Sustainable Family Farming Modernization Project (P151963) Procurement Plan Country: Ecuador Region: LATIN AMERICA AND CARIBBEAN Approval Date: 5-May-2015 (original). General Procurement Notice published on: 4-March-2016 July 9, 2010 PROCUREMENT Ecuador : Ecuador - Sustainable Family Farming Modernization Project PLAN General Information Country: Ecuador Bank’s Approval Date of the Original Procurement Plan: 2017-03-02 2019-08-06 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P151963 GPN Date: Project Name: Ecuador - Sustainable Family Farming Modernization Project Loan / Credit No: IBRD / 85150, COFN / C1410 Executing Agency(ies): Ministry of Agriculture,Livestock, Aquaculture and Fisheries WORKS Bid Evaluation Activity Reference No. Estimated Actual Draft Pre- Draft Bidding Specific Proposal Loan / Market Procurement Prequalificatio Process Prequalification Bidding Documents Report and Contract / Description Component Review Type Method Amount Amount qualification Document / Procurement Notice Submission / Signed Contract Credit No. Approach Process n (Y/N) Status Evaluation Report as Issued Recommendation for Completion (US$) (US$) Documents Justification / Invitation Opening / Minutes Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual EC-MAGAP-8176-027 / Component 1: Investments Solicitud de Single Stage - 2016-10- 2016-11- 2016-12- 2017-02- 2017-04- 2017-07- Asociación de Productores IBRD / 85150 for climate-smart sub- Posterior Open - National 253,597.88 287,876.44 Finalizado ofertas One Envelope 31 18 19 07 01 31 Agrícolas San Rafael projects EC-MAGAP-8176-029 / Component 1: Investments Solicitud de Single Stage - 2016-10- 2016-11- 2016-12- 2017-02- 2017-03- 2017-06- Cooperativa Agropecuaria IBRD / 85150 for climate-smart sub- Posterior Open - National 240,663.07 247,158.58 Firmado ofertas One Envelope 31 18 19 02 04 30 el Marco, Pintag projects EC-MAGAP-8176-030 / Component 1: Investments Solicitud de Single Stage - 2016-11- 2016-11- 2016-12- 2017-02- 2017-03- 2017-06- Asociación Campesina 15 IBRD / 85150 for climate-smart sub- Posterior Open - National 151,237.97 160,946.57 Finalizado ofertas One Envelope 11 25 23 02 25 30 de Diciembre, Campozano projects EC-MAGAP-8176-031 / Component 1: Investments Solicitud de Single Stage - 2016-12- 2016-12- 2017-01- 2017-02- 2017-03- 2017-07- Directorio de Agua del IBRD / 85150 for climate-smart sub- Posterior Open - National 282,495.04 352,483.50 Finalizado ofertas One Envelope 02 16 16 08 31 31 canal Palo Marcado projects EC-MAGAP-8176-032 / Component 1: Investments Solicitud de Single Stage - 2016-12- 2016-12- 2017-01- 2017-02- 2017-03- 2017-06- Inversión - Asociación IBRD / 85150 for climate-smart sub- Posterior Open - National 288,011.72 283,055.88 Finalizado ofertas One Envelope 20 30 30 13 31 30 Santa Cecilia de Pucalpa projects EC-MAGAP-8176-033 / Inversión - Asociación de Component 1: Investments trabajadores agrícolas, Solicitud de Single Stage - 2016-12- 2016-12- 2017-01- 2017-02- 2017-03- 2017-08- IBRD / 85150 for climate-smart sub- Posterior Open - National 537,557.30 769,439.81 Firmado autónomos comerciantes, ofertas One Envelope 20 30 30 13 15 31 projects exportadores “Voluntad de Dios" EC-MAGAP-8176-034 / Inversión - Asociación de Component 1: Investments Solicitud de Single Stage - 2016-12- 2016-12- 2017-01- 2017-02- 2017-03- 2017-07- desarrollo integral de la IBRD / 85150 for climate-smart sub- Posterior Open - National 387,514.99 371,209.00 Finalizado ofertas One Envelope 20 30 30 13 15 31 comunidad de Cutahua, projects Simiatug EC-MAGAP-8176-036 / Component 1: Investments Inversión - Junta de Solicitud de Single Stage - 2016-12- 2016-12- 2017-01- 2017-02- 2017-05- 2017-06- IBRD / 85150 for climate-smart sub- Posterior Open - National 221,582.20 194,445.74 Finalizado Regantes del sistema de ofertas One Envelope 02 16 16 07 01 30 projects riego La Era EC-MAGAP-8176-045 / 1. Component 3: Project Solicitud de Single Stage - 2016-07- 2017-01- 2017-02- IBRD / 85150 Posterior Open - National 66,120.00 65,477.67 Firmado Readecuación Oficinas Management cotizaciones One Envelope 31 06 15 EC-MAGAP-8176-035 / Component 1: Investments Inversión - Tecnificacion Solicitud de Single Stage - 2016-12- 2016-12- 2017-01- 2017-02- 2017-05- 2017-06- IBRD / 85150 for climate-smart sub- Posterior Open - National 163,125.09 174,085.22 Finalizado del sistema de riego Zhilla ofertas One Envelope 08 23 23 06 01 30 projects San Pedro EC-MAGAP-8176-028 / Inversión en 11 Component 1: Investments Solicitud de Single Stage - 2017-06- 2017-06- 2017-07- 2017-08- 2017-09- 2018-02- subproyectos de riego IBRD / 85150 for climate-smart sub- Posterior Open - National 4,779,232.60 0.00 Cancelado ofertas One Envelope 01 06 18 17 01 28 parcelario de la primera projects convocatoria EC-MAGAP-8176-038 / Component 1: Investments Inversión - Asociación Solicitud de Single Stage - 2017-02- 2017-02- 2017-03- 2017-04- 2017-05- 2017-09- IBRD / 85150 for climate-smart sub- Posterior Open - National 316,415.09 0.00 Cancelado Agropecuaria Santa Clara ofertas One Envelope 13 27 30 21 08 30 projects de Tolontag EC-MAGAP-8176-044 / Component 1: Investments Inversión en 2 Solicitud de Single Stage - 2017-03- 2017-03- 2017-04- 2017-05- 2017-05- 2017-12- IBRD / 85150 for climate-smart sub- Posterior Open - National 1,041,398.91 0.00 Cancelado subproyectos de ofertas One Envelope 01 06 17 17 31 31 projects microreservorios primera convocatoria EC-MAGAP-8176-042 / Component 1: Investments Inversión - Tecnificación Solicitud de Single Stage - 2017-02- 2017-02- 2017-03- 2017-04- 2017-05- 2017-11- IBRD / 85150 for climate-smart sub- Posterior Open - National 395,844.22 0.00 Cancelado del sistema de riego Luis ofertas One Envelope 13 27 30 21 31 27 projects Cordero Etapa 1 EC-MAGAP-8176-041 / Component 1: Investments Solicitud de Single Stage - 2017-02- 2017-02- 2017-03- 2017-04- 2017-05- 2017-08- Inversión - Tecnificacion IBRD / 85150 for climate-smart sub- Posterior Open - National 476,881.35 0.00 Cancelado ofertas One Envelope 13 27 30 21 08 31 del sistema de riego projects Putucay EC-MAGAP-8176-043 / Inversiones en 34 Component 1: Investments Solicitud de Single Stage - 2016-02- 2016-02- 2016-03- 2016-04- 2016-05- 2017-10- Microreservorios en la IBRD / 85150 for climate-smart sub- Posterior Open - National 254,281.88 0.00 Cancelado ofertas One Envelope 13 27 30 21 08 31 parroquia Ingapirca-Coop. projects Vendeleche EC-MAGAP-32782-CW- Component 3: Project Solicitud de Single Stage - 2017-11- 2017-12- 2018-01- RFQ / Implementación de IBRD / 85150 Posterior Open - National 10,000.00 0.00 Cancelado Management cotizaciones One Envelope 20 09 23 espacio físico para archivo EC-MAGAP-37039-CW- RFB / Obra - Subproyecto: Component 1: Investments Implementación de riego Solicitud de Single Stage - 2018-09- 2018-10- 2018-11- 2018-11- 2018-12- 2019-04- IBRD / 85150 for climate-smart sub- Posterior Open - National 255,018.99 0.00 Cancelado tecnificado a nivel ofertas One Envelope 24 04 03 18 23 22 projects parcelario del sistema de riego El Verde - Pacayunga. EC-MAGAP-36997-CW- RFB / Obra - Subproyecto: Implementación del Component 1: Investments Solicitud de Single Stage - 2018-09- 2018-09- 2018-10- 2018-10- 2018-12- 2019-04- sistema de riego por goteo COFN / C1410 for climate-smart sub- Posterior Open - National 181,122.08 0.00 Cancelado ofertas One Envelope 03 13 13 28 02 01 y aspersión en la projects Asociación "Un Paso Hacia El Progreso" (Huaquer) EC-MAGAP-37040-CW- RFB / Obra - Subproyecto: Implementación de riego Component 1: Investments Solicitud de Single Stage - 2018-09- 2018-09- 2018-10- 2018-11- 2018-12- 2019-06- parcelario tecnificado por IBRD / 85150 for climate-smart sub- Posterior Open - National 515,344.07 0.00 Cancelado ofertas One Envelope 17 27 27 11 16 14 aspersión y goteo para el projects sistema de riego "Y de El Guineo". EC-MAGAP-37050-CW- RFB / Obra - Subproyecto: Component 1: Investments Tecnificación de Riego a Solicitud de Single Stage - 2018-09- 2018-09- 2018-10- 2018-11- 2018-12- 2019-04- IBRD / 85150 for climate-smart sub- Posterior Open - National 304,748.40 0.00 Cancelado nivel parcelario por ofertas One Envelope 10 20 20 04 09 08 projects aspersión para la Junta de Riego "Gúlac - Cruz Rumi". EC-MAGAP-37036-CW- Component 1: Investments RFB / Inversión Solicitud de Single Stage - 2017-11- 2017-12- 2018-01- 2018-01- 2018-02- 2018-08- IBRD / 85150 for climate-smart sub- Posterior Open - National 451,844.13 0.00 Cancelado Tecnificación del Sistema ofertas One Envelope 24 04 03 18 22 21 projects de Riego Luis Cordero EC-MAGAP-37037-CW- Component 1: Investments RFB / Inversión - Solicitud de Single Stage - 2018-05- 2018-05- 2018-06- 2018-06- 2018-07- 2018-11- IBRD / 85150 for climate-smart sub- Posterior Open - National 343,109.13 0.00 Cancelado Tecnificación del Sistema ofertas One Envelope 01 11 10 25 30 27 projects de Riego Tolontag EC-MAGAP-37025-CW- Component 1: Investments RFB / Inversión Solicitud de Single Stage - 2018-02- 2018-02- 2018-03- 2018-04- 2018-05- 2018-11- IBRD / 85150 for climate-smart sub- Posterior Open - National 1,867,958.40 0.00 Cancelado Tecnificación del Sistema ofertas One Envelope 15 25 27 11 16 12 projects de Riego Las Mercedes EC-MAGAP-37051-CW- Component 1: Investments RFB / Inversión Solicitud de Single Stage - 2018-07- 2018-07- 2018-08- 2018-08- 2018-09- 2019-07- IBRD / 85150 for climate-smart sub- Posterior Open - National 2,638,944.00 0.00 Cancelado Tecnificación del Sistema ofertas One Envelope 01 11 10 25 29 26 projects de Riego Bolo Dolores EC-MAGAP-37044-CW- Component 1: Investments RFB / Inversión Solicitud de Single Stage - 2018-05- 2018-05- 2018-06- 2018-06- 2018-07- 2019-01- IBRD / 85150 for climate-smart sub- Posterior Open - National 879,648.00 0.00 Cancelado Tecnificación del Sistema ofertas One Envelope 01 11 10 25 30 26 projects de Riego Chambitola EC-MAGAP-37048-CW- Component 1: Investments RFB / Inversión Solicitud de Single Stage - 2018-07- 2018-07- 2018-08- 2018-08- 2018-09- 2019-01- IBRD / 85150 for climate-smart sub- Posterior Open - National 382,905.60 0.00 Cancelado Tecnificación del Sistema ofertas One Envelope 01 11 10 25 29 27 projects de Riego Jesús María EC-MAGAP-37346-CW- Component 1: Investments Solicitud de Single Stage - 2017-11- 2017-12- 2018-01- 2018-01- 2018-02- 2018-06- RFB / Inversión IBRD / 85150 for climate-smart sub- Posterior Open - National 538,457.85 0.00 Cancelado ofertas One Envelope 24 04 03 18 22 22 Tecnificación del Sistema projects de Riego Putucay EC-MAGAP-37030-CW- RFB / Inversión - Component 1: Investments Solicitud de Single Stage - 2017-12- 2017-12- 2018-01- 2018-01- 2018-03- 2018-11- Tecnificación del Sistema COFN / C1410 for climate-smart sub- Posterior Open - National 859,281.16 0.00 Cancelado ofertas One Envelope 01 11 10 25 01 26 de Riego Directorio de projects aguas de la acequia "Mundug Yamate" EC-MAGAP-37047-CW- Component 1: Investments RFB / Inversión Solicitud de Single Stage - 2018-02- 2018-02- 2018-03- 2018-03- 2018-05- 2018-08- IBRD / 85150 for climate-smart sub- Posterior Open - National 486,393.60 0.00 Cancelado Tecnificación del Sistema ofertas One Envelope 01 11 13 28 02 30 projects de Riego La Belgica Page 1 EC-MAGAP-37053-CW- Component 1: Investments Solicitud de Single Stage - 2018-06- 2018-06- 2018-07- 2018-07- 2018-08- 2019-02- RFB / Inversión IBRD / 85150 for climate-smart sub- Posterior Open - National 1,034,880.00 0.00 Cancelado ofertas One Envelope 01 11 11 26 30 26 Tecnificación del Sistema projects de Riego Zhinzhon EC-MAGAP-37043-CW- Component 1: Investments Solicitud de Single Stage - 2018-08- 2018-08- 2018-09- 2018-09- 2018-10- 2019-02- RFB / Inversión IBRD / 85150 for climate-smart sub- Posterior Open - National 289,766.40 0.00 Cancelado ofertas One Envelope 01 11 10 25 30 27 Tecnificación del Sistema projects de Riego Milagro EC-MAGAP-37026-CW- RFB / Obra - Subproyecto: Component 1: Investments Solicitud de Single Stage - 2018-09- 2018-09- 2018-10- 2018-10- 2018-12- 2019-05- Implementación del IBRD / 85150 for climate-smart sub- Posterior Open - National 394,535.71 0.00 Cancelado ofertas One Envelope 03 13 13 28 02 31 sistema de riego por projects aspersión en el predio "Santa Ana". EC-MAGAP-37033-CW- RFB / Obra - Component 1: Investments Subproyecto: Solicitud de Single Stage - 2018-09- 2018-09- 2018-10- 2018-10- 2018-12- 2019-08- COFN / C1410 for climate-smart sub- Posterior Open - National 1,178,659.32 0.00 Cancelado Implementación de riego ofertas One Envelope 03 13 13 28 02 29 projects parcelario tecnificado en 15 módulos del sistema de riego Píllaro Ramal Norte. EC-MAGAP-37029-CW- RFB / Obra - Subproyecto: Implementación del Component 1: Investments Solicitud de Single Stage - 2018-09- 2018-09- 2018-10- 2018-11- 2018-12- 2019-05- sistema de riego parcelario IBRD / 85150 for climate-smart sub- Posterior Open - National 290,247.35 333,084.45 Firmado ofertas One Envelope 10 20 20 04 09 08 por aspersión para la projects "Asociación Agropecuaria Sierra Morena" EC-MAGAP-37032-CW- RFB / Obra - Subproyecto: Implementación de riego Component 1: Investments Solicitud de Single Stage - 2018-09- 2018-09- 2018-10- 2018-10- 2018-12- 2019-04- parcelario tecnificado, con COFN / C1410 for climate-smart sub- Posterior Open - National 806,547.88 583,084.02 Firmado ofertas One Envelope 03 13 13 28 02 01 las familias de usuarios projects del óvalo Pinguilí de la acequia Mocha Huachi. EC-MAGAP-37028-CW- RFB / Obra - Subproyecto: Implementación del Component 1: Investments sistema de riego parcelario Solicitud de Single Stage - 2018-09- 2018-09- 2018-10- 2018-11- 2018-12- 2019-05- IBRD / 85150 for climate-smart sub- Posterior Open - National 266,172.40 0.00 Cancelado por aspersión para la ofertas One Envelope 10 20 20 04 09 08 projects "Asociación de productores agropecuarios la Nueva Esperanza". EC-MAGAP-37034-CW- RFB / Obra - Subproyecto: Component 1: Investments Implementación de riego Solicitud de Single Stage - 2018-09- 2018-09- 2018-10- 2018-11- 2018-12- 2019-09- IBRD / 85150 for climate-smart sub- Posterior Open - National 2,398,113.10 0.00 Cancelado parcelario tecnificado en ofertas One Envelope 10 20 20 04 09 05 projects veinte módulos del sistema de riego Píllaro Ramal Sur. EC-MAGAP-37038-CW- RFB / Obra - Subproyecto: Component 1: Investments Tecnificación de riego Solicitud de Single Stage - 2018-09- 2018-10- 2018-11- 2018-11- 2018-12- 2019-04- IBRD / 85150 for climate-smart sub- Posterior Open - National 767,833.70 0.00 Cancelado parcelario por micro ofertas One Envelope 24 04 03 18 23 22 projects aspersión para la comunidad Estero Piedras. EC-MAGAP-37041-CW- RFB / Obra - Subproyecto: Component 1: Investments Implementación de riego Solicitud de Single Stage - 2018-09- 2018-09- 2018-10- 2018-11- 2018-12- 2019-04- COFN / C1410 for climate-smart sub- Posterior Open - National 473,289.39 0.00 Cancelado por aspersión en la