Sample Procurement Plan (Text in italic font is meant for instruction to staff and should be deleted in the final version of the PP) (This is only a sample with the minimum content that is required to be included in the PAD. The detailed procurement plan is still mandatory for disclosure on the Bank’s website in accordance with the guidelines. The initial procurement plan will cover the first 18 months of the project and then updated annually or earlier as necessary). I. General 1. Bank’s approval Date of the procurement Plan [Original: December 2007]: Revision 15 of Updated Procurement Plan, June 2010] 2. Date of General Procurement Notice: Dec 24, 2006 3. Period covered by this procurement plan: The procurement period of project covered from year June 2010 to December 2012 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: [Thresholds for applicable procurement methods (not limited to the list below) will be determined by the Procurement Specialist /Procurement Accredited Staff based on the assessment of the implementing agency’s capacity.] Procurement Method Prior Review Threshold Comments US$ 1. ICB and LIB (Goods) Above US$ 500,000 All 2. NCB (Goods) Above US$ 100,000 First contract 3. ICB (Works) Above US$ 15 million All 4. NCB (Works) Above US$ 5 million All 5. (Non-Consultant Services) Below US$ 100,000 First contract [Add other methods if necessary] 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: [Refer to the relevant CDD project implementation document approved by the Bank or delete if not applicable] 4. Reference to (if any) Project Operational/Procurement Manual: Project Implementation Manual for World Bank Loan Project XYZ 04/01/2010 issued by July 9, 2010 5. Any Other Special Procurement Arrangements: [including advance procurement and retroactive financing, if applicable] 5 ICB works packages will be financed under retroactive financing 6. Summary of the Procurement Packages planned during the first 18 months after project effectiveness ( including those that are subject to retroactive financing and advanced procurement) [List the Packages which require Bank’s prior review first and then the other packages] 1 2 3 4 5 6 7 Ref. Description Estimated Packages Domest Review Comments No. Cost ic by Bank US$ Prefere (Prior / Post) million nce (yes/no) Summary of 82 5 No Prior the ICB (Works) Summary of 43.77 15 No Prior the ICB (Goods) Summary of 64.53 18 No Post 1st the NCB contract (Works) for Prior Review Summary of 1.86 4 No Post 1st the NCB contract (Goods) for Prior Review Summary of 0.45 1 No Prior the ICB (Non- Consultant Services) III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Threshold Comments 1. Competitive Methods (Firms) Above US$ 100,000 2. Single Source (Firms) All 3. Individual Above US$ 50,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise July 9, 2010 entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: [including advance procurement and retroactive financing, if applicable or delete if not applicable] 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Ref. No. Description of Estimated Packages Review Comments Assignment Cost by Bank US$ (Prior / million Post) Summary of 4.17 7 Prior number of contracts that will be let under QCBS Summary of 0.83 1 Prior CQS number of contracts that will be let under other methods July 9, 2010 PROCUREMENT Brazil : Second Bolsa Família PLAN General Information Country: Brazil Banks Approval Date of the Original Procurement Plan: 2018-02-22 Revised Plan Date(s): (comma delineated, leave blank if none) 2018-07-24 Project ID: P101504 GPN Date: Project Name: Second Bolsa Família Loan / Credit No: IBRD / 78410 Executing Agency(ies): Ministry of Social Development WORKS Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GOODS Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Conditional Cash Transfers (Grants) Operational Support to the Project Implementation Unit at the Ministry of Social NCB 001/2014 / Pesquisa Development Painel da Pobreza (PPP) - Supporting the National Contratato de presta o de servi Commitment for Social os t cnicos especializados Development (CNDS) Single Stage - One necess rios realiza o de estudo IBRD / 78410 Prior Request for Bids Open - National N 0.00 2,553,660.86 Signed 2014-09-10 2014-09-24 Consolidation of the Monitoring Envelope longitudinal sobre as caracter and Evaluation System in the sticas gerais da popula em situa Ministry of Social Development o de pobreza no semi rido Institutional Strengthening for brasileiro e no sudeste metrop the Consolidation of the Bolsa Familia Program Strengthening Cadastro Unico as the Main Targeting Instrument for Social Programs 3D26 / Encontro Nacional sobre o Reordenamento dos Serviços Strengthening Cadastro Unico de Acolhimento para Crianças, Request for Single Stage - One Pending IBRD / 78410 as the Main Targeting Post Limited 23,000.00 0.00 2018-03-07 2018-03-12 2018-04-23 2018-05-23 2018-06-27 2018-12-24 Adolescentes e Jovens e os Proposals Envelope Implementation Instrument for Social Programs desafios para a inclusão desse público no Cadastro nÚ ico. 2B22 -NC-SNAS / 2B22 - Contratacao de empresa para Strengthening Cadastro Unico realizar mobilizacao dos Single Stage - Two Pending IBRD / 78410 as the Main Targeting Post Request for Bids Open - National 223,642.17 0.00 2018-05-01 2018-05-10 2018-06-19 2018-08-28 2018-10-02 2018-12-31 beneficiarios (pessoas com Envelope Implementation Instrument for Social Programs deficiencia) do BPC para insercao no Cadastro Unico 2B23 -NC-SNAS / 2B23 Strengthening Cadastro Unico Contratacao para Produzir videos Request for Single Stage - One IBRD / 78410 as the Main Targeting Post Open - National 25,559.11 0.00 Canceled 2018-05-21 2018-08-02 2018-10-31 de capacitacao para as Quotations Envelope Instrument for Social Programs organizacoes da sociedade civil 2B25 -NC-SNAS / 2B25 - Strengthening Cadastro Unico Aquisicao de equipamentos e Request for Single Stage - One Pending IBRD / 78410 as the Main Targeting Post Open - National 99,680.51 0.00 2018-05-21 2018-08-02 2018-10-31 acessorios para Quotations Envelope Implementation Instrument for Social Programs VideoConferencia 2B26 -NC-SNAS / 2B26 - Strengthening Cadastro Unico Impressao de materiais voltados Request for Single Stage - One IBRD / 78410 as the Main Targeting Post Open - National 99,680.51 0.00 Canceled 2018-05-21 2018-08-02 2018-10-31 aos usuarios e trabalhadores do Quotations Envelope Instrument for Social Programs SUAS 2B31 -NC-SNAS / 2B31 - Impressao e distribuicao de Strengthening Cadastro Unico material grafico para informar os Request for Single Stage - One IBRD / 78410 as the Main Targeting Post Open - National 99,680.51 0.00 Canceled 2018-05-21 2018-08-02 2018-10-31 beneficiarios do BPC quanto a Quotations Envelope Instrument for Social Programs obrigatoriedade de se inscreverem no Cadastro Unico 2B32 -NC-SNAS / 2B32 - Strengthening Cadastro Unico Request for Single Stage - One Pending Aquisicao de equipamentos de IBRD / 78410 as the Main Targeting Post Open - National 25,079.87 0.00 2018-05-21 2018-08-02 2018-10-31 Quotations Envelope Implementation audiovisual Instrument for Social Programs 2B33 -NC-SNAS / 2B33 - Empresa especializada para facilitacao dos GTs e relatoria para evento "Encontro Nacional Strengthening Cadastro Unico sobre o Reordenamento dos Request for Single Stage - One IBRD / 78410 as the Main Targeting Post Open - National 56,869.01 0.00 Canceled 2018-05-21 2018-08-02 2018-10-31 Servicos de Acolhimento para Quotations Envelope Instrument for Social Programs Criancas, Adolescentes e Jovens e os desafios para a inclusao desse publico no Cadastro Unico" 2B28 -NC-SENARC / 2B28 - Prestar servicos de degravacao Strengthening Cadastro Unico de registros em audio realizados Request for Single Stage - One Pending IBRD / 78410 as the Main Targeting Post Open - National 3,194.89 0.00 2018-05-21 2018-08-02 2018-09-01 durante a etapa qualitativa da Quotations Envelope Implementation Instrument for Social Programs pesquisa sobre a estimativa de custos do Cadastro Unico 2B29 -NC-SENARC / 2B29 - Prestar servicos de degravacao Strengthening Cadastro Unico de registros em audio realizados Request for Single Stage - One Pending IBRD / 78410 as the Main Targeting Post Open - National 3,194.89 0.00 2018-05-21 2018-08-02 2018-09-01 durante a etapa qualitativa da Quotations Envelope Implementation Instrument for Social Programs pesquisa de revisao dos formularios do Cadastro Unico 2B30 -NC-SENARC / 2B30 - Contratacao de empresa Strengthening Cadastro Unico especializada em servicos de Single Stage - Two Pending IBRD / 78410 as the Main Targeting Post Request for Bids Open - National 95,846.65 0.00 2018-05-01 2018-05-16 2018-06-15 2018-08-14 2018-09-01 2018-12-30 videos para elaboracao de video Envelope Implementation Instrument for Social Programs documentario, exclusivo do Cadastro Unico 3A13 -NC-SENARC / 3A13 - Elaboracao de uma serie de video aulas para gestores, Institutional Strengthening for tecnicos e conselheiros do Single Stage - Two Pending IBRD / 78410 the Consolidation of the Bolsa Post Request for Bids Open - National 543,130.99 0.00 2018-05-01 2018-05-06 2018-06-05 2018-08-14 2018-09-01 2018-12-30 Cadastro Unico e do PBF e uma Envelope Implementation Familia Program serie de videos informativos para os beneficiarios do Programa e sociedade civil 3A14 -NC-SENARC / 3A14 - Impressao dos materiais instrucionais atualizados para as capacitacoes Gestao do Institutional Strengthening for Cadatro Unico e do Programa Single Stage - Two Pending IBRD / 78410 the Consolidation of the Bolsa Post Request for Bids Open - National 111,821.09 0.00 2018-05-01 2018-05-21 2018-06-20 2018-08-09 2018-08-29 2018-10-28 Bolsa Familia e Formularios do Envelope Implementation Familia Program Cadastro Unico, para atendimento do Plano de Capacitacao do 2o semestre de 2017 3B1 -NC-SENARC / 3B1 - Aquisicao de equipamentos para Institutional Strengthening for realizacao de teleconferencia Request for Single Stage - One Pending IBRD / 78410 the Consolidation of the Bolsa Post Open - National 1,916.93 0.00 2018-05-21 2018-08-31 2018-10-30 entre gestores e Quotations Envelope Implementation Familia Program realizacao/registro de capacitacoes a distancia 3B2 -NC-SNPDH / 3B2 - Contratacao de empresa para realizar servicos de editoracao, arte, identidade visual, Institutional Strengthening for Single Stage - Two Pending impressao, manuseio e IBRD / 78410 the Consolidation of the Bolsa Post Request for Bids Open - National 143,769.97 0.00 2018-05-05 2018-05-10 2018-06-09 2018-08-28 2018-09-12 2018-11-11 Envelope Implementation distribuicao de 30000 (trinta mil) Familia Program exemplares do "Guia de Visita Domiciliar do Programa Crianca Feliz" Page 1 3B3 -NC-SNPDH / 3B3 - Realizar servicos de editoracao, arte, identidade visual, impressao, manuseio e Institutional Strengthening for distribuicao de 7000 (sete mil) Request for Single Stage - One Pending IBRD / 78410 the Consolidation of the Bolsa Post Open - National 63,897.76 0.00 2018-05-21 2018-08-02 2018-10-01 exemplares da Publicacao Quotations Envelope Implementation Familia Program "Situacao da Primeira Infancia do Brasil em 2017 do CadUnico, com enfase no Programa Bolsa Familia" 3B4 -NC-SNPDH / 3B4 - Realizar servicos de editoracao, arte, identidade visual, impressao, manuseio e Institutional Strengthening for distribuicao de 7000 (sete mil) Request for Single Stage - One Pending IBRD / 78410 the Consolidation of the Bolsa Post Open - National 63,897.76 0.00 2018-05-21 2018-08-02 2018-10-01 exemplares da Publicacao Quotations Envelope Implementation Familia Program "Situacao da Pessoa Idosa no Brasil em 2017 do CadUnico, com enfase no Programa Bolsa- Familia" 3B5 -NC-SNPDH / 3B5 Producao de certificados, selos metalicos e de cartelas Institutional Strengthening for Request for Single Stage - One Pending autoadesivas metalicas para IBRD / 78410 the Consolidation of the Bolsa Post Open - National 63,897.76 0.00 2018-05-21 2018-08-02 2018-10-01 Quotations Envelope Implementation municipios participantes da Familia Program Estrategia Brasil Amigo da Pessoa Idosa 3B6 -NC-SNPDH / 3B6 Realizar servicos de editoracao, arte, identidade visual, mpressao, manueseio e distribuicao de Institutional Strengthening for 7000 (sete mil) exemplares da Request for Single Stage - One Pending IBRD / 78410 the Consolidation of the Bolsa Post Open - National 63,897.76 0.00 2018-05-21 2018-08-02 2018-10-01 Publicacao "Situacao de Quotations Envelope Implementation Familia Program Adolescentes e Jovens no brasil em 2017 do CadUnico, com enfase no Programa Bolsa- Familia" 3B7 -NC-SNPDH / 3B7 Contratacao de empresa especializada em servicos de editoracao, arte, identidade Institutional Strengthening for visual, impressao, manuseio e Single Stage - Two Pending IBRD / 78410 the Consolidation of the Bolsa Post Request for Bids Open - National 191,693.29 0.00 2018-05-01 2018-05-21 2018-06-20 2018-08-29 2018-09-13 2018-10-13 distribuicao de material Envelope Implementation Familia Program instrucional de capacitacao da metodologia do Programa Crianca Feliz: 30000 (trinta mil) exemplares 3B8 -NC-SNPDH / 3B8 Gravacao/edicao/producao de video sobre a Estrategia Nacional de Comunidades e Cidades Institutional Strengthening for Amigas do Idoso (duracao de 5 Request for Single Stage - One Pending IBRD / 78410 the Consolidation of the Bolsa Post Open - National 63,897.76 0.00 2018-05-21 2018-08-02 2018-11-30 minutos) com entrevistas com Quotations Envelope Implementation Familia Program pessoas idosas e especialistas e cenas do cotidianos de Pessoa idosa beneficiarios do PBF e BPC 3B9 -NC-SNPDH / 3B9 Contratacao de empresa para realizar servicos de impressao, Institutional Strengthening for Request for Single Stage - One Pending manuseio e distribuicao de 7000 IBRD / 78410 the Consolidation of the Bolsa Post Open - National 63,897.76 0.00 2018-05-21 2018-08-04 2018-09-03 Quotations Envelope Implementation (sete mil) exemplares da Familia Program publicacao "Guia da Estrategia Brasil Amigo da Pessoa idosa 3C2 -NC-SENARC / 3C2 - Impressao e montagem de Kits de Educacao financeira, que incluem material grafico e outros, Institutional Strengthening for como por exemplo lapis, Request for Single Stage - One Pending IBRD / 78410 the Consolidation of the Bolsa Post Open - National 95,846.65 0.00 2018-01-29 2018-03-14 2018-11-19 embalagem plastica Quotations Envelope Implementation Familia Program customizada, etc, para primeira etapa do Projeto de Educacao Financeira do Programa Bolsa Familia (PBF) 3C3 -NC-SENARC / 3C3 - Impressao, montagem e distribuicao de KIts de Educacao financeira, que incluem material Institutional Strengthening for Single Stage - Two Under grafico, imas, lapis, embalagem IBRD / 78410 the Consolidation of the Bolsa Post Request for Bids Open - National 1,789,137.38 0.00 2018-05-30 2018-07-20 2018-06-09 2018-07-09 2018-08-28 2018-09-07 2018-12-31 Envelope Implementation plastica customizada, com os Familia Program seguintes quantitativos dos matpara implantacao do Projeto de Educacao Financeira do PBF 3D1 -NC-SENARC / 3D1 - Publicacao de materiais relacionados a gestao de Institutional Strengthening for Request for Single Stage - One