(a) Prior Review Thresholds: (a) Methods Thresholds: Procurement Prior Review Method Threshold 1 ICB (Goods) All Procurement Method 2 NCB (Goods) US$3,000,000 and First 1 ICB (Goods) contract irrespective of the value 3 ICB (Works) All 2 NCB (Goods) 4 NCB (Works) US$15,000,000 and 3 ICB (Works) First contract irrespective of the value 5 Shopping (Goods) First contract 4 NCB (Works) irrespective of the value 6 Shopping (Works) First contract 5 Shopping (Goods) irrespective of the value 7 Direct contracting All 6 Shopping (Works) 8 Innovation Fund As defined by the 7 Direct contracting operational manual thresholds 8 Innovation fund 2. Consulting Services (b) Methods Thresholds: Prior Review Threshold: Selection Method Prior Review Selection Method Threshold 1 Competitive > = US$1,000,000 1 QCBS (Firms) Methods (Firms) 2 Government-owned All 2 CQS, FBS, LCS universities and research institutes 3 Single Source All 3 Single Source (Firms) (Firms) 4 Individual > = US$300,000 4 Individual Consultants Consultants 5 Governed-owned All 5 Sole Source university (Individual) professors or scientists from research institutes 6 Single Source All 6 Innovation fund (Individual) 7 Innovation fund As defined by the operational manual thresholds Thresholds: Expected Signing 1-Jul-09 CLOSING 31-Dec-15 Method Threshold Updated on 14-Jan-09 Estimated Contract Cost (in USD) No threshold Type of Procurement High Risk Substantial Implementi Risk ng Agency Implementin g Agency <= US$1,000,000 Works, Turnkey and S&I of $ 5 million $ 10 million No threshold Goods $ 0.5 million $ 1 million <= US$10,000,000 IT Systems, and Non- consulting Services $ 0.5 million $ 1 million <= US$200,000 Consulting Firms Services $ 0.2 million $ 0.5 million <= US$300,000 Individuals $ 0.1 million $ 0.2 million No threshold As defined by the 1 15 operational manual thresholds 6.66666667 100 Method Threshold No threshold Updated on 14-Jan-09 Estimated Contract Cost (in USD) <300,000 Type of Procurement High Risk Substantial Implementi Risk ng Agency Implementin g Agency No threshold Works, Turnkey and S&I of Plant and Equipment $ 5 million $ 10 million No threshold Goods $ 0.5 million $ 1 million No threshold IT Systems, and Non- consulting Services $ 0.5 million $ 1 million As defined by the Consulting Firms operational manual Services thresholds $ 0.2 million $ 0.5 million Consulting Services Individuals $ 0.1 million $ 0.2 million Updated on 14-Dec-14 mated Contract Cost (in USD) Moderate Risk Low Risk Implementing Implementing Agency Agency $ 15 million $ 20 million $ 3 million $ 5 million $ 3 million $ 5 million $ 1 million $ 2 million $ 0.3 million $ 0.5 million PPR=7% to be reviewd mated Contract Cost (in USD) Moderate Risk Low Risk Implementing Implementing Agency Agency $ 15 million $ 20 million $ 3 million $ 5 million $ 3 million $ 5 million $ 1 million $ 2 million $ 0.3 million $ 0.5 million Hashemite Kingdom of Jordan ERFKEII PROCUREMENT PLAN FOR GOODS/WORLD BANK- for year 4-2013 UPDATE20/11/2014 Execution in months Proc. System Ref. # Execution in days Selection Method Plan vs. Actual Bid. Sub-Comp Bid. Doc/Sp Interval Interval Interval Interval Interval Interval Interval Doc/Sp SN. # Needsecs Invitation Bid Opening Evaluation Contract Contract Completion Location/ Description of Assignment Bank Rev. Needsecs NOL Date NOL Date The Contractor Comment prep. Date Date & Recomm. Signature Date Start Date Date (original) prep. End Date Start Date P C51 PG002 [Eqpmt] Furniture New schools. 