ofertas One Envelope 17 27 27 11 16 15 projects Asociación Agropecuaria Manuel Freile Barba "La Magdalena". EC-MAG-74155-CW-RFB / Obra - Subproyecto: Implementación de riego Component 1: Investments Solicitud de Single Stage - 2018-09- 2018-09- 2018-10- 2018-11- 2018-12- 2019-07- parcelario tecnificado por COFN / C1410 for climate-smart sub- Posterior Open - National 857,261.64 0.00 Cancelado ofertas One Envelope 17 27 27 11 16 21 aspersión en 152,44 ha projects para la Junta General de Riego "Canal Central Toacaso" EC-MAGAP-37042-CW- RFB / Obra - Subproyecto: Component 1: Investments Implementación del Solicitud de Single Stage - 2018-09- 2018-09- 2018-10- 2018-11- 2018-12- 2019-05- IBRD / 85150 for climate-smart sub- Posterior Open - National 345,986.16 313,599.73 Firmado sistema de riego parcelario ofertas One Envelope 17 27 27 11 16 15 projects por aspersión para la "Comuna Jurídica La Libertad". EC-MAG-74161-CW-RFB / Obra - Subproyecto: Component 1: Investments Solicitud de Single Stage - 2018-09- 2018-10- 2018-11- 2018-11- 2018-12- 2019-05- Implementación de riego COFN / C1410 for climate-smart sub- Posterior Open - National 448,238.83 0.00 Cancelado ofertas One Envelope 24 04 03 18 23 22 parcelario tecnificado en el projects predio Sucuso EC-MAGAP-37046-CW- RFB / Obra - Subproyecto: Component 1: Investments Solicitud de Single Stage - 2018-09- 2018-09- 2018-10- 2018-10- 2018-12- 2019-04- Implementación del IBRD / 85150 for climate-smart sub- Posterior Open - National 1,257,417.83 1,119,683.44 Firmado ofertas One Envelope 03 13 13 28 02 01 sistema de riego por projects aspersión en el predio "La Paquita" EC-MAG-87856-CW-RFB / Obra - Subproyecto: Implementación del Component 1: Investments sistema de riego parcelario Solicitud de Single Stage - 2018-11- 2018-11- 2018-12- 2018-12- 2018-12- 2019-05- IBRD / 85150 for climate-smart sub- Posterior Open - National 266,172.40 234,999.76 Firmado por aspersión para la ofertas One Envelope 23 24 10 13 17 16 projects "Asociación de productores agropecuarios la Nueva Esperanza". EC-MAG-87857-CW-RFB / Obra - Subproyecto: Component 1: Investments Implementación de riego Solicitud de Single Stage - 2018-11- 2018-11- 2018-12- 2018-12- 2018-12- 2019-04- COFN / C1410 for climate-smart sub- Posterior Open - National 473,289.39 445,759.73 Firmado por aspersión en la ofertas One Envelope 23 24 10 13 17 16 projects Asociación Agropecuaria Manuel Freile Barba "La Magdalena". EC-MAG-87859-CW-RFB / Obra - Subproyecto: Component 1: Investments Tecnificación de Riego a Solicitud de Single Stage - En 2018-11- 2018-11- 2018-12- 2018-12- 2018-12- 2019-04- IBRD / 85150 for climate-smart sub- Posterior Open - National 304,748.40 0.00 nivel parcelario por ofertas One Envelope ejecución 23 24 10 13 17 16 projects aspersión para la Junta de Riego "Gúlac - Cruz Rumi" EC-MAG-87861-CW-RFB / Obra - Subproyecto: Component 1: Investments Solicitud de Single Stage - 2018-11- 2018-11- 2018-12- 2018-12- 2018-12- 2019-06- Implementación del IBRD / 85150 for climate-smart sub- Posterior Open - National 394,535.71 349,855.71 Firmado ofertas One Envelope 23 24 10 13 17 15 sistema de riego por projects aspersión en el predio "Santa Ana" EC-MAG-87862-CW-RFB / Obra - Subproyecto: Component 1: Investments Tecnificación de riego Solicitud de Single Stage - 2018-11- 2018-11- 2018-12- 2018-12- 2018-12- 2019-04- IBRD / 85150 for climate-smart sub- Posterior Open - National 767,833.70 721,919.70 Firmado parcelario por micro ofertas One Envelope 23 24 10 13 17 16 projects aspersión para la comunidad Estero Piedras EC-MAG-87863-CW-RFB / Obra - Subproyecto: Component 1: Investments Implementación de riego Solicitud de Single Stage - 2018-11- 2018-11- 2018-12- 2018-12- 2018-12- 2019-09- COFN / C1410 for climate-smart sub- Posterior Open - National 1,178,659.32 1,003,229.85 Firmado parcelario tecnificado en ofertas One Envelope 23 24 10 13 17 13 projects 15 módulos del sistema de riego Píllaro Ramal Norte EC-MAG-87864-CW-RFB / Obra - Subproyecto: Component 1: Investments Implementación de riego Solicitud de Single Stage - 2018-11- 2018-11- 2018-12- 2018-12- 2018-12- 2019-09- IBRD / 85150 for climate-smart sub- Posterior Open - National 2,398,113.10 1,977,314.38 Firmado parcelario tecnificado en ofertas One Envelope 23 24 10 13 17 13 projects veinte módulos del sistema de riego Píllaro Ramal Sur EC-MAG-87865-CW-RFB / Obra - Subproyecto: Implementación de riego Component 1: Investments Solicitud de Single Stage - 2018-11- 2018-11- 2018-12- 2018-12- 2018-12- 2019-06- parcelario tecnificado por IBRD / 85150 for climate-smart sub- Posterior Open - National 515,344.07 401,816.49 Firmado ofertas One Envelope 23 24 10 13 17 15 aspersión y goteo para el projects sistema de riego "Y del Guineo". EC-MAG-87867-CW-RFB / Obra - Subproyecto: Implementación del Component 1: Investments Solicitud de Single Stage - 2018-11- 2018-11- 2018-12- 2018-12- 2018-12- 2019-04- sistema de riego por goteo COFN / C1410 for climate-smart sub- Posterior Open - National 181,122.08 179,199.73 Firmado ofertas One Envelope 23 24 10 13 17 16 y aspersión en la projects Asociación "Un Paso Hacia El Progreso" (Huaquer) EC-MAG-87869-CW-RFB / Obra - Subproyecto: Component 1: Investments Implementación de riego Solicitud de Single Stage - En 2018-11- 2018-11- 2018-12- 2018-12- 2018-12- 2019-04- IBRD / 85150 for climate-smart sub- Posterior Open - National 255,018.99 0.00 tecnificado a nivel ofertas One Envelope ejecución 23 24 10 13 17 16 projects parcelario del sistema de riego El Verde - Pacayunga EC-MAG-87870-CW-RFB / Obra - Subproyecto: Component 1: Investments Solicitud de Single Stage - En 2018-11- 2018-11- 2018-12- 2018-12- 2018-12- 2019-05- Implementación de riego COFN / C1410 for climate-smart sub- Posterior Open - National 448,238.83 0.00 ofertas One Envelope ejecución 23 24 10 13 17 16 parcelario tecnificado en el projects predio Sucuso EC-MAG-87871-CW-RFB / Obra - Subproyecto: Implementación de riego Component 1: Investments Solicitud de Single Stage - 2018-11- 2018-11- 2018-12- 2018-12- 2018-12- 2019-07- parcelario tecnificado por COFN / C1410 for climate-smart sub- Posterior Open - National 857,261.64 614,999.76 Firmado ofertas One Envelope 23 24 10 13 17 22 aspersión en 152,44 ha projects para la Junta General de Riego "Canal Central Toacaso" Page 2 EC-MAG-94817-CW-RFB / Obra - Subproyecto: Component 1: Investments Solicitud de Single Stage - Ejecución 2019-07- 2019-07- 2019-08- 2019-09- 2019-09- 2020-02- Implementación de Riego IBRD / 85150 for climate-smart sub- Posterior Open - National 1,071,772.80 0.00 ofertas One Envelope pendiente 19 24 23 07 27 24 Tecnificado para la projects "Asociación 17 de Junio" EC-MAG-94818-CW-RFB / Obra - Subproyecto: Component 1: Investments Tecnificación de Riego Solicitud de Single Stage - En 2019-05- 2019-05- 2019-06- 2019-06- 2019-07- 2020-01- IBRD / 85150 for climate-smart sub- Posterior Open - National 521,781.70 0.00 Parcelario por ofertas One Envelope ejecución 06 13 12 27 17 13 projects Microaspersión para el Sistema de Riego Putucay EC-MAG-94819-CW-RFB / Obra - Subproyecto: Component 1: Investments Solicitud de Single Stage - Ejecución 2019-06- 2019-07- 2019-08- 2019-08- 2019-09- 2020-01- Implementación de Riego IBRD / 85150 for climate-smart sub- Posterior Open - National 433,490.87 0.00 ofertas One Envelope pendiente 28 03 02 19 10 08 Parcelario Tecnificado Luis projects Cordero EC-MAG-94899-CW-RFB / Obra - Subproyecto: Component 1: Investments Solicitud de Single Stage - En 2019-06- 2019-07- 2019-08- 2019-08- 2019-09- 2020-03- Implementación de IBRD / 85150 for climate-smart sub- Posterior Open - National 1,816,819.83 0.00 ofertas One Envelope ejecución 28 03 02 19 10 08 Sistema de Riego projects Tecnificado en el Predio "Las Mercedes" EC-MAG-94902-CW-RFB / Obra - Subproyecto: Component 1: Investments Implementación de Riego Solicitud de Single Stage - En 2019-06- 2019-07- 2019-08- 2019-08- 2019-09- 2020-03- COFN / C1410 for climate-smart sub- Posterior Open - National 983,136.62 0.00 Parcelario Tecnificado con ofertas One Envelope ejecución 28 03 02 19 10 08 projects las familias de usuarios de la Acequia Mundug Yamate EC-MAG-94904-CW-RFB / Obra - Subproyecto: Component 1: Investments Solicitud de Single Stage - Ejecución 2019-07- 2019-07- 2019-08- 2019-09- 2019-09- 2020-02- Implementación del IBRD / 85150 for climate-smart sub- Posterior Open - National 1,208,323.20 0.00 ofertas One Envelope pendiente 19 24 23 07 27 24 Sistema de Riego projects Tecnificado para la Comuna Chambitola EC-MAG-94906-CW-RFB / Obra -Subproyecto: Component 1: Investments Solicitud de Single Stage - Ejecución 2019-09- 2019-09- 2019-10- 2019-10- 2019-11- 2020-03- Implementación de Riego COFN / C1410 for climate-smart sub- Posterior Open - National 403,200.00 0.00 ofertas One Envelope pendiente 02 09 09 24 13 12 Parcelario Tecnificado projects "Campo Alegre" EC-MAG-119189-CW-RFB / OBRA: IMPLEMENTACIÓN DE MICRORESERVORIOS Component 1: Investments CON RIEGO Solicitud de Single Stage - Ejecución 2019-06- 2019-06- 2019-07- 2019-08- 2019-08- 2019-09- IBRD / 85150 for climate-smart sub- Posterior Open - National 1,054,201.92 0.00 PARCELARIO ofertas One Envelope pendiente 14 19 19 02 22 03 projects TECNIFICADO POR ASPERSIÓN Y GOTEO EN LA "JUNTA DE AGUAS DE RIEGO DE LA ACEQUIA DEL PUEBLO DE PIMAMPIRO" EC-MAG-119195-CW-RFB / OBRA: CONSTRUCCIÓN DE MICRORESERVORIOS E IMPLEMENTACIÓN DE RIEGO PARCELARIO Component 1: Investments TECNIFICADO PARA LA Solicitud de Single Stage - Ejecución 2019-06- 2019-06- 2019-07- 2019-08- 2019-09- 2020-05- IBRD / 85150 for climate-smart sub- Posterior Open - National 697,836.16 0.00 ASOCIACIÓN DE ofertas One Envelope pendiente 14 26 26 12 03 30 projects PRODUCCIÓN CAFETALERA DEL SUR ORIENTE DE LA PROVINCIA DE LOJA "PROCAFEQ" GOODS Bid Evaluation Activity Reference No. Estimated Actual Draft Pre- Draft Bidding Specific Proposal Loan / Market Procurement Prequalificatio Process Prequalification Bidding Documents Report and Contract / Description Component Review Type Method Amount Amount qualification Document / Procurement Notice Submission / Signed Contract Credit No. Approach Process n (Y/N) Status Evaluation Report as Issued Recommendation for Completion (US$) (US$) Documents Justification / Invitation Opening / Minutes Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual EC-MAGAP-8176-046 / Component 3: Project Solicitud de Single Stage - 2016-05- 2016-09- 2016-10- Equipos de cómputo, IBRD / 85150 Posterior Open - National 44,061.00 37,203.90 Firmado Management cotizaciones One Envelope 17 29 28 impresora y proyector UGP EC-MAGAP-8176-047 / Component 3: Project Solicitud de Single Stage - 2016-05- 2016-10- 2016-11- IBRD / 85150 Posterior Open - National 182,400.00 144,535.00 Firmado Vehículos (4) Management cotizaciones One Envelope 17 31 29 EC-MAGAP-8176-049 / Component 3: Project Solicitud de Single Stage - 2017-02- 2017-04- 2017-05- IBRD / 85150 Posterior Open - National 40,698.00 33,426.62 Firmado Equipos de cómputo Management cotizaciones One Envelope 15 08 08 EC-MAGAP-32767-GO- Component 3: Project Solicitud de Single Stage - 2017-11- 2017-11- 2018-01- COFN / C1410 Posterior Open - National 39,566.13 24,074.40 Finalizado RFQ / Mobiliario para Management cotizaciones One Envelope 03 22 06 oficinas EC-MAGAP-32776-GO- Component 3: Project Solicitud de Single Stage - Ejecución 2017-11- 2017-11- 2017-12- IBRD / 85150 Posterior Open - National 4,592.00 0.00 RFQ / Materiales de Management cotizaciones One Envelope pendiente 06 25 25 oficina EC-MAGAP-32778-GO- Component 3: Project Solicitud de Single Stage - 2017-11- 2017-11- 2018-01- RFQ / Equipos y COFN / C1410 Posterior Open - National 71,548.96 60,858.15 Finalizado Management cotizaciones One Envelope 06 25 09 suministros informáticos EC-MAGAP-8176-050 / Component 3: Project Solicitud de Single Stage - 2017-02- 2017-04- 2017-05- Equipo topográfico: GPS IBRD / 85150 Posterior Open - National 2,234.40 0.00 Cancelado Management cotizaciones One Envelope 17 23 08 Diferencial y Nivel EC-MAGAP-8176-048 / Component 3: Project Solicitud de Single Stage - 2017-02- 2017-02- 2017-03- 2017-03- 2017-04- 2017-05- IBRD / 85150 Posterior Open - National 228,000.00 0.00 Cancelado Vehículos Management ofertas One Envelope 13 17 19 29 23 23 EC-MAG-74050-GO-RFB / Component 3: Project Solicitud de Single Stage - 2018-09- 2018-09- 2018-10- 2018-10- 2018-11- 2018-12- Adquisición de Vehículos COFN / C1410 Posterior Open - National 170,240.00 143,498.05 Firmado Management ofertas One Envelope 17 22 20 25 04 31 para la UGP-PIT EC-MAGAP-32575-GO- Component 3: Project Solicitud de Single Stage - 2017-10- 2017-11- 2017-12- RFQ / Vehículos para COFN / C1410 Posterior Open - National 99,902.88 0.00 Cancelado Management cotizaciones One Envelope 30 18 08 Oficinas Técnicas Zonales (3) EC-MAGAP-32777-GO- Component 3: Project Solicitud de Single Stage - Ejecución 2018-11- 2018-11- 2018-12- RFQ / Vestuario-Prendas IBRD / 85150 Posterior Open - National 34,720.00 0.00 Management cotizaciones One Envelope pendiente 08 21 06 de Proteccion EC-MAGAP-32781-GO- Component 3: Project Solicitud de Single Stage - 2017-11- 2017-12- 2018-01- COFN / C1410 Posterior Open - National 4,480.00 0.00 Cancelado RFQ / Kits para análisis Management cotizaciones One Envelope 13 02 01 de campo EC-MAGAP-32779-GO- Component 3: Project Solicitud de Single Stage - 2017-11- 2017-11- 2017-12- COFN / C1410 Posterior Open - National 11,200.00 0.00 Cancelado RFQ / Equipo Management cotizaciones One Envelope 10 29 19 micromolinete NON CONSULTING SERVICES Bid Evaluation Activity Reference No. Estimated Actual Draft Pre- Draft Bidding Specific Proposal Loan / Market Procurement Prequalificatio Process Prequalification Bidding Documents Report and Contract / Description Component Review Type Method Amount Amount qualification Document / Procurement Notice Submission / Signed Contract Credit No. Approach Process n (Y/N) Status Evaluation Report as Issued Recommendation for Completion (US$) (US$) Documents Justification / Invitation Opening / Minutes Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual EC-MAGAP-8176-026 / Sistema informático MSE Component 3: Project Adquisición 2016-08- 2016-09- 2016-11- 2016-12- IBRD / 85150 Posterior Direct 8,550.00 8,550.00 Firmado Financiero: diseño, Management directa 15 22 02 02 capacitación y mantenimiento EC-MAGAP-14944-NC- Component 2: Capacity RFQ / EVENTO DE building for institutional Solicitud de Single Stage - 2017-05- 2017-05- 2017-05- IBRD / 85150 Posterior Limited 16,121.24 16,120.00 Firmado ESCUELA NACIONAL DE stakeholders and cotizaciones One Envelope 12 16 18 IIRIGACIÓN CAMPESINA beneficiaries’ organizations EC-MAGAP-8176-023 / Component 3: Project Solicitud de Single Stage - 2017-04- 2017-06- 2017-10- Eventos (Promoción y IBRD / 85150 Posterior Open - National 11,400.00 0.00 Cancelado Management cotizaciones One Envelope 13 