Pending condicionalidades (cartilhas e IBRD / 78410 the Consolidation of the Bolsa Post Open - National 63,897.76 0.00 2018-05-21 2018-08-02 2018-10-01 Quotations Envelope Implementation guias) A divulgacao sera feita Familia Program pelo MDS junto aos estados e municipios 3D2 -NC-SENARC / 3D2 - Diagramacao dos materiais Institutional Strengthening for instrucionais para capacitacao Request for Single Stage - One Pending IBRD / 78410 the Consolidation of the Bolsa Post Open - National 63,897.76 0.00 2018-05-21 2018-08-02 2018-10-01 presencial de instrutores sobre a Quotations Envelope Implementation Familia Program utilizacao do Sistema de condicionalidades elaborados Consolidation of the Monitoring 4A14 -NC-SAGI / 4A14 - Request for Single Stage - One Pending IBRD / 78410 and Evaluation System in the Post Open - National 63,897.76 0.00 2018-05-03 2018-08-06 2018-12-24 Impressao de Publicacoes SAGI Quotations Envelope Implementation Ministry of Social Development 4A15 -NC-SAGI / 4A15 - Coleta Consolidation of the Monitoring Request for Single Stage - One de dados para avaliacao de acao IBRD / 78410 and Evaluation System in the Post Open - National 95,846.65 0.00 Canceled 2018-05-21 2018-08-14 2018-10-13 Quotations Envelope de educacao financeira Ministry of Social Development 5D13 -NC-SESAN / 5D13 - Supporting the National Elaboracao de material de Request for Single Stage - One Pending IBRD / 78410 Commitment for Social Post Open - National 6,389.78 0.00 2018-05-21 2018-08-04 2018-09-03 divulgacao de informacoes sobre Quotations Envelope Implementation Development (CNDS) o Programa Fomento Rural 5D14 -NC-SESAN / 5D14 - Elaboracao de material de divulgacao de informacoes sobre Supporting the National Request for Single Stage - One Pending o PAA Compra com Doacao IBRD / 78410 Commitment for Social Post Open - National 9,584.66 0.00 2018-05-21 2018-08-14 2018-09-13 Quotations Envelope Implementation Simultanea - Termo de Adesao Development (CNDS) para os gestores estaduais e municipais 5D15 -NC-SESAN / 5D15 - Supporting the National Coleta de dados das acoes do Single Stage - Two Pending IBRD / 78410 Commitment for Social Post Request for Bids Open - National 319,488.82 0.00 2017-12-11 2018-01-04 2018-02-02 2018-03-08 2018-04-15 2018-10-02 Programa de Fomento as Envelope Implementation Development (CNDS) Atividades Produtivas Rurais 5D16 -NC-SESAN / 5D16 - Supporting the National Single Stage - Two Pending Coleta de dados das acoes do IBRD / 78410 Commitment for Social Post Request for Bids Open - National 319,489.14 0.00 2017-12-05 2018-01-04 2018-01-24 2018-02-27 2018-03-05 2018-12-30 Envelope Implementation Programa Cisternas Development (CNDS) 5D17 -NC-SESAN / 5D17 - Provisao de solucao de consulta a beneficiarios dos programas de Supporting the National inclusao produtiva rural e a Single Stage - Two Pending IBRD / 78410 Commitment for Social Post Request for Bids Open - National 127,795.53 0.00 2018-05-30 2018-06-14 2018-07-09 2018-08-28 2018-09-07 2018-12-31 outros atores envolvidos em sua Envelope Implementation Development (CNDS) implementacao para monitoramento e avaliacao de tais programas 5D10 -NC-SISP / 5D10 Contratacao de empresa Supporting the National especializada em servicos Request for Single Stage - One Pending IBRD / 78410 Commitment for Social Post Open - National 2,396.17 0.00 2018-05-21 2018-08-19 2018-09-18 graficos, visando a impressao de Quotations Envelope Implementation Development (CNDS) manuais de apresentacao da Estrategia (1500 exemplares) 5D11 -NC-SISP / 5D11 Contratacao de empresa especializada em servicos Supporting the National Request for Single Stage - One Pending graficos, visando a impressao de IBRD / 78410 Commitment for Social Post Open - National 2,396.17 0.00 2018-05-05 2018-06-30 2018-12-27 Quotations Envelope Implementation folders de acoes e programas de Development (CNDS) Inclusao Social e Produtiva (3 mil exemplares) Page 2 5D15 -NC-SISP / 5D15 Contratacao de empresa especializada em servicos Supporting the National Request for Single Stage - One Pending graficos, visando a impressao de IBRD / 78410 Commitment for Social Post Open - National 2,396.17 0.00 2018-05-21 2018-08-04 2018-09-03 Quotations Envelope Implementation cartilhas de acoes e programas Development (CNDS) de Inclusao Social e Produtiva (3 mil exemplares) 5D16 -NC-SISP / 5D16 Contratacao de empresa especializada em servicos Supporting the National Request for Single Stage - One Pending graficos, visando a impressao de IBRD / 78410 Commitment for Social Post Open - National 2,396.17 0.00 2018-05-21 2018-08-19 2018-09-18 Quotations Envelope Implementation manuais instrucionais de acoes Development (CNDS) e programas de inclusao social e produtiva (1500 exemplares) 5D19 -NC-SISP / 5D19 Contratacao de empresa Supporting the National especializada em servicos de Request for Single Stage - One Pending IBRD / 78410 Commitment for Social Post Open - National 95,846.65 0.00 2018-05-21 2018-08-04 2018-09-03 videos para elaboracao de video Quotations Envelope Implementation Development (CNDS) documentario, exclusivo dos finalistas do Premio Progredir 2B43 -NC-SNAS / 2B43 -Curso Strengthening Cadastro Unico de Planejamento e Prospectiva - IBRD / 78410 as the Main Targeting Post UN Agencies (Direct) Direct 6,389.78 0.00 Canceled 2018-08-11 2018-08-26 2018-09-25 2018-10-25 40 horas - 1 turma Instrument for Social Programs 2B45 -NC-SNAS / 2B45 - Strengthening Cadastro Unico Seminario sobre Politicas de IBRD / 78410 as the Main Targeting Post UN Agencies (Direct) Direct 6,389.78 0.00 Canceled 2018-09-10 2018-09-25 2018-10-25 2018-11-24 Protecao Social em perspectiva Instrument for Social Programs comparada 3 2B46 -NC-SNAS / 2B46 -I Strengthening Cadastro Unico Seminario de Regulacao do IBRD / 78410 as the Main Targeting Post UN Agencies (Direct) Direct 31,948.88 0.00 Canceled 2018-05-11 2018-05-26 2018-06-25 2018-07-25 SUAS Instrument for Social Programs 2B48 -NC-SNAS / 2B48 - Strengthening Cadastro Unico Capacitacao de Multiplicadores IBRD / 78410 as the Main Targeting Post UN Agencies (Direct) Direct 38,338.66 0.00 Canceled 2018-11-10 2018-11-25 2018-12-25 2019-01-24 para Elaboracao de Diagnosticos Instrument for Social Programs Socioterritoriais Locais 2B50 -NC-SNAS / 2B50 - Strengthening Cadastro Unico Capacitacao de Multiplicadores Pending IBRD / 78410 as the Main Targeting Post UN Agencies (Direct) Direct 31,948.88 0.00 2018-09-10 2018-09-25 2018-10-25 2018-11-24 para "Gestao de Centros de Implementation Instrument for Social Programs Referencia do SUAS" 2B52 -NC-SNAS / 2B52 - Capacitacao de Trabalhadores e Strengthening Cadastro Unico gestores do SUAS para o IBRD / 78410 as the Main Targeting Post UN Agencies (Direct) Direct 31,948.88 0.00 Canceled 2018-11-10 2018-11-25 2018-12-25 2019-01-24 atendimento a Populacoes Instrument for Social Programs Indigenas 2B53 -NC-SNAS / 2B53 - Strengthening Cadastro Unico Oficinas vivenciais para acoes do IBRD / 78410 as the Main Targeting Post UN Agencies (Direct) Direct 31,948.88 0.00 Canceled 2018-07-11 2018-07-26 2018-08-25 2018-09-24 SUAS na Amazonia Legal - 1 Instrument for Social Programs 2B54 -NC-SNAS / 2B54 - Strengthening Cadastro Unico Pending Encontro Nacional de Vigilancia IBRD / 78410 as the Main Targeting Post UN Agencies (Direct) Direct 102,236.42 0.00 2018-06-10 2018-06-25 2018-07-25 2018-08-24 Implementation Socioassistencial Instrument for Social Programs 2B55 -NC-SNAS / 2B55 - Strengthening Cadastro Unico Oficinas de Apoio Tecnico aos Pending IBRD / 78410 as the Main Targeting Post UN Agencies (Direct) Direct 15,974.44 0.00 2018-03-11 2018-03-26 2018-04-25 2018-05-25 estados - (3 oficinas de 60 Implementation Instrument for Social Programs pessoas - 2,5 dias) 2B56 -NC-SNAS / 2B56 -II Strengthening Cadastro Unico Pending Encontro Nacional de Usuarios IBRD / 78410 as the Main Targeting Post UN Agencies (Direct) Direct 47,923.32 0.00 2018-05-11 2018-05-26 2018-06-25 2018-07-25 Implementation do SUAS Instrument for Social Programs 2B59 -NC-SNAS / 2B59 - Strengthening Cadastro Unico Capacitacao de Multiplicadores Pending IBRD / 78410 as the Main Targeting Post UN Agencies (Direct) Direct 9,584.66 0.00 2018-01-12 2018-02-06 2018-03-13 2018-05-12 para uso do Prontuario SUAS 2 Implementation Instrument for Social Programs turmas 2B61 -NC-SNAS / 2B61 - Strengthening Cadastro Unico Capacitacao de Multiplicadores Pending IBRD / 78410 as the Main Targeting Post UN Agencies (Direct) Direct 9,584.66 0.00 2018-09-25 2018-10-10 2018-11-09 2018-12-09 para uso do Prontuario SUAS 2 Implementation Instrument for Social Programs turmas 2B62 -NC-SNAS / 2B62 - Capacitacao de Multiplicadores Strengthening Cadastro Unico Pending para uso do Prontuario SUAS - IBRD / 78410 as the Main Targeting Post UN Agencies (Direct) Direct 6,900.96 0.00 2018-11-01 2018-11-16 2018-12-07 2018-12-22 Implementation 40 horas - turma 5 - 26 a 30 de Instrument for Social Programs novembro de 2018 -35 pessoas 2B63 -NC-SNAS / 2B63 - Strengthening Cadastro Unico Oficinas vivenciais para acoes do IBRD / 78410 as the Main Targeting Post UN Agencies (Direct) Direct 31,948.88 0.00 Canceled 2018-09-10 2018-09-25 2018-10-25 2018-11-24 SUAS na Amazonia Legal - (6 Instrument for Social Programs oficinas de 15 pessoas - 3 dias) 2B64 -NC-SNAS / 2B64 - Strengthening Cadastro Unico Oficinas vivenciais para acoes do IBRD / 78410 as the Main Targeting Post UN Agencies (Direct) Direct 31,948.88 0.00 Canceled 2018-11-10 2018-11-25 2018-12-16 2018-12-31 SUAS na Amazonia Legal - (6 Instrument for Social Programs oficinas de 15 pessoas - 3 dias) 2B70 -NC-SNAS / 2B70 -Oficina Regional com o Forum de Strengthening Cadastro Unico Pending Usuarios do SUAS ( 20 IBRD / 78410 as the Main Targeting Post UN Agencies (Direct) Direct 15,974.44 0.00 2018-05-09 2018-05-24 2018-06-23 2018-07-23 Implementation participantes - 2,5 dias) - Turma Instrument for Social Programs 4 2B71 -NC-SNAS / 2B71 -Oficina Regional com o Forum de Strengthening Cadastro Unico Pending Usuarios do SUAS ( 20 IBRD / 78410 as the Main Targeting Post UN Agencies (Direct) Direct 15,974.44 0.00 2018-05-09 2018-05-24 2018-06-23 2018-07-23 Implementation participantes - 2,5 dias) - Turma Instrument for Social Programs 5 2B72 -NC-SNAS / 2B72 - Strengthening Cadastro Unico Seminario sobre Politicas de IBRD / 78410 as the Main Targeting Post UN Agencies (Direct) Direct 6,389.78 0.00 Canceled 2018-05-25 2018-06-09 2018-07-09 2018-08-08 Protecao Social em perspectiva Instrument for Social Programs comparada 2 2B73 -NC-SNAS / 2B73 - Strengthening Cadastro Unico Seminario sobre Politicas de IBRD / 78410 as the Main Targeting Post UN Agencies (Direct) Direct 6,389.78 0.00 Canceled 2018-10-11 2018-10-26 2018-11-25 2018-12-25 Protecao Social em perspectiva Instrument for Social Programs comparada 4 2B74 -NC-SNAS / 2B74 - Encontro sobre o papel das Strengthening Cadastro Unico organizacoes da sociedade civil IBRD / 78410 as the Main Targeting Post UN Agencies (Direct) Direct 15,974.44 0.00 Canceled 2018-06-25 2018-07-10 2018-08-09 2018-09-08 no fortalecimento do SUAS e do Instrument for Social Programs Cadastro nù ico- Regiao Sudeste 2B75 -NC-SNAS / 2B75 - Encontro sobre o papel das Strengthening Cadastro Unico Pending organizacoes da sociedade civil IBRD / 78410 as the Main Targeting Post UN Agencies (Direct) Direct 15,974.44 0.00 2018-05-11 2018-05-26 2018-06-25 2018-07-25 Implementation no fortalecimento do SUAS e do Instrument for Social Programs Cadastro nù ico- Regiao Sul 2B76 -NC-SNAS / 2B76 - Encontro sobre o papel das Strengthening Cadastro Unico Pending organizacoes da sociedade civil IBRD / 78410 as the Main Targeting Post UN Agencies (Direct) Direct 15,974.44 0.00 2018-11-01 2018-11-16 2018-12-07 2018-12-22 Implementation no fortalecimento do SUAS e do Instrument for Social Programs Cadastro nù ico- Regiao Nordeste 2B77 -NC-SNAS / 2B77 - Strengthening Cadastro Unico Oficina com Liderancas Pending IBRD / 78410 as the Main Targeting Post UN Agencies (Direct) Direct 12,779.55 0.00 2018-11-12 2018-11-27 2018-12-15 2018-12-30 Nacionais Representantes de Implementation Instrument for Social Programs Usuarios do SUAS 2B78 -NC-SNAS / 2B78 - Strengthening Cadastro Unico Pending Oficinas de Apoio Tecnico aos IBRD / 78410 as the Main Targeting Post UN Agencies (Direct) Direct 15,974.44 0.00 2018-05-31 2018-06-15 2018-07-15 2018-08-14 Implementation estados - 1 Instrument for Social Programs 2B79 -NC-SNAS / 2B79 - Strengthening Cadastro Unico Pending Oficinas de Apoio Tecnico aos IBRD / 78410 as the Main Targeting Post UN Agencies (Direct) Direct 15,974.44 0.00 2018-05-30 2018-06-14 2018-07-14 2018-08-13 Implementation estados - 2 Instrument for Social Programs 2B80 -NC-SNAS / 2B80 - Strengthening Cadastro Unico Pending Oficinas de Apoio Tecnico aos IBRD / 78410 as the Main Targeting Post UN Agencies (Direct) Direct 15,974.44 0.00 2018-11-12 2018-11-27 2018-12-16 2018-12-31 Implementation estados - 3 Instrument for Social Programs 2B35 -NC-SENARC / 2B35 - Realizacao de encontro dos Strengthening Cadastro Unico membros permanentes da Rede Pending IBRD / 78410 as the Main Targeting Post UN Agencies (Direct) Direct 22,364.22 0.00 2018-07-02 2018-07-17 2018-08-07 2018-09-06 do Cadastro Unico com Implementation Instrument for Social Programs participacao de 50 pessoas (agosto/2018) Page 3 2B36 -NC-SENARC / 2B36 - Realizacao de encontro dos Strengthening Cadastro Unico membros permanentes da Rede Pending IBRD / 78410 as the Main Targeting Post UN Agencies (Direct) Direct 22,364.22 0.00 2018-10-31 2018-11-15 2018-12-06 2019-01-05 do Cadastro Unico com Implementation Instrument for Social Programs participacao de 50 pessoas (dezembro/2018) 2B38 -NC-SENARC / 2B38 - Realizacao do 12o encontro com gestores municipais de 18 Strengthening Cadastro Unico metropoles brasileiras para Pending IBRD / 78410 as the Main Targeting Post UN Agencies (Direct) Direct 12,779.55 0.00 2018-05-31 2018-06-15 2018-07-15 2018-08-14 seguimento do Plano de Implementation Instrument for Social Programs Monitoramento da Gestao do Cadastro Unico Data: janeiro de 2018 2B39 -NC-SENARC / 2B39 - Realizacao do 13o encontro com gestores municipais das Strengthening Cadastro Unico Pending metropoles brasileiras para IBRD / 78410 as the Main Targeting Post UN Agencies (Direct) Direct 22,364.22 0.00 2018-09-20 2018-09-30 2018-10-21 2018-11-20 Implementation seguimento do Plano de Instrument for Social Programs Monitoramento da Gestao do Cadastro Unico 2B40 -NC-SENARC / 2B40 - Oficina com trabalhadores da Strengthening Cadastro Unico Gestao Municipal, Estadual e Pending IBRD / 78410 as the Main Targeting Post UN Agencies (Direct) Direct 31,948.88 0.00 2018-06-25 2018-07-10 2018-08-09 2018-09-08 Federal para identificacao de Implementation Instrument for Social Programs demandas de modificacao dos instrumentos do Cadastro Unico 2B41 -NC-SENARC / 2B41 - Mesa de discussao com Strengthening Cadastro Unico especialistas sobre conceitos Pending IBRD / 78410 as the Main Targeting Post UN Agencies (Direct) Direct 31,948.88 0.00 2018-06-20 2018-07-05 2018-08-04 2018-09-03 basilares e atual Implementation Instrument for Social Programs modelo/estrutura do Cadastro Unico 3A25 -NC-SENARC / 3A25 - Realizacao de I Encontro Institutional