73224 Cities Alliance Project Output City Development Plan – Greater Visakhapatnam Visakhapatnam City Development Strategy and Slum Upgrading Action Plan P095174 This project output was created with Cities Alliance grant funding. Visakhapatnam City Development Plan ANNEXURE-1 of PART-III of MoA CITY DEVELOPMENT PLAN GREATER VISAKHAPATNAM MUNICIPAL CORPORATION 1 Visakhapatnam City Development Plan 2 Visakhapatnam City Development Plan TABLE OF CONTENTS 1. Introduction to City Development Plan 9 1.1. Brief Profile of City 9 1.2. City Development Strategy 12 1.3. Objectives and Scope of CDP 12 1.4. The CDP Process 13 2. Demography, Economy and Land Use 17 2.1. Introduction 17 2.2. Demography 18 2.3. Economy 22 2.4. Spatial Growth, Planning and Land Use. 30 3. Governance Frame Work and Reforms 33 3.1. Legal Framework 33 3.2. GVMC - organisation structure 34 3.3. Institutional Framework 36 3.4. Key Issues in CITY Governance 39 3.5. Reforms 41 4. Municipal Infrastructure 46 4.1. Infrastructure 46 4.2. Water Supply 47 4.3. Sewerage System 53 4.4. Storm Water Drainage 54 4.5. Traffic and Transportation 56 4.6. Solid Waste Management 62 5. Basic Services to the Urban Poor 65 5.1. Introduction 65 5.2. Growth of Slums and Slum Population 65 5.3. Socio-economic Characteristics 65 5.4. Poverty Reduction Initiatives 67 5.5. institutional arrangements 68 5.6. Housing 69 6. Physical and Environmental Aspects of City 72 6.1. Physical Setting 72 6.2. Physiographic Setting 72 6.3. Geological Setting 72 7. Vision Formulation 82 7.1. CITY vision 82 7.2. Water supply 83 7.3. Sewerage Sector: 88 7.4. Storm Water Drainage: 91 7.5. Traffic And Transportation 95 7.6. Solid Waste Management 101 7.7. Poverty Reduction Strategic Plan 106 8. City Investment Plan 110 8.1. Water Supply 110 8.2. Sewerage 110 8.3. Traffic & Transportation: 111 8.4. Storm Water Drainage 112 8.5. Solid waste management 112 8.6. Basic Services for the Poor 112 3 Visakhapatnam City Development Plan 9. Investment Finance Plan 123 9.1. Financial performance 123 9.2. Investment Sustenance 130 Annexure 8 151 LIST OF TABLES Table 1.1: Visakhapatnam at the National Level- A Comparison ............................................ 11 Table 1.2: Visakhapatnam at International Level- A Comparison ........................................... 12 Table 2.1: Population by Major Geographical Units ................................................................ 18 Table 2.2: Population Trends – Greater Visakhapatnam Municipal Corporation .................... 18 Table 2.3: Population Projections ............................................................................................ 20 Table 2.4: Composition of Growth ........................................................................................... 20 Table 2.5: Literacy Rate ........................................................................................................... 21 Table 2.6: Economic Base Occupational Distribution, 2001 .................................................... 23 Table 2.7: Gross District Domestic Product at Factor Cost (Rs Crores) ................................. 29 Table 2.8: Per Capita Income at Factor Cost (Rs) ................................................................... 29 Table 3.1: Table Showing the Institutions established by Law ................................................ 33 Table 3.2: Role of the Private Sector in Urban Infrastructure Provision .................................. 36 Table 4.1: State of the Infrastructure ....................................................................................... 46 Table 4.2: Cost Recovery in Urban Infrastructure ................................................................... 47 Table 4.3: Level of Agreegate Investment in Urban Infrastructure, 2001/02 to 2004/05 ......... 47 Table 4.4: Details of Water Supply Sources ............................................................................ 48 Table 4.5: Deficit in Supply for Different horizon years ............................................................ 50 Table 4.6: Tariff Structure Water Supply.................................................................................. 51 Table 4.7: Connection Details .................................................................................................. 51 Table 4.8: Performance Indicators ........................................................................................... 52 st Table 4.9: Progress of Implementation (1 August 2005) ....................................................... 53 Table 4.10 Performance Indicators .......................................................................................... 53 Table 4.11: Per Capita Growth Rate (PCTR)........................................................................... 58 Table 4.12: Annual Vehicular composition............................................................................... 59 Table 4.13: Share of Public Transport ..................................................................................... 59 Table 4.14: Number of Accidents in Visakhapatnam ............................................................... 61 Table 4.15 Details of Solid Waste Generation In Greater Visakha Municipal Corporation ..... 62 Table 4.16 Composition of Solid Waste in GVMC ................................................................... 62 Table 4.17: Current Status ....................................................................................................... 63 Table 5.1: Basic Infrastructure in Slums .................................................................................. 66 Table 5.2 : Existing Position Of Community Facilities Available In Slums Of GVMC: ............. 67 Table 5.3: List of Poverty Alleviation Programs ....................................................................... 68 Table 5.4 Indicative List of Institutions and Programmes ........................................................ 69 Table 5.5 .................................................................................................................................. 70 Table 6.1: Environment Services ............................................................................................. 75 Table 6.2: Land Supply (Hectares) .......................................................................................... 76 Table 6.3: Land Use Break-Up ................................................................................................ 76 Table 6.4: Estimating Renewal of Housing and Infrastructure Stock, 2005 ............................ 76 Table 6.5: Ambient Air Quality Standards ................................................................................ 77 Table 6.6: Noise Levels In Localities ....................................................................................... 79 Table 6.7: Indoor Sources of Domestic Air Pollution ............................................................... 80 Table 7.1: Goals & Service Outcomes for Different Horizon Years ......................................... 84 4 Visakhapatnam City Development Plan Table 7.2 Water Supply strategy.............................................................................................. 87 Table 7.3: Current Status and Vision ....................................................................................... 88 Table 7.4: Sewerage Sector strategy....................................................................................... 90 Table 7.6. : Storm water strategy ............................................................................................ 95 Table 7.7: Goals, Service Outcomes for Different Horizon Years ........................................... 96 Table 7.8: Traffic and Transportation strategy ....................................................................... 100 Table 7.9: Goals, Service Outcomes for Different Horizon Years ......................................... 102 Table 7.10. : Proposed Primary Collection System ............................................................... 103 Table 7.11 : Solid Waste Management Strategy ................................................................... 104 Table 7.12 : Basic Infrastructure Requirement For Slums .................................................... 107 Table 7.13: Community Facilities Available In Slums ............................................................ 107 Table 7.14: Solid Waste Infrastructure Required ................................................................... 108 Table 7.15. : Housing & Infrastructure Requirements ........................................................... 108 Table 7.16. : Poverty Reduction ............................................................................................ 109 Table 8.0 : Proposed MRTS Corridor .................................................................................... 111 Table 8.1. Water sector – City investment plan ..................................................................... 113 Table 8.2. Sewerage sector – City investment plan .............................................................. 115 Table 8.3. Storm water drainage sector – City investment plan ............................................ 116 Table 8.4. Traffic and transportation sector – City investment plan ...................................... 117 Table 8.5. Solid Waste Management Sector – City investment plan ..................................... 120 Table 8.6. Basic Services for the poor – City investment plan .............................................. 121 Table 8.7: Sector - Wise Investment Plan for 2005-2012 ...................................................... 122 Table 8.8: Financing Plan (Rs. In Crores).............................................................................. 122 Table 9.1: Assigned Revenue Income (Rs. in Crores) .......................................................... 125 Table 9.2: Revenue Grants (Rs. in Lakhs)............................................................................. 126 Table 9.3 :Key Financial Indicators ........................................................................................ 128 Table 9.4 City investment plan – Sector-wise investment plan for 2005-2012 ...................... 131 Table 9.5 : Investment SUSTENANCE .................................................................................. 132 Table 9.6 : Annualised investment plan ................................................................................. 133 LIST OF FIGURES Figure 2.1 Greater Visakha ...................................................................................................... 17 Figure 2.2: Decadal population growth in major Urban ........................................................... 19 Figure 2.3 Comparative Decadal Growth Rates of Vizag with other surrounding Muicipalities ......................................................................................................................................... 19 Figure 2.4: Sex ratio ................................................................................................................. 21 Figure 2.6 Areas of Economic Growth ..................................................................................... 22 Figure 2.8: Gross District Product per capita (2000 – 01) ....................................................... 30 Figure 2.9 Land Use Structure of GVMC 2001 ........................................................................ 30 Figure 3.1: Organisation Chart ................................................................................................. 35 Figure 3.2 Organogram2: State Level Agencies ...................................................................... 37 Figure 3.3: Role and responsibilities – inter relationship of various Department..................... 38 Figure 3.4: Functional Overlaps & Co-ordination Requirements ............................................. 39 Figure 4.1: Sources of Water Supply ....................................................................................... 49 Figure 4.2: Vehicular Average Speed ...................................................................................... 58 Fig. 5.1: Land Status of Slums in Gvmc................................................................................... 66 5 Visakhapatnam City Development Plan 6 Visakhapatnam City Development Plan TERMINOLOGY, DEFINITIONS AND GLOSSARY ABBREVIATIONS BOT build-operate-transfer CIP In the context of sectoral strategy will mean Capital Investment programme and in the context of the city as a whole will mean City Investment Plan GVMC Greater Visakhapatnam Municipal Corporation NGO non governmental organisation NRW non revenue water O&M operation and maintenance PPP Public Private Participation PSP private sector participation SSWP small-scale water provider TOR Terms of Reference WHO World Health Organization MEASUREMENT UNITS AND SYMBOLS gal gallon km Kilometer km 2 square kilometer l/c/d liter per capita per day m meter m2 square meter m3 cubic meter m3/d cubic meter per day m3/d/c cubic meter per day per capita mgd million gallons per day mld million liters per day mm millimeter NA not available or not applicable sq ft square feet sq km square kilometer sq yd square yard “ inch UNIT CONVERSION 1 gallon 4.546 liters 1,000 gallons 4.546 cubic meters 7 Visakhapatnam City Development Plan The formulas used for the computations are shown below. 1. Production/population (m3/d/c) = [annual production volume(m3) / 365] / [number of people served] 2. Water supply coverage (%) = [number of people served] x 100 [total population in service area] 3. Per capita consumption (l/c/d) = [total annual domostic consumption (m3) x 1,000/365] / [number of people served] 4. Average tariff (US$/m3) = [total annual revenue from tariff (US$)] / [total annual consumption (m3)] 5. Nonrevenue water (%) = [ total annual production (m3) – total annual consumption (m3)] x 100/ [total annual production (m3)] 6. Working ration = (annual O&M const] / [annual revenue] 7. Staff/1,000 connection ratio = [number of utility staff for city] / [number of city connections/1,000] 8. Unit production cost (US$)] = [annual O&M cost (US$)][total annual production (m 3)] 9. People served (persons) = [(number of domestic connections) x (number of persons per domestic connection)] 10. Cost of water for domestic use (10,20,30, and 50 m3 per month) – use the corresponding tariff structure provided for each water utility. 11. Sewage Treatment Ratio = Waste water treated (kl)/ Waste water produced (kl) 12. Reuse Ratio = Treated Waste water reused / recycled (kl) / Treated waste water (kl) 8 Visakhapatnam City Development Plan Chapter-I 1. Introduction to City Development Plan 1.1. BRIEF PROFILE OF CITY Visakhapatnam, popularly known as Vizag, is a fast developing port city. With a population of 15, 00,000 in 2001 and a land area of 530 square kilometres, Visakhapatnam is the country’s largest city in terms of land and Andhra Pradesh’s second largest urban agglomeration in population. On account of rapid industrialisation, there has been significant migration into the city. The city was originally a small fishing village but due to its natural harbour it developed into a major port. It has experienced rapid industrialisation with the growth of major industries, including steel, petroleum refining and fertiliser. With the formation of “Greater Visakhapatnam� in 2005 the city’s development is set for a quantum leap. The city of Visakhapatnam has implemented a number of reforms including e- governance and citizen-friendly initiatives. Vizag has been the first city in the country to implement e-governance and still leads in offering a variety of services to its residents online. The Corporation is working closely with other planning and service delivery institutions in the city for improving the quality of life. GVMC has entered into partnerships with the resident welfare associations and the slum communities in undertaking solid waste management and management of neighbourhood parks. The Visakhapatnam Slum Improvement Project (VSIP), implemented with £ 9 million grant funding from the DFID, UK during 1988-1996, improved the service provision to about 200,000 slum residents in the city. This slum upgrading initiative was evaluated as a successful within its specified objectives. However, it only worked in “notified� slums of the city, and did not encourage a citywide assessment of need or any leveraging of additional funds e.g. cost sharing etc. This left many poor settlements in the city untouched, and others partially covered. VSIP did not work to improve municipal management or finances. The impact assessment identified difficulties for the city in operation and maintenance of this additional infrastructure created in poor settlements. Consolidating on the past initiatives the Municipal Corporation proposed to prepare a City Development Plan with a focus on service delivery improvements and comprehensive and citywide slum upgradation. Administrative Staff College of India is assigned for the purpose with the assistance of Cities Alliance. History This beautiful city is said to have derived its name from the deity 'Visakha' - the God of Valour. The history of the town can be traced back to Ashoka the Great (273-232 B.C.) when this was a small fishing village of the Kalinga empire. Later on this port town successively passed from the Andhra Kings of Vengi to the Pallavas, Cholas and the Gangas. In the 15th century Visakhapatnam became a part of Vijayanagar Empire. The British took charge of this beautiful land and transformed this into a busy and flourishing port town. Today it has emerged as an important port on the east coast of India. The Vizag port handles the maximum cargo in the country and promises to become one of Asia's major ports. Location & Topography o Vizag is located on the east coast of India, in 17 42' o North latitude and 82 02' East range of hills. Based on 9 Visakhapatnam City Development Plan topographical conditions, the city and its environs can be divided into four categories viz., Hilly region, Upland tracks, Rolling plains and Plains. The Kailasa and Yarada are the major hill ranges in the city. The Kailasa hill range stretches from Simhachalam to MVP Colony on the north flank of the city. The city, which appears like a small basin, is surrounded by the Yarada hill popularly known as Dolphin’s nose (358m) on the side of the Kailasgiri hills on the north, with the Bay of Bengal forming the eastern wall. The coastal line runs from north- east to south west over a dist nce of six kilometres. On the west there is an extensive tidal basin called Upputeru now under reclamation. Beyond Yarada there is a valley followed by another range of hills. Economy The city is experiencing tremendous economic growth. The sectors contributing to city’s economic growth are agriculture and fishing (primary sector), large, medium and small scale industries (secondary sector) and services (tertiary sector) that include trade and commerce, transport, telecommunications, management and consultancy services, education, etc. It has experienced rapid industrialization with the onset of major industries viz., Oil Refinery -- a private sector fertilizer factory, Hindustan Zinc Smelter and Visakhapatnam Steel Plant. The construction of the outer harbour and Steel Plant have considerably changed the character of the city. On account of rapid industrialization, there has been tremendous amount of migration into the city. Today the tourism, services and information technology contribute significantly to the economy. Tourism Vizag, sandwiched between the promontory called Dolphin’s nose and the Kailashgiri Hills, is one sea together and that makes for a spectacular view from even within the city. The beaches of Vizag Rama Krishna, Lawson’s Bay, Rishikonda and Gangavaram are amongst the best kept secrets of India. Head north up to the Simhachalam hills is simhachalam temple, a 11th Century temple dedicated to Lord Narasimha. Vizag is well endowed with excellent hotels and restaurants to accommodate national and international tourists. Recently, many Buddhist ruins have been discovered in and around Vizag. A more fascinating site to visit is the village of Sankaram, where numerous images of Buddha are seen carved in caves of the hills. Vizag is home to the Eastern Fleet of the Indian Navy and the Naval presence has cast its influence over the city. Overlooking the port in all its majesty is the 358 meters high promontory of Dolphin’s Nose so called because of its uncanny resembalance to the mammal. The lighthouse atop, which can be visited with permission, is the highest in India. Its beams can be seen far out at the sea and it directs the traffic in the busy shipping lanes of the Bay of Bengal as well as the entrance to Vizag port. A comparison of Vizag with cities in India indicates that it is deficient in service delivery in many respects like per capita water supply and sanitation. On economic, health, 10 Visakhapatnam City Development Plan education and transport indicators it is no better. Higher percentage of people is below rhe poverty line. Similar situation exists in comparision with cities at international level. Tables 1.1 and 1.2 describe the position. Table 1.1: Visakhapatnam at the National Level- A Comparison Sector Indicator Vizag Hyd Mumbai Delhi Chennai Kolkata Gross District Product Per 20,910 23000 43000 39000 34,000 33,000 Capita ( in Rs.) Population below poverty 30% 23% 27% 8% 20% 6% Economy line (2001) Economic Disparity (% of low and lower middle 43% 37% 27% 18% 42% 32% Income households, 2002) Literacy Rate (2001) 70.46% 79% 87% 83% 80% 81% Education Drop out rate (2001) 33.4 66% 42% 52% 46% 42% % of population living in 28% 37% 55% 35% 40% 31% Housing slums ( 2001) Health Child Mortality Rate (2001) 6% 6.90% NA 2.60% 3.70% 1.60% Piped water supply per day 0.75 2 NA 2 1 NA (Hours) Water Per capita Availability in 62 110 168 180 106 173 lpcd of potable water Household water 23% 36% 58% 51.30% NA 23% connections (2001) Sewerage Connections 6% 41% NA 55% 55% NA Sanitation (UA) Average commute time 30 60 30 45 NA NA (minutes) Public Transport Utilization 49% 44% NA 62% 36% NA rate Transport % Area covered by roads 1.5% 6% 10% 18% 10% 12% Vehicles Density (passenger car units per 372 723 242 NA 293 NA KM of road length) Source – CPO’S Office, Collectorate; GVMC 11 Visakhapatnam City Development Plan Table 1.2: Visakhapatnam at International Level- A Comparison Sector Indicator Vizag Hyd Hanoi Bangkok Jakarta Jo’burg Per capita income (USD) 495 511 3,510 15,053 7,2,69 2,900 Economic Population below poverty 30% 23% 1.80% NA NA 25% Outcomes line ( 2001) Unemployment Rate (%) 24% 22% 10.30% 2.20% 16.80% 26.40% (1998) Literacy Rate( 2001) 70.46% 79% 92% 97% 98% 93% Education Drop out rate ( 2001) 33.4% 66% 7.40% NA NA NA % of population living in 28.3 Housing slums ( 2001) Health Child Mortality Rate 6% 6.90% 4.20% 3.30% 2.40% 5.50% Household access to 43% 81% 100% NA 91% 84.50% water Per capita Availability in lpcd of potable water Water 62% 106 NA NA 77 261 (Water utility coverage area, 2003) Household water 23% 64% 70% 99% 50.30% 50% connections (2001) Sewerage Connections 6% 41% 50% 100% 64.80% 84% Sanitation (UA) Average commute time 30 60 15 60 NA 50 (minutes) Transport Public Transport 49% 44% 2% 28% NA 33.40% Utilization rate Source – Monitor group report Strong Weak 1.2. CITY DEVELOPMENT STRATEGY Greater Visakhapatnam Municipal Corporatiuon (GVMC) has prepared a City Development Strategy (CDS) in 2005 to address the infrastructure and service delivery gaps in with support and assistance from Cities Alliance. The objective of CDS was to prepare and implement a strategy for creating a stong and robust economy with equitable growth. 1.3. OBJECTIVES AND SCOPE OF CDP The Government of India has launched a major programme viz., Jawaharlal Nehru National Urban Renewal Mission (JNNURM), for promoting reforms and investments for select 63 cities. Visakhapatnam is one of the eligible cities under the scheme. Under JNNURM, it is mandatory to prepare a City Development Plan through a participatory and consultative process. Accordingly, GVMC, along with other key stakeholders, prepared the CDP based on the City Development Strategy formulated earlier. The main objective of the CDP is to ensure a planned growth of the city and to make Visakhapatnam as a better alternative to the mega cities, guided by a shared vision for city’s development. The CDP makes basic policy choices and provides a flexible framework for adapting to deal with emerging challenges over time. It emphasizes on issues of priority, local concerns for liveability, and the implied requirements in terms of: 12 Visakhapatnam City Development Plan • Enhancing city productivity; • Reducing poverty; • Improving urban governance; and • Enhancing financial sustainability. The sectoral plans for the identified sectors form part of the CDP and it covers a time horizon of 20 year. The CDP outlines a policy framework and investment/reform interventions to achieve the vision. Scope The strategic policy and investment interventions to achieve the vision of Visakhapatnam including formulation of sectoral plans for the identified sectors are outlined in the CDP. The scope of work is to: • Assess the existing situation with regards to demography, economic base, financial profile, infrastructure services, physical and environmental aspects and institutions. • Identify the gaps in service delivery • Outline the issues faced by the City’s poor • Prepare a vision and sectoral strategic framework outlining the goals, strategies, interventions/projects to achieve the vision and • Formulate a city investment plan with appropriate financing strategies and an implementation action plan. • Focus on the reforms to be carried out at the state and local level in consonance with the vision and strategic plan outlined to sustain the planned interventions. 1.4. THE CDP PROCESS The critical element in the city development plan is to formulate a shared vision for the city of Visakhapatnam outlining: • Development objectives and long term environmental, social, economic infrastructure, cultural and health goals, and • Programme of institutional and policy priorities and a definition of sectoral and inter sectoral goals and development strategies. Tthe CDP process has established a creative dialogue between Government Departments, and between Government Departments and Citizens, and identified the priority activities to be undertaken to improve service provision / management in tahe city. These dialogues would develop into sustainable partnerships for strategic development of the city in the future. This process also resulted in the formulation of Strategic Action Plan and City Assistance Programme incorporating sectoral investments for economic growth and poverty reduction. The CDP also took into consideration the works and plans of other government and quasi- government agencies contributing towards the growth and development of the city. The key steps involved in the CDP process include: • Formation of Program Steering Committee (PSC) at the apex level • Constitution of Working Groups • Stakeholder workshops and Meetings • Visioning Exercise • Situation Analysis • Formulation of Goals & Strategies • Capital Investment Plan and Project Scheduling • Approval by the CDP by the Council along with Draft MoA • Action & Operating Plan indicating the policy and reform measures for improved service provision and delivery. 13 Visakhapatnam City Development Plan The CDP exercise was carried out through consistent stakeholder participation at various stages. A core group headed by the heads of the agencies involved in city’s governance was formed to manage and drive the process and to look into different elements of urban functions. The concerns of the urban poor were captured by the Urban Community Development Department through a series of consultations with the stakeholders held during the preparation of CDS, which was again reinforced during the preparation of CDP. The stakeholders were identified through stakeholder analysis. The key stakeholders viz., Greater Visakhapatnam Municipal Corporation, the district collector representing the state government, Visakhapatnam Urban Development Authority, Visakhapatnam Port Trust, Visakhapatnam Steel Plant, state government line departments like police, health, education, electricity and transport, academic institutions, government and non-governmental agencies involved in service delivery, private sector agencies such as chambers of commerce and industry, representatives of the poor, non-governmental and community based organisations, members of civil society including the media were involved in the process. A key feature of consultations is the inclusion of the representatives from poor community groups such as community development societies and self-help groups in the entire process. They were also included as members of the working groups. Orientaion was organised to all the stakeholders to familiarise them with the purpose, process, and expected outcomes of the CDP, and to build enthusiasm, understanding and commitment to the CDP. This helped in arriving at a consensus along with the stakeholders firming the process and agreeing upon a structured programme to take the CDP forward. For detailed and indeph analysis of the situation and to help the process working groups were formed and each group was assigned a sector to identify the interventions in the CDP. The sectors were finalised based on the stakeholders’ concerns. Each of the working groups assisted in focussing on the city vision, define sectoral goals, and define strategies to achieve the goals. Thirteen working groups, comprising of eminent experts, prepared the strategies and action plans in the following key sectors: • Governance • Poverty alleviation and Slum Up gradation • Economic Development and Livelihoods • Tourism Development (regional focus) • Water Supply • Public Health and Sanitation • Traffic and Transportation • Health and Education • Urban Finance • Old City Regeneration a. Housing and Land use b. Gender c. Environment A summary of the recommendations of working groups is presented in the Annexure. The CDP identified performance-monitoring/ sustainability indicators to assist the City of Visakhapatnam to review the progress of the CDP on an annual basis and to enable them in setting the agenda for the future. The process is iterative and enabled the city to review its outcomes through the identified indicators so as to make the process dynamic and in tune 14 Visakhapatnam City Development Plan with the felt needs and requirements. The process adopted for the preparation of CDP is presented in Figure 1.1. One of the key recommendations of the city development strategy of GVMC was the preparation of Visakhapatnam Slum Upgradation Action Plan with the support of Cities Alliance. A number of consultations were held with elected representatives, poor communities and other stakeholders leading to the preparation of comprehensive strategy and action plan including investments. The CDP process is given in the Figure 1.1. Figure 1.1. : CDP PROCESS CDP THINK TANK Program steering Program steering committee committee meetings meetings Working groups Working groups meetings meetings Technical Committee Technical Committee meetings meetings Stakeholder consultations Stakeholder consultations Media reports Media reports CDP for CDP for Implementation Implementation Formulation of Formulation of City Vision City and Goals Vision and Goals Preparation of Preparation two pronged of two pronged Prioritization of Sectors Prioritization of Sectors for for strategies for strategies achieving the for achieving the intervention intervention vision vision •• Water Supply & Water Supply & Sewerage Sewerage Reform Agenda •• Reform Agenda & action plan & action plan •• Storm Storm Water Water Capital Investment •• Capital Investment program program •• Traffic and Transportation Traffic and Transportation Solid Waste •• Solid Waste Management Management Sectoral vision Sectoral vision formulation formulation Before the formation of Greater Visakhapatnam Municipal Corporation in 2005, Gajuwaka, now a constituent of the Corporation, was a separate municipality. Gajuwaka municipality prepared municipal action plans adopting consultative and participative processes under Andhra Pradesh Urban Services for the Poor (APUSP), Andhra Pradesh Urban Reforms and Municipal Services Project (APURMSP) and Rajiv Nagara Bata (RNB). As such the prepararion of municipal action plans through consultations was internalised in the municipality even before it became part of the GVMC. Later two programmes are also under implementation in the Visakhapatnam Municipal Corporation as well. As such the participatory praocessess were internalized in the GVMC through these development programmes. The participatory process under APURMSP and RNB involved two consultations with stakeholders, which included government departments, members of the council, members of committees, representatives of CBOs, SHGs, civil society, business and trade, economics, media and the urban poor. One third of the participants were women. The discussions during consultations facilitated identification of needs, their prioritization and preparation of an accepted development plan for the city focusing on the poor. Working groups on governance reforms, infrastructure and urban poor supported these consultations and the deliberations of these groups also provided inputs to the consultative process. Under Rajiv Nagara Bata, a convergence programme launched by the state government, GVMC prepared a citywide action plan through consultative process with the key stakeholders covering all sections of the society to identify the felt needs of the town and prioritize them through consensus. These consultations were conducted during June - October 2005 and the stakeholders were engaged in consultations in rapid assessment of 15 Visakhapatnam City Development Plan needs, feedback, prioritisation and implementation of policies and programmes. The rapid assessment and feedback process of consultations and preparation of report is given in the figure 1.2. Apart from the city wide consultations detailed discussion with members of civil society, poor and vulnerable sections of the society and the municipal staff were carried out through focus group discussions. The purpose of these group discussions was to dovetail the identified action plan proposals and to come up with implementation mechanism. Based on these consultations RAFT reports were prepared and it is under implementation. Figure 1.2 RAFT Process VUDA prepared a draft master plan for the Visakhapatnam Metropolitan Area in 2005 based on extensive consultations, which are mandatory in the preparation and finalisation of master plan. In the consultaions in the Greater Visakhapatnam area elected representatives and local people participated. In addition, a large number of meetings were held with various government agencies engaged in the provision of infrastructure and specific suggestions received. These consultations began in 2001 and went on for nearly two years. The draft was revised in 2005 through a similar consultative process. The draft was submitted to the Government for approval. 16 Visakhapatnam City Development Plan CHAPTER-II: Greater Visakhapatnam Municipal Corporation 2. Demography, Economy and Land Use 2.1. INTRODUCTION Greater Visakha, once a small fishing village, has evolved into a major port city over the decades. It is also the administrative headquarters of the Visakhapatnam district. The city is located at a distance of 712 kms from the state capital of Hyderabad. The city is strategically located midway between Calcutta and Chennai. The total area of the city at present is 515 sq.km. It is well connected by all modes of surface transport - east coast railway, national highway No.5 and domestic air linkages. This strategic geographical location coupled with the availability of the other associated factors in logistics has enabled the city to attract large commercial investments and the major public and private sector industries. In recent years, there has been a spurt in investments in the city and its surrounding areas giving further impetus to transform the city as a future mega city. The map of the Greater Visakha city is given figure 2.1. Figure 2.1 Greater Visakha The Municipal Corporation of Visakhapatnam, prior to its constitution as Greater Visakhapatnam Municipal Corporation in 2005 has a jurisdiction of 111 square kilometers with a population of 9.69 lakhs as per the 2001 census while the Visakhapatnam Urban Agglomeration covered approximately 5.3 square kilometers with a population of 13.62 lakhs. The government of Andhra Pradesh has reconstituted the Municipal Corporation of Visakhapatnam in the year 2005 by extending the jurisdiction and by merging the adjoining municipality and panchayats. The reconstituted Greater Visakhapatnam Municipal Corporation has an area of 515 square kilometers with a population of 14.5 million. Thus the GVMC is representative of the urban agglomeration in terms of area as well as population. The Visakhapatnam Urban Development Authority has a jurisdiction of 1701 square kilometers and covers a poulation of 22.02 lakhs. Table 2.1 gives the details. 17 Visakhapatnam City Development Plan Table 2.1: Population by Major Geographical Units Sl Geographical unit Area Population components no. (Sq.kms) (in Lakhs) 1 Municipal Corporation Vizag 111 9.69 M.corp (MCV) – Prior to 2005 2 Visakhapatnam Urban 503 13.62 MCV, Gajuwaka + 6 Agglomeration (VUA) (approx) outgrowths 3 Greater Visakha Municipal 515 14.5 MCV+ gajuwaka + 32 Corporation (GVMC) – After villages 2005 4 Visakhapatnam Urban 1701 22.02 Visakhapatnam dist + Development Authority (VUDA) part of Vizianagaram district Source: census 2001 2.2. DEMOGRAPHY Visakhapatnam is currently ranked as the second largest urban agglomeration in Andhra Pradesh. The Greater Visakhapatnam Municipal Corporation (GVMC) consists of the Municipal Corporation of Visakhapatnam (MCV), 32-merged Villages and the erstwhile Gajuwaka Municipality. The population of Vizag urban agglomeration increased from 1.05 million in 1991 to 1.32 million in 2001. The growth of population was more than 80% during 1971-81 and 37.11% during 1991-2001. Due to formation of GVMC and merger of surrounding villages, several well established urban components of the city are located within the GVMC. The details of population of the Municipal Corporation Visakhapatnam and now functioning as the Greater Visakhapatnam Municipal Corporation are given in Table 2.2. Table 2.2: Population Trends – Greater Visakhapatnam Municipal Corporation Density Component Area (Sq km)) Population (Lakhs) (Persons/Sq.km) 2001 2006 2001 2006 2001 2006 Greater Visakha 111 540 9.69 14.5 8765 2685 Municipal Corporation VUDA 1701 1701 22.02 26.21 1293 1540 The Viskhapatnam city is growing faster than any other city in the state over the last two decades. The Visakhapatnam Municipal Corporation has grown faster than Mumbai, Kolkata, Chennai and Hyderabad between the years 1991-2001. The population density is more than Chennai. A distinctive feature of population growth is that it is takoing place both within and outside the core area. Thus, the population growth in Vizag is quite high as given in Figure 2.2 and this would necessitate long term planning and significant investments for improved service delivery. 18 Visakhapatnam City Development Plan Figure 2.2: Decadal population growth in major Urban Figure 2.3 Comparative Decadal Growth Rates of Vizag with other surrounding Muicipalities A key feature of population growth in Greater Visakhapatnam Municipal Corporation is that the people living in surrounding areas, especially from the near by districts are migrating in search of livelihoods owing to rapid fast growth of industrialisation to the city of Visakhapatnam. Comparative to other surrounding Municipalities of Vijayanagaram, Anakapalli and Bimunipatnam the decadal population growth in Vizag City is phenomenal during the year 1991-01 at 75% compared to Vijayanagaram at 37.2%, Anakapalli at 15% and Bhimunipatnam 20%. (Figure 2.3) 2.2.1 Future Growth The growth rate of population experienced by VMC during 1991 and 2001 will continue in future though at a lesser rate. The projections indicate that the Greater Visakhapatnam City area would have a population of 16.61 lakhs in 2011 and 20.99 lakhs in 2021. 19 Visakhapatnam City Development Plan Table 2.3: Population Projections Area (sq.km) Total Population (in lakhs) Density (Population / sq. km) Component 2001 2006 2001 2006 2011 2021 2001 2006 2011 2021 Municipal 111 540 9.69 14.5 16.61 20.99 8765 2685 3075 5537 Corporation VUDA 1701 1701 22.02 26.21 30.58 34.99 1293 1540 1797 2057 Components of Growth An analysis of composition of population growth indicates that natural growth contributed about 70 percent while migration contributed 30 percent between the years 1981-1991. However, the contribution of natural growth has come down significantly in the years 1991- 2001 to 47 percent, mainly due to jurisdictional change. The contribution of migration has come down from 30 to 20 percent. This indicates that the urban growth in GVMC will take place even if measures are taken to control migration. Hence long term and strategic planning is necessary to promote equitable economic growth and service delivery. Table 2.4 gives the details on composition of population growth. Table 2.4: Composition of Growth Composition Population increase during Year 1981-91 % of total 1991-2001 % of total Natural increase 1,38,000 70% 2,32,000 47% In-migration 47,360 30% 73,200 20% Jurisdictional 0 0% 1,70,000 33% Total increase 1,85,360 100% 4,75,200 100% One of the key reasons for inadequate service delivery outcomes in GVMC is the overlapping arrangements in functions, roles and responsibilities of the institutions resulting in poor accountability. The absence of an effective coordination mechanism, amongst city and state level agencies has implications for orderly spatial development, coordinated infrastructure provision, local economic growth, development management, service delivery and expenditure effectiveness. There is an urgent need to ensure spatial and functional integration of service delivery process through innovative institutional arrangements for achieving better service outcomes. There is a need for widespread reform in governance and service delivery framework with a focus on city integration and co-ordination. 