30 31 Difusión) EC-MAGAP-8176-024 / Component 3: Project Solicitud de Single Stage - 2017-04- 2017-06- 2017-10- Avisos de prensa IBRD / 85150 Posterior Open - National 11,400.00 0.00 Cancelado Management cotizaciones One Envelope 13 30 31 (Promoción y Difusión) EC-MAGAP-8176-025 / Pautaje de radio locales Component 3: Project Solicitud de Single Stage - 2017-04- 2017-06- 2017-10- IBRD / 85150 Posterior Open - National 14,250.00 0.00 Cancelado cuñas/ spot de television Management cotizaciones One Envelope 13 30 31 (Promoción y Difusión) EC-MAGAP-8176-020 / Apoyo legal para legalización tenencia de la Component 1: Investments Solicitud de Single Stage - 2017-06- 2017-08- 2018-02- tierra, organizaciones y IBRD / 85150 for climate-smart sub- Posterior Open - National 8,550.00 0.00 Cancelado cotizaciones One Envelope 13 08 04 concesiones de agua para projects pequeños reservorios individuales y/o colectivos EC-MAGAP-8176-021 / Apoyo legal para Component 1: Investments legalización tenencia de la Solicitud de Single Stage - 2017-06- 2017-08- 2018-01- IBRD / 85150 for climate-smart sub- Posterior Open - National 25,080.00 0.00 Cancelado tierra, organizaciones y cotizaciones One Envelope 13 02 29 projects concesiones de agua para parcelas agrícolas EC-MAGAP-8176-022 / Component 3: Project Solicitud de Single Stage - 2017-04- 2017-06- 2017-10- Impresiones (Promoción y IBRD / 85150 Posterior Open - National 11,400.00 0.00 Cancelado Management cotizaciones One Envelope 13 30 31 Difusión) Page 3 EC-MAGAP-8176-017 / Asis. Tec. & Cap. de Component 1: Investments aproximadamente 14 Solicitud de Single Stage - 2017-08- 2017-08- 2017-09- 2017-09- 2017-10- 2018-10- IBRD / 85150 for climate-smart sub- Posterior Open - National 583,121.58 0.00 Cancelado subproyectos de riego ofertas One Envelope 01 15 12 26 10 05 projects parcelario de la primera convocatoria EC-MAGAP-8176-011 / Component 1: Investments Solicitud de Open - Single Stage - 2017-04- 2017-04- 2017-05- 2017-06- 2017-07- 2018-01- Asis. Tec. & Capacitación IBRD / 85150 for climate-smart sub- Posterior 515,299.52 0.00 Cancelado ofertas International One Envelope 01 06 18 17 22 18 de riego tecnificado projects parcelario. EC-MAGAP-8176-019 / Asis. Tec. & Cap. de Component 1: Investments aproximadamente 2 Solicitud de Single Stage - 2016-05- 2016-05- 2016-06- 2016-06- 2016-07- 2017-02- IBRD / 85150 for climate-smart sub- Posterior Open - National 100,713.35 0.00 Cancelado subproyectos de ofertas One Envelope 01 15 12 26 10 05 projects microreservorios primera convocatoria EC-MAG-74026-NC-RFQ / Servicio logístico para realizar talleres de Component 1: Investments Solicitud de Single Stage - Ejecución 2018-09- 2018-10- 2018-12- preparación y evaluación, IBRD / 85150 for climate-smart sub- Posterior Open - National 22,400.00 0.00 cotizaciones One Envelope pendiente 19 02 31 demandadas por la projects Coordinación del PIT y Dirección Técnica. EC-MAG-74029-NC-RFQ / Servicio logístico para Component 1: Investments realizar talleres de Solicitud de Single Stage - Ejecución 2018-09- 2018-10- 2018-12- IBRD / 85150 for climate-smart sub- Posterior Open - National 28,000.00 0.00 promoción, demandadas cotizaciones One Envelope pendiente 19 02 31 projects por la Coordinación del PIT y la Dirección Técnica. EC-MAGAP-32577-NC- RFQ / Servicio logístico Component 1: Investments Solicitud de Single Stage - 2017-10- 2017-11- 2017-12- para el desarrollo de IBRD / 85150 for climate-smart sub- Posterior Limited 20,000.00 0.00 Cancelado cotizaciones One Envelope 29 09 24 eventos de promoción y projects difusión de los subproyectos EC-MAGAP-37384-NC- Component 1: Investments Solicitud de Single Stage - 2018-03- 2018-03- 2018-12- RFQ / Servicio logístico IBRD / 85150 for climate-smart sub- Posterior Open - National 72,800.00 0.00 Cancelado cotizaciones One Envelope 03 28 31 para eventos y talleres projects EC-MAGAP-37385-NC- Component 1: Investments Solicitud de Single Stage - 2018-03- 2018-04- 2018-12- RFQ / Servicio de IBRD / 85150 for climate-smart sub- Posterior Open - National 84,000.00 0.00 Cancelado cotizaciones One Envelope 10 04 31 publicación en medios projects escritos EC-MAGAP-37386-NC- Component 1: Investments Solicitud de Single Stage - 2018-03- 2018-04- 2018-12- RFQ / Servicio de difusión IBRD / 85150 for climate-smart sub- Posterior Open - National 32,704.00 0.00 Cancelado cotizaciones One Envelope 26 20 31 radial y promoción en projects redes sociales EC-MAGAP-18328-NC- RFQ / CONTRATACIÓN DEL SERVICIO DE EMISIÓN DE PASAJES Component 3: Project Solicitud de Single Stage - 2017-06- 2017-06- 2017-12- AÉREOS, PARA LOS COFN / C1410 Posterior Limited 17,920.00 0.00 Cancelado Management cotizaciones One Envelope 16 19 16 FUNCIONARIOS Y SERVIDORES DE LA UNIDAD DE GESTIÓN DEL PROYECTO PIT UGP-PIT EC-MAGAP-32784-NC- Component 3: Project Solicitud de Single Stage - 2017-11- 2017-12- 2017-12- IBRD / 85150 Posterior Open - National 3,360.00 0.00 Cancelado RFQ / Licencias de Management cotizaciones One Envelope 15 04 24 software EC-MAG-86481-NC-RFQ / Component 2: Capacity Servicio de topografía building for institutional Solicitud de Single Stage - Ejecución 2018-11- 2018-12- 2019-02- IBRD / 85150 Posterior Open - National 43,680.00 0.00 (Subproyecto Jima, stakeholders and cotizaciones One Envelope pendiente 20 10 28 Paquiestancia y Sanambay) beneficiaries’ organizations CONSULTING FIRMS Activity Reference No. Actual Short List and Opening of Combined Loan / Market Contract Type Estimated Process Expression of Request for Evaluation of Contract / Description Component Review Type Method Amount Terms of Reference Draft Request for Technical Proposals Evaluation Report Signed Contract Credit No. Approach Amount (US$) Status Interest Notice Proposals as Issued Technical Proposal Completion (US$) Proposals / Minutes and Draft Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Negotiated Contract Actual Planned Actual Planned Actual EC-MAGAP-8176-051 / Component 3: Project Selección 2016-08- 2016-09- 2016-10- 2016-10- 2016-10- 2016-11- 2017-05- IBRD / 85150 Posterior Open - National 20,000.00 0.00 En ejecución 2016-07-22 Auditoría Financiera Management basada en el 05 30 14 21 28 12 11 menor costo EC-MAGAP-8176-052 / Selección Component 3: Project 2016-12- 2017-01- 2017-01- 2017-02- 2017-02- 2017-03- 2018-03- Sistema informático IBRD / 85150 Posterior basada en Open - National 102,727.78 102,697.98 Firmado 2016-12-23 Management 28 13 15 04 21 19 19 gerencia de SMM&E calidad y costo EC-MAGAP-8176-053 / Component 1: Investments Selección Estudios de pre-inversión 2017-02- 2017-03- 2017-03- 2017-04- 2017-04- 2017-05- 2018-05- IBRD / 85150 for climate-smart sub- Posterior basada en Open - National 114,000.00 0.00 Cancelado 2017-02-15 en pequeños reservorios 20 08 30 09 21 08 08 projects calidad y costo individuales y/o colectivos EC-MAGAP-8176-054 / Component 1: Investments Selección 2017-02- 2017-03- 2017-03- 2017-04- 2017-04- 2017-05- 2018-05- Estudios de pre-inversión IBRD / 85150 for climate-smart sub- Posterior basada en Open - National 202,759.85 0.00 Cancelado 2017-02-15 20 08 30 09 21 08 08 en las parcelas agrícolas projects calidad y costo EC-MAG-74044-CS-LCS / Selección Contratación del Servicio Component 3: Project 2018-09- 2018-09- 2018-10- 2018-10- 2018-11- 2018-11- 2019-05- IBRD / 85150 Posterior basada en el Open - National 56,000.00 0.00 En ejecución 2018-09-05 de Auditoria Financiera Management 19 25 25 28 03 13 12 menor costo del Período Fiscal 2018 EC-MAG-74052-CS-LCS / Contratación de Servicio de Consultoría para la Selección Implementación de un Component 3: Project Ejecución 2018-10- 2018-10- 2018-11- 2018-11- 2018-11- 2018-12- 2019-03- IBRD / 85150 Posterior basada en el Open - National 67,200.00 0.00 2018-09-28 Software de Gestión Management pendiente 12 18 17 20 26 06 06 menor costo Documental en el Área de Tecnología y Desarrollo de la UGP-PIT EC-MAG-74058-CS-QCBS / Estudios de factibilidad y diseño definitivos Component 1: Investments Selección Ejecución 2018-10- 2018-10- 2018-11- 2018-11- 2018-12- 2018-12- 2019-10- integrales de subproyectos: IBRD / 85150 for climate-smart sub- Posterior basada en Open - National 365,526.99 0.00 2018-10-07 pendiente 21 27 26 29 05 15 21 riego, social y ambiental projects calidad y costo en las provincias con financiamiento BIRF EC-MAGAP-37589-CS- QCBS / Asistencia Técnica Component 2: Capacity Selección y Capacitación Plan building for institutional 2018-10- 2018-10- 2018-11- 2018-11- 2018-11- 2018-12- 2019-12- IBRD / 85150 Posterior basada en Open - National 167,357.12 0.00 Cancelado 2018-09-10 Productivo y Ambiental - stakeholders and 10 25 04 14 26 06 01 calidad y costo Junta de riego acequia beneficiaries’ organizations Mocha Huachi - Distribuidor Pinguilí EC-MAGAP-37271-CS- Component 1: Investments Selección 2018-07- 2018-07- 2018-07- 2018-08- 2018-09- 2018-09- 2019-07- QCBS / Supervisión de IBRD / 85150 for climate-smart sub- Posterior basada en Open - National 154,224.00 0.00 Cancelado 2018-07-01 06 24 28 17 03 29 26 obra de riego - Bolo projects calidad y costo Dolores EC-MAGAP-37612-CS- Component 2: Capacity Selección QCBS / Asistencia Técnica building for institutional Open - 2019-04- 2019-04- 2019-05- 2019-06- 2019-06- 2019-06- 2020-04- IBRD / 85150 Previa basada en 359,856.00 0.00 Cancelado 2019-04-01 y Capacitación Plan stakeholders and International 13 30 22 01 13 30 25 calidad y costo Productivo y Ambiental - beneficiaries’ organizations Bolo Dolores EC-MAGAP-37352-CS- QCBS / Estudios de Component 1: Investments Selección factibilidad y diseño Open - 2018-01- 2018-03- 2018-04- 2018-04- 2018-05- 2018-06- 2018-12- IBRD / 85150 for climate-smart sub- Posterior basada en 453,600.00 0.00 Cancelado 2018-01-10 definitivos integrales de International 31 12 06 21 16 09 06 projects calidad y costo subproyectos: riego, social y ambiental - Zona: Costa EC-MAGAP-37347-CS- QCBS / Estudios de Component 1: Investments Selección factibilidad y diseño Open - 2018-01- 2018-01- 2018-02- 2018-02- 2018-03- 2018-03- 2018-09- IBRD / 85150 for climate-smart sub- Previa basada en 604,800.00 0.00 Cancelado 2017-12-20 definitivos integrales de International 01 18 09 19 03 20 16 projects calidad y costo subproyectos: riego, social y ambiental - Zona: Sierra Norte EC-MAGAP-37351-CS- QCBS / Estudios de Component 1: Investments Selección factibilidad y diseño Open - 2018-01- 2018-01- 2018-02- 2018-02- 2018-03- 2018-03- 2018-09- IBRD / 85150 for climate-smart sub- Previa basada en 621,600.00 0.00 Cancelado 2017-12-20 definitivos integrales de International 01 18 09 19 03 20 16 projects calidad y costo subproyectos: riego, social y ambiental - Zona: Sierra Centro Sur EC-MAGAP-37613-CS- Component 2: Capacity Selección QCBS / Asistencia Técnica building for institutional 2018-11- 2018-12- 2019-01- 2019-01- 2019-01- 2019-02- 2019-12- IBRD / 85150 Posterior basada en Open - National 141,120.00 0.00 Cancelado 2018-11-13 y Capacitación Plan stakeholders and 25 12 03 13 25 11 08 calidad y costo Productivo y Ambiental - beneficiaries’ organizations Zhinzhon EC-MAGAP-37055-CS- Component 1: Investments Selección 2018-02- 2018-03- 2018-03- 2018-04- 2018-04- 2018-05- 2018-11- QCBS / Supervisión de IBRD / 85150 for climate-smart sub- Posterior basada en Open - National 109,166.40 0.00 Cancelado 2018-02-15 20 10 14 03 20 16 12 obra de riego - Las projects calidad y costo Mercedes EC-MAGAP-37587-CS- QCBS / Asistencia Técnica Component 2: Capacity Selección y Capacitación Plan building for institutional 2018-07- 2018-07- 2018-08- 2018-09- 2018-09- 2018-09- 2019-07- IBRD / 85150 Posterior basada en Open - National 104,428.80 0.00 Cancelado 2018-07-02 Productivo y Ambiental - stakeholders and 14 31 22 01 13 30 27 calidad y costo Directorio de aguas de la beneficiaries’ organizations acequia "Mundug Yamate" EC-MAGAP-37580-CS- Component 2: Capacity Selección QCBS / Asistencia Técnica building for institutional 2018-08- 2018-08- 2018-09- 2018-10- 2018-10- 2018-10- 2019-08- IBRD / 85150 Posterior basada en Open - National 254,721.60 0.00 Cancelado 2018-08-01 y Capacitación Plan stakeholders and 13 30 21 01 13 30 26 calidad y costo Productivo y Ambiental - beneficiaries’ organizations Las Mercedes EC-MAGAP-37272-CS- Component 1: Investments Selección 2018-06- 2018-07- 2018-07- 2018-07- 2019-01- QCBS / Supervisión de IBRD / 85150 for climate-smart sub- Posterior basada en Open - National 60,480.00 0.00 Cancelado 2018-06-01 21 06 16 31 27 obra de riego - Zhinzhon projects calificaciones de consultores Page 4 EC-MAGAP-37596-CS- Component 2: Capacity Selección QCBS / Asistencia Técnica building for institutional basada en 2018-09- 2018-09- 2018-09- 2018-10- 2019-08- IBRD / 85150 Posterior Open - National 28,224.00 0.00 Cancelado 2018-08-12 y Capacitación Plan stakeholders and calificaciones de 01 16 26 11 07 Productivo y Ambiental - beneficiaries’ organizations consultores Tolontag EC-MAGAP-37606-CS- Component 2: Capacity Selección QCBS / Asistencia Técnica building for institutional basada en 2018-06- 2018-06- 2018-07- 2018-07- 2019-05- IBRD / 85150 Posterior Open - National 66,326.40 0.00 Cancelado 2018-05-18 y Capacitación Plan stakeholders and calificaciones de 07 22 02 17 13 Productivo y Ambiental - beneficiaries’ organizations consultores La Belgica EC-MAGAP-37603-CS- Component 2: Capacity Selección QCBS / Asistencia Técnica building for institutional basada en 2018-12- 2018-12- 2018-12- 2019-01- 2019-11- IBRD / 85150 Posterior Open - National 39,513.60 0.00 Cancelado 2018-11-15 y Capacitación Plan stakeholders and calificaciones de 05 20 30 14 10 Productivo y Ambiental - beneficiaries’ organizations consultores Milagro EC-MAGAP-37268-CS- Component 1: Investments Selección 2018-05- 2018-06- 2018-06- 2018-06- 2018-12- QCBS / Supervisión de IBRD / 85150 for climate-smart sub- Posterior basada en Open - National 51,408.00 0.00 Cancelado 2018-05-01 21 05 15 30 27 obra de riego - projects calificaciones de Chambitola consultores EC-MAGAP-37608-CS- Component 2: Capacity Selección QCBS / Asistencia Técnica building for institutional basada en 2018-10- 2018-11- 2018-11- 2018-11- 2019-09- IBRD / 85150 Posterior Open - National 52,214.40 0.00 Cancelado 2018-10-01 y Capacitación Plan stakeholders and calificaciones de 21 05 15 30 26 Productivo y Ambiental - beneficiaries’ organizations consultores Jesús María EC-MAGAP-37257-CS- Selección QCBS / Supervisión de Component 1: Investments basada en 2017-12- 2018-01- 2018-01- 2018-02- 2018-11- obra de riego - Directorio COFN / C1410 for climate-smart sub- Posterior Open - National 50,363.40 0.00 Cancelado 2017-12-11 calificaciones de 31 15 25 09 06 de aguas de la acequia projects consultores "Mundug Yamate" EC-MAGAP-37593-CS- Component 2: Capacity Selección QCBS / Asistencia Técnica building for institutional basada en 2018-05- 2018-06- 2018-06- 2018-06- 2019-04- IBRD / 85150 Posterior Open - National 