6new+8 Ext - NCB PO 28-Jun-12 30 28-Jul-12 0 28-Jul-12 1 29-Jul-12 28 26-Aug-12 28 23-Sep-12 23-Sep-12 14 7-Oct-12 10-Oct-12 122 4 9-Feb-13 Redistribution R 13 WB/2012 1-Sep-12 30 1-Oct-12 0 1-Oct-12 1-Oct-12 28 29-Oct-12 26-Nov-12 26-Nov-12 26-Nov-12 26-Nov-12 122 4 28-Mar-13 Package A 6 new schools+8Ext. 1/13WB/2012 1-Sep-12 8 9-Sep-12 0 9-Sep-12 1 10-Sep-12 28 8-Oct-12 49 26-Nov-12 0 26-Nov-12 27 23-Dec-12 23-Dec-12 90 3 23-Mar-13 ‫ مصنع ياسين لالثاث المعدني واالخشاب‬13WB/2012&12WB/20 A 2/13WB/2012 1-Sep-12 8 9-Sep-12 0 9-Sep-12 1 10-Sep-12 28 8-Oct-12 49 26-Nov-12 0 26-Nov-12 30 26-Dec-12 26-Dec-12 90 3 26-Mar-13 ‫شركة التجدد لصناعة االثاث والمÙ?روشات‬ 12 A Total 3/13WB/2012 1-Sep-12 8 9-Sep-12 0 9-Sep-12 1 10-Sep-12 28 8-Oct-12 49 26-Nov-12 0 26-Nov-12 30 26-Dec-12 26-Dec-12 90 3 26-Mar-13 ‫منجرة ومÙ?روشات حسونة‬ P C51 PG003 [Eqpmt] Furniture New schools- 2 WB/2013 NCB PO 28-Feb-13 30 30-Mar-13 30-Mar-13 1 31-Mar-13 28 21-Apr-13 28 19-May-13 19-May-13 14 2-Jun-13 5-Jun-13 122 4 5-Oct-13 R 6 new schools+7 Ext. 0-Jan-00 0-Jan-00 0-Jan-00 0-Jan-00 17-Jun-13 17-Jun-13 17-Jun-13 17-Jun-13 122 4 17-Oct-13 A 28-Feb-13 26 26-Mar-13 0 26-Mar-13 5 31-Mar-13 36 6-May-13 42 17-Jun-13 0 17-Jun-13 23 10-Jul-13 10-Jul-13 90 90 8-Oct-13 ‫شركة التجدد لصناعات االثاث والمÙ?روشات‬ 2WB/2013 A 28-Feb-13 26 26-Mar-13 0 26-Mar-13 5 31-Mar-13 36 6-May-13 42 17-Jun-13 0 17-Jun-13 30 17-Jul-13 17-Jul-13 90 90 15-Oct-13 ‫مصنع ياسين لالثاث المعدني واالخشاب‬ A 28-Feb-13 26 26-Mar-13 0 26-Mar-13 5 31-Mar-13 36 6-May-13 42 17-Jun-13 0 17-Jun-13 28 15-Jul-13 15-Jul-13 90 90 13-Oct-13 ‫الصناعات االردنية‬ P C51 PG004 [Eqpmt] Furniture New schools, IFB no. 00 NCB PO 23-Aug-13 30 22-Sep-13 22-Sep-13 1 23-Sep-13 28 21-Oct-13 28 18-Nov-13 18-Nov-13 14 2-Dec-13 5-Dec-13 122 4 6-Apr-14 R WB/2013 30-Aug-14 29-Sep-14 29-Sep-14 4-Oct-14 1-Nov-14 28 29-Nov-14 0 29-Nov-14 14 13-Dec-14 13-Dec-14 122 14-Apr-15 30 0 5 28 4 4new schools+2 Ext. A 0 0 0 0 0 0 0 0 0-Jan-00 P C51 PG005 [Eqpmt] Furniture New schools,IFB no. 00 NCB 24-Aug-14 30 23-Sep-14 23-Sep-14 23-Sep-14 28 21-Oct-14 28 18-Nov-14 18-Nov-14 14 2-Dec-14 2-Dec-14 122 4 3-Apr-15 R WB/2014- SCHOOL UNDER PO 0-Jan-00 0-Jan-00 0-Jan-00 0-Jan-00 0-Jan-00 0-Jan-00 0-Jan-00 0-Jan-00 122 4 1-May-00 A DESIGN 0 0 0 0 0 0 0 0 0-Jan-00 6new schools+18 Ext. P C51 PG006 [Eqpmt] New Sch- Lab Equipment 19 new ICB PO 11-May-13 30 10-Jun-13 10-Jun-13 1 11-Jun-13 28 9-Jul-13 28 6-Aug-13 6-Aug-13 14 20-Aug-13 23-Aug-13 122 4 23-Dec-13 R schools & 4 extension - 3WB/2013 19-Mar-13 19-Mar-13 19-Mar-13 19-Mar-13 19-Mar-13 19-Mar-13 19-Mar-13 19-Mar-13 19-Mar-13 122 4 19-Jul-13 3WB/2013 A 28-Mar-13 89 25-Jun-13 29 24-Jul-13 5 29-Jul-13 35 2-Sep-13 97 8-Dec-13 74 20-Feb-14 ### 120 3.93 29-Apr-00 10-Nov-14 10-Nov-14 120 4 10-Nov-14 ‫شركة الÙ?