2.2.2. Sex Ratio Sex ratio in Visakhapatnam Municipal Corporation is 971 in 2001, which is substantially higher than the sex ratio in the year 1991. However, the sex ratio in 2001 is below the state average of 978. 20 Visakhapatnam City Development Plan Figure 2.4: Sex ratio Sex Ratio 980 Year Sex Ratio Sex Ratio 1951 978 960 1961 920 940 1971 921 920 1981 925 900 1991 939 2001 971 880 1951 1971 1991 2.2.3. Literacy Census figures for 1991 & 2001 for Visakhapatnam Municipal Corporation and the rest of the state reveal that general literacy and female literacy have improved. Visakhapatnam Municipal Corporation leads in literacy in Andhra Pradesh, with 76.60% in 2001. Male literacy in the agglomeration is approximately 83.46%, while female literacy is considerably lower at 69.59%. table 2.5 Table 2.5: Literacy Rate Percentage of Literates Year Male Female Total 1971 61.59 39.77 51.12 1981 65.57 45.65 55.96 1991 71.99 57.56 65.00 2001 83.46 69.59 76.60 Demography: Emerging Issues and Concerns Visakhapatnam has experienced high growth in population and the same trend is expected to continue over the next two decades. It is projected that by 2021 Visakhapatnam would emerge as one of the major cities in the country. Most of this growth would take place in Greater Visakhapatnam area away from the city core. However, this has serious implications for service delivery both for city core as well as peripheral areas since the traffic and population flows occur between them. This calls for integrated planning of Greater Visakhapatnam with a focus on equitable provision of services to all the areas and all the sections of the population. 21 Visakhapatnam City Development Plan 2.3. ECONOMY 2.3.1 Background The economic impetus in Visakhapatnam over the past three decades has provided numerous employment opportunities, which are clearly visible in the population growth rates for the past three decades. The demographic trends of growth essentially follow the geographical expansions, which were the result of various developmental initiatives in the infrastructure and on the industrial front. During the first quarter of the century', a very slow increase is recorded as there was no major event except the opening of the East Coast Railway line. During the second quarter of the century, a steady rise is recorded till Independence was observed, with the establishment of major institutions. A significant growth of the city after partition, which lasted during the third quarter of the century, is due to the development of port activities and industrialization. The new industrial policy declared by the Government of Andhra Pradesh in 2005 gives boost to new investors who are willing to invest in Andhra Pradesh. Visakhapatnam is the district of plentiful opportunities. The City having an investment of Rs. 20,000 Crores is the industrial capital of the State. The City is recognised as the fifth-fastest growing "Industrial Metropolis" in the Asian subcontinent and the fastest growing industrial city on the East coast of India strategically located midway between Calcutta and Chennai. The areas of economic growth are indicated in Figure 2.6 Figure 2.6 Areas of Economic Growth The geographical advantage with a natural harbour and bountiful infrastructural facilities helped the city acquire industrial importance and well known place in the international market. The ideal industrial climate has led to the development of core industries .Rich deposits of iron and aluminium ores in close proximity and good rail and road connectivity and Export oriented Zones and EXIM park s present interesting possibilities for setting up major industries. The basic requirements which are necessary for establishing an industry are the power supply, raw materials, transportation facilities etc are available in Visakhapatnam and very 22 Visakhapatnam City Development Plan large plants have come to be established in Visakhapatnam and environs. – Hindustan Ship Yard, Bharat Heavy Plates and Vessels factory and such others. The employment potential is 2, 00,000 workers. With its long coast line, fishing and travel and tourism is a major economic activity .There are also handful opportunity for development of brackish water, prawn culture, pisci culture since this is an export oriented and a lot of investment can be poured into it. The state as well the city government have made concerted efforts to make Visakhapatnam the second economic development hub in the areas of Information Technology Enabled Services, Pharma and Biotechnology, development of Consumer goods and Ancillary industries/Tourism after Hyderabad. Significant efforts in this direction include some of the recent projects supported by the Corporation which include Upgradation of the local Airport, setting up of VSEZ, Simhadri Power Plant, Special Economic Zone, Pharma City at Parawada, Gangavaram Port, Gems and Jewellery Park and Apparel Export Park amongst other Projects. There is a possibility of a few more manufacturing unit being located in the close proximity to the City The transport infrastructure has permitted industrial investment and growth in the region. In addition to the international and national linkages, the Corporation has undertaken several initiatives to upgrade the municipal roads and public utilities and amenities to international standards. 2.3.3 Occupational Structure According to 2001 census, the work force in Visakhapatnam city is about 3,44,729 of which maximum proportion of workers is found to be in tertiary services which includes services and trade and commerce. The services sector is the largest sector contributing 30 percent of the workforce while a significant and equal proportion of workers are found in three sectors viz. trae and commerce, manufacturing and transport and communications with 13 percent reach. A significant feature of the occupational structure is that the work force in primary sector constitutes nearly 20 percent of the total workforce. This significant presence is due to the merging of nearby villages and fishing related activities. Table 2.6: Economic Base Occupational Distribution, 2001 Occupation category Number of % of total workers (lakh) Primary sector 69,792 20.24 Household industry 13,943 4.04 Manufacturing 46,137 13.38 Electricity, gas and water supply 3,829 1.11 Construction 20,289 5.88 Transport, storage and communication 43,847 12.71 Banking insurance 720 0.20 Trade and business 44,588 12.93 Services 1,01,584 29.46 Total 3,44,729 A brief description of various activates are presented below. Industrial Activities 23 Visakhapatnam City Development Plan The industrial activities are one of the prime economic activities of the city. The total number of industrial units in the city stood at 1,775.Tthe total investment of this sector is about Rs. 8,021.77 crores, of which about 8,005.32 crores (99.79 per cent) is in large and medium-scale industries alone and the rest is in small-scale industries. The total work force engaged in industrial activities is about 44,275 persons, of which 30,110 per sons (68.01 per cent) are found in large and medium-scale industries and the rest in small-scale industries. Of the 55 large and medium manufacturing industries, 8 units are in the public sector, 42 in the private sector and 5 in the cooperative sector. Public sector dominates in investment and employment accounting for 85% of the investment and 68% of employment. Major public sector undertakings like Visakhapatnam Steel Plant, National Thermal Power Corporation, Hindustan Petroleum Corporation, Hindustan Zinc, Hindustan Shipyard, Bharat Heavy Plates and Vessels are located in and around the city. Other projects in city periphery are Divi Pharmaceuticals, Thermal Power project of NTPC, Cement plants, Ancillaries of Visakhapatnam Steel Plant, Jindal Petrochemicals and Marine based industries. There are 23 medium to major ones in the pipeline. These basic Industries themselves have played a decisive role in facilitating the expansion of the private sector industries such as Coramandal Fertilizers, LG Polymers India Pvt. Ltd, Essar Iron Ore Pelletisation Plant, East India Petroleum Limited and Rain Calcining Limited in recent years. The minor industries include manufacturing units of rubber and plastics, coal products, gas and steam units, automobile workshops, beverages, ship breaking units, export processing zone, fishing trawlers, communications, aqua culture units, airport, port conveyer belt across the city and a host of rail lines connecting the industries for wagon movement. Around 100,000 workers live in the proximity of the industrial units. The city has one of the oldest industrial estates in the state providing sites and services for establishment of small and medium scale industries. In tune with time, APIIC has developed an Industrial Area of about 1200 acres in five Blocks in Visakhapatnam. While blocks A, B, C & D have been fully developed. Visakhapatnam Port The Port has a natural harbour and is one of the major ports on the East Coast of India. It is o situated at the mouth of the stream Meghadrigedda, at the confluence point at 17 41’34� N o latitude and 83 17’-15� E longitude. The harbour is protected by “Dolphin’s nose� projecting into the sea and having low tidal range with a maximum of 1.83 mts, offers safe shelter to ships. The Visakhapatnam Port was opened to ocean going ships in October 1933. The Visakhapatnam outer harbour is India’s deepest harbour and can accommodate bulk carriers of 1.00 lakh DWT and more ships drawing up to 15.3 mts. and having a length up to 263 mts. can be accommodated at the outer harbour ore berths. The Visakhapatnam inner harbour has an entrance channel, a turning basin and 3 navigable areas known as the Northern arm, North western arm and Western arm. The construction of the harbour was taken up in 1723 and three arms formed by 1933. It has earned recognition for being one to the top ports for the export of marine products in India. The volume of seafood exports through Visakhapatnam Port has increased to 26, 637 tone in 2001 – 02, according to the figures compiled by the Marine products Exports Development Authority (MPEDA). Among the significant developments in the port – the Fertilizer berth in the westerns arm of inner harbour, operated by the Coromondal Fertilizer Ltd has come up for modernization by installing a new ship unloaded for achieving higher productivity. Other large 24 Visakhapatnam City Development Plan user groups include Visakhapatnam Steel Plant (VSP), Steel Authority of India Limited (SAIL), National Thermal Power Corporation (NTPC), and Export Processing Zone etc. The statistics indicate that all the major ports of the country handled 281 million tones of various cargoes while Visakhapatnam port handled cargoes, which is 16 percent of the all India quantum. The VPT has two harbours i.e. inner harbour and outer harbour. It also has Naval Dockyard, Shipyard and submarine yard. At Visakhapatnam Port, ships from more than 50 countries come every year with 321 days berth occupancy. The Port is obsessed by the dense urban developments and industrial development around. The employment in the port is 6909. Gangavaram Port The State Government is establishing the new deepwater grass root port at Gangavaram adjoining the Steel Plant under Private Public Partnership and with the establishment of this port; GVMC would have two major ports functioning under its jurisdiction. It is situated at a distance of 15 km south of Visakhapatnam Port. Investment planned for the port is around Rs 20,000 million (US $400m). Construction of the first phase of the port will be completed by March 2006. Fishing Fishing is one of the major activities in the GVMC area. The export value of the fishing products in India is in crores of rupees, 70% of which is from Andhra Pradesh and major portion of this is from Visakhapatnam. It is estimated that around 6 lakh people of the state depend on fishing activity of which one fourth are in Visakhapatnam. According to an estimate, about 50 families directly or indirectly make their livelihood on each boat that goes for fishing. There are 118 primary fishermen cooperative societies. There were 2800 mechanised boats in the city. The Visakhapatnam coast is always a hub of fishing activity. A fishing harbour exists to facilitate marine fishing. There are 22 fish / prawn processing units in and around the City. These plants have cold storage capacity ranging from 5 tones to 400 tones. The fishing harbour is likely to be relocated to Bheemunipatnam to further the spatial expansion of the Port. A new fish-landing infrastructure was established at Yarada essentially to meet the requirements of fishermen from Dibbapalem and Gangavaram who have to shift their fishing activities due to the establishment of the new grass root port of Gangavaram. Commercial Activities Owing to a high degree of industrial concentration, the complementary sectors such as commercial, institutional and services sectors have also developed rapidly. The total number of commercial establishments in the city is about 20,000 units. The work force engaged in this sector is about 40,000 persons. The major categories of commercial establishments are related to food products (Rice, Tirana, Chicken, Poultry, Hotels, Restaurants and Parlours, Cloth Shops, Electronic and Consumer Products, Construction Materials, Hardware, Automobiles and Personal Services. Besides this, the wholesale trading activities also have developed substantially. The important commercial areas in the city are Velampeta, Dabagardens, Suryabagh, Dwarakanagar and Gajuwaka. Similarly the important market in the city is Poorna Market, Kurupam Market, and RTC. & TSR. Complexes. There is notable shift of commercial business district (CBD) from the then hub of the city (now old city) to multiple CBDs. The city expanded up to Poorna Market, the only commercial centre for the entire city up to 1970s. After the construction of Jagadamba Theatre, the city’s 25 Visakhapatnam City Development Plan major activities moved towards north and the commercial activity spread up to the so-called Jagadamba centre in 1970s. Thereafter the city expanded further northwards after the construction of the RTC Complex and the tallest LIC building in 1980’s. The entire Dabagardens has become a hub of electronic goods trade. In 1990’s, the prestigious NH5 road project brought the city shifts towards further to the north. With the proposed construction of IT towers in the old TB hospital area, the city is destined to create a hub for IT activity. The city has developed it self as a cluster of differentiated zones which could be broadly categorized as follows: 1 The old town area a fishing zone 2 The Waltair upland area an educational zone, 3 The Jagadamba centre an entertainment Zone (cinema), 4 The RTC complex area a shopping zone 5 The Beach road recreation and tourism 6 The Gajuwaka area an industrial zone and 7 The Simchalam area a religious zone. Institutional and Services Activities The city has all types of services and institutional activities such as Administration, Health, Education, Transport and Communication, Financial and Defence Services. The total institutional and services employment in the city is around 50,000 persons. The major institutions found in the city are: Collectorate, Zillaparishad and Municipal Corporation, King George Hospital, C.D.R. Hospital, Apollo Hospital and Seven-Hills Hospital, Andhra University, GITAM, Port Trust, Railways, R.T.C., Airport, Postal and Telecommunications, Life Insurance and Major Zonal and Regional Offices of various Banks and Corporate Offices and Head Quarters of the Eastern Naval Command in Defence Services. Tourism and Recreation Tourism is one of the emerging areas in the city in terms of attracting national and international tourists and bringing in foreign currency as well. The sector also contributes to the increasing employment opportunities. Marketing of local products, Hospitality and transport services, etc. are some of the areas of employment generation in connection with tourism. Some tourist attractions in the city are given in annexure. As the area around the city has vast potential for development of tourism, various places of historical and religious importance in the region have been taken into consideration to prepare a new theme based initiative for the development of Tourism and Recreation. It is proposed to develop the following dedicated tourism transits in this direction. The transits are the following. • Buddhism transit covering various Buddhist sites area in Visakhapatnam. • Religious transit covering famous religious locations. • Coastal recreational transit along the coast inclusive of development of marinas • Historical and heritage transit covering places of interest. • Eco transits cover areas like Marsh lands an mangroves,, Zoological parks, Reserve Forests and the Eastern Ghats and marine faunal occurrences Surrounded by virgin beaches the city offers immense potential for the hospitality industry. 26 Visakhapatnam City Development Plan Archaeological and historical monuments play a major role in enhancing the tourist’s experience of the City\ region. Since Archaeological preservation and the development of tourism are not mutually exclusive process, there is a strong case for the Department of Tourism facilitating preservation and protection of monuments that have not yet been taken up by the Archaeological Survey of India or by the Archaeological Department of the State. Towards this end, initiatives taken during the current year are noteworthy. Driven by the spirit of think globally but act locally, the Corporation in association with the Andhra Pradesh Tourism Department has taken up collaborative venture for preservation and enhancement of the common inheritance. 2.3.4 Key Future Economic Drivers Visakhapatnam SEZ The Government of India actively encourages the setting up of Special Economic Zones (SEZ). These are specially delineated duty free enclaves for the purpose of trade and commerce, with a liberal tax, fiscal and administrative regime. The SEZ concept is designed to enable its resident units to maximize their production efficiencies through relaxed policy framework and world-class infrastructure. The Government has committed itself to the success of these zones and has come up with attractive benefits for all stakeholders in these SEZ’s. These include developers, operators, entrepreneurs and residents. VSEZ is located at a distance of 24 kms from the city and 15kms from the airport. The broad gauge railway line from Calcutta to Madras passes by the side of the Zone and the National Highway-5 is at a distance of 2 . 6 kms from the zone. The National Highway is connected to the Zone. The Visakhapatnam Port is located at a distance of 17kms from the Zone. The Zone is being developed in a phased manner and accordingly development of the first phase was taken u p . An extent of 163 acres of land has been taken up for development of infrastructure and other facilities in the first phase. EXIM Park Visakhapatnam Port Trust has established an EXIM Park in 750 acres of land for the allotment of Port based industries with an objective to promote industrialization of the hinterland and to facilitate handling of export / import cargoes of various industries at this Port, and to attract more cargo. The location of the Port’s EXIM Park has been chose in the existing industrial belt. The EXIM Park area is connected to National Highway linking AP with Orissa, West Bengal, Madhya Pradesh and Tamilnadu. The EXIM Park is situated 4 kms away from the Airport, 8 kms from the railway station and it sis adjacent to the Northern arm, which is the main commercial arm of the Port. The close proximity of the EXIM Park to the Port’s waterfront area enables the entrepreneurs to have greater operational flexibi9lity and to reduce transport costs. The Port’s EXIM Park provides plots to various port based industries depending upon their requirements. Each industry will be allotted an area of not less than 10 acres of land. A minimum cargo throughput by way of export / import is to be guaranteed for handling at this port. GVMC (Visakhapatnam Municipal Corporation) provides one million galloons per day of water to cater to the needs of the Port based industries at EXIM Park. The development of Open Stacking areas, Storage Sheds and Warehouses is also being taken up. The Port developed 20 railway lines for the “Mindi Interchange Yard� and 20 lines for the Sorting Yard with 5 sick lines for servicing and maintenance of locos and a comprehensive railway network to serve the proposed Open Stacking Area, Storage sheds. 27 Visakhapatnam City Development Plan Availability of skilled manpower, cheap labour and land resources The economic development in Visakhapatnam over the past three decades offered enormous employment potential that has attracted large scale in migration, which in turn led to population growth rates of 59%, 34% and 25% respectively for the past three decades. After Hyderabad, Visakhapatnam accounts for a high share of urban population and non- agricultural workforce that is not unionised. Projections of workforce indicate an increase in the non-agricultural employment to total workforce ratio from 44% in 2001 and 50% in 2005 NSN 57% in 2010. This growth is also visible in the credits and deposits in scheduled commercial banks in the city that show higher levels of commercial transactions, industrial activity and circulation of capital. Presence of academic/technical institutions of repute Educational and Technical institutions provide the essential infrastructure that creates and upgrade the skill sets of the workforce. In addition to this, educational intuitions themselves are responsible for spinning off industries as in the case of the Biotechnology / IT sector. The Urban local body and the State Government have recognized the importance of these engines of growth in future developmental scenarios that are envisaged and have undertaken several initiatives to upgrade the infrastructure and facilities of these institutions. In summary, at the outset the decisive advantages \ contributory factors for economic development are shown below in Figure 2.7 Figure 2.7 Ongoing Infrastructure Upgradation projects Prime Location Good Urban Local Body Socio Economic And Locational Advantage Surface Transport Academic and – Air, Port and Technical Road Institutions Skilled Industrial Manpower and Base Cheap Labor The city has geographic and socio-economic advantages and these have been leveraged to promote economic development in the region. The developmental efforts are combined with efforts to create a sound institutional mechanism and to develop human resources. This helps the city to alleviate poverty and achieve balanced growth and development in the region. 2.3.5 Key Domestic Product and Per Capita Income 28 Visakhapatnam City Development Plan The Gross Domestic product of Visakhapatnam district, of which Greater Visakha constitutes more than three fourths, has been steadily increasing from 1993-94 to 2001-02 at 101.4 %. As per the household surveys, the income per household as well as the per capita income structures is depicted as follows. Table 2.7: Gross District Domestic Product at Factor Cost (Rs Crores) At Constant Prices (1993-94) At Current Prices Year Vizag Vizag as A.P Vizag Vizag as A.P % of A.P % of A.P 1993-94 3288 5.68 57867 3288 5.68 57867 94-95 4064 6.65 61114 4455 6.46 68923 95-96 4461 6.89 64729 5412 6.78 79854 96-97 4488 6.52 68809 5835 6.47 90147 97-98 4071 6.01 67866 5558 5.80 95782 98-99 5568 7.32 76116 7864 6.87 114937 99-00 5133 6.45 79605 7698 6.15 125236 00-01 5775 6.68 86513 9271 6.62 140119 01-02 6623 7.31 90558 10711 7.07 151459 Table 2.8: Per Capita Income at Factor Cost (Rs) At Constant Prices (1993-94) At Current Prices Year Vizag A.P Vizag A.P 1993-94 8265 7416 8265 7416 94-95 10032 7711 11024 8732 95-96 10865 8071 13225 9999 96-97 10896 8514 14244 11202 97-98 9628 8191 13226 11650 98-99 12602 9144 18345 13965 99-00 11843 9445 18111 15049 00-01 13231 10195 21533 16708 01-02 14709 10590 24081 17916 Though the overall GDP of the GVMC is significant, it does not compare well with the GDPs of other major cities. The per capita GDP in Visakhapatnam is only 21.5, which is much lower than the per capita GDPs of Mumbai, Kolkata, Delhi and Bangalore as given in Figure 2.8. Thus; the potential of the city is under-utilised. 29 Visakhapatnam City Development Plan Figure 2.8: Gross District Product per capita (2000 – 01) 2.4. SPATIAL GROWTH, PLANNING AND LAND USE. 2.4.1. Land Use Structure:- Land use break-up in GVMC indicates that in 2002 8.33% constituted residential area and 4.56% of land was under industrial. The area under hills and forests and the area under agricultural activity constitutes major chunk of the land. The residential area is expected to increase in the GVMC region to 12.17% by 2021. Similarly the industrial area is expected to increase to 7% by 2021 from 4.56% in 2002. An analysis of spatial growth pattern in the past as well as the future indicates stagnation of growth in the old town area and the city is growing industrially towards Anakapalle and residentially towards Bheemunipatnam. There is a need to plan infrastructure investments corresponding to the growth pattern. As the city is witnessing Urban sprawl planning should precede development to pave way for plan need development. Figure 2.9 Land Use Structure of GVMC 2001 30 Visakhapatnam City Development Plan 2.4.2 Initial Development Plan for Visakhapatnam, 1970:- Till 1970 development in Visakhapatnam was confined to the Port area, getting as a focal point in the growth of the city mainly in terms of industrial development and as a shipyard. Today, the port has emerged as one of the largest in India export mainly consisting of iron- ore, and imports mainly consisting of petroleum products. In the last decade development of residential strip along the coastal stretch is witnessed. It has been accompanied by institutional and recreational uses. The main corridor of development included areas along the NH- 5 and Visakhapatnam – Bheemili Beach Road. At present, Visakhapatnam is the second largest city in Andhra Pradesh, a sprawling industrial city and one of the emerging metropolises. The spatial growth of the city has been restricted in the North, Yerada hill range on the south, extensive Bay of Bengal occupying the East, Port Swamp area covering 3000 hectares within the city and also defence areas, airport and hills. The initial Plan was approved by the Govt of AP to the Visakhapatnam city in the name of General Town Planning Scheme in the year 1970 vide GO.Ms.No: 703 HH and MA Dt: 29.08.70 and the important feature of the plan was to provide a framework for balance growth and development. The plan was devoted not only for physical aspects but also on the social infrastructure including development of good road network. 2.4.3. Master Plan for Visakhapatnam, 1989:- After setting up Visakhapatnam Steel Plant, the city of Vizag experienced spurt in its growth and several ancillary units also have come up in the vicinity of Visakhapatnam Steel Plant. Accordingly the APIIC took initiative in acquiring large chunks of land in the vicinity of Stall Plant to facilitate planned growth in industrial front. The Visakhapatnam Urban Development Authority (VUDA) constituted under in AP Urban Areas (Development) Act 1975 took initiative and prepared Zonal Development Plans for Visakhapatnam city and Master Plan for the entire VMR region which was sanctioned by the Govt of AP in GO.Ms.No: 274 MA, Dt: 23.05.89. Apart from preparation of Master Plan for the entire VMR region Visakhapatnam Urban Development Authority (VUDA) prepared Zonal Development Plan for Visakhapatnam, Gajuwaka, Anakapalle, Bheemunipatnam and Rushikonda areas which have been approved by the govt to promote and facilitate planned development not only in urban centres but also in the entire development area. Despite preparation of Master Plan and Zonal Development Plan it so happened that in some of the areas such as Gajuwaka, Vepagunta etc. there was no plan need development, as a result of which there were several unauthorized colonies and in several parts of VMR developments have taken plan contrary to the Master Plan. 2.4.4. Revision of the Master Plan 2021:- The Visakhapatnam Urban Development Authority revised its Master Plan in 2004 for the target year 2021 with a view to make Visakhapatnam a planned city with sound and equitable planning. Considering the growth pattern the Master Plan, which was prepared for VMR, proposed town ship developments in potential areas. Similarly, in respect of transportation sector provision has been for LRTS in the Master Plan. The Govt initiatives to develop tier two cities for IT and other purposes have also been taken into consideration while preparing the Master Plan for the VMR region. Sufficient care has been taken in the Master Plan to maintain ecological balance and also to protect fragile coastal stretches in the region. The Visakhapatnam Urban Development Authority (VUDA) has also prepared and submitted Zonal Development Plans for Visakhapatnam, Gajuwaka, Anakapalle, Bheemili and 31 Visakhapatnam City Development Plan Vizianagaram, which are in the vicinity of sprawling Visakhapatnam city. After taking into consideration various developmental activities that have taken place in Vizag and its vicinity the Govt with view to ensure plan development issued orders and created Greater Visakha Municipal Corporation in GO.Ms. No: 938 MA, Dt: 21.11.05 duly merging Gajuwaka Municipality and 32 other potential settlements. 32 Visakhapatnam City Development Plan Chapter-III 3. Governance Frame Work and Reforms Growth of cities makes the scale and complexity of urban problems daunting. This requires efficient and effective governance framework. Urban governance refers to the management of civic affairs by institutions to improve the quality of life in an inclusive, transparent and accountable manner. The ‘good urban governance’ is characterized by equity, efficiency, transparency, accountability, civic engagement and security of people and environment. Only good urban governance enhances city’s competitiveness and contributes to sustainability. A number of institutions are involved in governing a city. They include the state government departments, local bodies and parastatals. While the departments are part of government, the local bodies and parastatals are created through Acts of legislature or government orders. The complexity of city problems is increasing with the spatial expansion of the city like Visakhapatnam as also the growth of their population. 3.1. LEGAL FRAMEWORK In Visakhapatnam a number of institutions are involved in the governance of the city. Some of them were established through Acts of legislature and others are part of state’s governance framework. The institutions established by law are given in table below. Table 3.1: Table Showing the Institutions established by Law Agency Legislation Greater Visakhapatnam Municipal Visakhapatnam Municipal Corporation Act 1979 Corporation Visakhapatnam Urban Development Andhra Pradesh Urban (Dev.) Act 1975 Authority (VUDA) Andhra Pradesh Pollution Control Water (protection and control of pollution) Act, Board 1974 The GVMC is governed by two important legislations viz., Visakhapatnam Municipal Corporation Act 1979 and the latter Act extends to all the 14 municipal corporations in the state. The Acts specify the governance framework, the spatial jurisdiction and the functional domain of the GVMC. The VUDA is an important planning and development agency. But the corporation and urban development authority have to work in harmony for better development outcomes. 3.1.1. Functional Domain The functional domain of GVMC is specified in the two legislations referred. The Municipal Acts list the functions under two categories, namely, “Obligatory Functions� and “Discretionary Functions�. The obligatory functions include water supply, street cleaning, drainage improvements, lighting, reclamation of unhealthy localities, prevention of infectious diseases etc. The discretionary functions include child welfare, urban forestry, library, education, housing for the poor, etc. The functional domain was expanded in 1994 as per the 12th Schedule of the 74th Constitution Amendment Act. In Andhra Pradesh, the Municipalities and Corporation Acts provide for a majority of the functions listed in the 12th Schedule of the constitution. They include:  Urban Planning including Town Planning  Regulation of land use and construction of buildings  Roads and bridges  Water supply for domestic, industrial and commercial purposes 33 Visakhapatnam City Development Plan  Public health, sanitation, conservancy and solid waste management  Slum improvement and upgradation  Provision of urban amenities and facilities such as parks, gardens, play grounds  Burials and burial ground; cremations, cremation grounds and electric crematoriums  Cattle ponds; prevention of cruelty to animals  Vital statistics including registration of births and death  Public amenities including street lighting, parking lots, bus stops and public conveniences.  Regulation of slaughter houses and tanneries In 2004 the Government after a review of functions of urban local bodies, transferred five more functions to the urban local bodies through government orders. They are:  Planning for economic and social development  Urban forestry, protection of the environment and promotion of ecological aspects  Urban Poverty alleviation  Safeguarding the interest of weaker sections including the handicapped and mentally retarded  Promotion of cultural and aesthetic aspects. The Government decided that the remaining function i.e. Fire Services should remain with the state government and will be transferred after a review later. Though the five functions were transferred, they have no statutory basis. There are several issues in the transfer of functions of state agencies to the local bodies. Transfer of functions need follow up legislation, institutional capacity of the local bodies, financial resources, etc., which come in the way of transfer of these functions to the urban local bodies. It is also expected that the transfer of functions will be followed by transfer of officials as well as resources. However, transfer has not happened in the state thereby leaving the transferred functions only on paper. 3.2. GVMC - ORGANISATION STRUCTURE The functioning of Greater Visakhapatnam Municipal Corporation is controlled by the two main wings. The first wing consists of the General Body and the committees like Standing Committee, Ward committees. These are mainly responsible for formulating the policies and other administrative matters, which are referred to the administrative wing according to the provisions of the Act. The organisation chart is given at the figure 5.1. The second wing is the administrative wing, which is headed by the Municipal Commissioner. The Commissioner is a civil servant belonging to the Indian Administrative Service of the Government of India. He controls the working of various departments and implements the policies formulated by elected representatives. 34 Visakhapatnam City Development Plan Figure 3.1: Organisation Chart COMMISSIONER MONITORING AND COORDINATION SECTION AUDIT SECTION IT SERVICES SECTION DIRECTOR ADDITIONAL DEPUTY ADDITIONAL HEAD, PARKS, CITY URBAN COMMUNITY COMMISSIONER COMMISSIONER COMMISSIONER CHIEF ENGINEER VIZAG WATER LEISURE AND PLANNER DEVELOPMENT, GENERAL FINANCE ADMINISTRATION CEMETRIES PUBLIC HEALTH General Cell Finance Cell Town Planning Urban Community Revenue Section Parks Cell Development Works Wing Water Supply Dispatch Cell Zonal Offices (5) And Sewerage Sports Deposits and Vizag Estate Cell Advance Cell Public Health Electrical Cemetries Election Cell Education Division (1) Sanitation Section Maintenance Legal Cell Wing Divisions (3) City Tourism Zonal Anti Malaria Secretary Cell Divisions(5) Wing Projects Medical and Division(1) Media Cell Health Wing Projects Wing Veterinary Wing Projects Divisions(3) Vital Records Wing Food Hygiene Wing VPH Engineering Wing 3.2.1. Deliberative Wing As per the provisions of the Act, the following committees function in Visakhapatnam Municipal Corporation. a. Mayor and the Council The Mayor is elected from among the Corporators. In addition to the members representing the various wards, there are Ex. Officio members i.e., local MPs and local MLAs, Co-opted members and two minority representatives in the Council. b. Standing Committee The standing committee consists of all the chairpersons of the wards’ committees and the Mayor is the exofficio chairperson. This is an important policy making body of the corporation. c. Wards Committees Ward committees representing the various wards of Greater Visakhapatnam Municipal Corporation are constituted adopting the proximal cluster approach. For every ten wards there would be a wards committee. For the purpose of wards committees the city is divided into seven zones and each zone will have a wards committee. They elect one among them as their chairperson and they automatically become members of the Standing Committee. On the administrative side, each ward committee has one ward officer (departmental officer designated as Secretary). The ward committees are the important components of the administrative set up, because they are the main and direct link between the citizens and the municipal authorities 3.2.2. Executive wing The Municipal Commissioner is the head of the organization and is drawn from IAS cadre. The Commissioner, Greater Visakhapatnam Municipal Corporation is empowered to 35 Visakhapatnam City Development Plan sanction works up to Rs. 20.00 Lakhs and also look after the Office of Visakhapatnam Municipal Corporation in accordance with the provisions of the HMC Act as an Administrator. The administration is organised into seven departments. They are: • Health and Sanitation Department • Engineering Department • Parks, Leisure and Cemeteries (PL&C) Department • Town Planning Department • Urban Community Development Department • Revenue Department • Accounts Department For providing efficient and effective services to the community, the administration has been decentralized. The city is divided into six zones and zonal offices have been delegated both powers and functions. Officer of the rank of Assistant Commissioner heads these zones. This facilitates greater access to the citizens closer to them. 3.2.3. Accounting and recording methods, accounting policies Accounting and Recording Methods The Corporation is adopting single entry system at present. Each and every voucher on expenditure side is being audited before payment. No manual receipt is in existence, all the receipts of cash and cheques are through the on-line outlets. Daily Receipts are audited at the end of the day both center wise and head wise. The cash books are maintained both manually and through computer system. The reconciliation of all the cash books are done at the end of each month. For the sake of convenience or for special reasons, receipts or charges pertaining to more than one head of account may be booked in the first instance under one of the head concerned, but the portion creditable to the other head involved is transferred from the former head to the later before the accounts of the year are closed. The Corporation’s accounts are maintained on a single entry cash basis. Annual budget report is presented to the Corporation, which includes last two years actual accounts and budget estimates for the next year. One of the significant features of the GVMC is that all the critical functions viz., storm water drains, water supply, sewerage, solid waste management, municipal roads and street lights are under the corporation itself. Only water supply sources are managed by the Irrigation department. As such there are no serious problems of planning, provision and O&M of these services. The corporation has been outsourcing some of its functions either partly or fully to improve efficiency. Table 3.2 gives the details of outsourcing of activities. Table 3.2: Role of the Private Sector in Urban Infrastructure Provision Infrastructure Category Role of the private sector (specify) Water Supply 50% of the activities and O&M are out sourced Sewerage O&M is outsourced Drainage Nil Storm water drainage Nil Solid waste disposal 50% of cleaning and disposal under PPP/Out sourced Municipal roads (including flyovers) Nil Street lighting O&M is outsourced 3.3. INSTITUTIONAL FRAMEWORK Institutional framework can be discussed at two levels viz. internal administrative structure and the agencies external to the ULBs but connected with them in development and service delivery. Apart from GVMC, a number of government institutions are associated with the governance of Vizag. They include: 36 Visakhapatnam City Development Plan State government Agencies:  Municipal Administration and Urban Development Department  Directorate of Municipal Administration (DMA)  Directorate of Town and Country Planning (DTCP)  Public Health Engineering Department (PHED)  Andhra Pradesh Urban Services for the Poor (APUSP)  Medical and Health Department  Revenue Department  Social Welfare Department  R&B Department  Home Department Parastatals:  Visakhapatnam Urban Development Authority (VUDA)  AP State Highways Authority  AP State Road Transport Corporation (APSRTC)  AP Transmission Corporation (AP Transco)  AP Housing Board (APHB)  AP Pollution Control Board (APPCB)  AP Industrial Infrastructure Development Corporation (APIIC) The Organogram 2 (figure 3.2) gives an overview of state level agencies operating in GVMC. Each of the institutions listed above have specific functions and liase with local government institutions in planning the provision of infrastructure and delivery of services. Thre are several central government agencies which have impact on the management and delivery of services in the city. The Figure 3.3 and Table 3.2 give an indicative list of governance institutions in the city along with their functions and jurisdictions. The role of private sector in GVMC is given in table 3.3. In the absence of a coordinating agency, there are several constraints in the integrated and comprehensive planning and delivery of services. Interdepartmental coordination is one of the prominent issues and conflict that are becoming difficult to address or resolve even at the level of heads of the service delivery agencies. It is observed that the citizen is often concerned with the quality of service rather than who is delivering the service. The service delivery often suffers because more than one agency is involved and there is no mechanism for ensuring inters agency coordination. Figure 3.2 Organogram2: State Level Agencies STATE GOVERNMENT STATE GOVERNMENT CENTRAL GOVERNMENT CENTRAL GOVERNMENT Others Others Home Home Transport, roads Transport, roads Energy Energy Municipal Municipal Affairs Affairs & & Industry Industry Indian Navy Indian Navy • Health and and buildings and buildings dept dept Dept. Dept. Urban Urban Development Development Department Department Family Welfare Department Department • Education Visakhapatnam Traffic Roads Visakhapatnam Departments Traffic Roads & & APEPDC APEPDC Port • Civil Supplies Police Buildings Port Trust Trust Police Buildings APEPDC APEPDC GVMC GVMC VUDA VUDA East Coast East Coast AP Road AP Road Railway Railway Dev.Corp Dev.Corp AP State AP State Road Road NHAI NHAI Transport Transport 37 Visakhapatnam City Development Plan To illustrate, there are a number of agencies dealing with road infrastructure both construction and service delivery, and there is no clear distinction of scope. This is clear from the Figure 3.4. Road management is a key co-ordination issue and it can be built and maintained but the multiplicity in agencies involved making the task difficult. Road infrastructure development could suffer due to lack of co-ordination between agencies. As a consequence, the traffic and transportation in the city faces uphill tasks with increased travel time, traffic congestion etc. Figure 3.3: Role and responsibilities – inter relationship of various Department Pollution Control Urban Planning, Tax Collections Law and Order Irrigation, and Government Body Jurisdiction Water Supply Development Telecom and other utilities Fire Service and control Road Infra Sewerage Transport Electricity Drainage Greater Visakhapatnam Municipal Limits Municipal Corporation Vizag Urban Development Authority Urban Development Area Andhra Pradesh Transco Entire Metropolitan Area A.P.Eastern Power Distribution Co. Central District of AP Postal and Telegraphs Department Entire State Andhra Pradesh State Road Entire State Transport Corporation Road and Building Department Entire State AP Pollution Control Board Entire State Indian Railways Entire State Vizag Port Trust Municipal Limits Naval Area Municipal Limits Police Municipal Limits NHAI Entire Country Coordination Key Agency in Respective Jurisdiction Overlap 38 Visakhapatnam City Development Plan Figure 3.4: Functional Overlaps & Co-ordination Requirements Construction of Roads Maintenance of Roads City Roads Flyover Connecting High Regular Road Cutting Agency Roads ways Maintenance GVMC Maintenance of city Responsible for road cutting roads, flyovers and permissions but lacks Responsible for road and side walk connecting roads enforcement powers for quality construction and time for restoration VUDA Takes on construction of flyovers on specific projects such as Mega city. Also constructs roads in area where it develops and sells residential plots Road & Takes on construction Responsible for Responsible for road cutting Building of connecting roads, road maintenance permissions for highways highways connecting roads and highways APEPDC APCPDCL and telecom players often need to dig up roads for No role maintenance of their own Telecom infrastructure operators 3.4. KEY ISSUES IN CITY GOVERNANCE The city governance is characterized by multiplicity of agencies. This results in lack of inter department coordination which is a serious roadblock plaguing the municipal governance. The agencies have their own priorities, procedures, lines of accountability, financing patterns, which often may not be in conformity with those of GVMC. The critical issues that emerge from the existence of multiple agencies include:  Spatial and functional fragmentation  Overlapping functions  Multiple accountability lines  High service delivery gaps, and  Increasing urban poverty These and other key challenges are discussed below. Lack of Clarity in Local Functions The Constitution (74th Amendment) Act, 1992 envisages that the functions listed in th the 12 schedule be entrusted to elected municipalities. This is with a view to minimise ambiguities and overlapping of functions between local bodies and other authorities. However, in practice, several agencies are responsible for the functions and in some cases, local bodies have no role. Inter-Institutional Conflicts Inter-jurisdictional and inter-institutional conflicts between public service planners and providers are common in city administration. District heads of departments and heads of parastatals are required to coordinate their works on a day-to-day basis. The large number of departments, institutions, local authorities, agencies and officers undertaking similar, related or over-lapping functions or functions that are not clearly defined lead to conflicts in operation. 