PROCUREMENT PLAN (Textual Part) Project information: Democratic Republic Democratic of Congo - Public Service Reform and Rejuvenance – P122229 Project Implementation agency: CMRAP Date of the Procurement Plan: March 2018 Period covered by this Procurement Plan: January 2018 – December 2018 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016 and revised November 2017) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in the Borrower’s Public Procurement Law No 10/010 of April 27, 2010 (PPL) and the Manual of Procedures of the PPL as per Borrower’s Decree No 10/22 of June 2, 2010, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. (a) Standard Bidding Documents: All standard bidding documents to be used for the Project under NCB shall be found acceptable to the World Bank before their use during the implementation of Project; (b) Eligibility: Eligibility of bidders and acceptability of their goods and services shall not be based on their nationality and/or their origin; and association with a national firm shall not be a condition for participation in a bidding process. Therefore, except for the ineligibility situations referred to in paragraphs 1.10(a) (i) and 1.10(a) (ii) of the Procurement Guidelines, the eligibility of bidders must be based solely on their qualification, experience and capacity to carry out the contract related to the specific bidding process; (c) Advertising and Bid Preparation Time: Bidding opportunities shall be advertised at least in a national newspaper of wide circulation and on the website of the Recipient’s Procurement Regulator (Autorité de Régulation des Marchés Publics) and bidders should be given at least 30 days from the date of invitation to bid or the date of availability of the bidding documents, whichever is later; (d) Criteria for Qualification of Bidders: Qualification criteria shall only concern the bidder’s capability and resources to perform the contract taking into account objective and measurable factors. Such criteria for qualification of bidders shall be clearly specified in the bidding documents; (e) Bid Evaluation and Contract Award: A contract shall be awarded to the substantially responsive and lowest evaluated bidder provided that such bidder meets the qualification criteria specified in the bidding documents. No scoring system shall be allowed for the evaluation of bids, and no “blanket” limitation to the number of lots which can be awarded to a bidder shall apply. The criteria for bid evaluation and the contract award conditions shall be clearly specified in the bidding documents; (f) Preferences: No preference shall be given to domestic/regional bidders; to domestically/regionally manufactured goods; and to bidders forming a joint venture with a national firm or proposing national sub-contractors or carrying out economic activities in the territory of the Recipient; (g) Publication of Contract Award: Information on all contract awards shall be published in at least a national newspaper of wide circulation or in the Recipient’s Procurement Regulator (Autorité de Régulation des Marchés Publics) web-site; (h) Fraud and Corruption: In accordance with the Procurement Guidelines, each bidding document and contract shall include provisions stating the World Bank’s policy to sanction firms or individuals found to have engaged in fraud and corruption as set forth in the Procurement Guidelines; (i) Inspection and Audit Rights: In accordance with the Procurement Guidelines, each bidding document and contract shall include provisions stating the World Bank’s policy with respect to inspection and audit of accounts, records and other documents relating to the bid submission and contract performance; (j) Requirement for administrative documents and/or tax clearance certificate: The bidding documents shall not require foreign bidders to produce any administrative or tax related certificates prior to confirmation of awarding a contract; and (k) Modifications of a Signed Contract: Any change in the contract amount which, singly or combined with all previous changes, increases the original contract amount by fifteen (15) percent or more must be done through an amendment to the signed contract instead of signing a new contract. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables. “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is applicable for those contracts identified in the Procurement Plan tables; Other Relevant Procurement Information. “Not Applicable” PROCUREMENT Congo, Democratic Republic of : Public Service Reform and Rejuvenation Project PLAN General Information Country: Congo, Democratic Republic of Banks Approval Date of the Original Procurement Plan: 2018-05-14 Revised Plan Date(s): (comma delineated, leave blank if none) 2018-07-26 Project ID: P122229 GPN Date: Project Name: Public Service Reform and Rejuvenation Project Loan / Credit No: IDA / D1850, IDA / H8970 Executing Agency(ies): Public Service Reform and Rejuvenance WORKS Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ZR-PRRAP-57173-CW-RFB / Targeted Ministries are Travaux de rafraichissement des Restructured According to Their Single Stage - One Under murs extérieurs du bâtiment IDA / D1850 Post Request for Bids Open - National 200,000.00 0.00 2017-07-12 2018-05-24 2017-07-17 2017-08-28 2017-09-27 2018-05-06 2018-11-02 Revised Orgazational Envelope Implementation Administratif de la Fonction Framework Publique ZR-PRRAP-56763-CW-RFQ / A Sustainable Retirement Travaux de remise en t é at de System for Civil Servants is l'espace des bureaux de la CTAD Established Request for Single Stage - One Pending IDA / D1850 Post Limited 220,000.00 0.00 2018-05-20 2018-07-15 2019-01-11 (lot 1) et de réhabilitation Component 4: Quotations Envelope Implementation partielle du bâtiment de la Supporting Public Service CNSSAP (Lot 2) Reform at the Provincial Level ZR-PRRAP-56741-CW-RFQ / Targeted Ministries are Travaux d'aménagement, de Restructured According to Their Request for Single Stage - One Pending sécurisation et IDA / D1850 Post Limited 110,000.00 0.00 2018-04-30 2018-06-25 2018-12-22 Revised Orgazational Quotations Envelope Implementation d'opérationalisation de la salle Framework Data Center GOODS Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ZR-PRRAP-57145-GO-RFQ / Component 5: Acquisition de 15 ordinateurs et Project Management and Core consommables informatiques du Request for Single Stage - One Pending IDA / D1850 Support to Government Post Limited 40,000.00 0.00 2018-04-20 2018-06-15 2018-12-12 Projet de réforme et de Quotations Envelope Implementation Agencies in Charge of Steering rajeunissement de the Reform l'Administration Publique ZR-PRRAP-56760-GO-RFQ / Component 5: Acquisition des fournitures et Project Management and Core petits matériels de bureau du Request for Single Stage - One Pending IDA / D1850 Support to Government Post Limited 26,100.00 0.00 2018-04-11 2018-06-06 2018-12-03 Projet de réforme et de Quotations Envelope Implementation Agencies in Charge of Steering rajeunissement de the Reform l'Administration Publique Targeted Ministries are ZR-PRRAP-56739-GO-RFQ / Restructured According to Their Acquisition des q é uipements Revised Orgazational informatiques en 3 lots dont: 1) Framework é uipements informatiques du q Component 4: Request for Single Stage - One Pending SENAREC, 2) q é uipements IDA / D1850 Post Limited 140,000.00 0.00 2018-04-20 2018-06-15 2018-12-12 Supporting Public Service Quotations Envelope Implementation informatiques et logistiques de la Reform at the Provincial Level CTAD et CTAC, 3) Equipements Component 3: informatiques pour le système Building Capacity through an d'archivage Infrastructure of Training Centers ZR-PRRAP-56704-GO-RFB / Reproduction des modules de Targeted Ministries are formation des Jeunes Restructured According to Their Single Stage - One Pending Professionnels et d'un recueil IDA / D1850 Post Request for Bids Open - National 400,000.00 0.00 2018-04-09 2018-04-14 2018-05-26 2018-06-25 2018-07-30 2019-01-26 Revised Orgazational Envelope Implementation des textes légaux et Framework règlementaires sur la réforme de l'Administration Publique ZR-PRRAP-56317-GO-RFB / A Sustainable Retirement é uipements et Acquisition des q Single Stage - One Pending IDA / D1850 System for Civil Servants is Post Request for Bids Open - National 100,000.00 0.00 2018-05-15 2018-05-20 2018-07-01 2018-07-31 2018-09-04 2019-03-03 système informatique de la Envelope Implementation Established CNSSAP ZR-PRRAP-56706-GO-RFQ / Targeted Ministries are Acquisition matériel (tablettes) Restructured According to Their Request for Single Stage - One Pending IDA / D1850 Post Limited 15,450.00 0.00 2018-04-25 2018-06-20 2018-12-17 de formation sur les enquêtes de Revised Orgazational Quotations Envelope Implementation base Framework ZR-PRRAP-56765-GO-RFQ / Component 5: Acquisition et installation des Project Management and Core é uipements pour le système de q Request for Single Stage - One Pending IDA / D1850 Support to Government Post Limited 15,000.00 0.00 