52,637.76 0.00 Cancelado 2018-05-01 y Capacitación Plan stakeholders and calificaciones de 21 05 15 30 26 Productivo y Ambiental - beneficiaries’ organizations consultores Luis Cordero EC-MAGAP-37594-CS- Component 2: Capacity Selección QCBS / Asistencia Técnica building for institutional basada en 2018-05- 2018-06- 2018-06- 2018-06- 2019-04- IBRD / 85150 Posterior Open - National 88,997.33 0.00 Cancelado 2018-05-01 y Capacitación Plan stakeholders and calificaciones de 21 05 15 30 26 Productivo y Ambiental - beneficiaries’ organizations consultores Putucay EC-MAGAP-37604-CS- Component 2: Capacity Selección QCBS / Asistencia Técnica building for institutional 2018-10- 2018-10- 2018-11- 2018-11- 2018-12- 2018-12- 2019-10- IBRD / 85150 Posterior basada en Open - National 119,952.00 0.00 Cancelado 2018-09-20 y Capacitación Plan stakeholders and 02 19 10 20 02 19 15 calidad y costo Productivo y Ambiental - beneficiaries’ organizations Chambitola EC-MAGAP-37601-CS- Component 2: Capacity Selección QCBS / Asistencia Técnica building for institutional basada en 2018-08- 2018-09- 2018-09- 2018-10- 2019-08- IBRD / 85150 Posterior Open - National 70,560.00 0.00 Cancelado 2018-08-10 y Capacitación Plan stakeholders and calificaciones de 30 14 24 09 05 Productivo y Ambiental - beneficiaries’ organizations consultores La Magdalena EC-MAGAP-37583-CS- Component 2: Capacity Selección QCBS / Asistencia Técnica building for institutional basada en 2018-04- 2018-05- 2018-05- 2018-06- 2019-03- IBRD / 85150 Posterior Open - National 23,856.34 0.00 Cancelado 2018-04-02 y Capacitación Plan stakeholders and calificaciones de 22 07 17 01 28 Productivo y Ambiental - beneficiaries’ organizations consultores Huaquer EC-MAGAP-37610-CS- Component 2: Capacity Selección QCBS / Asistencia Técnica building for institutional basada en 2018-07- 2018-08- 2018-08- 2018-08- 2019-06- IBRD / 85150 Posterior Open - National 47,980.80 0.00 Cancelado 2018-07-02 y Capacitación Plan stakeholders and calificaciones de 22 06 16 31 27 Productivo y Ambiental - beneficiaries’ organizations consultores Chumblin EC-MAGAP-37598-CS- Component 2: Capacity Selección QCBS / Asistencia Técnica building for institutional basada en 2018-05- 2018-05- 2018-06- 2018-06- 2019-04- y Capacitación Plan IBRD / 85150 Posterior Open - National 31,752.00 0.00 Cancelado 2018-04-25 stakeholders and calificaciones de 15 30 09 24 20 Productivo y Ambiental - beneficiaries’ organizations consultores Verde Pacayunga EC-MAGAP-37602-CS- Component 2: Capacity Selección QCBS / Asistencia Técnica building for institutional basada en 2018-08- 2018-09- 2018-09- 2018-10- 2019-08- IBRD / 85150 Posterior Open - National 56,448.00 0.00 Cancelado 2018-08-10 y Capacitación Plan stakeholders and calificaciones de 30 14 24 09 05 Productivo y Ambiental - beneficiaries’ organizations consultores La Libertad EC-MAGAP-37597-CS- Component 2: Capacity QCBS / Asistencia Técnica Selección building for institutional 2018-05- 2018-05- 2018-06- 2018-07- 2018-07- 2018-07- 2019-05- y Capacitación Plan IBRD / 85150 Posterior basada en Open - National 93,844.80 0.00 Cancelado 2018-05-01 stakeholders and 13 30 21 01 13 30 26 Productivo y Ambiental - calidad y costo beneficiaries’ organizations Estero Piedras EC-MAGAP-37605-CS- Component 2: Capacity Selección QCBS / Asistencia Técnica building for institutional 2019-01- 2019-01- 2019-02- 2019-02- 2019-03- 2019-03- 2020-01- IBRD / 85150 Posterior basada en Open - National 285,768.00 0.00 Cancelado 2018-12-20 y Capacitación Plan stakeholders and 01 18 09 19 03 20 14 calidad y costo Productivo y Ambiental - beneficiaries’ organizations La Paquita EC-MAGAP-37599-CS- Component 2: Capacity QCBS / Asistencia Técnica Selección building for institutional 2018-07- 2018-08- 2018-09- 2018-09- 2018-09- 2018-10- 2019-08- y Capacitación Plan IBRD / 85150 Posterior basada en Open - National 93,139.20 0.00 Cancelado 2018-07-16 stakeholders and 28 14 05 15 27 14 10 Productivo y Ambiental - calidad y costo beneficiaries’ organizations La Y del Guineo EC-MAGAP-37591-CS- QCBS / Asistencia Técnica Component 2: Capacity Selección y Capacitación Plan building for institutional 2018-09- 2018-10- 2018-10- 2018-11- 2018-11- 2018-12- 2019-09- IBRD / 85150 Posterior basada en Open - National 215,208.00 0.00 Cancelado 2018-09-03 Productivo y Ambiental - stakeholders and 15 02 24 03 15 02 28 calidad y costo Junta General de Usuarios beneficiaries’ organizations Píllaro - Ramal Norte (15 módulos) EC-MAG-74381-CS-QCBS Component 2: Capacity Selección / Asistencia Técnica y building for institutional 2018-09- 2018-10- 2018-11- 2018-11- 2018-11- 2018-12- 2019-12- IBRD / 85150 Posterior basada en Open - National 201,163.59 0.00 Cancelado 2018-09-10 Capacitación Plan stakeholders and 25 10 09 14 27 06 01 calidad y costo Productivo y Ambiental - beneficiaries’ organizations Toacaso EC-MAG-74411-CS-CQS / Fiscalización de Obra de Selección Component 1: Investments Riego - Implementación de basada en 2018-11- 2018-11- 2018-12- 2018-12- 2019-04- IBRD / 85150 for climate-smart sub- Posterior Open - National 62,995.48 0.00 En ejecución 2018-10-23 sistema de riego por calificaciones de 07 29 04 10 09 projects aspersión en el predio "La consultores Paquita". EC-MAG-74409-CS-CQS / Capacitación Técnica Component 2: Capacity Selección Integral para building for institutional basada en Ejecución 2018-11- 2018-11- 2018-12- 2018-12- 2019-06- IBRD / 85150 Posterior Open - National 89,600.00 0.00 2018-10-23 Organizaciones y stakeholders and calificaciones de pendiente 07 29 04 10 08 usuarios/as - beneficiaries’ organizations consultores productores/as y equipo técnico. EC-MAGAP-37262-CS- QCBS / Supervisión de Component 1: Investments Selección 2017-12- 2017-12- 2017-12- 2018-01- 2018-02- 2018-03- 2018-12- obra de riego - Junta COFN / C1410 for climate-smart sub- Posterior basada en Open - National 101,779.31 0.00 Cancelado 2017-12-01 06 24 28 17 03 01 26 General de Usuarios projects calidad y costo Píllaro - Ramal Norte (15 módulos) EC-MAGAP-37252-CS- Component 1: Investments Selección 2018-01- 2018-01- 2018-02- 2018-02- 2018-08- QCBS / Supervisión de IBRD / 85150 for climate-smart sub- Posterior basada en Open - National 39,916.80 0.00 Cancelado 2017-12-20 09 24 03 18 17 obra de riego - Santa Ana projects calificaciones de consultores EC-MAGAP-37266-CS- Component 1: Investments Selección 2018-01- 2018-01- 2018-02- 2018-02- 2018-07- QCBS / Supervisión de IBRD / 85150 for climate-smart sub- Posterior basada en Open - National 44,217.60 0.00 Cancelado 2017-12-20 09 24 03 18 18 obra de riego - Estero projects calificaciones de Piedras consultores EC-MAGAP-37267-CS- Component 1: Investments Selección 2018-02- 2018-02- 2018-03- 2018-03- 2018-09- QCBS / Supervisión de IBRD / 85150 for climate-smart sub- Posterior basada en Open - National 44,352.00 0.00 Cancelado 2018-01-15 04 19 01 16 12 obra de riego - La Y del projects calificaciones de Guineo consultores EC-MAGAP-37270-CS- Component 1: Investments Selección 2018-05- 2018-05- 2018-05- 2018-06- 2018-07- 2018-07- 2019-04- QCBS / Supervisión de IBRD / 85150 for climate-smart sub- Posterior basada en Open - National 122,472.00 0.00 Cancelado 2018-05-01 06 24 28 17 04 30 26 obra de riego - La projects calidad y costo Paquita EC-MAGAP-37581-CS- Component 2: Capacity Selección QCBS / Asistencia Técnica building for institutional basada en 2018-06- 2018-07- 2018-07- 2018-07- 2019-05- IBRD / 85150 Posterior Open - National 84,672.00 0.00 Cancelado 2018-06-01 y Capacitación Plan stakeholders and calificaciones de 21 06 16 31 27 Productivo y Ambiental - beneficiaries’ organizations consultores Santa Ana EC-MAG-75734-CS-CQS / Component 2: Capacity Selección Asistencia Técnica y building for institutional basada en 2018-11- 2018-11- 2018-12- 2018-12- 2019-06- IBRD / 85150 Posterior Open - National 43,974.64 0.00 Cancelado 2018-10-23 Capacitación Plan stakeholders and calificaciones de 07 29 04 10 08 Ambiental y Productivo - beneficiaries’ organizations consultores Santa Ana EC-MAGAP-37614-CS- Component 2: Capacity Selección QCBS / Asistencia Técnica building for institutional basada en 2018-01- 2018-02- 2018-02- 2018-03- 2019-01- IBRD / 85150 Posterior Open - National 52,012.80 0.00 Cancelado 2018-01-10 y Capacitación Plan stakeholders and calificaciones de 30 14 24 11 05 Productivo - San Rafael beneficiaries’ organizations consultores EC-MAG-75756-CS-CQS / Component 2: Capacity Selección Asistencia Técnica y building for institutional basada en 2018-11- 2018-11- 2018-12- 2018-12- 2019-06- IBRD / 85150 Posterior Open - National 52,012.80 0.00 En ejecución 2018-10-23 Capacitación Plan stakeholders and calificaciones de 07 29 04 10 08 Productivo y Ambiental - beneficiaries’ organizations consultores San Rafael EC-MAGAP-37615-CS- Component 2: Capacity Selección QCBS / Asistencia Técnica building for institutional basada en 2018-01- 2018-02- 2018-02- 2018-03- 2019-01- IBRD / 85150 Posterior Open - National 66,206.81 0.00 Cancelado 2018-01-10 y Capacitación Plan stakeholders and calificaciones de 30 14 24 11 05 Productivo - Pucalpa beneficiaries’ organizations consultores EC-MAG-75759-CS-CQS / Component 2: Capacity Selección Asistencia Técnica y building for institutional basada en 2018-11- 2018-11- 2018-12- 2018-12- 2019-06- IBRD / 85150 Posterior Open - National 66,206.82 0.00 En ejecución 2018-10-23 Capacitación Plan stakeholders and calificaciones de 07 29 04 10 08 Productivo y Ambiental - beneficiaries’ organizations consultores Pucalpa EC-MAGAP-37617-CS- Component 2: Capacity Selección QCBS / Asistencia Técnica building for institutional basada en 2018-01- 2018-02- 2018-02- 2018-03- 2019-01- IBRD / 85150 Posterior Open - National 69,216.00 0.00 Cancelado 2018-01-10 y Capacitación Plan stakeholders and calificaciones de 30 14 24 11 05 Productivo - Gral. Plaza beneficiaries’ organizations consultores EC-MAG-75760-CS-CQS / Component 2: Capacity Selección Asistencia Técnica y building for institutional basada en 2018-11- 2018-11- 2018-12- 2018-12- 2019-06- IBRD / 85150 Posterior Open - National 69,216.00 0.00 Cancelado 2018-10-23 Capacitación Plan stakeholders and calificaciones de 07 29 04 10 08 Productivo y Ambiental - beneficiaries’ organizations consultores Gral. Plaza Page 5 EC-MAGAP-37618-CS- Component 2: Capacity Selección QCBS / Asistencia Técnica building for institutional basada en 2018-01- 2018-02- 2018-02- 2018-03- 2019-01- IBRD / 85150 Posterior Open - National 52,155.01 0.00 Cancelado 2018-01-10 y Capacitación Plan stakeholders and calificaciones de 30 14 24 11 05 Productivo - Palmar beneficiaries’ organizations consultores Grande EC-MAG-75761-CS-CQS / Component 2: Capacity Selección Asistencia Técnica y building for institutional basada en 2018-11- 2018-11- 2018-12- 2018-12- 2019-06- Capacitación Plan IBRD / 85150 Posterior Open - National 52,155.01 0.00 En ejecución 2018-10-23 stakeholders and calificaciones de 07 29 04 10 08 Productivo y Ambiental - beneficiaries’ organizations consultores Palmar Grande EC-MAGAP-37619-CS- Component 2: Capacity Selección QCBS / Asistencia Técnica building for institutional basada en 2018-01- 2018-02- 2018-02- 2018-03- 2019-01- IBRD / 85150 Posterior Open - National 33,787.42 0.00 Cancelado 2018-01-10 y Capacitación Plan stakeholders and calificaciones de 30 14 24 11 05 Productivo - Cutahua beneficiaries’ organizations consultores EC-MAG-75762-CS-CQS / Component 2: Capacity Selección Asistencia Técnica y building for institutional basada en 2018-11- 2018-11- 2018-12- 2018-12- 2019-06- IBRD / 85150 Posterior Open - National 33,787.43 0.00 En ejecución 2018-10-23 Capacitación Plan stakeholders and calificaciones de 07 29 04 10 08 Productivo y Ambiental - beneficiaries’ organizations consultores Cutahua EC-MAGAP-37620-CS- Component 2: Capacity Selección QCBS / Asistencia Técnica building for institutional basada en 2018-01- 2018-02- 2018-02- 2018-03- 2019-01- IBRD / 85150 Posterior Open - National 27,870.36 0.00 Cancelado 2018-01-10 y Capacitación Plan stakeholders and calificaciones de 30 14 24 11 05 Productivo - Zhilla beneficiaries’ organizations consultores EC-MAG-75763-CS-CQS / Component 2: Capacity Selección Asistencia Técnica y building for institutional basada en 2018-11- 2018-11- 2018-12- 2018-12- 2019-06- IBRD / 85150 Posterior Open - National 27,870.36 0.00 En ejecución 2018-10-23 Capacitación Plan stakeholders and calificaciones de 07 29 04 10 08 Productivo y Ambiental - beneficiaries’ organizations consultores Zhilla EC-MAGAP-37621-CS- Component 2: Capacity Selección QCBS / Asistencia Técnica building for institutional basada en 2018-01- 2018-02- 2018-02- 2018-03- 2019-01- IBRD / 85150 Posterior Open - National 53,541.68 0.00 Cancelado 2018-01-10 y Capacitación Plan stakeholders and calificaciones de 30 14 24 11 05 Productivo - La era beneficiaries’ organizations consultores EC-MAG-75764-CS-CQS / Component 2: Capacity Selección Asistencia Técnica y building for institutional basada en 2018-11- 2018-11- 2018-12- 2018-12- 2019-06- IBRD / 85150 Posterior Open - National 53,541.69 0.00 En ejecución 2018-10-23 Capacitación Plan stakeholders and calificaciones de 07 29 04 10 08 Productivo y Ambiental - beneficiaries’ organizations consultores La Era EC-MAG-75765-CS-CQS / Component 2: Capacity Selección Asistencia Técnica y building for institutional basada en 2018-11- 2018-11- 2018-12- 2018-12- 2019-06- IBRD / 85150 Posterior Open - National 32,116.64 0.00 En ejecución 2018-10-23 Capacitación Plan stakeholders and calificaciones de 07 29 04 10 08 Productivo y Ambiental - beneficiaries’ organizations consultores Campozano EC-MAG-75766-CS-CQS / Component 2: Capacity Selección Asistencia Técnica y building for institutional basada en 2018-11- 2018-11- 2018-12- 2018-12- 2019-06- IBRD / 85150 Posterior Open - National 33,979.41 0.00 Cancelado 2018-10-23 Capacitación Plan stakeholders and calificaciones de 07 29 04 10 08 Productivo y Ambiental - beneficiaries’ organizations consultores El Marco EC-MAGAP-37623-CS- Component 2: Capacity Selección QCBS / Asistencia Técnica building for institutional basada en 2018-01- 2018-02- 2018-02- 2018-03- 2019-01- IBRD / 85150 Posterior Open - National 33,979.40 0.00 Cancelado 2018-01-10 y Capacitación Plan stakeholders and calificaciones de 30 14 24 11 05 Productivo - El Marco beneficiaries’ organizations consultores EC-MAGAP-37624-CS- Component 2: Capacity Selección QCBS / Asistencia Técnica building for institutional basada en 2018-01- 2018-02- 2018-02- 2018-03- 2019-01- IBRD / 85150 Posterior Open - National 31,264.69 0.00 Cancelado 2018-01-10 y Capacitación Plan stakeholders and calificaciones de 30 14 24 11 05 Productivo - Voluntad de beneficiaries’ organizations consultores Dios EC-MAG-75767-CS-CQS / Component 2: Capacity Selección Asistencia Técnica y building for institutional basada en 2018-11- 2018-11- 2018-12- 2018-12- 2019-06- Capacitación Plan IBRD / 85150 