39 Visakhapatnam City Development Plan Moreover, the various agencies operate over the same or overlapping jurisdictions and are not in a position to fully understand or evaluate the backward and forward linkages associated with these functions. Inter-institutional externalities, which occur abundantly in city economies, account for most problems of city management. They call for effective coordination and mitigation mechanisms to be put in place. Managerial Coordination Issues As discussed earlier, GVMC has a strong presence of the State Government Departments and several parastatals, Central Government agencies including Indian Navy, Visakahapatnam Port Trust, Airport Authority of India, East Coast Railways, Archaeological Survey of India, urban and rural local bodies and a strong presence of civil society organizations. Thus, there are many managers connected with city service delivery and infrastructure and management. All these make the task of city management highly complex and difficult. In addition to general coordination between urban and rural local authorities, there are several inter-departmental and inter-institutional coordination issues, which arise, in day-to-day administration of the city area. There is a need to address these institutional and other challenges to provide good governance to the city. Unless the roadblocks are removed, economic development gets hampered and efficient service delivery becomes difficult. This adversely impacts the community - particularly the poor. There is need, therefore, to streamline the governance framework, remove the roadblocks and strengthen the lines of accountability. The governance reforms become all the more critical in the context of Visakhapatnam becoming more competitive and investment destination. The problems become complex in the context of formation of GVMC with spatial expansion and increase in population. The city should offer high quality services and promote inclusiveness and citizen friendly governance institutions. The institutional strategies required include:  Establishing clear lines of accountability of all service delivery agencies, and  Constituting autonomous service delivery agencies in different sectors like water and sanitation, transport, roads, solid waste management etc.  Performance based memorandum of understanding between the corporation and various service delivery agencies focussing on targets and outcomes. Within this overall framework institutional and implementation mechanisms need to be worked out. They include:  Establishing a Reform Monitoring Unit as a oversight body to monitor the reforms underway and being proposed;  Strengthening local government capacities by outsourcing the project management and M&E functions;  Establishing appraisal institutions and processes; The institutional and governance reform strategies include; th  Strengthening decentralisation – 74 CAA  Evolving inclusive governance mechanisms  Institutional integration  Evolving partnerships for service delivery  Establishing coordination mechanisms to overcome spatial and functional fragmentation 40 Visakhapatnam City Development Plan 3.5. REFORMS Analysis of state & city Reforms and Change are critical elements in development process; they become more significant in urban development in the context of growth of cities and consequent pressure on infrastructure and services, growth of poverty, etc. this is compounded by institutional constraints like in capacity, fragmented structures, functional overlaps and dated processes and procedures. In addition, there has been a paradigm shift in governance from the traditional top-down model. As a result governance reforms have become imperative for efficient delivery of services, provision and maintenance of infrastructure and to provide efficient and responsive governance to the people. Recognizing the significance of reforms to provide efficient and effective governance, government of Andhra Pradesh has initiated and implementing several urban sector reforms during the last few years. Similarly the urban local bodies particularly the municipal corporations have initiated city specific reforms to improve governance. State Level Reforms The reforms initiated at the state level fall under three categories namely 74th CAA, Governance and Pro-poor. They are discussed below: 74th CAA • Reforms related to 74th Constitution Amendment Act (CAA) • Development State Urban Development & Poverty Reduction Strategy • Governance • Establishment of Strategy Performance and Innovation Unit (SPIU) • Citizen charters • E-Governance initiatives • Outsourcing of services • Developing partnerships in service delivery • Rationalization of municipal staffing • Preparation of common municipal act for corporation and municipalities • Simplification of planning regulations • Framework for solid waste management • Rationalization of stamp duty Pro-poor • Preparation of municipal actions plans for poverty reduction by ULBs • Affordable water supply connection to BPL families • New citizen friendly street vendor policy • Notification of slums Urban good governance The goal of good governance is provide, transparent, accountable and responsive government and to ensure that the citizens have a strong voice and role in the governance of their city. GVMC has initiated several innovatitive measures to provide good governance. The Corporation is in the process of enacting other measures to increase public participation in policy making and private sector in service delivery to improve accountability, transparency and efficiency in service delivery. The functions and urban good governance initiatives instituted GVMC are detailed. 41 Visakhapatnam City Development Plan E-seva Saukaryam E-seva Saukaryam initiated in 1999 is GVMC’s effort to improve access to information, accountability and transparency in services. The project, which has been implemented through public private partnership, is offering a whole gamut of civic services online. These range from providing facilities for payment of dues to the lodging of public grievances and the system of work sanctions. Some of the Services provided by the online facility are summarized below  Birth registration, Birth certification  Death registration, Death certification  Building plan registration, Building plan approval  Tap connection registration  Tender schedule, EMD registration  Well / Bore well registration, Sewerage connection registration  Commercial water tax collection  Property tax collection  Shop lease / rent collection  Tap charge collection  Trade license  Vacant land tax  Complaints registration  Advertisement tax collection  New Passbook issue  Contractor registration  Electricity charges The project is now being implemented in several other municipalities, and the corporation has applied for patent for it. The website of GVMC allows citizens to see their property dues, access their births and death, provides information about infrastructure works being undertaken by the Corporation and the status of various tender notices, building applications, complaints or grievances etc. The website also provides general information about the weather, local news, tourist areas, train and bus timings etc and hosts a virtual meeting place for citizens to discuss issues related urban governance and also provides citizens with the opportunity to have online conversations with the Commissioner and the Mayor. City Civic Centres – A One Stop Civic Shop To provide Internet access to all citizens, GVMC has established a computerized City Civic Center, which acts an outlet for citizens to have access to the civic services. The Civic Center has string of computers on the network and allows citizens to avail facilities like getting a death / birth certificates file a water tap/ drainage connection request apply for building plan approval lodge a complaint / grievance, make miscellaneous payments and everything which requires physical presence and cant be transacted on the net through website. The popularity of the Civic Center can be gauged by the fact that not less than 500 persons visit it everyday. The results have been stupendous. The complete networking and computerization enables the Corporation to get real time demand / collection statements improving tax collection efficiency increasing revenue by Rs 200 million during 2002-03 alone which the Corporation has used to extend more civic services. Over 2000 people make use of this facility every day either through the banking network through the City Civic Center or through the Internet. There are over 45000 registered users for the Corporation web site while the 42 Visakhapatnam City Development Plan civic center receives over 200 citizens every day reflecting its popularity across the range of communities. The project has been declared as the pilot project for municipal governance and is being replicated in various municipalities and corporation across the state and other parts of the country. Visakhaptanm Municipal Corporation has also applied for its patenting and has entered into a memorandum of understanding with a private company for the international marketing of this product. The project has already branched out into other areas of utility payments like telephone bills and registration and has tied up with electricity department for collection of bills on line. This initiative bagged several wards such NIUA, UNDP, CSI, CRISIL and also a finalist for Stockholm Challenges award. Systematic Database Realizing the need for a systematic database for good governance, GVMC has invested in a Geographic Information System mapping program to provide geo-spatial information of all utilities and services. Tariff Revisions During 2003, GVMC revised its water and sewerage tariffs and indexed them to internalize inflation. This measure was enacted through a consensus driven approach where all the stakeholders were involved in the decision making processes and is considered to be one of the most progressive steps taken by GVMC Augmentation of Water Supply GVMC has undertaken proactive measures for augmenting the water supply system through the Visakhapatnam Industrial Water Supply Project (VIWSP). GVMC will be making investments to the tune of Rs 1675 million in the current financial year in VIWSP and will be creating infrastructure to off take water and transmit it to the City after treatment. This measure would facilitate GVMC to achieve its goal of providing citizens with water twenty-four hours a day, seven days a week. PPP Formulation To improve service delivery, GVMC has initiated PPP for street light maintenance, parks, sanitation, etc. GVMC has also identified priority city wide projects like water, drainage, roads and schools which will also be enacted through Public Private Partnerships in partnership with APIIC and IL&FS Infrastructure Development Corporation Limited (IIDC). As a part of the project development for these projects, GVMC is undertaking a service deficit survey through the AP Productivity Council. The survey would provide valuable information for creating a Comprehensive Action Plan. B. PRIVATE SECTOR PARTICIPATION Involvement of Resident Welfare Associations To improve sanitation at Primary level, the involvement of Resident Welfare Associations is initiated in Visakhapatnam. Such an association has come forward in MVP colony which is one the biggest colonies consisting of 12 sectors to improve the sanitation with their involvement. Similar initiatives is in progress with very good results in Daspalla layout. The resident welfare associations have agreed to take up the maintenance of parks in their localities and also to involve themselves in the sanitation through EXONORA. 43 Visakhapatnam City Development Plan Prakruthi Initiative An Organization Prakruthi has been established wherein representatives of all the major industries, Public sector Organizations, Non Governmental Organizations and Officers representing various Departments are members. The Organization functions under the Chairmanship of Chairman, Visakhapatnam Port Trust and the Commissioner of Visakhapatnam civic body is the Member Secretary. Prakruthi launches every year massive th tree plantation programme on 15 July to promote Environmental Greening Initiative with active participatory involvement of all the members of Prakruthi. To date over 200,000 trees are planted and being maintained in the city along the various avenues as well as part of industrial green belts. Public Private Partnership Parks To ensure maintenance of environmental greening level, the civic body itself maintains major parks while a number of parks are being maintained through Public Private Partnership. Similarly for solid waste management also private participation is being encouraged through resident welfare associations. New Institutional Arrangements The increasing urbanization has resulted in growing challenges and pressures, where urban local bodies are required to undertake several new functions, deal with the problems of growing information sector, meet the demands of increasing the population base and adapt to newer technologies in information and communication amongst other things. At the same time, the sources of revenue collected in the form of taxes, assessments and levies that have not increased proportionately with the population. Therefore, to enable GVMC to meet these challenges, the following exercises are being carried out  Review of governance in Visakhapatnam vis a vis ICT, HRD and Urban Finance  Analyzing the effects of re cent initiatives by the GVMC  Formulate specific action plans that facilitate GVMC in attaining the goal of good governance. The Studies will assist the GVMC to initiate improvements in the following areas  Human Resource development and skill augmentation of the GVMC employees  Improving the outreach and interface of existing programs  Networking to improve inter departmental information flows  Strengthening and augmenting the Corporations sources of revenue Lessons Learnt Several lessons were learnt from the reform initiatives. They include:  Vernacular language should be introduced in all the transactions of the corporation as well as in to the computerization programme.  Launch data warehousing on a large scale, which would avoid cross-reference to paper record, which are time consuming and also preservation of paper media, which occupies space, could be avoided.  Establish linkages with a GIS System so that spatial approaches could be assigned to stakeholders’ requirements and grievances.  Publish white papers on various activities of the corporation and need not be necessarily restricted to financial aspects.  Undertake capacity building exercises in the corporation as well as in the various offices distributed all over the city in respect of physical and human resources through training programmes to make the personnel change their mind set and to make them appreciate that the Stake holders are the bosses.  Establish a knowledge bank, which would store the expertise and experience gained by the employees in implementation of the initiative. 44 Visakhapatnam City Development Plan SWOT ANALYSIS SWOT analysis has been undertaken to assess on the negative and positive aspects of the implementation of reforms. It involves analyzing the internal positive (strengths) and negative (weakness) aspects of an organization and considering these in relation to aspects of the external environment – both the positive aspects (or opportunities) and negative aspects (or threats). The figure gives the details of the swot analysis. Strengths Weakness  Industrially developed area  Lack of training programmes to the  Proper maintenance of records staff  Less expenditure on establishment  Lack of trained staff in all sections  Spacious office accommodation  Inadequate staff to the selection grade Municipality  Lack of motivation to the employees Opportunities Threats  Staff interested to undergo training  Due to heavy industrialization  Availability of active community migration to the town is very high organizations  Lack of inter departmental co-  NHCs active in Government ordination and understanding programmes  Less staff in revenue section  Cooperation of MLAs, MPs,  No updating of DRs and ADRs Councilors and people taking to aBTumulation of arrears representatives without collection.  Partial computerization of revenue  No proper information on section assessments  Major part of the town oBTupaid  No proper records on municipal industries assets  Manor revenue generated industries  Improper tax collection systems like Zinc, BHPV, Steel Plant, VEPZ  Enhancing the taxes at irregular etc., with in the Municipal limits. intervals causing incontinence  Scope of getting major vehicle among the public parking fee due to heavy vehicles  Lack of modern technical from industries equipment in various sections  Major revenue improvement due to  No exposure to staff in modern detailed survey on D&O Trades technical and scientific methods  Revenue improvement due to  Dissatisfaction among public due to implementation of vacant land tax problems in water supply  Service delivery  Partial privatisation of various services like sanitation water system etc., 45 Visakhapatnam City Development Plan Chapter – IV 4. Municipal Infrastructure 4.1. INFRASTRUCTURE The City of Visakhapatnam is one of the largest Municipal Corporations in India and delivers services to about 1.5 million residents spread across a huge geographical area of 515 Sq.km. There has been a significant migration into the city owing to continuing rapid industrialization and urbanization. Over 500 poor settlements have come into existence and under a policy of promotion of social Justice, the civic administration has taken steps to upgrade them with a provision of water supply, street lighting paved roads, drainage and sewerage. This level of growth will not only open new opportunities for the city and its residents, but will also bring enormous change and new challenges in improving public health and sanitation. The following is the status in brief in respect of Infrastructure in the GVMC covering Water Supply, Transportation network, Underground Drainage, Storm water drains, and Municipal Solid Waste disposal. Table 4.1: State of the Infrastructure Drinking Water Water Availability Installed capacity 37 mgd Released/daily 37 mgd Source of water supply 50-100 sq.km. Water coverage Population covered by public water supply 30 % per capita supply : 62 lpcd Supply of duration : 0.45 hrs Wastewater Disposal Wastewater generated daily: 67.5 mld Disposal (underground sewerage) Capacity: 25 mld Present operating capacity: 10 mld Households connected to underground sewerage: 6 % Solid waste Waste generation daily : 650 tones/day Collection daily: 650 tones/day Stormwater Drainage Annual rainfall 1080 cm Length of stormwater drains 1400 km Roads and Road Municipal Roads – 1120 km Transport  C.C.Roads – 150 km  B.T.Roads – 750 km  Kutcha Roads – 220 km State-level roads - 100 km Public transport Buses – 1500 Bus capacity/passengers : A capacity of 60,000 seats with moving 3.9 lakh people daily @ 6032 trips/day covering 1.37 lakh km daily Private registered vehicles – 3,50,000  2 wheelers - 2,40,000  4 wheelers - 60,000  Others - 50,000 Street lighting Number : 46,000 Area Coverage: 80 % 46 Visakhapatnam City Development Plan Table 4.2: Cost Recovery in Urban Infrastructure Cost incurred in service (Rs. in Crores) Direct recoveries (Rs. in Crores) Infrastructure 2002/03 2003/04 2004/05 2002/03 2003/04 2004/05 Water Supply 17.67 23.00 24.00 46.58 47.00 51.36 Sewerage 1.93 2.87 6.27 1.41 1.66 1.55 (Waste Water) Solid Waste 18.60 22.61 25.88 0.66 2.11 2.10 Public bus services 70.53 81.12 93.96 73.77 84.84 97.08 Table 4.3: Level of Agreegate Investment in Urban Infrastructure, 2001/02 to 2004/05 Infrastructure Public investment Private investment (Rs. Crore) (Rs. Crore) Water Supply 100 - Sewerage and drainage 25 - Solid waste 10 - Roads (municipal) 90 - Street lighting 3 - Storm water drainage 5 - Total 233 - Urban growth both spatially and population wise puts heavy pressure on infrastructure, particularly water supply, sewerage, solid waste, sanitation, road network, traffic and transportation etc., unless infrastructure in improved, quality of life suffers. Most importantly, it impacts economic development of the city and investment climate. This chapter presents current status of infrastructure, gaps and future requirements strategies and investment requirements in the areas of water supply, sewerage, solid waste management, traffic and transportation. 4.2. WATER SUPPLY The GVMC is responsible for supply of potable water including planning, design, construction, implementation, maintenance, operation & management of water supply and sewerage system. The existing facilities have been critically assessed. Some have been found to be designed an / or constructed that they have to be replaced and following deficiencies have been arrived at based on the SWOT analysis.  Insufficient distribution network  Insufficient infrastructure  Lack of water audits  Lack of energy Audits  Lack of reuse facilities  Storm water drains and utilization. 4.2.1. Sources of Water The main surface sources of water for the city of Visakhapatnam are;  Mudasaralova Reservoir  Gambheeram Gedda Reservoir  Gosthani River  Thatipudi Reservoir  Mehadri Gedda Reservoir  Raiwada Link Canal  Yeleru Left Bank Canal 47 Visakhapatnam City Development Plan The City was initially receiving 0.4 mgd of water from the Mudasarlova reservoir with subsequent additions of 3.60 mgd from Gosthani, 9.00 mgd from Thatipudi, 9.00 mgd from Mehadrigedda reservoir and 15.0 mgd from Raiwada and Yeleru systems totaling 37.00 mgd of water. The other sources of supply are the reservoirs built on minor streams like Gambheeram and others All these sources are rain fed reservoirs. The failure of monsoon makes the water supply position in the City very critical forcing the Corporation to regulate the water supply so as to conserve and supply the available water for longer durations and to all sections of the society. The brief details of water supply at a glance in given in annexure The total quantity of water that can be drawn from the above sources is 40.25 Mgd. In addition to the above 7.5 Mgd of ground water is also drawn through bore wells. Around 16 Mgd water is supplied to slums and industries. The Godavari Drinking Water Supply Project designed to supply 33 MGD of water taken up in 2003, is ready for commissioning. All above sources are not perennial and due to considerable reduction in the inflows to impoundments and rapid growth in the population, the city is experiencing shortage crisis in the summer seasons. Table 4.4: Details of Water Supply Sources Distance Drawl Min. from the Max. Water SN Source quantity Water Town Level (in MGD) Level Service Reservoir Mudasaralova 1 0.40 168 Ft 152Ft 5 Km Reservoir Gambheeram Gedda 2 1.80 126 Ft 107 Ft 30 Km Reservoir 3 Gosthani 3.60 36 Ft 21.5 Ft 35 Km Mehadri Gedda 4 9.00 61 Ft 44 Ft 25 Km Reservoir 5 Thatipudi Reservoir 9.00 297 Ft 251 Ft 65 Km 6 Raiwada Reservoir 15.00 114Mt 99Mt 75 Km 7 MGR Infiltration Wells 1.00 16 Km 8 K.B.R. 2 MGD Scheme 2.00 30 Km Total: 41.80 4.2.2. Service Area The present water supply service area of GVMC is 515 Sq.Kms which includes Gajuwaka and adjoining peripheral areas. The average per capita consumption is 63 llpcd on an average whereas the Manual on Water Supply and Treatment recommends a minimum of 150 to 200 Lpcd for all residences. For higher and higher middle income level houses, the per capita supply is fairly low, which is around 75 litres. This is far below what is usually encountered elsewhere. In case of poor households, the consumption is fairly high (51 lpcd) when compared to averages registered elsewhere in similar social conditions. This high level consumption comes from the fact that the water is supplied mostly free of charge for most of these people or at very low price. However most of them have affordability to pay marginal tariff rates. 48 Visakhapatnam City Development Plan Figure 4.1: Sources of Water Supply 4.2.3. Existing Transmission, Distribution and Storage Capacities The transmission mains carry water from the source to the water treatment plants and subsequently towards the Master balanced reservoirs, subsequently to the reservoirs in the city by means of trunk disribution mains.The total length of the transmission mains is about 244 Km comprising of CI, RCC, and PSC pipes. The water distribution system for the GVMC area is divided into zonesand sub zonesdue to inadequate inflow as well as inadequate storage capacity. The sub zones are operated using control valves thereby making the operation of the system very complicated. The total storage capacity available within GVMC is about 17.45 MG (79.5 ML) comprising of ground level reservoirs and elevated reservoirs. There are 161 reservoirs in total, both ground and elevated, supplying water to all the localities in the City. The total length of the distribution system is 1035 Km, comprising of pipes with diameter ranging from 75 mm to 700 mm of different materials. 4.2.4. Service Coverage As per the GVMC, over 85 % of population are covered with potable water supply in the core area and very low coverage in the extended areas. Thus, the overall supply would be around 30% of the total GVMC area. The city has over 50,825 water connections. Percentage access to piped water supply in GVMC core area is around 80% and is much lower in surrounding extended areas. In addition to that, the city has 12,019 public stand posts (PSP) for water supply to the weaker sections of society, who cannot have individual house connections. GVMC has started fixing meters and about 363 Nos. of house connections are metered on trail basis. However all the commercial connections are metered. The frequency of water supply is around 45 minutes every day. In addition water supply is provided through 22 Nos. of tankers of capacity 5 KL to 10 KL and they make 192 trips per aday nd deliver 49 Visakhapatnam City Development Plan 1390 KL of Water for Public,Sulabh complexes, Mid-day Meal Programme and Government Organizations. 4.2.5. Water Demand and Deficit GVMC’s current estimated demand stands at 87 Mgd. However, its installed capacity is merely 40.25 Mgd, and this is made worse by draught conditions that constrict supply even further. The estimated ground water extraction that supplements water supply is 7.25 Mgd. As shown in table 4.5 a huge gap is indicated between current supply and demand, and this is likely to widen by 2021. The status of the demand in the year 2005 and the projected demand for the year 2020 is presented. The supply provided to domestic sector is 21.0 mgd showing a deficit of 21.69 mgd as the standard norm of supply is 42.69 mgd. The supply to the bulk consumers is 16.0 mgd while the demand requirement is around 22.31 mgd indicating a deficit of 6.31 mgd.The total deficit in water supply in respect of both the categories is 28.0 mgd. Table 4.5: Deficit in Supply for Different horizon years Projected Water Present Water Deficit (in Year Population Demand Availability (in Mgd) (in Millions) (in Mgd) Mgd) 2006 19.25 87 40 46.75 2010 22.8 97.7 40 57.45 2020 26.7 124 40 83.75 4.2.6. Drinking Water quality (distribution system / Borewells) The Municipal Corporation is supplying chlorinated water to the entire city. Chlorination is being done at the major reservoirs for maintaining the residual chlorine of 0.20 ppm at all the tail end points. Sodium Hypo Chloride solution is also being added at the respective reservoirs so as to maintai n the residual chlorine of 0.2 ppm wherever necessary. Around 700 water samples are taken and tested at Public Fountains, House Service Connections and metered connections per day. In addition analyes of water samples is also outsourced to a private agency who test around 500 samples per day. The water samples collected from the distribution system on a random basis have been compared with the required drinking water standards. The pH values vary from 7.65 to 8.79 in public fountain water samples, and 7.64 to 8.5 in bore well water samples indicating that the waters are neutral and alkaline. The recorded values of specific conductance vary from 73.4 to 4,470 Micro mhos/cm in public fountain water samples, and 66.3 to 11,934 Micro Mhos’ cm in bore water samples. The values of chlorides vary from 9.9 mg/1 to 215.2 mg/ 1 in public fountain water samples and 30.0 mg/1 to 4,757 mg/1 in bore water samples. 4.2.7. Tariff Structure and Consumer Mix The main source of funding for urban water supplies should be tariffs. The average cost of production of water is estimated to be Rs. 2/kl. The cost of realisation from the domestic sector is not reaching to the production cost as all residential connections are un-metered and flat rate supply. Hence, GVMC cross subsidizing the residential supplies with the revenue 50 Visakhapatnam City Development Plan that is realized through industrial and commercial connections. The water supply sector is a profit making sector in the GVMC with surplus revenues. During 2003, GVMC revised its water and sewerage tariffs and indexed them to internalise inflation. This measure was enacted through a consensus driven approach where al the stakeholders were involved in the decision making processes and is considered to be one of the most progressive steps taken by GVMC. Table 4.6: Tariff Structure Water Supply Consumption of water in Rates in Rs. Category kL per month Per kilo Litres 1. All water supply connections other than covered by category below Where the monthly consumption is 500 kl or Upto 30 6.00 less Above 30 upto 200 10.00 Above 200 25.00 (B) Where the monthly consumption Entire consumption 25.00 exceeds 500 kl 2. Group Housing Municipalities, panchayats, local Authorities, Upto the agreed quantity 6.00 cantonment and housing colonies Above the agreed quantity 25.00 The water needs of the poor settlements would be specially addressed and the present rate of 50% of the normal rate would be followed and they would receive the added advantage of receipt of the increased quantities for the same rate. The connection rate, i.e., the percentage of households supplied with water from a network (either public or private) is 45%. However due to water scarcity, 40% of the connected households use also some other mode of supply, which is mostly a private well or a bore well. Around 10%of households are supplied with private sources mainly in colonies created by industrial or transport organizations. The total number of connections including the bulk water supply connections is more than 74,000 approximately. Of the total, 73% constitute domestic connections. The industrial connections and commercial metered connections is about 12%. The Public Stand Posts through which the water supply will be made at free of cost works out to around 17%. Table 4.7: Connection Details Category Connections % Domestic 50,825 77.38 Slums 17,000 19.71 Commercial 598 2.69 Industrial 64 0.19 Semi-bulk 727 0.04 Others 4786 Total 74,000 100.00 51 Visakhapatnam City Development Plan 4.2.8. Non Revenue Water Non revenue water due to commercial losses and physical losses in the system, lead to loss of revenue. The water system has high leakage levels of around 40%. There are no studies conducted so far to find out the exact percentage of non-revenue water. Table 4.8: Performance Indicators Indicators GVMC Total Population 15.00 lakhs Slum Population (appr.) 6.00 lakhs Network Coverage 30% (GVMC) 85% (Core) % Access to Piped Water Supply NA (GVMC) 60% (Core) Average Per Capita Supply 65 lpcd Unaccounted for water ~ 40% (est.) Duration of Supply 45 minutes everyday % metered Residential – nil % metered Commercial & Industries – 100% Average volume of water produced 40.25 Mgd Unit Production Cost Rs.2/- per KL No. of PSPs 12,019 Water Tariffs Residential Flat Rate Rs.60/- per Tap Commercial Rs. 20 / KL Industrial Rs. 25/- KL Basis of billing Flat rate monthly Residential Free of cost PSPs Metered - Commercial/Industrial Mode of Payment Cash, Cheques, DDs, Credit cards Private sector involvement Operation, Maintenance, Leak repair, Bore Well maintenance Computerization/automation Billing, accounting, complaint handling Management Information System To be developed Key Issues and Challenges • Huge deficit between the demand and supply. • Huge demand supply gap which is likely to widen drastically in future. • High non revenue water resulting in wastage of precious and scarce source • High amounts of physical loses due to old transmission and distribution network • Public stand posts leads to inadequate measurement, and free (authorized) use. • Inaccurate or absence of customer meters • Lack of effective communication strategy • Lack of efficient energy conservation measures • Unregulated abstractions of ground water leading to falling of ground water levels • Lack of commercialisation and cost recovery approaches • Need for tariff balancing • Even lower slabs are below the threshold-paying limit of the poor. • No regulatory mechanism to oversee the functioning of the sector and to fix service standards as well as tariff to meet capital and operating expenditure. • No management mechanism to regular the supply. 52 Visakhapatnam City Development Plan 4.3. SEWERAGE SYSTEM 4.3.1. Current Scenario The Visakhapatnam City is divided in to 14 drainage blocks according to topographical conditions. The Drainage Block 1 was executed in the year 1980 and commissioned in the year 1981, serving a population of 50,000 of Old City covering an extent of 141 hectares. The length of sewer lines provided is 18 km. One No of pumping station and One Sewage Treatment Plant of 7 MLD capacity were constructed. No of house hold connections are 1500. Under phase-II, sewerage system was provided in ward Nos: 21, 22,23p 24p, 25 & 26p in the year 2001. The area covered is 9.43 sq.km and population benefited is 2,03,100 (2001). The length of sewer lines provided is 96.32 km. Two No of pumping stations and One Sewage Treatment Plant of 25 MLD capacity were constructed. No of house hold connection are 13,000 Greater Visakhapatnam Municipal Corporation (GVMC) has taken up an initiative to strengthen sewerage system through private sector participation. The objective of this initiative is to improve the operation, maintenance and management of the existing systems and subsequently invest on system strengthening and augmentation to achieve complete coverage of the services in GVMC area and to meet the further demands. Sewerage facilities have been developed and are in use in the old parts of Visakhapatnam city. Phase I of the facility was completed in year 1980, while Phase II- Sub-phase I works have been recently completed in year 2002. Works under sub-phase II are being constructed and likely to be commissioned in totality shortly. A comprehensive plan of providing sewerage to the whole city has been prepared and forms the basis of sewerage schemes implemented so far and contemplated in future. This plan divides the whole city in 13 drainage blocks. st Table 4.9: Progress of Implementation (1 August 2005) Sl Phase No. Zone Target Applications Connections No. No. Received given 1 I I 1500 1572 1234 2 II (Sub Phase – I) II 13,000 10,335 6238 Total 14,500 11,907 7472 4.3.1.1. Network Coverage The existing sewerage system covers only 10.5% of the GVMC area. Most of the core area of the city and Northern part of the city are not at all covered so far with the Sewerage system. Due to lack of well established Sewerage system in about 90% of the city, the GVMC is facing lot of problems concerning to the Health & Sanitation. Against 15.00 lakh population, only 2.50 lakh population are so far covered with total connections of 15,000. Table 4.10 Performance Indicators S.No. Components GVMC Area 1 Network Coverage 10.5% 2 Access to Sewerage NA 3 Total Quantity Generated 135 MLD 4 Capacity of Treatment Plants 32 MLD 5 Treatment & Disposal 20 MLD 6 Recycling / Reuse 10% 53 Visakhapatnam City Development Plan 4.3.1.2. Sewerage Distribution Network A network of length 104 km consisting of local and branch/main sewers are existing in the city in the Block - I, VI & VII against 14 Drainage Blocks. With mere sewerage distribution network as stated above, infers that the City lacks safe sanitation facilities to a majority of the population. The treatment capacities are not utilized to the optimum as 90% of city is not covered with the sewerage system. 