Procurement Plan (Text in italic font is meant for instruction to staff and should be deleted in the final version of the PP) (This is only a sample with the minimum content that is required to be included in the PAD. The detailed procurement plan is still mandatory for disclosure on the Bank’s website in accordance with the guidelines. The initial procurement plan will cover the first 18 months of the project and then updated annually or earlier as necessary). General 1. Bank’s approval Date of the procurement Plan N/A 2. Date of General Procurement Notice: N/A 3. Period covered by this procurement plan: December 2019 4. II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: [Thresholds for applicable procurement methods (not limited to the list below) will be determined by the Procurement Specialist /Procurement Accredited Staff based on the assessment of the implementing agency’s capacity.] No. Procurement Method Prior Review Threshold Comments US$ 1. ICB and LIB (Goods) Above US$ 2,000,000 All 2. NCB (Goods) Above US$ 2,000,000 All 3. ICB (Works) Not Applicable All 4. NCB (Works) Not Applicable All 5. (Non-Consultant Services) Above US$ 1,000,000 All 2. Prequalification. Bidders when applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: Not applicable 4. Reference to (if any) Project Operational/Procurement Manual: Project Implementation Manual for World Bank Loan Project XYZ 04/01/2010 issued by 5. Any Other Special Procurement Arrangements: Not Applicable 6. Summary of the Procurement Packages planned during the first 18 months after project effectiveness (including those that are subject to retroactive financing and advanced procurement) Oct, 2018 1 2 3 4 5 6 7 Estimated Domestic Review Ref. Description Cost Packages Preference by Bank Comments No. US$ million (yes/no) (Prior / Post) Summary of the ICB 1 (Goods) None None None None Summary of the NCB 2 (Goods) None None No Post Summary of the ICB 3 (Non-Consultant None None None None Services) Summary of the NCB 4 (Non-Consultant 1.0 2 None None Services) III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Threshold Comments 1. Competitive Methods (Firms) Above US$ 300,000 2. Single Source (Firms) None 3. Individual Above US$ 200,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Ref. Description of Assignment Estimated Review No. Cost Packages by Bank Comments US$ million (Prior / Post) Summary of number of 1 contracts that will be let 0.60 6 Post under QCBS Summary of number of 2 contracts that will be let 1.35 5 Prior under other methods Oct, 2018 PROCUREMENT Ghana : Ghana Financial Sector Development Project PLAN General Information Country: Ghana Bank’s Approval Date of the Original Procurement Plan: 2018-10-29 2019-12-11 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P161787 GPN Date: Project Name: Ghana Financial Sector Development Project Loan / Credit No: IDA / V2190, IDA / 63100 Executing Agency(ies): Ministry of Finance - FSD Project WORKS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GOODS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MOF-FSD-GDS-9 / Purchase Bolstering Financial Pending basic IT infrastructure for Single Stage - One IDA / 63100 Capability and Consumer Post Request for Bids Open - National 120,000.00 0.00 Implementati 2020-08-15 2020-08-20 2020-10-01 2020-10-31 2020-12-05 2021-08-02 the establishment of the Envelope Protection on DCRA MOF-FSD-GDS-16 / Enhancing the Capacity for Procurement of IT Hardware- the Implementation and Cyber and Info Security Under Monitoring of Financial Open - Single Stage - One posture of the Bank, Data IDA / 63100 Prior Request for Bids 2,550,000.00 0.00 Implementati 2020-02-13 2020-02-18 2020-03-31 2020-04-30 2020-06-04 2021-05-30 Sector Policies and International Envelope Storage Array, Servers