Strengthening for Pending Nacional de coordenadores IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 63,897.63 0.00 2018-05-30 2018-06-14 2018-07-14 2018-08-13 Implementation estaduais do Cadastro Unico e Familia Program Bolsa Familia 3A26 -NC-SENARC / 3A26 - Realizacao de II Encontro Institutional Strengthening for Pending Nacional de coordenadores IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 38,338.66 0.00 2018-09-17 2018-10-02 2018-11-01 2018-12-01 Implementation estaduais do Cadastro Unico e Familia Program Bolsa Familia 3A31 -NC-SENARC / 3A31 - Realizacao de turma piloto da capacitacao para formacao de Instrutores do Sistema de Institutional Strengthening for Pending Condicionalidades - Sicon (a IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 23,961.66 0.00 2018-05-30 2018-06-14 2018-07-14 2018-08-13 Implementation capacitacao tera duracao de 2 Familia Program dias e meio e atendera 28 participantes) de 26 a 28 de junho de 2018 3A32 -NC-SENARC / 3A32 - Realizacao de capacitacao para formacao de Instrutores do Institutional Strengthening for Sistema de Condicionalidades - Pending IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 23,961.66 0.00 2018-06-25 2018-07-10 2018-08-09 2018-09-08 Sicon (a capacitacao tera Implementation Familia Program duracao de 2 dias e meio e atendera 28 participantes) de 07 a 09 de agosto de 2018 3A33 -NC-SENARC / 3A33 - Realizacao de capacitacao para formacao de Instrutores do Institutional Strengthening for Sistema de Condicionalidades - Pending IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 23,961.66 0.00 2018-06-29 2018-07-14 2018-08-13 2018-09-12 Sicon (a capacitacao tera Implementation Familia Program duracao de 2 dias e meio e atendera 28 participantes) de 21 a 23 de agosto de 2018 3A34 -NC-SENARC / 3A34 - Realizacao de capacitacao para formacao de Instrutores do Institutional Strengthening for Sistema de Condicionalidades - Pending IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 23,961.66 0.00 2018-05-30 2018-06-14 2018-07-14 2018-08-13 Sicon (a capacitacao tera Implementation Familia Program duracao de 2 dias e meio e atendera 28 participantes) de 03 a 05 de setembro de 2018 3A35 -NC-SENARC / 3A35 - Realizacao de capacitacao para formacao de Instrutores do Institutional Strengthening for Sistema de Condicionalidades - Pending IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 23,961.66 0.00 2018-06-29 2018-07-14 2018-08-13 2018-09-12 Sicon (a capacitacao tera Implementation Familia Program duracao de 2 dias e meio e atendera 28 participantes) de 18 a 20 de setembro de 2018 3A36 -NC-SENARC / 3A36 - Realizacao de capacitacao para formacao de Instrutores do Institutional Strengthening for Sistema de Condicionalidades - Pending IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 23,961.66 0.00 2018-07-11 2018-07-26 2018-08-30 2018-09-29 Sicon (a capacitacao tera Implementation Familia Program duracao de 2 dias e atendera 28 participantes) de 23 a 25 de outubro de 2018 3B3 -NC-SENARC / 3B3 - Painel internacional sobre Institutional Strengthening for tendencias dos programas de Pending IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 47,923.32 0.00 2018-05-31 2018-06-15 2018-07-15 2018-08-14 transferencia de renda na Implementation Familia Program America Latina - 15 anos do Programa Bolsa Familia 3B4 -NC-SENARC / 3B4 - Realizacao de Seminario sobre a tematica de genero e mulheres Institutional Strengthening for nas politicas publicas e Pending IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 31,948.88 0.00 2018-05-30 2018-06-14 2018-07-14 2018-08-13 programas de transferencia de Implementation Familia Program renda (2 dias de evento, cerca de 50 participantes, 6 palestrantes convidados) 3B5 -NC-SENARC / 3B5 - Realizacao de evento de Premiacao de boas praticas do Institutional Strengthening for Programa Bolsa Familia - Premio Pending IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 95,846.65 0.00 2018-07-25 2018-08-09 2018-09-08 2018-10-08 Rosani Cunha e Desenvolvimento Implementation Familia Program Social: Edicao 15 anos do Bolsa Familia (250 participantes, em setembro de 2018) 3B6 -NC-SENARC / 3B6 - Realizacao de missao internacional para conhecer uma experiencia internacional de Institutional Strengthening for referencia de programas de Pending IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 0.01 0.00 2018-08-01 2018-08-16 2018-09-15 2018-10-15 transferencia de renda, como Implementation Familia Program forma de premiar as boas praticas vencedoras no Premio Rosani Cunha de Desenvolvimento Social 3B20 -NC-SNPDH / 3B20 Institutional Strengthening for Lancamento da publicacao dos 3 Pending IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 19,169.33 0.00 2018-07-02 2018-07-17 2018-08-16 2018-09-15 diagnosticos na Regiao Sul (em Implementation Familia Program Porto Alegre) 3B25 -NC-SNPDH / 3B25 Institutional Strengthening for Lancamento da publicacao dos 3 Pending IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 19,169.33 0.00 2018-07-02 2018-07-17 2018-08-16 2018-09-15 diagnosticos na Regiao Sudeste Implementation Familia Program (em Sao Paulo) 3B30 -NC-SNPDH / 3B30 Institutional Strengthening for Lancamento da publicacao dos 3 Pending IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 19,169.33 0.00 2018-07-02 2018-07-17 2018-08-16 2018-09-15 diagnosticos na Regiao Centro- Implementation Familia Program Oeste (em Goiania) 3B34 -NC-SNPDH / 3B34 Institutional Strengthening for Lancamento da publicacao dos 3 Pending IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 19,169.33 0.00 2018-07-02 2018-07-17 2018-08-16 2018-09-15 diagnosticos na Regiao Implementation Familia Program Nordeste (em Recife) 3B44 -NC-SNPDH / 3B44 Institutional Strengthening for Lancamento da publicacao dos Pending IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 19,169.33 0.00 2018-07-02 2018-07-17 2018-08-06 2018-09-05 3 diagnosticos na Regiao Norte Implementation Familia Program (em Manaus) Page 4 3B46 -NC-SNPDH / 3B46 - Institutional Strengthening for Seminario Internacional sobre Pending IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 79,872.20 0.00 2018-06-29 2018-07-14 2018-08-18 2018-09-17 Desenvolvimento Humano de Implementation Familia Program adolescentes e jovens 3B74 -NC-SNPDH / 3B74 - Seminario Internacional "O Poder Institutional Strengthening for Transformador do Pending IBRD / 78410 the Consolidation of the Bolsa Prior UN Agencies (Direct) Direct 383,386.58 0.00 2018-03-01 2018-03-05 2018-03-27 2018-06-21 Desenvolvimento da Primeira Implementation Familia Program Infancia para um Desenvolvimento Equitativo" 3B75 -NC-SNPDH / 3B75 Realizacao de Lancamento Nacional sobre o Diagnostico da Institutional Strengthening for Pending Primeira Infancia, adolescencia e IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 95,846.65 0.00 2018-07-02 2018-07-17 2018-08-21 2018-09-20 Implementation juventude, e idosos no Brasil (2 Familia Program dias de evento, cerca de 200 participantes) 3C1 -NC-SENARC / 3C1 -1o Workshop Nacional de Inclusao Institutional Strengthening for Pending Financeira Cidada de familias IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 31,948.88 0.00 2018-06-29 2018-07-14 2018-08-18 2018-09-17 Implementation beneficiarias do Programa Bolsa Familia Program Familia 3C2EV -NC-SENARC / 3C2 - 1o Workshop Internacional de Institutional Strengthening for Pending Inclusao Financeira Cidada de IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 47,923.32 0.00 2018-06-29 2018-07-14 2018-08-18 2018-09-17 Implementation familias beneficiarias do Familia Program Programa Bolsa Familia 3C3EV -NC-SENARC / 3C3 - 1o Institutional Strengthening for Seminario Internacional de Pending IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 143,770.01 0.00 2018-07-30 2018-08-14 2018-09-18 2018-10-18 Desenvolvimento Social, Implementation Familia Program Educacao e Inclusao Financeira 3C4 -NC-SENARC / 3C4 - Oficina de Discussao para alteracao da Portaria GM/MDS Institutional Strengthening for no 555, de 11 de novembro de Pending IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 47,923.32 0.00 2018-07-30 2018-08-14 2018-09-18 2018-10-18 2005, conjuntamente com Implementation Familia Program integrantes da Gestao do Programa Bolsa Familia (PBF) de 10 municipios selecionados 3C5 -NC-SENARC / 3C5 - Realizacao de 1a capacitacao com quatro turmas para Institutional Strengthening for Pending formacao de 100 Instrutores do IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 38,338.66 0.00 2018-03-20 2018-04-04 2018-05-19 2018-07-18 Implementation Programa de Educacao Familia Program Financeira para beneficiarias do Programa Bolsa Familia 3C6 -NC-SENARC / 3C6 - Realizacao de 2a capacitacao com quatro turmas para Institutional Strengthening for Pending formacao de 100 Instrutores do IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 38,338.66 0.00 2018-06-01 2018-06-16 2018-07-16 2018-09-14 Implementation Programa de Educacao Familia Program Financeira para beneficiarias do Programa Bolsa Familia 3C9 -NC-SENARC / 3C9 - Realizacao de 5a capacitacao com quatro turmas para Institutional Strengthening for Pending formacao de 100 Instrutores do IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 38,338.66 0.00 2018-07-16 2018-07-31 2018-08-30 2018-10-29 Implementation Programa de Educacao Familia Program Financeira para beneficiarias do Programa Bolsa Familia 3C10 -NC-SENARC / 3C10 - Realizacao de 6a capacitacao com quatro turmas para Institutional Strengthening for formacao de 100 Instrutores do IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 38,338.66 0.00 Canceled 2018-05-15 2018-05-30 2018-06-29 2018-08-28 Programa de Educacao Familia Program Financeira para beneficiarias do Programa Bolsa Familia 3C11 -NC-SENARC / 3C11 - Realizacao de 7a capacitacao com quatro turmas para Institutional Strengthening for formacao de 100 Instrutores do IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 38,338.66 0.00 Canceled 2018-05-15 2018-05-30 2018-06-29 2018-08-28 Programa de Educacao Familia Program Financeira para beneficiarias do Programa Bolsa Familia 3C12 -NC-SENARC / 3C12 - Realizacao de 8a capacitacao com quatro turmas para Institutional Strengthening for formacao de 100 Instrutores do IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 38,338.66 0.00 Canceled 2018-06-15 2018-06-30 2018-07-30 2018-09-28 Programa de Educacao Familia Program Financeira para beneficiarias do Programa Bolsa Familia 3C13 -NC-SENARC / 3C13 - Realizacao de 9a capacitacao com quatro turmas para Institutional Strengthening for formacao de 100 Instrutores do IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 38,338.66 0.00 Canceled 2018-07-15 2018-07-30 2018-08-29 2018-10-28 Programa de Educacao Familia Program Financeira para beneficiarias do Programa Bolsa Familia 3C14 -NC-SENARC / 3C14 - Realizacao de 10a capacitacao com quatro turmas para Institutional Strengthening for formacao de 100 Instrutores do IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 38,338.66 0.00 Canceled 2018-08-15 2018-08-30 2018-09-29 2018-11-28 Programa de Educacao Familia Program Financeira para beneficiarias do Programa Bolsa Familia 3D18 -NC-SNAS / 3D18 - Oficina de Integracao Servicos e Institutional Strengthening for Beneficios na Protecao Social Pending IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 95,846.65 0.00 2018-06-07 2018-06-22 2018-07-22 2018-08-21 Basica para acompanhamento Implementation Familia Program de familias em descumprimento de condicionalidades 3D20 -NC-SNAS / 3D20 - Institutional Strengthening for 1°Seminario de Alinhamento Pending IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 70,287.54 0.00 2018-11-07 2018-11-22 2018-12-22 2019-01-21 Tecnico e Avaliacao do Programa Implementation Familia Program Acessuas Trabalho 3D21 -NC-SNAS / 3D21 - Oficina Colaborativa e Programa Institutional Strengthening for Pending Acessuas: Inclusao produtiva no IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 63,897.76 0.00 2018-06-07 2018-06-22 2018-07-22 2018-08-21 Implementation contexto rural, povos e Familia Program comunidades tradicionais 3D22 -NC-SNAS / 3D22 - Institutional Strengthening for Seminario Nacional Trabalho Pending IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 63,897.76 0.00 2018-11-01 2018-11-16 2018-12-01 2018-12-31 Social com Familias no ambito Implementation Familia Program do PAIF 3D23 -NC-SNAS / 3D23 - Institutional Strengthening for Oficina de Integracao do Pending IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 70,287.54 0.00 2018-03-20 2018-04-04 2018-05-19 2018-06-18 Programa Crianca Feliz e as Implementation Familia Program acoes da Protecao Social Basica 3D25 -NC-SNAS / 3D25 - Oficina sobre os servicos Institutional Strengthening for socioassistenciais voltados para Pending IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 26,517.57 0.00 2018-10-01 2018-10-16 2018-11-15 2018-12-15 a populacao em situacao de rua Implementation Familia Program no Brasil registrada no Cadastro Unico 3D29 -NC-SNAS / 3D29 - Encontro sobre integracao entre servicos socioassistenciais Institutional Strengthening for Pending (Basica e Especial) e beneficios IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 20,447.28 0.00 2018-06-29 2018-07-14 2018-08-13 2018-09-12 Implementation para Pessoa Idosa no Brasil, e Familia Program as interfaces com o Cadastro Unico 3D30 -NC-SNAS / 3D30 - Institutional Strengthening for Oficinas com o Forum de Pending IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 6,389.78 0.00 2018-07-23 2018-08-07 2018-09-06 2018-10-06 Trabalhadores do SUAS (3 Implementation Familia Program Oficinas - 30 participantes cada) 3D31 -NC-SNAS / 3D31 -Oficina Institutional Strengthening for Regional: "Novos parametros Pending IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 22,364.22 0.00 2018-07-25 2018-08-09 2018-09-08 2018-10-08 para o Trabalho Social com Implementation Familia Program Familias" - Regiao Norte Page 5 3D32 -NC-SNAS / 3D32 -Oficina Institutional Strengthening for Regional: "Novos parametros Pending IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 22,364.22 0.00 2018-05-31 2018-06-15 2018-07-15 2018-08-14 para o Trabalho Social com Implementation Familia Program Familias" - Regiao Sul 3D33 -NC-SNAS / 3D33 -Oficina Institutional Strengthening for Regional: "Novos parametros Pending IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 28,753.99 0.00 2018-06-01 2018-06-16 2018-07-16 2018-08-15 para o Trabalho Social com Implementation Familia Program Familias" - Regiao Nordeste 3D34 -NC-SNAS / 3D34 -Oficina Institutional Strengthening for Regional: "Novos parametros Pending IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 22,364.22 0.00 2018-06-15 2018-06-30 2018-07-30 2018-08-29 para o Trabalho Social com Implementation Familia Program Familias" - Regiao Sudeste 3D35 -NC-SNAS / 3D35 -Oficina Institutional Strengthening for Regional: "Novos parametros Pending IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 22,364.22 0.00 2018-07-02 2018-07-17 2018-08-16 2018-09-15 para o Trabalho Social com Implementation Familia Program Familias" - Regiao Centro-Oeste 3D36 -NC-SNAS / 3D36 -Oficina colaborativa:Alinhamento