4.3.1.3. Sewage Treatment Plants A primary sewage treatment plant with a capacity of 7 MLD is in operation at Old Sewage Farm since 1982. Another STP near Kailasha Giri with a capacity of 25 MLD receives the flows from the MVP Colony, Pandurangapuram, Seethammadhara etc., and is not able to be utilized completely due to insufficient sewerage network. About 10% of the treated Sewage Water is recycled and reused for Horticulture and other purposes. Key Issues and Challenges:  Low sewerage network coverage in the whole GVMC area including core area.  Non-existence of comprehensive master plan for sewerage  Data on access to sewerage connections is not available.  No comprehensive sewerage quality studies  Lack of effective communication strategy  Lack of efficient energy conservation measures .  Inadequate sewerage treatment facilities resulting in discharge of untreated sewage into water bodies.  Very low recycling and reuse of wastewater. 4.4. STORM WATER DRAINAGE The Topography of the city is like a saucer surrounded by hillocks on 3 sides and sea on the other side. As the city is a coastal city, situated on East Coast of Bay-of-Bengal, it experiences heavy rains particularly between ‘Aug-Dec’ every year, under the influence of south west monsoon and also due to cyclones. Due to the terrain & Topographical conditions, the rain water collected from the hills and catchments flow at much higher velocity and gushes through the un- trained Major Drains, before reaching to the Sea. In the course of its Journey to the Sea, the rain water during heavy cyclonic rains flows at much higher velocity through this un-trained water course and devastate the life of public and their properties situated all along the water course / stream. The population living along the banks of the stream courses essentially belong to the weaker sections of the society are prone to flooding and their houses are getting damaged or inundated. Annual rain fall : 1080 mm Length of storm water : 1400 Km Coverage 20% drains Flooding : 10% Coverage : 20% 54 Visakhapatnam City Development Plan And moreover, due to the rapid urbanization & un-precedent growth of the city in the past 2 decades, most of these Storm Water Drains were encroached upon by the public, ‘narrowing’ of the original stream. Further, most of the ‘slum-dwellers’ and people of weaker sections, occupy and reside on the banks of the drains and causing obstructions to the free flow of stream and narrow-down the width furthermore. It is observed that at many places, even the cleaning / De-silting of the drains during pre-monsoon season is not found to be feasible due to the inaccessibility. Lack of proper Demarcation & fencing of Storm Water Drains, the near by residents / Slum dwellers, are habituated to throw the debris & other wastages in the Drains, which one causing obstruction to the free flow of rain water and finally over flows on the roads. 4.4.1. Major Water Bodies & Drains There are 55 major water streams in the City. The most important tanks are Mudasarlova, Nerella Koneru and tank at Surya Bagh etc., There are about 3 tanks in the peripheral area of the city. Primary Drains Nearly all the major drains following through the city flows and drains in to the sea. There are in all 22 major Geddas and 20 primary drains passing through the GVMC.. These primary drains or nallahs carry the storm water finally draining into either in to the sea or near by water bodies. The length of the primary drains is around 110 Km. Tertiary Storm Water Drains The tertiary drains are roadside drains discharging storm water into the primary drains and water bodies. The total length of tertiary drains In GVMC area is about 750 Km, comprising 450 Km of pucca drains (lined with brick or stone masonry and pre-cast RCC sections) and about 300 Km of kutcha drains (un-lined). 4.4.2. Flood Prone Areas in GVMC The major flood prone areas in twin cities are the low lying areas in the catchment areas of Velemapeta, Poorna Market, Kota Veedhi etc., in the Old City comprising of wards 1 to 20 and some parts in the 30 to 40 divisions. The Air Port area is a complete Flood Prone area and affects the city normal life tremendously in the Floods. The areas in the 45 to 50 divisions and the Gajuwaka are commonly affected with the flash floods which occurs during the cyclonic rains. 4.4.3. Improvements to Storm Water Drainage The GVMC is proposing to undertake a study to prepare a storm water drainage master plan to alleviate the problems of flooding by providing adequate measures. The study is basically aimed to know the geddas / nallahs which needs to be widened and deepened and to free the banks from the encroachments. The study also reveals the critical sections for further improvement and a broad cost to carry out the improvements. The improvements proposed include:  Deepening  Widening  Provision of retaining walls at critical sections  Modification to cross drainage works and in addition suggested some soft measures such as prevention of dumping of waste into the nalllah to prevent clogging. 55 Visakhapatnam City Development Plan Key Issues and Challenges:  Inadequate drainage system, with no proper design of drainage.  Excessive concentration of flood due to breaching of tanks.  Disappearance of flood absorbing tanks.  Dumping of debris and garbage into the open Nallahs.  Illegal encroachment of natural water courses  Patta lands in the natural watercourses.  Springing up of housing colonies in the foreshores of the tanks.  Sanctioning of layouts without reference in the ground levels.  Indiscriminate laying of service lines all along and across natural courses.  Collection of building materials on the road sides resulting in excessive silting of drains.  Diversion of natural water courses to accommodate habitations.  Increased run off due to increase in impervious areas.  Low Coverage  Low Capacity  Lack of integrated drainage plan  Encroachments resulting in flooding and inundation 4.5. TRAFFIC AND TRANSPORTATION 4.5.1. Current Situation The city’s importance and ranking interms of economic development, industrialisation, specifically of port activities, steel plant with large scale imports and exports signifies the inter city/ inter national connectivity of the city through roadways, railways, water ways and road ways. The vast area under the city limits of Greater Visakhapatnam emphasises the importance of intra city transportation and regular commuting facilities. Due to the rapid Industrialisation in the last two decades, It is striving to manage the growing transportation requirements. The transportation network in the city area is dominated by three major arteries, one along beachfront, another along the Northern Hill flank and the third which runs through the city. Visakhapatnam is ideally situated to become the national and international logistics hub. The city is linked through roads, ports and airports to the key economic centers. To leverage this geographic advantage, the city will have to create the link infrastructure required for providing smooth connections and ensure timely completion of ongoing infrastructure projects such as the airport up gradation project and the Gangavaram port project and more particularly in the Greater Visakha. NH- 5 and NH – 43 of the National Highway (NH) network and the State Highways connect the city area to the vast hinterland. Around 7.88 % of the total area is covered by roads, 2.13% by railways and 0.85% by the Port authorities. More than 125.77 tones of goods are moved in a year, 76.57% is by rail, 23.4% by road. Public transport comprises buses, which are used by 20% of the total commuters in the city. Only 0.25% of the population use auto rickshaws. A special effort has been undertaken to provide interconnecting between major arteries of the city. Development of this programme would ease congestion along the major roads and facilitate traffic to by pass crowded segments of the major roads within the city. The traffic moves faster and the roads also would help in cordoning or areas in case of fire and 56 Visakhapatnam City Development Plan other disasters. The interconnectivity through a programme of new roads as well as widening and strengthening of existing new roads has 'been taken up to connect the national highway passing through the city and the beach road, National Highway and the Station Road and National Highway and the Industrial.The NH-5 and NH-43 pass through the city and connect the city area to the vast hinterland. The city’s transportation requirement is met by the following modes of transport  Bus transport is the major public transport with modal share of 20%  Three seated autos acting as the Para transit contributing to nearly 15% of the transport demand.  Private vehicles comprising two and four wheelers. Many agencies are involved in supporting and facilitating traffic and transportation mechanism in Visakhapatnam. Provision of road infrastructure is done by GVMC and VUDA will take care of the roads that are to be developed in the outer periphery of the city. The public transport is taken care by APSRTC. The traffic regulation has been the responsibility of the police department. The NHAI, R&B, AP Transco. Etc, are the other agencies that contribute to the facilitation of transport system. No single agency is solely responsible and accountable for traffic and transport management. This is giving rise to functions and spatial and functional fragmentation. 4.5.2. Traffic Flows and Travel Demand Multiwheeled transport vehicles with heavy cargo plying between the important corridors (steel city, visakhapatnam port trust, HPCL and other industrial corridors) of the city and the national high ways are contributing to traffic problems and increased accidents. They run between the steel city and the port causing huge environmental degradation. There is an urgent necessity to regularise and stremline the transport cargo so that it doesnot crete problems to the non transport/ commuting traffic. In addition the non transport vehicles specifically private vehicles multiplied during the last decade. The two wheelers have multiplied by 11.2%, Four wheelers by 8.1%. Explosive growth of the surrounding areas and the concentration of substantial economic activity within the GVMC area has resulted in heavy radial flows being pumped into the central core which has limited road capacity leading to traffic bottle necks. In absence of conveneient by pass roads, these flows are being funnelled through existing travel corridors of GVMC area, thus accentuating the problem. Peak hour flows on major travel corridors carry heavy and high traffic volumes. The mixed traffic conditions present additional problems in maintaining lane discipline and hence the lane capacities are far less than those observed in car traffic flows. This has resulted in the reduction of average speeds of the vehicles over a period of time. The present average speed is just 15 km per hour and it is still likely to reduce if there is no improvement in the situation. 57 Visakhapatnam City Development Plan Figure 4.2: Vehicular Average Speed Average Speed 30 25 20 Km per hour 15 10 5 0 1981 19991 2001 2006 Average Speed (Km/Hr.) 4.5.3. Per Capita Trip Rate (PCTR) The growing population and increase in the spending power of the residents has resulted in greater demand for travel. This is very well indicated by the increasing per-capita trip rate (PCTR) projections shown in table 4.11. The ever-increasing size of the city is also expected to result in longer trip lengths, which means that the total travel miles will increase faster than the PCTR and the population growth rates. Table 4.11: Per Capita Growth Rate (PCTR) Year Per capita trip rate (PCTR) 2001 0.69 2006 0.82 2011 0.98 4.5.4. Visakhapatnam Road Network The city has radial form of road network development. The major road network in the city area extends over a length of 126 Km. The total road length is 1007 kms. In addition to these major roads, the reaches of three major R & B roads, which are state highways passing through have also been taken up for development in addition to this network, nine new roads have been opened and nine master plan roads have been taken up for widening. The recent growth trend is more in the North / south and west directions of the city. Two National Highways, NH5 (connecting Chennai on south and Kolkatta on East, and NH43 connecting Raipur. There are state highways also start from the city and diverge radially connecting several towns and district head quarters within the State in all three directions. 58 Visakhapatnam City Development Plan The road network of Visakhapatnam is very dense and congested due to narrow carriage ways , high pedestrian traffic and slow moving vehicle concentration. As per the existing land use plan, the area under road and railways is about 6% only and inadequate as a whole with insufficient pedestrians and other road infrastructure. 4.5.5. Vehicular Growth and Composition As per the Regional Transport Authority statistics, the total number of non transport vehicles registered in Visakhapatnam city is about 2.85 lakhs in the year 2005. Of which about 2.43 lakhs (85.00%) are 2-wheelers, 0.27 lakh motor cars (9.4%), 0.14 lakh 3- wheelers (5.1%), 0.05 lakh (0.18%) buses vehicles. Commensurate with the growth in population, the number of vehicles also grew at a rapid pace within the urban area. The private transportation has also become the preferred mode of transportation in Visakhapatnam like any other cities in India. The growth of cars/jeeps has grown up at an annual growth rate of 8% and that of two wheelers 10.5% over the last decade. The deficiency in frequency of APSRTC buses and non-coverage of suburban train services is one of the reasons for the growth of private vehicles. Overall, there is an attitudinal shift of people to use private vehicle rather than public transport. Table 4.12: Annual Vehicular composition Category 2001 2002 2003 2004 2005 Motor Cycles 15,948 1,78,143 1,97,534 2,19,158 2,43,033 (2Wheelers) Motor Cars & 15285 17757 20360 23511 27065 Jeeps (4 Wheelers) Autos 8531 9993 11718 13212 14771 APSRTC 508 503 491 495 521 Source : AP Transport and APSRTC, Visakhapatnam All these vehicles are plying on a near static road length of 420 km in GVMC area resulting enormous strain on the road network and leading a situation of endless transportation gridlocks. 4.5.6. Public Transport System Public Transport System (PTS) in Visakhapatnam is primarily road-based bus transport. APSRTC buses capture about 85% of all the trips made by public transport whereas para transit services share the balance 15% in commuting passengers. The total share of public transport is less than 20% against the minimum desired 50% share for Visakhapatnam, as per the guidelines issued by the Ministry of Urban Development, GoI. Table 4.13: Share of Public Transport Sl.No. City with Population in Millions Desired Share of Public Transport (%) 1 0.1 – 0.5 30-40 2 0.5 – 1.0 40 – 50 3 1.0 – 2.0 50 – 60 4 2.0 – 5.0 60 - 70 5 5.0 plus 70 – 85 Source: “Traffic and Transportation Policies and Strategies in Urban areas in India�, Ministry of Urban Development, GoI - 1998 Aware of this situation, the National Policy of Urban Transport (NUTP) recommends to “encourage and support investments in facilities that would wewan people away from the use of personal vehicles rather than build facilities that would encourage greater use of personal 59 Visakhapatnam City Development Plan motor vehicles� in order to promote sustainable development of the urban areas. The existing PTS may not be able to keep its present mode share under the current scenario unless pro- active policy changes in favour of public transport are implemented and complementing them with improved the PTS infrastructure. The NUTP document also further states that “the Central Government would, therefore, recommend the adoption of measures that restrain the use of motor vehicles through market mechanisms such as higher fuel taxes, higher parking fee, reduced availability of parking space, longer time taken in travelling by personal vehicles vis-à-vis public transport, etc.� 4.5.6.1. Bus Transport Currently, the city division of APSRTC is operating its services in about 17 sectors in between Scindia-Anakapalli, Maddipalem to Kurmannapalem, Old Gajuwaka to Collectors Office, arilova to OHPO, RK Beach to Simhachalam, OHPO to Madhurwada etc. The total number of passengers travelled in APSRTC services are about 2.9 lakh passengers per day. At present, there are about 600 buses that are operating in the above routes of the city and likely to increase to 850 nos in the next 5 to 10 years. All the buses ply on the same carriageway as that of other private vehicles and thus the level-of-service offered by the bus system is severely limited by the heavily congested road-network. This manifests in a situation where the bus system is unable to cater to the peak hour passenger demand, resulting in over-crowded buses, longer waiting times and slower speeds. It is to mention that observed that the patronage of buses has remained stable over the years while population is increasing each year. The important reason for this could be deteriorating service especially in the peak hours and a concomitant proliferation of seven seated Para transit modes providing convenient accessibility. Figure 4.3: Modal Split Actual Modal Share public transport Benchmark 20% private 45% public paratransit private 15% 55% 65% 4.5.6.2. Para Transit The para-transit operators, mainly in the form of auto-rickshaws (3-seater and 7-seater) have mushroomed in the recent years to capture the peak hour demand and are emerging as unhealthy competitors to the APSRTC buses. A total of 15,000 auto-rickshaws ply on the city roads and cater to an estimated 10% of the 71 lakh person trips each day. While a proper integration of para-transit can actually complement the bus system, this has not happened due to the very unorganised nature of the sector with too many independent owners of auto- rickshaws. The high degree of maneuverability of the auto rickshaws and frequent stopping on the carriageway to serve the passengers has resulted in severe problems to the free flow of road traffic in the city. 60 Visakhapatnam City Development Plan 4.5.7. Traffic and Transport Safety The transport safety is the important component of traffic and transportation mechanism. About 10% of the accidents were fatal and remaining 90% were injurious. It was observed that about 40% of the accidents occurring in the city involve pedestrians as the victims. This can be attributed to the poor pedestrian facilities in city road network The fatal accidents involving pedestrians were observed to occur during the road crossings. It was observed that the maximum accidents occurred. The number of accidents that occurred in the Accidents in Visakhapatnam 1600 1397 1342 1370 Number of Accidents 1400 1203 1223 1139 1158 1149 1200 1022 1055 1000 800 600 400 203 239 221 181 168 200 0 2001 2002 2003 2004 2005 Year fatal injured Total last decade is given below. Table 4.14: Number of Accidents in Visakhapatnam Accident Type 2001 2002 2003 2004 2005 Fatal 181 168 203 239 221 percentage 15.04% 13.7% 15.1% 17.1% 16.13% Injured 1022 1055 1139 1158 1149 percentage 84.96% 86.3% 84.9% 82.9% 83.87% No. of accidents 1054 1106 1079 912 994 Source : AP Transport and APSRTC, Visakhapatnam Key Issues and Challenges  Streamlining the heavy cargo transport.  Institutional accountability  Declining Share of Public Transport resulting in traffic menace and environmental degradation.  Integration of landuse plan and transportation planning.  Inadequate Road Infrastructure – narrow carriageways, junctions, signage, traffic management, etc.  Safety  Lack of awareness and non-compliance of the commuters to traffic regulations. 61 Visakhapatnam City Development Plan 4.6. SOLID WASTE MANAGEMENT The GVMC generates around 750 tons of solid waste every day with a collection efficiency of over 91%. The major sources of solid waste generation in GVMC are household domestic waste, commercial establishments, markets, hotels and restaurants, etc. The sources and quantity of solid waste generated in GVMC is presented in table 4.15. Table 4.15 Details of Solid Waste Generation In Greater Visakha Municipal Corporation GVMC S. No Source of Generation Quantity/ % to Total day in tons 1 House Hold – Domestic 480.75 64.1 2 Street Sweepings & Drain Cleanings 54.75 7.4 3 Hotels and Restaurants 25.96 3.46 4 Markets 29.25 3.90 5 Shops, Commercial Establishments 112.50 15.00 6 Hospitals, clinics 11.25 1.50 7 Industries & others 34.24 4.32 Total 750 100 4.6.1. Characteristics and Composition of Solid Waste On an average the domestic solid waste in Visakhapatnam contains 10.56% of paper, 7.39% of plastics, and 8% glass. Similarly, the waste was found to have a low moisture content of 13.36 and an average calorific value of 1223.33 cal /gm just suitable for thermal chemical conversion and associated energy generation processes.Composition of waste is a major determinant in evaluating the disposal options. Table 4.16 Composition of Solid Waste in GVMC Constituent Average Physical Characteristics (%) Paper 10.56 Plastic 7.39 Metals 5.65 Glass 7.9 Sa+Gr+St 42.66 Miscellaneous 4.00 Moisture Content 13.36 3 Av. Bulk Density, kg/m * 369.00 Chemical Characteristics pH 8.16 Electical Conductivity 138.53 Organic Carbon 2.19 Organics 3.94 Total Nitrogen 0.40 C/N Ratio 21.33 Compostable Matter 31.33 Calorific Value , cal / gm 1223.33 62 Visakhapatnam City Development Plan 4.6.2. Present Practices of Solid Waste Management Waste Storage & Segregation The Urban local body is responsible for collection, transportation and disposal of Solid Waste except untreated bio-medical waste and hazardous industrial waste. Storage and segregation of waste at source is not very prominent in GVMC. Primary Collection GVMC presently have a network of 1500 primary collection points for collecting waste from various generation points. The waste is collected through dumper bins and RCC bins. In addition to Corporation has provided tricycles to the members of rag picker community for door-to-door collection of waste. Similarly around 360 commercial units under Door Step Solid Waste Collection (DSSWC) deliver the waste to the municipal vehicles directly for agreed amount and the waste is directly disposed off in the disposal site. 40% of the city is covered under door- to- door collection. Secondary Collection The waste from the primary collection points are transported by the conservancy workers (ULBs or private) to the secondary collection points and dumper placers through wheel borrows and hand carts. There are 100 collection vehicles and 40 dumper placers for collection and transportation. The waste is transported to the transfer station at Old Sewage Farm and then to Dumping yard which is about 25 Km from the city. The responsibility of collection and transport of waste to transfer stations has been entrusted to private contractors. Processing and Disposal There is no engineered landfill site in GVMC area. However, the current disposal facility is located at Kapuluppada having extent of 100 acers, which is about 25 km from the City. Since the modern practice is processing of Solid Waste rather than distancing and disposal, GVMC is encouraging enterprises to setup processing plants and land fill sites and land fill facility. The biomedical waste generated in Hospitals and Nursing homes is covered under a special arrangement where the private agencies approved by the AP Pollution Control Board collect and transport the bio-medical waste to their Hydroclaving/ Autoclaving plants. The biomedical waste is treated and finally disposed off at the plant sites. The firms collect the charges directly from the hospitals and Nursing Homes. Table 4.17: Current Status Parameter Details Quantity of garbage collected and transported 750T Door to door collection covered 40% Number of Rickshaws 300 Capacity of each Rickshaw 250Kgs Amount collected from house hold Rs.10/- per month Number of Iron Dumper Bins 500 Capacity of Dumper Bins 1.2MT Lifting of dumper bins 50% every 24hrs and remaining 50% in 2 to 3 days Total area of the city covered 65% Transfer Stations (area and wards covered under this) 20% of the old Vizag city. 63 Visakhapatnam City Development Plan 4.6.3. MSW 2000 rules – Overview In October 2000, the Ministry of Environment and Forests notified the Municipal Solid Wastes (Management and Handling) Rules, 2000, which lay down the procedures/guidelines for collection, segregation, storage, transportation, processing, and disposal of municipal solid waste. The rules require that all cities should set up suitable waste treatment and disposal facilities by 31December 2003. A comprehensive manual on Municipal Solid Waste Management has been brought out by CPHEEO for the guidance of ULBs • An effective waste management system includes the following: • Waste collection and transportation • Resource recovery through sorting and recycling of materials • Resource recovery through waste processing by using composting or waste to energy approaches • Waste minimization by reducing volume, toxicity or other physical/chemical properties of waste to make it safe for final disposal • Disposal of waste in an environmentally safe and sustainable manner through land filling Components GMCV ( %) The secretaries to the government urban Collection Efficiency 91 development department Segregation NA and the district magistrates Door to Door 40 are made responsible to ensure the implementation Vehicle Capacity 50 of these rules in the Processing of Waste NA corporations and municipal Disposal- SLF No Engineering Landfill Site areas respectively and the state pollution control board is made responsible to monitor the implementation of the rules and adherence to the standards prescribed. This time limit is over and the cities and towns in the country have failed to implement the rules. The following chart clearly shows the negligence of the ULB’s to comply with the MSWM 2000 rules Key Issues The analysis of existing solid waste management practices of GVMC indicates that the city has structured primary and secondary collection arrangements. However, the disposal arrangements of the city need substantial improvement. Integrated solid waste management requires the use of various instruments for improved service delivery. The range of issues that needs to be addressed are listed below.  Effective public participation in segregation of recyclable waste and storage of waste at source.  Effectiveness of awareness building or direct community involvement  User Charges  Waste Minimisation, Recycling  Integrated Waste Treatment  Regional Sanitary Landfill Facility  Scientific Closure of the abandoned dump sites  Institutional strengthening and human resources development 64 Visakhapatnam City Development Plan Chapter - V 5. Basic Services to the Urban Poor 5.1. INTRODUCTION In this chapter an overview of the urban poverty in Greater Visakhapatnam Municipal Corporation is presented. More than one-fifth of Greater Visakhapatnam Minicipal Corporation's population reside in slums, squatters and other poor settlements. Their contribution to city’s economy has been also been growing over the period. In the absence of developed land and clear policy to address their problems, the poor suffer from many inadequacies in terms of access to basic services, socio- economic needs. It is necessary, therefore, to articulate policies and programmes to mainstream the slum communities with the city, both in terms of infrastructure provision and social and economic development. 5.2. GROWTH OF SLUMS AND SLUM POPULATION Greater Visakhapatnam Municipal Corporation is characterized by a very significant presence of the urban poor, with a growing poverty profile. Slum settlements have multiplied over decades and the living conditions of the poor have not improved. Environmental decline, vehicular pollution, inadequate basic services and infrastructure in the poor settlements hit the poor hardest. Slums are scattered across the city and surrounding areas, with high population densities and the number of people inhabiting them estimated to be around 342658. It is estimated that more than half of these slums are on GVMC and Govt lands , and the rest on lands belonging to various public entities. Poverty has a visible gender dimension too. The incidence of poverty among women is higher and female-headed households constitute the poorest of poor. The poor, not only habitat in slums of GVMC area but are spread in squatter and informal settlements in small groups deprived of basic services. This makes them more vulnerable to vagaries of nature and threat of eviction. At present there are 472 slums and the slum population is over 6 lakhs. A major problem is the incorporation of 32 villages around Visakhapatnam in the GVMC. Almost all these villages are inhabited by poor and the infrastructure is very low. These areas should be taken as ‘poor areas’ and special programmes need to be initiated to develop them on par with the city. 5.3. SOCIO-ECONOMIC CHARACTERISTICS 5.3.1. Communities Slum population in GVMC is heterogeneous in character - with Hindus, Muslims and Christians having migrated from different neighbouring villages, Languages predominantly spoken in slums in Greater Visakhapatnam Municipal Corporation are Telugu and Oriya,. 5.3.2. Literacy As per the census 2001, the literacy rate of slum population was found to vary between _______ in the urban agglomeration. Female literacy in slums varied from ____________. 5.3.3. Land Holdings Slums in GVMC are located on GVMC, Govt lands, Railway, Port, Endowment, Wakf and private lands as given in figure 5.1. Government of Andhra Pradesh classified all the slums on government land into objectionable and unobjectionable. Categorisation as 65 Visakhapatnam City Development Plan "objectionable" was based on location and land use - location on riverbeds, low lying areas, drains, road margins, etc. In case of surrounding areas, they were the small and scattered villages inhabited by the poor; particularly the labour from the industrial areas. They suffer from worse deprivations in terms of physical and social amenities as well as sustainable livelihoods. Figure 5.1: Land Status of Slums in Gvmc Land status of Slums in GVMC Greater Visakhapatnam 20% Municipal Corporation Govt Department 5% 45% Railways and Port 10% Endowment / wakf Private owners 20% 5.3.4. Environmental Conditions and Health Status The environmental conditions in slums are very poor and lack basic civic amenities like proper roads, drainage, protected water supply, street lights and adequate number of community toilets. Earlier studies have recorded that the common diseases prevalent in slums in Greater Visakhapatnam Municipal Corporation are gastro-enteritis, dysentery, liver enlargement, malnutrition, ringworm, scabies and other skin diseases. To overcome these hazards health infrastructure was developed and 15 urban primary health centres were established. Most of the slum communities and the poor access the services from these centres. However, in the newly incorporated villages, health facilities are totally inadequate – and at many places donot exist. 5.3.5. Basic Infrastructure Access of slum population to basic services is a key indicator of the quality of life in slums in particular and the city in general. The infrastructure provided during the Visakhapatnam Slum Improvement Project between 1988 - 96 is shown as below (table 5.1) Table 5.1: Basic Infrastructure in Slums Services Units Road Network 258734 Sq.Mts. Community Halls 115 Nos CC Drains 133461 Rmts., SW Drains 20930 Rmts., Public and Individual Toilets 64,056 Nos Street lights and poles 4,512 Nos 66 Visakhapatnam City Development Plan About one third of the slums have individual service connections and the rest depend upon public taps. Basic infrastructure facilities in the slum indicates that they are minimal and inadequate and need to be strengthened. 5.3.6. Community Facilities The community facilities in the slums comprise of schools, community halls, etc. No other amenities are available in the slum areas. The existing community infrastructure facilities in slums of Greater Visakhapatnam Municipal Corporation are as follows (table 5.2): Table 5.2 : Existing Position Of Community Facilities Available In Slums Of GVMC: Community Hall (No`s) S.No. Balwadi Government Schools Community Halls 1. 106 120 115 5.3.7. Unorganised and Informal Sector Employment The contribution of informal sector absorbing more than 30% of the industrial workforce, to the city's overall economy is considerable. The informal sector contributes to more than 30% of the total income generation of Greater Visakhapatnam Municipal Corporation. Studies conducted by Ministry of Urban Development and Poverty Alleviation in 2001 indicate that informal sector accounts to 50-60% in a majority of the cities of the country and their share in the urban employment is increasing. The salient features are: • The sector derives its importance due to the scale and nature of operations; • The activities are concentrated in the important road network in the city. • They occupy the road margins, footpaths etc. and are spread all over the GVMC and surrounding areas; • The major areas of concentration of informal activities are noticed in Suryabagh, Poorna Market Area, Jagadamba Centre, Railway New Colony, and Maddilapalem Area in Greater Visakhapatnam Municipal Corporation and surrounding areas. • The people involved in the informal sector constitute a major portion of urban poor as these units have a low labour income though the entire family might be involved. 5.4. POVERTY REDUCTION INITIATIVES The urban poverty reduction programmes in city started with the Urban Community Development (UCD) Programme in MCV in 1979. This is one of the internationally acclaimed programmes of poverty reduction. After its initial success, the UNICEF and the British Government supported the poverty reduction programmes during 1982-96. Now the Urban Community Development deparment implements several programmes sponsored by both central and state governments. They are given in the table 5.3 67 Visakhapatnam City Development Plan Table 5.3: List of Poverty Alleviation Programs Nature Central sponsored  Swarna Jayanthi Sahari Rozgar Yojana (SJSRY)  National Slum Development Program (NSDP)  Balika Samruddi Yojana (BSY)  Adarsha Basthi Program (ABP)  Individual Letrines (ILCS)  VAMBAY State Sponsored  Rajeev Yuvasakthi  Rajeev Gruhakalpa  Indiramma  Welfare Programmes Sponsored by women, SC, ST, Minorities and other Corporations Training  Fashion Technology Programmes  Neati Mahila  Fisher Women Training  Trainig through Labs  Wax Flower Making  Packaging These apart, the GVMC is allocating 40 percent of the net municipal resources on providing services to the poor and in slum locations. Another important initiative is to extend water supply house connections to the poor at Rs. 1200/-. The amount can be paid in 12 equal instalments. These two initiatives are being implemented as part of state policy. 5.5. INSTITUTIONAL ARRANGEMENTS Urban Community Development Department (UCDD) of Greater Visakhapatnam Municipal Corporation (GVMC) is the lead agency in the implementation of slum improvement projects and is responsible for the coordination of different inputs. The main focus is community mobilisation, and organising the community to implement community development activities through their involvement. Currently, the Department coordinates the direct provision of services to the slums. An intrinsic feature is of the urban community development program is mobilizing the community and involving them from the beginning through Neighbourhood Committees, Resident Welfare Organisations, Mahila Mandals and Youth Clubs. Under the urban poverty reduction programs, community structures were established with the community having a major say in the provision of infrastructure and other services. In addition, the socio-economic programmes, especially those aiming at empowerment of women and weaker sections by generating self-employment through skill improvement, are under implementation through SHGs and other community structures.In addition there are a large number of agencies responsible for implementing programmes aimed at poverty reduction. They include the revenue, education, health, housing and SC, ST, BC, Physically Handicapped, Women and Minority welfare departments and their organisations, urban development authorities, CBOs, NGOs and academic institutions. A serious problem in this arrangement is the overlapping jurisdiction and absence of coordination and convergence of programmes and activities. There is need for integrated and unified arrangements for addressing the problems of poverty reduction comprehensively. This will facilitate better targeting of programmes, effective identification of beneficiaries, facilitates participation of community based organizations, better institutional coordination, etc. 68 Visakhapatnam City Development Plan Linkages should be established between the UCD and civil society and their role in poverty reduction should be clearly understood. Table 5.4 Indicative List of Institutions and Programmes S. Institutions Programmes No. 1 GVMC Implementation of poverty programmes Notification and denotification UCD Health and Sanitation Town Planning Infrastructure 2 District Collector Issue of Pattas 3 Scheduled Caste Corporation Provision of loans and subsidy for livelihoods 4 Minorities Development Provision of loans and subsidy for Corporation livelihoods 5 Physically handicapped Provision of loans and subsidy for development corporation livelihoods. 6 Women Welfare Development Provision of loans and subsidy for Corporation livelihoods 7 Housing Corporation/Board House Development 8 Education Department School education 9 Health Department Health care and ICDS 10 Social Welfare Department Welfare of backward sections 11 VUDA Planning and development 12 Urban Health Centres Primary health care 13 NGOs Livelihoods and services 14 Research and Training Studies and surveys Institutions Training Impact assessment Policy advice and support 15 CBOs Articulating needs and priorities Planning and implementation In the urban agglomeration area effective coordination between the Corporation and other Government Departments will benefit both. Similarly, urban health centre in GVMC should become the focal point for implementing the programmes. There is also need for convergence of programmes and coordination between UCD and government agencies, for effective targeting and better impact. In addition to ensuring better coordination across the public agencies, private sector and the civil society, it is recommended that a high level Task Force at the city level should be set up with representatives of public sector, private sector and the civil society as the members. The Task Force should provide support for implementation of the action plans. 5.6. HOUSING The Visakhapatnam is one of the fastest growing cities with population of over 1.4 million. Visakhapatnam Municipal Corporation is committed to bring enormous changes in the socio-economic policies in extending its services to the citizen of city. Most of the Visakhapatnam urban poor live in overcrowded and unsanitary slums and squatter settlements and often do not have accesses to basic infrastructure and services. They are forced to live in illegal and informal settlements because they cannot enter formal land and housing markets. The reasons for the formation of slums and squatter settlements 69 Visakhapatnam City Development Plan are numerous and have been discussed extensively in the development literature. It suffices to say here that, because of the way formal markets are regulated and structured; the poor are unable to afford the choices offered to them in these markers. In contrast, the informal and illegal housing markets of slums and squatter settlements are specifically geared to meet their shelter needs. Need for housing the poor: In slum areas the houses are very small and look congested. Many people are living under one roof due to in adequate space. They are not able to construct pucca individual houses due to poverty. Therefore, it is identified and planned to construct a pucca Housing colony to the people who are living in slum areas with nominal contribution from beneficiaries and with contribution of other Government sectors. 