Posterior Open - National 31,264.71 0.00 Cancelado 2018-10-23 stakeholders and calificaciones de 07 29 04 10 08 Productivo y Ambiental - beneficiaries’ organizations consultores Voluntad de Dios EC-MAGAP-37625-CS- Component 2: Capacity Selección QCBS / Asistencia Técnica building for institutional basada en 2018-01- 2018-02- 2018-02- 2018-03- 2019-01- IBRD / 85150 Posterior Open - National 28,888.55 0.00 Cancelado 2018-01-10 y Capacitación Plan stakeholders and calificaciones de 30 14 24 11 05 Productivo - Palo Marcado beneficiaries’ organizations consultores EC-MAGAP-37622-CS- Component 2: Capacity Selección QCBS / Asistencia Técnica building for institutional basada en 2018-01- 2018-02- 2018-02- 2018-03- 2019-01- IBRD / 85150 Posterior Open - National 32,116.64 0.00 Cancelado 2018-01-10 y Capacitación Plan stakeholders and calificaciones de 30 14 24 11 05 Productivo - Campozano beneficiaries’ organizations consultores EC-MAG-75768-CS-CQS / Component 2: Capacity Selección Asistencia Técnica y building for institutional basada en 2018-11- 2018-11- 2018-12- 2018-12- 2019-06- IBRD / 85150 Posterior Open - National 28,888.56 0.00 En ejecución 2018-10-23 Capacitación Plan stakeholders and calificaciones de 07 29 04 10 08 Productivo y Ambiental - beneficiaries’ organizations consultores Palo Marcado EC-MAGAP-37585-CS- Component 2: Capacity Selección QCBS / Asistencia Técnica building for institutional basada en 2018-12- 2018-12- 2018-12- 2019-01- 2019-11- y Capacitación Plan IBRD / 85150 Posterior Open - National 33,163.20 0.00 Cancelado 2018-11-15 stakeholders and calificaciones de 05 20 30 14 10 Productivo y Ambiental - beneficiaries’ organizations consultores Nueva Esperanza EC-MAG-75769-CS-CQS / Component 2: Capacity Selección Asistencia Técnica y building for institutional basada en 2018-11- 2018-11- 2018-12- 2018-12- 2019-06- Capacitación Plan IBRD / 85150 Posterior Open - National 39,860.68 0.00 Cancelado 2018-10-23 stakeholders and calificaciones de 07 29 04 10 08 Productivo y Ambiental - beneficiaries’ organizations consultores Nueva Esperanza EC-MAG-75771-CS-CQS / Component 2: Capacity Selección Asistencia Técnica y building for institutional basada en 2018-11- 2018-11- 2018-12- 2018-12- 2019-06- Capacitación Plan IBRD / 85150 Posterior Open - National 30,033.57 0.00 Cancelado 2018-10-23 stakeholders and calificaciones de 07 29 04 10 08 Productivo y Ambiental - beneficiaries’ organizations consultores Sierra Morena EC-MAGAP-37586-CS- Component 2: Capacity Selección QCBS / Asistencia Técnica building for institutional basada en 2018-07- 2018-08- 2018-08- 2018-09- 2019-07- y Capacitación Plan IBRD / 85150 Posterior Open - National 35,251.78 0.00 Cancelado 2018-07-10 stakeholders and calificaciones de 30 14 24 08 05 Productivo y Ambiental - beneficiaries’ organizations consultores Sierra Morena EC-MAGAP-37592-CS- QCBS / Asistencia Técnica Component 2: Capacity y Capacitación Plan Selección building for institutional Open - 2018-12- 2018-12- 2019-01- 2019-01- 2019-02- 2019-02- 2019-12- Productivo y Ambiental - IBRD / 85150 Posterior basada en 409,248.00 0.00 Cancelado 2018-11-25 stakeholders and International 07 24 15 25 06 23 20 Junta General de Usuarios calidad y costo beneficiaries’ organizations del Sistema de Riego Píllaro Ramal El Rosario EC-MAGAP-37260-CS- Selección QCBS / Supervisión de Component 1: Investments basada en 2017-12- 2018-01- 2018-01- 2018-02- 2018-08- obra de riego - Junta de COFN / C1410 for climate-smart sub- Posterior Open - National 44,732.29 0.00 Cancelado 2017-12-08 calificaciones de 28 12 22 06 05 riego acequia Mocha projects consultores Huachi - Distribuidor Pinguilí EC-MAGAP-37383-CS- Selección Component 3: Project 2018-09- 2018-10- 2018-10- 2018-11- 2019-04- QCBS / Auditoría IBRD / 85150 Posterior basada en Open - National 56,000.00 0.00 Cancelado 2018-09-03 Management 23 08 18 02 01 Financiera - Tercer calificaciones de Periodo consultores EC-MAG-74363-CS-CQS / Fiscalización de Obra de Selección Riego - Implementación de Component 1: Investments basada en 2018-11- 2018-11- 2018-12- 2018-12- 2019-05- riego parcelario tecnificado COFN / C1410 for climate-smart sub- Posterior Open - National 70,623.46 0.00 Cancelado 2018-10-23 calificaciones de 07 29 04 10 09 en 15 módulos del sistema projects consultores de riego "Píllaro Ramal Norte" EC-MAG-74649-CS-CQS / Fiscalización de Obra de Riego - Subproyecto: Selección Implementación del Component 1: Investments basada en 2018-11- 2018-11- 2018-12- 2018-12- 2019-05- sistema de riego parcelario IBRD / 85150 for climate-smart sub- Posterior Open - National 16,853.13 0.00 Cancelado 2018-10-23 calificaciones de 07 29 04 10 09 por aspersión para la projects consultores "Asociación de Productores Agropecuarios La Nueva Esperanza" EC-MAG-74360-CS-CQS / Fiscalización de Obra de Selección Riego - Implementación Component 1: Investments basada en 2018-11- 2018-11- 2018-12- 2018-12- 2019-05- del Sistema de riego IBRD / 85150 for climate-smart sub- Posterior Open - National 15,627.84 0.00 Cancelado 2018-10-23 calificaciones de 07 29 04 10 09 parcelario por aspersión projects consultores para la Asociación Agropecuaria "Sierra Morena" EC-MAGAP-37265-CS- QCBS / Fiscalización de Obra de Riego - Component 1: Investments Selección 2018-09- 2018-10- 2018-11- 2018-11- 2018-11- 2018-12- 2019-10- Implementación de riego IBRD / 85150 for climate-smart sub- Posterior basada en Open - National 143,787.32 0.00 Cancelado 2018-09-09 14 28 01 15 27 05 31 parcelario tecnificado en projects calidad y costo veinte módulos del sistema de riego "Píllaro Ramal Sur" EC-MAG-74384-CS-CQS / Component 2: Capacity Selección Asistencia Técnica y building for institutional basada en 2018-09- 2018-10- 2018-11- 2018-11- 2019-11- IBRD / 85150 Posterior Open - National 88,248.29 0.00 Cancelado 2018-09-10 Capacitación Plan stakeholders and calificaciones de 20 25 04 14 09 Productivo y Ambiental - beneficiaries’ organizations consultores Sucuso EC-MAG-74057-CS-QCBS / Estudios de factibilidad y diseño definitivos Component 1: Investments Selección Ejecución 2018-10- 2018-10- 2018-11- 2018-11- 2018-12- 2018-12- 2019-08- integrales de subproyectos: COFN / C1410 for climate-smart sub- Posterior basada en Open - National 548,622.62 0.00 2018-10-07 pendiente 21 27 26 29 05 15 12 riego, social y ambiental projects calidad y costo en las provincias con financiamiento AECID Component 2: Capacity Selección EC-MAG-87308-CS-CQS / building for institutional basada en Ejecución 2018-12- 2019-01- 2019-01- 2019-01- 2019-07- Estudios Subproyecto COFN / C1410 Posterior Open - National 84,000.00 0.00 2018-11-29 stakeholders and calificaciones de pendiente 14 05 10 16 15 Sarachupa beneficiaries’ organizations consultores Page 6 Component 2: Capacity EC-MAG-87311-CS-QCBS Selección building for institutional Ejecución 2018-12- 2018-12- 2019-01- 2019-02- 2019-02- 2019-02- 2019-06- / Estudios Subproyecto COFN / C1410 Posterior basada en Open - National 168,000.00 0.00 2018-11-29 stakeholders and pendiente 14 29 28 02 15 24 30 Cebadas calidad y costo beneficiaries’ organizations Component 2: Capacity EC-MAG-87314-CS-QCBS Selección building for institutional Ejecución 2018-12- 2018-12- 2019-01- 2019-02- 2019-02- 2019-02- 2019-06- / Estudios Subproyecto IBRD / 85150 Posterior basada en Open - National 134,400.00 0.00 2018-11-29 stakeholders and pendiente 14 29 28 02 15 24 30 Santiago calidad y costo beneficiaries’ organizations EC-MAG-94800-CS-QCBS Component 2: Capacity / Capacitación y Asistencia Selección building for institutional Ejecución 2019-08- 2019-08- 2019-08- 2019-09- 2019-09- 2019-10- 2020-10- Técnica para la Puesta en IBRD / 85150 Posterior basada en Open - National 141,836.80 0.00 2019-07-22 stakeholders and pendiente 05 19 26 09 30 08 02 Marcha, Plan Productivo y calidad y costo beneficiaries’ organizations Ambiental - Píllaro Norte EC-MAG-94802-CS-QCBS Component 2: Capacity / Capacitación y Asistencia Selección building for institutional Ejecución 2019-08- 2019-08- 2019-08- 2019-09- 2019-09- 2019-10- 2020-10- Técnica para la Puesta en IBRD / 85150 Posterior basada en Open - National 179,956.00 0.00 2019-07-22 stakeholders and pendiente 05 19 26 09 30 08 02 Marcha, Plan Productivo y calidad y costo beneficiaries’ organizations Ambiental - Píllaro Sur EC-MAG-94807-CS-CQS / Component 2: Capacity Selección Capacitación y Asistencia building for institutional basada en Ejecución 2019-04- 2019-04- 2019-04- 2019-05- 2020-04- Técnica para la Puesta en IBRD / 85150 Posterior Open - National 43,909.68 0.00 2019-03-25 stakeholders and calificaciones de pendiente 08 23 28 06 30 Marcha, Plan Productivo y beneficiaries’ organizations consultores ambiental - La Magdalena EC-MAG-94809-CS-CQS / Component 2: Capacity Selección Capacitación y Asistencia building for institutional basada en Ejecución 2019-05- 2019-05- 2019-06- 2019-06- 2020-06- Técnica para la Puesta en IBRD / 85150 Posterior Open - National 45,564.11 0.00 2019-04-30 stakeholders and calificaciones de pendiente 14 29 03 11 05 Marcha, Plan Productivo y beneficiaries’ organizations consultores Ambiental - La Libertad EC-MAG-94810-CS-QCBS Component 2: Capacity / Capacitación y Asistencia Selección building for institutional Ejecución 2019-03- 2019-04- 2019-04- 2019-04- 2019-05- 2019-05- 2020-05- Técnica para la Puesta en IBRD / 85150 Posterior basada en Open - National 208,501.47 0.00 2019-03-04 stakeholders and pendiente 18 01 08 22 13 21 15 Marcha, Plan Productivo y calidad y costo beneficiaries’ organizations Ambiental - La Paquita EC-MAG-94811-CS-CQS / Component 2: Capacity Selección Capacitación y Asistencia building for institutional basada en Ejecución 2019-04- 2019-04- 2019-05- 2019-05- 2020-05- Técnica para la Puesta en IBRD / 85150 Posterior Open - National 29,857.89 0.00 2019-03-25 stakeholders and calificaciones de pendiente 08 27 02 10 04 Marcha, Plan Productivo y beneficiaries’ organizations consultores Ambiental - Estero Piedras EC-MAG-94941-CS-CQS / Fiscalización de Obra de Selección Component 1: Investments Riego - Implementación basada en Ejecución 2019-08- 2019-09- 2019-09- 2019-09- 2020-02- IBRD / 85150 for climate-smart sub- Posterior Open - National 72,499.39 0.00 2019-08-13 del Sistema de Riego calificaciones de pendiente 27 16 19 27 24 projects Tecnificado para la consultores Comuna Chambitola EC-MAG-94943-CS-QCBS Component 2: Capacity / Capacitación y Asistencia Selección building for institutional Ejecución 2019-10- 2019-10- 2019-10- 2019-11- 2019-12- 2019-12- 2020-12- Técnica para la Puesta en IBRD / 85150 Posterior basada en Open - National 106,779.99 0.00 2019-09-23 stakeholders and pendiente 07 21 28 11 02 10 04 Marcha, Plan Productivo y calidad y costo beneficiaries’ organizations Ambiental - Las Mercedes EC-MAG-94951-CS-CQS / Component 2: Capacity Selección Capacitación y Asistencia building for institutional basada en Ejecución 2019-06- 2019-07- 2019-07- 2019-07- 2020-07- Técnica para la Puesta en IBRD / 85150 Posterior Open - National 26,795.73 0.00 2019-06-03 stakeholders and calificaciones de pendiente 17 07 13 21 15 Marcha, Plan Productivo y beneficiaries’ organizations consultores Ambiental - Huaquer EC-MAG-94967-CS-LCS / Selección Servicio de Auditoria Component 3: Project Ejecución 2019-09- 2019-09- 2019-10- 2019-10- 2019-11- 2019-11- 2020-05- IBRD / 85150 Posterior basada en el Open - National 56,000.00 0.00 2019-09-05 Financiera del período Management pendiente 19 25 25 28 05 18 16 menor costo fiscal 2019 EC-MAG-95121-CS-QCBS / Fiscalización - Subproyecto: Component 1: Investments Selección 2019-02- 2019-02- 2019-03- 2019-03- 2019-04- 2019-04- 2020-01- Implementación de riego IBRD / 85150 for climate-smart sub- Posterior basada en Open - National 143,787.78 0.00 En ejecución 2019-01-28 11 25 04 18 08 16 11 parcelario tecnificado en projects calidad y costo veinte módulos del sistema de riego "Píllaro Ramal Sur" EC-MAG-95123-CS-CQS / Fiscalización - Subproyecto: Selección Component 1: Investments Implementación de riego basada en 2019-02- 2019-03- 2019-03- 2019-03- 2019-12- COFN / C1410 for climate-smart sub- Posterior Open - National 70,623.46 0.00 En ejecución 2019-01-28 parcelario tecnificado en calificaciones de 12 05 11 19 14 projects 15 módulos del sistema de consultores riego Píllaro Ramal Norte EC-MAG-95147-CS-CQS / Component 2: Capacity Selección Capacitación y Asistencia building for institutional basada en Ejecución 2019-11- 2019-11- 2019-12- 2019-12- 2020-12- para la Puesta en Marcha, IBRD / 85150 Posterior Open - National 65,548.46 0.00 2019-10-21 stakeholders and calificaciones de pendiente 04 25 02 10 04 Plan Productivo y beneficiaries’ organizations consultores Ambiental - Gúalc Cruz Rumi EC-MAG-95151-CS-CQS / Component 2: Capacity Selección Capacitación y Asistencia building for institutional basada en Ejecución 2019-11- 2019-11- 2019-12- 2019-12- 2020-12- Técnica para la Puesta en IBRD / 85150 Posterior Open - National 93,698.57 0.00 2019-10-21 stakeholders and calificaciones de pendiente 04 25 02 10 04 Marcha, Plan Productivo y beneficiaries’ organizations consultores Ambiental - Y del Guineo EC-MAG-95155-CS-CQS / Capacitación y Asistencia Component 2: Capacity Selección Técnica para la Puesta en building for institutional basada en Ejecución 2019-11- 2019-11- 2019-12- 2019-12- 2020-12- IBRD / 85150 Posterior Open - National 32,558.44 0.00 2019-10-21 Marcha, Plan Productivo y stakeholders and calificaciones de pendiente 04 25 02 10 04 Ambiental - El Verde beneficiaries’ organizations consultores Pacayunga EC-MAG-95167-CS-QCBS Component 2: Capacity / Capacitación y Asistencia Selección building for institutional Ejecución 2019-10- 2019-10- 2019-10- 2019-11- 2019-12- 2019-12- 2020-12- Técnica para la Puesta en IBRD / 85150 Posterior basada en Open - National 142,555.84 0.00 2019-09-23 stakeholders and pendiente 07 21 28 11 02 10 04 Marcha, Plan Productivo y calidad y costo beneficiaries’ organizations Ambiental - Mundug Yamate EC-MAG-95185-CS-CQS / Component 2: Capacity Selección Capacitación y Asistencia building for institutional basada en Ejecución 2019-11- 2019-11- 2019-12- 2019-12- 2020-12- Técnica para la Puesta en IBRD / 85150 Posterior Open - National 35,730.24 0.00 2019-10-21 stakeholders and calificaciones de pendiente 04 25 02 10 04 Marcha, Plan Productivo y beneficiaries’ organizations consultores Ambiental - Putucay EC-MAG-95187-CS-CQS / Component 2: Capacity Selección Capacitación y Asistencia building for institutional basada en Ejecución 2019-11- 2019-11- 2019-12- 2019-12- 2020-12- Técnica para la Puesta en IBRD / 85150 Posterior Open - National 45,358.91 0.00 2019-10-21 stakeholders and calificaciones de pendiente 04 25 02 10 04 Marcha, Plan Productivo y beneficiaries’ organizations consultores Ambiental - Luis Cordero EC-MAG-109154-CS-CQS Component 2: Capacity Selección / Asistencia Técnica y building for institutional basada en