سطاط‬ 03-Nov-14 03-Nov-14 120 4 03-Nov-14 ‫دار العلوم‬ A C51 New Sch- Lab Equipment 19 new 19-Dec-13 63 20-Feb-14 0 20-Feb-14 6 26-Feb-14 47 14-Apr-14 150 11-Sep-14 12-Nov-14 12-Nov-14 120 4 12-Nov-14 ‫االوروبية الخليجية‬ schools & 4 extension - ICB PO 19-Dec-13 63 20-Feb-14 0 20-Feb-14 6 26-Feb-14 47 14-Apr-14 150 11-Sep-14 10-Nov-14 10-Nov-14 120 4 10-Nov-14 ‫شركة الÙ?سطاط‬ 3WB/2013R1 19-Dec-13 63 20-Feb-14 0 20-Feb-14 6 26-Feb-14 47 14-Apr-14 150 11-Sep-14 03-Nov-14 03-Nov-14 120 4 03-Nov-14 ‫دار العلوم‬ 3WB/2013R1 10-Nov-14 10-Nov-14 120 4 10-Nov-14 ‫شركة الÙ?سطاط‬ 19-Dec-13 63 20-Feb-14 0 20-Feb-14 6 26-Feb-14 47 14-Apr-14 150 11-Sep-14 02-Nov-14 02-Nov-14 120 4 02-Nov-14 ‫الغيث النتاج وسائل التعليم‬ P C51 PG007 [Eqpmt] Furniture New schools, IFB no.27 NCB 23-Aug-13 30 22-Sep-13 22-Sep-13 1 23-Sep-13 28 21-Oct-13 28 18-Nov-13 18-Nov-13 14 2-Dec-13 5-Dec-13 122 4 6-Apr-14 R WB/2013 PO 0-Jan-00 0-Jan-00 0-Jan-00 11-Nov-13 11-Nov-13 11-Nov-13 11-Nov-13 11-Nov-13 122 4 13-Mar-14 A 16new schools+4 Ext. 1-Aug-13 62 2-Oct-13 0 2-Oct-13 4 6-Oct-13 36 11-Nov-13 27 8-Dec-13 0 8-Dec-13 45 22-Jan-14 22-Jan-14 90 2.95 22-Apr-14 ‫شركة التجدد لصناعة االثاث والمÙ?روشات‬ 27WB/2013 1-Aug-13 62 2-Oct-13 0 2-Oct-13 4 6-Oct-13 36 11-Nov-13 27 8-Dec-13 0 8-Dec-13 46 23-Jan-14 23-Jan-14 90 2.95 23-Apr-14 ‫مصنع ياسين لالثاث المعدني واالخشاب‬ 1-Aug-13 62 2-Oct-13 0 2-Oct-13 4 6-Oct-13 36 11-Nov-13 27 8-Dec-13 0 8-Dec-13 50 27-Jan-14 27-Jan-14 90 2.95 27-Apr-14 ‫منجرة ومÙ?روشات حسونة‬ P C51 PG008 [Eqpmt] New Sch- Lab Equipment NCB PO 23-Aug-14 30 22-Sep-14 22-Sep-14 1 23-Sep-14 28 21-Oct-14 28 18-Nov-14 18-Nov-14 14 2-Dec-14 5-Dec-14 122 4 6-Apr-15 R ==SCHOOL UNDER DESIGN 0-Jan-00 0-Jan-00 0-Jan-00 0-Jan-00 0-Jan-00 0-Jan-00 0-Jan-00 0-Jan-00 122 4 1-May-00 A 0 0 0 0 0 0 0 0 0-Jan-00 P C51 PG009 [Eqpmt] New Sch-Computer Labs ICB PO 14-Jun-13 30 14-Jul-13 14-Jul-13 1 15-Jul-13 28 12-Aug-13 60 11-Oct-13 11-Oct-13 14 25-Oct-13 28-Oct-13 122 4 27-Feb-14 R 32 Labs 19-Aug-13 30 18-Sep-13 18-Sep-13 1 19-Sep-13 28 17-Oct-13 28 14-Nov-13 14-Nov-13 14 28-Nov-13 1-Dec-13 122 4 2-Apr-14 A #### 0 0 0 0-Jan-00 PCs for Various Functions for 19 10-Jul-14 28-Aug-14 4-Sep-14 8-Sep-14 20-Oct-14 New Schools and 8 Extensions NCB PO 49 7 4 42 17WB/2014 P C51 PG0010 [Eqpmt] New Sch-Computer Labs NCB PO 19-Aug-14 30 18-Sep-14 18-Sep-14 1 19-Sep-14 28 17-Oct-14 60 16-Dec-14 16-Dec-14 14 30-Dec-14 2-Jan-15 122 4 4-May-15 R 15 Labs SCHOOL UNDER 30 30-Jan-00 30-Jan-00 1 31-Jan-00 28 28-Feb-00 28 27-Mar-00 27-Mar-00 14 10-Apr-00 13-Apr-00 122 4 13-Aug-00 A DESIGN 0 0 0 0 0 0 0 0 0-Jan-00 P C51 PG011 [Eqpmt] New Sch-preVocational NCB PO ######### 30 ########## ########## 1 ######### 28 ########### 28 ########## ########## 14 122 4 1-May-00 ‫مؤسسة عمورية التجارية‬ 14WB/2014 R 14 WB/2014 1-Mar-14 30 31-Mar-14 31-Mar-14 1 1-Apr-14 28 29-Apr-14 28 27-May-14 27-May-14 3 122 4 1-May-00 ‫الزهوة لتجارة مواد البناء‬ A 16-Mar-14 43 28-Apr-14 0 28-Apr-14 20 18-May-14 36 23-Jun-14 86 17-Sep-14 ### no need ### 0 0-Jan-00 ‫مؤسسة االنماء االهلية للتجارة‬ P C51 PG012 [Eqpmt] New Sch-preVocational SCHOOL NCB PO 23-Aug-14 30 22-Sep-14 22-Sep-14 1 23-Sep-14 28 21-Oct-14 28 18-Nov-14 18-Nov-14 14 2-Dec-14 5-Dec-14 122 4 6-Apr-15 R UNDER DESIGN 30 30-Jan-00 30-Jan-00 1 31-Jan-00 28 28-Feb-00 28 27-Mar-00 27-Mar-00 3 30-Mar-00 30-Mar-00 122 4 