and on Supporting Project Network Devices, Ancillary Implement ation Data Centre Devices Enhancing the Capacity for MOF-FSD-GDS-34 / the Implementation and Under Procurement of two Pickup Monitoring of Financial Request for Single Stage - One IDA / 63100 Post Limited 100,000.00 0.00 Implementati 2019-10-21 2019-12-16 2020-06-13 Vehicle to support Sector Policies and Quotations Envelope on supervision work Supporting Project Implement ation MOF-FSD-GDS-054 / Increasing the Outreach of Pending Procurement of Office RCBs and MFIs and Request for Single Stage - One IDA / 63100 Post Limited 16,000.00 0.00 Implementati 2019-10-26 2019-12-21 2020-06-18 Equipment, furniture and Linking VSLAs to the Quotations Envelope on Stationery for Project Formal Financial Sector Enhancing the Capacity for MOF-FSD-CS-21 / the Implementation and Pending Procurement of an Agency Monitoring of Financial Open - Single Stage - One IDA / 63100 Prior Request for Bids 800,000.00 0.00 Implementati 2020-06-25 2020-06-30 2020-08-11 2020-09-10 2020-10-15 2021-04-13 Banking software and Sector Policies and International Envelope on implementation support Supporting Project Implement ation MOF-FSD-CS-22 / Procurement of a Back-end Enhancing the Capacity for ICT system including the Implementation and Pending Software License, hardware, Monitoring of Financial Open - Single Stage - One IDA / 63100 Prior Request for Bids 1,500,000.00 0.00 Implementati 2020-02-20 2020-02-25 2020-04-07 2020-05-07 2020-06-11 2020-12-08 logistics, communications Sector Policies and International Envelope on and POS Device equipment Supporting Project including Supply, install and Implement ation train. Page 1 Enhancing the Capacity for the Implementation and MOF-FSD-GDS-18 / Monitoring of Financial Open - Single Stage - One Procurement of E-banking IDA / 63100 Prior Request for Bids 700,000.00 0.00 Canceled 2020-07-10 2020-07-15 2020-08-26 2020-09-25 2020-10-30 2021-04-28 Sector Policies and International Envelope Platform Supporting Project Implement ation MOF-FSD-GDS-19 / Procure Enhancing the Capacity for supply, install and train for the Implementation and an upgrade service for the Monitoring of Financial Single Stage - One IDA / 63100 Prior Request for Bids Open - National 750,000.00 0.00 Canceled 2020-02-10 2020-02-15 2020-03-28 2020-04-27 2020-06-01 2021-05-27 implementation of the new Sector Policies and Envelope version of the ARB Apex Supporting Project Bank. Implement ation MOF-FSD-GDS-17 / Enhancing the Capacity for Procurement of ICT systems the Implementation and Pending and functionality and Monitoring of Financial Single Stage - One IDA / 63100 Prior Request for Bids Open - National 500,000.00 0.00 Implementati 2020-01-15 2020-01-20 2020-03-02 2020-04-01 2020-05-06 2020-11-02 business intelligence Sector Policies and Envelope on applications including Supporting Project Supply, install and train. Implement ation Enhancing the Capacity for MOF-FSD-GDS-63 / the Implementation and Procurement of ARB Apex Monitoring of Financial Single Stage - One IDA / V2190 Prior Request for Bids Open - National 600,000.00 0.00 Canceled 2020-01-02 2020-01-07 2020-02-18 2020-03-19 2020-04-23 2020-10-20 Bank's Cyber Security Sector Policies and Envelope System Supporting Project Implement ation MOF-FSD-GDS-DS-65 / Enhancing the Capacity for Procurement for the Upgrade the Implementation and of ARB Apex Bank's T24 Pending Monitoring of Financial CORE Banking & E-Banking IDA / V2190 Prior Direct Selection Direct 1,450,000.00 0.00 Implementati 2020-01-02 2020-01-07 2020-02-11 2020-08-09 Sector Policies and (Mobile & Internet Banking) on Supporting Project Software Modules & Implement ation Implementation Services. Enhancing the Capacity for MOF-FSD-GDS-67 / the Implementation and Pending Procurement of