Institutional Strengthening for Pending conceitual e construcao de IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 22,364.22 0.00 2018-07-31 2018-08-15 2018-09-14 2018-10-14 Implementation parametros para a atuacao das Familia Program Equipes Volantes 3D37 -NC-SNAS / 3D37 -Oficina Institutional Strengthening for colaborativa sobre gestao da Pending IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 70,287.54 0.00 2018-03-11 2018-03-31 2018-05-15 2018-06-14 Protecao Social Basica no Implementation Familia Program territorio 4A18 -NC-SAGI / 4A18 - Consolidation of the Monitoring Realizacao de Oficina Tecnica de Pending IBRD / 78410 and Evaluation System in the Post UN Agencies (Direct) Direct 11,980.83 0.00 2018-05-30 2018-06-14 2018-07-14 2018-08-13 Avaliacao de Impacto do Implementation Ministry of Social Development Programa Crianca Feliz 4A20 -NC-SAGI / 4A20 - Realizacao de capacitacao para formacao de Instrutores de Consolidation of the Monitoring Gestao do Cadastro Unico e Pending IBRD / 78410 and Evaluation System in the Post UN Agencies (Direct) Direct 5,750.80 0.00 2018-05-30 2018-06-14 2018-07-14 2018-08-13 Bolsa Familia (a capacitacao Implementation Ministry of Social Development tera duracao de 5 dias e atendera 30 participantes) - Turma 1 4A21 -NC-SAGI / 4A21 - Realizacao de capacitacao para formacao de Instrutores de Consolidation of the Monitoring Gestao do Cadastro Unico e Pending IBRD / 78410 and Evaluation System in the Post UN Agencies (Direct) Direct 5,750.80 0.00 2018-06-29 2018-07-14 2018-08-13 2018-09-12 Bolsa Familia (a capacitacao Implementation Ministry of Social Development tera duracao de 5 dias e atendera 30 participantes) - Turma 2 4A22 -NC-SAGI / 4A22 - Realizacao de capacitacao para formacao de Instrutores de Consolidation of the Monitoring Gestao do Cadastro Unico e Pending IBRD / 78410 and Evaluation System in the Post UN Agencies (Direct) Direct 5,750.80 0.00 2018-05-01 2018-05-16 2018-06-15 2018-07-15 Bolsa Familia (a capacitacao Implementation Ministry of Social Development tera duracao de 5 dias e atendera 30 participantes) - Turma 3 4A26 -NC-SAGI / 4A26 - Realizacao de capacitacao para formacao de Instrutores de Consolidation of the Monitoring Pending Formulario do Cadastro Unico (a IBRD / 78410 and Evaluation System in the Post UN Agencies (Direct) Direct 5,750.80 0.00 2018-01-29 2018-02-13 2018-03-06 2018-04-05 Implementation capacitacao tera duracao de 5 Ministry of Social Development dias e atendera 30 participantes) - Turma 1 4A27 -NC-SAGI / 4A27 - Realizacao de capacitacao para formacao de Instrutores de Consolidation of the Monitoring Pending Formulario do Cadastro Unico (a IBRD / 78410 and Evaluation System in the Post UN Agencies (Direct) Direct 5,750.80 0.00 2018-02-06 2018-02-21 2018-03-19 2018-04-18 Implementation capacitacao tera duracao de 5 Ministry of Social Development dias e atendera 30 participantes) - Turma 2 4A28 -NC-SAGI / 4A28 - Realizacao de capacitacao para formacao de Instrutores de Consolidation of the Monitoring Pending Formulario do Cadastro Unico (a IBRD / 78410 and Evaluation System in the Post UN Agencies (Direct) Direct 5,750.80 0.00 2018-02-26 2018-03-13 2018-04-12 2018-05-12 Implementation capacitacao tera duracao de 5 Ministry of Social Development dias e atendera 30 participantes) - Turma 3 4A31 -NC-SAGI / 4A31 - Realizacao de turma piloto para capacitacao presencial avancada Consolidation of the Monitoring modular sobre o Bolsa Familia e Pending IBRD / 78410 and Evaluation System in the Post UN Agencies (Direct) Direct 5,750.80 0.00 2018-06-29 2018-07-14 2018-08-13 2018-09-12 Cadastro Unico (a capacitacao Implementation Ministry of Social Development tera duracao de 5 dias e atendera 30 participantes) de 24 a 28 de setembro de 2018 4A33 -NC-SAGI / 4A33 - Realizacao de capacitacao presencial avancada modular Consolidation of the Monitoring sobre o Bolsa Familia e Cadastro Pending IBRD / 78410 and Evaluation System in the Post UN Agencies (Direct) Direct 5,750.80 0.00 2018-07-01 2018-07-16 2018-08-15 2018-09-14 Unico (a capacitacao tera Implementation Ministry of Social Development duracao de 5 dias e atendera 30 participantes) de 05 a 09 de novembro de 2018 4A34 -NC-SAGI / 4A34 - Realizacao de Oficina Tecnica com Equipes de Pesquisa de Avaliacao de Impacto do Consolidation of the Monitoring Pending Programa Crianca Feliz (10 IBRD / 78410 and Evaluation System in the Post UN Agencies (Direct) Direct 0.01 0.00 2018-07-01 2018-07-16 2018-08-15 2018-09-14 Implementation participantes de cada Ministry of Social Development universidade e equipe tecnica da coordenacao da pesquisa), a ser realizado em Brasilia - DF 5D35 -NC- SISP / 5D35 - Supporting the National Pending Cerimonia de premiacao do IBRD / 78410 Commitment for Social Post UN Agencies (Direct) Direct 95,846.65 0.00 2018-01-31 2018-02-09 2018-04-04 2018-06-05 Implementation Premio Progredir Development (CNDS) 5D37 -NC-SESAN / 5D37 - Encontro com gestores municipais para capacitacao e Supporting the National intercambio de experiencias Pending IBRD / 78410 Commitment for Social Post UN Agencies (Direct) Direct 54,313.10 0.00 2018-05-30 2018-06-14 2018-07-14 2018-08-13 sobre o PAA Compra com Implementation Development (CNDS) Doacao Simultanea - Termo de Adesao (250 participantes) Brasilia/DF 5D41 -NC-SESAN / 5D41 - Realizacao de Seminario de Compras de Alimentos da Agricultura Familiar para Supporting the National Pending atendimento de Orgaos Publicos IBRD / 78410 Commitment for Social Post UN Agencies (Direct) Direct 63,897.76 0.00 2018-01-01 2018-02-02 2018-04-04 2018-05-04 Implementation e Lancamento de Catalogo de Development (CNDS) Produtos da Agricultura Familiar em Brasilia/DF (200 participantes) 5D42 -NC-SESAN / 5D42 - "Encontro Internacional de Supporting the National Gestores de Agricultura do Pending IBRD / 78410 Commitment for Social Post UN Agencies (Direct) Direct 6,389.78 0.00 2018-05-30 2018-06-14 2018-07-14 2018-08-13 Caribe para compartilhamento de Implementation Development (CNDS) expertise e boas praticas sobre os Programas Sociais do MDS" 2B43PD -NC-SNAS / 2B43 - Strengthening Cadastro Unico Curso de Planejamento e IBRD / 78410 as the Main Targeting Post UN Agencies (Direct) Direct 28,753.99 0.00 Canceled 2018-08-11 2018-08-26 2018-09-25 2018-10-25 Prospectiva - 40 horas - 1 turma Instrument for Social Programs 2B45PD -NC-SNAS / 2B45 - Strengthening Cadastro Unico Seminario sobre Politicas de IBRD / 78410 as the Main Targeting Post UN Agencies (Direct) Direct 8,945.69 0.00 Canceled 2018-09-10 2018-09-25 2018-10-25 2018-11-24 Protecao Social em perspectiva Instrument for Social Programs comparada 3 2B46PD -NC-SNAS / 2B46 -I Strengthening Cadastro Unico Seminario de Regulacao do IBRD / 78410 as the Main Targeting Post UN Agencies (Direct) Direct 38,338.66 0.00 Canceled 2018-05-11 2018-05-26 2018-06-25 2018-07-25 SUAS Instrument for Social Programs 2B48PD -NC-SNAS / 2B48 - Strengthening Cadastro Unico Capacitacao de Multiplicadores IBRD / 78410 as the Main Targeting Post UN Agencies (Direct) Direct 53,674.12 0.00 Canceled 2018-11-10 2018-11-25 2018-12-25 2019-01-24 para Elaboracao de Diagnosticos Instrument for Social Programs Socioterritoriais Locais Page 6 2B50PD -NC-SNAS / 2B50 - Strengthening Cadastro Unico Capacitacao de Multiplicadores Pending IBRD / 78410 as the Main Targeting Post UN Agencies (Direct) Direct 88,178.91 0.00 2018-09-10 2018-09-25 2018-10-25 2018-11-24 para "Gestao de Centros de Implementation Instrument for Social Programs Referencia do SUAS" 2B52PD -NC-SNAS / 2B52 - Capacitacao de Trabalhadores e Strengthening Cadastro Unico gestores do SUAS para o IBRD / 78410 as the Main Targeting Post UN Agencies (Direct) Direct 83,067.09 0.00 Canceled 2018-11-10 2018-11-25 2018-12-25 2019-01-24 atendimento a Populacoes Instrument for Social Programs Indigenas 2B53PD -NC-SNAS / 2B53 - Strengthening Cadastro Unico Oficinas vivenciais para acoes do IBRD / 78410 as the Main Targeting Post UN Agencies (Direct) Direct 23,003.19 0.00 Canceled 2018-07-11 2018-07-26 2018-08-25 2018-09-24 SUAS na Amazonia Legal - 1 Instrument for Social Programs 2B54PD -NC-SNAS / 2B54 - Strengthening Cadastro Unico Pending Encontro Nacional de Vigilancia IBRD / 78410 as the Main Targeting Post UN Agencies (Direct) Direct 146,964.86 0.00 2018-06-10 2018-06-25 2018-07-25 2018-08-24 Implementation Socioassistencial Instrument for Social Programs 2B55PD -NC-SNAS / 2B55 - Strengthening Cadastro Unico Oficinas de Apoio Tecnico aos Pending IBRD / 78410 as the Main Targeting Post UN Agencies (Direct) Direct 79,872.20 0.00 2018-03-11 2018-03-26 2018-04-25 2018-05-25 estados - (3 oficinas de 60 Implementation Instrument for Social Programs pessoas - 2,5 dias) 2B56PD -NC-SNAS / 2B56 -II Strengthening Cadastro Unico Pending Encontro Nacional de Usuarios IBRD / 78410 as the Main Targeting Post UN Agencies (Direct) Direct 120,766.77 0.00 2018-05-11 2018-05-26 2018-06-25 2018-07-25 Implementation do SUAS Instrument for Social Programs 2B59PD -NC-SNAS / 2B59 - Strengthening Cadastro Unico Capacitacao de Multiplicadores Pending IBRD / 78410 as the Main Targeting Post UN Agencies (Direct) Direct 51,437.70 0.00 2018-01-12 2018-02-06 2018-03-13 2018-05-12 para uso do Prontuario SUAS 2 Implementation Instrument for Social Programs turmas 2B61PD -NC-SNAS / 2B61 - Strengthening Cadastro Unico Capacitacao de Multiplicadores Pending IBRD / 78410 as the Main Targeting Post UN Agencies (Direct) Direct 51,437.70 0.00 2018-09-25 2018-10-10 2018-11-09 2018-12-09 para uso do Prontuario SUAS 2 Implementation Instrument for Social Programs turmas 2B62PD -NC-SNAS / 2B62 - Capacitacao de Multiplicadores Strengthening Cadastro Unico Pending para uso do Prontuario SUAS - IBRD / 78410 as the Main Targeting Post UN Agencies (Direct) Direct 29,904.15 0.00 2018-11-01 2018-11-16 2018-12-07 2018-12-22 Implementation 40 horas - turma 5 - 26 a 30 de Instrument for Social Programs novembro de 2018 -35 pessoas 2B63PD -NC-SNAS / 2B63 - Strengthening Cadastro Unico Oficinas vivenciais para acoes do Pending IBRD / 78410 as the Main Targeting Post UN Agencies (Direct) Direct 23,003.19 0.00 2018-09-10 2018-09-25 2018-10-25 2018-11-24 SUAS na Amazonia Legal - (6 Implementation Instrument for Social Programs oficinas de 15 pessoas - 3 dias) 2B64PD -NC-SNAS / 2B64 - Strengthening Cadastro Unico Oficinas vivenciais para acoes do IBRD / 78410 as the Main Targeting Post UN Agencies (Direct) Direct 23,003.19 0.00 Canceled 2018-11-10 2018-11-25 2018-12-16 2018-12-31 SUAS na Amazonia Legal - (6 Instrument for Social Programs oficinas de 15 pessoas - 3 dias) 2B70PD -NC-SNAS / 2B70 - Oficina Regional com o Forum de Strengthening Cadastro Unico Pending Usuarios do SUAS ( 20 IBRD / 78410 as the Main Targeting Post UN Agencies (Direct) Direct 63,897.76 0.00 2018-05-09 2018-05-24 2018-06-23 2018-07-23 Implementation participantes - 2,5 dias) - Turma Instrument for Social Programs 4 2B71PD -NC-SNAS / 2B71 - Oficina Regional com o Forum de Strengthening Cadastro Unico Pending Usuarios do SUAS ( 20 IBRD / 78410 as the Main Targeting Post UN Agencies (Direct) Direct 63,897.76 0.00 2018-05-09 2018-05-24 2018-06-23 2018-07-23 Implementation participantes - 2,5 dias) - Turma Instrument for Social Programs 5 2B72PD -NC-SNAS / 2B72 - Strengthening Cadastro Unico Seminario sobre Politicas de IBRD / 78410 as the Main Targeting Post UN Agencies (Direct) Direct 8,945.69 0.00 Canceled 2018-05-25 2018-06-09 2018-07-09 2018-08-08 Protecao Social em perspectiva Instrument for Social Programs comparada 2 2B73PD -NC-SNAS / 2B73 - Strengthening Cadastro Unico Seminario sobre Politicas de IBRD / 78410 as the Main Targeting Post UN Agencies (Direct) Direct 8,945.69 0.00 Canceled 2018-10-11 2018-10-26 2018-11-25 2018-12-25 Protecao Social em perspectiva Instrument for Social Programs comparada 4 2B74PD -NC-SNAS / 2B74 - Encontro sobre o papel das Strengthening Cadastro Unico organizacoes da sociedade civil IBRD / 78410 as the Main Targeting Post UN Agencies (Direct) Direct 4,792.33 0.00 Canceled 2018-06-25 2018-07-10 2018-08-09 2018-09-08 no fortalecimento do SUAS e do Instrument for Social Programs Cadastro nù ico- Regiao Sudeste 2B75PD -NC-SNAS / 2B75 - Encontro sobre o papel das Strengthening Cadastro Unico Pending organizacoes da sociedade civil IBRD / 78410 as the Main Targeting Post UN Agencies (Direct) Direct 4,792.33 0.00 2018-05-11 2018-05-26 2018-06-25 2018-07-25 Implementation no fortalecimento do SUAS e do Instrument for Social Programs Cadastro nù ico- Regiao Sul 2B76PD -NC-SNAS / 2B76 - Encontro sobre o papel das Strengthening Cadastro Unico Pending organizacoes da sociedade civil IBRD / 78410 as the Main Targeting Post UN Agencies (Direct) Direct 4,792.33 0.00 2018-11-01 2018-11-16 2018-12-07 2018-12-22 Implementation no fortalecimento do SUAS e do Instrument for Social Programs Cadastro nù ico- Regiao Nordeste 2B77PD -NC-SNAS / 2B77 - Strengthening Cadastro Unico Oficina com Liderancas Pending IBRD / 78410 as the Main Targeting Post UN Agencies (Direct) Direct 22,044.73 0.00 2018-11-10 2018-11-25 2018-12-16 2018-12-31 Nacionais Representantes de Implementation Instrument for Social Programs Usuarios do SUAS 2B78PD-NC-SNAS / 2B78 - Strengthening Cadastro Unico Pending Oficinas de Apoio Tecnico aos IBRD / 78410 as the Main Targeting Post UN Agencies (Direct) Direct 44,089.46 0.00 2018-05-31 2018-06-15 2018-07-15 2018-08-14 Implementation estados - 1 Instrument for Social Programs 2B79PD -NC-SNAS / 2B79 - Strengthening Cadastro Unico Pending Oficinas de Apoio Tecnico aos IBRD / 78410 as the Main Targeting Post UN Agencies (Direct) Direct 44,089.46 0.00 2018-05-31 2018-06-15 2018-07-15 2018-08-14 Implementation estados - 2 Instrument for Social Programs 2B80PD -NC-SNAS / 2B80 - Strengthening Cadastro Unico Pending Oficinas de Apoio Tecnico aos IBRD / 78410 as the Main Targeting Post UN Agencies (Direct) Direct 44,089.46 0.00 2018-11-12 2018-11-27 2018-12-16 2018-12-31 Implementation estados - 3 Instrument for Social Programs 2B35PD -NC-SENARC / 2B35 - Realizacao de encontro dos Strengthening Cadastro Unico membros permanentes da Rede Pending IBRD / 78410 as the Main Targeting Post UN Agencies (Direct) Direct 0.01 0.00 2018-07-02 2018-07-17 2018-08-07 2018-09-06 do Cadastro Unico com Implementation Instrument for Social Programs participacao de 50 pessoas (agosto/2018) 2B36PD -NC-SENARC / 2B36 - Realizacao de encontro dos Strengthening Cadastro Unico membros permanentes da Rede Pending IBRD / 78410 as the Main Targeting Post UN Agencies (Direct) Direct 0.01 0.00 2018-10-31 2018-11-15 2018-12-06 2019-01-05 do Cadastro Unico com Implementation Instrument for Social Programs participacao de 50 pessoas (dezembro/2018) 2B38PD -NC-SENARC / 2B38 - Realizacao do 12o encontro com gestores municipais de 18 Strengthening Cadastro Unico metropoles brasileiras para Pending IBRD / 78410 as the Main Targeting Post UN Agencies (Direct) Direct 35,623.00 0.00 2018-02-20 2018-03-07 2018-04-06 2018-05-06 seguimento do Plano de Implementation Instrument for Social Programs Monitoramento da Gestao do Cadastro Unico Data: janeiro de 2018 2B39PD -NC-SENARC / 2B39 - Realizacao do 13o encontro com gestores municipais das Strengthening Cadastro Unico Pending