2018-02-26 2018-04-23 2018-10-20 contrôle d'accès et la Quotations Envelope Implementation Agencies in Charge of Steering vidéosurveillance au niveau du the Reform PRRAP ZR-PRRAP-54563-GO-RFQ / Component 5: Services de maintenance de la Project Management and Core Request for Single Stage - One Pending climatisation, plomberie, IDA / D1850 Support to Government Post Limited 30,000.00 0.00 2018-03-30 2018-05-25 2018-11-21 Quotations Envelope Implementation é ectricité et groupe l l é ectrogène Agencies in Charge of Steering du PRRAP the Reform ZR-PRRAP-57187-GO-RFQ / Reproduction (i) des rapports biannuel 2015-2016 et annuel Targeted Ministries are 2017 du Projet, (ii) des Restructured According to Their Request for Single Stage - One Pending Newsletters sur les activités IDA / D1850 Post Limited 89,000.00 0.00 2018-05-05 2018-06-30 2018-12-27 Revised Orgazational Quotations Envelope Implementation réalisées dans le cadre de la Framework mise en Suvre du Projet et (iii) des supports de communication (3 lots) Page 1 ZR-PRRAP-57219-GO-RFQ / Targeted Ministries are Acquisition des Kits pour la Restructured According to Their Request for Single Stage - One Pending IDA / D1850 Post Limited 150,000.00 0.00 2018-04-20 2018-06-15 2018-12-12 formation initiale des Jeunes Revised Orgazational Quotations Envelope Implementation professionnels Framework NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ZR-PRRAP-57170-NC-DIR / Component 3: Location de la bande passante Request for Single Stage - One Pending IDA / D1850 Building Capacity through an Post Limited 195,000.00 0.00 2018-04-21 2018-06-16 2018-12-13 des huit centres de formation du Quotations Envelope Implementation Infrastructure of Training Centers SENAREC ZR-PRRAP-57189-NC-RFQ / Component 5: Services de maintenance de la Project Management and Core Request for Single Stage - One Pending climatisation, plomberie, IDA / D1850 Support to Government Post Limited 30,000.00 0.00 2018-05-05 2018-06-30 2018-12-27 Quotations Envelope Implementation é ectricité et groupe l l é ectrogène Agencies in Charge of Steering du PRRAP the Reform ZR-PRRAP-57217-NC-RFQ / Targeted Ministries are Production des films Restructured According to Their Request for Single Stage - One Pending documentaires et de success IDA / D1850 Post Limited 37,500.00 0.00 2018-05-25 2018-07-20 2019-01-16 Revised Orgazational Quotations Envelope Implementation stories sur la Réforme de Framework l'Administration Publique ZR-PRRAP-57221-NC-DIR / Component 3: Renouvellement service de Pending IDA / D1850 Building Capacity through an Post Direct Selection Direct 8,000.00 0.00 2018-04-20 2018-04-25 2018-05-30 2018-11-26 nettoyage des bureaux du Implementation Infrastructure of Training Centers SENAREC Component 5: ZR-PRRAP-57222-NC-RFQ / Project Management and Core Service de maintenance des Request for Single Stage - One Pending IDA / D1850 Support to Government Post Limited 15,000.00 0.00 2018-04-21 2018-06-16 2018-12-13 é uipements informatiques du q Quotations Envelope Implementation Agencies in Charge of Steering Projet the Reform Targeted Ministries are ZR-PRRAP-57215-NC-DIR / Restructured According to Their Pending Organisation des m é issions dans IDA / D1850 Post Direct Selection Direct 30,000.00 0.00 2018-05-05 2018-05-10 2018-06-14 2018-12-11 Revised Orgazational Implementation é ision et radio 5 Chaînes de télv Framework ZR-PRRAP-56323-NC-RFQ / Mutualisation de la gestion de la connexion internet pour Component 5: renouvellement d'abonnement au Project Management and Core Request for Single Stage - One Pending niveau du PRRAP, CMRAP¨, les IDA / D1850 Support to Government Post Limited 100,000.00 0.00 2018-06-05 2018-07-31 2019-01-27 Quotations Envelope Implementation deux Secretariats génré aux de la Agencies in Charge of Steering Fonction Publique et Cabinet the Reform MINFP aux mêmes conditions des prestations antérieures. CONSULTING FIRMS Activity Reference No. / Combined Evaluation Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Technical Description Loan / Credit No. Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ZR-PRRAP-54561-CS-QCBS / Component 5: Sélection d'un consultant cabinet Project Management and Core Quality And Cost- Pending international pour l'audit externe IDA / D1850 Support to Government Post Open - National 75,000.00 0.00 2018-03-06 2018-03-21 2018-05-04 2018-06-01 2018-07-01 2018-08-05 2018-09-09 2019-09-09 Based Selection Implementation du Projet pour trois exercices Agencies in Charge of Steering 2017,2018 et 2019 the Reform ZR-PRRAP-56738-CS-CQS / Sélection dun Consultant Component 5: Cabinet en appui à lappropriation Project Management and Core Consultant et exploitation du site de Pending IDA / D1850 Support to Government Post Qualification Open - National 150,000.00 0.00 2017-12-15 2018-01-05 2018-02-18 2018-04-10 2018-05-15 2018-11-11 visualisation budgétaire par six Implementation Agencies in Charge of Steering Selection (06) provinces de la RDC, dans le the Reform cadre de la Réforme de la Fonction Publique en RDC ZR-PRRAP-57166-CS-CQS / Sélection dun Consultant cabinet en appui à la mise en Targeted Ministries are place du système l é ectronique Consultant Restructured According to Their Pending de suivi de la paie des jeunes IDA / D1850 Post Qualification Open - National 90,000.00 0.00 2017-12-15 2018-01-05 2018-02-18 2018-03-20 2018-04-24 2018-10-21 Revised Orgazational Implementation professionnels et des indemnités Selection Framework de départ à la retraite dans le cadre de la réforme de lAdministration Publique ZR-PRRAP-57131-CS-CQS / Sélection dun Consultant Component 4: Consultant Pending Cabinet chargé de traduire les IDA / D1850 Supporting Public Service Post Qualification Open - National 80,000.00 0.00 2018-04-25 2018-05-16 2018-06-29 2018-07-29 2018-09-02 2019-03-01 Implementation lois et autres textes régissant le Reform at the Provincial Level Selection processus de décentralisation ZR-PRRAP-56473-CS-CQS / Sélection des deux Consultants Cabinets chargés des t é udes, Component 3: Consultant Pending contrôle et surveillance des IDA / D1850 Building Capacity through an Post Qualification Open - National 30,000.00 0.00 2018-05-10 2018-05-31 2018-07-14 2018-08-13 2018-09-17 2019-03-16 Implementation travaux de réhabilitation des deux Infrastructure of Training Centers Selection nouveaux centres d'excellence par province. ZR-PRRAP-56743-CS-CQS / Sélection d'un Consultant Cabinet en vue d'appuyer la Targeted Ministries are restructuration par le recrutement Consultant Restructured According to Their Pending du personnel de la DGRH de la IDA / D1850 Post Qualification Open - International 110,000.00 0.00 2018-05-10 2018-05-31 2018-07-14 2018-08-13 2018-09-17 2019-03-16 Revised Orgazational Implementation Fonction Publique et renforcer Selection Framework leurs capacités: Session de formation, ateliers et repriduction de documents Page 2 ZR-PRRAP-56825-CS-CQS / Sélection dun Consultant Cabinet chargé de proposer un A Sustainable Retirement Consultant plan de mise en Suvre du IDA / D1850 System for Civil Servants is Post Qualification Open - National 70,000.00 0.00 Under Review 2018-04-30 2018-05-21 2018-07-04 2018-08-03 2018-09-07 2019-03-06 processus de déploiement des Established Selection agences et antennes provinciales de la CNSSAP ZR-PRRAP-56709-CS-CQS / Sélection d'un Consultant Targeted Ministries are Consultant Cabinet en vue de la mise en Restructured According to Their Pending IDA / D1850 Post Qualification Open - National 50,000.00 0.00 2018-05-16 2018-06-06 2018-07-20 2018-08-19 2018-09-23 2019-03-22 place d'une plate forme de Revised Orgazational Implementation Selection gestion du système d'archivage Framework é ectronique du Projet l ZR-PRRAP-57180-CS-CQS / Slélection d'un Consultant Component 5: Cabinet en vue d'assurer le Project Management and Core Consultant Pending recrutement compétitive des IDA / D1850 Support to Government Post Qualification Open - National 125,000.00 0.00 2018-04-25 2018-05-16 2018-06-29 2018-07-29 2018-09-02 2019-03-01 Implementation membres du personnel du Agencies in Charge of Steering Selection PRRAP à la suite de la revue the Reform organisationnelle dudit Projet ZR-PRRAP-57184-CS-CQS / Targeted Ministries are Sélection d'un Consultant Consultant Restructured According to Their Pending Cabinet en appui logistique à IDA / D1850 Post Qualification Open - National 20,000.00 0.00 2018-04-30 2018-05-21 2018-07-04 2018-08-03 2018-09-07 2019-03-06 Revised Orgazational Implementation l'organisation de la journée porte Selection Framework ouverte ZR-PRRAP-57208-CS-CQS / Component 3: Consultant Sélection d'un Consultant Pending IDA / D1850 Building Capacity through an Post Qualification Open - National 50,000.00 0.00 2018-05-15 2018-06-05 2018-07-19 2018-08-18 2018-09-22 2019-03-21 Cabinet pour l'évaluation des Implementation Infrastructure of Training Centers Selection besoins en formation Targeted Ministries are ZR-PRRAP-57213-CS-CQS / Consultant Restructured According to Their Sélection d'une Agence de IDA / D1850 Post Qualification Open - National 36,000.00 0.00 Under Review 2018-05-15 2018-06-05 2018-07-19 2018-08-18 2018-09-22 2019-03-21 Revised Orgazational Communication Selection Framework ZR-PRRAP-57223-CS-QCBS / Sélection d'un Consultant Cabinet en vue de renforcer les capacités opérationnelles des Targeted Ministries are DRH installées au niveau Consultant Restructured According to Their Pending sectoriel des ministères et IDA / D1850 Post Qualification Open - National 130,000.00 0.00 2018-06-20 2018-07-11 2018-08-24 2018-09-23 2018-10-28 2019-04-26 Revised Orgazational Implementation structures cibles du PRRAP Selection Framework (Outils, manuel des procédures, GRH, GPEC) au regard notamment du SIGRH-Paie et redynam ZR-PRRAP-56773-CS-QCBS / Sélection dun Consultant Component 4: Consultant Pending Cabinet pour effectuer le IDA / D1850 Supporting Public Service Post Qualification Open - National 100,000.00 0.00 2018-06-11 2018-07-02 2018-08-15 2018-09-14 2018-10-19 2019-04-17 Implementation diagnostic de la Réforme de la Reform at the Provincial Level Selection décentralisation ZR-PRRAP-56297-CS-CDS / Sélection dun Consultant Component 3: Consultant Cabinet international chargé de la Pending IDA / D1850 Building Capacity through an Post Qualification Open - International 30,000.00 0.00 2018-05-31 2018-06-21 2018-08-04 2018-09-03 2018-10-08 2019-04-06 certification des centres Implementation Infrastructure of Training Centers Selection dexcellence et de SENAREC en assurance qualité ZR-PRRAP-56757-CS-CDS / Targeted Ministries are Sélection d'un Consultant Consultant Restructured According to Their Pending Cabinet pour l'assistance à la IDA / D1850 Post Qualification Open - National 100,000.00 0.00 2018-06-20 2018-07-11 2018-08-24 2018-09-23 2018-10-28 2019-04-26 Revised Orgazational Implementation mise en application réelle du Selection Framework système SIGRH-Paie ZR-PRRAP-57225-CS-QCBS / Sélection d'un Consultant Cabinet en vue d'appuyer la Targeted Ministries are restructuration par le recrutement Consultant Restructured According to Their Pending du personnel de la DGRH de la IDA / D1850 Post Qualification Open - National 110,000.00 0.00 2018-06-15 2018-07-06 2018-08-19 2018-09-18 2018-10-23 2019-04-21 Revised Orgazational Implementation Fonction Publique et renforcer Selection Framework leurs capacités: Session de formation, ateliers et repriduction de documents INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Contract Type Estimated Actual Amount Draft Negotiated Description Loan / Credit No. Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Targeted Ministries are ZR-PRRAP-56771-CS-INDV / Restructured According to Their Individual Consultant Pending Recrutement d'un Consultant IDA / D1850 Post Limited 28,000.00 0.00 2018-04-30 2018-05-05 2018-05-26 2018-06-30 2018-12-27 Revised Orgazational Selection Implementation ponctuel en organisation Framework ZR-PRRAP-56769-CS-INDV / Targeted Ministries are Recrutement de 2 Consultants Restructured According to Their Individual Consultant Pending IDA / D1850 Post Limited 10,000.00 0.00 2018-06-08 2018-06-13 2018-07-04 2018-08-08 2019-02-04 pour renforcer les capacités des Revised Orgazational Selection Implementation é ués délg syndicaux Framework Targeted Ministries are ZR-PRRAP-56710-CS-INDV / Restructured According to Their Individual Consultant Pending Recrutement dun Consultant IDA / D1850 Post Limited 24,000.00 0.00 2018-04-25 2018-04-30 2018-05-21 2018-06-25 2018-12-22 Revised Orgazational Selection Implementation individuel en Suivi-Evaluation Framework ZR-PRRAP-57136-CS-INDV / Component 3: Recrutement d'un Consultant Individual Consultant Pending IDA / D1850 Building Capacity through an Post Limited 20,000.00 0.00 2018-04-10 2018-04-15 2018-05-06 2018-06-10 2018-12-07 individuel chargé de la revue Selection Implementation Infrastructure of Training Centers organisationnelle du SENAREC ZR-PRRAP-56764-CS-INDV / Recrutement des Consultants Component 3: Individual Consultant Pending individuels Avocats Conseils au IDA / D1850 Building Capacity through an Post Open 80,000.00 0.00 2018-04-10 2018-05-29 2018-06-19 2018-07-24 2019-01-20 Selection Implementation SENAREC/PRRAP pour tous Infrastructure of Training Centers dossiers judiciaires Page 3 ZR-PRRAP-57156-CS-INDV / Recrutement et prise en charge Component 3: Individual Consultant Pending de 4 Consultants spécialisés de IDA / D1850 Building Capacity through an Post Limited 153,000.00 0.00 2018-04-24 2018-04-29 2018-05-20 2018-06-24 2018-12-21 