ARB Apex Monitoring of Financial Open - Single Stage - One IDA / V2190 Prior Request for Bids 600,000.00 0.00 Implementati 2020-01-05 2020-01-10 2020-02-21 2020-03-22 2020-04-26 2020-10-23 Bank's Cyber Security Sector Policies and International Envelope on System Supporting Project Implement ation NON CONSULTING SERVICES Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Enhancing the Capacity for GH-MOF-FSD-80512-NC- the Implementation and RFP / Carrying out a Monitoring of Financial Request for Open - Single Stage - Two IDA / V2190 Prior 500,000.00 0.00 Canceled 2019-02-21 2019-05-09 2019-05-09 2019-02-26 2019-07-18 2019-11-04 2021-04-27 financial inclusion demand Sector Policies and Proposals International Envelope side survey Supporting Project Implement ation GH-MOF-FSD-80515-NC- RFP / Carrying out a Bolstering Financial geospatial mapping of access Request for Open - Single Stage - Two IDA / V2190 Capability and Consumer Prior 500,000.00 0.00 Canceled 2019-03-08 2019-05-24 2019-05-24 2019-03-13 2019-08-02 2019-11-19 2021-05-12 points, to inform the Proposals International Envelope Protection identification of prospective agents -Non-Consulting Services MOF-FSD-CS-07 / Bolstering Financial Pending Acquisition and Development Open - Single Stage - One IDA / 63100 Capability and Consumer Prior Request for Bids 500,000.00 0.00 Implementati 2020-01-10 2020-01-15 2020-02-26 2020-03-27 2020-05-01 2020-10-28 of Supervising Application International Envelope Protection on software solution. Page 2 CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Market Contract Type Estimated Actual Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GH-MOF-FSD-80498-CS- QCBS / Design of a financial data center, including definition of its Enhancing the Capacity for objective and mandate, the Implementation and ownership structure, Monitoring of Financial Quality And Cost- Under IDA / V2190 Post Open - National 100,000.00 0.00 2018-11-23 2018-12-14 2019-01-27 2019-02-24 2019-03-26 2019-04-30 2019-06-04 2020-06-03 mapping of existing Sector Policies and Based Selection Implementation collection efforts and Supporting Project systems, implementation Implement ation arrangements, business model and sustainability, IT architecture and functionalit GH-MOF-FSD-80503-CS- QCBS / Design of technical specifications and Increasing the Outreach of development of ToR and RCBs and MFIs and Quality And Cost- RFP for the upgrade of the IDA / V2190 Post Open - National 75,000.00 0.00 Canceled 2019-02-28 2019-03-21 2019-05-04 2019-06-01 2019-07-01 2019-08-05 2019-09-09 2020-09-08 Linking VSLAs to the Based Selection ARB Apex Bank's core Formal Financial Sector banking system, e-banking platform, and associated IT infrastructure GH-MOF-FSD-80500-CS- QCBS / Carrying out preparatory work for the Improving Financial Sector establishment of a domestic Regulatory Oversight and Quality And Cost- Open - Under credit rating agency, IDA / V2190 Prior 200,000.00 0.00 2019-04-03 2019-04-24 2019-06-07 2019-07-05 2019-08-04 2019-09-08 2019-10-13 2020-10-12 Market Transparency and Based Selection International Implementation including the development of Discipline a detailed business plan, specification of IT systems requirements, etc. GH-MOF-FSD-80505-CS- QCBS / Firm to design an agent banking business model, identification and Increasing the Outreach of specification of a suitable RCBs and MFIs and Quality And Cost- Under IDA / V2190 Prior Open - National 150,000.00 0.00 2019-03-06 2019-03-27 2019-05-10 2019-06-07 2019-07-07 2019-08-11 2019-09-15 2020-09-14 back-end ICT system for Linking VSLAs to the Based Selection Implementation delivering services via Formal Financial Sector agents, and mapping of potential agent locations throughout the country. MOF-FSD-CS-10 / Capacity Building of