Ejecución 2019-07- 2019-07- 2019-07- 2019-08- 2020-05- Capacitación Plan IBRD / 85150 Posterior Open - National 64,418.09 0.00 2019-06-17 stakeholders and calificaciones de pendiente 01 22 29 06 02 Productivo y Ambiental - beneficiaries’ organizations consultores General Plaza EC-MAG-109156-CS-QCBS Component 2: Capacity Selección / Asistencia Técnica y building for institutional Ejecución 2019-06- 2019-06- 2019-06- 2019-07- 2019-07- 2019-08- 2020-05- IBRD / 85150 Posterior basada en Open - National 117,412.13 0.00 2019-05-20 Capacitación Plan stakeholders and pendiente 03 17 24 08 29 06 02 calidad y costo Productivo y Ambiental - beneficiaries’ organizations Pinguili EC-MAG-109171-CS-CQS Component 2: Capacity Selección / Asistencia Técnica y building for institutional basada en Ejecución 2019-07- 2019-07- 2019-07- 2019-08- 2020-05- Capacitación Plan IBRD / 85150 Posterior Open - National 61,592.45 0.00 2019-06-17 stakeholders and calificaciones de pendiente 01 22 29 06 02 Productivo y Ambiental - beneficiaries’ organizations consultores Sierra Morena EC-MAG-109173-CS-CQS Component 2: Capacity Selección / Asistencia Técnica y building for institutional basada en Ejecución 2019-07- 2019-07- 2019-07- 2019-08- 2020-05- IBRD / 85150 Posterior Open - National 80,508.46 0.00 2019-06-17 Capacitación Plan stakeholders and calificaciones de pendiente 01 22 29 06 02 Productivo y Ambiental - beneficiaries’ organizations consultores Sucuso EC-MAG-109176-CS-CQS Component 2: Capacity Selección / Asistencia Técnica y building for institutional basada en Ejecución 2019-07- 2019-07- 2019-07- 2019-08- 2020-05- IBRD / 85150 Posterior Open - National 46,650.53 0.00 2019-06-17 Capacitación Plan stakeholders and calificaciones de pendiente 01 22 29 06 02 Productivo y Ambiental - beneficiaries’ organizations consultores Santa Ana EC-MAG-109177-CS-CQS Component 2: Capacity Selección / Asistencia Técnica y building for institutional basada en Ejecución 2019-07- 2019-07- 2019-07- 2019-08- 2020-05- Capacitación Plan IBRD / 85150 Posterior Open - National 64,650.53 0.00 2019-06-17 stakeholders and calificaciones de pendiente 01 22 29 06 02 Productivo y Ambiental - beneficiaries’ organizations consultores Nueva Esperanza EC-MAG-109179-CS-QCBS Component 2: Capacity Selección / Asistencia Técnica y building for institutional Ejecución 2019-06- 2019-06- 2019-06- 2019-07- 2019-07- 2019-08- 2020-05- IBRD / 85150 Posterior basada en Open - National 184,177.04 0.00 2019-05-20 Capacitación Plan stakeholders and pendiente 03 17 24 08 29 06 02 calidad y costo Productivo y Ambiental - beneficiaries’ organizations Toacaso EC-MAG-109180-CS-CQS Component 2: Capacity Selección / Asistencia Técnica y building for institutional basada en Ejecución 2019-05- 2019-05- 2019-06- 2019-06- 2019-12- IBRD / 85150 Posterior Open - National 39,864.16 0.00 2019-04-22 Capacitación Plan stakeholders and calificaciones de pendiente 06 27 03 11 08 Productivo y Ambiental - beneficiaries’ organizations consultores El Marco EC-MAG-109182-CS-CQS Component 2: Capacity Selección / Asistencia Técnica y building for institutional basada en Ejecución 2019-05- 2019-05- 2019-06- 2019-06- 2019-12- Capacitación Plan IBRD / 85150 Posterior Open - National 41,888.46 0.00 2019-04-22 stakeholders and calificaciones de pendiente 06 27 03 11 08 Productivo y Ambiental - beneficiaries’ organizations consultores Voluntad de Dios EC-MAG-109183-CS-CQS Component 2: Capacity Selección / Asistencia Técnica y building for institutional basada en Ejecución 2019-05- 2019-05- 2019-06- 2019-06- 2019-12- IBRD / 85150 Posterior Open - National 40,921.01 0.00 2019-04-22 Capacitación Plan stakeholders and calificaciones de pendiente 06 27 03 11 08 Productivo y Ambiental - beneficiaries’ organizations consultores Cutahua Page 7 EC-MAG-119868-CS-CQS / Fiscalización - Obra: Implementación de Selección Microreservorios con Riego Component 1: Investments basada en Ejecución 2019-07- 2019-08- 2019-08- 2019-08- 2019-12- Parcelario Tecnificado por IBRD / 85150 for climate-smart sub- Posterior Open - National 61,927.88 0.00 2019-06-26 calificaciones de pendiente 11 01 07 19 17 Aspersión y Goteo en la projects consultores "Junta de Aguas de Riego de la Acequia del Pueblo de Pimampiro" EC-MAG-119871-CS-CQS / Fiscalización - Obra: Construcción de Microreservorios e Selección Component 1: Investments Implementación de Riego basada en Ejecución 2019-07- 2019-08- 2019-08- 2019-08- 2020-05- IBRD / 85150 for climate-smart sub- Posterior Open - National 68,262.88 0.00 2019-06-26 Parcelario Tecnificado para calificaciones de pendiente 11 01 07 19 15 projects la Asociación de consultores Producción Cafetalera del Sur Oriente de la Provincia de Loja "Procafeq" Component 2: Capacity Selección EC-MAG-87306-CS-CQS / building for institutional basada en Ejecución 2019-07- 2019-08- 2019-08- 2019-08- 2020-02- Estudios Subproyecto IBRD / 85150 Posterior Open - National 93,141.57 0.00 2019-07-12 stakeholders and calificaciones de pendiente 27 18 23 29 25 Potrerillos beneficiaries’ organizations consultores Component 2: Capacity EC-MAG-87312-CS-QCBS Selección building for institutional Ejecución 2019-07- 2019-08- 2019-09- 2019-09- 2019-09- 2019-10- 2020-02- / Estudios Subproyecto IBRD / 85150 Posterior basada en Open - National 212,678.50 0.00 2019-07-12 stakeholders and pendiente 27 11 10 15 28 07 10 Cariacu calidad y costo beneficiaries’ organizations Component 2: Capacity Selección EC-MAGAP-87307-CS-CQS building for institutional basada en Ejecución 2019-07- 2019-08- 2019-08- 2019-08- 2020-02- / Estudios Subproyecto COFN / C1410 Posterior Open - National 92,126.20 0.00 2019-07-12 stakeholders and calificaciones de pendiente 27 18 23 29 25 Santa Ana de Cagrin Zula beneficiaries’ organizations consultores EC-MAG-94915-CS-CQS / Fiscalización de Obra de Selección Component 1: Investments Riego - Implementación de basada en Ejecución 2019-08- 2019-09- 2019-09- 2019-09- 2020-02- IBRD / 85150 for climate-smart sub- Posterior Open - National 78,353.88 0.00 2019-08-02 Sistema de Riego calificaciones de pendiente 17 07 13 21 18 projects Tecnificado en el Predio consultores "Las Mercedes" INDIVIDUAL CONSULTANTS Activity Reference No. Actual Invitation to Loan / Market Contract Type Estimated Process Draft Negotiated Contract / Description Component Review Type Method Amount Terms of Reference Identified/Selected Signed Contract Credit No. Approach Amount (US$) Status Contract Completion (US$) Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual EC-MAGAP-8176-093 / Component 1: Investments Supervisión Asociación 2017-02- 2017-02- 2017-03- 2017-07- IBRD / 85150 for climate-smart sub- Posterior Individual Open 7,401.36 7,401.36 Firmado 2016-12-09 Campesina 15 de 17 17 04 02 projects Diciembre, Campozano EC-MAGAP-8176-094 / Component 1: Investments Supervisión Directorio de 2017-02- 2017-02- 2017-03- 2017-07- IBRD / 85150 for climate-smart sub- Posterior Individual Open 16,630.56 16,630.56 Rescindido 2016-12-23 Agua del canal Palo 10 10 10 08 projects Marcado EC-MAGAP-8176-095 / Component 1: Investments 2017-02- 2017-02- 2017-03- 2017-07- Supervisión - Asociación IBRD / 85150 for climate-smart sub- Posterior Individual Open 16,873.11 16,873.11 Finalizado 2016-12-30 17 17 15 13 Santa Cecilia de Pucalpa projects EC-MAGAP-8176-096 / Supervisión - Asociación Component 1: Investments de trabajadores agrícolas, 2017-02- 2017-03- 2017-03- 2017-09- IBRD / 85150 for climate-smart sub- Posterior Individual Open 26,877.86 27,877.86 Firmado 2016-12-30 autónomos comerciantes, 17 10 15 11 projects exportadores “Voluntad de Dios" EC-MAGAP-8176-097 / Supervisión - Asociación Component 1: Investments 2017-02- 2017-03- 2017-03- 2017-08- de desarrollo integral de IBRD / 85150 for climate-smart sub- Posterior Individual Open 19,124.88 19,124.88 Finalizado 2016-12-30 17 04 15 12 la comunidad de Cutahua, projects Simiatug EC-MAGAP-8176-098 / Component 1: Investments Supervisión - Tecnificacion 2017-02- 2017-02- 2017-03- 2017-07- IBRD / 85150 for climate-smart sub- Posterior Individual Open 10,532.40 10,532.40 Firmado 2016-12-23 del sistema de riego Zhilla 10 25 08 06 projects San Pedro EC-MAGAP-8176-099 / Component 1: Investments Supervisión - Junta de 2017-01- 2017-02- 2017-03- 2017-07- IBRD / 85150 for climate-smart sub- Posterior Individual Open 12,984.05 12,984.05 Finalizado 2016-12-09 Regantes del sistema de 27 21 09 07 projects riego La Era EC-MAGAP-8176-071 / Component 3: Project 2017-02- 2017-02- 2017-02- 2017-12- IBRD / 85150 Posterior Individual Open 27,086.40 28,193.62 En ejecución 2016-11-02 Técnico Hidraúlico Zona 2 Management 15 28 28 31 EC-MAGAP-8176-060 / Component 3: Project 2016-07- 2016-07- 2016-07- 2017-12- IBRD / 85150 Posterior Individual Open 56,329.22 54,908.51 En ejecución 2016-05-25 Especialista Ambiental Management 06 16 21 31 UGP EC-MAGAP-8176-072 / Component 3: Project 2017-02- 2017-02- 2017-02- 2017-12- IBRD / 85150 Posterior Individual Open 27,086.40 32,077.05 Firmado 2016-11-02 Técnico Agrícola Zona 2 Management 15 15 28 31 EC-MAGAP-8176-073 / Component 3: Project 2017-02- 2017-02- 2017-02- 2017-12- IBRD / 85150 Posterior Individual Open 27,086.40 32,077.05 Firmado 2016-11-02 Técnico Social Zona 2 Management 15 15 28 31 EC-MAGAP-8176-078 / Component 3: Project 2017-02- 2017-02- 2017-02- 2017-12- IBRD / 85150 Posterior Individual Open 27,086.40 28,193.62 Firmado 2016-11-02 Técnico Agrícola Zona 4 Management 15 15 28 31 EC-MAGAP-8176-079 / Component 3: Project 2017-02- 2017-02- 2017-02- 2017-12- IBRD / 85150 Posterior Individual Open 27,086.40 17,549.14 Firmado 2016-11-02 Técnico Social Zona 4 Management 15 15 28 31 EC-MAGAP-8176-081 / Component 3: Project 2017-02- 2017-02- 2017-02- 2017-12- IBRD / 85150 Posterior Individual Open 27,086.40 28,193.62 Firmado 2016-11-02 Técnico Agrícola Zona 5 Management 15 15 28 31 EC-MAGAP-8176-082 / Component 3: Project 2017-02- 2017-02- 2017-02- 2017-12- IBRD / 85150 Posterior Individual Open 27,086.40 20,210.26 Firmado 2016-11-02 Técnico Social Zona 5 Management 15 15 28 31 EC-MAGAP-8176-083 / Component 3: Project 2017-02- 2017-02- 2017-02- 2017-12- IBRD / 85150 Posterior Individual Open 27,086.40 28,193.62 Firmado 2016-11-02 Técnico Hidraúlico Zona 6 Management 15 15 28 31 EC-MAGAP-8176-084 / Component 3: Project 2017-02- 2017-02- 2017-02- 2017-12- IBRD / 85150 Posterior Individual Open 27,086.40 28,193.62 Firmado 2016-11-02 Técnico Agrícola Zona 6 Management 15 15 28 31 EC-MAGAP-8176-085 / Component 3: Project 2017-02- 2017-02- 2017-02- 2017-12- IBRD / 85150 Posterior Individual Open 27,086.40 12,226.90 Firmado 2016-11-02 Técnico Social Zona 6 Management 15 15 28 31 EC-MAGAP-8176-086 / Component 3: Project 2017-02- 2017-02- 2017-02- 2017-12- IBRD / 85150 Posterior Individual Open 27,086.40 28,193.62 Firmado 2016-11-02 Técnico Hidraúlico Zona 7 Management 15 15 28 31 EC-MAGAP-8176-087 / Component 3: Project 2017-02- 2017-02- 2017-02- 2017-12- IBRD / 85150 Posterior Individual Open 27,086.40 28,193.62 Firmado 2016-11-02 Técnico Agrícola Zona 7 Management 15 15 28 31 EC-MAGAP-8176-088 / Component 3: Project 2017-02- 2017-02- 2017-02- 2017-12- IBRD / 85150 Posterior Individual Open 27,086.40 28,193.62 En ejecución 2016-11-02 Técnico Social Zona 7 Management 15 15 28 31 EC-MAGAP-8176-055 / 1 Component 3: Project 2016-07- 2016-07- 2016-07- 2017-12- IBRD / 85150 Posterior Individual Open 56,329.22 58,981.89 En ejecución 2016-05-25 Especialista Hidráulico Management 06 16 21 31 UGP EC-MAGAP-8176-056 / 1 Component 3: Project 2016-07- 2016-07- 2016-07- 2017-12- IBRD / 85150 Posterior Individual Open 56,329.22 60,547.05 En ejecución 2016-05-25 Especialista Agrícola UGP Management 06 16 21 31 EC-MAGAP-8176-057 / 1 Component 3: Project 2016-07- 2016-07- 2016-07- 2017-12- IBRD / 85150 Posterior Individual Open 56,329.22 54,912.47 En ejecución 2016-05-25 Especialista Ambiental Management 06 16 21 31 UGP EC-MAGAP-8176-058 / 1 Component 3: Project 2016-07- 2016-07- 2016-07- 2017-12- IBRD / 85150 Posterior Individual Open 56,329.22 57,471.64 En ejecución 2016-05-25 Especialista Social UGP Management 06 16 21 31 EC-MAGAP-8176-059 / 1 Component 3: Project 2016-07- 2016-07- 2016-07- 2017-12- Especialista en IBRD / 85150 Posterior Individual Open 56,329.22 60,547.05 En ejecución 2016-05-25 Management 06 16 21 31 Agronegocios UGP EC-MAGAP-8176-090 / Component 1: Investments Supervisión Asociación de 2017-01- 2017-01- 2017-03- 2017-07- IBRD / 85150 for climate-smart sub- Posterior Individual Open 14,869.21 14,869.21 Firmado 2016-12-09 Productores Agrícolas San 27 27 09 07 projects Rafael EC-MAGAP-8176-092 / Component 1: Investments Supervisión Cooperativa 2017-02- 2017-02- 2017-03- 2017-08- IBRD / 85150 for climate-smart sub- Posterior Individual Open 14,549.64 14,549.63 Firmado 2016-12-09 Agropecuaria el Marco, 17 17 04 11 projects Pintag EC-MAGAP-8545-CS- Component 3: Project 2017-03- 2017-03- 2017-03- 2017-12- IBRD / 85150 Posterior Individual Open 31,294.03 15,377.05 Firmado 2017-02-26 INDV / Especialista de Management 11 14 15 31 Capacitación EC-MAGAP-32740-CS- INDV / Asistencia técnica Component 2: Capacity y capacitación para la building for institutional Ejecución 2017-11- 2017-11- 2017-11- 2018-01- IBRD / 85150 Posterior Individual Direct 12,073.88 0.00 2017-10-27 puesta en marcha del stakeholders and pendiente 01 03 06 05 sistema de riego - Junta beneficiaries’ organizations de Aguas de Riego Palmar Grande Page 8 EC-MAGAP-32742-CS- INDV / Asistencia técnica Component 2: Capacity y capacitación para la building for institutional 2017-11- 2017-11- 2017-11- 2018-01- puesta en marcha del IBRD / 85150 Posterior Individual Direct 5,521.88 5,521.88 Firmado 2017-10-27 stakeholders and 01 03 06 05 sistema de riego - beneficiaries’ organizations Asociación de Productores Agrícolas San Rafael EC-MAGAP-32744-CS- INDV / Asistencia técnica Component 2: Capacity y capacitación para la building for institutional 2017-11- 2017-11- 2017-11- 2018-01- IBRD / 85150 Posterior Individual Direct 11,637.08 11,637.08 Firmado 2017-10-27 puesta en marcha del stakeholders and 01 03 06 05 sistema de riego - beneficiaries’ organizations Asociación Santa Cecilia de Pucalpa EC-MAGAP-32746-CS- INDV / Asistencia técnica Component 2: Capacity y capacitación para la building for institutional 2017-11- 2017-11- 2017-11- 2018-01- puesta en marcha del IBRD / 85150 Posterior Individual Direct 12,073.88 0.00 En ejecución 2017-10-27 stakeholders and 01 03 06 05 sistema de riego - beneficiaries’ organizations Cooperativa Agropecuaria El Marco, Pintag EC-MAGAP-32747-CS- INDV / Asistencia técnica y capacitación para la Component 2: Capacity puesta en marcha del building for institutional 2017-11- 2017-11- 2017-11- 2018-01- IBRD / 85150 Posterior Individual Direct 12,073.88 12,073.88 Firmado 2017-10-27 sistema de riego - stakeholders and 01 03 06 05 Asociación de desarrollo beneficiaries’ organizations integral de