5.6.1. Rajiv Gruhakalpa To meet the existing and growing needs, Government formulated “Rajiv Gruhakalpa� scheme to construct a large number of houses in urban areas and to increase the availability of housing stock for poor and lower income groups. The scheme is expected to be demand and need driven. The Collectors are further requested to identify and reserve suitable Government lands out of the domain of the proposed state Land Bank Scheme for ‘Rajiv Gruhakalpa Scheme� on a priority basis. Thus the Urban Community Development department of Greater Visakhapatnam Municipal Corporation has always been ahead in creation and providing of Pucca Dwelling Units to the Urban Poor residing in slums ever since its inception. The providing of Pucca Dwelling Units has been taken place in a phased manner from time to time during the last three decades in association with various funding agencies. Consequent on formation of Visakhapatnam Municipal Corporation into the Greater Visakhapatnam Municipal Corporation there is enormous increase of slums due to the merger of the near by villages and Gajuwaka Municipality. Hence it is necessary on part of the Greater Visakhapatnam Municipal Corporation to provide Pucca Housing Units and infrastructure to the increased in number of beneficiaries with reference to slum population is given in table 5.5. Table 5.5 No.of Slums existing in GVMC 472 Total population living in urban slums including 32 6.00 Lakhs Merged Villages and Gajuwaka Municipality No. of pucca houses required with reference to 1.20 Lakhs population living in slums No.of houses so far provided 0.52 Lakhs No.of pucca houses still required to accommodate all the 0.68 Lakhs slum dwellers No.of dwelling units proposed to be taken up after 50,000 units considering all factors including land tenure Proposed cost of each dwelling unit Rs.1,00,000 Estimated value of 50,000 required units Rs.500 Crores 70 Visakhapatnam City Development Plan Key Challenges Inspite of several initiatives towards poverty alleviation there are several critical issues and challenges that need to be addressed. They Include:  Lack of Dependable Data: Lack of dependable data on various aspects of poverty including number of slums, slum population, access to services like water and sanitation, livelihood, etc.  Land Tenure: Land tenure continues to be a daunting issue in addressing the problems of the poor. People living in non-notified slums are most vulnerable, as they are not officially recognised. They are most vulnerable with no regular incomes, access to basic services absence of tenure rights, etc  Infrastructure Deficiency: Deterioration of infrastructure created by investments under various slum improvement programs due to inadequate maintenance, finance and direction in the post-project phase resulting in poor quality of service availability to the linked to the citywide networks. With funds constraints, service provision for the poor becomes a sporadic activity rather than a regular service delivery system of local government.  Informal Settlement: Programs arte targeted mostly for notified and developed Slums. Lack of awareness of non-notified slums and de-notification policy for developed slums.  Weak Municipal Resource Base: Poor resource base for creating and constantly maintaining infrastructure is a critical issue. As they depend on adhoc grants, the service provision for the poor becomes a sporadic activity rather than a regular service delivery system of local government institutions.  Lack of co-ordination and convergence: Lack of co-ordination among various programs and institutions to address the problems in an integrated and meaningful way.  Vulnerability: Programs for the poor need also to focus on vulnerable groups among them, like women and children, disabled and destitute, aged and children, etc.  Problem of the poor living in the villages incorporated into the GVMC recently. They lack basic infrastructure, livelihoods, proper housing etc.  The major challenge is the formation of slums on hillocks and hill slopes where provision of basic services like water, sanitation is very difficult.  There are several slums located on the central government lands like railways, defence establishments etc. the protracted correspondence is a major problem in extending basic services to the poor in these areas.  Reluctance of the poor to cooperate with multistoried constructions to provide housing is another problem. They demand individual house sites as in the past.  The two communities – fishermen and relli – require special attention for development due to their cultural and other practices. Special programmes need to be articulated keeping their needs.  71 Visakhapatnam City Development Plan Chapter-VI 6. Physical and Environmental Aspects of City 6.1. PHYSICAL SETTING The physiographic setting of various types of landforms, structural features, climate, hydrological, hydro geological setting, the litho logical framework, top soil cover, geographical distribution of various types of rocks occurring in the city area are described. 6.2. PHYSIOGRAPHIC SETTING Physiographically, the city’s area extent can be divided into four physiographic divisions  Hill ranges  Hill slopes  Central Plain area  Coastal Zone The Kailasa Hill range on the north extends east west with a length of 14.5 kms and has heights ranging 425m to 504 m above mean sea level (MSL). The Yarada Hill range (Dolphin Nose) on the south extends about 8 kms, almost parallel to the Kailasa hill range and has heights of about 355 m above MSL. There are a few detached hillocks along the foothills of these ranges towards the central part of the area. Narava hill range on the western side of the area extends north south for a length of 6.5 kms. It reaches heights of about 320 m above MSL. The southern hill slope of Kailasa hill range is flanked by a series of piedmont fans whereas the northern hill slope of the Yarada hill range has only one piedmont fan. In the interface areas and along the rest of the hill slopes are colluvium. The southern slope of the Kailasa hill slope, it is all colluvium. The southern slope of the Kailasa hill range has steeper gradients than the northern hill slopes of the Yarada hill range. The eastern part of the Narava hill range has a gentle gradient. The width of the piedmont zones along Kaisasa and Yarada hill ranges towards the central plain area varies from 0.25 to 0.5 kms. This zone is important from the groundwater point of view. The central plain area is occupied by a marsh. The plain zone is connected to sea through Naravagedda flowing from above till it touches the marshy zone. The elevations in the marshy area vary between 1mt and 4 mts above MSL. The coastal zone of Visakhapatnam is very narrow with widths varying from 30 – 100 m and rises to 5 m – 10 m above MSL. The coastal plain extends landward upto 0.25 km at Lawsons Bay, south of the Kailasa Hills. Sudden rise of elevation in the coastal zone due to hill locks resulted in the sea view colonies and sky scrapers. The hill slopes are classified o o o as steep and cliffy (>55 ) and deflectional slope (35 -55 ). The extent of debris slope is more when compared to the deflectional slope facilitating the extensive natural recharge potential of the minor watershed. The colluvial plain with gentle slope is extensively covered by peidmont fans. The material of the peidmont fans is mostly of colluvium. The river-built plain of the watershed is also very extensive with alluvium which is the common feature of the coastal area of the city 6.3. GEOLOGICAL SETTING The principal rock type in the area belongs to the Khondalites group and occurrence of Charnockites and Quartzites can not be ruled out. 72 Visakhapatnam City Development Plan Environment: A City Prone to Pollution This city has several areas with air and water quality falling below norms. As for noise pollution, it is common occurrence in most public places and roads with fairly heavy traffic. Air pollution is largely attributed to automobile emissions and hence it is important to regulate traffic at various junctions and see that it is not stagnated for long durations. This can be achieved by measures such as (a) regulating traffic with more number of one-way traffic streets, (b) providing bus bays for city bus halts and proper parking places for all vehicles, (c) having pedestrian malls or squares with traffic moving around them (Jagadamba Junction and RTC complex area are important candidates to begin with) and (d) providing flyovers where necessary and feasible Climate According to Thronthwait’s scheme of climatic classification the city area falls under semi-arid type of climate. Climatic setting in brief Ambient air temperature: Absolute maximum 44.4 degrees C - Absolute minimum 12.8 degrees C Sea surface temperature Min 20.2 degrees C, Max 32.3 degrees C, Monthly mean relative humidity Absolute maximum : 100% Absolute minimum : 4% Monthly Wind Speed Mean value : 10-16 kmph Prevailing Direction South West Frequency Distribution : 44.5% Highest monthly mean wind speed for 24 hours : 21.4 kmph. Extreme wind velocity : 131 kmph. Monthly sea level pressure: Mean value : 1009 mb Maximum observed : 1014 mb Monthly Visibility Less than ½ N mile, Less than 1 mile, Less than 2 N miles, Less than 10 N miles. Fog is infrequent at sea in all seasons. Reduction in visibility is mostly due to heavy rains, which during the southwest monsoon can reduce visibility below fog levels. Rainfall Average Annual : 973.6 mm Annual Min : 654.0 mm Annual Max : 1308.6 mm Maximum recorded in a day : 375.2 Highest annual : 1,314 Highest monthly : 606 mm Highest daily : 2, 93.3 mm Fog: Months : December to February Coastal and Oceanographic Data The cyclonic activity and the coastal and offshore data are presented to appreciate the various factors that affect the recreational aspects along the beaches. Monsoons and Cyclones In the Bay of Bengal, depressions are likely to be encountered in all seasons of the year with a gradual fall in pressure. On an average 4 to 5 cyclones per year occur. However, at particular locations the average frequencies may be lower. Hind casting studies indicated 73 Visakhapatnam City Development Plan that the Coast is mainly affected by waves generated by Cyclones from the South East to South East direction. The highest waves are experienced in the period April September when the winds are more intense and consistent. The deep sea waves with the highest and lowest period frequent from the South West quadrant. Waves of over 1.5 mtrs in the height may be expected approximately 14% of the time. The daily record of tidal levels shows two highs and two lows. There is published evidence to indicate that strong tides as much as 60 cms in excess of the predicted tides may occur during the cyclones. Coastline and the beaches The city has a long coastline with the beach front providing for recreation and relief to the city populations for summer heat and high humidity. There are vast recreational areas like parks, amusement parks, hotels and commercial complexes. A number of high raised buildings have come up on landward side of the road on the beachfront. There are two prominent locales along the coastline. One is at Jodugullapalem towards the northern extremity and the other is at Lawsons Bay. Both these areas are ideal for swimming in the sea and offer recreational avenues. There is a minor estuary where Hanumanthawaka stream joins the sea at Lawsons Bay area with a deltaic phase represented by MVP Colony area. Sea Level Rise The sea level rise is affected by geological and climatic factors. Any changes take a long time and are slow in impact. But there were also instances of rapid changes, which caused great loss of life and damage in the geological past. Sea level rise by 7.5 meters in the next150 years is envisaged. Solutions to these have thus to be attempted and included in all the strategies that are being conceptualised for Coastal areas in the context of present and future trends in the scenario in respect of depletion of natural resources, growing population, growing industrialization, growing high energy consumerism, growing urbanization and in general growing degradation of the environment. A 30 cm rise in the sea level would push saline incursion in marsh and MVP deltaic facies area particularly in regard to sea water- fresh water interface . Coastal Regulation Zone The GOI has formulated guidelines for the Coastal Regulation Zone (CRZ) with regard to various developmental activities to be undertaken in the zone both permissible and otherwise. The Zone is defined by Low Tide Line (LTL), the High Tide Line (HTL) and by 500 mts landward from HTL. The notification was issued in 1991and minor amendments have been issued by the ministry from time-to-time. As per the CRZ regulations the Beach Road is taken as the boundary limitation and constructions are permitted towards the landwards side of the Beach road except those which are specifically permitted under those guidelines. Vulnerability and Risk The natural hazards like cyclones promoting local floods in the city droughts and earthquakes are not rare or unusual phenomenon for the city particularly in view of the unique geo climatic conditions .The vulnerability varies from location to location. Seismicity Earlier the city fell under the seismic zone of Category II, where earthquakes of magnitude 5.6 and above do not occur. But in recent revised seismic map by National Geophysical Research Institute, Hyderabad the zone has been elevated to Category III which 74 Visakhapatnam City Development Plan suggests that earthquakes of magnitude greater than 5.6 are possible. In the recent times earth tremors are being increasingly felt particularly along the foot hills of Kailasa Hill and Yarada hills. Major fracture lineaments are noted in the structural history of the area. The small tremors and shocks experienced in the recent times as a sequel to structural movements which is indeed a rare phenomenon. The strongest earthquake recorded had a magnitude of 6.5. Tidal Waves / Tsunami and Flooding The coast is exposed to tidal waves. Some areas are flooding prone particularly the low lying area of old city. The impact of tidal waves is limited to marsh area. The Tsunami effects are not visible. Drought and Drought Management Mitigating the effects of drought could be broadly divided into (i) steps to be taken in anticipation of drought and (ii) steps to be taken when a drought actually occurs. The State Government has a policy to initiate several administrative steps in areas that are declared as ‘drought affected’. These are given in the ‘drought manual’ formulated by the Government. The drought essentially affects the water supply system. Land Use The land use pattern of the city area is enclosed. The topography, the transport network and accessibility to the port are the three structural elements that contributed towards the evaluation of the land use pattern in the city area in the present form. The land use pattern in the city has been delineated into following categories:  Residential – 25%  Industrial – 10%  Port area – 37%  Institutional – 9%  Road and Railways – 5%  Hills and Forests – 4%  Vacant – 10% Visakhapatnam is endowed with a Beach which provides relief, recreation and tourism avenues. Table 6.1: Environment Services Environmental services Quality Current Status 3 SO2 (mg/m ) 15 3 NOX (mg/m ) 39 Air RSPM 1.26 TSPM 222 Water (Residual Chlorine) 0.2 ppm Waste Water (BOD) 350 Solid waste Conventional dumping 75 Visakhapatnam City Development Plan Table 6.2: Land Supply (Hectares) Undeveloped and under Developed land Year developed land under use (hectares) (hectares) 2001/02 8880 2220 2002/03 9213 1887 2003/04 9657 1443 2004/05 9990 1110 Table 6.3: Land Use Break-Up Category % Area (2001) Residential 22.55% Commercial 1.15% Industrial 8.31% Public semi-public 6.62% Recreational 1.03% Transportation 44.65% Agricultural and water bodies 0.94% Special area* 14.75% Total area 100% * Specify details of which areas have been defined as special areas viz. urban villages, slums etc. Table 6.4: Estimating Renewal of Housing and Infrastructure Stock, 2005 City Stock Area (hectare) Housing 1121 Acres of old housing / slum area Infrastructure  Storm water drains 1400 KM  Road and streets 1120 KM  Water distribution network* 3000 KM  Sewerage and drainage* (Sewerage) 48.90 Sq.Km/ 141 km Industry  Obsolete, technological and physical 510 Acres of old industrial area  Incompatibility with other uses All 510Acres under industrial zones Business districts  Obsolete 290 Acres in old city  Incompatibility with other uses Entire 290 acres can be regenerated as heritage area * use appropriate unit of measurement such as km. for distribution network. Environmental Attributes The environmental quality varies from region to region within the city area depending upon the assimilative capacity of a region, population density and the quantity of pollutants causing social damage, the level of valuation and appreciation of the surrounding environment by people in a region etc. All these factors together accord different values regarding the environmental quality to different region within the city. Environmental policy coupled with regional and zonal planning which is presently underway by the APPCB takes into account the long term as well as short term orientation. Major environmental variables characteristic of the city which are responsible for the degradation of the quality of the environment in the city area are considered for describing the environmental scenario of Visakhapatnam - the point and non-point sources of pollution of air, noise, water, land, soil, regimes s well as coastal and marine sectors have been taken into consideration. The point sources are mostly concentrated in a limited area along the northern flank and in the Steel plant-Parawada area located on the south western flank of the Yarada Hill 76 Visakhapatnam City Development Plan range. The major industries are concentrated in pockets. The map of the city gives a fair idea of the industrial and residential areas. The other industrial areas are of minor consequence. Air Pollution The air pollution in the city area has been mainly determined by the presence and levels of sulphur oxides, nitrous oxides, carbon monoxide and SPM. The air pollution is contained to the northern flank of the Yarada hill range and nearby environs like Steel Plant area and Paravada mandal where a Pharmacity is proposed and near Agnampudi where manufacturing industry is proposed. The standards adopted are as follows. Table 6.5: Ambient Air Quality Standards Pollutant Area-A Area-B Area-C TSP 500 200 100 SO 2 120 80 30 CO 5000 2000 1000 NOX 120 80 30 A = Industrial and mixed use area B = Residential and rural C = Sensitive Diurnal variations The recorded emissions of So 2, No 2 and CO in Visakhapatnam and environs at the ground level have been studied. The concentration of So 2 was found to be high during the day. The peak period coincides with the peak hour of traffic flow i.e., around 1030 hrs. The concentration is higher in summer than in winter. It was also found that the So concentration has a positive correlation to the air temperature values So 2 concentrations were high during the day due to the low humidity and were low during the high humidity conditions as So 2 is oxidized to So 3 during the nights. The No 2 level was found to be maximum during the nights. The CO concentration tended to be high during the peak hours of the traffic movement in the city. If the data from the city area are compared with the Indian Ambient Air Quality Standards, it becomes evident that the city area is well on its way to crossing the threshold level of safety. The CO levels in the area defined by the APSED Office, Jagadamba, Poorna 3 3 Market and KG Hospital, in 1986 itself, were between 18,750 ug/m and 25,000 ug/m respectively which are well above the required amount, even given the fact that the area is mainly commercial. The highest So 2 levels recorded were at Akkayyapalem (residential area) and 3 3 Chavulamadum (mixed area) i.e., 100.1 ug/m and 251 ug/m respectively. In 1992, the highest recorded So 2 levels were at the Circuit House (residential area) and near the APSEB 3 Office area (commercial area), i.e., 68 and 53 ug/m respectively showing a drop in the values. The highest No 2 levels at the commercial area defined the APSEB Office, 3 Jagadamba, Poorna Market and KG Hospital; over a time frame were 95 to 141 ug/m . The 3 highest No 2 levels recorded 95 ug/m at the same area as 90 at Gajuwaka (mixed area). The No 2 level in the commercial area exceeds the ambient air quality level while in the mixed area it is within the limits. The highest SPM values recorded in the city were near the Iron Ore Belt 3 which runs through the residential area, i.e., 380.95 ug/m and at Chavulamadum (mixed 3 area) i.e., 493.8 ug/m . The values were highest at the HPCL area (Indus trial area) i.e., 288 3 3 ug/m , at the Circuit House (residential area) i.e., 234 ug/m and the commercial area 3 mentioned afore i.e., 211 ug/m . The SPM value is surprisingly high in the residential area 77 Visakhapatnam City Development Plan and crosses the ambient air quality level while the value is low at the ambient air quality level while the value is low at the industrial and commercial areas. Construction, operation, maintenance and repair work, transportation and industrial activities generate particulates. The respirable dust standard recommended by the Central Pollution Control Board is a 10 micron cut-off size of respirational dust measurements. The levels of Fe, Zn, Cd and Pb have been found to be very high in the Mindi industrial area . The highest recording of the elements -3 concentration in ugM are Fe-18.39, Zn-12,83, CCL-0.43 an Pb-17.70. zinc in the presence of lead and cadmium creates, a highly toxic effect and tends to produce synergism. At the Hindustan Zinc Ltd, the Zn and Pb levels have been found to be abnormally high especially at the lead and zinc oxide plant. The high concentrations of Zn along with S, Fe, Mn, Co and Ni pose a positive danger to the health of the workers and nearby residents. Zinc especially is liable to cause lung and liver damage in humans besides affecting the surrounding foliage. At Bharat heavy Plates and Vessels (BHPV), the high levels of Zn and Pb indicate synergism. The wind direction is such that the pollutants are carried away from the zinc plant. Trace element analysis of iron in the blood samples of 200 residents in the surrounding area reveals that 150 of these have very low iron levels leading to an anaemic state. Hindustan Shipyard reveals a high concentration of K and Mn, the latter being a likely causal agent of nervous disorders. Vehicular emissions One of the sources of urban air pollution is vehicular emission. Carbon monoxide emissions are attributed to petrol driven that is almost 85%. Two and three wheelers are the highest contributors of hydrocarbons. Diesel driven vehicles contribute more than 90% to nitrogen oxides. The data indicates that in general the Poorna Market to RTC complex area is comparatively more polluted from the traffic sector than other areas. The RTC complex area records the highest value of pollutants. Cargo Load at Port The Visakhapatnam port operations release a considerable amount of particulate matter into the environment of the city area. This contribution is essentially from the iron ore conveyor belt and due to cargo transportation. Conveyor Belt The iron ore conveyor belt run in the west-east and north-south directions from the stock pile. The ore comes by rail to the city in the form of lumps from Kirundal and Bailadilla in Madhya Pradesh and is exported to Japan by ship. If the ships are not available the ore is stored in stockpiles. The ships are loaded by way of the conveyor belt having a carrying capacity of 4,000 tonnes/hour. The total length of the belt is 5.876 kms and is located 16 mtrs. above the ground level. The belt runs at a speed of 190 m/sec while receiving ore and at 210 m/sec during loading. Of the total length only 0.825 kms of the belt is covered. The belt runs through one of he most densely populated parts of the area is mostly residential and even schools are located here. The levels of Ca and Pb are found to be high near the belt and at the Jagadamba traffic junction. This is probably due to he large amounts of dust generated by the traffic and due to the burning of gasoline by the automobiles. The high levels of Zn and Pb in the industrial zones have been attributed to the long range transportation of pollutants. Lead from traffic at busy junctions like Jagadamba was found negligible though relatively high near residential areas like Dabagardens and the Judges Court. This is accounted for by the prevailing meteorological conditions. 78 Visakhapatnam City Development Plan Poisonous Gases and Material Storage The list of poisonous materials stored by industries and which are hazardous by nature by was of causing explosions and fire and releasing toxic gases is as follows (Shivaji Rao and Venkata Rao, 1990). The HPCL has storage of thousands of tonnes of Naptha and Godavari Fertilizers has a stock pile of ammonia. Control Measures Various major and medium industries in the city area have adopted various control measures for air pollution. Noise One of the most pervasive environmental problems is noise. Yet, it is seldom protested against or its ill effects recognized. Hearing loss primarily due to noise is now being understood as an occupational disability. Noise being a by product of industrialization and technology could also cause devaluation of property, damage to physical objects and bring about “land use incompatibility.� The risk of noise induced hearing loss is to a large extent individual based. Some people are more prone to hearing loss than others when exposed to noise only for a short period. The localities registering various noise levels, within the city are given as follows : Table 6.6: Noise Levels In Localities No. of localities Noise range in Leg. DBA Classification 8 < 70 Calm 22 70 – 75 Noisy 18 75 – 83 Intolerably Noisy Of the 48 localities measured for noise levels only 8 are below the 70 dBA . By comparing the noise levels of the city area with the Ambient Air Quality Standards in respect of noise levels in the city area, it was found that the maximum limit for residential areas is 55 dBA commercial areas 65 dBA and industrial areas 75 dBA whereas maximum number of localities in the city inclusive of residential areas are over 70 dBA. Noise is one as pet of pollution that has to be taken very seriously in Visakhapatnam if permanent hearing impairment is to be avoided. Emissions in the Domestic Sector Various bio-fuels used for cooking also contribute to indoor pollution. Though LPG, electricity, kerosene and coal are considered as preferred urban cooking fuels, dung cakes and fuel wood are also used in the city especially by slum dwellers. The most common types of fuel used are LPG, coal, wood, kerosene and sawdust. Barring LPG which is used by the middle and higher income groups (1.1 cylinder per month), kerosene is the most widely used fuel both for cooking and providing light. It is followed by wood, charcoal and sawdust. The lower income groups use open-hearths and chulahs for cooking and account for maximum indoor pollution in the slums. The smoke escapes from the huts into the atmosphere early in the morning and at twilight hours. Considering the fact that there are fairly large number of poor settlements in the City, the amount of smoke emitted can be pictured in the mind’s eye. The pollutants from indoor sources are basically CO, HCX, TSP and NOX in the case of coal. Smoking contributes its share of pollutants. 79 Visakhapatnam City Development Plan Table 6.7: Indoor Sources of Domestic Air Pollution Fuel Devices Pollutants Cow dung Cooking stoves, cooker, milk heaters CO, TSP, HC x Wood Cooking stoves, open hearths, space CO, TSP, HC x heaters Tobacco Cigarettes, beedies etc. CO, TSP, HC x Charcoal Chulas, space heaters CO, TSP, HC x Kerosene Cooking stoves, lamps CO Coal Cooking stoves NOX Water Pollution The hydrological environment comprises the interrelated components, i.e., ground water and surface water. Pollution at one point in the system can eventually affect the other. The attributes common to both are physical, chemical and biological in nature. Man’s activities can have a bearing on all three. Hazardous Wastes Effective control of the generation, storage, treatment, recycling and reuse, transport, recovery and disposal of hazardous wastes is of paramount importance for proper health, environmental protection / natural resource management and sustainable development. The information obtained through a questionnaire canvassed in person at various industries was utilized in the assessment of the waste quantification. The available information indicates that Visakhapatnam accounts for about two thirds of the total Hazardous solid waste generated in the region. The date base has indicated that Visakhapatnam district accounts for 6,100 tonnes. Characterization Of Hazardous Wastes Quantification the solid wastes generated are categorized into different groups based on the classification given Group Visakhapatnam 1A Nil 1B 1354 A 2 Nil 2B 1616 3A 3047, 879 5A Nil 6A 15 7A Nil 7B 1 Nonpoint Source Nonpoint source discharges pollute the environment in a diffuse manner and at intermittent intervals. The pollutants cannot be measured or monitored at the place of origin for the exact source is normally untraceable. Nonpoint pollution is said to be related to uncontrollable climatic events and geographic and geologic conditions. However, urban nonpoint pollution varies from street litter, abrasion of road surfaces due to road traffic, construction activities, tire wear of vehicles, pet population or strays etc. The major contaminants from urban pollution are zinc, polychlorinated biphenyls (PCBs), oil, lead, grease, asbestos etc. Impervious urban roads, areas having a high water table and tight soils are sources of nonpoint pollution. Storm water overflow creates pollution when it carries the rubbish and deposits them on the surface of the roads. High intensity storms generate the highest pollution, which is a factor to be contented with in the study area which is prone to 80 Visakhapatnam City Development Plan cyclones, depressions and recurring storms. While pollution abatement regarding point sources can be carried out by say, controlling sewage and waste water discharges or secondary tertiary treatment with nonpoint sources the most effective controls are land management techniques, conservation and architectural control. Soil and Land Pollution A depleted soil mantle sets off a chain reaction leading to deforestation, siltation of rivers, erosion and deterrence of agriculture and vegetative cover. In coastal areas especially, shelterbelts of trees are necessary to combat the force of storms. Most of the reservoirs and tanks have degraded catchments in the city Effect of Climatic Setting on Air Pollution The atmosphere is the originating strata for sever point/nonpoint pollution problems. Particulate aerosols contain toxic and trace metals, sulphur, pesticides, fungi, pollen, nutrients, etc., besides chemical compounds like nitrites, chlorides, ozone, fluoride, oxides etc. Topographic bearing Topography produces – “mountain valley effects� preventing the dispersion of air pollutants. While the coast line of Visakhapatnam by virtue of its SW-NE direction is said to be congenial for the dilution and diffusion of pollutants, the stagnation pockets at the land-sea interface lead to the build up of air pollutants over the city for short periods. The undulating terrain and hills ranging to around 200 m, encourage the formation of micro eddies which contribute to the erratic trend of the stack emission plumes. This results in the drifting of emissions towards residential areas, Some of the major industries whose emissions pollute the air of Visakhapatnam and its environs are Hindustan Petroleum Corporation Limited, Hindustan Zinc, Coramandal Fertilizers, Duncan Cements, Visakhapatnam Port Trust, LG Polymers, Visakhapatnam Steel Plant. The major industries responsible for pollution of water sources in the city area are Hindustan Polymers Limited, Coramandal Fertilizers Ltd., Hindustan Petroleum Corporation Ltd (HPCL), Hindustan Zinc Ltd., Visakha Dairy, Aluminium factory, Pragati Fertilizers Ltd., Coastal Chemicals, Hindustan Shipyard, Fish Processing Units, Bharath heavy Plates & Vessels, Visakhapatnam Steel Plant. 81 Visakhapatnam City Development Plan Chapter-VII 7. Vision Formulation VISION To become an economically vibrant, safe and inclusive city providing the best social and physical infrastructure facilities for its residents, businesses and visitors. 7.1. CITY VISION The over all city vision of the GVMC is as follows  Boosting the Economic Development in the City by 2030 by ensuring Best Business Environment & Good Governance Optimum Mix of Industrial & Service Sector Best Labour force in the Country to Develop Industrial / Business / Residential Areas as per the Master Plan.  To Provide 24 Hours Water Supply to each & every House with metering along with Sewerage Connection by 2015 and to put a modern Solid Waste Service in place by the above period.  To Provide Best Civic Infrastructure to make the best Transport System in India by 2030 along with total up gradation of Poor Settlements with proper Drainage.  To create a social infrastructure with premier Health & Educations facilities by 2021 with safety & security. With the above Vision in mind, the GVMC has formulated an Agenda to reach the above Goals with in the specified time. Prioritisation The prioritisation of projects is done sector wise as Short-Term(2005-08), and Medium-Term(2008-2012) and indicated in the CIP matrices. This is done during the discussions held with the stakeholders in the working group meetings assisted by the technical experts. The consolidated CIP matrix for Visakhapatnam also has projects prioritised as short/medium term. All the short term projects are being taken up on top priority, followed by medium term projects. The CDP process of Vizag has undergone extensive consultative process with its key stakeholders in prioritizing the key sectors for investments and reform initiatives. The priorities of the national and state governments including the international developmental trends and Millennium development goals have been considered in prioritizing these critical sectors, presented below.  Water Supply  Sewerage  Solid Waste Management  Traffic and Transportation  Storm Water Drainage  Urban Poverty The overall vision for the city and the prioritisation of the key sectors paved the way to formulate sector specific vision and strategies. This sector specific approach with year wise strategies and corresponding year wise investments will be instrumental in framing the action plan/ implementation plan. The sector specific reforms and investments are an integral part of the year wise strategies. 82 Visakhapatnam City Development Plan 7.2. WATER SUPPLY 7.2.1. Key Challenges Based on the review of the current water supply scenario, the following key challenges are identified. There is huge decline in water supply sources due to considerable reduction in the inflows to impoundments. The GVMC is in shortage of adequate water supply network and access to piped water supply. There is a huge demand supply gap which is likely to widen drastically in future. Frequency of water supply is 45 minutes every day in city core and 1 hr every day in surrounding areas. Lack of metering, a number of illegal connections, and public Stand Posts are some of the major causes leading to high non revenue water. No regulatory mechanism to oversee the functioning of the sector and to fix service standards as well as tariff to meet capital and operating expenditure is another problem. VISION Our vision is to provide wholesome water round the clock to every house at affordable cost even to the poor. 7.2.2. Goals and Service Outcomes Considering the above challenges, the following goals for different horizon years have been identified (table 7.1). The water supply coverage and access to piped water supply in GVMC needs to be enhanced to 100% by the year 2016. around 120 lpcdof water should be supplied to the GVMC citizens by 2011 and met 165 lpcd by the year 2021. Non revenue water should be considerably reduced to 38% by 2011, 25% by 2016 and 21%by 2021. the 83 Visakhapatnam City Development Plan metering of customer connections and bill collection efficiency should be enhanced to 95% by year 2011. Table 7.1: Goals & Service Outcomes for Different Horizon Years Current VISION Reality Objective Vision Outcome 2006 2011 2016 2021 Consumer Water supply 30% 70% 100% 100% Satisfaction coverage 24-hour water 0 40% 100% 100% availability Consumption 62 120 lpd 150 lpd 165 LPD Water Resource Non Revenue 45% 38% 25% 21% Management Water Consumer metering 7.7% 95% 100% 100% Financial Working Ratio 0.5 0.4 0.4 0.3 Management Revenue collection 80% 95% 95% 99% efficiency Human Staff Ratio 8 4 4 3 Resource Management 7.2.3. Strategies and Action Plan Considering the current challenges and identified goals, a robust strategy for water supply is adopted. Detailed strategy is furnished below which covers policy level planning, reforms, institutional strengthening, source augmentation and service delivery aspects. The following is the brief outline of the projects proposed to be taken up immediately. Comprehensive Water Sector Development Plan To meet the future projected water demand for GVMC, it is proposed to carry out studies and prepare a comprehensive water sector development plan. Unaccounted for water th The water supply pipelines have been laid in the city from early 20 century onwards. Though the city took up replacement of pipelines from time to time, due to financial constraints, it has not been possible to fully replace all the old pipelines. GVMC proposes to implement UFW reduction measures in all parts of the city as an immediate measure by conducting leak detection studies, metering, rehabilitation of old pipe lines etc. Removal of public taps and legitimizing illegal connections By removing public stand posts and legitimising illegal connections, GVMC can achieve a reduction in revenue loss to the extent of 5 – 10 percent in a short term. Taking this into consideration, GVMC made a proposal to remove public stand posts and legitimise illegal connections within 7 years. Energy Audit Studies GVMC proposes to carry out a detailed energy audit of all the water supply pumping and distribution system to address the problems associated with high energy costs. 84 Visakhapatnam City Development Plan Design and Implementation of Communication Strategy An effective communication strategy among key stakeholders is proposed that will draw upon a range of communication channels, from interpersonal and group communication to mass media and electronic forms. Human Resources Development Recognizing the urgent need for capacity building at different levels in water supply sector, GVMC proposed to develop human resources in their organization bby making considerable investments in that sector. Modernizing Financial Management and MIS GVMC proposes to modernize financial management by developing key performance indicators and identifying best practices to improve finances, organizations, and human capital practices. It is also proposed to make efforts on revising accounting, auditing, and internal control standards and computerizing customer databases. The Strategy of the Water Supply Sector is as follows  To make the consumer feel satisfied with 24 hours water supply by ensuring supply as per the standards.  To manage the resources and system efficiently though metering & MIS.  To minimize the un-accounted water.  To manage the Human Resources effectively by reducing the staff ratio. The Growth Path to meet the above strategies is shown below Growth Path Vision Flow Diagram 85 Visakhapatnam City Development Plan 86 Visakhapatnam City Development Plan Table 7.2 Water Supply strategy Table 7.2: Water Supply Sector - Strategy (2005-2012) Year Year Year Year Year Year Year Component Activity 1 2 3 4 5 6 7 Comprehensive Water Sector Development Master Plan √ √ √ Energy Audit Studies √ √ √ Water Quality Studies and Monitoring √ √ √ √ √ √ √ Design and Implementation of Communication Strategy √ √ √ √ √ √ √ Planning, Reforms Baseline Survey √ and Institutional Human Resources Development √ √ √ √ √ √ √ Strengthening Establishment of Regulatory Authority √ √ √ √ √ √ GIS Mapping of Water and Sewerage Utility Mapping √ √ √ √ √ Community Initiatives Support √ √ √ √ Modernising Financial Management and MIS √ √ √ √ E-Governance √ √ √ √ √ √ Laying of Transmission main to Maduravada Region √ √ Development of Distribution network for peripharal (32) areas √ √ √ √ Laying of Transmission mains from Thatipudi to Visakhapatnam √ √ √ √ Water Resource Management Construction of 33 mgd Water Treatment plant at Narava √ √ Gajuwaka Water Supply Project √ √ Refurbishment of Distribution Network in Old City √ √ √ √ √ √ √ Upgradation and Improvement of Distribution System in Central Vizag √ √ √ √ a) Providing Pipeline from Raiwada canal to Narava √ √ √ √ b) Providing Pipeline from Yeleru reserveior to KBR √ √ √ √ √ √ Augmentation of Water Supply c) Construction of 2 Storage reservoirs on the upsteam of Airport √ √ √ √ √ √ d) Construction of summer storage tank at Yeleru canal √ √ √ √ √ √ e) Source Augmentation / Desalitation Plant √ √ √ √ √ √ a) SCADA Project √ √ √ √ √ √ Service Delivery b) UFW Reduction Project √ √ √ √ √ √ c) 24 Hr. Water Supply Project √ √ √ √ √ √ 1. O & M of Water Supply system Governance a) Motor & Electrical repairs and upgradation √ b) Distribution network reforms rationalization √ √ √ √ √ Citizens Relations Citizen fedback mechanisms to be established √ √ √ √ Management Complaint redressal made robust √ √ √ 87 Visakhapatnam City Development Plan 7.3. SEWERAGE SECTOR: 7.3.1. Key Challenges Analysis from the sewerage sector reveals that sewerage network coverage and access in GVMC area is very low. The poor and slum dwellers lack safe sanitation facilities and hence are prone to health related diseases. An enormous shortfall is noticed in the treatment of sewerage resulting in discharge of untreated sewage into natural streams thus polluting water bodies. In addition to that, wastewater recycling and reuse is quite negligible. 