Management Bolstering Financial Quality And Cost- Open - Pending staff of DCRA and IDA / 63100 Capability and Consumer Prior 1,500,000.00 0.00 2020-09-25 2020-10-16 2020-11-29 2020-12-27 2021-01-26 2021-03-02 2021-04-06 2022-10-17 Based Selection International Implementation Strengthen Technical Protection Capacity of CRA MOF-FSD-CS-042 / Technical Assistance to Improving Financial Sector design, develop and Regulatory Oversight and Quality And Cost- Pending implement a technology IDA / 63100 Post Open - National 400,000.00 0.00 2020-01-10 2020-01-31 2020-03-15 2020-04-12 2020-05-12 2020-06-16 2020-07-21 2021-07-21 Market Transparency and Based Selection Implementation application to allow Bank of Discipline Ghana to receive and manage complaints MOF-FSD-CS-046 / Increasing the Outreach of Consultancy Advisory RCBs and MFIs and Quality And Cost- Under Services for the completion IDA / 63100 Prior Open - National 500,000.00 0.00 2020-02-11 2020-03-03 2020-04-16 2020-05-14 2020-06-13 2020-07-18 2020-08-22 2021-04-19 Linking VSLAs to the Based Selection Implementation of financial inclusion survey Formal Financial Sector or Demand side Survey Page 3 MOF-FSD-CS-047 / Short Term Technical Assistant to Increasing the Outreach of develop and implement a RCBs and MFIs and Quality And Cost- Pending geospatial mapping of access IDA / 63100 Prior Open - National 500,000.00 0.00 2020-02-11 2020-03-03 2020-04-16 2020-05-14 2020-06-13 2020-07-18 2020-08-22 2021-08-22 Linking VSLAs to the Based Selection Implementation points as well as Formal Financial Sector development of online database and visual displays MOF-FSD-CS-31 / Procurement of two Enhancing the Capacity for firms/consortium of firms, the Implementation and service providers to design Monitoring of Financial Quality And Cost- Open - Pending IDA / 63100 Prior 3,800,000.00 0.00 2019-11-10 2019-12-01 2020-01-14 2020-02-11 2020-03-12 2020-04-16 2020-05-21 2021-11-22 and implement VSLA Sector Policies and Based Selection International Implementation linkage programs in the Supporting Project Most excluded regions of Implement ation Ghana. MOF-FSD-CS-01 / Technical Assistant to identify the Bolstering Financial Quality And Cost- Under Institutional and Regulatory IDA / 63100 Capability and Consumer Prior Open - National 200,000.00 0.00 2019-10-31 2019-11-21 2020-01-04 2020-02-01 2020-03-02 2020-04-06 2020-05-11 2021-05-11 Based Selection Implementation gaps and Recommendations Protection for Strengthening the Sector MOF-FSD-CS-02 / Technical Assistant to Implement the Bolstering Financial Quality And Cost- Open - Pending Recommendations of the IDA / 63100 Capability and Consumer Prior 450,000.00 0.00 2019-10-30 2019-11-20 2020-01-03 2020-01-31 2020-03-01 2020-04-05 2020-05-10 2021-05-10 Based Selection International Implementation Institutional and Regulatory Protection gaps Assessment MOF-FSD-CS-035 / Engage Short-term Technical Advisor to design and implement Improving Financial Sector awareness financial Regulatory Oversight and Quality And Cost- IDA / 63100 Prior Open - National 600,000.00 0.00 Canceled 2020-01-10 2020-01-31 2020-03-15 2020-04-12 2020-05-12 2020-06-16 2020-07-21 2021-07-21 education campaigns using Market Transparency and Based Selection traditional delivery platforms Discipline and development of an M&E framework MOF-FSD-CS-036 / Engage Short-term Technical Advisor to design and implement Improving Financial Sector awareness financial Regulatory Oversight and Quality And Cost- Open - education campaigns using IDA / 63100 Prior 700,000.00 0.00 Canceled 2020-03-15 2020-03-23 2020-05-06 2020-06-03 2020-07-03 2020-08-07 2020-09-11 2021-09-11 Market Transparency and Based Selection International innovative delivery platforms. Discipline This should include development of an M&E