30-Jul-00 A 0 0 0 0 0 0 0 0 0-Jan-00 P C51 PG013 [Eqpmt] New Sch-Recreational & educational NCB PO 17-Jan-14 30 16-Feb-14 16-Feb-14 1 17-Feb-14 28 17-Mar-14 60 16-May-14 16-May-14 14 30-May-14 2-Jun-14 122 4 2-Oct-14 R games for kindergarten 15KGs - 10 1-Mar-14 30 31-Mar-14 31-Mar-14 1 1-Apr-14 28 29-Apr-14 28 27-May-14 27-May-14 3 30-May-14 13-Jun-14 122 4 13-Oct-14 A WB/2014 16-Mar-14 43 28-Apr-14 0 28-Apr-14 22 20-May-14 27 16-Jun-14 85 9-Sep-14 2 11-Sep-14 33 14-Oct-14 14-Oct-14 90 2.95 12-Jan-15 ‫شركة المدائن والقرطاسية والوكاالت التجارية‬ 10WB/2014 P C51 PG014 [Eqpmt] New Sch-Recreational & educational NCB PO 19-Aug-14 30 18-Sep-14 18-Sep-14 1 19-Sep-14 28 17-Oct-14 60 16-Dec-14 16-Dec-14 14 30-Dec-14 2-Jan-15 122 4 4-May-15 R games for kindergarten19 KGs 30 30-Jan-00 30-Jan-00 1 31-Jan-00 28 28-Feb-00 28 27-Mar-00 27-Mar-00 3 30-Mar-00 13-Apr-00 122 4 13-Aug-00 A SCHOOL UNDER DESIGN 0 0 0 0-Jan-00 0 0 0 0 0 P C51 PG015 [Eqpmt] New Sch-sport for 19 New Schools NCB 17-Jan-14 30 16-Feb-14 16-Feb-14 1 17-Feb-14 28 17-Mar-14 60 16-May-14 16-May-14 14 30-May-14 2-Jun-14 122 4 2-Oct-14 R 11WB/2014 ‫مدرسة‬19 11 WB/2014‫مدرسة‬ 19‫ل‬ ‫تجهيزاترياضية‬ ‫رياضيةل‬ ‫تجهيزات‬ PO 1-Mar-14 31-Mar-14 31-Mar-14 1-Apr-14 29-Apr-14 28 27-May-14 27-May-14 3 30-May-14 13-Jun-14 122 13-Oct-14 11WB/2014 30 1 28 4 16-Mar-14 43 28-Apr-14 0 28-Apr-14 20 18-May-14 29 16-Jun-14 #### 0 A 11WB/2014 R1 16-Mar-14 43 28-Apr-14 0 90 2.95 30-Mar-00 P C51 PG016 [Eqpmt] New Sch-sport SCHOOL UNDER NCB PO 14-Aug-14 30 13-Sep-14 13-Sep-14 1 14-Sep-14 28 12-Oct-14 60 11-Dec-14 11-Dec-14 14 25-Dec-14 28-Dec-14 122 4 29-Apr-15 R DESIGN 30 30-Jan-00 30-Jan-00 1 31-Jan-00 28 28-Feb-00 28 27-Mar-00 27-Mar-00 3 30-Mar-00 13-Apr-00 122 4 13-Aug-00 A 0 0 0 0 0 0 0 0 0-Jan-00 P C51 PG017 [Eqpmt] New Sch-Art - 13 WB/2014 NCB PO 14-Apr-14 30 14-May-14 14-May-14 1 15-May-14 28 12-Jun-14 60 11-Aug-14 11-Aug-14 14 25-Aug-14 28-Aug-14 122 4 28-Dec-14 13WB/2014 R ‫ مدرسة‬19(‫تجهيزات غرÙ? الÙ?Ù† ل‬ 1-Mar-14 30 31-Mar-14 31-Mar-14 1 1-Apr-14 28 29-Apr-14 28 27-May-14 27-May-14 3 30-May-14 30-May-14 122 4 29-Sep-14 A 16-Mar-14 43 28-Apr-14 0 28-Apr-14 20 18-May-14 36 23-Jun-14 31 24-Jul-14 35 28-Aug-14 3 31-Aug-14 31-Aug-14 90 2.95 28-Nov-14 ‫ مؤسسة عمورية التجارية‬LOT 2 & 3 ‫مؤسسة عمورية التجارية‬ LOT 1 P C51 PG018 [Eqpmt] New Sch-Art SCHOOL UNDER NCB PO 14-Apr-14 30 14-May-14 14-May-14 1 15-May-14 28 12-Jun-14 60 11-Aug-14 11-Aug-14 14 25-Aug-14 28-Aug-14 122 4 28-Dec-14 R DESIGN 30 30-Jan-00 30-Jan-00 1 31-Jan-00 28 28-Feb-00 28 27-Mar-00 27-Mar-00 3 30-Mar-00 30-Mar-00 122 4 30-Jul-00 A 0 0 0 0 0 0 0 90 2.95 30-Mar-00 P C51 PG019 [Eqpmt] New schools -electrical appliances NCB PO 17-Jan-14 30 16-Feb-14 16-Feb-14 1 17-Feb-14 28 17-Mar-14 60 16-May-14 16-May-14 14 30-May-14 2-Jun-14 122 4 2-Oct-14 LOT4 ‫واÙ?Ù‚ البنك على اعادة طرح‬ R (19 schools)- 9WB/2014 1-Mar-14 30 31-Mar-14 31-Mar-14 1 1-Apr-14 28 29-Apr-14 28 27-May-14 27-May-14 3 30-May-14 30-May-14 122 4 29-Sep-14 5 ‫امتنع عن تمويل المجموعة‬ 16-Mar-14 43 28-Apr-14 0 28-Apr-14 18-May-14 29 16-Jun-14 66 21-Aug-14 25-Aug-14 12-Oct-14 12-Oct-14 90 2.95 9-Jan-15 ) LOT 6 ( ‫شركة سلعوس للتجهيزات‬ A 16-Mar-14 43 28-Apr-14 0 28-Apr-14 20 18-May-14 29 16-Jun-14 66 21-Aug-14 4 25-Aug-14 34 28-Sep-14 28-Sep-14 90 2.95 27-Dec-14 ) LOT 1,2,3( ‫شركة موÙ?