of cost (Rs in Lakhs) ---------------------------------------- Contract Number, Value and Method of selection through Shortlist / Final RFP (Date) Date of completionof work Evaluation to be finalised No objection by the Bank project Authorities (Date) --------------------------------- Date of contract signing Description of Services ---------------------------- Bid inivitation date RFP Issued (date) Bid opening date Code,If USA Package No consultancy bank (Date) **WBR No Currency Remarks S.No 1 2 3 4 5 5A 6 7 8 9 10 11 12 13 14 15 16 18 17 1 Environmental and Social DPR for IV Phase sub knowledge base analysis and basins prepared for 3 development (By fixing nodel years i.e (2010-13). agency or any educational Since the instituition) Administrative 01 / IAMWARM Consulting services for Sanction obtained / WRD - EC / Preparation of Environmental during September CHEY-KILI/ and social Impact Assessment 2011,the Procurement consultancy/ IV report with expert analysis @ Plan on Environmental / 2012 -2013 every 6 months and 9.00 SSS _ N.R N.R N.R N.R 15.5.12 28.5.12 31.5.12 N.R N.A N.A 31.3.2013 N.A activities for Cheyyar- documentation for Project and Kiliyar sub basin has non Project investment (Rs been prepared upto 2.25 lakhs X 4 reports ) the project closing period of 03/2013. 2 Transfer of technical know how for solid waste management system including source segregation, recycle of dry waste and linkage with user agencies. (By fixing nodel agency or any educational instituition) 02a / Consulting services for Motivating IAMWARM / the local bodies for Soild waste WRD - EC / management project and Sewage CHEY-KILI/ treatment plants to prevent consultancy/ IV pollution of water sources and / 2012 -2013 using for irrigation by transfering 1.50 SSS _ N.R N.R N.R N.R 15.5.12 28.5.12 31.5.12 N.R N.A N.A 31.3.2013 N.A technical know how through demonstration Documentary film and Technical visit (Rs.0.50 lakhs X 3 nos ) 02b / Consulting services for Promoting DPR for IV Phase sub IAMWARM / Entrepreneurship Policy for basins prepared for 3 WRD - EC / Eradication of weeds by setting years i.e (2010-13). CHEY-KILI/ up Bio gas Plant / Vermi compost Since the consultancy/ IV By WUA through Awareness Administrative 1.50 SSS _ N.R N.R N.R N.R 15.5.12 28.5.12 31.5.12 N.R N.A N.A 31.3.2013 N.A / 2012 -2013 creation, Demonstration and Sanction obtained consultative meeting and pilot during September study.(Rs.0.50 lakhs X 3 nos ) 2011,the Procurement Plan on Environmental activities for Cheyyar- 3 Conducting Environmental and Kiliyar sub basin has social Awareness meeting, been prepared upto programme, the project closing workshop,demonstration and period of 03/2013. Exhibitions on various environmental and social related issues including capacity building ie., Propogating ,preparing and publishing Environmental Atlas, Exposure to field visit and documentation(By fixing nodel agency or any educational instituition) 03a / Consulting services for IAMWARM / Conducting Awareness Programs WRD - EC / for Public CHEY-KILI/ (Rs.1.00 lakhs X 3 nos ) 3.00 SSS _ N.R N.R N.R N.R 15.5.12 28.5.12 31.5.12 N.R N.A N.A 31.3.2013 N.A consultancy/ IV / 2012 -2013 03b / Consulting services for DPR for IV Phase sub IAMWARM / Conducting Meetings for WRO basins prepared for 3 WRD - EC / officials / line department officials. years i.e (2010-13). CHEY-KILI/ (Rs.0.50 lakhs X 2 nos ) 1.00 SSS _ N.R N.R N.R N.R 15.5.12 28.5.12 31.5.12 N.R N.A N.A 31.3.2013 N.A Since the consultancy/ IV Administrative / 2012 -2013 Sanction obtained during September 03c / Consulting services for 2011,the Procurement IAMWARM / Conducting Meetings in School/ Plan on Environmental WRD - EC / Institution activities for Cheyyar- CHEY-KILI/ (Rs.0.25 lakhs X 3 nos ) 0.75 SSS _ N.R N.R N.R N.R 15.5.12 28.5.12 31.5.12 N.R N.A N.A 31.3.2013 N.A Kiliyar sub basin has consultancy/ IV been prepared upto / 2012 -2013 the project closing period of 03/2013. 