Selection Implementation SENAREC (CQ, Chargé des Infrastructure of Training Centers centres, Assistants CQ) Targeted Ministries are ZR-PRRAP-56770-CS-INDV / Restructured According to Their Individual Consultant Recrutement dun Consultant IDA / D1850 Post Limited 40,000.00 0.00 Under Review 2018-04-15 2018-04-20 2018-05-11 2018-06-15 2018-12-12 Revised Orgazational Selection é onomiste statisticien individuel c Framework ZR-PRRAP-56820-CS-CDS / Targeted Ministries are Recrutement de 26 Consultants Restructured According to Their Individual Consultant individuels superviseurs et IDA / D1850 Post Limited 200,000.00 0.00 Under Review 2018-04-20 2018-04-25 2018-05-16 2018-06-20 2018-12-17 Revised Orgazational Selection enquêteurs pour les enquêtes de Framework base ZR-PRRAP-56742-CS-INDV / Targeted Ministries are Recrutement dun individuel Restructured According to Their Individual Consultant Pending chargé dappuyer les IDA / D1850 Post Limited 16,000.00 0.00 2018-04-16 2018-04-21 2018-05-12 2018-06-16 2018-12-13 Revised Orgazational Selection Implementation programmes Jeunes Framework Professionnels et mi-carrière ZR-PRRAP-56707-CS-INDV / Component 5: Recrutement des Consultants Project Management and Core individuels pour des missions à Individual Consultant Pending IDA / D1850 Support to Government Post Limited 30,000.00 0.00 2018-04-16 2018-04-21 2018-05-12 2018-06-16 2018-12-13 courte durée en qualité des Selection Implementation Agencies in Charge of Steering é aluateurs des offres (missions v the Reform ponctuelles) ZR-PRRAP-57163-CS-INDV / Recrutement dun Consultant Component 3: individuel international chargé Individual Consultant Pending IDA / D1850 Building Capacity through an Post Open 20,000.00 0.00 2018-05-15 2018-07-03 2018-07-24 2018-08-28 2019-02-24 daccompagner les centres Selection Implementation Infrastructure of Training Centers dexcellence et le SENAREC au processus daccréditation ZR-PRRAP-56434-CS-INDV / Recrutement de 5 Consultants Component 3: individuels architectes pour les Individual Consultant Pending IDA / D1850 Building Capacity through an Post Limited 60,000.00 0.00 2018-04-20 2018-04-25 2018-05-16 2018-06-20 2018-12-17 petits travaux dentretien et Selection Implementation Infrastructure of Training Centers daménagement de 08 centres dexcellence Component 5: ZR-PRRAP-56762-CS-INDV / Project Management and Core Recrutement dun Expert Individual Consultant Pending IDA / D1850 Support to Government Post Limited 69,000.00 0.00 2018-05-15 2018-05-20 2018-06-10 2018-07-15 2019-01-11 International en Gestion Selection Implementation Agencies in Charge of Steering financière et comptable the Reform ZR-PRRAP-56774-CS-INDV / Targeted Ministries are Recrutement dun Consultant Restructured According to Their Individual Consultant Pending individuel pour lélaboration dun IDA / D1850 Post Limited 10,000.00 0.00 2018-04-15 2018-04-20 2018-05-11 2018-06-15 2018-12-12 Revised Orgazational Selection Implementation manuel des procédures de Framework gestion des Coaches Mentors ZR-PRRAP-56708-CS-INDV / Recrutement dun Consultant Component 3: Individual Consultant Pending individuel pour développer la IDA / D1850 Building Capacity through an Post Limited 24,000.00 0.00 2018-04-18 2018-04-23 2018-05-14 2018-06-18 2018-12-15 Selection Implementation stratégie de vulgarisation et de la Infrastructure of Training Centers mise en Suvre du PRONAREC II ZR-PRRAP-57139-CS-INDV / Recrutement dun Consultant Component 4: Individual Consultant Pending individuel pour appuyer la mise IDA / D1850 Supporting Public Service Post Open 40,000.00 0.00 2018-06-05 2018-07-24 2018-08-14 2018-09-18 2019-03-17 Selection Implementation en Suvre de la Caisse de Reform at the Provincial Level é uation pérq ZR-PRRAP-56759-CS-CQS / Recrutement des Consultants individuels chargés de l'assistance juridique à A Sustainable Retirement Individual Consultant l'élaboration et du lobbing en vue IDA / D1850 System for Civil Servants is Post Open 100,000.00 0.00 Under Review 2018-05-10 2018-06-28 2018-07-19 2018-08-23 2019-02-19 Selection de l'adoption et promulgation de Established la loi portant régime de sécurité sociale des agents publics de l'Etat. ZR-PRRAP-56766-CS-INDV / Sélection d'un Consultant Component 4: individuel chargé des t é udes et Individual Consultant IDA / D1850 Supporting Public Service Post Limited 20,000.00 0.00 Under Review 2018-04-10 2018-04-15 2018-05-06 2018-06-10 2018-12-07 surveillance des travaux de Selection Reform at the Provincial Level réhabilitation du bâtiment