Ù‚ جمعة وشركاه‬ 9WB/2014 R1 ( LOT4 ) P C51 PG020 [Eqpmt] New schools -electrical appliances NCB PO 22-Jul-14 30 21-Aug-14 21-Aug-14 1 22-Aug-14 28 19-Sep-14 60 18-Nov-14 18-Nov-14 14 2-Dec-14 5-Dec-14 122 4 6-Apr-15 R (7 schools)SCHOOL UNDER 30 30-Jan-00 30-Jan-00 1 31-Jan-00 28 28-Feb-00 28 27-Mar-00 3 27-Mar-00 30-Mar-00 30-Mar-00 122 4 30-Jul-00 A DESIGN 0 0 0 0 0 0 0 0 0-Jan-00 P C51 PG021 [Eqpmt] New schools - (18 schools)‫تجهيزات‬ NCB PO 17-Jan-14 30 16-Feb-14 16-Feb-14 1 17-Feb-14 28 17-Mar-14 60 16-May-14 16-May-14 14 30-May-14 2-Jun-14 122 4 2-Oct-14 R ‫غرÙ? االسعاÙ?‬12 WB/2014 1-Mar-14 30 31-Mar-14 31-Mar-14 1 1-Apr-14 28 29-Apr-14 28 12-Nov-14 3 90 2.95 30-Mar-00 )LOT1 ‫شركة مركز ابن سينا لالجهزة الطبية‬ 12WB/2014 R1 A 12WB/2014 R1 16-Mar-14 43 28-Apr-14 0 28-Apr-14 20 18-May-14 36 23-Jun-14 133 3-Nov-14 0 3-Nov-14 ### 90 2.95 30-Mar-00 LOT 2 & lot3 ‫مؤسسة الحياة العلمية الطبية‬ 940000PROP0P100n0Goods0201412140DCU.xls Page 7/16 2/1/2015 WORLD BANK- PROCUREMENT PLAN FOR GOODS Comp 1-4 20-Nov-14 UPDATE Execution in days Selection Method Proc. System Ref. Plan vs. Actual Execution in Sub-Comp Bid. Doc/Sp Bid. Doc/Sp Completio months Interval Interval Interval Interval Interval Interval Interval Interval Contract Completion Comp SN. # Location/ Description of Ban Needsecs Needsecs Invitation Bid Opening Evaluation Contract n Date NOL Date NOL Date Signature Date Consultant Name Comments Tenders No. # Assignment k prep. prep. Date Date & Recomm. Start Date (last Date (original) Rev. Start Date End Date revision) 1 p C42d PG001 Sp Prog- [Rationalizn, Welding & General Mechanics ICB PO 31-May-12 30 30-Jun-12 0 30-Jun-12 30-Jun-12 30-Jun-12 30-Jun-12 30-Jun-12 30-Jun-12 30-Jun-12 150 27-Nov-12 NA NA WB provided No- R Vocational redeploymt, or Workshops Equipment Tender 0-Jan-00 0-Jan-00 14 30-May-12 40 9-Jul-12 30 8-Aug-12 0 20-Nov-12 3 23-Nov-12 0 23-Nov-12 150 22-Apr-13 objection on 5WB/2012 Edu proc of tools and 5WB/2012 delivery A 25-Apr-12 30-May-12 18-Jun-12 27-Aug-12 20-Nov-12 retendering. eqpt] 1 p C42d PG001 Sp Prog- [Rationalizn, Welding & General Mechanics ICB PO 9-Feb-12 30 10-Mar-12 0 10-Mar-12 14 24-Mar-12 40 3-May-12 30 2-Jun-12 14 16-Jun-12 14 30-Jun-12 0 30-Jun-12 122 4 30-Oct-12 NA NA 5WB/2012R1 Vocational redeploymt, or Workshops Equipment IFB WB provided No- R 20-Nov-12 10 30-Nov-12 30-Nov-12 14 14-Dec-12 40 23-Jan-13 30 22-Feb-13 0 22-Feb-13 3 25-Feb-13 0 24-Aug-26 120 4 22-Dec-26 Edu proc of tools and objection on A eqpt] Lot (1,2,3,4) 20-Nov-12 19 9-Dec-12 9 18-Dec-12 9 27-Dec-12 39 4-Feb-13 62 7-Apr-13 10 17-Apr-13 41 28-May-13 85 21-Aug-13 120 New Tronic retendering.20/11/2 012 A Lot(5) 20-Nov-12 19 9-Dec-12 9 18-Dec-12 9 27-Dec-12 39 4-Feb-13 62 7-Apr-13 10 17-Apr-13 46 2-Jun-13 80 21-Aug-13 120 Prodit Engineering 2 P C42d PG002 Sp Prog- [Rationalizn, Hospitality Vocational NCB PO 22-Mar-12 30 21-Apr-12 21-Apr-12 1 22-Apr-12 28 20-May-12 28 17-Jun-12 0 17-Jun-12 3 20-Jun-12 14 4-Jul-12 122 4 3-Nov-12 NA NA 10WB/2012 R Vocational redeploymt, or Education Equipment 22-Mar-12 30 21-Apr-12 0 21-Apr-12 1 22-Apr-12 28 20-May-12 28 7-Jan-13 