la comunidad de Cutahua, Simiatug EC-MAGAP-32748-CS- INDV / Asistencia técnica y capacitación para la Component 2: Capacity puesta en marcha del building for institutional Ejecución 2017-11- 2017-11- 2017-11- 2018-01- sistema de riego - IBRD / 85150 Posterior Individual Direct 12,292.28 0.00 2017-10-27 stakeholders and pendiente 01 03 06 05 Asociación de trabajadores beneficiaries’ organizations agrícolas, autónomos comerciantes, exportadores "Voluntad de Dios" EC-MAGAP-32750-CS- INDV / Asistencia técnica Component 2: Capacity y capacitación para la building for institutional 2017-11- 2017-11- 2017-11- 2018-01- IBRD / 85150 Posterior Individual Direct 11,637.08 11,637.08 Firmado 2017-10-27 puesta en marcha del stakeholders and 01 03 06 05 sistema de riego - beneficiaries’ organizations Asociación Campesina 15 de Diciembre EC-MAGAP-32751-CS- Component 2: Capacity INDV / Asistencia técnica building for institutional 2017-11- 2017-11- 2017-11- 2018-01- y capacitación para la IBRD / 85150 Posterior Individual Direct 11,637.08 11,637.08 Firmado 2017-10-27 stakeholders and 01 03 06 05 puesta en marcha del beneficiaries’ organizations sistema de riego - Zhilla San Pedro EC-MAGAP-32753-CS- INDV / Asistencia técnica Component 2: Capacity y capacitación para la building for institutional 2017-11- 2017-11- 2017-11- 2018-01- puesta en marcha del IBRD / 85150 Posterior Individual Direct 12,073.88 12,073.88 Firmado 2017-10-27 stakeholders and 01 03 06 05 sistema de riego - Junta beneficiaries’ organizations de Regantes del sistema de riego La Era EC-MAGAP-32754-CS- INDV / Asistencia técnica Component 2: Capacity y capacitación para la building for institutional 2017-11- 2017-11- 2017-11- 2018-01- IBRD / 85150 Posterior Individual Direct 11,418.68 11,418.68 Firmado 2017-10-27 puesta en marcha del stakeholders and 01 03 06 05 sistema de riego - beneficiaries’ organizations Directorio de Agua del canal Palo Marcado EC-MAGAP-8176-101 / Component 1: Investments Supervisión - Asociación 2017-04- 2017-04- 2017-05- 2017-10- IBRD / 85150 for climate-smart sub- Posterior Individual Open 19,094.76 0.00 Cancelado 2017-02-23 Agropecuaria Santa Clara 13 24 08 05 projects de Tolontag EC-MAGAP-8176-100 / Component 1: Investments 2017-05- 2017-05- 2017-06- 2017-11- Supervisión - Asociación IBRD / 85150 for climate-smart sub- Posterior Individual Open 18,400.00 0.00 Cancelado 2017-03-20 08 19 02 29 de Agricultores Huaquer projects EC-MAGAP-8176-106 / Supervisiones en 34 Component 1: Investments 2017-04- 2017-04- 2017-05- 2017-11- Microreservorios en la IBRD / 85150 for climate-smart sub- Posterior Individual Open 25,231.95 0.00 Cancelado 2017-02-23 13 24 08 04 parroquia Ingapirca-Coop. projects Vendeleche EC-MAGAP-8176-107 / Component 1: Investments Supervisión en 2017-08- 2017-08- 2017-09- 2018-03- IBRD / 85150 for climate-smart sub- Posterior Individual Open 60,664.02 0.00 Cancelado 2017-06-15 microreservorios primera 03 24 07 06 projects convocatoria EC-MAGAP-8176-089 / Supervisión de Component 1: Investments aproximadamente 14 2017-08- 2017-08- 2017-09- 2018-02- IBRD / 85150 for climate-smart sub- Posterior Individual Open 278,401.90 0.00 Cancelado 2017-06-01 subproyectos de riego 15 15 01 28 projects parcelario de la primera convocatoria EC-MAGAP-8176-104 / Component 1: Investments Supervisión - Tecnificacion 2017-04- 2017-04- 2017-05- 2017-09- IBRD / 85150 for climate-smart sub- Posterior Individual Open 28,502.01 0.00 Cancelado 2017-02-23 del sistema de riego 13 24 08 05 projects Putucay EC-MAGAP-8176-105 / Component 1: Investments Supervisión - Tecnificación 2017-04- 2017-04- 2017-05- 2017-11- IBRD / 85150 for climate-smart sub- Posterior Individual Open 23,589.12 0.00 Cancelado 2017-02-23 del sistema de riego Luis 13 24 08 04 projects Cordero Etapa 1 EC-MAGAP-32990-CS-CDS Component 3: Project Selección 2017-11- 2017-11- 2018-03- IBRD / 85150 Previa Direct 56,000.00 0.00 En ejecución 2017-10-27 / Auditoría Financiera II Management directa de 15 27 27 consultores EC-MAGAP-36882-CS- Component 3: Project 2017-11- 2017-11- 2017-12- 2017-12- IBRD / 85150 Posterior Individual Direct 2,661.12 10,644.48 Firmado 2017-11-24 INDV / Técnico Social Management 28 29 01 31 Zona 6 EC-MAGAP-37387-CS- Component 3: Project 2017-12- 2017-12- 2018-01- 2018-12- IBRD / 85150 Posterior Individual Direct 40,602.24 5,622.24 Firmado 2017-11-28 INDV / Técnico Social - Management 14 19 01 31 Zona 2 EC-MAGAP-37388-CS- Component 3: Project 2017-12- 2017-12- 2018-01- 2018-12- INDV / IBRD / 85150 Posterior Individual Direct 40,602.24 5,622.24 Firmado 2017-11-28 Management 14 19 01 31 TécnicoAgropecuario y de Comercialización - Zona 2 EC-MAGAP-37389-CS- Component 3: Project 2017-12- 2017-12- 2018-01- 2018-12- INDV / Técnico Hidráulico IBRD / 85150 Posterior Individual Direct 40,602.24 5,622.24 Firmado 2017-11-28 Management 14 19 01 31 - Zona 2 EC-MAGAP-37390-CS- Component 3: Project 2017-12- 2017-12- 2018-01- 2018-12- INDV / Técnico IBRD / 85150 Posterior Individual Direct 40,602.24 6,072.24 Firmado 2017-11-28 Management 14 19 01 31 Agropecuario y de Comercialización - Zona 4 EC-MAGAP-37392-CS- Component 3: Project 2017-12- 2017-12- 2018-01- 2018-12- INDV / Técnico Hidráulico IBRD / 85150 Posterior Individual Direct 40,602.24 6,072.24 Firmado 2017-11-28 Management 14 19 01 31 - Zona 4 EC-MAGAP-37393-CS- Component 3: Project 2017-12- 2017-12- 2018-01- 2018-12- INDV / Técnico IBRD / 85150 Posterior Individual Direct 40,602.24 9,108.36 Firmado 2017-11-28 Management 14 19 01 31 Agropecuario y de Comercialización - Zona 5 EC-MAGAP-37396-CS- Component 3: Project 2017-12- 2017-12- 2018-01- 2018-12- INDV / Técnico IBRD / 85150 Posterior Individual Direct 40,602.24 5,922.24 Firmado 2017-11-28 Management 14 19 01 31 Agropecuario y de Comercialización - Zona 6 EC-MAGAP-37397-CS- Component 3: Project 2017-12- 2017-12- 2018-01- 2018-12- INDV / Técnico Hidráulico IBRD / 85150 Posterior Individual Direct 40,602.24 8,883.36 Firmado 2017-11-28 Management 14 19 01 31 - Zona 6 EC-MAGAP-37398-CS- Component 3: Project 2017-12- 2017-12- 2018-01- 2018-12- IBRD / 85150 Posterior Individual Direct 40,602.24 5,922.24 Firmado 2017-11-28 INDV / Técnico Social - Management 14 19 01 31 Zona 6 EC-MAGAP-37399-CS- Component 3: Project 2017-12- 2017-12- 2018-01- 2018-12- IBRD / 85150 Posterior Individual Direct 40,602.24 6,072.24 Firmado 2017-11-28 INDV / Técnico Social - Management 14 19 01 31 Zona 7 EC-MAGAP-37400-CS- Component 3: Project 2017-12- 2017-12- 2018-01- 2018-12- INDV / Técnico IBRD / 85150 Posterior Individual Direct 40,602.24 6,072.24 Firmado 2017-11-28 Management 14 19 01 31 Agropecuario y de Comercialización - Zona 7 EC-MAGAP-37401-CS- Component 3: Project 2017-12- 2017-12- 2018-01- 2018-12- INDV / Técnico Hidráulico IBRD / 85150 Posterior Individual Direct 40,602.24 6,072.24 Firmado 2017-11-28 Management 14 19 01 31 - Zona 7 EC-MAGAP-37402-CS- Component 3: Project 2017-12- 2017-12- 2018-01- 2018-12- INDV / Técnico Hidráulico COFN / C1410 Posterior Individual Direct 40,602.24 5,622.24 Firmado 2017-11-28 Management 14 19 01 31 - Zona 1 EC-MAGAP-37405-CS- Component 3: Project 2017-12- 2017-12- 2018-01- 2018-12- INDV / Técnico Hidráulico COFN / C1410 Posterior Individual Direct 40,602.24 5,622.24 Firmado 2017-11-28 Management 14 19 01 31 - Zona 3 EC-MAGAP-37407-CS- Component 3: Project 2017-12- 2017-12- 2018-01- 2018-12- INDV / Técnico COFN / C1410 Posterior Individual Direct 40,602.24 5,622.24 Firmado 2017-11-28 Management 14 19 01 31 Agropecuario y de Comercialización - Zona 3 EC-MAGAP-37408-CS- Component 3: Project 2017-12- 2017-12- 2018-01- 2018-12- INDV / Especialista IBRD / 85150 Posterior Individual Direct 41,126.40 33,753.68 Finalizado 2017-11-28 Management 14 19 01 31 Hidráulico UGP Page 9 EC-MAGAP-37409-CS- Component 3: Project 2017-12- 2017-12- 2018-01- 2018-12- IBRD / 85150 Posterior Individual Direct 41,126.40 0.00 Cancelado 2017-11-28 INDV / Especialista Social Management 14 19 01 31 UGP EC-MAGAP-37410-CS- Component 3: Project 2017-12- 2017-12- 2018-01- 2018-12- INDV / Especialista IBRD / 85150 Posterior Individual Direct 41,126.40 33,753.68 Finalizado 2017-11-28 Management 14 19 01 31 Ambiental 1 UGP EC-MAGAP-37411-CS- Component 3: Project 2017-12- 2017-12- 2018-01- 2018-12- IBRD / 85150 Posterior Individual Direct 41,126.40 33,753.68 Finalizado 2017-11-28 INDV / Especialista Management 14 19 01 31 Agrícola UGP EC-MAGAP-37412-CS- Component 3: Project 2017-12- 2017-12- 2018-01- 2018-12- INDV / Especialista IBRD / 85150 Posterior Individual Direct 41,126.40 33,753.68 Finalizado 2017-11-28 Management 14 19 01 31 Ambiental 2 UGP EC-MAGAP-37413-CS- Component 3: Project 2017-12- 2017-12- 2018-01- 2018-12- INDV / Especialista en IBRD / 85150 Posterior Individual Direct 41,126.40 33,753.68 Finalizado 2017-11-28 Management 14 19 01 31 Agronegocios UGP EC-MAGAP-37414-CS- Component 3: Project 2017-12- 2017-12- 2018-01- 2018-12- INDV / Especialista de IBRD / 85150 Posterior Individual Direct 41,126.40 33,753.69 Finalizado 2017-11-28 Management 14 19 01 31 Capacitación UGP EC-MAGAP-53287-CS- Component 3: Project Ejecución 2017-02- 2017-02- 2017-02- 2017-12- IBRD / 85150 Posterior Individual Open 27,086.40 0.00 2016-11-02 INDV / Técnico Hidraúlico Management pendiente 15 15 28 31 Zona 4 EC-MAG-64103-CS-INDV Component 3: Project 2018-05- 2018-05- 2018-06- 2018-12- / CONSULTOR IBRD / 85150 Posterior Individual Limited 26,252.86 26,252.86 Finalizado 2018-05-25 Management 28 30 01 31 ESPECIALISTA SOCIAL EC-MAG-65890-CS-INDV Component 3: Project 2018-07- 2018-07- 2018-07- 2018-12- COFN / C1410 Posterior Individual Open 17,916.72 11,919.48 Firmado 2018-06-18 / Técnico Social Carchi Management 09 10 12 31 EC-MAG-65893-CS-INDV Component 3: Project 2018-07- 2018-07- 2018-07- 2018-12- IBRD / 85150 Posterior Individual Open 20,016.72 19,791.72 Firmado 2018-06-18 / Técnico Social Manabí Management 09 10 12 31 EC-MAG-65896-CS-INDV Component 3: Project 2018-07- 2018-07- 2018-07- 2018-12- IBRD / 85150 Posterior Individual Open 18,336.72 18,051.72 Firmado 2018-06-18 / Técnico Social Loja Management 09 10 12 31 EC-MAG-65897-CS-INDV Component 3: Project 2018-06- 2018-06- 2018-06- 2018-12- COFN / C1410 Posterior Individual Direct 19,302.84 19,227.84 Firmado 2018-06-08 / Técnico Hidráulico Management 11 12 12 31 Imbabura EC-MAG-65898-CS-INDV Component 3: Project 2018-06- 2018-06- 2018-06- 2018-12- / Técnico Agropecuario y IBRD / 85150 Posterior Individual Direct 19,302.84 19,302.84 Firmado 2018-06-08 Management 11 12 12 31 de Comercialización Pichincha EC-MAG-65899-CS-INDV Component 3: Project 2018-06- 2018-06- 2018-06- 2018-12- IBRD / 85150 Posterior Individual Direct 19,302.84 19,302.84 Firmado 2018-06-08 / Técnico Hidráulico Management 11 12 12 31 Pichincha EC-MAG-65900-CS-INDV Component 3: Project 2018-06- 2018-06- 2018-06- 2018-12- IBRD / 85150 Posterior Individual Direct 19,302.84 19,201.84 Firmado 2018-06-08 / Técnico Social Pichincha Management 11 12 12 31 EC-MAG-65901-CS-INDV Component 3: Project 2018-06- 2018-06- 2018-06- 2018-12- COFN / C1410 Posterior Individual Direct 19,302.84 10,944.48 Firmado 2018-06-08 / Técnico Hidráulico Management 11 12 12 31 Cotopaxi EC-MAG-65902-CS-INDV Component 3: Project 2018-06- 2018-06- 2018-06- 2018-12- / Técnico Agropecuario y IBRD / 85150 Posterior Individual Direct 23,277.84 3,261.12 Firmado 2018-06-08 Management 11 12 12 31 de Comercialización Manabí EC-MAG-65903-CS-INDV Component 3: Project 2018-06- 2018-06- 2018-06- 2018-12- IBRD / 85150 Posterior Individual Direct 23,277.84 3,261.12 Firmado 2018-06-08 / Técnico Hidráulico Management 11 12 12 31 Manabí EC-MAG-65904-CS-INDV Component 3: Project 2018-06- 2018-06- 2018-06- 2018-12- / Técnico Agropecuario y IBRD / 85150 Posterior Individual Direct 19,302.84 19,302.84 Firmado 2018-06-08 Management 11 12 12 31 de Comercialización Bolivar EC-MAG-65905-CS-INDV Component 3: Project 2018-06- 2018-06- 2018-06- 2018-12- / Técnico Agropecuario y IBRD / 85150 Posterior Individual Direct 21,197.84 21,197.84 Firmado 2018-06-08 Management 11 12 12 31 de Comercialización Azuay EC-MAG-65906-CS-INDV Component 3: Project 2018-06- 2018-06- 2018-06- 2018-12- IBRD / 85150 Posterior Individual Direct 21,197.84 21,197.84 Firmado 2018-06-08 / Técnico Hidráulico Azuay Management 11 12 12 31 EC-MAG-65907-CS-INDV Component 3: Project 2018-06- 2018-06- 2018-06- 2018-12- IBRD / 85150 Posterior Individual Direct 21,197.84 21,197.84 Firmado 2018-06-08 / Técnico Social Azuay Management 11 12 12 31 EC-MAG-65908-CS-INDV Component 3: Project 2018-06- 2018-06- 2018-06- 2018-12- IBRD / 85150 Posterior Individual Direct 21,297.84 21,297.84 Firmado 2018-06-08 / Técnico Hidráulico Loja Management 11 12 12 31 EC-MAG-65909-CS-INDV Component 3: Project 2018-06- 2018-06- 2018-06- 2018-12- / Técnico Agropecuario y IBRD / 85150 Posterior Individual Direct 21,237.84 21,237.84 Firmado 2018-06-08 Management 11 12 12 31 de Comercialización El Oro EC-MAGAP-37330-CS- INDV / Fiscalización de obra de riego - Component 1: Investments 2018-11- 2018-11- 2018-12- 2019-04- Subproyecto: IBRD / 85150 for climate-smart sub- Posterior Individual Open 15,182.97 0.00 Cancelado 2018-11-06 27 30 06 05 Implementación de riego projects tecnificado a nivel parcelario en el sistema de riego El Verde - Pacayunga. EC-MAGAP-37276-CS- INDV / Fiscalización - Component 1: Investments Subproyecto: 2018-11- 2018-11- 2018-12- 2019-04- COFN / C1410 for climate-smart sub- Posterior Individual Open 21,073.07 0.00 Cancelado 2018-11-06 Implementación de riego 27 30 06 05 projects por aspersión en la Asociación Agropecuaria Manuel Freile Barba "La Magdalena". EC-MAGAP-37332-CS- INDV / Fiscalización - Component 1: Investments Subproyecto: 2018-11- 2018-11- 2018-12- 2019-05- IBRD / 85150 for climate-smart sub- Posterior Individual Open 24,191.62 0.00 Cancelado 2018-11-06 Implementación del 27 30 06 05 projects sistema de riego parcelario por aspersión para la "Comuna Jurídica La Libertad". EC-MAG-74171-CS-INDV / Fiscalización - Component 1: Investments 2018-11- 2018-11- 2018-12- 2019-05- Subproyecto: COFN / C1410 for climate-smart sub- Posterior Individual Open 25,738.66 0.00 Cancelado 2018-11-06 27 30 06 05 Implementación de riego projects parcelario tecnificado en el predio Sucuso EC-MAGAP-37328-CS- Component 1: Investments 2018-07- 2018-07- 2018-07- 2018-11- INDV / Supervisión de IBRD / 85150 for climate-smart sub- Posterior Individual Open 20,263.99 0.00 Cancelado 2018-05-30 06 13 29 26 obra de riego - Tolontag projects EC-MAGAP-37337-CS- Component 1: Investments 2018-09- 2018-09- 2018-09- 2019-01- INDV / Supervisión de IBRD / 85150 for climate-smart sub- Posterior Individual Open 22,377.60 0.00 Cancelado 2018-07-31 06 13 29 27 obra de riego - Jesús projects María EC-MAGAP-37279-CS- Component 1: Investments 2018-01- 2018-02- 2018-02- 2018-08- INDV / Supervisión de IBRD / 85150 for climate-smart sub- Posterior Individual Open 26,509.07 0.00 Cancelado 