7.3.2. Goals and Service Outcomes Considering the above challenges, the following goals for different horizon years have been identified. The sewerage coverage in GVMC needs to be enhanced to 45% by the year 2011, 90% by the year 2016 and 95% by the year 2021. By the year 2021, 95% of the wastewater should be treated and disposed and 70% of the wastewater should be recycled and reused. In addition to that, 100% O&M cost recovery is achieved by the year 2011. VISION Our vision is to provide safe and reliable collection, treatment and reuse/disposal of waste water towards an eco-friendly city inclusive of poor settlements. To enhance the coverage of safe sanitation facilities, following goals (table 4.3) have been identified for different horizon years. Table 7.3: Current Status and Vision Current Reality VISION Objective Vision Outcome 2006 2011 2016 2021 Consumer Sewerage Satisfaction network 7% 45% 100% 100% coverage Household 8% 45% 100% 100% connectivity Sewerage Treatment Ratio Treatment And 10% 60% 100% 100% Management Reuse Ratio 5% 30% 50% 70% Financial Sewerage 0 0.4 0.4 0.4 Management Working Ratio 7.3.3. Strategies and Action plan Considering the current challenges and identified goals, a robust strategy for sewerage is adopted to achieve 100% sewerage system. Detailed strategy is enclosed in the Annexure, which covers design and implementation of communication strategy and service delivery aspects. The following are brief outline of the activities to be taken up immediately:  Comprehensive Sewerage Master Plan: To meet the current gap and future requirements for GVMC, it is proposed to carry out studies and prepare a comprehensive Sewerage Master Plan.  Energy Audit Studies  Sewerage Quality Studies and Monitoring 88 Visakhapatnam City Development Plan  Design and Implementation of Communication strategy  Human Resources Development The sectoral strategy for the sewerage sector is  To cover the entire city with Sewerage network and to provide sewer connections to all including poor for improving the health conditions.  To treat the sewerage water efficiently by optimum utilization of treatment plants.  To manage the human resources efficiently. The growth part to attain the above strategies is as follows: Growth Path 89 Visakhapatnam City Development Plan Vision Flow Diagram Table 7.4: Sewerage Sector strategy Sewerage Sector - Strategy (2005-2012) Year Year Year Year Year Year Year Component Activity 1 2 3 4 5 6 7 Comprehensive Sewerage Master Plan √ √ Energy Audit √ Design & Implementation of Sewerage Quality Studies and Monitoring √ √ √ √ √ √ Communication Design & Communication Strategy Strategy √ √ √ √ √ √ √ Human Resources Development √ √ √ √ √ √ √ Community Initiative Support √ √ √ √ √ √ Service Delivery 1. Household Coverage √ √ √ √ √ √ √ Development of Sewerage System for old City √ √ Providing Swerage Sysem in Central Visakhapatnam √ √ √ √ √ √ Provding Sewerage System in Gajuwaka √ √ √ √ √ Providing Swerage System to North Visakhapatnam City √ √ √ √ √ Sewerage Network System to Madhurawada Sewarage Treatment Region √ √ √ √ √ & Management Sewerage Network System to Pendurthi Region √ √ √ √ √ Provding Sewerage System in Gajuwaka Periphery Areas √ √ √ √ √ √ Development of Waste wate re-use system √ √ √ √ Development of Sewerage Master Plan √ √ √ Recycling Plant & Reuse √ √ √ √ √ √ 90 Visakhapatnam City Development Plan 7.4. STORM WATER DRAINAGE: 7.4.1. Key Challenges The Municipal Corporation of Visakhapatnam is facing lot of hard-ship in day-to-day & periodic maintenance of Drains as well. Due to the rapid urbanization & un-precedent growth of the city in the past 2 decades, most of these Storm Water Drains were encroached upon by the public, ‘narrowing’ of the original stream. Further, most of the ‘slum-dwellers’ and people of weaker sections, occupy and reside on the banks of the drains and causing obstructions to the free flow of stream and narrow-down the width furthermore. Lack of proper Demarcation & fencing of Storm Water Drains, the near by residents / Slum dwellers, are habituated to throw the debris & other wastages in the Drains, which one causing obstruction to the free flow of rain water and finally over flows on the roads. 7.4.2. Goals and Service Outcomes Considering the above challenges, the following goals for different horizon years have been identified. There should be drastic reduction in flooding of the city and increase the safety.The flooding is to be eliminated completely by 2016. The natural system should be streamlined effectively for safe disposal. Storm water drains coverage should be enhanced to 50% by 2011 and 100% by 2016. In addition to that, atleast 50% of the storm water should be recharged by the year 2016. To enhance the coverage of safe sanitation facilities, following goals (table 7.5) have been identified for different horizon years. Table 7.5: Current Status and Vision Current Vision vision Objective Reality Outcome 2006 2011 2016 2021 Consumer Satisfaction Flooding 10% 5% 0% 0% Increasing 24 12 2 2 safety Storm Water Drainage Network 20% 50% 100% 100% (Swd) System coverage Management 20% 90% 100% 100% of natural system Environmental Recharge/ 30% 40% 50% 50% Friendliness reuse of storm water Safe disposal 70% 90% 100% 100% 7.4.3. Strategies and Action plan Considering the current challenges and identified goals, a robust strategy for sanitation is adopted. Detailed strategy is enclosed in the Annexure, which covers design and implementation of communication strategy and service delivery aspects. The following are brief outline of the activities to be taken up immediately: Primary Drain Rehabilitation and Improvement Program The primary drains are inadequate to handle the flash floods as they are not systematically designed and are not fully constructed in some sections. Moreover, significant 91 Visakhapatnam City Development Plan reduction in depth and width are noticed due to siltation and encroachment of drain bunds. To alleviate these, a rehabilitation and improvement program is recommended. Drainage Rehabilitation Program The flood prone areas identified are to be relieved of the problem in future by undertaking a drainage rehabilitation program. As a part of this program, the leading/connections between secondary and tertiary drains to primary drains have to be improved and strengthened. In addition, control of weed growth, limiting the dumping of solid and construction waste and controlling the growth of encroachments would be given top priority. City would desilt the primary drains and tertiary drains on a regular basis before the onset of the monsoon. The construction of new drains and connecting links would be taken up as a priority, along with strengthening of the existing drains with lining and side walls. Improvement Works and Construction of Tertiary Drains Construction of tertiary drains would be taken up on a priority basis as the city comprises of only 740 Km. of tertiary drains covering only 40% of the road length against a norm of 130%. It is proposed to construct tertiary drains to all the major arterials and important roads to increase the coverage and also to convert the kutcha drains to pucca drains to facilitate proper draining of storm water into natural drains. Conservation of Water Bodies As discussed, conservation of water bodies is an immediate priority for the City. Though initiatives are being undertaken, a large-scale program is pertinent to restore the water bodies to their original shape and conserve them as recharge structures. Protection of Environmental Resources The first and foremost intervention is the protection of environmental resources. Protection of water bodies, waterways and open spaces from further encroachments would be carried out in a co-ordinated way. Rehabilitation of ecosystems Efforts would be made to develop an integrated catchment management plan suitably connecting all the existing water bodies. Further, hydraulic capacity of the nalas and water bodies would be improved through widening and deepening and construction of side walls thereby limiting the risk of floods. Desilting would be carried out to increase the water holding capacity and to remove the toxic and hazardous materials stored in the tank beds. Monitoring and Quality Control Monitoring of water quality parameters would be conducted on a regular basis. City would take up the responsibility of monitoring the parameters in the water bodies within its jurisdiction and would take preventive measures, if the results are above the permissible limits. The horticulture division of city would devise pro-active strategies to limit pollution to water bodies within its limits and would co-ordinate with other agencies for monitoring the parameters in the other water bodies. Regulatory Framework Efforts would be directed at enforcing appropriate water pollution- related laws, ordinances, regulations, and corresponding enforcement responsibilities and procedures at the local level. In addition the conservation measures would include 92 Visakhapatnam City Development Plan  Dredging and desilting  Widening & strengthening of lake bunds  Setting up sewage treatment plants  Bund formation  Regulation of inlet and outlet channels The objectives of the storm water sector are ;  To reduce the flooding of the City and to increase the safety.  Stream lining the natural system effectively with 100% coverage.  Safe disposal. Growth Path 93 Visakhapatnam City Development Plan Vision Flow Diagram 94 Visakhapatnam City Development Plan Table 7.6. : Storm water strategy Storm Water Drainage - Strategy (2006-21) Component Activity Year Year Year Year Year Year Year 1 2 3 4 5 6 7 Identification of Problem Areas √ √ √ R& R Planning √ √ √ √ √ √ √ Capacity Comprehensive Drainage Master Plan Building √ √ Regularazation of S.L. Canel √ √ √ Improvement of Yerrigedda √ √ √ √ √ Improvement to the Gongulagedda √ √ √ Rehabilitation of 39 Natural Storm Water channel system in the central Vizag Region √ √ √ √ √ Rehabilitation of Storm Water Drains in Gajuwaka Region √ √ √ √ Rehabilitation of storm water Drains in Madurawada Region √ √ √ Drains Rehabilitation of storm water drains in Rehabilitation Pendurthy Region √ √ √ Development storm water system near Gangawara Port Area √ √ Development storm water system along Beach Road √ √ √ Construction of Treatment and re-use of storm water Drains √ √ √ √ √ 7.5. TRAFFIC AND TRANSPORTATION 7.5.1. Vision 95 Visakhapatnam City Development Plan Growth Path Table 7.7: Goals, Service Outcomes for Different Horizon Years Time Frame Vision Indicators 2005-06 2011 2016 2021 Road Network as % of Total 6% 13% 16% 17% Area This factor This factor Accessability to the dis Pilot projects included in included in all advantaged/ physically -------- completed all new T&T new T&T challenged projects projects Share of Public Transport 20% 25% 40% 55% Rail transport as share of total public transport / 0% 3% 10% 25% MRTS Average Speed -km/h 15 20 25 25 Sidewalks length to Total 40% of the 70% of the 90% of the 3% road length requirement requirement requirement Reduced by Reduced by Reduced by Road accidents 994 25% 50% 70% Pilot Usage of alternative fuels 15% 25% 40% initiated Within Within Environmental Upgradation Within ----- acceptable acceptable (SO X , NO x , TSPM levels) acceptable limits limits limits 7.5.2. Strategies Strategies for Planning, Reforms and Institutional Strengthening Constitution of Greater Visakhapatnam Transport Authority (GVTA) The issue of institutional accountability can be addressed by formulating an apex authority “ Greater Visakhaptnam Transport authority�. It establishes coordination between the line departments in providng efficient transport services. This acts as the single most autority that has budgetoary control of the transport sector. 96 Visakhapatnam City Development Plan Comprehensive Traffic and Transport Study for the entire GVMC Region This strategy is aimed to come out with sustained solutions for the entire GVMC as a unit that has financial and environmental viability. This also includes the current institutional analysis, policy, and financial and service delivery issues Traffic and Transportation Management using G.I.S. and GPS Technologies Use of Global Positioning System (GPS), a satellite based positioning and navigation technology, will help track the position of the public transport vehicles from a central location. This data is very useful in assessing the performance of the services offered. The same data can be beamed back to the electronic information boards at bus stops that will display information on the location of the busses and the expected arrival time. Use of such service has additional benefits in tracking the traffic conditions on the roadways, delays at intersections, passenger demand, as well as immediate notification to the control centre in case of accidents, all without any involvement of the driver or conductor. This strategy will also improve the share of public transport. Disincentivising the private transport during peak hours Disincentivicing the use of private vehicles during peak hours and in the CBDs is one of the key strategies to address the problems of traffic congestions and delayed journeys and improve the public transport as well. Congestion pricing during peak hours, differential parking fee, pedestrianisation, and surcharge on vehicles belonging to other cities/ regions, etc. are some of the strategic disincentives. Strategy for Finance Urban Transportation Development Fund Infrastructure development for efficient functioning of transport system is a capital- intensive process and a substantial financial burden would have to be shouldered by the government. The state government or the local bodies do not have the required resources for financing such developments, thus delaying the projects indefinitely. The Central Government in the National Urban Transport Policy (NUTP) has recommended levy of direct taxes that would be credited to the account of the ‘Urban Transport Fund’ and used exclusively to meet the urban transportation needs. NUTP has further specified that such direct taxes could be in the form of a supplement to the petrol and diesel taxes, betterment charges on landowners or even in the form of employment tax on employers. Such provisions will also result in making private vehicular transport more expensive and result in a shift towards use of public transport systems. A similar approach is recommended for implementation in GVMC. Improve the Share of Public Transport Increasing the Fleet of Bus As per the standards of GoI, a city should have at least 100 buses per lakh of population. It is also mentioned that by 2020, this should go up to 250 buses per lakh population. This is also supported by the prevailing over crowded buses specifically in peak hours. Hence a fleet of 200 buses per annum for the three consecutive years will be introduced. Dedicated Bus corridors, Bus bays and Terminals: 97 Visakhapatnam City Development Plan 150 bus bays have been identified for provision of convenient stoppages for buses so that they donot cause inconvenience to the traffic following them. Further, dedicated bus corridors and construction of bus terminals at major hubs will ease the traffic flow, significantly increase the share of public transport and will also improve the comfort of the passengers through the development of ‘hub and spoke’ system of transport. Introduction of MRTS: It is proposed to study and introduce MRTS (Mass Road Transport System) in selected corridors of the City to ease the congestion. Better Transport Infrastructure Streamlining, regularising the heavy cargo transport Specific dedicated corriodors along the important routes will be developed extensively for the cargo transport along the important routes where such cargo transport traffic is predominant. This traffic will be regularised in the all the regular network by introducing differential timings. Adequate number of Truck terminals will be provided to discourage the onroad parking of heavy cargo. Junctions and Traffic Signal improvements Visakhapatnam has about 270 intersections, out of which 125 are manned and 150 unmanned. Both of these intersections shall be provided with better LED controlled signal system. SCOOT area traffic control There are more than 55 signalised intersections in the GVMC area alone. Unless all these signals are linked with suitable area traffic management system, the overall delays may not come down. Optimisations of signals as an integrated network will be able to give better results pertain to the core area. Hence the SCOOT system with traffic detectors on the approaches, assisted by Video Cameras for incidence detection and management shall be installed. Traffic Signs and Markings The traffic in Visakhapatnam city being mixed in nature and carriage way being a non- standard format, the carriageways need extensive traffic signs and road markings to provide guidance for disciplined and safe driving. It is observed that on many important corridors traffic guidance in the form traffic signs and lane markings are not up to the standards. It is necessary to standardize the lane markings, edge markings, median markings, pedestrian crossings, parking zones etc; and locations for installing traffic delineators, and traffic signs and implemented on all important travel corridors extending over a length of 120 Km. Parking management It is proposed to demarcate parking stalls and design the parking fee structure to improve parking turnover. A proper parking policy, which looks at users–pay principle, is imperative. Off street parking complexes for private vehicles at 20 important nodal points in the city are required to ease traffic congestion by releasing precious carriage way. Besides there is urgent need to stream line the para-transit vehicles at major trip attraction centres by provision of suitably designed para-transit hubs. As many as 25 locations have been identified to implement this scheme. Similarly there is a need for providing parking spaces for private bus operators. 10 such locations, on all major arterial roads are identified for this purpose. Parallel roads 98 Visakhapatnam City Development Plan There are situations when alternative roads have to be developed to reduce the load on overburdened links. Finding space for such development is difficult in densely built up areas of the Urban Area. Only possible open areas for such purpose can be created from the vacant space available in the city and peripheral areas. Such a plan will have dual benefits of providing alternate routes and also help in non-encroachment of important lands. Road widening Given that the percentage area covered by roads in the city is a mere 10 % of the total area, road-widening programme improves channel capacity by adding more area to the circulation channels. Visakhapatnam is one of the cities, which has been able to implement road-widening programme with the participation of building owners, successfully. 25 congested links have been identified for widening with 7 of them being already implemented. 99 Visakhapatnam City Development Plan Table 7.8: Traffic and Transportation strategy Traffic and Transportation Sector - Strategic Action Plan (2005-2012) Insti Component Activity Y1 Y2 Y3 Y4 Y5 Y6 Y7 tution ULB Comprehensive Traffic & Transportation • • Study for entire GVMC. Constitution and Operationalisation of GoAP Greater Visakhapatnam Transport • • • • • • Authority (GVTA) State Govt Ring fencing APSRTC, Railways • • • • • • ULB Transport Assets and utilities mapping • • • • • using G.I.S. Technology ULB, Police Planning, • • dept. Traffic and Transportation Management Reforms and using G.I.S. and G.P.S. technology Institutional Strengthening ULB, Police Design and Implementation of IEC • • • • • • dept. campaign for improved traffic awareness Capacity building initiatives for better • • • • • • traffic management Introduce congestion pricing for private • • • • • • sector during peak hours ULB Differential parking fee • • • • • • Auto restricted zones/ pedestrianisation • • • • • • Surcharge for other state/ city vehicles • • • • • • imposed APSRTC Increasing the bus fleet • • • Provision of bus bays in identified • • locations including signage ULB, Signage improvement at bus bays to 30% 70% 80% 95% 95% 95% APSRTC streamline bus and passenger mobility Development of bus terminals • • • • • • Better Service Dedicated line for bus carriage way (arterial and sub arterial roads) Delivery through improved share Survey, Land acquisition and provision of Public of bus bays in feasible locations • • Transport (Bus, (Approx. 150) MMTS & MRTS) Development of required infrastructure • • • (signage, signal system, separators, etc.) Formulation and Operationalisa-tion of 25% 50% 75% 100% the dedicated lines (% completed of the total corridor planned) ULB Provision of MRTS (length in km) 15 Dedicated corridors for heavy cargo • • • • • • • Improved Safety, transport / streamlining transport traffic Service delivery and Customer Strengthening existing roads by - 1320 • • • • • • • Satisfaction by km providing better GVMC infrastructure up gradation of important roads • • • • • • Junction Improvements – 95 locations • • • Signals - 55 locations • • 100 Visakhapatnam City Development Plan Traffic and Transportation Sector - Strategic Action Plan (2005-2012) Insti Component Activity Y1 Y2 Y3 Y4 Y5 Y6 Y7 tution Flyovers - 9 nos. • • • • • • Signage and markings • Street Lighting • • • • • • Parking Lots/ complexes – 15 Nos. • • • • Upgradation of major link roads • • • Parallel Roads, slip roads, • • • new links – 20 km Truck, Private Bus, Para Transit, • • • • Parking Lots- 20 Nos Truck Terminals – 2 Nos. • • • ROBs & RUBs -2 Nos. • • • Accessibility to the disadvantaged • • • • • • Improved Pedestrian Pedestrianisation • • • ULB Facilities, comfort • • • • Subways/ FoBs - 5 Nos. and safety Pedestrian crossings • • • • • • • • • • RTA Phasing out 15 year old vehicles APPCB, • • • • • • Environemntal upgradation RTA Effective monitoring and pollution check RTA, • • • • Traffic Impose ban the use of air horns causing • Police noise pollution Constitution of Urban Transport • ULB, state Development Fund Finance govtt Loans/Bonds • • • • • • • Annuity Based arrangements • • • • • • 7.6. SOLID WASTE MANAGEMENT 7.6.1. Key Challenges: • Awareness building and community involvement in segregation of recyclable waste and storage of waste at source • Effective waste minimisation • Integrated Waste Treatment • Creating a Regional sanitary Landfill Facility VISION Our vision is to create a healthy community by establishing an efficient Integrated Solid Waste Management system complying with the MSW 2000 rules 101 Visakhapatnam City Development Plan 7.6.2. VISION The major objectives of this sector are: • To put an effective Solid Waste Management System complying with the rules of 2000. • To ensure effective processing of waste through composting or energy projects. • To secure and develop the landfill site for disposing the processed waste. To provide more transfer stations. 7.6.3. Strategies - Integrated Solid Waste Management The local governments should effectively involve the private sector in delivering the solid waste management service. The rationale for private sector participation includes attracting project funding, new technology, cost savings and service delivery improvements. A Comprehensive Solid waste management Strategic Plan has been evolved which outlines the vision, goals and strategies to achieve the same. The vision of GVMC is to “Provide its citizens an environmentally friendly and sustainable waste management system with safe disposal facilities by putting in place waste reduction and recovery mechanisms�. Table 7.9: Goals, Service Outcomes for Different Horizon Years Goal Time Frame 2005 2010 2015 2025 Door to Door Collection 20% 50% 100% 100% Source Segregation 20% 50% 100% 100% Collection Efficiency 90% 100% 100% 100% Treatment & Disposal 0% 100% 100% 100% Cost Recovery of O & M 0% 30% 100% 100% Private Sector Modest Complete in Complete in Complete in Participation protocols in the Disposal the Disposal the place Disposal In order to achieve above outcomes, issues and deficiencies in each of the solid waste management component have been identified and the strategies for improvement both in physical and financial terms are elaborated in the following sections. 7.6.3.1. Source Segregation Deficiencies Storage of waste at source is one of the important recommendations of MoEF. It is however, observed that storage and segregation at source is generally absent in Vizag and people in general are not aware of the benefits of developing such a practice. However, some households (say around 10 to 15%) store the un-segregated waste in open containers and dispose off the same at the community collection points. Waste generated from the major markets in the city lack adequate storage facilities. Strategies for Improvement Highest priority has to be accorded for Segregation & Storage at source irrespective of the area of generation so as to facilitate an organized and environmentally acceptable waste collection, processing and disposal. Source segregation of Recyclables and biodegradable (organic waste) will not only provide an efficient way for resource recovery, but will also substantially reduce the pressure and pollution in Landfill sites. 102 Visakhapatnam City Development Plan In order to achieve the above objective, ‘Two Bin system of Solid Waste Storage’ at source is being recommended. As per this system, each of the households would be directed to keep separate Bins/containers for Biodegradable and non-bio degradable waste generated within their premises. 7.6.3.2. Collection Deficiencies Households generally deposit the waste at community facilities except in areas where community manages the primary collection of waste. Strategies for Improvement The following measures have been recommended for improving the primary collection practices of Vizag.  Phased implementation of ‘Door to Door collection System’ through community organisations and GVMC by mobilising, facilitating, organising and supporting community activities with the help of local NGOs.  Installation of ‘Community Storage Bins’ in areas where house-house collection cannot be implemented.  Expanding the ‘Voluntary Garbage Disposal Scheme’ for more number of restaurants/hotels and commercial establishments and collecting user charges  Placement of dumper containers sufficient in number at markets for ensuring that all the vendors places the waste in the containers.  Persuading the hospitals to be part of the existing bio-medical waste management facility in the suburbs of the city. It is recommended to collect Non-bio degradable waste separately from premises where door-to-door / kerb side collections are organised. Present system of primary collection should be phased out by introducing Multi-bin carts (Push carts / Tricycles), semi mechanized systems like refuse collectors. Separate collection vehicles should collect the non- biodegradable waste stored in separate bin. The details of proposed primary collection system are summarised in Table 7.10. Requirements of the Proposed Primary Collection System Presently the city has 500 dumper bins spaced at 250 m. Similarly, the city has over 300 open dumping (serving as the secondary collection centres) places where the community / sanitary workers deposit the waste. Table 7.10. : Proposed Primary Collection System Mode of Primary Collection Area of collection Secondary storage collection Vehicle 1.Bio-degradable in 1.Residential Multi-bin cart/Tricycle-with Skips/wheel containers colonies of High & 6 of 40 lit capacity bins-4 2. Non-biodegradable- middle income for Biodegradable waste, Door to Door Sell or hand over to group 2 for recyclables waste collector Closed vehicle to collect Direct transport to 2.Hotels/restaurants biodegradable Disposal site Combination of Mixed Residential, Tri-cycle- with Six bins of Bins emptied to skips Kerb-side &bell Commercial Areas 40 litre kept for the waste. system Fruit & Vegetable Large Community Carrying bins to transfer Market/ transfer Skip / Dumper Placer bin system point stations Transfer contents of Small community Slums/urban poor Carrying bins to Transfer biodegradable to bin system colonies point community bins 103 Visakhapatnam City Development Plan 7.6.3.3. Collection & Transportation Deficiencies Current transportation system in Vizag is only able to address 50% of the total waste. There is only one modern transfer station for the city, which is not sufficient. Strategies for Improvement Key information on vehicle movement and deployment is critical. It is recommended that a standard register at the disposal site and transfer station be maintained. The register should contain information on each of the vehicle trips at both the locations and the origin of waste collection. A summary of this information would be prepared at the end of the day, to be verified by the health officer. In order to address the collection gap, it is recommended procuring new vehicles of 5.5 tons. 7.6.3.4. Processing & Disposal Deficiencies The major issues of processing and disposal in Vizag are crude dumping of waste and its impacts on the neighbourhood. Strategies for Improvement The characteristics and quantity of solid waste generated in the city primarily influence the disposal options. A review of the available solid waste sample analysis results indicates that nearly 30% of the waste generated in the city is organic nature. Considering these aspects, it is recommended to develop a landfill site for safe disposal of solid waste of Vizag. The treatment and disposal strategies for Vizag will be to:  Compost the organic fraction of the waste  Sanitary land filling of inorganic fraction of waste and the compost rejects  Encouraging local level aerobic vermi composting and  Educating the community on 4R strategy (Reduce, Reuse. Recycle and Recover) The capital investment for the proposed interventions is presented in the investment plan. The immediate objective is to establish landfill site with public private partnership for effective solid waste management by 2008. Table 7.11 : Solid Waste Management Strategy Solid Waste Management Sector - Strategy to achieve Vision and Goal (2005-2012) Insti Component Activity Y1 Y2 Y3 Y4 Y5 Y6 Y7 tution Comprehensive Solid Waste Management Plan • • Training of functionaries • • • • • • • Service Communication Strategy Improvement Development ULB • • Communication Campaigns • • • • • • Support for Community Initiatives • • • • • • • Source Segregation Primary • • • • • • • 104 Visakhapatnam City Development Plan Collection Door to Door Collection • • • • • • • Installation of Storage Bins • • • • • • • Vehicle tracking system • • • Secondary Vehicle Fleet Collection & • • • • Transportation Transfer Stations Modernisation • • • Waste Minimisation, Recycling • • • • Integrated Waste Treatment • • • Regional Sanitary Landfill Disposal & Facility • • • Treatment Scientific Closure of the abandoned dump sites • • • • Project Development Assistance (5% of the total) • • • • • • • 105 Visakhapatnam City Development Plan 7.7. POVERTY REDUCTION STRATEGIC PLAN With about one third of the population living in slums, urban poverty is a major issue confronting the GVMC area. “The vision of Vizag is to become a city without slums by 2021�. The goals formulated to achieve the vision are:  All poor will have access to qualitative and affordable basic services;  100 % literacy;  Universal access to primary health care and no one should die of preventable diseases;  Livelihood to all urban poor.  Security of tenure and Affordable Housing The strategy formulated for reducing poverty in GVMC is:  Provision of land tenure security  Community empowerment  Linking livelihoods to city’s economy  Development of housing through partnerships - PPP  Formulation of Notification and Denotification Policy  Relocation of slums located in hazardous and vulnerable Areas  Provision of basic infrastructure - both physical (water, roads, sanitation and sewerage) and social infrastructure (clinics, schools, training facilities, etc). 7.7.1. Housing & Infrastructure Action Plan Provision of infrastructure in poor settlements is one of the key objectives of City Development Plan. Infrastructure improvement in poor settlements would continue to cover roads, drains, water supply, solid waste management and sanitation. Poor settlements were identified from the matrix prepared during the consultation with the inhabitants of the slums and action plan will be prepared for provision of basic infrastructure. The sub-project proposals were carefully appraised to exclude non-poor areas within the notified poor settlements. Emphasis will also be laid for rehabilitation of infrastructure linked with poor settlements and integration with citywide infrastructure facilities. Slum Networking Under this initiative, slum networking will be taken up for an integrated up gradation of the slums. As there is a close correlation between the slum locations and the natural drainage paths of a city they would be tapped and improved upon with the infrastructure services. This approach would help in building low cost service trunks, particularly for gravity-based systems of sewerage and storm drainage, together with environmental improvements such as cleaning up of nallahs, development of green pedestrian spines and restoration of waterfront structures. Social & Economic Development Action Plan The city administration has identified that for overall development of the slum areas the development should concentrate on the social and economic issues and hence would focus 106 Visakhapatnam City Development Plan on strengthening community based organizations, enhanced role of the self-help groups (SHGs), access to institutional finance to SHGs, etc. Accordingly the Social & Economic Development Action Plan would focus on the following areas:  Education  Health  Livelihoods  Strengthening SHGs Considering the deficiencies in infrastructure - physical and social - the cost of estimated interventions is to the tune of Rs.2600 crores and is presented in Table ----. 7.7.2. Future Infrastructure Requirements GVMC has been implementing a series of poverty reduction programmes over the last three decades. But the need to prepare a comprehensive programme to address the problems of the urban poor came out prominently during CDP consultations. This is being attempted through the Visakhapatnam Slum Up gradation Action Plan which is under preparation. At present, GVMC is contributing 40% of its property tax revenues for slum improvement facilities and aims to make basic services permanently available to all poor residents of the city, irrespective of their place of residence or tenure status. The future requirement of infrastructure and community facilities is presented in Table 7.7, 7.8 & 7.9 respectively. Table 7.12 : Basic Infrastructure Requirement For Slums Infrastructure GVMC Roads (Mts) BT 2,00,500 mts. CC 4,02,000 mts. Metal Roads 2,00,000 mts. Drains (Mts) Sewers 6,00,000 Mts. SW Drains 9,50,000 Mts. Toilets (Nos) 1450 (6 Seats) Street lights 4589 Nos Table 7.13: Community Facilities Available In Slums Infrastructure GVMC Schools (No.) 210 Comm Halls (Nos) 171 107 Visakhapatnam City Development Plan Table 7.14: Solid Waste Infrastructure Required MSW Tricycles Dumper placer No. of Dumper bins Generation in required trucks required slums required (no.) MTPD (no.) (no.) GVMC 418 933 1000 1000 75 In addition, the existing infrastructure in slums requires complete rehabilitation as a majority of the assets are in dilapidated condition. 7.7.3. Housing Requirements The earlier Slum Improvement Projects had a limited focus on the housing for poor. Even the initiatives of Municipal Corporation are to create infrastructure facilities in slums. The provision of housing for urban poor is the responsibility of Andhra Pradesh State Housing Corporation. A survey carried out by APSHCL, estimates that about 25000 families need housing as they fall under EWS category. It is proposed to construct group housing with G+3 structures with each house occupying an area of 286 sq.ft. In addition, the infrastructure in existing housing colonies is very bad necessitating a complete rehabilitation. More than 150 colonies in the city area require rehabilitation of basic services. Accordingly, the requirements of housing and infrastructure facilities for GVMC are estimated and presented in Table 7.11 Table 7.15. : Housing & Infrastructure Requirements Details GVMC Cost A. Housing for EWS – Number 50,000 500 Crores Cost (Rs In crores) Water Supply 3.75 MLD 22.50 Crores Sewerage System 45 Mts 15.00 Crores Roads 38.00 MTS 104 Crores Street Lighting & Electrification 1254 Nos 2.00 Crores A. SUB Total 643.50 Crores B. Infrastructure in existing colonies 0.40 Crores @20,000 C. Other comm. facilities 6.00 Crores Grand total (Rs. Crores) 649.90 Crores 108 Visakhapatnam City Development Plan Table 7.16. : Poverty Reduction Poverty Reduction - Strategy to Achieve Vision And Goal (2005-2012) Component Activities Y1 Y2 Y3 Y4 Y5 Y6 Y7 Development of Comprehensive data base • Conferring Tenural Rights • • Evolving a policy on Notification and Denotification • • Planning, Institutional Strenthening and Capacity Building • • • Reforms and Governance Providing Access to Social Infrastructure( Health and Education) • • • • • • • Evolving a comprehensive Livelihood Policy IEC • • • • • • Strenthening CBOs • • • • Relocations of Slums located in Hazardous and vulnerable Areas • • • • Identification of Infrastructure and Housing Deficiencies • • Improvement in Infrastructure Development of Basic Services to the Poor • • • • • • • Water Supply & Sewerage • • • • • Roads • • • • • • • Street Lights • • • • • • • Service delivery Community Toilets • • • • • • • Construction of Storm Water Drains including primary drains • • • • • • • Environmental Improvement of Slums • • • • • • • Solid Waste Management • • • • • • • Civic Amenities, Community Halls, Child Care Centres • • • • • • • Rehabilitation of existing assets • • • • • • • Housing Infrastructure • • • • • • • 109 Visakhapatnam City Development Plan Chapter-VIII 8. City Investment Plan The City Investment Plan gives an estimate of the level and quantum of investment required to implement the strategic sectors in the City Development Plan over a specified time-frame to attain the sustainable growth and to achieve the agenda goals. The G.V.M.C. has summarized the recommendations of the working groups and prepared a City Investment Plan for the entire City of 5 strategic sectors identified in the CDP process. The City Investment Plan (CIP) is worked out duly considering the advises of Technical Experts and the recommendations of Stakeholders. The sector-wise introduction and description of the sub projects included in the CIP are as follows. The mapping of the projects on the city map is indicated in the annexure 8.1. WATER SUPPLY 8.1.1. City investment plan- water supply The Greater Visakhapatnam city extends over an area of 514 Sq. Kms including Visakhapatnam city and its surrounding extended areas. It is supplying protected water to the 85 % of the Visakhapatnam city area and part of the area only in the extended areas. The water drawl sources to the Visakhapatnam city and its surrounding areas are 60 KM to 150 KM away from the city . Therefore the GVMC requires more financial assistance not only for providing infrastructure but also for the maintenance of its installations. More over Industries such as Pharmacity , Brandix Apparel Park, Gangavaram Port , Soft ware companies have already come up and a lot of Industries are likely to come up in the near future. The GVMC is supplying 65 Lpcd of drinking water to the domestic consumers and only 60 % of the agreement quantity to its Bulk consumers. There is a lot of pressure from the domestic consumers and bulk consumers for the supply of water. In order to wipe of the deficit and to meet the demands of both domestic and bulk consumers, the GVMC has proposed to take the following water supply projects asgiven in the city investment plan (table no. 8.1) 8.2. SEWERAGE The sewerage Master Plan will guide the sewerage system of Visakhapatnam over the next two and a half decade as it strives to manage growing needs in improvement of sanitation. The plan identifies the facilities and services that the city intends to put in place by 2020 to meet the needs of the domestic and industrial sectors. It will also provide a basis for developing projects for achieving the vision. This exercise does not focus on the design and operational details but helps in evolving a strategy and policy guidelines in the sewerage sector for the city of Visakhapatnam. 8.2.1. Project proposals – City Investment Plan To cover the entire GVMC area with the sewerage system as recommended by the working committee and to improve the efficiency and re-use of waste water, the following proposals have been made as indicated in the city investment plan (table no. 8.2 ): 110 Visakhapatnam City Development Plan 8.3. TRAFFIC & TRANSPORTATION: 8.3.1. Project proposals – City Investment Plan As evolved in the City Development process, the following proposals have been made in the Transportation Sector with an objective to provide a safe, affordable, eco-friendly, speedy transport system in the GVMC area. The city investment plan is given in table no. 8.4 Mass Rapid Transit System (MRTS) As already brought out above, creation of a reliable, comfortable, attractive, and affordable Public Transport System is the long-term solution for solving the traffic problems of a metropolis. Thus, construction of Metro Rail project (Mass Rapid Transit System – MRTS) is envisaged on the busy traffic corridors to provide a high quality mass transit system. Proposed to be built in PPP (Public-Private-Partnership) mode, under Phase-II and proposed to cover the following traffic corridors in the city. Table 8.0 : Proposed MRTS Corridor Serial Proposed MRTS Corridor Length No (in Km.) 1. Old Post Office to Hunumanthawaka 8.00 2. Asilmettta to Lankelapalem via Gajuwaka 15.00 3. Convent Junction to Pendurthy 20.00 It is an elevated rail system to be built on single piers with a minimum height of 5.5 meters in the central median of the road. With stations located at an average spacing of 1km, the system can wan away the traveling public from personalized motor vehicles to it and will thus give a breathing relief to the ever-increasing traffic congestion, as it is the case with the metros world over. The cost of the project is estimated to be about Rs. 6240 crores and proposed to be implemented over a period of 7 years starting from the year 2007. Once the MRT system is in place, appropriate policy mechanism needs to be evolved discourage and or impose restrictions on private vehicles, through peak hour pricing, congestion pricing, restriction of car/motor cycle purchases by quota and auction methods, restriction on entry of private vehicles, encouraging pooled cars, etc., as it is practised in most of the metro cities. 