03d / Consulting services for IAMWARM / Conducting Workshop at sub WRD - EC / basin level CHEY-KILI/ (Rs.1.00 lakhs X 3 nos ) 3.00 SSS _ N.R N.R N.R N.R 15.5.12 28.5.12 31.5.12 N.R N.A N.A 31.3.2013 N.A consultancy/ IV / 2012 -2013 03e / Consulting services for Exposure IAMWARM / to field visit and Eco-friendly WRD - EC / practices and environmental CHEY-KILI/ monitoring 1.00 SSS _ N.R N.R N.R N.R 15.5.12 28.5.12 31.5.12 N.R N.A N.A 31.3.2013 N.A consultancy/ IV (Rs.0.50 lakhs X 2 nos ) / 2012 -2013 03f / IAMWARM Consulting services for / WRD - EC / Environmental fair / exhibition, CHEY-KILI/ benchmarking, recognition of consultancy/ IV good eco friendly practices, green 1.00 SSS _ N.R N.R N.R N.R 15.5.12 28.5.12 31.5.12 N.R N.A N.A 31.3.2013 N.A / 2012 -2013 awards. (Rs.0.50 lakhs X 2 nos ) Superintending Engineer,PWD,WRD, Environmental Cell Circle,Trichy-20 PROCUREMENT PLAN(2012-13) IV PHASE TAMIL NADU IAMWARM PROJECT ENVIRONMENTAL ACTIVITIES IN CHEYYAR-KILIYAR SUB-BASIN OF PALAR BASIN (NS ) STATEMENT - 1B -------------------------------------------------- TOR/ Shortlist to be finalised (Date) Method of Procurement (Shopping) ---------------------------------------------- Name of Consultant / Nationality & RFP Final Draft to be forwarded to Advertising for shortlisting (Date) No objection from bank for TOR/ Services to be completed (Date) Date of commencement of work Proposals to be received by the ---------------------------------------- Estimate of cost (Rs in Lakhs) Contract Number, Value and Method of selection through Shortlist / Final RFP (Date) Date of completionof work No objection by the Bank Evaluation to be finalised project Authorities (Date) --------------------------------- Date of contract signing Description of Services ---------------------------- Bid inivitation date RFP Issued (date) Bid opening date Zip Code,If USA the bank (Date) Package No consultancy **WBR No Currency Remarks S.No 1 2 3 4 5 5A 6 7 8 9 10 11 12 13 14 15 16 17 18 1 Conducting Environmental and DPR for IV Phase sub social Awareness meeting, basins prepared for 3 programme, years i.e (2010-13). workshop,demonstration and Since the Exhibitions on various Administrative environmental and social Sanction obtained related issues including during September capacity building ie., 2011,the Procurement Propogating ,preparing and Plan on Environmental publishing Environmental activities for Cheyyar- Atlas, Exposure to field visit Kiliyar sub basin has and documentation(By fixing been prepared upto nodel agency or any the project closing period of 03/2013. educational instituition) 01a / IAMWARM / Preparing and publishing WRD - EC / CHEY- Environmental Atlas for the Sub KILI/ goods/ IV / Basin for the use of Line 2012 -2013 departments / Institutions for 1.00 _ NS N.R N.R N.R N.R 4.6.12 15.6.12 20.6.12 N.R N.A N.A 31.3.2013 N.A better Management of Sub basin 01b / IAMWARM / Printing Stickers, Pamphlets, Tin WRD - EC / CHEY- sheets, Providing Banners for KILI/ goods/ IV / Propagating Environmental 0.50 _ NS N.R N.R N.R N.R 4.6.12 15.6.12 20.6.12 N.R N.A N.A 31.3.2013 N.A 2012 -2013 Awareness among public 01c / IAMWARM / Environmental related books/ WRD - EC / CHEY- journal, publishing, Annual report KILI/ goods/ IV / for the sub basin 0.20 _ NS N.R N.R N.R N.R 4.6.12 15.6.12 20.6.12 N.R N.A N.A 31.3.2013 N.A 2012 -2013 01d / IAMWARM / Formation of Herbal garden WRD - EC / CHEY- (Rs.1.00 lakhs X 2 nos ) KILI/ goods/ IV / 2.00 _ NS N.R N.R N.R N.R 4.6.12 15.6.12 20.6.12 N.R N.A N.A 31.3.2013 N.A 2012 -2013 Superintending Engineer,PWD,WRD, Environmental Cell Circle,Trichy-20 PROCUREMENT PLAN(2012-13) IV PHASE TAMIL NADU IAMWARM PROJECT ENVIRONMENTAL ACTIVITIES IN COOUM SUB-BASIN OF CHENNAI BASIN (SSS) STATEMENT - 1A Name of Consultant / Nationality & Zip RFP Final Draft to be forwarded to the -------------------------------------------------- TOR/ Shortlist to be finalised (Date) Method of Procurement (Shopping) ---------------------------------------------- Advertising for shortlisting (Date) No objection from bank for TOR/ Services to be completed (Date) Date of commencement of work Proposals to be received by