0 7-Jan-13 3 10-Jan-13 14 24-Jan-13 120 4 24-May-13 A Edu proc of tools and 10WB/2012-lot (1) 0 0 ### 5-Jun-12 71 2-Jul-12 189 7-Jan-13 0 7-Jan-13 83 31-Mar-13 31-Mar-13 90 3 29-Jun-13 NA OMEGA CLOSED eqpt] 5-Jun-12 2-Jul-12 7-Jan-13 8-Apr-13 WB povided No- objection on 10WB/2012-lot (2,3,4) retendering lot (2,3,4) 8/4/2013 3 P C42d PG003 Sp Prog- [Rationalizn, Hospitality Vocational NCB PO 3-May-13 30 2-Jun-13 2-Jun-13 1 3-Jun-13 28 1-Jul-13 28 29-Jul-13 0 29-Jul-13 3 1-Aug-13 14 15-Aug-13 122 4 15-Dec-13 WB povided No- 10WB/2012R1 Vocational redeploymt, or Education Equipment objection on CLOSED R 8-Apr-13 30 11-Apr-13 0 11-Apr-13 1 12-Apr-13 28 13-May-13 28 10-Jun-13 0 10-Jun-13 3 13-Jun-13 14 27-Jun-13 120 4 25-Oct-13 Edu proc of tools and 10WB/2012R1-lot (2,3,4) retendering lot A 9-Apr-13 2 11-Apr-13 0 11-Apr-13 6 17-Apr-13 31 13-May-13 56 8-Jul-13 0 8-Jul-13 20 28-Jul-13 28-Jul-13 90 26-Oct-13 ‫محالت احمد نعمان مصطÙ?ى‬ eqpt] (2,3,4) 8/4/2013 4 P C42d PG004 Sp Prog- [Rationalizn, Equipment for the Workshops ICB 1-Aug-14 30 31-Aug-14 31-Aug-14 1 1-Sep-14 28 29-Sep-14 28 27-Oct-14 0 27-Oct-14 3 30-Oct-14 14 13-Nov-14 122 4 15-Mar-15 28WB/2013 Vocational redeploymt, or of Offices Machines & R 1-Aug-13 30 11-Oct-13 0 11-Oct-13 1 12-Oct-13 28 9-Nov-13 28 7-Dec-13 0 7-Dec-13 3 10-Dec-13 14 24-Dec-13 120 4 23-Apr-14 Edu proc of tools and Computers Maintenances A 23-Jun-13 109 10-Oct-13 0 21-Oct-13 13 3-Nov-13 72 23-Dec-13 88 21-Mar-14 ### 0 eqpt] (28WB/2013) New 4 P C42d PG004 Sp Prog- [Rationalizn, NCB PO 6-Sep-14 28WB/2013 Vocational redeploymt, or Equipment for the Workshops R of Offices Machines & Edu proc of tools and A Computers (28WB/2013)R1 6-Sep-14 32 8-Oct-14 1 9-Oct-14 5 14-Oct-14 27 10-Nov-14 eqpt] 5 P C42d PG005 Sp Prog- [Rationalizn, Machines & Tools for NCB PO 1-Aug-14 30 31-Aug-14 31-Aug-14 1 1-Sep-14 28 29-Sep-14 28 27-Oct-14 0 27-Oct-14 3 30-Oct-14 14 13-Nov-14 122 4 15-Mar-15 7WB/2014 R Vocational redeploymt, or Woodworking 1-Aug-14 30 31-Aug-14 0 31-Aug-14 1 1-Sep-14 28 29-Sep-14 28 27-Oct-14 0 27-Oct-14 3 30-Oct-14 14 13-Nov-14 120 4 13-Mar-15 A Edu proc of tools and for Workshops 7WB/2014 3-Feb-14 48 23-Mar-14 4 27-Mar-14 10 6-Apr-14 43 19-May-14 131 27-Sep-14 ### 0 6 P C42d PG006 Sp Prog- [Rationalizn, NCB PO 1-Aug-14 30 31-Aug-14 31-Aug-14 1 1-Sep-14 28 29-Sep-14 28 27-Oct-14 0 27-Oct-14 3 30-Oct-14 14 13-Nov-14 122 4 15-Mar-15 Central Heating Workshop& Air R Vocational redeploymt, or 1-Aug-14 30 31-Aug-14 0 31-Aug-14 1 1-Sep-14 28 29-Sep-14 28 27-Oct-14 0 27-Oct-14 3 30-Oct-14 14 13-Nov-14 120 4 13-Mar-15 18WB/2014 Conditioning 18WB/2014 A Edu proc of tools and 20-Aug-14 33 22-Sep-14 2 24-Sep-14 1 25-Sep-14 56 27-Oct-14 #### 0 0 7 P C42d PG007 Sp Prog- eqpt] [Rationalizn, Cars Workshops for NCB PO 1-Aug-14 30 31-Aug-14 31-Aug-14 1 1-Sep-14 28 29-Sep-14 28 27-Oct-14 0 27-Oct-14 3 30-Oct-14 14 13-Nov-14 122 4 15-Mar-15 8WB/2014 R Vocational redeploymt, or Vocational Educational 1-Aug-14 30 31-Aug-14 0 31-Aug-14 1 1-Sep-14 28 29-Sep-14 28 27-Oct-14 0 27-Oct-14 3 30-Oct-14 14 13-Nov-14 120 4 13-Mar-15 A Edu proc of tools and (8WB/2014) 3-Feb-14 48 23-Mar-14 4 27-Mar-14 10 6-Apr-14 43 19-May-14 #### 0 0 Awareness mechanisms for