de la CTAD ZR-PRRAP-56761-CS-CDS / Sélection d'un Consultant Cabinet chargé d'appuyer le Targeted Ministries are Ministère de la Fonction Publique IDA / H8970 Restructured According to Their Under Post Direct Selection Direct 300,000.00 0.00 2018-04-10 2017-08-16 2018-04-20 2017-12-05 2018-06-24 2018-12-21 dans l'organisation et le IDA / D1850 Revised Orgazational Implementation recrutement des 500 jeunes Framework professionnels supplémentaires (Contrat SODEICO n°2) ZR-PRRAP-56772-CS-CQS / Recrutement d'un Consultant A Sustainable Retirement Individual Consultant Pending individuel en charge de IDA / D1850 System for Civil Servants is Post Limited 15,000.00 0.00 2018-04-30 2018-05-05 2018-05-26 2018-06-30 2018-12-27 Selection Implementation l'organisation de la revue Established technique CIPRES ZR-PRRAP-56693-CS-INDV / Recrutement de 5 Consultants Component 4: dont 1 international et 4 Individual Consultant IDA / D1850 Supporting Public Service Prior Limited 360,000.00 0.00 Under Review 2018-04-15 2018-04-20 2018-05-11 2018-06-15 2018-12-12 nationaux en appui à la mise en Selection Reform at the Provincial Level place des guychets uniques et de la fonction publique provinciale ZR-PRRAP-57202-CS-CDS / Renouvellement du contrat du Targeted Ministries are Coach international chargé Restructured According to Their Pending IDA / D1850 Post Direct Selection Direct 98,000.00 0.00 2018-06-11 2018-06-21 2018-08-25 2019-02-21 d'appui à la CMRAP et coaching Revised Orgazational Implementation de la mise en oeuvre du Projet Framework PRRAP Page 4 ZR-PRRAP-57204-CS-CDS / Renouvellement du contrat du Targeted Ministries are Consultant international pour le Restructured According to Their IDA / D1850 Post Direct Selection Direct 70,000.00 0.00 Under Review 2018-04-16 2018-04-26 2018-06-30 2018-12-27 Tableau de Bord de Suivi des Revised Orgazational Indicateurs de la Réforme de Framework l'Administration¨Publique (TBSI) ZR-PRRAP-56468-CS-INDV / Renouvellement du Contrat de A Sustainable Retirement Monsieur SAIBOU SEYNOU, Pending IDA / D1850 System for Civil Servants is Post Direct Selection Direct 98,940.00 0.00 2018-05-25 2018-06-04 2018-08-08 2019-02-04 Consultant International Implementation Established Spécialiste en régime des retraites pour la CNSSAP ZR-PRRAP-57144-CS-INDV / Recrutement d'un Consultant ponctuel Coach régional pour Targeted Ministries are assurer le développement d'un Restructured According to Their Individual Consultant Pending appui coaching stratégique et IDA / D1850 Post Limited 80,000.00 0.00 2018-05-31 2018-06-05 2018-06-26 2018-07-31 2019-01-27 Revised Orgazational Selection Implementation opérationnel autour des critères Framework et indicateurs de la réforme: dialogue interstructure,Gestion du projet et IRR ZR-PRRAP-56758-CS-CDS / Targeted Ministries are Renouvellement du contrat de Restructured According to Their Pending IDA / D1850 Post Direct Selection Direct 84,000.00 0.00 2018-05-25 2018-06-04 2018-08-08 2019-02-04 Monsieur Honoré TSHIYOYO, Revised Orgazational Implementation Coordonnateur de la CSPP Framework ZR-PRRAP-56470-CS-INDV / Recrutement d'un Consultant Targeted Ministries are individuel en vue de réaliser une Restructured According to Their Individual Consultant Pending IDA / D1850 Post Limited 20,000.00 0.00 2018-05-30 2018-06-04 2018-06-25 2018-07-30 2019-01-26 é ude pour l'aménagement de la t Revised Orgazational Selection Implementation salle du DATA CENTER du Framework Ministère de la Fonction Publique ZR-PRRAP-56424-CS-INDV / Renouvellement du contrat de Monsieur Jean LUZAYAMO Targeted Ministries are LEMA, Consultant Expert en Restructured According to Their Individual Consultant Pending IDA / D1850 Post Direct 18,000.00 0.00 2018-05-31 2018-06-10 2018-07-01 2018-08-05 2019-02-01 administration publique pour Revised Orgazational Selection Implementation l'évaluation et le suivi de Framework l'opérationnalisation du SIGRH- Paie Component 5: ZR-PRRAP-56737-CS-INDV / Project Management and Core Recrutement d'un Expert Individual Consultant Pending IDA / D1850 Support to Government Prior Open 288,000.00 0.00 2018-04-20 2018-06-08 2018-06-29 2018-08-03 2019-01-30 International en Passation des Selection Implementation Agencies in Charge of Steering Marchés du Projet the Reform ZR-PRRAP-56454-CS-CDS / Recrutement des Coaches- Mentors ci-après parmi les retraités de l'Administration Targeted Ministries are Publique: ALI RAMAZANI, Restructured According to Their Pending IDA / D1850 Post Direct Selection Direct 200,000.00 0.00 