metropoles brasileiras para IBRD / 78410 as the Main Targeting Post UN Agencies (Direct) Direct 35,623.00 0.00 2018-09-20 2018-09-30 2018-10-21 2018-11-20 Implementation seguimento do Plano de Instrument for Social Programs Monitoramento da Gestao do Cadastro Unico 2B40PD -NC-SENARC / 2B40 - Oficina com trabalhadores da Strengthening Cadastro Unico Gestao Municipal, Estadual e Pending IBRD / 78410 as the Main Targeting Post UN Agencies (Direct) Direct 35,623.00 0.00 2018-06-25 2018-07-10 2018-07-26 2018-08-25 Federal para identificacao de Implementation Instrument for Social Programs demandas de modificacao dos instrumentos do Cadastro Unico 2B41PD -NC-SENARC / 2B41 - Mesa de discussao com Strengthening Cadastro Unico especialistas sobre conceitos Pending IBRD / 78410 as the Main Targeting Post UN Agencies (Direct) Direct 35,623.00 0.00 2018-06-20 2018-07-05 2018-08-04 2018-09-03 basilares e atual Implementation Instrument for Social Programs modelo/estrutura do Cadastro Unico Page 7 3A25PD -NC-SENARC / 3A25 - Realizacao de I Encontro Institutional Strengthening for Pending Nacional de coordenadores IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 95,846.65 0.00 2018-05-30 2018-06-14 2018-07-14 2018-08-13 Implementation estaduais do Cadastro Unico e Familia Program Bolsa Familia 3A26PD -NC-SENARC / 3A26 - Realizacao de II Encontro Institutional Strengthening for Pending Nacional de coordenadores IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 79,872.20 0.00 2018-09-17 2018-10-02 2018-11-01 2018-12-01 Implementation estaduais do Cadastro Unico e Familia Program Bolsa Familia 3A31PD -NC-SENARC / 3A31 - Realizacao de turma piloto da capacitacao para formacao de Instrutores do Sistema de Institutional Strengthening for Pending Condicionalidades - Sicon (a IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 35,143.77 0.00 2018-05-30 2018-06-14 2018-07-14 2018-08-13 Implementation capacitacao tera duracao de 2 Familia Program dias e meio e atendera 28 participantes) de 26 a 28 de junho de 2018 3A32PD -NC-SENARC / 3A32 - Realizacao de capacitacao para formacao de Instrutores do Institutional Strengthening for Sistema de Condicionalidades - Pending IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 35,143.77 0.00 2018-06-25 2018-07-10 2018-08-09 2018-09-08 Sicon (a capacitacao tera Implementation Familia Program duracao de 2 dias e meio e atendera 28 participantes) de 07 a 09 de agosto de 2018 3A33PD -NC-SENARC / 3A33 - Realizacao de capacitacao para formacao de Instrutores do Institutional Strengthening for Sistema de Condicionalidades - Pending IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 35,143.77 0.00 2018-06-29 2018-07-14 2018-08-13 2018-09-12 Sicon (a capacitacao tera Implementation Familia Program duracao de 2 dias e meio e atendera 28 participantes) de 21 a 23 de agosto de 2018 3A34PD -NC-SENARC / 3A34 - Realizacao de capacitacao para formacao de Instrutores do Institutional Strengthening for Sistema de Condicionalidades - Pending IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 35,143.77 0.00 2018-05-30 2018-06-14 2018-07-14 2018-08-13 Sicon (a capacitacao tera Implementation Familia Program duracao de 2 dias e meio e atendera 28 participantes) de 03 a 05 de setembro de 2018 3A35PD -NC-SENARC / 3A35 - Realizacao de capacitacao para formacao de Instrutores do Institutional Strengthening for Sistema de Condicionalidades - Pending IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 35,143.77 0.00 2018-06-29 2018-07-14 2018-08-13 2018-09-12 Sicon (a capacitacao tera Implementation Familia Program duracao de 2 dias e meio e atendera 28 participantes) de 18 a 20 de setembro de 2018 3A36PD -NC-SENARC / 3A36 - Realizacao de capacitacao para formacao de Instrutores do Institutional Strengthening for Sistema de Condicionalidades - Pending IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 35,143.77 0.00 2018-07-11 2018-07-26 2018-08-30 2018-09-29 Sicon (a capacitacao tera Implementation Familia Program duracao de 2 dias e atendera 28 participantes) de 23 a 25 de outubro de 2018 3B3PD -NC-SENARC / 3B3 - Painel internacional sobre Institutional Strengthening for tendencias dos programas de Pending IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 63,897.76 0.00 2018-05-31 2018-06-15 2018-07-15 2018-08-14 transferencia de renda na Implementation Familia Program America Latina - 15 anos do Programa Bolsa Familia 3B4PD -NC-SENARC / 3B4 - Realizacao de Seminario sobre a tematica de genero e mulheres Institutional Strengthening for nas politicas publicas e Pending IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 44,728.43 0.00 2018-05-30 2018-06-14 2018-07-14 2018-08-13 programas de transferencia de Implementation Familia Program renda (2 dias de evento, cerca de 50 participantes, 6 palestrantes convidados) 3B5PD -NC-SENARC / 3B5 - Realizacao de evento de Premiacao de boas praticas do Institutional Strengthening for Programa Bolsa Familia - Premio Pending IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 134,185.30 0.00 2018-07-25 2018-08-09 2018-09-08 2018-10-08 Rosani Cunha e Desenvolvimento Implementation Familia Program Social: Edicao 15 anos do Bolsa Familia (250 participantes, em setembro de 2018) 3B6PD -NC-SENARC / 3B6 - Realizacao de missao internacional para conhecer uma experiencia internacional de Institutional Strengthening for referencia de programas de Pending IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 31,948.88 0.00 2018-08-01 2018-08-16 2018-09-15 2018-10-15 transferencia de renda, como Implementation Familia Program forma de premiar as boas praticas vencedoras no Premio Rosani Cunha de Desenvolvimento Social 3B20PD -NC-SNPDH / 3B20 Institutional Strengthening for Lancamento da publicacao dos 3 Pending IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 44,728.43 0.00 2018-07-02 2018-07-17 2018-08-16 2018-09-15 diagnosticos na Regiao Sul (em Implementation Familia Program Porto Alegre) 3B25PD -NC-SNPDH / 3B25 Institutional Strengthening for Lancamento da publicacao dos 3 Pending IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 44,728.43 0.00 2018-07-02 2018-07-17 2018-08-16 2018-09-15 diagnosticos na Regiao Sudeste Implementation Familia Program (em Sao Paulo) 3B30PD -NC-SNPDH / 3B30 Institutional Strengthening for Lancamento da publicacao dos 3 Pending IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 44,728.43 0.00 2018-07-02 2018-07-17 2018-08-16 2018-09-15 diagnosticos na Regiao Centro- Implementation Familia Program Oeste (em Goiania) 3B34PD -NC-SNPDH / 3B34 Institutional Strengthening for Lancamento da publicacao dos 3 Pending IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 44,728.43 0.00 2018-07-02 2018-07-17 2018-08-16 2018-09-15 diagnosticos na Regiao Implementation Familia Program Nordeste (em Recife) 3B44PD -NC-SNPDH / 3B44 Institutional Strengthening for Lancamento da publicacao dos Pending IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 44,728.43 0.00 2018-07-02 2018-07-17 2018-08-16 2018-09-15 3 diagnosticos na Regiao Norte Implementation Familia Program (em Manaus) 3B46PD -NC-SNPDH / 3B46 - Institutional Strengthening for Seminario Internacional sobre Pending IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 25,559.11 0.00 2018-06-29 2018-07-14 2018-08-18 2018-09-17 Desenvolvimento Humano de Implementation Familia Program adolescentes e jovens 3B75PD -NC-SNPDH / 3B75 Realizacao de Lancamento Nacional sobre o Diagnostico da Institutional Strengthening for Pending Primeira Infancia, adolescencia e IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 31,948.88 0.00 2018-07-02 2018-07-17 2018-08-21 2018-09-20 Implementation juventude, e idosos no Brasil (2 Familia Program dias de evento, cerca de 200 participantes) 3C1PD -NC-SENARC / 3C1 -1o Workshop Nacional de Inclusao Institutional Strengthening for Pending Financeira Cidada de familias IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 51,118.21 0.00 2018-06-29 2018-07-14 2018-08-18 2018-09-17 Implementation beneficiarias do Programa Bolsa Familia Program Familia 3C2PD -NC-SENARC / 3C2 - 1o Workshop Internacional de Institutional Strengthening for Pending Inclusao Financeira Cidada de IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 65,495.21 0.00 2018-06-29 2018-07-14 2018-08-18 2018-09-17 Implementation familias beneficiarias do Familia Program Programa Bolsa Familia 3C3PD -NC-SENARC / 3C3 - 1o Institutional Strengthening for Seminario Internacional de Pending IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 143,770.01 0.00 2018-07-30 2018-08-14 2018-09-18 2018-10-18 Desenvolvimento Social, Implementation Familia Program Educacao e Inclusao Financeira Page 8 3C4PD -NC-SENARC / 3C4 - Oficina de Discussao para alteracao da Portaria GM/MDS Institutional Strengthening for no 555, de 11 de novembro de Pending IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 79,872.20 0.00 2018-07-30 2018-08-14 2018-09-18 2018-10-18 2005, conjuntamente com Implementation Familia Program integrantes da Gestao do Programa Bolsa Familia (PBF) de 10 municipios selecionados 3C5PD -NC-SENARC / 3C5 - Realizacao de 1a capacitacao com quatro turmas para Institutional Strengthening for Pending formacao de 100 Instrutores do IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 79,872.20 0.00 2018-03-20 2018-04-04 2018-05-19 2018-07-18 Implementation Programa de Educacao Familia Program Financeira para beneficiarias do Programa Bolsa Familia 3C6PD -NC-SENARC / 3C6 - Realizacao de 2a capacitacao com quatro turmas para Institutional Strengthening for Pending formacao de 100 Instrutores do IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 79,872.20 0.00 2018-06-01 2018-06-16 2018-07-16 2018-09-14 Implementation Programa de Educacao Familia Program Financeira para beneficiarias do Programa Bolsa Familia 3C9PD -NC-SENARC / 3C9 - Realizacao de 5a capacitacao com quatro turmas para Institutional Strengthening for Pending formacao de 100 Instrutores do IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 79,872.20 0.00 2018-07-16 2018-07-31 2018-08-30 2018-10-29 Implementation Programa de Educacao Familia Program Financeira para beneficiarias do Programa Bolsa Familia 3C10PD -NC-SENARC / 3C10 - Realizacao de 6a capacitacao com quatro turmas para Institutional Strengthening for formacao de 100 Instrutores do IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 79,872.20 0.00 Canceled 2018-05-15 2018-05-30 2018-06-29 2018-08-28 Programa de Educacao Familia Program Financeira para beneficiarias do Programa Bolsa Familia 3C11PD -NC-SENARC / 3C11 - Realizacao de 7a capacitacao com quatro turmas para Institutional Strengthening for formacao de 100 Instrutores do IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 79,872.20 0.00 Canceled 2018-05-15 2018-05-30 2018-06-29 2018-08-28 Programa de Educacao Familia Program Financeira para beneficiarias do Programa Bolsa Familia 3C12PD -NC-SENARC / 3C12 - Realizacao de 8a capacitacao com quatro turmas para Institutional Strengthening for formacao de 100 Instrutores do IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 79,872.20 0.00 Canceled 2018-06-15 2018-06-30 2018-07-30 2018-09-28 Programa de Educacao Familia Program Financeira para beneficiarias do Programa Bolsa Familia 3C13PD -NC-SENARC / 3C13 - Realizacao de 9a capacitacao com quatro turmas para Institutional Strengthening for formacao de 100 Instrutores do IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 79,872.20 0.00 Canceled 2018-07-15 2018-07-30 2018-08-29 2018-10-28 Programa de Educacao Familia Program Financeira para beneficiarias do Programa Bolsa Familia 3C14PD -NC-SENARC / 3C14 - Realizacao de 10a capacitacao com quatro turmas para Institutional Strengthening for formacao de 100 Instrutores do IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 79,872.20 0.00 Canceled 2018-08-15 2018-08-30 2018-09-29 2018-11-28 Programa de Educacao Familia Program Financeira para beneficiarias do Programa Bolsa Familia 3D18PD -NC-SNAS / 3D18 - Oficina de Integracao Servicos e Institutional Strengthening for Beneficios na Protecao Social Pending IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 111,821.09 0.00 2018-06-07 2018-06-22 2018-07-22 2018-08-21 Basica para acompanhamento Implementation Familia Program de familias em descumprimento de condicionalidades 3D20PD -NC-SNAS / 3D20 - Institutional Strengthening for 1°Seminario de Alinhamento Pending IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 47,923.32 0.00 2018-11-07 2018-11-22 2018-12-22 2019-01-21 Tecnico e Avaliacao do Programa Implementation Familia Program Acessuas Trabalho 3D21PD -NC-SNAS / 3D21 - Oficina Colaborativa e Programa Institutional Strengthening for Pending Acessuas: Inclusao produtiva no IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 83,067.09 0.00 2018-06-07 2018-06-22 2018-07-22 2018-08-21 Implementation contexto rural, povos e Familia Program comunidades tradicionais 3D22PD -NC-SNAS / 3D22 - Institutional Strengthening for Seminario Nacional Trabalho Pending IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 83,067.09 0.00 2018-11-01 2018-11-16 2018-12-01 2018-12-31 Social com Familias no ambito Implementation Familia Program do PAIF 3D23PD -NC-SNAS / 3D23 - Institutional Strengthening for Oficina de Integracao do Pending IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 47,923.32 0.00 2018-03-20 2018-04-04 2018-05-19 2018-06-18 Programa Crianca Feliz e as Implementation Familia Program acoes da Protecao Social Basica 3D26PD -NC-SNAS / 3D26 - Encontro Nacional sobre o Reordenamento dos Servicos de Institutional Strengthening for Pending Acolhimento para Criancas, IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 54,952.08 0.00 2018-03-30 2018-04-14 2018-05-19 2018-06-18 Implementation Adolescentes e Jovens e os Familia Program desafios para a inclusao desse publico no Cadastro Unico 3D29PD -NC-SNAS / 3D29 - Encontro sobre integracao entre servicos socioassistenciais Institutional Strengthening for Pending (Basica e Especial) e beneficios IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 73,162.94 0.00 2018-06-29 2018-07-14 2018-08-13 2018-09-12 Implementation para Pessoa Idosa no Brasil, e Familia Program as interfaces com o Cadastro Unico 3D30PD -NC-SNAS / 3D30 - Institutional Strengthening for Oficinas com o Forum de Pending IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 41,533.55 0.00 2018-07-23 2018-08-07 2018-09-06 2018-10-06 Trabalhadores do SUAS (3 Implementation Familia Program Oficinas - 30 participantes cada) 3D31PD -NC-SNAS / 3D31 - Oficina Regional: "Novos Institutional Strengthening for Pending parametros para o Trabalho IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 44,728.43 0.00 2018-07-25 2018-08-09 2018-09-08 2018-10-08 Implementation Social com Familias" - Regiao Familia Program Norte 3D32PD -NC-SNAS / 3D32 - Oficina Regional: "Novos Institutional Strengthening for Pending parametros para o Trabalho IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 41,533.55 0.00 2018-05-31 2018-06-15 2018-07-15 2018-08-14 Implementation Social com Familias" - Regiao Familia Program Sul 3D33PD -NC-SNAS / 3D33 - Oficina Regional: "Novos Institutional Strengthening for Pending parametros para o Trabalho IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 47,923.32 0.00 2018-06-01 2018-06-16 2018-07-16 2018-08-15 Implementation Social com Familias" - Regiao Familia Program Nordeste 3D34PD -NC-SNAS / 3D34 - Oficina Regional: "Novos Institutional Strengthening for Pending parametros para o Trabalho IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 41,533.55 0.00 2018-06-15 2018-06-30 2018-07-30 2018-08-29 Implementation Social com Familias" - Regiao Familia Program Sudeste 3D35PD -NC-SNAS / 3D35 - Oficina Regional: "Novos Institutional Strengthening for Pending parametros para o Trabalho IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 41,533.55 0.00 2018-07-02 2018-07-17 2018-08-16 2018-09-15 Implementation Social com Familias" - Regiao Familia Program Centro-Oeste 3D36PD -NC-SNAS / 3D36 - Oficina colaborativa:Alinhamento Institutional Strengthening for Pending conceitual e construcao de IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 41,533.55 0.00 2018-07-31 2018-08-15 2018-09-14 2018-10-14 Implementation parametros para a atuacao das Familia Program Equipes Volantes 3D37PD -NC-SNAS / 3D37 - Institutional Strengthening for Oficina colaborativa sobre gestao Pending IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 47,923.32 0.00 2018-03-11 2018-03-31 2018-05-15 2018-06-14 da Protecao Social Basica no Implementation Familia Program territorio Page 9 4A18PD -NC-SAGI / 4A18 - Consolidation of the Monitoring Realizacao de Oficina Tecnica de Pending IBRD / 78410 and Evaluation System in the Post UN Agencies (Direct) Direct 11,980.83 0.00 2018-06-29 2018-07-14 2018-08-13 2018-09-12 Avaliacao de Impacto do Implementation Ministry of Social Development Programa Crianca Feliz 4A20PD -NC-SAGI / 4A20 - Realizacao de capacitacao para formacao de Instrutores de Consolidation of the Monitoring Gestao do Cadastro Unico e Pending IBRD / 78410 and Evaluation System in the Post UN Agencies (Direct) Direct 24,440.89 0.00 2018-05-30 2018-06-14 2018-07-14 2018-08-13 Bolsa Familia (a capacitacao Implementation Ministry of Social Development tera duracao de 5 dias e atendera 30 participantes) - Turma 1 4A21PD -NC-SAGI / 4A21 - Realizacao de capacitacao para formacao de Instrutores de Consolidation of the Monitoring Gestao do Cadastro Unico e Pending IBRD / 78410 and Evaluation System in the Post UN Agencies (Direct) Direct 24,440.89 0.00 2018-06-29 2018-07-14 2018-08-13 2018-09-12 Bolsa Familia (a capacitacao Implementation Ministry of Social Development tera duracao de 5 dias e atendera 30 participantes) - Turma 2 4A22PD -NC-SAGI / 4A22 - Realizacao de capacitacao para formacao de Instrutores de Consolidation of the Monitoring Gestao do Cadastro Unico e Pending IBRD / 78410 and Evaluation System in the Post UN Agencies (Direct) Direct 24,440.89 0.00 2018-05-01 2018-05-16 2018-06-15 2018-07-15 Bolsa Familia (a capacitacao Implementation Ministry of Social Development tera duracao de 5 dias e atendera 30 participantes) - Turma 3 4A26PD -NC-SAGI / 4A26 - Realizacao de capacitacao para formacao de Instrutores de Consolidation of the Monitoring Pending Formulario do Cadastro Unico (a IBRD / 78410 and Evaluation System in the Post UN Agencies (Direct) Direct 24,440.89 0.00 2018-01-29 2018-02-13 2018-03-06 2018-04-05 Implementation capacitacao tera duracao de 5 Ministry of Social Development dias e atendera 30 participantes) - Turma 1 4A27PD -NC-SAGI / 4A27 - Realizacao de capacitacao para formacao de Instrutores de Consolidation of the Monitoring Pending Formulario do Cadastro Unico (a IBRD / 78410 and Evaluation System in the Post UN Agencies (Direct) Direct 24,440.89 0.00 2018-02-06 2018-02-21 2018-03-19 2018-04-18 Implementation capacitacao tera duracao de 5 Ministry of Social Development dias e atendera 30 participantes) - Turma 2 4A28PD -NC-SAGI / 4A28 - Realizacao de capacitacao para formacao de Instrutores de Consolidation of the Monitoring Pending Formulario do Cadastro Unico (a IBRD / 78410 and Evaluation System in the Post UN Agencies (Direct) Direct 24,440.89 0.00 2018-02-26 2018-03-13 2018-04-12 2018-05-12 Implementation capacitacao tera duracao de 5 Ministry of Social Development dias e atendera 30 participantes) - Turma 3 4A31PD -NC-SAGI / 4A31 - Realizacao de turma piloto para capacitacao presencial avancada Consolidation of the Monitoring modular sobre o Bolsa Familia e Pending IBRD / 78410 and Evaluation System in the Post UN Agencies (Direct) Direct 24,440.89 0.00 2018-06-29 2018-07-14 2018-08-13 2018-09-12 Cadastro Unico (a capacitacao Implementation Ministry of Social Development tera duracao de 5 dias e atendera 30 participantes) de 24 a 28 de setembro de 2018 4A33PD -NC-SAGI / 4A33 - Realizacao de capacitacao presencial avancada modular Consolidation of the Monitoring sobre o Bolsa Familia e Cadastro Pending IBRD / 78410 and Evaluation System in the Post UN Agencies (Direct) Direct 24,440.89 0.00 2018-07-01 2018-07-16 2018-08-15 2018-09-14 Unico (a capacitacao tera Implementation Ministry of Social Development duracao de 5 dias e atendera 30 participantes) de 05 a 09 de novembro de 2018 4A34PD -NC-SAGI / 4A34 - Realizacao de Oficina Tecnica com Equipes de Pesquisa de Avaliacao de Impacto do Consolidation of the Monitoring Pending Programa Crianca Feliz (10 IBRD / 78410 and Evaluation System in the Post UN Agencies (Direct) Direct 47,923.32 0.00 2018-07-01 2018-07-16 2018-08-15 2018-09-14 Implementation participantes de cada Ministry of Social Development universidade e equipe tecnica da coordenacao da pesquisa), a ser realizado em Brasilia - DF 5D35PD -NC- SISP / 5D35 - Supporting the National Pending Cerimonia de premiacao do IBRD / 78410 Commitment for Social Post UN Agencies (Direct) Direct 31,948.88 0.00 2018-01-31 2018-02-09 2018-04-04 2018-06-05 Implementation Premio Progredir Development (CNDS) 5D37PD -NC-SESAN / 5D37 - Encontro com gestores municipais para capacitacao e Supporting the National intercambio de experiencias Pending IBRD / 78410 Commitment for Social Post UN Agencies (Direct) Direct 9,584.66 0.00 2018-05-30 2018-06-14 2018-07-14 2018-08-13 sobre o PAA Compra com Implementation Development (CNDS) Doacao Simultanea - Termo de Adesao (250 participantes) Brasilia/DF 5D41PD -NC-SESAN / 5D41 - Realizacao de Seminario de Compras de Alimentos da Agricultura Familiar para Supporting the National Pending atendimento de Orgaos Publicos IBRD / 78410 Commitment for Social Post UN Agencies (Direct) Direct 63,897.76 0.00 2018-01-08 2018-02-02 2018-04-04 2018-05-04 Implementation e Lancamento de Catalogo de Development (CNDS) Produtos da Agricultura Familiar em Brasilia/DF (200 participantes) 5D42PD -NC-SESAN / 5D42 - "Encontro Internacional de Supporting the National Gestores de Agricultura do Pending IBRD / 78410 Commitment for Social Post UN Agencies (Direct) Direct 43,130.99 0.00 2018-05-30 2018-06-14 2018-07-14 2018-08-13 Caribe para compartilhamento de Implementation Development (CNDS) expertise e boas praticas sobre os Programas Sociais do MDS" 2B81 - NC - SNAS / 2B81 - Strengthening Cadastro Unico Pending Oficinas de Apoio Tecnico aos IBRD / 78410 as the Main Targeting Post UN Agencies (Direct) Direct 22,364.21 0.00 2018-04-30 2018-05-15 2018-06-14 2018-07-14 Implementation estados - julho/2018 Instrument for Social Programs 2B81PD - NC - SNAS / 2B81 - Strengthening Cadastro Unico Pending Oficinas de Apoio Tecnico aos IBRD / 78410 as the Main Targeting Post UN Agencies (Direct) Direct 61,725.23 0.00 2018-04-30 2018-05-15 2018-06-14 2018-07-14 Implementation estados - julho/2018 Instrument for Social Programs 3B74PD -NC-SNPDH / 3B74 - Seminario Internacional "O Poder Institutional Strengthening for Transformador do Pending IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 255,591.05 0.00 2018-03-01 2018-03-05 2018-03-27 2018-06-21 Desenvolvimento da Primeira Implementation Familia Program Infancia para um Desenvolvimento Equitativo" 5D20-NC-SISP / 5D20 - Contratacao de empresa especializada em servicos graficos, visando a impressao de Supporting the National Request for Single Stage - One Pending 500 Catalogos do Premio IBRD / 78410 Commitment for Social Post Open - National 38,338.70 0.00 2018-08-08 2018-10-04 2018-12-03 Quotations Envelope Implementation Progredir, o qual detalha os Development (CNDS) projetos de Inclusao Produtiva dos 10 municipios finalistas do Premio Progredir. 5D36PD -NC- SISP / 5D36PD - Realizacao do evento do plano progredir a ser realizado em Supporting the National brasilia com duracao de 3 dias. Pending IBRD / 78410 Commitment for Social Post UN Agencies (Direct) Direct 105,431.31 0.00 2018-05-30 2018-06-09 2018-07-05 2018-08-04 Combinacao de oficina sobre o Implementation Development (CNDS) plano progredir com feira de oportunidade externa com cerca de 300 participantes por dia 5D36 -NC- SISP / 5D36 - Realizacao do evento do plano progredir a ser realizado em Supporting the National brasilia com duracao de 3 dias. Pending IBRD / 78410 Commitment for Social Post UN Agencies (Direct) Direct 159,744.41 0.00 2018-05-30 2018-06-09 2018-07-05 2018-08-04 Combinacao de oficina sobre o Implementation Development (CNDS) plano progredir com feira de oportunidade externa com cerca de 300 participantes por dia 3C7PD -NC-SENARC / 3C7 - Realizacao de 3a capacitacao com oito turmas para formacao Institutional Strengthening for Pending de 100 Instrutores do Programa IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 159,744.41 0.00 2018-06-29 2018-07-14 2018-08-13 2018-10-12 Implementation de Educacao Financeira para Familia Program beneficiarias do Programa Bolsa Familia Page 10 3C7 -NC-SENARC / 3C7 - Realizacao de 3a capacitacao com oito turmas para formacao Institutional Strengthening for Pending de 100 Instrutores do Programa IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 76,677.32 0.00 2018-06-29 2018-07-14 2018-08-13 2018-10-12 Implementation de Educacao Financeira para Familia Program beneficiarias do Programa Bolsa Familia 3C8 -NC-SENARC / 3C8 - Realizacao de 4a capacitacao com oito turmas para formacao Institutional Strengthening for Pending de 100 Instrutores do Programa IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 76,677.32 0.00 2018-07-02 2018-07-17 2018-08-16 2018-10-15 Implementation de Educacao Financeira para Familia Program beneficiarias do Programa Bolsa Familia 3C8PD -NC-SENARC / 3C8 - Realizacao de 4a capacitacao com oito turmas para formacao Institutional Strengthening for Pending de 100 Instrutores do Programa IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 159,744.41 0.00 2018-07-02 2018-07-17 2018-08-16 2018-10-15 Implementation de Educacao Financeira para Familia Program beneficiarias do Programa Bolsa Familia 5D43-NC-SESAN / 5D43 - ã Realizaço de Reunião Gerencial - Compras de Alimentos da Agricultura Familiar para Supporting the National Pending atendimento de rÓ gãos da União IBRD / 78410 Commitment for Social Post UN Agencies (Direct) Direct 76,677.32 0.00 2018-08-30 2018-09-19 2018-11-03 2018-12-03 Implementation - com foco na modalidade Development (CNDS) Compra Institucional do Programa de Aquisiço ã de Alimentos 5D43PD-NC-SESAN / 5D43 - ã Realizaço de Reunião Gerencial - Compras de Alimentos da Agricultura Familiar para Supporting the National Pending atendimento de rÓ gãos da União IBRD / 78410 Commitment for Social Post UN Agencies (Direct) Direct 8,626.20 0.00 2018-08-30 2018-09-19 2018-11-03 2018-12-03 Implementation - com foco na modalidade Development (CNDS) Compra Institucional do Programa de Aquisiço ã de Alimentos 3D25PD -NC-SNAS / 3D25 - Oficina sobre os servicos Institutional Strengthening for socioassistenciais voltados para Pending IBRD / 78410 the Consolidation of the Bolsa Post UN Agencies (Direct) Direct 88,178.92 0.00 2018-10-01 2018-10-16 2018-11-15 2018-12-15 a populacao em situacao de rua Implementation Familia Program no Brasil registrada no Cadastro Unico CONSULTING FIRMS Activity Reference No. / Combined Evaluation Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Technical Description Loan / Credit No. Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 3B2 -CS-SNPDH / 3B2 - Institutional Strengthening for Elaboracao do Guia de visita Quality And Cost- Pending IBRD / 78410 the Consolidation of the Bolsa Post Open - National 223,642.17 0.00 2018-04-30 2018-05-01 2018-05-09 2018-05-19 2018-06-18 2018-07-08 2018-07-12 2018-10-10 Domiciliar do Programa Crianca Based Selection Implementation Familia Program Feliz 3B3 -CS-SNPDH / 3B3 Elaboracao de diagnostico situacional (quantitativo e qualitativo) de criancas no Brasil, Institutional Strengthening for na faixa de 0 a 6 anos de idade, Quality And Cost- Under IBRD / 78410 the Consolidation of the Bolsa Post Open - National 479,233.23 0.00 2018-01-11 2018-03-15 2018-02-15 2018-05-03 2018-04-23 2018-05-18 2018-05-22 2018-06-17 2018-05-29 2018-06-25 2018-07-13 2018-07-02 2018-09-30 com recorte para a populacao Based Selection Implementation Familia Program vulneravel ou cadastrada no CadUnico e beneficiarios de programas de tranferencia de renda 3B4 -CS-SNPDH / 3B4 Elaboracao de diagnostico situacional (quantitativo e qualitativo) da populacao idosa Institutional Strengthening for Quality And Cost- Under no Brasil, com recorte para a IBRD / 78410 the Consolidation of the Bolsa Post Open - National 447,284.35 0.00 2018-01-10 2018-05-01 2018-02-14 2018-05-02 2018-05-17 2018-06-16 2018-06-24 2018-07-02 2018-09-30 Based Selection Implementation populacao vulneravel ou Familia Program cadastrada no CadUnico e beneficiarios de programas de tranferencia de renda 3B6 -CS-SNPDH / 3B6 Elaboracao de diagnostico situacional (quali quanti) dos Adolescentes e Jovens no Brasil, Institutional Strengthening for na faixa etaria de 12 a 29 anos, Quality And Cost- Pending IBRD / 78410 the Consolidation of the Bolsa Post Open - National 383,386.58 0.00 2018-01-31 2018-02-15 2018-05-03 2018-05-18 2018-06-17 2018-06-25 2018-07-02 2018-09-30 com recorte para a populacao Based Selection Implementation Familia Program vulneravel ou cadastrada no CadUnico e beneficiarios do programas de transferencia de renda 3B7 -CS-SNPDH / 3B7 - Aprimoramento do Manual para Orientacao as Familias" do Programa Crianca Feliz - Institutional Strengthening for Quality And Cost- Pending Cuidados para o IBRD / 78410 the Consolidation of the Bolsa Post Open - National 127,795.53 0.00 2018-04-30 2018-05-15 2018-06-07 2018-06-17 2018-07-17 2018-07-29 2018-08-02 2018-10-31 Based Selection Implementation Desenvolvimento da Crianca - Familia Program CDC, melhorando seu conteudo, linguagem e forma de apresentacao 3B8 -CS-SNPDH / 3B8 - Contratacao de empresa para construcao de documentos Institutional Strengthening for Quality And Cost- Pending tecnicos que possam subsidiar o IBRD / 78410 the Consolidation of the Bolsa Post Open - National 230,031.95 0.00 2018-04-30 2018-05-15 2018-06-07 2018-06-17 2018-07-17 2018-07-29 2018-08-02 2018-10-31 Based Selection Implementation acompanhamento do Programa Familia Program Crianca Feliz em todas as unidades da federacao 3C3 -CS-SENARC / 3C3 Avaliacao e diagnostico da logistica e custo (temporal e financeiro) de deslocamento das Institutional Strengthening for familias para saque do beneficio Quality And Cost- Pending IBRD / 78410 the Consolidation of the Bolsa Post Open - National 191,693.29 0.00 2018-04-30 2018-05-15 2018-06-21 2018-07-06 2018-08-05 2018-08-25 2018-09-02 2018-12-31 e atendimento das regras do Based Selection Implementation Familia Program PBF, bem como a avaliacao do atendimento realizado nos canais oferecidos pelo agente operador INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Contract Type Estimated Actual Amount Draft Negotiated Description Loan / Credit No. Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 2B59 -CS-SENARC / 2B59 - Realizar levantamento e analise dos processos de recepcao, tratamento, carga, uso e Strengthening Cadastro Unico disponibilizacao dos dados Individual Consultant Pending IBRD / 78410 as the Main Targeting Post Open 30,750.80 0.00 2018-04-01 2018-05-26 2018-06-10 2018-07-04 2018-12-31 gerados pelo Agente Operador Selection Implementation Instrument for Social Programs do Sistema do Cadastro Unico, diagnosticando gargalos e propondo melhorias na metodologia 2B38 -CS-SNAS / 2B38 Consultor para consolidar todos Strengthening Cadastro Unico Individual Consultant Pending os normativos relativos a Politica IBRD / 78410 as the Main Targeting Post Open - National 27,156.55 0.00 2018-03-01 2018-04-17 2018-04-27 2018-05-05 2018-11-01 Selection Implementation Nacional de Assistencia Social Instrument for Social Programs com o escopo de publicacao 2B39 -CS-SNAS / 2B39 Strengthening Cadastro Unico Consultoria com estudos sobre Individual Consultant Pending IBRD / 78410 as the Main Targeting Post Open 27,156.55 0.00 2018-04-30 2018-06-16 2018-06-26 2018-07-04 2018-12-31 Participacao e Controle Social Selection Implementation Instrument for Social Programs no SUAS 2B40 -CS-SNAS / 2B40 Consultoria para Elaboracao de Strengthening Cadastro Unico Individual Consultant Pending orientacoes Tecnicas de IBRD / 78410 as the Main Targeting Post Open 27,156.55 0.00 2018-04-30 2018-06-16 2018-06-26 2018-07-04 2018-12-31 Selection Implementation Diagnosticos Socioterritorias no Instrument for Social Programs SUAS 2B41 -CS-SNAS / 2B41 Strengthening Cadastro Unico Consultoria com estudos sobre Individual Consultant Pending IBRD / 78410 as the Main Targeting Post Open 27,156.55 0.00 2018-04-30 2018-06-16 2018-06-26 2018-07-04 2018-12-31 Fortalecimento e Participacao Selection Implementation Instrument for Social Programs Social no SUAS Page 11 2B42 -CS-SNAS / 2B42 Consultoria para Elaboracao de Strengthening Cadastro Unico Individual Consultant Pending metodologias de planejamento IBRD / 78410 as the Main Targeting Post Open 27,156.55 0.00 2018-04-30 2018-06-16 2018-06-26 2018-07-04 2018-12-31 Selection Implementation em Diagnostico e Planejamento Instrument for Social Programs no SUAS 2B43 -CS-SNAS / 2B43 - Consultoria para elaboracao de metodologias pedagogicas Strengthening Cadastro Unico Individual Consultant Pending inovadoras para processos de IBRD / 78410 as the Main Targeting Post Open 23,961.66 0.00 2017-11-09 2017-12-26 2018-01-05 2018-01-13 2018-07-12 Selection Implementation capacitacao destinados aos Instrument for Social Programs trabalhadores, gestores e conselheiros do SUAS 2B44 -CS-SNAS / 2B44 Consultoria para Elaboracao de proposta de conteudos Strengthening Cadastro Unico Individual Consultant Pending instrucionais para cursos de IBRD / 78410 as the Main Targeting Post Open - National 27,156.55 0.00 2018-04-30 2018-06-16 2018-06-26 2018-07-04 2018-12-31 Selection Implementation capacitacao em Gestao Instrument for Social Programs Estrategica e Diagnostico no SUAS 2B45 -CS-SNAS / 2B45 Consultoria para Elaboracao de Strengthening Cadastro Unico Individual Consultant Pending materiais instrucionais sobre a IBRD / 78410 as the Main Targeting Post Open - National 31,948.88 0.00 2018-04-30 2018-06-16 2018-06-26 2018-07-04 2018-12-31 Selection Implementation Gestao de Centros de Referencia Instrument for Social Programs do SUAS 2B46 -CS-SNAS / 2B46 Consultoria para Elaboracao de Strengthening Cadastro Unico Estudos e pesquisas sobre perfil Individual Consultant Pending IBRD / 78410 as the Main Targeting Post Open 27,156.55 0.00 2018-04-30 2018-06-16 2018-06-26 2018-07-04 2018-12-31 profissional e mapas de Selection Implementation Instrument for Social Programs competencias para as equipes de referencia do SUAS 2B47- CS-SNAS / 2B47- Strengthening Cadastro Unico Individual Consultant Pending Consultoria para revisar Boas IBRD / 78410 as the Main Targeting Post Open 27,156.55 0.00 2018-04-30 2018-06-16 2018-06-26 2018-07-04 2018-12-31 Selection Implementation Praticas em Vigilancia no SUAS Instrument for Social Programs 2B48- -CS-SNAS / 2B48- Strengthening Cadastro Unico Consultoria para proposta de Individual Consultant Pending IBRD / 78410 as the Main Targeting Post Open 27,156.55 0.00 2018-04-30 2018-06-16 2018-06-26 2018-07-04 2018-12-31 Planejamento no ambito do Selection Implementation Instrument for Social Programs SUAS 2B49- -CS-SNAS / 2B49- Consultor para levantamento e analise dos projetos de lei de Strengthening Cadastro Unico Individual Consultant interesse da Politica Nacional de IBRD / 78410 as the Main Targeting Post Open 27,156.55 0.00 Canceled 2018-04-30 2018-06-16 2018-06-26 2018-07-04 2018-12-31 Selection Assistencia Social com o Instrument for Social Programs escopo de estruturacao do observatorio legislativo 2B50- -CS-SNAS / 2B50- Consultor para levantamento e Strengthening Cadastro Unico analise historica da Politica Individual Consultant Pending IBRD / 78410 as the Main Targeting Post Open 27,156.55 0.00 2018-04-30 2018-06-16 2018-06-26 2018-07-04 2018-12-31 Nacional de Assistencia Social Selection Implementation Instrument for Social Programs com enfoque na Legiao Brasileira de Assistencia 3B18 -CS-SENARC / 3B18 - Realizar levantamento, analise e sistematizacao de informacoes Institutional Strengthening for Individual Consultant Pending sobre a gestao de programas IBRD / 78410 the Consolidation of the Bolsa Post Open 18,555.91 0.00 2018-04-30 2018-06-16 2018-06-26 2018-07-04 2018-12-31 Selection Implementation sociais e de transferencia de Familia Program renda com gestao descentralizada 3B19 -CS-SENARC / 3B19 - Contratacao de CI para levantamento e sistematizacao de informacoes e pesquisas Institutional Strengthening for sobre genero em politicas Individual Consultant Pending IBRD / 78410 the Consolidation of the Bolsa Post Open 24,741.21 0.00 2018-04-30 2018-06-16 2018-06-26 2018-07-04 2018-12-31 publicas e programas de Selection Implementation Familia Program transferencia de renda e sugestao de estrutura de agenda para aprofundamento do tema no ambito do PBF 3B20 -CS-SENARC / 3B20 - Contratacao de consultor individual para realizar sistematizacao dos resultados Institutional Strengthening for Individual Consultant Pending obtidos no Encontro Nacional IBRD / 78410 the Consolidation of the Bolsa Post Open 12,370.61 0.00 2018-02-01 2018-03-22 2018-04-12 2018-05-17 2018-11-13 Selection Implementation dos Coordenadores Estaduais do Familia Program Cadastro Unico e do Programa Bolsa Familia (Ence 2017), em comparacao aos anos anteriores 3B22 -CS-SNPDH / 3B22 - Contratacao de consultor para elaboracao de documento Institutional Strengthening for tecnico de orientacao conceitual Individual Consultant Pending IBRD / 78410 the Consolidation of the Bolsa Post Open 23,003.19 0.00 2018-04-30 2018-06-16 2018-06-26 2018-07-04 2018-12-31 e metodologica para a Selection Implementation Familia Program estruturacao e implantacao de politicas de atencao ao idoso no Brasil 3B24 -CS-SNPDH / 3B24 - Contratacao de consultor Institutional Strengthening for individual para desenvolver acoes Individual Consultant Pending IBRD / 78410 the Consolidation of the Bolsa Post Open - National 28,753.99 0.00 2018-04-30 2018-06-16 2018-06-26 2018-07-04 2018-12-31 em gestao publica na promocao Selection Implementation Familia Program do desenvolvimento humano na area da primeira infancia 3B25 -CS-SNPDH / 3B25 - Contratacao de consultor para elaboracao de documento Institutional Strengthening for tecnico contendo a elaboracao Individual Consultant Pending IBRD / 78410 the Consolidation of the Bolsa Post Open - National 23,003.19 0.00 2018-04-30 2018-06-16 2018-06-26 2018-07-04 2018-12-31 de conteudo para educacao Selection Implementation Familia Program permanente no tema Gestao e Planejamento das visitas domiciliares 3B26 -CS-SNPDH / 3B26 - Contratacao de consultor Institutional Strengthening for individual a fim de construir Individual Consultant Pending IBRD / 78410 the Consolidation of the Bolsa Post Open - National 23,003.19 0.00 2018-04-30 2018-06-16 2018-06-26 2018-07-04 2018-12-31 metodologia de monitoramento Selection Implementation Familia Program da implementacao da Estrategia Brasil Amigo da Pessoa Idosa 3B27 -CS-SNPDH / 3B27 - Contratacao de consultor individual para construcao de Institutional Strengthening for Individual Consultant Pending documentos tecnicos que IBRD / 78410 the Consolidation of the Bolsa Post Open - National 23,003.19 0.00 2018-04-30 2018-06-16 2018-06-26 2018-07-04 2018-12-31 Selection Implementation possam subsidiar a execucao da Familia Program Estrategia Brasil Amigo da Pessoa Idosa 3B28 -CS-SNPDH / 3B28 - Contratacao de consultor individual para desenvolver acoes Institutional Strengthening for Individual Consultant Pending em gestao publica na promocao IBRD / 78410 the Consolidation of the Bolsa Post Open 28,753.99 0.00 2018-04-30 2018-06-16 2018-06-26 2018-07-04 2018-12-31 Selection Implementation do desenvolvimento humano na Familia Program area da adolescencia, juventude e da pessoa idosa 3B29 -CS-SNPDH / 3B29 - Contratacao de consultor individual a fim de construir Institutional Strengthening for indicadores para Individual Consultant Pending IBRD / 78410 the Consolidation of the Bolsa Post Open 23,003.19 0.00 2018-04-30 2018-06-16 2018-06-26 2018-07-04 2018-12-31 acompanhamento, Selection Implementation Familia Program monitoramento e avaliacao da Estrategia Brasil Amigo da Pessoa Idosa 3B30 -CS-SNPDH / 3B30 - Contratacao de consultor individual para construcao de Institutional Strengthening for documentos referenciais que Individual Consultant Pending IBRD / 78410 the Consolidation of the Bolsa Post Open 23,003.19 0.00 2018-04-30 2018-06-16 2018-06-26 2018-07-04 2018-12-31 possam subsidiar o processo de Selection Implementation Familia Program capacitacao a ser oferecido no ambito da Estrategia Brasil Amigo da Pessoa Idosa 3B31 -CS-SNPDH / 3B31 - Contratacao de consultor para elaboracao de documento tecnico contendo a elaboracao Institutional Strengthening for Individual Consultant Pending de conteudo para educacao IBRD / 78410 the Consolidation of the Bolsa Post Open 23,003.19 0.00 2018-04-30 2018-06-16 2018-06-26 2018-07-04 2018-12-31 Selection Implementation permanente no tema Atividades Familia Program ludicas, artisticas e culturais e desenvolvimento infantil, por faixa etaria Page 12 3B32 -CS-SNPDH / 3B32 - Contratacao de consultor para elaboracao de documento tecnico contendo a elaboracao Institutional Strengthening for Individual Consultant Pending de conteudo para educacao IBRD / 78410 the Consolidation of the Bolsa Post Open 23,003.19 0.00 2018-04-30 2018-06-16 2018-06-26 2018-07-04 2018-12-31 Selection Implementation permanente no tema Educacao, Familia Program Saude e assistencia social na atencao integral a crianca de 0 a 6 anos" 3C1 -CS-SENARC / 3C1 - Contratacao de consultor individual para mapeamento de novas ferramentas e solucoes Institutional Strengthening for tecnologicas que garantam Individual Consultant Pending IBRD / 78410 the Consolidation of the Bolsa Post Open 18,530.35 0.00 2018-04-30 2018-06-16 2018-06-26 2018-07-04 2018-12-31 transparencia na comunicacao Selection Implementation Familia Program com beneficiarios do programa Bolsa Familia sobre os processos de gestao de beneficios 3C2 -CS-SENARC / 3C2 Contratacao de CI para formulacao, acompanhamento e sistematizacao dos trabalhos Institutional Strengthening for Individual Consultant Pending realizados em Seminario de IBRD / 78410 the Consolidation of the Bolsa Post Open 18,555.91 0.00 2017-11-18 2018-01-06 2018-01-27 2018-03-03 2018-08-30 Selection Implementation troca de experiencias nacionais Familia Program e internacionais sobre meios de pagamento, inclusao financeira e tecnologias de suporte (PBF) 3D75 -CS-SENARC / 3D 75 - Institutional Strengthening for Avaliar e propor melhorias para Individual Consultant Pending IBRD / 78410 the Consolidation of the Bolsa Post Open 30,617.68 0.00 2018-04-30 2018-06-16 2018-06-26 2018-07-04 2018-12-31 evolucao do Sistema de Selection Implementation Familia Program Condicionalidades 3D81- -CS-SENARC / 3D81- Elaboracao de Metodologia e Institutional Strengthening for Materiais Instrucionais para Individual Consultant Pending IBRD / 78410 the Consolidation of the Bolsa Post Open 18,555.91 0.00 2017-10-09 2017-11-27 2017-12-18 2018-01-22 2018-07-21 capacitacao presencial de Selection Implementation Familia Program instrutores sobre a utilizacao do Sistema de Condicionalidades 3D72 -CS-SNAS / 3D72 - Contratacao de CI para elaborar orientacoes tecnicas e metodologicas para a supervisao Institutional Strengthening for Individual Consultant Pending das visitas domiciliares ao IBRD / 78410 the Consolidation of the Bolsa Post Open 30,670.93 0.00 2018-04-30 2018-06-16 2018-06-26 2018-07-04 2018-12-31 Selection Implementation publico prioritario do PCF Familia Program (criancas de 0 a 36 meses e suas familias do PBF e de 0 a 72 meses do BPC e suas familias) 4A94 -CS-SAGI / 4A94 - Construcao e validacao de Consolidation of the Monitoring Individual Consultant Pending proposta de protocolos IBRD / 78410 and Evaluation System in the Post Open 15,335.46 0.00 2017-08-07 2017-10-26 2017-11-15 2017-12-26 2018-06-24 Selection Implementation metodologicos normativos sobre Ministry of Social Development pesquisas qualitativas 4A95 -CS-SAGI / 4A95 - Construcao e validacao de Consolidation of the Monitoring Individual Consultant Pending proposta de protocolos IBRD / 78410 and Evaluation System in the Post Open 15,335.46 0.00 2017-10-09 2017-11-27 2017-12-18 2018-01-22 2018-07-21 Selection Implementation metodologicos normativos sobre Ministry of Social Development pesquisas quantitativas 4A96 -CS-SAGI / 4A96 - Elaboracao de Metodologia e Consolidation of the Monitoring Materiais Instrucionais para Individual Consultant Pending IBRD / 78410 and Evaluation System in the Post Open 23,003.19 0.00 2018-02-15 2018-04-05 2018-04-26 2018-05-31 2018-11-27 capacitacao presencial Selection Implementation Ministry of Social Development avancada modular sobre o Bolsa Familia e Cadastro Unico 4A97 -CS-SAGI / 4A97 Desenvolver estudos, analises e diagnosticos das capacitacoes Consolidation of the Monitoring Individual Consultant Pending presenciais "Formularios do IBRD / 78410 and Evaluation System in the Post Open 24,741.21 0.00 2018-04-30 2018-06-16 2018-06-26 2018-07-04 2018-12-31 Selection Implementation Cadastro Unico" e "Gestao do Ministry of Social Development Cadastro Unico e do Programa Bolsa Familia" 4A103 -CS-SAGI / 4A103 - Contratacao de 5 consultores Consolidation of the Monitoring para elaboracao de estudo Individual Consultant Pending IBRD / 78410 and Evaluation System in the Post Open 