parents of disabled children ICB and deployment Resource develoment, acquision Part. Part. Total: 0.0000 ### C1-G C1-W C2-G C2-W C3-G C3-W C4-G C4-W Subtotal: WORLD BANK- PROCUREMENT PLAN FOR GOODS (Shopping) Comp 1-4 Innovation Fund Round 2 as at [16-Mar-2013] Proc. System Ref. Plan vs. Actual Sub-Comp Location/ Comp SN. # Governorat Description of # e Assignment 1 P ( ‫إعادة تدوير قطع األقمشة‬ Policy- R C21k SH001 Project 1 )8WB/2012 ‫لواء الكورة‬ Pcy Dvlpt A 2 P ‫استغالل اوراق األشجار‬ Policy- R C21k SH002 Project 2 ‫إلنتاج سماد عضوي‬ ‫البادية الجنوبية‬ Pcy Dvlpt A )9WB/2012( 3 P ‫تدريس وتعليم الÙ?سيÙ?ساء‬ Policy- R C21k SH003 Project 3 ) 7WB/2012 ( ‫مادبا‬ Pcy Dvlpt A 4 P ‫ال متاهات على خريطة العالم‬ Policy- R C21k SH004 Project 4 )3WB/2012( ‫بعد اليوم‬ ‫عمان الثالثة‬ Pcy Dvlpt A 5 P ‫ الطاقة‬/‫الطاقة المتجددة‬ Policy- R C21k SH005 Project 5 ‫الشمسية‬ ‫عمان الخامسة‬ Pcy Dvlpt A )6WB/2012( 5 P 1WB/2014- 11-‫مشروع‬ R Policy- C21k SH006 Project 6 ‫الرسم على االواني الÙ?خارية‬ ‫بصيرا‬ A Pcy Dvlpt ‫والزجاجية وتصميم الدمى‬ 6 P 2WB/2014R1-‫ادوات‬ ‫بادية ش‬،‫الكرك‬ R C21k SH007 Policy- Project7 ‫صحية وكهربائية وبيت‬ ‫الطيبة‬،‫غ‬ A Pcy Dvlpt ‫بالستيكي‬ ‫ اربد‬، ‫والوسطية‬ 7 P Policy- 3WB/2014R1-‫الغاز‬ ‫قصبة اربد‬ R C21k SH008 Pcy Dvlpt Project 8 ‫الحيوي‬1+7 ‫الطيبة والوسطية‬ A 8 P Policy- 4WB/2014R1-‫مكيÙ?‬ R C21k SH009 Project 9 1/‫عمان‬ Pcy Dvlpt 8 ‫تدريبي للسيارات‬ A 9 P 5WB/2014R1-‫اجهزة‬ ‫الطيبه‬ R C21k SH0010 Policy- Project10 ‫كمبيوتر وطابعات واجهزة‬ ،‫الرمثا‬،‫والوسطية‬ A Pcy Dvlpt ‫كهربائية‬ ‫القصر‬ 10 P Policy- ‫القصر‬ R C21k SH0011 Project11 6WB/2014R1-‫قرطاسية‬ Pcy Dvlpt ‫الطيبه والوسطية‬ A P Policy- Innovation fund for R C21k SH006 Project 5 Pcy Dvlpt Remaining Round 3 A hopping) Comp 1-4 Execution in days Selection Method Quotations Comparison Contract Ban Specs prep. Contract Start school Submission of Signature k Start Date Date Date Quotations Date Rev. SH PO 18-Aug-09 15-Sep-09 22-Sep-09 28-Sep-09 12-Oct-09 60 ‫مدرسة دير ابي سعيد‬ 28-Jan-00 4-Feb-00 10-Feb-00 24-Feb-00 60 ‫الثانوية الشاملة بنات‬ 14-May-12 13-Aug-12 10-Sep-12 10-Sep-12 60 SH PO 10-Feb-12 9-Mar-12 16-Mar-12 22-Mar-12 5-Apr-12 60 ‫بئر ابو دنة الثانوية‬ ‫المجمعة‬ 0-Jan-00 7-Jan-00 13-Jan-00 27-Jan-00 60 14-May-12 26-Nov-12 23-Dec-12 23-Dec-12 60 SH PO 10-Feb-12 9-Mar-12 16-Mar-12 22-Mar-12 5-Apr-12 60 ‫األميرة بسمة الثانوية‬ ‫الشاملة‬ 0-Jan-00 7-Jan-00 13-Jan-00 27-Jan-00 60 16-Jun-12 11-Dec-12 26-Dec-12 26-Dec-12 60 SH PO 10-Feb-12 9-Mar-12 16-Mar-12 22-Mar-12 5-Apr-12 60 ‫ام عمارة الثانوية للبنات‬ 0-Jan-00 7-Jan-00 13-Jan-00 27-Jan-00 60 14-May-12 5-Jun-12 28-Jun-12 28-Jun-12 60 SH PO 10-Feb-12 9-Mar-12 16-Mar-12 22-Mar-12 5-Apr-12 60 ‫الصويÙ?ية الثانوية‬ 6-Sep-12 13-Sep-12 19-Sep-12 3-Oct-12 60 6-Sep-12 24-Jan-13 29-Jan-13 29-Jan-13 60 SH PO 6-Mar-14 3-Apr-14 10-Apr-14 16-Apr-14 30-Apr-14 60 6-Mar-14 3-Apr-14 10-Apr-14 16-Apr-14 30-Apr-14 60 ‫م‬/‫نسيبة المازنية س‬ 4-Nov-13 13-May-14 10-Jun-14 18-Aug-14 18-Aug-14 60 ‫صÙ?