2018-06-15 2018-06-25 2018-08-29 2019-02-25 Boniface BOLA, Joseph Revised Orgazational Implementation IPALAKA, Jean de dieu Framework KASEYA, Bernard Louis KILIKWA, Fernand TUDIENU, Léon KAYEMBE, etc. ZR-PRRAP-56768-CS-CDS / Sélection d'un Consultant Cabinet (Faculté des Sciences Component 3: Pending é onomiques de l'Université c IDA / D1850 Building Capacity through an Post Direct Selection Direct 150,000.00 0.00 2018-05-25 2018-06-04 2018-08-08 2019-02-04 Implementation Pédagogique Nationale) en appui Infrastructure of Training Centers à la recherche active de l'Administration Publique ZR-PRRAP-63389-CS-CDS / Renouvellement du contrat du A Sustainable Retirement Pending Consultant Moise MUSOLE IDA / D1850 System for Civil Servants is Post Direct Selection Direct 72,600.00 0.00 2018-05-25 2018-06-04 2018-08-08 2019-02-04 Implementation l'Expert National en Gestion Established Financière pour la CNSSAP ZR-PRRAP-63390-CS-CDS / Renouvellement du contrat du A Sustainable Retirement Pending Consultant Oscar NSARHAZA, IDA / D1850 System for Civil Servants is Post Direct Selection Direct 60,600.00 0.00 2018-05-25 2018-06-04 2018-08-08 2019-02-04 Implementation Expert National Informaticien Established pour la CNSSAP ZR-PRRAP-63400-CS-INDV / Renouvellement du contrat de Targeted Ministries are Monsieur Pierre TSHIYOMBO, Restructured According to Their Individual Consultant Pending Consultant Expert Informaticien IDA / D1850 Post Direct 18,000.00 0.00 2018-05-31 2018-06-10 2018-07-01 2018-08-05 2019-02-01 Revised Orgazational Selection Implementation pour l'évaluation et le suivi de Framework l'opérationnalisation du SIGRH- PAIE ZR-PRRAP-63391-CS-CDS / Targeted Ministries are Renouvellement du contrat de Restructured According to Their Pending Monsieur Clément MBIKAYI, IDA / D1850 Post Direct Selection Direct 60,000.00 0.00 2018-05-25 2018-06-04 2018-08-08 2019-02-04 Revised Orgazational Implementation Coordonnateur Adjoint de la Framework CSPP ZR-PRRAP-63392-CS-CDS / Targeted Ministries are Renouvellement de contrat de Restructured According to Their Pending Madame Gratias KAYIBABU IDA / D1850 Post Direct Selection Direct 36,000.00 0.00 2018-05-25 2018-06-04 2018-08-08 2019-02-04 Revised Orgazational Implementation KABUYA, Chargé de Projet à la Framework CSPP ZR-PRRAP-63393-CS-CDS / Targeted Ministries are Renouvellement de contrat de Restructured According to Their Pending Monsieur Audry KAZEMBOLA IDA / D1850 Post Direct Selection Direct 36,000.00 0.00 2018-05-25 2018-06-04 2018-08-08 2019-02-04 Revised Orgazational Implementation MBEMBA, Chargé de Projet à la Framework CSPP ZR-PRRAP-63394-CS-CDS / Targeted Ministries are Renouvellement de contrat de Restructured According to Their Pending Monsieur Diamant EBENE IDA / D1850 Post Direct Selection Direct 36,000.00 0.00 2018-05-25 2018-06-04 2018-08-08 2019-02-04 Revised Orgazational Implementation NGANGA, Chargé de Projet à la Framework CSPP Page 5 ZR-PRRAP-63395-CS-CDS / Targeted Ministries are Renouvellement de contrat de Restructured According to Their Pending Monsieur Samuel KAULU IDA / D1850 Post Direct Selection Direct 36,000.00 0.00 2018-05-25 2018-06-04 2018-08-08 2019-02-04 Revised Orgazational Implementation LUSANGA, Chargé de Projet à la Framework CSPP ZR-PRRAP-63396-CS-CDS / Targeted Ministries are Renouvellement de contrat de Restructured According to Their Pending Monsieur Eddy MBUNGU IDA / D1850 Post Direct Selection Direct 36,000.00 0.00 2018-05-25 2018-06-04 2018-08-08 2019-02-04 Revised Orgazational Implementation MBEMBA, Chargé de Projet à la Framework CSPP ZR-PRRAP-63397-CS-CDS / Targeted Ministries are Renouvellement de contrat de Restructured According to Their Pending Madame Lourlaine IDA / D1850 Post Direct Selection Direct 36,000.00 0.00 2018-05-25 2018-06-04 2018-08-08 2019-02-04 Revised Orgazational Implementation KUTEKEMENYI MUANZA, Framework Chargée de Projet à la CSPP ZR-PRRAP-63400-CS-CDS / Renouvellement du contrat du Component 3: Pending Spécialiste en informatique et IDA / D1850 Building Capacity through an Post Direct Selection Direct 40,536.00 0.00 2018-05-31 2018-06-10 2018-08-14 2019-02-10 Implementation é ommunication du Télc Infrastructure of Training Centers SENAREC ZR-PRRAP-63401-CS-CDS / Component 3: Renouvellement de contrat du Pending IDA / D1850 Building Capacity through an Post Direct Selection Direct 36,000.00 0.00 2018-05-31 2018-06-10 2018-08-14 2019-02-10 Consultant en Gestion Financière Implementation Infrastructure of Training Centers et Comptable du SENAREC Page 6