75775 Power Transmission Project Procurement Plan (revised 04.03.2013) Procure Procurem Start Doc Bid Bid Contract Contract â„– Description ent type ment Preparation Invitation Opening Signed Completion method Pivdenna S&I ICB 15.03.10 21.12.10 15.03.11 15.07.11 31.12.14 Rehabilitation of substations in 1. Pershotravneva S&I ICB 17.05.10 21.12.10 15.03.11 15.07.11 31.12.14 the Dnieper Power Grid Dniprodzerzhinska S&I ICB 17.05.10 21.12.10 15.03.11 15.07.11 31.12.14 Azovska S&I ICB 24.06.10 16.03.11 05.07.11 20.12.11 31.12.14 Rehabilitation of substations in 2. the Donbas Power Grid Chaikine S&I ICB 26.05.10 16.03.11 05.07.11 20.12.11 31.12.14 3. High Voltage Circuit Breakers for 750 kV substations Goods ICB 02.03.10 23.06.10 25.08.10 31.12.10 01.12.14 Additional High Voltage Circuit Breakers for 750 kV 3Ð?. Goods ICB 10.11.10 29.03.11 14.06.11 26.10.11 31.12.14 substations Protective relaying and automation for 750 kV 4. S&I ICB 15.12.10 22.11.11 08.06.12 31.05.12 31.12.14 substations Construction of the 330 kV Bar-Dniester transmission 5. S&I ICB 17.07.09 16.02.10 26.05.10 29.12.10 31.03.13 line 6. Expansion of the 330kV Bar substation S&I ICB 17.07.09 28.06.10 29.09.10 31.03.11 31.03.13 7. Modernization of 330 kV Simferopol substation S&I ICB 05.11.10 31.05.11 22.09.11 31.01.12 31.12.14 8. Upgrading substation controls in the Crimea S&I ICB 01.11.10 14.04.11 15.07.11 30.12.11 01.02.14 9. Management information system S&I ICB 31.05.12 01.03.13 01.06.13 01.10.13 31.12.14 Consulting Services Procure Procurem Start Doc Bid Bid Contract Contract â„– Description ent type ment Preparation Invitation Opening Signed Completion method 10. Procurement and project management consulting QCBS 10.02.09 31.12.14 10A. Procurement and project management consulting QCBS 01.06.12 04.10.12 31.01.13 15.05.13 31.12.14 11. Management information system consulting QCBS 27.01.12 31.12.12 12. Audit of project and company accounts consulting LCS annually 13. Implementation of the Grid Code consulting QCBS 14. Non-current assets revaluation consulting QCBS 13.10.11 10.02.12 06.06.12 30.06.13 Unallocated proceeds TOTAL * - Package 5 –the Contract can be completed only in parallel with completion of the contract for expansion of the 330 kV Bar substation ** - Packages 1, 2, 3, 3A, 7 - the construction seasonality for rehabilitation of transmission substations which will take 3 summer seasons (2012, 2013, 2014) to complete. *** - Packages 3A, 4, 10A, and 14. - these Packages were added or increased (Package 4) later due to savings during the project implementation