ية بنت‬،‫القطرانة س‬ SH PO 6-Mar-14 3-Apr-14 10-Apr-14 16-Apr-14 30-Apr-14 60 ‫المركز‬،‫عبد المطلب‬ 6-Mar-14 3-Apr-14 10-Apr-14 16-Apr-14 30-Apr-14 60 ‫الملك عبداهلل‬،‫الريادي‬ 4-Nov-13 24-Feb-14 20-Mar-14 27-Apr-14 27-Apr-14 60 ‫الثني للتميز‬ SH PO 60 ‫الملك عبد اهلل الثاني للتميز‬ ‫المركز الريادي‬ 6-Mar-14 11-May-14 60 6-Mar-14 13-May-14 60 SH PO 60 ‫برهان كمال Ø« مهنية‬ ‫للبنين‬ 6-Mar-14 11-May-14 18-May-14 60 4-Nov-13 13-May-14 17-Jul-14 60 ‫الطيبة‬،‫ مديرية (القصر‬SH PO 60 ‫والوسطية )Ùˆ مدرسة‬ 6-Mar-14 11-May-14 18-May-14 60 ‫مدرسة جمانه‬، ‫صبحا س‬ 4-Nov-13 13-May-14 19-Aug-14 60 ‫ثش‬ SH PO 6-Mar-14 3-Apr-14 10-Apr-14 16-Apr-14 60 ‫القصر‬ 6-Mar-14 11-May-14 18-May-14 24-May-14 60 ‫مدرسة صبحا س‬ 4-Nov-13 13-May-14 15-Sep-14 60 SH PO 6-Mar-14 3-Apr-14 10-Apr-14 16-Apr-14 30-Apr-14 60 30-May-14 27-Jun-14 4-Jul-14 10-Jul-14 24-Jul-14 60 60 update 20-Nov-14 Compl Execution in etion months Completion Date Consultan Comments Date (original) (last t Name revisio n) 2.0 11-Dec-09 NA NA 24-Apr-00 2.0 9-Nov-12 2.0 4-Jun-12 NA NA 2.0 27-Mar-00 2.0 21-Feb-13 2.0 4-Jun-12 NA NA 2.0 27-Mar-00 2.0 24-Feb-13 2.0 4-Jun-12 NA NA 2.0 27-Mar-00 2.0 27-Aug-12 2.0 4-Jun-12 NA NA 2.0 2-Dec-12 2.0 30-Mar-13 2.0 29-Jun-14 NA NA 2.0 29-Jun-14 2.0 18-Oct-14 2.0 29-Jun-14 NA NA 2.0 29-Jun-14 2.0 26-Jun-14 2.0 NA NA 2.0 2.0 2.0 NA NA 2.0 2.0 2.0 NA NA 2.0 2.0 2.0 NA NA 2.0 2.0 2.0 29-Jun-14 NA NA 2.0 22-Sep-14 2.0 Total WORLD BANK- PROCUREMENT PLAN FOR CONSULTANCY SERVICES - CONSULTING FIRMS as at [17-Octr-12] Proc. System Ref. Selection Method Plan vs. Actual Sub-Comp Location/ Short Comp SN. # TOR Start Adv. EOI Description of Bank Rev. Listing # Date end Date Assignment Report Date 1 P C21j FC002 Policy- Pcy [ M&E areas TIMSS-2011 SSS PR 18-Sep-09 2-Oct-09 2-Oct-09 R Dvlpt of assmt] 14-Jan-00 14-Jan-00 A 2 P C21j FC003 Policy- Pcy [ M&E areas PISA 2012 SSS PR 19-Sep-09 3-Oct-09 3-Oct-09 R Dvlpt of assmt] 14-Jan-00 14-Jan-00 A 3 P C21j FC004 Policy- Pcy [ M&E areas TIMSS-2015 SSS PR R Dvlpt of assmt] A 4 P C21j FC005 Policy- Pcy [ M&E areas PISA 2015 SSS PR R Dvlpt of assmt] A 5 P C21j Policy- Pcy [ M&E areas R Dvlpt of assmt] A 5 P C21j Policy- Pcy [ M&E areas Comprehensive SSS PR 22/8/ 2-Oct-09 2-Oct-09 R Dvlpt of assmt] Evaluation of the 14-Jan-00 14-Jan-00 A CIDA fund Project PROMAN 80276 PISA 2015 192943 PISA 2009 208000 TIMSS 2011 156770 TIMSS 2015 245000 882989 Execution in days Execution in Contract Technical Final Contract Completion Interval months Finan. Public negotiation/ Contract RFP prep. Evaluation Evaluation signature Date Consultant Name Comments openg Date Award- Start Date Report Date Report Date Date (original) Draft 2-Oct-09 2-Oct-09 2-Oct-09 2-Oct-09 9-Oct-09 25-Oct-09 2 27-Oct-09 1464 48 30-Oct-13 NA 14-Jan-00 14-Jan-00 14-Jan-00 14-Jan-00 21-Jan-00 23-Jan-00 2 25-Jan-00 1464 48 28-Jan-04 NA 0 0 0-Jan-00 Barabara Ischinger 3-Oct-09 3-Oct-09 3-Oct-09 3-Oct-09 10-Oct-09 26-Oct-09 2 28-Oct-09 1464 48 31-Oct-13 NA 14-Jan-00 14-Jan-00 14-Jan-00 14-Jan-00 21-Jan-00 23-Jan-00 2 25-Jan-00 1464 48 28-Jan-04 NA 0 0 0-Jan-00 The agreement not signed 25-Dec-12 10-Jan-13 21-Jan-13 OECD/Mr.Anthony Rottier 2-Oct-09 2-Oct-09 2-Oct-09 2-Oct-09 9-Oct-09 25-Oct-09 2 27-Oct-09 1464 48 30-Oct-13 NA 14-Jan-00 14-Jan-00 14-Jan-00 14-Jan-00 21-Jan-00 23-Jan-00 2 25-Jan-00 1464 48 28-Jan-04 NA 22-Nov-10 27-Dec-10 19-Jan-11 0 19-Jan-11 37 1.21 25-Feb-11 Dr.Joachim Friedrich CONTRACTS PLAN PLAN/NCHRD 1.30985915 130.985915 1.358754