111 Visakhapatnam City Development Plan 8.4. STORM WATER DRAINAGE The Greater Visakhapatnam Municipal Corporation is facing lot of hard-ship in day-to- day & periodic maintenance of Drains as well, due to the cited reasons. Lot of loss & Damages to the Public life & Properties are being encountered in every rainy season, particularly during cyclonic storms. Thus giving scope to the Public & to the Media to comment on the very existence and functioning of Local Administration. 8.4.1. Project Proposals – City investment plan Realizing the severity of the problem as explained above, GVMC is forced to envisage a Compressive Plan & Strategy of Regularisation of Storm Water Drains for deflooding to minimise occurrences of damages to Public/Private properties and loss of public life, apart from avoiding disruption of public life, especially during the periods of cyclonic storms & high intensity rainfall. As a part of strategy about 27 Nos of both Major drains and their tributaries are identified for immediate regularization and aim to achieve the following objectives. The Technical features of regularisation consist of; a) Construction of retaining walls on both sides wherever needed duly demarcating the boundaries on either side. b) Construction of Check dams/Drops wherever necessary to reduce the velocity in stages and to ensure steady flow c) Construction of cross culverts/Bridges wherever necessary. d) Bed concrete in Vent portion to avoid erosion of bed. e) Chain link fences to minimize dumping of garbage and litter. f) De-silting / De-weeding to ensure full flow of water. The city investment plan for storm water drainage is given in table no. 8.3. 8.5. SOLID WASTE MANAGEMENT City investment plan is given in table no. 8.5 8.6. BASIC SERVICES FOR THE POOR City investment plan is given in table no. 8.6 112 Visakhapatnam City Development Plan Table 8.1. Water sector – City investment plan Water Supply Sector - Investment Plan (2005-2012) Rupees in Crores Year Year Year Year Year Year Year Component Activity Total JNNURM 1 2 3 4 5 6 7 GOI GOAP IR/IF Total Comprehensive Water Sector Development Master 0.08 1.50 1.50 3.08 3.08 3.08 Plan Energy Audit Studies 0.08 1.50 1.50 3.08 3.08 3.08 Water Quality Studies and Monitoring 0.08 1.50 0.50 0.50 0.50 0.50 0.50 4.08 4.08 4.08 Design and Implementation of Communication 0.10 0.75 0.75 0.75 0.75 0.75 0.75 4.60 4.6 4.6 Strategy Planning, 0.75 0.75 0.75 0.75 Baseline Survey Reforms and Institutional Human Resources Development 0.10 0.75 1.50 1.50 1.50 1.50 1.50 8.35 8.35 8.35 Strengthenin 0.10 0.75 1.50 1.50 1.50 1.50 6.85 6.85 6.85 Establishment of Regulatory Authority g GIS Mapping of Water and Sewerage Utility Mapping 1.00 2.00 0.50 0.50 0.50 4.50 4.5 4.5 Community Initiatives Support 0.50 0.50 0.50 0.50 2.00 2 2 Modernising Financial Management and MIS 0.75 1.00 1.00 1.00 3.75 3.75 3.75 E-Governance 0.50 0.50 0.50 0.50 0.50 0.50 3.00 3 3 Sub-Total 1.29 10.50 11.25 6.75 5.75 5.25 3.25 44.04 44.04 44.04 Laying of Transmission main to Maduravada Region 14.70 2.50 17.20 8.60 3.44 5.16 17.20 Development of Distribution network for peripharal 14.00 17.50 17.50 18.90 67.90 33.95 13.58 20.37 67.90 (32) areas Laying of Transmission mains from Thatipudi to 0.00 19.90 16.90 8.70 45.50 22.75 9.10 13.65 45.50 Visakhapatnam Water Construction of 33 mgd Water Treatment plant at Resource 7.00 4.90 11.90 5.95 2.38 3.57 11.90 Narava Management 17.10 10.90 28.00 14.00 5.60 8.40 28.00 Gajuwaka Water Supply Project Refurbishment of Distribution Network in Old City 7.00 14.00 14.00 17.50 17.50 17.50 16.10 103.60 51.80 20.72 31.08 103.60 Upgradation and Improvement of Distribution System 14.00 14.00 14.00 25.20 67.20 33.60 13.44 20.16 67.20 in Central Vizag Sub-Total 59.80 83.70 62.40 59.10 42.70 17.50 16.10 341.30 170.65 68.26 102.39 341.30 Augmentation a) Providing Pipeline from Raiwada canal to Narava 35.00 35.00 35.00 33.60 138.60 69.30 27.72 41.58 138.60 113 Visakhapatnam City Development Plan Water Supply Sector - Investment Plan (2005-2012) Rupees in Crores Year Year Year Year Year Year Year Component Activity Total JNNURM 1 2 3 4 5 6 7 of Water b) Providing Pipeline from Yeleru reserveior to KBR 105.00 175.00 175.00 175.00 161.00 70.00 861.00 430.50 172.20 258.30 861.00 Supply c) Construction of 2 Storage reservoirs on the 7.00 7.00 10.50 17.50 17.50 11.90 71.40 35.70 14.28 21.42 71.40 upsteam of Airport d) Construction of summer storage tank at Yeleru 17.50 17.50 24.50 25.20 28.00 28.00 140.70 70.35 28.14 42.21 140.70 canal e) Source Augmentation / Desalination Plant 35.00 35.00 35.00 35.00 35.00 35.00 210.00 105.00 42.00 63.00 210.00 Sub-Total 52.50 199.50 276.50 280.70 289.10 241.50 81.90 1421.70 710.85 284.34 426.51 1421.70 a) SCADA Project 7.00 10.50 10.50 14.00 14.00 10.50 66.50 33.25 13.30 19.95 66.50 Service b) UFW Reduction Project 7.00 10.50 10.50 17.50 17.50 8.80 71.80 35.90 14.36 21.54 71.80 Delivery 7.00 10.50 10.50 14.00 14.00 17.50 73.50 36.75 14.70 22.05 73.50 c) 24 Hr. Water Supply Project Sub-Total 0.00 21.00 31.50 31.50 45.50 45.50 36.80 211.80 105.90 42.36 63.54 211.80 1. O & M of Water Supply system a) Motor & Electrical repairs and upgradation 0.18 0.00 0.00 0.00 0.00 0.00 0.00 0.18 0.09 0.04 0.05 0.18 Governance b) Distribution network reforms rationalization 0.00 0.81 1.65 0.32 0.00 0.08 0.08 2.94 1.47 0.59 0.88 2.94 Sub-Total 0.18 0.81 1.65 0.32 0.00 0.08 0.08 3.122 1.561 0.624 0.9366 3.122 Citizens Citizen fedback mechanisms to be established 0.03 0.65 0.65 0.65 1.98 0.99 0.40 0.59 1.98 Relations Complaint redressal made robust 0.03 0.65 0.65 1.33 0.66 0.27 0.40 1.33 Management Sub-Total 0.052 1.3 1.3 0.65 0 0 0 3.302 1.65 0.66 0.99 3.30 Grand Total 113.82 316.81 384.60 379.02 383.05 309.83 138.13 2025.26 1034.65 396.24 594.37 2025.26 114 Visakhapatnam City Development Plan Table 8.2. Sewerage sector – City investment plan Sewerage Sector - Investment Plan (2005-2012) - Rupees Crores Year Component Activity Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Total JNNURM 7 GOI GOAP IR/IF Total Comprehensive Sewerage Master Plan 1.00 0.75 1.75 1.75 1.75 Energy Audit 0.30 0.30 0.3 0.3 Design & Sewerage Quality Studies and Monitoring 0.75 0.30 0.30 0.30 0.30 0.30 2.25 2.25 2.25 Implementation of Design & Communication Strategy 0.30 0.30 0.30 0.30 0.30 0.30 0.30 2.10 2.1 2.1 Communication Strategy Human Resources Development 0.30 0.30 0.75 0.75 0.75 0.75 0.75 4.35 4.35 4.35 Community Initiative Support 0.30 0.30 0.30 0.30 0.30 0.30 1.80 1.8 1.8 Sub-Total 0.60 2.95 2.40 1.65 1.65 1.65 1.65 12.55 12.55 12.55 Service Delivery 1. Household Coverage 1.60 2.20 2.20 1.00 1.00 0.50 0.20 10.40 5.20 2.08 3.12 10.40 Sub-Total 1.60 2.20 2.20 1.00 1.00 0.50 0.20 10.40 5.20 2.08 3.12 10.40 Development of Sewerage System for old City 14 2.8 16.80 8.40 3.36 5.04 16.80 Providing Swerage Sysem in Central Visakhapatnam 14 21 49 49 49 42 224.00 112.00 44.80 67.20 224.00 Provding Sewerage System in Gajuwaka 35 35 35 54.6 49 208.60 104.30 41.72 62.58 208.60 Providing Swerage System to North Visakhapatnam City 35 35 35 23.1 0 128.10 64.05 25.62 38.43 128.10 Sewerage Network System to Madhurawada Region 21 21 21 21 25.2 109.20 54.60 21.84 32.76 109.20 Sewarage Treatment & Sewerage Network System to Pendurthi Region 21 21 21 21 28.7 112.70 56.35 22.54 33.81 112.70 Management Provding Sewerage System in Gajuwaka Periphery Areas 7 21 35 35 35 29.4 162.40 81.20 32.48 48.72 162.40 Development of Waste wate re-use system 3.5 7 14 10.5 35.00 17.50 7.00 10.50 35.00 Development of Sewerage Master Plan 0.7 2.8 3.5 7.00 3.50 1.40 2.10 7.00 Recycling Plant & Reuse 5.00 3.00 5.00 5.00 3.00 3.00 24.00 12.00 4.80 7.20 24.00 Sub-Total 39.20 171.60 216.50 211.50 208.70 177.30 3.00 1027.80 513.90 205.56 308.34 1,027.80 Grand Total 41.40 176.75 221.10 214.15 211.35 179.45 4.85 1050.75 531.65 207.64 311.46 1050.75 115 Visakhapatnam City Development Plan Table 8.3. Storm water drainage sector – City investment plan Storm Water Drainage - Investment Plan (in crores) JNNURM Component Activity Year Year Year Year Year Year Year Total GOI GOAP IR/IF Total 1 2 3 4 5 6 7 Identification of Problem Areas 0.75 1.5 2 4.25 4.25 4.25 R& R Planning 0.75 3 3 3 1.5 1.5 1 13.75 13.75 13.75 Capacity Building Comprehensive Drainage Master Plan 0 2 1 3 3 3 Sub-Total 1.5 6.5 6 3 1.5 1.5 1 21 21 21 Regularazation of S.L. Canel 1.4 1.4 2.8 1.4 0.56 0.84 2.8 Improvement of Yerrigedda 3.5 14 14 14 10.5 56 28 11.2 16.8 56 Improvement to the Gongulagedda 3.5 14 10.5 28 14 5.6 8.4 28 Rehabilitation of 39 Natural Storm Water channel system in the central Vizag Region 14 17.5 17.5 17.5 3.5 70 35 14 21 70 Drains Rehabilitation Rehabilitation of Storm Water Drains in Gajuwaka Region 2.8 14 14 18.2 49 24.5 9.8 14.7 49 Rehabilitation of storm water Drains in Madurawada Region 14 14 7 35 17.5 7 10.5 35 Rehabilitation of storm water drains in Pendurthy Region 2.1 14 18.9 35 17.5 7 10.5 35 Sub-Total 13.3 85.4 88.9 56.7 28 3.5 0 275.8 137.9 55.16 82.74 275.8 Development storm water system near Gangawara Port 14 14 28 14 5.6 8.4 28 Area Construction of Development storm water system along Beach Road 3.5 7 10.5 5.25 2.1 3.15 10.5 Drains Treatment and re-use of storm water 3.5 7 7 10.5 7 35 17.5 7 10.5 35 Sub-Total 3.5 24.5 21 7 10.5 7 0 73.5 36.75 14.7 22.05 73.5 Grand Total 18.3 116.4 115.9 66.7 40 12 1 370.3 195.7 69.86 104.8 370.3 116 Visakhapatnam City Development Plan Table 8.4. Traffic and transportation sector – City investment plan Traffic and Transportation Sector - Investment Plan (2005-2012) - Rupees Crores Component Activity/ Sub Projects Y1 Y2 Y3 Y4 Y5 Y6 Y7 JNNURM 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 TOTAL GOI GoAP IF/IR TOTAL Constitution and Operationalisation of Greater Visakhapatnam Transport 5 5 5 0 0 5 Management Authority (GVTA) Comprehensive Traffic & Transportation Study for entire GVMC 3 3 6 6 0 0 6 region Planning, Reforms and Transport Assets and utilities mapping Institutional Strengthening using G.I.S. Technology 20 10 10 10 10 60 60 0 0 60 Design and Implementation of IEC campaign for improved traffic 1 0.5 0.5 0.5 0.5 0.5 0.5 4 4 0 0 4 awareness Capacity building initiatives for better traffic management 0.5 0.1 0.1 0.1 0.1 0.1 1 1 0 0 1 Dedicated corridors for heavy cargo transport / streamlining transport traffic 5.00 3.00 2.00 1.00 0.50 0.50 0.50 12.5 6.25 2.50 3.75 12.50 Development of inner Circular Road 21 4.3 25.3 12.65 5.06 7.59 25.30 Development of Beach front from Mahamatha Gandhi Statu to Kailasagiri 6.3 2.9 9.2 4.60 1.84 2.76 9.20 Widening and Strengthing of roads 37.2 53.9 17.5 0 0 0 0 108.6 54.30 21.72 32.58 108.60 Formation of New roads 9.5 112.8 202.7 86.8 25.2 0 0 437 218.50 87.40 131.10 437.00 Provision of Infrastructure Construction of Tunnel from Visakhapatnam City to Mudassarlova 3.5 7 14 17.5 17.5 14.3 73.8 36.90 14.76 22.14 73.80 through Simhachalem Hill Construction of Flyover at Asselimetta Jn 3.5 9.5 14 16.8 43.8 21.90 8.76 13.14 43.80 Development of grade separators in the City 17.5 17.5 17.5 35 35 21 143.5 71.75 28.70 43.05 143.50 Junction Improvements – 95 locations 1.00 0.50 0.35 0.54 0.77 0.58 0.35 4.09 2.05 0.82 1.23 4.09 117 Visakhapatnam City Development Plan Traffic and Transportation Sector - Investment Plan (2005-2012) - Rupees Crores Component Activity/ Sub Projects Y1 Y2 Y3 Y4 Y5 Y6 Y7 JNNURM 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 TOTAL GOI GoAP IF/IR TOTAL Signals - 55 locations 0.50 0.18 0.20 0.18 0.30 0.20 0.10 1.655 0.83 0.33 0.50 1.66 Flyovers - 9 nos. 25.00 10.00 10.00 10.00 10.00 10.00 10.00 85 42.50 17.00 25.50 85.00 Signage and markings 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.35 0.18 0.07 0.11 0.35 Street Lighting 0.50 0.50 0.50 0.50 0.50 0.50 0.50 3.5 1.75 0.70 1.05 3.50 Parking Lots/ complexes – 15 Nos. 3.00 2.00 1.00 0.50 0.50 0.50 0.50 8 4.00 1.60 2.40 8.00 Truck, Private Bus, Para Transit, Parking Lots- 20 Nos 0 0.00 0.00 0.00 0.00 Truck Terminals – 2 Nos. 2.00 2.00 1.00 0.50 0.50 0.50 6.5 3.25 1.30 1.95 6.50 ROBs & RUBs -2 Nos. 2.00 2 1.00 0.40 0.60 2.00 Development of connectivity across Harbour approach channel (Port Trust) 35 35 35 105 52.50 21.00 31.50 105.00 10 Works in Phase-I of 58.8 Km and 13 Works of Phase-II of 100.5 KM of 50 105 100 100 100 100 31.6 586.6 293.30 117.32 175.98 586.60 VUDA. Provision of bus bays in all feasible locations including signage 3.00 3.00 6 3.00 1.20 1.80 6.00 Development of bus terminals at CBDs and growth centers 5.00 5.00 5.00 5.00 5.00 5.00 30 15.00 6.00 9.00 30.00 Dedicated line for bus carriage way (arterial and sub arterial roads) 0 0.00 0.00 0.00 0.00 Improved share of public Transport 2.2 DEDICATED BUS CORRIDORS Land acquisitions for providing dedicated lines 5.00 5.00 10 5.00 2.00 3.00 10.00 Development of required infrastructure (signage, signal system, separators, etc.) 5.00 3.00 2.00 10 5.00 2.00 3.00 10.00 118 Visakhapatnam City Development Plan Traffic and Transportation Sector - Investment Plan (2005-2012) - Rupees Crores Component Activity/ Sub Projects Y1 Y2 Y3 Y4 Y5 Y6 Y7 JNNURM 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 TOTAL GOI GoAP IF/IR TOTAL accessibility to the disadvantaged 3 2 1 1 1 1 1 10 5.00 2 3 10 pedestrianisation 0.52 0.87 1.17 1.81 2.56 1.92 1.15 10 5.00 2 3 10 Pedestrian Safety Subways/ FoBs - 36 no.s 6.0 6.0 6.0 18 9.00 3.6 5.4 18 Infrastructure/ signage for Pedestrian crossings 1.0 1.0 1.0 3 1.50 0.6 0.9 3 PART I SUB TOTAL 210.57 413.00 449.57 307.78 209.98 170.65 67.85 1829.40 952.70 350.68 526.02 1829.40 MRTS 1500 1500 1500 1740 6240 PART II TOTAL* 8069.4 **Eight thousand sixty nine crores only (including MRTS) 119 Visakhapatnam City Development Plan Table 8.5. Solid Waste Management Sector – City investment plan Solid Waste Management Sector - Urban Infrastructure - Investment Plan 2005-2012 - Rupees Crores Inst JNNURM Outcome Activity Y1 Y2 Y3 Y4 Y5 Y6 Y7 Total itution GOI GOAP IR/IF Total ULB Comprehensive Solid Waste 0.5 1.0 1.5 1.5 1.5 Management Plan Training of functionaries 0.1 0.3 1.0 1.0 1.0 1.0 0.9 5.3 5.3 5.3 Service Improvement Communication Strategy Development 0.2 0.6 0.8 0.8 0.8 Communication Campaigns 0.3 0.3 0.3 0.3 0.3 0.3 1.5 1.5 1.5 Support for Community Initiatives 0.1 0.5 0.5 0.5 0.5 0.5 0.6 3.2 3.2 3.2 Source Segregation 0.2 0.6 1 0.7 1 0.7 0.6 4.7 2.4 0.9 1.4 4.7 Primary Door to Door Collection 0.7 1 1 0.8 1 0.8 0.8 6.1 3.1 1.2 1.8 6.1 Collection Installation of Storage Bins 0.2 2 1 1 2 1 0.5 7.7 3.9 1.5 2.3 7.7 Vehicle tracking system 0.8 3 3 6.8 3.4 1.4 2.0 6.8 Secondary Collection & Vehicle Fleet 1.3 10 8 8 27.3 13.7 5.5 8.2 27.3 Transportation Transfer Stations Modernisation 0.0 0.0 Waste Minimization, Recycling 0.1 0.6 0.4 0.4 1.5 0.8 0.3 0.5 1.5 Integrated Waste Treatment 0.0 0.0 Disposal & Regional Sanitary Landfill Facility 15 20 13 48.0 24.0 9.6 14.4 48.0 Treatment Construction of Transmission Station 2 5 8 15.0 7.5 3.0 4.5 15.0 Project Development Assistance (5% of 0.2 1 2 0.2 0.5 2 0.5 6.4 6.4 6.4 the total) Grand Total 6.4 40.8 46.2 25.9 6.3 6.3 4.1 135.7 77.1 23.4 35.1 135.7 120 Visakhapatnam City Development Plan Table 8.6. Basic Services for the poor – City investment plan Poverty Sector - Investment Plan (2005-2012) - Rupees Crores Year Component Activity Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Total JNNURM 7 GOI GOAP IR/IF Total Development of database 0.80 0.80 1.00 2.60 2.60 2.60 Planning, Design and Implementation of 0.10 0.75 0.75 0.75 0.75 0.75 0.75 4.60 4.6 4.6 Reforms and Communication Strategy Institutional Baseline Survey 0.75 0.75 0.75 0.75 Strengthening Human Resources Development 0.10 0.75 1.50 1.50 1.50 1.50 1.50 8.35 8.35 8.35 Community Initiatives Support 0.50 0.50 0.50 0.50 2.00 2 2 Sub-Total 1.00 3.55 3.75 2.75 2.75 2.25 2.25 18.30 18.30 0.00 18.30 Water supply provision 48.45 130.64 159.03 159.44 162.00 130.50 57.75 847.81 423.91 423.91 0.00 847.81 Sewerage 17.10 71.70 91.80 88.80 87.60 74.70 431.70 215.85 215.85 431.70 Storm water drains 7.20 47.10 47.10 27.30 16.50 4.50 149.70 74.85 74.85 0.00 149.70 Traffic and Transportation 34.71 104.04 128.85 74.40 33.30 21.13 9.00 405.43 202.72 202.72 0.00 405.43 Housing and Infrastructure 150.00 600.00 580.00 125.00 1455.00 727.50 727.50 0.00 1455.00 Solid Waste Management 2.50 9.10 6.10 4.00 2.70 2.30 1.60 28.30 14.15 14.15 0.00 28.30 Sub-Total 259.96 962.58 1012.88 478.94 302.10 233.13 68.35 3317.94 1,658.97 1,658.97 0.00 3,317.94 Grand Total 260.96 966.13 1016.63 481.69 304.85 235.38 70.60 3336.24 1677.27 1658.97 0.00 3336.24 121 Visakhapatnam City Development Plan Table 8.7: Sector - Wise Investment Plan for 2005-2012 Year wise requirements ( Rs. in crores) Sector Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Total Water Supply 113.8 316.8 384.6 379 383 309.8 138.1 2025.3 Sewarage 41.4 176.8 229.1 214.2 211.4 179.5 4.9 1050.8 Traffic & Transporation (GVMC) 210.6 413 449.6 307.8 210 170.7 67.9 1829.4 Storm Water Drainage 18.3 116.4 116 66.8 40 12 1 370.3 Solid Waste Management 6.4 40.8 46.2 26.0 6.3 6.3 4.1 135.7 Basic services for the urban poor 261 966.1 1016.6 481.7 304.9 235.4 70.6 3336.2 Total Excluding MRTS 651.5 2029.9 2242.1 1449.5 1149.3 907.4 281.5 8747.7 MRTS 1500 1500 1500 1740 6240 Total Including MRTS 651.5 2029.9 2242.1 2949.5 2649.3 2407.4 2021.5 14987.7 Table 8.8: Financing Plan (Rs. In Crores) GOI GoAP ULB Sector Total (50%) (20%) (30%) Water Supply 1034.70 396.20 594.40 2025.30 Sewarage 531.70 207.60 311.50 1050.80 Traffic & Transporation 952.70 350.70 526.00 1829.40 Storm Water 195.70 69.90 104.80 370.30 Solid Waste 77.10 23.40 35.10 135.70 Management Basic Services for the 1677.30 1659.00 0 3336.24 Urban poor** Total Excluding MRTS 4469.2 2706.8 1571.8 8747.74 MRTS 3120.00 1248.00 1872.00 6240.00 Total Including MRTS 7589.2 3954.8 3443.8 14987.74 **In case of urban poor GoI and GoAP have 50% share each 122 Visakhapatnam City Development Plan Chapter-IX 9. Investment Finance Plan 9.1. FINANCIAL PERFORMANCE This chapter details the municipal finances of the Greater Visakhapatnam Municipal Corporation and the Visakhapatnam Urban Development Authority involved in the provision of services and outlines the receipts and expenditure over the last five years. • Greater Visakhapatnam Municipal Corporation • Visakhapatnam Urban Development Authority 9.1.1. Greater Visakhapatnam Municipal Corporation Municipal finances of GVMC have been reviewed for the last five years, commencing from the financial year 2000-01. For the purpose of analysis, the items of account have been categorized under the following major heads: Revenue Account All recurring items of income and expenditure are included under this head. These include taxes, charges, salaries, maintenance expenditure, etc. Capital Account Income and expenditure items under this account are primarily non- recurring in nature. Income items include loans, contributions by GoAP, other agencies and capital grants under various State and Central Government programmes. Expenditure items include expenses booked under developmental works. Financial status Capital Account Revenue income of Greater Visakhapatnam Municipal Corporation has 200 Amount in Rs. Crores grown to a level of INR 168 crores in the Expenditure financial year 2004-05 from INR 83 crores in 150 financial year 2000-01, the revenue income Income had registered an annual growth of 10.12 100 percent whereas the revenue expenditure 50 increased at an average annual rate of 9 percent. Thus indicating a surplus position, 0 during this period,GVMC consistently 00-01 01-02 02-03 03-04 04-05 maintained a revenue surplus. Capital income of GVMC comprises of loans, grants and contribution in the form of sale proceeds of assets and contribution. A major share of 123 Visakhapatnam City Development Plan capital income is from the Bulk Water Supply and Other Revenue Recipts. It is observed that capital expenditure has been inconsistent during the review period. During financial year 2004-05, capital expenditure had risen to INR 106.31 crores from INR 85.25 crores in the financial year 2003-04. This rise was primarily attributed to higher allocation for road works, and other capital expenditure as part of Visakhapatnam City improvement programme. The following sections provide an in depth review of the revenue and capital account, primarily aimed at assessing the municipal fiscal status and providing a base for determining the financial capacity of GVMC to sustain additional capital investment. Revenue account The revenue account comprises of two components, revenue income and revenue expenditure. Revenue income comprises of internal resources in the form of tax and non-tax items. External resources are in the form of shared taxes/transfers and revenue grants from the State Government. Revenue income The revenue sources of Grants GVMC can be broadly categorized Own source under three categories viz., own Assints Revenue sources, assigned revenues and grants. The base and basis of each income source has been further elaborated in the following section. Own Sources Own-source income includes income from resource mobilization activities of GVMC in the form of 00-01 01-02 02-03 03-04 04-05 taxes, Bulk Water Charges, fee for building permission, trade licenses, etc. Own revenue sources are further classified as tax and non-tax sources that are generated by various sections of the GVMC. Tax Sources The sections contributing tax income include Property Tax, Town Planning, Public Health. The General Taxation section is the largest revenue generating section and collects among other taxes, property tax and advertisement tax. Especially the water charges derived through Bulk and Semi Bulk that form a larger component of Revenue is collected by the Water Supply Department. Other sections collect charges and fees, as per the rules, towards services rendered by GVMC. Non-Tax Sources Non-tax sources include all non-tax revenues such as fees and charges levied as per the Municipal Act. Such revenue sources include income from special services, etc. The major sections/departments contributing non-tax income include Revenue Section Income from Town Planning Section, Dangerous & Offensive Trade Licence Fee, Births and Death Certificate and Income from Remunerative Enterprises. The essential features of this head of revenue income are listed below: 124 Visakhapatnam City Development Plan Income from own sources accounts for about 92 percent of revenue income, and has increased at an average rate of 15.79 percent per annum. Major items of own-source income, include property tax as follows: PropertyTax = 21%. Water Supply = 28% Source of Revenue Income (Average 2000-2005) Civic Infra Structure = 5% 21 Town Planning = 5% 38.19 Public Health = 1.25% Remunerative Enterprises = 1.56% Other Receipts = 38.19%. 1.56 Income through own-source heads that 28 contribute substantially towards revenue 1.25 5 income include: 5 P.T. W.S. C.I. T.P. P.H. R.E. O.R. Other Administrative Receipts: Income through other Receipts is in the form of magisterial fines, warrant & distrait fees, lapsed deposits and other sundry income. It also includes income from interest on investments and realization of past fixed deposits. These items together account for about 1 percent of revenue income. Property Tax/Water Charges: Income through property tax is based on the Annual Rental Value (ARV) of Property. It contributes about 23% of the Corporation’s Revenue. Water Charges contributes 30% of the Revenue income which is the largest and most elastic source of revenue. Town Planning: The income from the town planning section, excluding building regularization fees, accounts for about 5.02 percent of revenue income. Public Health: The Public Health section of GVMC generates income by way of dangerous and offensive (D&O) trade licence fees, and birth & death certificates. Income under this head contributes over 1.38 percent to revenue income. Remunerative Enterprises: The income generated through remunerative assets on average is about 1.71 percent of revenue income. Assigned Revenues Assigned revenues include revenues transferred to GVMC by the State Government (GoAP) under specific acts. Transfers are in the form of GVMC share of taxes levied and collected by GoAP from establishments/operations within the municipal limits. Surcharge on transfer of immovable properties, entertainment tax, and professional taxes are items on which these revenues are realised by GVMC. Transfers affected by GoAP during the last five years are presented in Table 9.1. Table 9.1: Assigned Revenue Income (Rs. in Crores) Items 2000-01 2001-02 2002-03 2003-04 2004-05 Entertainment Tax 3.41 3.17 3.61 2.31 2.13 Professional Tax 5.66 6.61 19.00 5.96 16.14 Surcharge on Stamp 9.26 5.37 14.75 16.28 17.53 Duty Total 18.33 15.15 37.42 24.55 35.80 Share in RI (%) 22.35 12.82 27.54 18.17 23.24 125 Visakhapatnam City Development Plan Income through assigned revenues contributes 24 percent of revenue income and has increased at an average rate of 8 percent per annum. It is observed from the above table that the inflow from this account head have been inconsistent due to delays in transfers and deductions at source towards to any outstanding. Professional tax is a fixed transfer amount per annum and other transfers are as per actual realization. Income through assigned revenue heads that contribute substantially towards revenue income include: Entertainment Tax: The Commercial tax (CT) Department collects entertainment tax from all cinema halls functioning within GVMC limits. The CT Department transfers 90 percent of the total tax collection to GVMC, and retains 10 percent towards management charges. Entertainment tax accounts for around 1.38 percent of total revenue income and has grown at an average rate of 1.92 percent per annum. Professional Tax: Professional tax is also collected by the Commercial Tax Department. Profession Tax accounts for about 10.48 percent of municipal income Stamp Duty: Surcharge on stamp duty is a major assigned revenue source, accounting for 20 percent of revenue income. It is levied in the form of a surcharge on stamp duty applicable on all properties registered or transferred within GVMC limits. The Registration Department collects this and 95 percent of the collections are transferred to GVMC. The proceeds from this source have registered an average annual growth of about 7.56 percent. Revenue Grants and Contribution The Corporation receives revenue grants and compensations from the State Government under various heads. The regular revenue grants are listed in Table 9.2, of which some items are fixed and are transferred on a quarterly basis. Other grant heads are for specific purposes; hence ad hoc in nature. Table 9.2: Revenue Grants (Rs. in Lakhs) 2000- 2001- 2002- 2003- 2004- Items 01 02 03 04 05 Per Capita Grant 0.60 0.30 0.98 5.01 0.59 Road Maintenance Grant 0.00 0.00 3.42 0.00 0.00 Compensation in Lieu of Octroi Compensation due to cont. to tax Payers Other Grants 0.01 0.20 0.22 0.01 0.10 Total 0.61 0.50 4.62 5.02 0.69 Share in RI (%) 0.75 0.42 3.40 3.72 0.44 126 Visakhapatnam City Development Plan Revenue expenditure Revenue Expenditure 60 Revenue expenditure of GVMC has 53.21 51.15 Items of Revenue Expenditure 49.67 been analysed based on expenditure 50 49.15 (Average of 2000-2005) heads broadly classified under the Rs. in Crores 40 following departments/sections of GVMC - General Establishment, Civic Infra 30 26.01 Structure,Street Lighting, Revenue, 28.84 29.45 30.56 29.66 27.74 Education, Public Health, Pension 20 Contribution, Conservancy, Engineering Establishment 10 5.45 Remunerative Enterprises, and Town 1.92 Debt Servicing 0.67 Contingencies / O & M 0.62 5.35 Planning & Urban Community 0 Development (UCD). Revenue 2000-01 2001-02 2002-03 2003-04 2004-05 expenditure is further classified under Establishment Contingencies/O&M Debt Servicing establishment and contingencies (O&M). Besides the above items of expenditure and debt servicing constitute a substantial proportion of revenue expenditure. Application of funds by each sector is presented in Diagram Establishment expenditure accounts for 18 percent of revenue expenditure. Debt servicing accounts for a major share of about 6.5 percent of the revenue expenditure. Analysis of heads under revenue expenditure has been carried out with regard to establishment, operation & maintenance, and debt servicing. The following sections detail the same. Establishment Expenditure Establishment expenditure of all sections accounts for over 18 per cent of total revenue expenditure (include debt servicing). The salary bill alone of GVMC, during financial year 2004-05, was INR 27.75 crores. Operation and Maintenance Expenditure Operation and maintenance expenditure of all section together accounts for 60 percent of revenue expenditure. The total O&M expenditure during financial year 2004-05 was INR 50 crores. Debt Services 1. GVMC had given a loan of Rs.60 Crores with the interest of 10% PA in the year 2003- 04 to APIIC Ltd. and had invested Rs.7.50 crores in VIWSCO during the year 2003-04. 2. GVMC had cleaned its loan with LIC in the year 2004-05. 3. During the year 2003-04 GVMC had issued Tax Free and Taxable Bonds to the tune of Rs. 65 crores. The details of the payments is as follows: Principal Amount : Rs.65.00 Crores Interest : Rs.29.20 Crores (upto the year 2010-11) Total Repayment : Rs.94.20 Crores Interest already paid : Rs.94.20 Crores (upto the year 2010-11 Interest already paid : Rs. 7.18 Crores th (upto 30 Sep 2006) 127 Visakhapatnam City Development Plan Capital Income Capital income comprises loans, grants and own contributions. During the year 2003- 04 the total Capital Receipts were Rs.91.73 Crores. The analysis indicates that 70.86% is constituted by income from Bonds issued. 9.81% is from Water Supply 3.61% from land grants and 15.72% from Other Receipts. During the year 2004-05 the total capital receipts were Rs.313.92 Crores and the analysis indicates that 40% is constituted by income from Water supply and 17.75% from Plan Grants. This indicates the increasing trend in Capital Receipts from Water Supply and the Plan Grants are also in the same direction of increase year by year. Capital Expenditure Capital Expenditure comprises of Expenditure towards Public Health, Remunerative Enterprises, Water Supply, Drainage, Street Lighting, Interest on Bond Issue etc., During the year 2004-05 an amount of Rs.4.79 Crores was paid towards interest on bonds. Table 9.3 :Key Financial Indicators Items 2000-01 2001-02 2002-03 2003-04 2004-05 Operating Ratio 0.69 0.69 0.57 0.36 0.49 Capital Utilization Ratio 0.24 0.25 0.13 0.51 0.56 Share of Establishment Cost 50 34.11 35.71 37.80 34.14 % Revenue Spent on 36 24.52 22.08 22.95 18 Establishment Debt Servicing % of Income 2.36 4.61 0.49 0.46 3.47 Key Issues and Conclusions The following issues emerge from the above analyses carried out on the municipal finances of GVMC. Revenue account status There is Revenue surplus every year and it is increasing year by year. The Revenue Surplus was increase to Rs. 71.67 Crores in the year 2004-05 from that of Rs.52.71 Crores in the year 2003-04. The increase in this surplus is about 35.97% . the increasing trend of Revenue surplus is a very healthy sign of the organisation and consider to be financially in sound position. Revenue income GVMC is generating about 77% of total Receipts from its own sources which is a healthy sign. Dependency on grants is as low as 0.44%, which is lesser than 1%. Remaining 22% revenue income is by of Assign Revenues i.e. from VLT,Stamp Duty, Road Cutting Charges, P.S.Charges, Entertainment Charges etc.,. the percentages clearly shows that the Corporation not dependent on others and its own sources are sufficient to meet its expenses and is sailing smoothly. The Property Tax Collection has increased to Rs. 35.01 Crores during the year 2004- 05 from that of Rs.28.30 Crores during the year 2003-04. There is 18.61% increase in Property tax collection during the year 2003-04 when compared to its previous year i.e. 2002- 03. 128 Visakhapatnam City Development Plan During the year 204-05 there is an increase in assign Revenues and other Receipts to the tune of Rs 6.78Crores i.e. about 0.17% Revenue Receipts when compared to the year 2003-04. Decrease in Revenue Expenditure Total Revenue Expenditure for the year 2004-05 as decrease by Rs.4.51 Crores when compared to that of 2003-04. This indicates that there is a Decreased Trend in Revenue Expenditure due to Cost Reduction Techniques. Establishment Expenditure: Establishment Expenditure compared with Revenue Receipts decreased from Rs.30.75 Crores (23%) of 2003-04 to Rs.27.75 Crores (18%) of 2004-05 that is about 5% decrease in Establishment Expenditure. Capital Expenditure: The Capital Expenditure is on the increase in side that indicates that the Corporation is investing more on Capital Assets which is a good sign. By invest in Capital Assets the Corporation is incresing Assets base and in future the Capital Assets will have appreciation in its values and the NetWork of the Corporation will increase. Conclusion: Reduction in some Expenditure by introducing Cost Reduction Techniques and increase in Revenue Receipts and Surplus in Revenue Receipts clearly indicates that the Corporation is Financially is very Strong and will become more stronger in future. 9.1.2. Visakhapatnam Urban Development Authority This section details the financial performance of Visakhapatnam Urban Development Authority (VUDA) during the last five years. The VUDA generates its revenue through development charges and other levies. In addition, capital income to VUDA is through government grants and sale of lands under its possession. A brief summary of the income and expenditure account of VUDA from financial year 2000-01 to 2004-2005. During the last five years there has been substantial increase in the Development charges, rents, and income from the recreational items etc. However, with the decrease in the interest & miscellaneous receipts from Rs. 1014 lakh in 2002-03 to Rs. 393 lakh in 2004-05. Income Revenue income has increased substantially from Rs. 405.29 Lakhs to Rs.1285.43 Lakhs from 2000 to 2005, an increase of more than three times. The increase in the Revenue income is due to interest, other miscellaneous, rent receipts and other general receipts Expenditure The expenditure of the VUDA increased from Revenue Account Rs. 547.47 Lakhs in 2000-01 to Rs. 979.93 2500 lakhs in 2004-05, an increase of 100%. The Expenditur Amount in Rs.Lakh major expenditure items are salaries, 2000 e contingencies and repairs & Maintenance. 1500 Incom e Salaries, pension and other establishment charges contribute 58% and other repairs & 1000 maintenance works contributes 22 %. 500 0 00-01 01-02 02-03 03-04 04-05 129 Visakhapatnam City Development Plan Capital Income Capital income comprises sale of sites, houses and contribution from other agencies and meager grants from the Government.VUDA is also getting income due to grounding of certain major projects during 2004-05. Capital Expenditure Capital expenditure comprises expenditure on land acquisition, spill over works ,new works. The expenditure has been increased from 1149.32 to 1646.78 Lakhs with an increase of 25%. Major works are grounded in the year 2004-05 towards housing schemes,sites and services , road widening etc., Capital Account 6000 Amount in Rs.Lakh Expenditure 5000 Income 4000 3000 2000 1000 0 00-01 01-02 02-03 03-04 04-05 9.2. INVESTMENT SUSTENANCE 9.2.1. GVMC In order to assess the investment sustaining capacity of GVMC, the municipal fiscal situation is simulated through a Financial Operating Plan (FOP). The FOP is essentially a multi-year forecast of municipal finances for a term of 7 years (table 10.5). It is used to forecast revenue income and operating expenditure (revenue expenditure) for the period between financial year 2005-06 and financial year 2011-12. Following are important assumptions towards simulating the municipal fiscal situation, and include both existing and new resources. The CIP abstract is given in table 10.4 Base case scenario - Income considerations In “do nothing “scenario following assumption was made; No revision in taxation from financial year 06-07; Maintaining the same collection efficiency over the forecast period; Growth in other revenue income items based on past performance and/or likely growth; An enhancement of property tax by 80Cr due to merges of Vizag Steel Plant into city area is considered. Base case scenario - Expenditure considerations Establishment expenditure assumed to increase at rate of 9% per annum for GVMC 130 Visakhapatnam City Development Plan O& M to grow based on past performance and/or likely growth; Additional O&M due to the new investment was considered; Repayment commitments of all outstanding debt liabilities like bonds etc. With Reforms scenario - Income considerations Property tax revision (Rationalization) by 15% in financial year 2006-07 and Revision of property tax current valuation method to Unit Area method from FINANCIAL YEAR 2006-07 and there on every year 15% increase is assumed; Improving the tax collection efficiency from the current level to the minimum of 85 % of current demand and 50% of arrear demand; Growth in other revenue income items based on past performance and/or likely growth; Introduction of conservancy fee in addition to the bulk garbage collection charges to households to a minimum of Rs. 10 per month per households; Identifying more areas for parking and increasing the parking fee With Reforms scenario - Expenditure considerations Establishment expenditure assumed to increase at rate of 9% per annum for GVMC O& M to grow based on past performance and/or likely growth; Repayment commitments of all outstanding debt liabilities like bonds etc. An enhancement of property tax by 80Cr due to merges of Vizag Steel Plant into city area is considered. Table 9.4 City investment plan – Sector-wise investment plan for 2005-2012 Sector Year wise requirements ( Rs. in crores) Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Total Water Supply 113.8 316.8 384.6 379 383 309.8 138.1 2025.3 Sewarage 41.4 176.8 229.1 214.2 211.4 179.5 4.9 1050.8 Traffic & Transporation (GVMC) 210.6 413 449.6 307.8 210 170.7 67.9 1829.4 Storm Water Drainage 18.3 116.4 116 66.8 40 12 1 370.3 Solid Waste Management 6.4 40.8 46.2 26.0 6.3 6.3 4.1 135.7 Basic services for the urban poor 261 966.1 1016.6 481.7 304.9 235.4 70.6 3336.2 Total Excluding MRTS 651.5 2029.9 2242.1 1449.5 1149.3 907.4 281.5 8747.7 MRTS 1500 1500 1500 1740 6240 Total Including MRTS 651.5 2029.9 2242.1 2949.5 2649.3 2407.4 2021.5 14987.7 131 Visakhapatnam City Development Plan Table 9.5 : Investment SUSTENANCE (Rs. In Crores) 2005- 2006- 2007- 2008- 2009- 2010- 2011- 06 07 08 09 10 11 12 Without Reform Revenue Income 172 198 227 262 301 346 399 Revenue Expenditure 78 98. 107 118 130 143 157 Investable Surplus 94 100 120 144 171 203 242 With Reforms Revenue Income 172 282 308 336 401 439 490 Revenue Expenditure 78 98 107 115 125 135 145 Investable Surplus 94 184 201 221 276 304 345 FINANCIAL OPERATION PLAN (FOP) The GVMC has taken into consideration the overall revenue sources and feasibility of collection in all aspects while preparing its financial operation plan as a part of city development strategy (CDS) estimated to reach its goal in near future. The financial planning process in the present FOP of GVMC for over 7 years involves a trade off between the financial situation and required levels of services and infrastructure. This process is initiated by estimating the needs and the resources vice versa. The sources of funding are identified for the additional capital expenditure required by augmentation of internal resources as well as the expected level of funding assistance from The Government of India. The FOP of the GVMC is proposed with reference to requirements of funds after due identification of potential sources and after arriving at the overall affordability in all respects. Taking all the factors into consideration the following 6 years financial plan with statistical information is arrived. 132 Visakhapatnam City Development Plan Table 9.6 : Annualised investment plan (Rs. in crores) Total 2005- 2006- 2007- 2008- 2009- 2010- 2011- Financing Options Requirement 06 07 08 09 10 11 12 1. GVMC 2495 160 512 555 453 386 310 118 2. Governement of Andhra Pradesh 3. Financing Institution 4. Capital Market 5. Off-Shore financing 1663 107 341 370 302 257 207 79 6. Government of India 4159 267 854 926 756 643 517 197 Total Excluding 8317 533 1707 1852 1511 1285 1035 394 MRTS 7. Government of India 1248 300 300 300 348 (MRTS) 20% 8. Private Funding 4992 1200 1200 1200 1392 (MRTS) 80% MRTS 6240 1500 1500 1500 1740 Total 14557 533 1707 1852 4511 4285 4035 3874 In order to achieve an overall development of the city of Greater Visakhapatnam the Greater Visakhapatnam Municipal Corporation is estimated to be successful in extending its financial share out of its own funds to a tune of Rs. 2,495 Crores through mobilization of its internal resources in the coming 6 years plan. It is also estimated that an amount of Rs. 1,663 Crores would be mobilized through the financial institutions, off share financing and Capital marketing as a partial component of financial resource for the development of the city of Visakhapatnam. The Greater Visakhapatnam Municipal Corporation solicits an extended funding support from The Government of India to a tune of Rs. 4,159 Crores for the development of all required infrastructure to achieve its goal to make the city destiny to be a world class city in the Global contest. The Greater Visakhapatnam Municipal Corporation also expects a financial support of Rs. 1,248 crores for grounding and development of Multi Railway Transport System (MRTS) in addition to an expected funding of Rs. 4,992 crores from the private sector. The above Financial Operating Plan (FOP) of Greater Visakhapatnam Municipal Corporation with an expected out come of city development in all respects with a budget of Rs. 14,557/- crores in coming seven years is submitted for kind consideration of Government of India to make the dream of citizens of Greater Visakhapatnam Municipal Corporation come true in near future. 