86,261.98 0.00 2018-02-18 2018-04-08 2018-04-29 2018-06-03 2018-11-30 analitico e diagnostico para a Selection Implementation Ministry of Social Development Pesquisa Qualitativa do Programa Crianca Feliz 4A105 -CS-SAGI / 4A105 - Contratacao de 2 consultores Consolidation of the Monitoring Individual Consultant Pending para elaboracao de Relatorio de IBRD / 78410 and Evaluation System in the Post Open 37,252.40 0.00 2018-02-01 2018-03-22 2018-04-12 2018-05-17 2018-11-13 Selection Implementation Avaliacao sobre cisternas de Ministry of Social Development producao e fomento rural 4A107 -CS-SAGI / 4A107 - Levantamento, analise e Consolidation of the Monitoring diagnostico dos resultados Individual Consultant Pending IBRD / 78410 and Evaluation System in the Post Open 23,003.19 0.00 2018-02-18 2018-04-08 2018-04-29 2018-06-03 2018-11-30 obtidos com a implantacao da Selection Implementation Ministry of Social Development unificacao dos diferentes Portais EaD utilizados pelo MDS 4A108 -CS-SAGI / 4A108 - Levantamento, analise e Consolidation of the Monitoring diagnostico do Sistema de Individual Consultant Pending IBRD / 78410 and Evaluation System in the Post Open 20,447.28 0.00 2018-04-30 2018-06-16 2018-06-26 2018-07-04 2018-12-31 Monitoramento e Avaliacao Selection Implementation Ministry of Social Development (SIMA) utilizado para as capacitacoes presenciais 4A113 -CS-SAGI / 4A113 - Contratacao de 7 consultores Consolidation of the Monitoring Individual Consultant Pending para elaboracao de desenhos de IBRD / 78410 and Evaluation System in the Post Open 151,539.94 0.00 2018-02-10 2018-03-31 2018-04-21 2018-05-26 2018-11-22 Selection Implementation Avaliacao relativas a Programa Ministry of Social Development de Microcredito 4A116 -CS-SAGI / 4A116 - Contratacao de 1 consultor para elaboracao de estudo analitico e Consolidation of the Monitoring Individual Consultant Pending diagnostico de concessao de IBRD / 78410 and Evaluation System in the Post Open 21,086.26 0.00 2018-02-10 2018-03-31 2018-04-21 2018-05-26 2018-11-22 Selection Implementation Microcredito Produtivo Orientado Ministry of Social Development Consolidacao de estudos analiticos e diagnosticos 4A117 -CS-SAGI / 4A117 - Contratacao de 2 consultores Consolidation of the Monitoring para elaboracao de estudo Individual Consultant Under IBRD / 78410 and Evaluation System in the Post Open 61,853.04 0.00 2018-02-10 2018-03-31 2018-04-21 2018-05-26 2018-11-22 analitico e diagnostico para Selection Implementation Ministry of Social Development estudo sobre educacao financeira 4A118 -CS-SAGI / 4A118 - Contratacao de 1 consultor para Consolidation of the Monitoring Individual Consultant Pending consolidacao de estudos IBRD / 78410 and Evaluation System in the Post Open 25,303.51 0.00 2018-04-30 2018-06-16 2018-06-26 2018-07-04 2018-12-31 Selection Implementation analiticos e diagnosticos sobre Ministry of Social Development Educacao Financeira 5D61 -CS-SISP / 5D61 - Consultor para propor desenho de acoes de formacao e capacitacao nas modalidades Supporting the National Individual Consultant presencial e a distancia para os IBRD / 78410 Commitment for Social Post Open - National 18,555.91 0.00 Canceled 2017-12-01 2018-02-09 2018-02-19 2018-03-02 2018-11-27 Selection tecnicos que atuarao na Development (CNDS) implementacao do Plano Nacional de Inclusao Social e Produtiva na ponta (ADL, SUAS) 5D95 -CS-SISP / 5D95 - Contratacao de 1 consultor individual para elaboracao de Supporting the National Individual Consultant Pending estudo analitico e diagnostico IBRD / 78410 Commitment for Social Post Open - National 18,785.94 0.00 2018-04-30 2018-06-16 2018-06-26 2018-07-04 2018-12-31 Selection Implementation sobre o publico-alvo da acoes de Development (CNDS) inclusao produtiva, a partir de registros administrativos 5D96 -CS-SISP / 5D96 - Contratacao de 1 consultor individual para elaboracao de pesquisa de avaliacao sobre Supporting the National Individual Consultant experiencias de inclusao IBRD / 78410 Commitment for Social Post Open - National 30,670.93 0.00 Canceled 2018-04-30 2018-06-16 2018-06-26 2018-07-04 2018-12-31 Selection produtiva e elaboracao de Development (CNDS) relatorio analitico e diagnostico sobre politicas e praticas de inclusao produtiva Page 13 5D97 -CS-SISP / 5D97 - Contratacao de 1 consultor individual para realizacao de Supporting the National pesquisa de avaliacao sobre Individual Consultant IBRD / 78410 Commitment for Social Post Open 18,555.91 0.00 Canceled 2018-04-30 2018-06-16 2018-06-26 2018-07-04 2018-12-31 experiencias de inclusao Selection Development (CNDS) produtiva, em municipios com mais de 200 mil habitantes da regiao Norte 5D98 -CS-SISP / 5D98 - Contratacao de 1 consultor individual para realizacao de Supporting the National pesquisa de avaliacao sobre Individual Consultant IBRD / 78410 Commitment for Social Post Open 18,555.91 0.00 Canceled 2018-04-30 2018-06-16 2018-06-26 2018-07-04 2018-12-31 experiencias de inclusao Selection Development (CNDS) produtiva, em municipios com mais de 200 mil habitantes da regiao Nordeste 5D99 -CS-SISP / 5D99 - Contratacao de 1 consultor individual para realizacao de Supporting the National pesquisa de avaliacao sobre Individual Consultant IBRD / 78410 Commitment for Social Post Open 18,555.91 0.00 Canceled 2018-04-30 2018-06-16 2018-06-26 2018-07-04 2018-12-31 experiencias de inclusao Selection Development (CNDS) produtiva, em municipios com mais de 200 mil habitantes da regiao Centro-Oeste 5D100 -CS-SISP / 5D100 - Contratacao de 1 consultor individual para realizacao de Supporting the National pesquisa de avaliacao sobre Individual Consultant IBRD / 78410 Commitment for Social Post Open 18,555.91 0.00 Canceled 2018-04-30 2018-06-16 2018-06-26 2018-07-04 2018-12-31 experiencias de inclusao Selection Development (CNDS) produtiva, em municipios com mais de 200 mil habitantes da regiao Sudeste 5D101 -CS-SISP / 5D101 - Contratacao de 1 consultor individual para realizacao de Supporting the National pesquisa de avaliacao sobre Individual Consultant IBRD / 78410 Commitment for Social Post Open 18,555.91 0.00 Canceled 2018-04-30 2018-06-16 2018-06-26 2018-07-04 2018-12-31 experiencias de inclusao Selection Development (CNDS) produtiva, em municipios com mais de 200 mil habitantes da Regiao Sul 5D79 -CS-SESAN / 5D79 - Contratacao de 01 consultoria para desenhar fluxos e Supporting the National Individual Consultant Pending especificacoes de interacao com IBRD / 78410 Commitment for Social Post Open 30,926.52 0.00 2018-04-30 2018-06-16 2018-06-26 2018-07-04 2018-12-31 Selection Implementation parceiros executores e com Development (CNDS) beneficiarios de programas de inclusao produtiva rural 5D80 -CS-SESAN / 5D80 - Contratacao de 01 consultoria Supporting the National para elaborar propostas de novos Individual Consultant Pending IBRD / 78410 Commitment for Social Post Open 30,926.52 0.00 2018-04-30 2018-06-16 2018-06-26 2018-07-04 2018-12-31 formatos de implementacao do Selection Implementation Development (CNDS) Programa de Fomento as Atividades Produtivas Rurais 5D81 -CS-SESAN / 5D81 - Contratacao de 01 consultoria para qualificacao dos Supporting the National Individual Consultant Pending mecanismos e fluxos de IBRD / 78410 Commitment for Social Post Open 30,926.52 0.00 2018-04-30 2018-06-16 2018-06-26 2018-07-04 2018-12-31 Selection Implementation comunicacao com entidades Development (CNDS) executoras dos programas de inclusao produtiva rural 5D82 -CS-SESAN / 5D82 - Contratacao de 01 consultoria Supporting the National para pesquisa sobre Individual Consultant Pending IBRD / 78410 Commitment for Social Post Open 30,926.52 0.00 2018-04-30 2018-06-16 2018-06-26 2018-07-04 2018-12-31 experiencias de implementacao Selection Implementation Development (CNDS) do Programa de Fomento as Atividades Produtivas Rurais 5D83 -CS-SESAN / 5D83 - Elaborar subsidios tecnicos para a criacao de documentos de Supporting the National Individual Consultant Pending normas, orientacao e educacao IBRD / 78410 Commitment for Social Post Open 30,926.52 0.00 2018-04-30 2018-06-16 2018-06-26 2018-07-04 2018-12-31 Selection Implementation no ambito da Rede Brasileira de Development (CNDS) Bancos de Alimentos (1 VAGA) VIGENCIA DE 10 MESES 5D84 -CS-SESAN / 5D84 - Producao de um documento tecnico com avaliacao do Supporting the National Individual Consultant Pending processo de credenciamento das IBRD / 78410 Commitment for Social Post Open 30,926.52 0.00 2018-04-30 2018-06-16 2018-06-26 2018-07-04 2018-12-31 Selection Implementation entidades executoras do Development (CNDS) Programa Cisternas e sugestoes de aprimoramento 5D85 -CS-SESAN / 5D85 - Producao de um documento tecnico com avaliacao das Supporting the National Individual Consultant Pending tecnologias de acesso a agua IBRD / 78410 Commitment for Social Post Open 30,926.52 0.00 2018-02-10 2018-03-31 2018-04-21 2018-05-26 2018-11-22 Selection Implementation para a producao de alimentos e Development (CNDS) proposicao de novas estrategias de atendimento 5D86 -CS-SESAN / 5D86 - Producao de documento tecnico com diagnostico do atendimento das demandas por acesso a Supporting the National Individual Consultant Pending agua de povos e comunidades IBRD / 78410 Commitment for Social Post Open 30,926.52 0.00 2018-04-30 2018-06-16 2018-06-26 2018-07-04 2018-12-31 Selection Implementation tradicionais no ambito das acoes Development (CNDS) de inclusao produtiva rural e sugestoes de aprimoramento das acoes 5D87 -CS-SESAN / 5D87 - Producao de um documento tecnico com sistematizacao dos Supporting the National conteudos referentes aos Individual Consultant Pending IBRD / 78410 Commitment for Social Post Open 30,926.52 0.00 2018-04-30 2018-06-16 2018-06-26 2018-07-04 2018-12-31 processos de capacitacao Selection Implementation Development (CNDS) associados a implementacao das tecnologias sociais apoiadas pelo Programa Cisternas 5D88 -CS-SESAN / 5D88 - Producao de um documento tecnico analise e revisao dos Supporting the National instrumentos normativos que Individual Consultant Pending IBRD / 78410 Commitment for Social Post Open 30,926.52 0.00 2018-04-30 2018-06-16 2018-06-26 2018-07-04 2018-12-31 regulamentam o Programa Selection Implementation Development (CNDS) Cisternas e proposicao de aperfeicoamentos que por ventura sejam necessarios 3D76 -CS-SENARC / 3D76 - Contratacao de consultor individual para Realizacao de Institutional Strengthening for Individual Consultant Pending estudos de avaliacao acerca dos IBRD / 78410 the Consolidation of the Bolsa Post Open 36,741.21 0.00 2017-10-09 2017-11-27 2017-12-18 2018-01-22 2018-07-21 Selection Implementation resultados educacionais dos Familia Program beneficiarios do Programa Bolsa Familia 2B57 -CS-SENARC / 2B57 Pesquisa de levantamento do custo global do Cadastro Unico Strengthening Cadastro Unico Individual Consultant Pending nos municipios, considerando os IBRD / 78410 as the Main Targeting Post Open 37,111.82 0.00 2017-10-02 2017-11-20 2017-12-11 2018-01-15 2018-07-14 Selection Implementation recursos investidos na gestao do Instrument for Social Programs Cadastro Unico pelo Governo Federal e por fonte propria 2B58 -CS-SENARC / 2B58 Pesquisa qualitativa em municipios de diferentes portes Strengthening Cadastro Unico Individual Consultant Pending populacionais com a finalidade IBRD / 78410 as the Main Targeting Post Open 31,957.40 0.00 2018-04-30 2018-06-13 2018-06-28 2018-07-04 2018-12-31 Selection Implementation de levantar subsidios para Instrument for Social Programs reavaliacao estrutural dos formularios do Cadastro Unico 3D55 -CS-SENARC / 3D55 - Realizar estudos referentes as condicionalidades de saude, tendo como finalidade monitorar Institutional Strengthening for Individual Consultant Pending e avaliar os efeitos do PBF sobre IBRD / 78410 the Consolidation of the Bolsa Post Open 37,060.70 0.00 2017-12-20 2018-02-05 2018-02-15 2018-02-23 2018-12-20 Selection Implementation as familias beneficiarias, com Familia Program vistas a subsidiar o aprimoramento da politica de condicionalidades 3D63 -CS-SENARC / 3D63 - Contratacao de consultor individual para acompanhar e Institutional Strengthening for Individual Consultant Pending propor melhorias e evolucoes das IBRD / 78410 the Consolidation of the Bolsa Post Open 43,166.49 0.00 2018-04-30 2018-06-16 2018-06-26 2018-07-04 2018-12-31 Selection Implementation etapas de desenvolvimento de Familia Program melhorias no Sicon: analise, definicao e desenvolvimento Page 14 3D73 -CS-SENARC / 3D73 - Analisar e propor melhoria de interface grafica do Sistema de Condicionalidades - SICON, Institutional Strengthening for Individual Consultant Pending baseado no padrao eMAG IBRD / 78410 the Consolidation of the Bolsa Post Open 36,741.21 0.00 2017-10-09 2017-11-27 2017-12-18 2018-01-22 2018-07-21 Selection Implementation Desenvolver proposta de Familia Program identidade visual e manual pratico para o usuario do Sistema 3D74 -CS-SENARC / 3D74 - Institutional Strengthening for Avaliar e propor evolucoes das Individual Consultant Pending IBRD / 78410 the Consolidation of the Bolsa Post Open 36,741.21 0.00 2017-08-10 2017-10-19 2017-11-08 2017-12-09 2018-06-07 solucoes de Businesse Selection Implementation Familia Program Intelligence 3D80 -CS-SENARC / 3D80 - Montagem de fluxo de informacoes e atividades para as acoes de pos-coleta em relacao Institutional Strengthening for Individual Consultant Pending ao Acompanhamento Familiar IBRD / 78410 the Consolidation of the Bolsa Post Open 32,658.86 0.00 2018-04-30 2018-06-16 2018-06-26 2018-07-04 2018-12-31 Selection Implementation previsto para as familias do Familia Program Programa Bolsa Familia em descumprimento de condicionalidades 3B23 -CS-SNPDH / 3B23 Contratacao de 1 consultor- Institutional Strengthening for executivo de "notorio saber" para Individual Consultant Pending IBRD / 78410 the Consolidation of the Bolsa Post Direct 51,118.21 0.00 2018-05-30 2018-06-19 2018-06-29 2018-07-19 2018-10-17 producao de metodologias sobre Selection Implementation Familia Program estrategias de desenvolvimento da Primeira Infancia 5D102 - CS - SISP / Contratacao de 1 consultor individual para elaboracao de Supporting the National Individual Consultant Pending relatorio analitico e diagnostico IBRD / 78410 Commitment for Social Post Open 12,370.61 0.00 2018-06-15 2018-07-15 2018-07-25 2018-07-27 2018-11-24 Selection Implementation sobre politicas e praticas Development (CNDS) estaduais e municipais de inclusao produtiva 5D103-CS-SISP / 5D103 - Contratacao de 1 consultor Supporting the National individual para realizacao de Individual Consultant Pending IBRD / 78410 Commitment for Social Post Open 9,277.96 0.00 2018-07-15 2018-08-14 2018-08-24 2018-08-26 2018-11-24 publicacao relacionada as acoes Selection Implementation Development (CNDS) da SISP a partir do planejamento e execucao do Plano Progredir 5D89 - CS - SESAN / 5D89 - ã Elaboraço de conteúdos de Supporting the National Individual Consultant Pending pesquisa e de suporte técnico IBRD / 78410 Commitment for Social Post Direct 19,531.25 0.00 2018-07-23 2018-07-28 2018-08-02 2018-08-08 2018-12-31 Selection Implementation para aperfeiçoamento das açeõ s Development (CNDS) de Inclusão Produtiva Rural. Page 15