the Estimate of cost (Rs in Lakhs) ---------------------------------------- Contract Number, Value and Method of selection through Shortlist / Final RFP (Date) Date of completionof work Evaluation to be finalised No objection by the Bank project Authorities (Date) --------------------------------- Date of contract signing Description of Services ---------------------------- Bid inivitation date RFP Issued (date) Bid opening date Code,If USA Package No consultancy bank (Date) **WBR No Currency Remarks S.No 1 2 3 4 5 5A 6 7 8 9 10 11 12 13 14 15 16 18 17 1 Environmental and Social DPR for IV Phase sub knowledge base analysis and basins prepared for 3 development (By fixing nodel years i.e (2010-13). agency or any educational Since the instituition) Administrative 01 / IAMWARM Consulting services for Sanction obtained / WRD - EC / Preparation of Environmental during August COOUM and social Impact Assessment 2011,the Procurement /consultancy/ report with expert analysis @ Plan on Environmental 3.00 SSS _ N.R N.R N.R N.R 15.5.12 28.5.12 31.5.12 N.R N.A N.A 31.3.2013 N.A activities for Cooum IV / 2012 -2013 every 6 months and documentation for Project and sub basin has been non Project investment prepared upto the (Rs 0.75 lakhs X 4 reports ) project closing period 2 Transfer of technical know how of 03/2013. for solid waste management system including source segregation, recycle of dry waste and linkage with user agencies. (By fixing nodel agency or any educational instituition) 02 a / Consulting services for Motivating IAMWARM / the local bodies for Soild waste WRD - EC / management project and Sewage COOUM treatment plants to prevent /consultancy/ pollution of water sources and IV / 2012 -2013 using for irrigation by transfering 0.75 SSS _ N.R N.R N.R N.R 15.5.12 28.5.12 31.5.12 N.R N.A N.A 31.3.2013 N.A technical know how through demonstration Documentary film and Technical visit ( Rs. 0.75 lakhs × 1 no ) 02 b / Consulting services for Promoting DPR for IV Phase sub IAMWARM / Entrepreneurship Policy for basins prepared for 3 WRD - EC / Eradication of weeds by setting years i.e (2010-13). COOUM / up Bio gas Plant / Vermi compost Since the consultancy/ IV By WUA through Awareness Administrative / 2012 -2013 creation, Demonstration and 1.00 SSS _ N.R N.R N.R N.R 15.5.12 28.5.12 31.5.12 N.R N.A N.A 31.3.2013 N.A Sanction obtained consultative meeting and pilot during August study. ( Rs. 1.00 lakh x 1 2011,the Procurement no ) Plan on Environmental activities for Cooum sub basin has been 3 Conducting Environmental and prepared upto the social Awareness meeting, project closing period programme, of 03/2013. workshop,demonstration and Exhibitions on various environmental and social related issues including capacity building ie., Exposure to field visit and documentation(By fixing nodel agency or any educational instituition) 03 a / Consulting services for IAMWARM / Conducting Awareness Programs WRD - EC / for Public COOUM / ( Rs. 1.00 lakhs X 3 Nos ) 3.00 SSS _ N.R N.R N.R N.R 15.5.12 28.5.12 31.5.12 N.R N.A N.A 31.3.2013 N.A consultancy/ IV / 2012 -2013 03 b / Consulting services for IAMWARM / Conducting Meetings for WRO WRD - EC / officials / line department officials. 0.30 SSS _ N.R N.R N.R N.R 15.5.12 28.5.12 31.5.12 N.R N.A N.A 31.3.2013 N.A COOUM / ( Rs. 0.15 lakhs X 2 Nos ) consultancy/ IV / 2012 -2013 03 c / Consulting services for DPR for IV Phase sub IAMWARM / Conducting Meetings in School/ basins prepared for 3 WRD - EC / Institution years i.e (2010-13). COOUM / ( Rs. 0.20 lakhs X 4 Nos ) 0.80 SSS _ N.R N.R N.R N.R 15.5.12 28.5.12 31.5.12 N.R N.A N.A 31.3.2013 N.A Since the consultancy/ IV Administrative / 2012 -2013 Sanction obtained 03 d / Consulting services for during August IAMWARM / Conducting Workshop at sub 2011,the Procurement WRD - EC / basin level Plan on Environmental 1.00 SSS _ N.R N.R N.R N.R 15.5.12 28.5.12 31.5.12 N.R N.A N.A 31.3.2013 N.A activities for Cooum COOUM / ( Rs. 1.00 lakh X 1 no ) consultancy/ IV sub basin has been / 2012 -2013 prepared upto the 03 e / Consulting services for project closing period IAMWARM / Conducting Workshop at region of 03/2013. WRD - EC / level 1.00 SSS _ N.R N.R N.R N.R 15.5.12 28.5.12 31.5.12 N.R N.A N.A 31.3.2013 N.A COOUM ( Rs. 1.00 lakh X 1 no ) /consultancy/ IV / 2012 -2013 project closing period of 03/2013. 