framework MOF-FSD-CS-64 / Short Enhancing the Capacity for Term Technical Assistance to the Implementation and design the VSLA linkage Monitoring of Financial Quality And Cost- Under programme including M & E IDA / V2190 Prior Open - National 450,000.00 0.00 2020-01-02 2020-01-23 2020-03-07 2020-04-04 2020-05-04 2020-06-08 2020-07-13 2021-07-13 Sector Policies and Based Selection Implementation framework and RFP to Supporting Project select service providers Implement ation throughout Ghana. Enhancing the Capacity for MOF-FSD-CS-66 / the Implementation and Engagement of a Service Monitoring of Financial Quality And Cost- Open - Pending IDA / V2190 Prior 3,450,000.00 0.00 2020-06-02 2020-06-23 2020-08-06 2020-09-03 2020-10-03 2020-11-07 2020-12-12 2021-12-12 Provider to Implement the Sector Policies and Based Selection International Implementation VSLA Program Supporting Project Implement ation MOF-FSD-CS-61 / Consulting Services to Improving Financial Sector Design and Support Regulatory Oversight and Quality And Cost- Open - IDA / V2190 Prior 500,000.00 0.00 Under Review 2020-01-20 2020-02-10 2020-03-25 2020-04-22 2020-05-22 2020-06-26 2020-07-31 2021-07-31 Implementation of a Market Transparency and Based Selection International Financial Education Discipline Campaign Page 4 INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Market Contract Type Estimated Actual Draft Negotiated Description Component Review Type Method Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GH-MOF-FSD-80492-CS- INDV / Design of technical specifications and Enhancing the Capacity for development of ToR and the Implementation and RFP for the acquisition of Individual Monitoring of Financial credit union/Credit Union IDA / V2190 Prior Consultant Limited 100,000.00 0.00 Canceled 2019-01-24 2019-01-29 2019-02-19 2019-03-26 2019-09-22 Sector Policies and Association's core Selection Supporting Project Management Information Implement ation System, associated IT infrastructure, and supervisory application. Enhancing the Capacity for GH-MOF-FSD-80516-CS- the Implementation and Individual INDV / Design of a Monitoring of Financial IDA / V2190 Post Consultant Limited 25,000.00 24,243.87 Signed 2018-12-07 2018-12-12 2019-01-02 2019-02-06 2019-08-05 monitoring and evaluation Sector Policies and Selection system for the project Supporting Project Implement ation Enhancing the Capacity for the Implementation and GH-MOF-FSD-80486-CS- Individual Monitoring of Financial INDV / Recruitment of IDA / V2190 Prior Consultant Limited 130,000.00 0.00 Canceled 2018-10-10 2018-10-15 2018-11-05 2018-12-10 2019-06-08 Sector Policies and Project Coordinator Selection Supporting Project Implement ation Enhancing the Capacity for the Implementation and GH-MOF-FSD-84131-CS- Individual Monitoring of Financial INDV / Recruitment of IDA / V2190 Prior Consultant Limited 120,000.00 0.00 Under Review 2018-10-29 2018-11-03 2018-11-24 2018-12-29 2019-06-27 Sector Policies and Procurement Specialist Selection Supporting Project Implement ation Increasing the Outreach of GH-MOF-FSD-80509-CS- Individual RCBs and MFIs and INDV / Agent Banking IDA / V2190 Post Consultant Limited 50,000.00 216,000.00 Signed 2018-10-29 2018-11-03 2018-11-24 2018-12-29 2019-06-27 Linking VSLAs to the Consultant Selection Formal Financial Sector GH-MOF-FSD-100446-CS- INDV / Design of technical specifications and Increasing the Outreach of development of ToR and Individual RCBs and MFIs and Under RFP for the upgrade of the IDA / V2190 Post Consultant Open 75,000.00 0.00 2019-02-25 2019-04-15 2019-05-06 2019-06-10 2019-12-07 Linking VSLAs to the Implementation ARB Apex Bank's core Selection Formal Financial Sector banking system, e-banking platform, and associated IT infrastructure GH-MOF-FSD-109927-CS- Improving Financial Sector