133 Visakhapatnam City Development Plan ANNEXURE – 1 : LIST OF MAJOR INDUSTRIES IN THE CITY BRIEF PARTICULARS IN RESPECT OF MAJOR INDUSTRIES LOCATED WITHIN AND IN CLOSE PROXIMITY OF THE CITY Name Year of Products Establishment Heavy Industries Visakha Steel Plant 1989 Steel Hindustan Shipyard 1952 Shipbuilding Hindustan Petroleum Corporation 1957 Crude oil refinery Limited Large Scale Industries Coromondal Fertilizers 1967 Fertilizers. Bharat Heavy Plates and Vessels 1971 Pressure vessels, boilers, heat exchange columns Hindustan Polymers 1973 Ethyl alcohol, Styrene, Polysterene Hindustan Zinc 1977 Zinc, lead, silver cadmium, sulphuric acid Medium Industries Union Carbide 1971 Shrimp processing Coastal Chemicals 1970 Alum Andhra Duncan Cement Company 1979 Slag cement Pragati Fertilizers 1983 Super Phosphate Andhra Oxygen Limited 1982 Oxygen, Acetylene Aqua Marine Products 1982 Processed Fish Andhra Drinking Limited 1983 Aerated Water, Soft drinks, juices 134 Visakhapatnam City Development Plan ANNEXURE-2 LIST OF HERITAGE SITES IN THE CITY. The various cultural and heritage sites which are available in the city and in close proximity contributing to the tourism initiatives are given in the Annexure. List of Heritage Sites in the City  Town Hall (GVMC)  Masenic Lodge  St. Allosis School  Victoria status  KGH  Callectorate  District Court  Hawa Mahal (old Visakha woman college)  Old Bunglow (opp to swagruha flats) Mukherjee house  Railway Guest House (near China Waltair)  Rani Chandramathi Devi hospital  Kurupam monuments  Kali temple  Kanakamahalakshmi temple  Visakha museum  Queen Mary's school  Christian cemetery near Jagadamba  Waltair Club Building  Jaganadha Swamy temple  Siva temple (Jagadamba junction)  Circuit house  Appikonda - Shnhachalam Temple  Church on hill top  Kottavadhi Dargah Church  Kottavadhi church  Venketeshwara temple  Vikramadevi Varma College Building (AU campus) 135 Visakhapatnam City Development Plan ANNEXURE-3 TOURIST ATTRACTIONS IN THE CITY Tourist attraction what is on offer R k Beach Parks, an aquarium and war memorials Three Hillocks A Roman Catholic Church, built in 1864, lies atop the Rose Hill; the temple of the Hindu God Venkateshwara was built in 1886 on top of the Venkatesh Konda; and on top of Dargakonda lies a mosque. Kailasa Giri Park located on a hilltop gives a bird’s eye view of the city. Larger than life idols of shiva and Parvati adorn the hill. Submarine Museum The submarine built by Russia served for 31 years before it was decommissioned and retired from Defence services. Matsya Darshini Aquarium managed by a private firm; has fish from all over the world. Indira Gandhi Zoological The zoo spread over 425 acres has a varied collection of wild species Park and is home for over 400 varieties of animals. th Simhachalam Historic temple built in the 11 Century is the abode of Lord Varaha Narasimha Swami. Located on hilltop at a height of 244 meters. nd th Thotlakonda Buddhist Dating back to 2 Century BC to 7 Century AD, situated 15 kms from Complex the city, the complex has a number of Stupas, Chaityas, Viharas, a congregation hall and a refectory belonging to the Hinayana School. Bojjannakonda Located in Sankaram – 8 kms from Anakapalli. Has an array of Buddhist constructions made of stone believed to be made during Mahayana period. Araku A haven for tourists with attractions like botanical gardens, tunnels, coffee plantations, caves, water falls, natural rock formations and a tribal museum. Borra Caves Situated at around 90 Kms from the city, Borra caves were discovered in 1807. The rocks at the caves date back to a million years. Deep in the illuminated caves, there is a Shivalingam and an idol of Kamadhenu. Eco Tourism Jungle Bells is a nature camp launched in the eastern ghats (85 kilometres from Visakhapatnam). The attractions include bird watching, rock climbing, trekking and archery. Tribal Craft Village, Araku Crafts of the tribals of Andhra Pradesh, Orissa, Chattisgarh and Madhya Pradesh are displayed and sold. 136 Visakhapatnam City Development Plan ANNEXURE-4 PROFILE OF THE WATER SUPPLY SYSTEM Public taps : 6759 House Service connections : 53935 General : 33703 NSDP. : 4780 Jeevandhara : 4641 Amrutharnm : 4670 Taps for BPLfamilies : 9163 Metered Residential Connections : 3834 Commercial Connections : 544 (Hotels, restaurants, Hospitals, etc.) Semi Bulk connections : 597 (Apartments, Govt. Institutions & Group Housing) Bulk : 63 Bore Wells : 3043 Pilot Water Supply schemes in the un-served areas : 62 No. of distribution reservoirs : 58 Total storage capacity of reservoirs (lack gallons) : 535.95 Rate of water supply to domestic sector by V.M.C. : 70.0Lpcd Through private Bore Wells / Open Wells : 58.00Lpcd Distribution network coverage : 85% Distribution Pipe lines ranging from 100 mm to 600 mm : 940KM Trunk Mains ranging from 300 mm to 1600 mm : 260KM No. of Pumping Stations : 41 Hours of supply in the domestic sector : 45’ Tankersin use to meet unserved areas : 22 No of trips per day (on average) : 192 Quantumof water supplied through tankers : 1390 kl. 137 Visakhapatnam City Development Plan ANNEXURE - 5 PROPOSED HOUSING UNITS IN VARIOUS LOCATIONS Sl. Name of The Locations No.Of Units No 1 Gvmc (Urban) 22920 2 Gajuwaka 7000 3 Madhuravada 2500 4 Paradesipalem 550 5 Kommadi 120 6 Pm Palem 400 7 Bakkanna Palem 210 8 Yendada 800 9 Gudlavani Palem 1000 10 Pendurthi 2000 11 Pulagani Palem 500 12 Chinnamushriwada 1000 13 Lakshmi Puram 300 14 Vepagunta 1500 15 Pursothapuram 100 16 Porlu Palem 200 17 Adivivaram 1500 18 Anganampudi 1000 19 A Marripalem 200 20 Manthri Palem 300 21 Duvvada 1000 22 Vedulla Narava 300 23 Nanginarapu Padu 100 24 Gangavaram 50 25 Lankela Palem 1000 26 Desipathruni Palem 100 27 Narava 500 28 Yallapuvani Palem 400 29 Sathivani Palem 800 30 Devada 200 31 Chinnipalem 150 32 Kt Naidu Palem 600 33 Appikonda 300 34 Palavalasa 400 Grand Total 50000 138 Visakhapatnam City Development Plan ANNEXURE 6 : FINANCIAL DETAILS OF GVMC Table A-1 : Financial Status at a Glance (GVMC) Rs.in Lakh Items 2000-01 2001-02 2002-03 2003-04 2004-05 A- Revenue Acount Income 8119.98 11820.55 13585.33 13504.92 14979.16 Expenditure 5676.70 8457.49 8354.16 8233.39 7491.49 A-Surplus/Deficit 2443.28 3363.06 5231.17 5271.53 7487.67 B- Capital Account Income 147.67 470.44 953.97 9173.44 1521.98 Expenditure 1830.25 3468.53 1239.45 8525.48 10632.51 B- Surplus(Deficit) (1,682.58) (2,998.09) (285.48) 647.96 (9,110.53) C- Overall Status (A+B) 760.70 364.97 4,945.69 5,919.49 (1,622.86) Net Surpuls-Exclusive 760.70 364.97 4945.69 5271.53 7487.67 Revenue Transfers. Source: GVMC Annual Accouts, Figures in parenthesis indicate negative. Table A-2 : Source- Wise Revenue Income (GVMC) Rs.in Crores Items 2000-01 2001-02 2002-03 2003-04 2004-05 Own Sources 54.17 93.34 85.14 94.85 104.55 Assigned Revenue 18.50 16.00 38.00 25.00 36.00 Grants 8.33 8.66 11.86 16.15 9.45 Total 81.00 118.00 135.00 136.00 150.00 Table A-3 : Revenue Income from Own Sources (Taxes and Non Taxes) (GVMC) Rs.in Crores Items 2000-01 2001-02 2002-03 2003-04 2004-05 General Taxation 20.09 26.39 24.85 29.20 35.02 General Admin. 0.19 1.53 1.93 3.02 1.40 Civic Infrastructure 2.93 7.08 3.49 1.40 7.65 Water Supply & Drinages 25.77 47.00 44.03 45.73 45.85 Town Planning 2.91 4.84 4.40 8.05 7.73 PH & Sanitation 0.13 0.91 0.66 2.11 2.12 Remunerative enterprises 2.15 2.75 2.53 3.32 2.64 Other Receipts 0.00 2.79 3.07 1.83 1.86 UCD Section 0.00 0.05 0.18 0.19 0.28 Total 54.17 93.34 85.14 94.85 104.55 Share in RI (%) 66.88 79.10 63.07 70.25 69.67 Annual gr.rate (%) 12.22 (16.03) 7.18 (0.58) 139 Visakhapatnam City Development Plan Table A-4 : Sector Wise Application of Revenue Expenditure (GVMC) (Rs.in Crores) Items 2000-01 2001-02 2002-03 2003-04 2004-05 Establishment 28.84 29.45 29.66 30.56 27.74 Contingencies/O & M 26.01 49.67 53.21 51.15 41.82 Debt Servicing 1.92 5.45 0.67 0.62 5.35 Total 56.77 84.57 83.54 82.33 74.91 Table A-5 : Section Wise Esablishment Expenditure (GVMC) (Rs. in Lakh) Items 2000-01 2001-02 2002-03 2003-04 2004-05 General Taxation 180.62 178.64 190.65 14.93 5.30 General Admin. 73.70 103.89 272.71 438.48 348.64 HW Mayors Office 6.30 1.73 14.67 11.73 0.42 Comm. -Engg. 838.52 851.95 791.20 889.50 802.76 Street Lighting 0.00 0.00 0.00 0.00 0.00 Horticulture Section 27.81 27.94 29.67 30.01 35.22 Town Planning 62.32 68.75 49.60 65.94 74.26 Veterinary Section 18.49 20.42 21.72 23.61 22.48 Public Health 1294.32 1268.04 1306.99 1452.63 1364.84 UCD Pilot Project 81.79 81.62 86.15 90.06 79.97 Others 301.08 342.02 203.41 40.02 41.06 Pension Total 2884.95 2945.00 2966.77 3056.91 2774.95 Share in RE (%) 50.82 34.82 35.51 37.12 33.74 Annual gr. Rate (%) (16.00) 0.69 1.61 (3.38) Table A-6 : Section Wise O & M Expenditure (GVMC)( Rs.Lakh) Items 2000-01 2001-02 2002-03 2003-04 2004-05 General Taxation 0.94 1.20 4.01 7.88 8.67 General Admin. 336.40 168.61 110.48 147.66 166.78 HW Mayors Office 0.25 0.28 3.40 4.80 5.62 Comm. -Engg. 1361.40 2710.71 2572.31 2622.58 2742.61 Street Lighting 475.02 881.22 723.31 812.43 881.07 Horticulture Section 71.50 64.54 75.23 85.97 47.81 Town Planning 15.39 9.59 2.74 21.65 10.18 Veterinary Section 4.80 2.07 6.36 7.50 5.52 Public Health 307.39 213.99 193.38 39.64 107.68 Sports Section 22.49 3.27 7.14 18.23 17.38 UCD Pilot Project 5.78 14.57 41.84 47.64 108.00 Others 0.00 897.00 1581.00 1300.00 81.00 Total 2601.36 4967.05 5321.20 5115.98 4182.32 Share in RE (%) 45.82 58.66 63.94 62.13 55.83 Annual gr. Rate (%) 12.84 5.28 (1.81) (6.30) 140 Visakhapatnam City Development Plan Table A-7 : Capital Income Rs.Lakh (GVMC) 2000-01 2001-02 2002-03 2003-04 2004-05 Items loans Unsecured 6500.00 Loans/Bonds/Debentures Grants From Government NSDP and PVP 76.34 NRY and SJSRY 179.00 MP Grant 47.25 6.76 100.00 LCS 75.00 236.89 Road Grant 342.25 Others 147.65 423.19 604.96 2343.10 1185.09 Total Capital Income 147.65 470.44 953.97 9173.44 1521.98 Table A-8 : Capital Expenditure Rs Lakh (GVMC) Application of Funds 2000-01 2001-02 2002-03 2003-04 2004-05 Total Capital Income 147.65 470.44 953.97 9173.44 1521.98 Purchase of Equipment 45.12 241.06 181.31 159.30 147.66 Roads and Bridges 545.76 1303.13 213.24 310.14 570.98 Godavari Water Supply 0.00 0.00 0.00 6301.10 7249.78 Project PH Department 171.39 142.87 39.64 107.68 366.15 Others 1067.98 1781.47 805.26 1647.26 2297.94 Total Capital Expenses 1830.25 3468.53 1239.45 8525.48 10632.51 Capital A/c Status (1,682.60) (2,998.09) (285.48) 647.96 (9,110.53) 141 Visakhapatnam City Development Plan Table A-9 : Projected Revenue Surplus for GVMC (Rs.Crores) Without Reform Revenue Income 172 198 227 262 301 346 399 Revenue Expenditure 78 98. 107 118 130 143 157 Investable Surplus 94 100 120 144 171 203 242 With Reforms Revenue Income 172 282 308 336 401 439 490 Revenue Expenditure 78 98 107 115 125 135 145 Investable Surplus 94 184 201 221 276 304 345 Table A-10 : Detailed Municipal Accounts (Rs.in lakh) Head of Account 2000-01 2001-02 2002-03 2003-04 2004-05 Summary of Municipal Accounts Receipts 1. Revenue Account 8119.98 11820.55 13585.33 13504.92 14979.16 2. Capital Account 147.67 470.44 953.97 9173.44 1521.98 3. Advances and Deposits 0.00 0.00 0.00 0.00 0.00 Grand Municipal Income 8267.65 12290.99 14539.30 22678.36 16501.14 Expenditure 1. Revenue Account 5676.70 8457.49 8354.16 8233.39 7491.49 2. Capital Account 1830.25 3468.53 1239.45 8525.48 10632.51 3. Advances and Deposits 0.00 0.00 0.00 0.00 0.00 Grand Municipal Expenditure 7506.95 11926.02 9593.61 16758.87 18124.00 Municipal Account Status 760.70 364.97 4,945.69 5,919.49 (1,622.86) 142 Visakhapatnam City Development Plan Table A-11 : GVMC Financial Status - Expenditure (Rs. In Lakhs) S. Details of Account 2000-01 2001-02 2002-03 2003-04 2004-05 No. I EXPENDITURE-REVENUE GENERAL ADMINISTRATION Office Staff 1018.19 917.05 2422.31 2904.27 2774.64 Hon. To Mayor/Councilors 2.74 1.72 14.68 117.34 0.42 Commissioner Est. 4.39 4.42 0.00 0.00 0.00 Collection Staff 208.44 206.59 190.66 14.97 5.3 Contributions toPF&other Conts. 1.40 3.73 90.55 0.00 0.00 T.A. all Est. 4.04 10.99 3.40 10.60 14.42 Study Tours 0.00 0.15 0.00 5.95 8.72 Election Exp. 70.44 6.14 0.00 0.13 3.99 CONTINGENCIES Postage, Printing & Stationery 2.74 3.15 20.25 38.90 22.31 Stationery & Forms 3.60 64.14 0.00 0.00 0.00 Repairs to Build. F&F, Vehicle Etc. 300.94 55.83 0.00 40.25 107.6 Computer Exp. 0.70 14.83 23.72 19.96 27.36 Maint Tele, Cell, Wireless 0.00 0.00 39.83 52.52 63.52 Maint.of Roads,Bld.Traf.Sig.Parks Etc. 107.04 1174.75 797.48 627.45 861.75 NMR Wages 12.12 13.07 0.00 0.00 0.00 Investments 0.00 210.00 1350.00 633.12 165.7 Supply of Uniforms & St Charges 15.82 31.50 26.68 15.15 28.37 Rent for Sanitation Vehicles 0.00 0.00 204.00 283.96 328.64 Garbage Disp / Private Sanitation 232.19 552.90 199.45 126.97 236.31 Malaria / Fly Control Eqp. 11.19 14.22 0.00 0.00 9.26 Conservancy Materials 31.21 37.29 0.00 0.00 53.56 Other contingencies 1228.31 1695.39 624.19 680.88 334.7 Grand Total (General Exp) 3255.50 5017.86 6007.20 5572.42 5046.57 STREET LIGHTING Staff 96.05 68.92 0.00 0.00 0.00 Lighting Charges 231.77 570.76 691.32 723.84 667.43 Maint. Of St. Lights 23.66 141.59 29.20 87.34 113.64 N.M.R Wages 13.67 1.00 0.00 0.00 0.00 Bild (CC Charges) 101.98 0.00 0.00 0.00 0.00 Other Maintenance 7.89 98.95 2.79 1.25 0.00 Grand Total (St Lighting) 475.02 881.22 723.31 812.43 781.07 WATER SUPPLY W.S Staff Salaries 389.07 409.92 863.10 727.92 0.00 Rep.& Mat(Buld,Pump,Etc.,) 327.64 548.46 400.72 718.81 510.65 CC Charges 974.03 0.00 0.00 0.00 902.23 NMR Wages 1.71 0.00 0.00 0.00 0 Repayment of Loan & Interest 0.00 0.00 67.40 0.00 0 Other contingencies 52.66 1036.38 42.00 10.70 0 1745.11 1994.76 1373.22 1457.43 1412.88 DRAINAGE 143 Visakhapatnam City Development Plan Drainage/UGDS Staff Salaries 13.50 3.72 0.00 0.00 0.00 R & M to Drains & Vehicles 29.44 92.69 70.09 165.82 201.55 NMR Wages 0.12 0.05 0.00 0.00 0.00 Other contingencies 3.94 0.00 0.00 0.00 43.06 100.40 70.09 165.82 201.55 Grand Total (W.S. & Drainage) 1788.17 2095.16 1443.31 1623.25 1614.43 TOWN PLANNING Est & Other Staff Salaries 30.05 68.49 49.60 65.94 0 NMR Wages 32.80 0.26 0.00 0.00 0.00 Law Charges 5.03 8.05 0.00 0.00 0.00 VUDA Charges 0.00 280.67 0.00 0.00 0.00 Debris Removing Charges 8.08 5.51 2.74 21.65 10.18 Other contingencies 7.31 4.08 0.00 0.00 0.00 Grand Total (Town Planning) 83.27 367.06 52.34 87.59 10.18 U.C.D.P A/C Est Salaries 68.96 81.62 86.16 90.06 0 T.A. to Est. 0.10 0.21 0.00 0.00 0 Leave Salary Contribution 0.20 0.19 0.00 0.00 0 Print & Stan 0.87 0.09 0.38 7.29 0.15 Advertisement 2.18 0.85 0.00 0.00 0 Printing Press Mat 0.07 0.81 0.00 0.00 0 Health Activities 0.16 0.00 0.00 25.88 21.06 Other contingencies 0.63 7.97 41.46 14.47 16.67 Economic Supp Prog 1.57 4.45 0.00 0.00 1.36 Grand Total (U.C.D.P) 74.74 96.19 128.00 137.70 39.24 Grand Total (Town Pl / UCDP) 158.01 Grand Total (Revenue Exp) 5676.70 8457.49 8354.16 8233.39 7491.49 II EXPENDITURE-CAPITAL GENERAL A/C Const of Buildings 8.72 19.97 26.30 40.03 123.97 Furniture & Equip 21.58 31.13 19.31 17.65 4.02 Computers 0.00 18.79 29.83 66.54 32.01 Purchase of Vehicles 9.54 0.00 1.82 0.00 105.21 39.84 69.89 77.26 124.22 265.21 Formation of Roads 228.07 247.47 191.25 236.26 408.86 Const of Bus Shelters 0.00 0.49 0.00 0.00 0 SC. ST. W & CHE MF 18.83 6.32 2.37 5.33 15.23 Traffic Signals 0.00 0.94 5.43 0.00 0 Erection of Statues 18.79 2.26 0.58 0.00 0 R.O.B 0.00 17.97 0.00 0.00 14.74 Bridges & Culverts 98.42 103.57 21.99 73.88 111.30 Road Widening Scheme 196.06 770.15 0.00 0.00 0 Beach Road Spl Works 0.05 33.54 0.00 0.00 0 Other Expenses 4.90 8.67 57.06 227.58 199.88 565.12 1191.38 278.68 543.05 750.01 EDN & ELE OTHER ED Building 0.00 10.08 0.00 0.00 0.00 Furniture 0.00 18.12 0.00 0.00 0.00 0.00 28.20 0.00 0.00 0.00 144 Visakhapatnam City Development Plan PUBLIC HEALTH Purchase of Mach & Plants&Eqp 0.92 0.70 0.00 0.00 Elec Crematorium / Burial Grounds 7.98 10.16 8.61 7.32 Latrines & Bathrooms 65.71 52.96 28.00 23.08 52.86 Dhobi Khanas 0.00 10.59 0.07 2.27 0.81 Purchase of Vehicles 27.99 26.50 0.00 0.00 0 Low Cost Sanitation 53.60 21.38 2.90 61.34 296.42 Other Purchases 0.03 8.03 0.06 0.00 1.73 Other Expenses 15.16 12.55 0.00 13.67 14.34 171.39 142.87 39.64 107.68 366.16 REMUNERATIVE ENTERPRISES Com Halls / Compound Walls 18.05 10.98 2.95 47.69 11.98 Const of Shoprooms & Markets 35.75 104.06 34.29 5.06 51.71 Modern Slaughter House 0.00 1.55 0.09 0.20 0 Parks & Gardens / Museums 68.60 63.33 55.76 63.40 34.99 Tree Plantation 2.90 1.21 19.47 22.57 0.4 Kalyana Mandapam 12.25 36.41 4.15 9.18 0.79 Stadiums 2.34 18.00 2.78 0.62 0.12 M.P. Grant Works 3.08 0.00 44.67 63.30 6.92 Other Expenses 6.39 72.53 11.94 51.27 2.14 149.36 308.07 176.10 263.29 109.05 Grand Total (Gen Cap) 925.71 1740.41 571.68 1038.24 1490.43 STREET LIGHTING Modern Lighting 75.79 50.41 94.47 47.88 46.00 Ordinary Lighting 0.00 42.57 0.00 0.00 0 Purchase of Transformers, Stores Etc. 2.58 0.00 20.92 67.02 3.98 Other Expenses 0.00 16.25 0.10 6.75 2.15 Grand Total (St Lighting) 78.37 109.23 115.49 121.65 52.13 ELE. EDUCATION Buildings & F&F 0.00 71.21 0.00 0.00 Other Expenses 0.00 0.00 0.00 0.00 Grand total (Ele.Edu) 0.00 0.00 0.00 0.00 WATER SUPPLY Bore & Ring Wells 21.94 133.08 75.68 92.72 47.67 Extension of Mains/Dist System 158.10 174.59 84.93 164.06 102.69 Other Civil Works 52.43 103.02 83.43 113.58 130.31 Purchase of Motors & Pumps 11.51 8.83 19.52 26.75 12.30 Repayment of Loans & Bonds Interest 39.58 68.91 0.00 62.06 296.09 New Water Supply Projects 100.44 49.77 1.42 49.06 0.95 Godavari W.S. Project 0.00 0.00 0.00 6301.10 7249.78 Public Fountains 7.70 29.91 0.00 0.00 0 SC. ST. W & CH EMF 0.00 0.00 29.91 0.18 33.72 Deposit Works &Other Expenses 8.86 70.52 99.11 45.23 509.61 400.56 638.63 394.00 6854.74 8383.12 DRAINAGE Geddas & Comp SWD Scheme 81.31 95.25 0.00 0.00 0 Const. Of Street Drains 70.19 68.66 58.35 107.37 148.17 Comprehensive Sewage Scheme 95.66 223.98 0.00 0.00 0 SC. ST. W & CH EMF 0.25 2.32 0.00 0.77 0 U.G.D.S 0.00 0.00 64.61 13.06 476.80 145 Visakhapatnam City Development Plan Purchase of Vehicles & Plants Repayment of Loans Interest 152.38 475.70 0.00 0.00 0.00 399.79 865.91 122.96 121.20 624.97 Grand Total (W.S. & DRAINAGE) 800.35 1504.54 516.96 6975.94 9008.09 TOWN PLANNING Road Widening Scheme 23.21 100.65 0.00 0.00 0.00 Acquisition of Lands & Builds 0.23 12.35 19.99 9.00 0.00 Other Expenses 2.37 1.35 0.00 0.00 0.00 25.81 114.35 19.99 9.00 0.00 UCDP (ODA) 0.00 0.00 0.00 0.00 0 UPA SCHEME 0.01 0.00 0.00 0.00 0.00 0.01 0.00 0.00 0.00 0.00 Grand Total (Town Planning) 25.82 114.35 19.99 9.00 0.00 UCDP A/C NSDP WORKS 0.00 0.00 0.00 115.07 16.08 NOAP 0.00 0.00 14.99 15.09 25.36 NGO/CBO Support 0.00 0.00 0.00 4.70 0.00 SJSRY/BSY 0.00 0.00 0.34 245.79 40.42 Grand Total (UCDP) 0.00 0.00 15.33 380.65 81.86 Grand Total of Capital Expenditure 1830.25 3468.53 1239.45 8525.48 10632.51 Grand Total of Revenue & Cap Exp 7506.95 11926.02 9593.61 16758.87 18124.00 ANNEXURE 7 : FINANCE STATUS OF GVMC A) Revenue Receipts & Payments for the year 1999-2000 to 2004-2005 The Corporation is having a Revenue surplus of about Rs.71.67 Crores for the year ending 31.03.2005. Compared to 2003-04 there is Increase in Revenue Receipts to the Tune of Rs. 18.87 Crores during the year 2004-05 which is about 13% increase. For the last Five years there is an increase in Revenue Receipts(this has been depicted in the following Bar Chart) 146 Visakhapatnam City Development Plan GREATER VISAKHAPTNAM MUNICIPAL CORPORATION REV. RECEIPTS AND EXPENDITURE FOR THE PERIOD 1999-00 TO 2004-05 18000 16000 14000 12000 AMOUNT (Rs. in Lakhs) 10000 8000 6000 4000 2000 0 1999-00 2000-01 2001-02 2002-03 2003-04 2004-05 Rev. Rec 8930.02 8119.98 11820.55 13585.33 13504.92 15391.64 Rev. Exp 5856.14 5676.7 8457.49 8354.16 8233.39 8224.32 YEARS B) Capital Receipts & Expenditure for the year 1999-2000 to 2004-2005: There is increase in Capital Expenditure which means that the Corporation is spending more on Capital Assets like Drinking Water Projects, Drainage, etc.,. Compared to 2003-04 there is an increase of about Rs.21.05 Crores in Capital Expenditure. The relevant data for the last Five years is depicted in the following Bar Chart. 147 Visakhapatnam City Development Plan GREATER VISAKHAPTNAM MUNICIPAL CORPORATION CAP. RECEIPTS AND EXPENDITURE FORTHE PERIOD 1999-00 TO 2004-05 12000 10000 8000 AMOUNT (RS in LAKHS) 6000 4000 2000 0 1999-00 2000-01 2001-02 2002-03 2003-04 2004-05 Cap.Rec 200.63 147.67 470.44 953.97 9173.44 1,392.20 Cap.Exp 4562.23 1830.25 2802.7 1239.45 8525.48 10631.43 YEARS C) TOTAL RECEIPTS & EXPENDITURE (CAPITAL AND REVENUE): For the last Five years there is Surplus of Receipts over Expenditure in the year 2003-04 there is a huge surplus of Rs.59.19 Crores due to Bonds Issue for Godavari Water Project to the tune of Rs. 65.00 Crores and there is a deficit of Rs.20.71Crores during the year 2004-05 due to Capital Expenditure on Godavari Water Project. The total Receipts & Expenditure is depicted in the following Bar Chart. 148 Visakhapatnam City Development Plan GREATER VISAKHAPTNAM MUNICIPAL CORPORATION REV.& CAP RECEIPTS AND EXPENDITURE FOR THE PERIOD 1999-00 TO 2004-05 25000 20000 AMOUNT (Rs. in Lakhs) 15000 10000 5000 0 1999-00 2000-01 2001-02 2002-03 2003-04 2004-05 Tot Rec 9130.65 8267.65 12290.99 14539.3 22678.36 16783.84 Tot Exp 10418.37 7506.95 11260.19 9593.61 16758.87 18855.75 YEARS The Revenues of the Corporation are on the increasing trend and in future there will be sharp increase in the Revenues after the completion of Godavari Water Project. The Financial Position of the Corporation is sound enough to take up New Projects. D) Summary of Receipts & Expenditure: The summary of Total Receipts & Expenditure (Revenue & Capital) for the last Five years is given in the following Table. 149 Visakhapatnam City Development Plan GREATER VISAKHAPATNAM MUNICIPAL CORPORATION RECEIPTS & PAYMENTS FOR THE PERIOD FROM 1999-2000 TO 2004-2005 (Rs. In Lakhs) 1999-00 2000-01 2001-02 2002-03 2003-04 2004-05 REVENUE RECEIPTS 8930.02 8119.98 11820.55 13585.33 13504.92 15391.64 REVENUE EXPENDITURE 5856.14 5676.7 8457.49 8354.16 8233.39 8224.32 REVENUE SURPLUS/ 3073.88 2443.3 3363.06 5231.17 5271.53 7167.32 (DEFICIT) ** Capital Receipts 200.63 147.67 470.44 953.97 9173.44 1,392.20 * Capital Expenditure 4562.23 1830.25 2802.7 1239.45 8525.48 10631.43 CAPITAL SURPLUS/ -4361.6 -1682.6 -2332.3 -285.48 647.96 -9239.23 (DEFICIT) TOTAL REV. & CAPITAL RECEIPTS 9130.65 8267.7 12291 14539.3 22678.4 16783.84 TOTAL REV. & CAPITAL EXPENDITURE 10418.4 7507 11260.2 9593.61 16758.9 18855.75 REV. & CAP. SURPLUS / (DEFICIT) -1287.7 760.7 1030.8 4945.69 5919.49 -2071.91 ** Includes amount received from Bonds Issue Rs.6500 lakhs for Godavari Water Project * Includes payments to Godavari Water Project 150 Visakhapatnam City Development Plan ANNEXURE 8 SUMMARY OF RECOMMENDATIONS OF WORKING GROUPS The recommendations of Working Groups have been consolidated to evolve a vision for the city. After the meetings held from time to time, each working group has come out with various recommendations in their respective sectors. The summary of recommendations of working groups are as follows. Working group on Economic Development and Livelihoods Current Status: According to 2001 census, the work-force in Vizag city is about 2,18,695 of which maximum proportion of workers (about 39.45 per cent) is found to be in tertiary services, Trade and Commerce (17.51 per cent), Transport (16.75) and industrial workers (14.54 per cent), while the lowest is found in cultivators (0.15 per cent) in 2001. Fishing is one of the major activities in Vizag. The export value of the fishing products in India is in crores of rupees 70% of which is from Andhra Pradesh and major portion of this is from Visakhapatnam. Tourism is one of the emerging areas in Visakhapatnam in terms of attracting national and international tourists and bringing in foreign currency as well. The industrial activities are one of the prime economic activities of the city. The total number of industrial units in the city is about, 1,775, the total investment of this sector is about Rs. 8,021.77 crores. The total work force engaged in industrial activities is about 44,275 persons Owing to a high degree of industrial concentration, the complementary sectors such as commercial, institutional and services sectors have also developed rapidly. Key Issues and Challenges: The liberalized policies have a thrust on economic development. This move has redefined various sectors of growth, brought in the new business and employment opportunities in Visakhapatnam there is limited financial and strategic support from Fisheries department to the fisherman. Policies and programs to be well articulated to safeguard the livelihoods of the poor. Established financial and market linkages is the need of the hour for promoting self employment and entrepreneurship in the informal sector. While the city has noticed good growth rate, the growth in the inner city has been declined and need to be rejuvenated. Recommendations:  Economic Development Board  District Training and Placement Institute  Promoting Fishing Industry  Rejuvenation of Inner City  District Zonal Mapping Working Group on Public Health and Sanitation Current Status: Drains/ Liquid Waste: The total length of open drains/ geddas in the municipal limits is about 950 km. From the total length of drains running across the GVMC area, the liquid waste is estimated at 139.62 MLD, which is expected to increase to 169.46 MLD by 2021 according to the Master Plan of VUDA. Road Sweeping: The responsibility of road sweeping for long is being carried out by GVMC. After taking into account the managerial and financial issues, GVMC has evolved a new 151 Visakhapatnam City Development Plan scheme titled Subram Scheme as a public private partnership for discharging its functions of road sweeping. Open Defecation: Open defecation is an age-old practice particularly for those people who have migrated from the rural areas to the city for a living. Besides, there are already 275 identified slum areas, which have no adequate toilet facilities. Key Issues and Challenges The key issue is the non-compliance of existing solid waste management system with the 2000 rules. There is no mechanism for door to door collection of waste from households. Segregation of waste at source is also absent. Secondary storage is mainly through open RCC bins, which is unhygienic and needs to be completely replaced with closed dumper bins. The practice of night sweeping is also absent. The existing dumping site is prone to serious health hazard particularly for the people living around it. WHO studies have indicated that 22 diseases are directly linked to improper solid waste management practices in cities. A noted environmentalist, Sagar Dhara, recently observed the presence of “cadmium� a very dangerous chemical in the air in Visakhapatnam that had put about half the city’s population at cancer risk ranging from 50 to 500 times�. Recommendations: a. Improved Collection and disposal of Solid Waste and Management System b. Zero Open Defecation Working Group on Water Supply: Current Status: The GVMC is supplying intermittent water supply to the domestic consumers for a duration of 45 minutes in a day and the residents are mostly relying on ground water to meet the demand. The piped water coverage is about 30% of GVMC area. The present supply is daily in some areas and on alternate days in other parts. The city has a population of around 15 lakhs with demand for 70 mgd (@140 LPCD). Currently 37 mgd is being supplied through different sources covering the entire city with protected water supply through the comprehensive distribution network at 65 LPCD. The un- covered areas under this distribution network are being supplied with water thorough local network i.e., through borewells and water tankers. The Municipal Corporation Visakhapatnam supplies water to residential, commercial and on bulk to various industries. The connection charges varied depending on the category and size of connection whereas the tariff varied depending on the category and consumption. Even though, around 57% of the supply of water from the corporation is catered to domestic customers and 43% goes to Industries, around 86% of the revenue on water supply is obtained from the industries. Key issues and Challenges  To upgrade the present system to ensure continuous water supply to all households of the city through individual taps.  Replacement/Remodelling Old Pipeline Distribution System  Metering  Mechanization  Identification of New Sources:  Depletion of Ground Water Level: Recommendations:  Meter all the connection to prevent wastage  Ensure promotion of suitable cost effective and sustainable measures for water 152 Visakhapatnam City Development Plan conservation and utilisation in the city.  Augment the water sources and prevent wastage of water  Increase the number of connections to cover the entire city  All the poor localities to be covered by piped water  Keeping the under water levels analysis in view restriction to be imposed on digging borewells which indirectly helps increase water level.  Strategies for Water Conservation : Massive watershed programme for development of all degraded and wastelands. Degraded and wasteland has been treated by watershed committees under Rural Development department. Degraded forestland has been treated by Vana Samrakshana Samithis (VSSs) under Forest department. The legislation should aim to regulate water extraction and the types of crops grown in identified areas.  Strategy for Ground Water Management Complete treatment of Kailasa hill range within hill slots with different SMC works. Mudasarlova reservoir to be protected and rejuvenated. The parks along the northern portion of the city are to be provided with ponds. Recharge well with 0.6m-1.0m dia and 6-8 m depth must be connected with roof top collected rain water. Strict enforcement of APWALTA act for apartments in ground water utilization. Artificial recharge through pits, trenches, shafts and dried up wells. Sewerage Sector Current Status: The city is divided into 14 drainage blocks according to the typographical conditions. The first underground drainage system was executedin the year 1980 under Phase-I and serving 60,000 population covering in an area of 114 Hectors. The Phase-II was divided into two sub phases i.e., sub phase-1 and sub phase-2. In the year 2001, the sub phase-1 of the phase-2 was commissioned serving a population of 3.2 lakhs in an area of 943 Hectors. By extent wise, only 2% has been covered with the underground drainage system serving a population of 3.8 lakhs in the total population of 15 lakhs. So far above, 14,000 connections are existing. Key Issues & Challenges: The old traditional way of sewerage disposal is causing a great concern to the city in view of the rapid urbanisation. Lack of infrastructure for the underground drainage system is causing threat to the environment and mosquito meanance which inturn affecting the citizens in many ways. Recommendations:  To cover the entire city with underground network in a phased manner to maintain better environmental & health conditions.  To improve the percentage of reuse of sewage treated water for other purposes. Working Group on Poverty and Slum Upgradation Current Status: Visakhapatnam city is characterized by significant presence of urban poor, with a growing poverty profile. Presently there are 275 notified and 123 non-notified slums with a total slum population of 4,23,030 and BPL population of 3,43,349 as per 2001 census. The total SC and ST population is 65,153. Because of the geographical profile of the city, the slums are scattered across the city spread across 505 sq. km. Area. 153 Visakhapatnam City Development Plan Key Issues and Challenges The unhygienic living conditions, the stagnated drainages, garbage’s etc., lack of awareness and illiteracy paves way to rampant diseases in the slums. The poor women and children suffer from malnutrition and majority of women suffer from anemia. The mortality rate of women is rather high. Inadequate number of government hospitals, inaccessibility of the existing hospitals and poor infrastructure and staffing also contribute to the increasing health concerns. Recommendations:  Clear backlog of providing housing for all  Plan for housing for yearly migrant population  Providing all infrastructure facilities in the poor localities at a level better than those in the rich localities  Strengthening and Capacity Building of Self Help Groups and NGOs  Scaling up of Micro credit for poverty alleviation:  Livelihoods and Employment Working Group on Health and Education Current Status: Health: The estimated number of doctors in Visakhapatnam is 3,000. In the Government hospitals a total of 2127 beds and 466 doctors are available. The KGH and VGH are the only hospitals, which are considered to have adequate health care facilities. There are only twelve municipal dispensaries, which provide general out patient facility, antenatal care and immunisation services. HIV/AIDS became a big health threat to the city population. In the State, Visakhapatnam occupies second place in terms of HIV/AIDS population, which is rising every year. Education: According to the 1991Census the literate population of Visakhapatnam constitutes 65%. The data further indicates that 72% of the males and 58% of the females are literate. Although the literacy rate is higher in Visakhapatnam than the national average, a further analysis indicates that there is a wide gap between levels of literacy between males and females. Female children are not attending school in order to support mother in domestic work looking after younger siblings. In the corporation area, out of 17,000 school going children, 3,000 are dropouts. The quality of education is poor. The schools, particularly municipal/ government are over crowded. Another reason is lack of adequate number of teachers. The teacher student ratio ranges from 100 to 150. Key Issues and Concerns: Health: Due to the lack of required medical and paramedical staff, deliveries are not conducted in the municipal dispensaries. In KGH, very costly equipment is kept unutilised and allowed to rust because of lack of human power to handle the equipment or because of lack of accessories necessary to make the machinery to work. Lack of minimum infrastructure is of major concern. About 50% of the hospitals do not have clearance from pollution control board. There exists no mechanism to address the increased number of accidents due to continuous increase in the day-to-day traffic. Lack of proper understanding to the public about the preventive aspects of health care is a major concern. In the State, Visakhapatnam occupies second place in terms of HIV/AIDS population, which is rising every year. There is no specific facility for Geriatric health care in Visakhapatnam. 154 Visakhapatnam City Development Plan Recommendations:  Health Coordination committee for health services Budgetary allocations Rehabilitation of HIV/ AIDS patients Strict enforcement of regulations Creation of Health Fund  Education Comprehensive study on education system Budgetary allocation Establishment of Public relation systems Involvement of NGOs Vocational education Working Group on Gender Issues Current status: It is estimated that about 93% of the national economy depends on informal sector. Visakhapatnam City, as is the case with most of the cities in the developing countries, is experiencing the process of tertiarisation and informalisation of economy. Women form 92 per cent of this informal sector economy. The Social empowerment of women requires measures with special attention to women in difficult circumstances including the destitute, disabled and victims of family violence. Key issues, concerns and challenges: Violence against women: Violence against women, inhibited women as a group from enjoying the full benefits of human rights. Lack of gender sensitization is one of the major causes for violence against women. There are several cases reporting on the molestation, eve teasing, cruelity, brides buring among both working & non working women in the city. Social Empowerment: Given that women are involved in day to day relations with their husbands, sons, male relatives and male community leaders, it is important to sensitise the men to gender concerns. The challenges are  Sensitizing men to gender concerns  Combating training with non-training strategies.  Conciously weaving in gendern concerns within capacity building efforts. Women Health and Child Care: While the municipal hospitals and public hospitals in the city suffer from lack of government attention and financial constraints, the corporate hospitals are not within the reach of the poor. Recommendations at the policy level:  At the policy level, one important tool is gender budgeting.  From the point of view of gender planning and analysis, there is a need for sex- disaggregated information pertaining to the development programmes.  Gender sensitive training needs to be taken up for functionaries and councillors in the corporation and other functionaries of government agencies.  Women councillors need special training to improve their competencies.  For the sustainability of the gender related development programs, the experiences and knowledge of women should be used as resources for planning, implementation and evaluation.  Linking up with International goals: The Millennium Development Goals (MDGs)  Protective services for women and families. 155 Visakhapatnam City Development Plan Working Group on Traffic and Transportation Current Status: The city area is accessible through rail, road and air links. NH-5 and NH-43 of the National Highway (NH) network and the State Highways connect the city are a to the vast hinterland. The transportation network in the city area is dominated by three major arteries one along the beach front, another along the northern hill flank and the third which runs through the city A number of roads link these arteries. Around 7.88% of the total area is covered by roads, 2.13% by railways and 0.85% by the Port authorities. More than 125.77 tones of goods are moved in a year, 76.57% is by rail, 23.4% by road. Public transport comprises buses, which are used by 3,.91% of the total population. Only 0.25% of the population use auto rickshaws. The major road network in the City area extends over a length of 126 km. The total road length is 1320 kms. Key Issues and Challenges: The city needs a comprehensive approach to combat the bottlenecks in the present transport sector and to tackle the future problems that might arise due to the unprecedent growth of vehicular traffic. Suitable Facilities are to be created for the disadvantaged people and children for better accessibility on the roads. The roads are to be widened and link roads are to be formed for better interconnectivity in the city. The junctions and intersections are to be developed to accommodate more traffic. The posibility of providing mode split transport should be looked for the future requirements. Recommendations:  Widen all the arterial roads within the city to a minimum of 100 feet with safe pedestrian walkways.  To improve the signal system, intersection points/ junction points, develop parking lots as required, up gradation of roads, road widening wherever required, lane marking, etc. as a short term strategy.  To focus on the action plans aimed at development of traffic infrastructure over a perspective plan period of 5-10 years and cover alternative modes of transport like LRTS, rail cum road service, revival of the entire bus transport mechanism, as may be required as a medium term strategy.  Transport Infrastructure for Sub urban areas connecting all the 33 localities with 150-200 feet wide roads with grade separators wherever necessary.  Provide utility ducts to prevent frequent digging of roads  Construction of safe and physically handicapped friendly walkways in Inner City Governance Current Status: The innovative measures are in place in GVMC for urban good governance. In recent past, it introduced several innovations in Municipal management. Some of them are...  Outsourcing of street light maintenance  Formation of Self Help Groups for community participation & development  Privatisation of non critical functions.  Collection of all taxes and dues through online outlets like E-Seva Soukaryam, etc.  Issue of Birth, Death and other certificates through online  Registration of Building plans and approvals through online.  Payment of all charges through online  Lodging of complaints and grievances through online The GVMC is the first in India to provide online e-governance facilities. It is also the process of enacting other measures to increase public participation in policy making. Key Issues & Challenges: 156 Visakhapatnam City Development Plan The increased urbanization and growth has resulted in growing challenges and pressure, where urban local bodies are required to undertake several new functions, deal with problems of growing information sector and meet the demands of increasing population base. It should also adapt to newer technologies in information and communication among other things. Recommendations:  Review of governance via ICT, HRD and Urban Finance  Analysing the effects of initiatives of GVMC  Formulation of specific action plan that facilitate in attaining the goal of good governance.  Improving the outreach and interface of existing programmes.  Networking to improve inter-departmental information flows.  Strengthening and augmenting the corporation sources of revenue.  Introducing double entry system in the accounting procedures. 157