03 f / Consulting services for Exposure IAMWARM / to field visit and Eco-friendly WRD - EC / practices and environmental COOUM monitoring 0.75 SSS _ N.R N.R N.R N.R 15.5.12 28.5.12 31.5.12 N.R N.A N.A 31.3.2013 N.A /consultancy/ ( Rs.0.75 lakh × 1 no ) IV / 2012 -2013 03 g / Consulting services for IAMWARM / Environmental fair / exhibition, WRD - EC / benchmarking, recognition of COOUM good eco friendly practices, green 0.50 SSS _ N.R N.R N.R N.R 15.5.12 28.5.12 31.5.12 N.R N.A N.A 31.3.2013 N.A /consultancy/ awards. IV / 2012 -2013 ( Rs.0.50 lakh X 1 No ) Superintending Engineer,PWD,WRD, Environmental Cell Circle,Trichy-20 PROCUREMENT PLAN(2012-13) IV PHASE TAMIL NADU IAMWARM PROJECT ENVIRONMENTAL ACTIVITIES IN COOUM SUB-BASIN OF CHENNAI BASIN (NS ) STATEMENT - 1B Name of Consultant / Nationality & Zip RFP Final Draft to be forwarded to the -------------------------------------------------- TOR/ Shortlist to be finalised (Date) Method of Procurement (Shopping) ---------------------------------------------- Advertising for shortlisting (Date) No objection from bank for TOR/ Services to be completed (Date) Date of commencement of work Proposals to be received by the Estimate of cost (Rs in Lakhs) ---------------------------------------- Contract Number, Value and Method of selection through Shortlist / Final RFP (Date) Date of completionof work Evaluation to be finalised No objection by the Bank project Authorities (Date) --------------------------------- Date of contract signing Description of Services ---------------------------- Bid inivitation date RFP Issued (date) Bid opening date Code,If USA Package No consultancy bank (Date) **WBR No Currency Remarks S.No 1 2 3 4 5 5A 6 7 8 9 10 11 12 13 14 15 16 17 18 1 Conducting Environmental DPR for IV Phase sub and social Awareness basins prepared for 3 meeting, programme, years i.e (2010-13). workshop,demonstration Since the and Exhibitions on various Administrative Sanction environmental and social obtained during August related issues including 2011,the Procurement capacity building ie., Plan on Environmental Exposure to field visit and activities for Cooum sub documentation(By fixing basin has been nodel agency or any prepared upto the educational instituition) project closing period of 03/2013. 01 a / IAMWARM / Preparing and publishing WRD - EC / Environmental Atlas for the COOUM / goods/ Sub Basin for the use of Line IV/ 2012 -2013 departments / Institutions for 1.00 _ NS N.R N.R N.R N.R 4.6.12 15.6.12 20.6.12 N.R N.A N.A 31.3.2013 N.A better Management of Sub basin 01 b / IAMWARM / Printing Stickers, Pamphlets, WRD - EC / Tin sheets, Providing COOUM / goods/ Banners for Propagating IV / 2012 -2013 Environmental Awareness 0.05 _ NS N.R N.R N.R N.R 4.6.12 15.6.12 20.6.12 N.R N.A N.A 31.3.2013 N.A among public 01 c/ IAMWARM / Environmental related books/ DPR for IV Phase sub WRD - EC / journal, publishing, Annual basins prepared for 3 COOUM /goods/ report for the sub basin 0.05 _ NS N.R N.R N.R N.R 4.6.12 15.6.12 20.6.12 N.R N.A N.A 31.3.2013 N.A years i.e (2010-13). IV / 2012 -2013 Since the Administrative Sanction obtained during August 2011,the Procurement Plan on Environmental activities for Cooum sub basin has been prepared upto the project closing period of 03/2013. DPR for IV Phase sub basins prepared for 3 years i.e (2010-13). Since the Administrative Sanction 01d / IAMWARM / Formation of Herbal garden obtained during August WRD - EC / 2011,the Procurement COOUM /goods/ Plan on Environmental IV / 2012 -2013 activities for Cooum sub 0.30 _ NS N.R N.R N.R N.R 4.6.12 15.6.12 20.6.12 N.R N.A N.A 31.3.2013 N.A basin has been prepared upto the project closing period of 03/2013. Superintending Engineer,PWD,WRD, Environmental Cell Circle,Trichy-20