INDV / Recruitment of Individual Regulatory Oversight and Under Consultant for Credit IDA / V2190 Prior Consultant Limited 35,000.00 0.00 2019-04-25 2019-04-30 2019-05-21 2019-06-25 2019-12-22 Market Transparency and Implementation Unions' Supervision Selection Discipline Application GH-MOF-FSD-109932-CS- INDV / Design of technical specifications and development of ToR and Enhancing the Capacity for RFP for the acquisition of the Implementation and Individual credit union/Credit Union Monitoring of Financial Under IDA / V2190 Prior Consultant Limited 75,000.00 0.00 2019-04-25 2019-04-30 2019-05-21 2019-06-25 2019-12-22 Association's core Sector Policies and Implementation Selection Management Information Supporting Project System, associated IT Implement ation infrastructure, Recruitment of Core Banking Software Consultant Page 5 Enhancing the Capacity for the Implementation and GH-MOF-FSD-80486-CS- Individual Monitoring of Financial INDV-2 / Recruitment of IDA / V2190 Prior Consultant Limited 130,000.00 0.00 Under Review 2019-05-09 2019-05-14 2019-06-04 2019-07-09 2020-01-05 Sector Policies and Project Coordinator Selection Supporting Project Implement ation MOF-FSD-CS-037 / Engage Long-term Technical Advisor Improving Financial Sector Individual to support BOG Staff Regulatory Oversight and Pending IDA / 63100 Post Consultant Open 150,000.00 0.00 2020-01-10 2020-02-28 2020-03-20 2020-04-24 2022-04-14 implement its market Market Transparency and Implementation Selection Conduct Supervisory Discipline capacity. MOF-FSD-CS-040 / Technical Assistance for the Improving Financial Sector identification of business Individual Regulatory Oversight and Pending requirements and technology IDA / 63100 Post Consultant Open 100,000.00 0.00 2020-01-13 2020-03-02 2020-03-23 2020-04-27 2020-10-24 Market Transparency and Implementation specifications and technology Selection Discipline applications for BOG, SEC, and NIC MOF-FSD-CS-044 / Technical Assistance for the design of a financial Increasing the Outreach of Individual inclusion website and RCBs and MFIs and Pending IDA / 63100 Post Consultant Open 30,000.00 0.00 2020-02-15 2020-04-04 2020-04-25 2020-05-30 2021-01-25 database for dissemination of Linking VSLAs to the Implementation Selection financial inclusion initiatives Formal Financial Sector and information tracking of financial inclusion indicators MOF-FSD-CS-045 / Increasing the Outreach of Individual Production of financial RCBs and MFIs and Pending IDA / 63100 Post Consultant Open 48,000.00 0.00 2020-02-18 2020-04-07 2020-04-28 2020-06-02 2021-05-28 inclusion publications and Linking VSLAs to the Implementation Selection organization of events. Formal Financial Sector MOF-FSD-CS-052 / Increasing the Outreach of Individual Communication and Visibility RCBs and MFIs and IDA / 63100 Post Consultant Limited 40,000.00 0.00 Under Review 2019-10-22 2019-10-27 2019-11-17 2019-12-22 2020-06-19 Campaign and Citizen Linking VSLAs to the Selection engagement Formal Financial Sector MOF-FSD-CS-051 / Short term Tech Assistant to Increasing the Outreach of Individual develop Communication RCBs and MFIs and IDA / 63100 Post Consultant Open 40,000.00 0.00 Canceled 2020-09-20 2020-11-08 2020-11-29 2021-01-03 2021-07-02 Strategy and Visibility and Linking VSLAs to the Selection Citizen Engagement Formal Financial Sector Approach MOF-FSD-CS-30 / Short Enhancing the Capacity for Term Tech Assistance to the Implementation and design the VSLA linkage Individual Monitoring of Financial programme including and M IDA / 63100 Prior Consultant Open 100,000.00 0.00 Canceled 2020-01-10 2020-02-28 2020-03-20 2020-04-24 2020-10-21 Sector Policies and & E framework and the Selection Supporting Project RFP to select service Implement ation providers throughout Ghana. Page 6