2017-12-22 28 04 20 19 obra de riego - Luis projects Cordero EC-MAGAP-37326-CS- Component 1: Investments 2018-01- 2018-02- 2018-02- 2018-06- INDV / Supervisión de IBRD / 85150 for climate-smart sub- Posterior Individual Open 31,290.36 0.00 Cancelado 2017-12-20 26 02 18 18 obra de riego - Putucay projects EC-MAGAP-37336-CS- Component 1: Investments 2018-03- 2018-03- 2018-04- 2018-08- INDV / Supervisión de IBRD / 85150 for climate-smart sub- Posterior Individual Open 28,425.60 0.00 Cancelado 2018-02-15 24 31 16 14 obra de riego - La Belgica projects EC-MAGAP-37333-CS- Component 1: Investments 2018-10- 2018-10- 2018-10- 2019-02- INDV / Supervisión de IBRD / 85150 for climate-smart sub- Posterior Individual Open 16,934.40 0.00 Cancelado 2018-08-30 06 13 29 26 obra de riego - Milagro projects EC-MAGAP-33018-CS-CDS / Estudios de factibilidad Component 1: Investments Selección y diseños definitivos 2017-11- 2017-11- 2018-03- IBRD / 85150 for climate-smart sub- Previa directa de Direct 72,866.08 0.00 Cancelado 2017-10-27 integrales de subproyectos: 15 27 27 projects consultores riego, social y ambiental para la Provincia de Chimborazo EC-MAGAP-33019-CS-CDS / Estudios de factibilidad Component 1: Investments Selección y diseños definitivos 2017-11- 2017-11- 2018-03- IBRD / 85150 for climate-smart sub- Previa directa de Direct 95,133.92 0.00 Cancelado 2017-10-27 integrales de subproyectos: 15 27 27 projects consultores riego, social y ambiental para las Provincias Cotopaxi y Azuay EC-MAGAP-37395-CS- Component 3: Project 2017-12- 2017-12- 2018-01- 2018-12- INDV / Técnico Hidráulico IBRD / 85150 Posterior Individual Open 40,602.24 0.00 Cancelado 2017-11-24 Management 20 22 01 31 - Zona 5 EC-MAG-65889-CS-INDV Component 3: Project 2018-07- 2018-07- 2018-07- 2018-12- COFN / C1410 Posterior Individual Open 17,916.72 0.00 Cancelado 2018-06-18 / Técnico Hidráulico Management 09 10 12 31 Carchi EC-MAGAP-38879-CS- Component 3: Project 2017-11- 2017-11- 2017-12- 2017-12- INDV / Asistente IBRD / 85150 Posterior Individual Direct 733.00 0.00 Cancelado 2017-11-30 Management 30 30 01 31 Administrativo Planta Central EC-MAGAP-38881-CS- INDV / Especialista de Component 3: Project 2017-11- 2017-11- 2017-12- 2017-12- IBRD / 85150 Posterior Individual Direct 1,676.00 0.00 Cancelado 2017-11-30 Procesos y Gestión de Sub- Management 30 30 01 31 proyectos Planta Central EC-MAGAP-8176-080 / Component 3: Project 2017-02- 2017-02- 2017-02- 2017-12- IBRD / 85150 Posterior Individual Open 27,086.40 0.00 Cancelado 2016-11-02 Técnico Hidraúlico Zona 5 Management 15 15 28 31 Page 10 EC-MAGAP-38872-CS- Component 3: Project 2017-11- 2017-11- 2017-12- 2017-12- INDV / Analista IBRD / 85150 Posterior Individual Direct 817.00 0.00 Cancelado 2017-11-30 Management 30 30 01 31 Administrativo Financiero Zona 2 EC-MAGAP-37394-CS- Component 3: Project 2017-12- 2017-12- 2018-01- 2018-12- IBRD / 85150 Posterior Individual Direct 40,602.24 0.00 Cancelado 2017-11-28 INDV / Técnico Social - Management 14 19 01 31 Zona 5 EC-MAGAP-37403-CS- Component 3: Project 2017-12- 2017-12- 2018-01- 2018-12- COFN / C1410 Posterior Individual Direct 40,602.24 0.00 Cancelado 2017-11-28 INDV / Técnico Social - Management 14 19 01 31 Zona 1 EC-MAGAP-37404-CS- Component 3: Project 2017-12- 2017-12- 2018-01- 2018-12- INDV / Técnico COFN / C1410 Posterior Individual Open 40,602.24 0.00 Cancelado 2017-11-24 Management 20 22 01 31 Agropecuario y de Comercialización - Zona 1 EC-MAGAP-37406-CS- Component 3: Project 2017-12- 2017-12- 2018-01- 2018-12- COFN / C1410 Posterior Individual Direct 40,602.24 0.00 Cancelado 2017-11-28 INDV / Técnico Social - Management 14 19 01 31 Zona 3 EC-MAGAP-38880-CS- Component 3: Project 2017-11- 2017-11- 2017-12- 2017-12- INDV / Especialista de IBRD / 85150 Posterior Individual Direct 1,676.00 0.00 Cancelado 2017-11-30 Management 30 30 01 31 Planificación Planta Central EC-MAG-65892-CS-INDV Component 3: Project 2018-07- 2018-07- 2018-07- 2018-12- / Técnico Hidráulico COFN / C1410 Posterior Individual Open 17,916.72 0.00 Cancelado 2018-06-18 Management 09 10 12 31 Chimborazo EC-MAGAP-32571-CS-CDS Component 3: Project 2017-11- 2017-11- 2017-11- 2018-01- / Ingeniero Civil - IBRD / 85150 Posterior Individual Direct 9,407.68 0.00 Cancelado 2017-10-27 Management 01 03 06 05 Especialista Hidráulico 1 EC-MAGAP-32574-CS- Component 3: Project 2017-11- 2017-11- 2017-11- 2018-01- INDV / Ingeniero Civil - IBRD / 85150 Posterior Individual Direct 9,407.68 0.00 Cancelado 2017-10-27 Management 01 03 06 05 Especialista Hidráulico 2 EC-MAGAP-37391-CS- Component 3: Project 2017-12- 2017-12- 2018-01- 2018-12- IBRD / 85150 Posterior Individual Open 40,602.24 0.00 Cancelado 2017-11-24 INDV / Técnico Social - Management 20 22 01 31 Zona 4 EC-MAG-65894-CS-INDV Component 3: Project 2018-07- 2018-07- 2018-07- 2018-12- IBRD / 85150 Posterior Individual Open 20,036.72 0.00 Cancelado 2018-06-18 / Técnico Hidráulico Management 09 10 12 31 Guayas EC-MAG-74340-CS-INDV / Fiscalización de obra de Component 1: Investments riego - Implementación del 2018-11- 2018-11- 2018-12- 2019-06- IBRD / 85150 for climate-smart sub- Posterior Individual Open 22,753.95 0.00 Cancelado 2018-11-06 sistema de riego por 27 30 06 04 projects aspersión en el predio "Santa Ana". EC-MAG-74365-CS-INDV / Fiscalización de Obra de Component 1: Investments Riego - Tecnificación de 2018-11- 2018-11- 2018-12- 2019-04- IBRD / 85150 for climate-smart sub- Posterior Individual Open 34,469.01 0.00 Cancelado 2018-11-06 riego parcelario por micro 27 30 06 05 projects aspersión para la Comunidad "Estero Piedras" EC-MAG-74530-CS-INDV Component 3: Project 2018-09- 2018-09- 2018-09- 2018-12- COFN / C1410 Posterior Individual Open 13,680.60 0.00 Cancelado 2018-09-03 / Técnico Social Imbabura Management 24 25 27 31 EC-MAG-74532-CS-INDV Component 3: Project 2018-09- 2018-09- 2018-09- 2018-12- COFN / C1410 Posterior Individual Open 13,680.60 0.00 Cancelado 2018-09-03 / Técnico Social Cotopaxi Management 24 25 27 31 EC-MAG-74533-CS-INDV Component 3: Project 2018-09- 2018-09- 2018-09- 2018-12- COFN / C1410 Posterior Individual Open 14,805.60 0.00 Cancelado 2018-09-03 / Técnico Social Management 24 25 27 31 Chimborazo EC-MAG-65895-CS-INDV Component 3: Project 2018-09- 2018-09- 2018-09- 2018-12- IBRD / 85150 Posterior Individual Open 13,750.05 0.00 Cancelado 2018-09-03 / Técnico Hidráulico Management 24 25 27 31 Bolívar EC-MAGAP-37277-CS- INDV / Fiscalización de Obra de Riego - Component 1: Investments Implementación del 2018-11- 2018-11- 2018-12- 2019-05- IBRD / 85150 for climate-smart sub- Posterior Individual Open 16,852.82 0.00 Cancelado 2018-11-06 sistema de riego parcelario 27 30 06 05 projects por aspersión para la "Asociación de productores agropecuarios La Nueva Esperanza". EC-MAGAP-37278-CS- INDV / Fiscalización de obra de riego - Component 1: Investments Subproyecto: 2018-01- 2018-02- 2018-02- 2018-08- IBRD / 85150 for climate-smart sub- Posterior Individual Open 15,627.85 0.00 Cancelado 2017-12-22 Implementación del 28 04 20 19 projects sistema de riego parcelario por aspersión para la "Asociación Agropecuaria Sierra Morena". EC-MAG-74361-CS-INDV / Fiscalización de Obra de Component 1: Investments Riego - Implementación de 2018-11- 2018-11- 2018-12- 2019-04- COFN / C1410 for climate-smart sub- Posterior Individual Open 47,892.24 0.00 Cancelado 2018-11-06 riego parcelario tecnificado 27 30 06 05 projects con las familias de usuarios del Óvalo Pinguilí EC-MAG-74366-CS-INDV / Fiscalización de Obra de Riego - Implementación de Component 1: Investments 2018-11- 2018-11- 2018-12- 2019-06- riego parcelario tecnificado IBRD / 85150 for climate-smart sub- Posterior Individual Open 25,734.88 0.00 Cancelado 2018-11-06 27 30 06 04 por aspersión y goteo para projects el sistema de riego "Y de El Guineo" EC-MAGAP-37339-CS- INDV / Fiscalización - Subproyecto: Tecnificación Component 1: Investments 2018-11- 2018-11- 2018-12- 2019-04- de Riego a nivel parcelario IBRD / 85150 for climate-smart sub- Posterior Individual Open 15,142.43 0.00 En ejecución 2018-11-06 27 30 06 05 por aspersión para la projects Junta de Riego "Gúlac - Cruz Rumi" Chumblín. EC-MAG-74176-CS-INDV / Fiscalización - Subproyecto: Component 1: Investments 2018-11- 2018-11- 2018-12- 2019-07- Implementación de riego COFN / C1410 for climate-smart sub- Posterior Individual Open 51,416.79 0.00 Cancelado 2018-11-06 27 30 06 11 parcelario tecnificado por projects aspersión en 152,44 ha para la Junta General de Riego "Canal Central Toacaso" EC-MAGAP-37273-CS- INDV / Fiscalización - Subproyecto: Component 1: Investments 2018-11- 2018-11- 2018-12- 2019-04- Implementación del COFN / C1410 for climate-smart sub- Posterior Individual Open 12,377.76 0.00 Cancelado 2018-11-06 27 30 06 05 sistema de riego por goteo projects y aspersión en la Asociación "Un Paso Hacia El Progreso" (Huaquer) EC-MAG-77872-CS-INDV Component 3: Project 2018-10- 2018-10- 2018-10- 2018-12- IBRD / 85150 Posterior Individual Open 13,750.05 0.00 Cancelado 2018-09-17 / Técnico Hidráulico Management 08 09 11 31 Bolívar EC-MAG-65891-CS-INDV Component 3: Project Ejecución 2018-07- 2018-07- 2018-07- 2018-12- / Técnico Hidráulico COFN / C1410 Posterior Individual Open 2,811.12 0.00 2018-06-18 Management pendiente 09 10 12 31 Tungurahua EC-MAG-84898-CS-CDS / Component 2: Capacity Selección Capacitación en el Método building for institutional Ejecución 2018-11- 2018-11- 2018-12- IBRD / 85150 Posterior directa de Direct 35,000.00 0.00 2018-10-31 Keyline a Técnicos/as y stakeholders and pendiente 06 11 31 consultores Usuarios/as a Nivel beneficiaries’ organizations Nacional EC-MAG-94368-CS-INDV Component 3: Project 2019-01- 2019-01- 2019-01- 2019-12- / Técnico Agropecuario y IBRD / 85150 Posterior Individual Direct 35,533.43 8,583.36 Firmado 2019-01-10 Management 12 13 16 31 de Comercialización Azuay EC-MAG-94370-CS-INDV Component 3: Project 2019-01- 2019-01- 2019-01- 2019-12- / Técnico Agropecuario y IBRD / 85150 Posterior Individual Direct 32,833.43 0.00 En ejecución 2019-01-10 Management 12 13 16 31 de Comercialización Bolívar EC-MAG-94371-CS-INDV Component 3: Project 2019-01- 2019-01- 2019-01- 2019-12- IBRD / 85150 Posterior Individual Direct 45,004.91 7,500.82 Firmado 2019-01-10 / Especialista en Management 12 13 16 31 Agronegocios EC-MAG-94372-CS-INDV Component 3: Project 2019-01- 2019-01- 2019-01- 2019-12- / Técnico Agropecuario y IBRD / 85150 Posterior Individual Direct 32,833.43 0.00 En ejecución 2019-01-10 Management 12 13 16 31 de Comercialización Pichincha EC-MAG-94374-CS-INDV Component 3: Project 2019-01- 2019-01- 2019-01- 2019-12- / Técnico Agropecuario y IBRD / 85150 Posterior Individual Direct 39,133.44 0.00 En ejecución 2019-01-10 Management 12 13 16 31 de Comercialización Manabí EC-MAG-94375-CS-INDV Component 3: Project 2019-01- 2019-01- 2019-01- 2019-12- IBRD / 85150 Posterior Individual Direct 45,004.92 7,500.82 Firmado 2019-01-10 / Especialista Ambiental 1 Management 12 13 16 31 EC-MAG-94377-CS-INDV Component 3: Project 2019-01- 2019-01- 2019-01- 2019-12- IBRD / 85150 Posterior Individual Direct 45,004.92 7,500.82 Firmado 2019-01-10 / Especialista Ambiental 2 Management 12 13 16 31 EC-MAG-94378-CS-INDV Component 3: Project 2019-01- 2019-01- 2019-01- 2019-12- IBRD / 85150 Posterior Individual Direct 45,004.92 0.00 En ejecución 2019-01-10 / Especialista de Management 12 13 16 31 Capacitación EC-MAG-94380-CS-INDV Component 3: Project 2019-01- 2019-01- 2019-01- 2019-12- IBRD / 85150 Posterior Individual Direct 45,004.92 7,500.82 Firmado 2019-01-10 / Especialista Hidráulico Management 12 13 16 31 EC-MAG-94381-CS-INDV Component 3: Project 2019-01- 2019-01- 2019-01- 2019-12- COFN / C1410 Posterior Individual Direct 32,833.43 0.00 En ejecución 2019-01-10 / Técnico Hidráulico Management 12 13 16 31 Imbabura EC-MAG-94383-CS-INDV Component 3: Project 2019-01- 2019-01- 2019-01- 2019-01- IBRD / 85150 Posterior Individual Direct 35,533.44 0.00 En ejecución 2019-01-10 / Técnico Hidráulico Azuay Management 12 13 16 31 Page 11 EC-MAG-94385-CS-INDV Component 3: Project 2019-01- 2019-01- 2019-01- 2019-12- IBRD / 85150 Posterior Individual Direct 35,533.43 0.00 En ejecución 2019-01-10 / Técnico Hidráulico Loja Management 12 13 16 31 EC-MAG-94386-CS-INDV Component 3: Project 2019-01- 2019-01- 2019-01- 2019-12- IBRD / 85150 Posterior Individual Direct 45,004.92 7,500.82 Firmado 2019-01-10 / Especialista Social Management 12 13 16 31 EC-MAG-94387-CS-INDV Component 3: Project 2019-01- 2019-01- 2019-01- 2019-12- IBRD / 85150 Posterior Individual Direct 39,133.43 0.00 En ejecución 2019-01-10 / Técnico Social Manabí Management 12 13 16 31 EC-MAG-94389-CS-INDV Component 3: Project 2019-01- 2019-01- 2019-01- 2019-12- IBRD / 85150 Posterior Individual Direct 35,533.44 0.00 En ejecución 2019-01-10 / Técnico Social Azuay Management 12 13 16 31 EC-MAG-94390-CS-INDV Component 3: Project 2019-01- 2019-01- 2019-01- 2019-12- IBRD / 85150 Posterior Individual Direct 35,533.44 0.00 En ejecución 2019-01-10 / Técnico Social Loja Management 12 13 16 31 EC-MAG-94391-CS-INDV Component 3: Project 2019-01- 2019-01- 2019-01- 2019-12- COFN / C1410 Posterior Individual Direct 35,533.44 0.00 En ejecución 2019-01-10 / Técnico Social Carchi Management 12 13 16 31 EC-MAG-94393-CS-INDV Component 3: Project 2019-01- 2019-01- 2019-01- 2019-12- COFN / C1410 Posterior Individual Direct 32,833.43 0.00 En ejecución 2019-01-10 / Técnico Hidráulico Management 12 13 16 31 Cotopaxi EC-MAG-94395-CS-INDV Component 3: Project 2019-01- 2019-01- 2019-01- 2019-12- / Técnico Agropecuario y IBRD / 85150 Posterior Individual Direct 35,533.44 0.00 En ejecución 2019-01-10 Management 12 13 16 31 de Comercialización El Oro EC-MAG-94396-CS-INDV Component 3: Project 2019-01- 2019-01- 2019-01- 2019-12- / Técnico Hidráulico COFN / C1410 Posterior Individual Direct 32,833.43 0.00 En ejecución 2019-01-10 Management 12 13 16 31 Tungurahua EC-MAG-94397-CS-INDV Component 3: Project 2019-01- 2019-01- 2019-01- 2019-12- IBRD / 85150 Posterior Individual Direct 45,004.91 7,500.82 Finalizado 2019-01-10 / Especialista Agrícola Management 12 13 16 31 EC-MAG-94398-CS-INDV Component 3: Project 2019-01- 2019-01- 2019-01- 2019-12- IBRD / 85150 Posterior Individual Direct 32,833.44 0.00 En ejecución 2019-01-10 / Técnico Social Pichincha Management 12 13 16 31 EC-MAG-94919-CS-INDV / Fiscalización Obra de Component 1: Investments Riego - Implementación de Ejecución 2019-08- 2019-09- 2019-09- 2020-03- COFN / C1410 for climate-smart sub- Posterior Individual Open 45,950.46 0.00 2019-08-05 Riego Parcelario pendiente 29 02 10 08 projects Tecnificado con las familias de usuarios de la Acequia Mundug Yamate EC-MAG-94927-CS-INDV / Fiscalización Obra de Component 1: Investments Riego - Tecnificación de Ejecución 2019-07- 2019-07- 2019-07- 2020-01- IBRD / 85150 for climate-smart sub- Posterior Individual Open 28,445.78 0.00 2019-06-10 Riego Parcelario por pendiente 04 09 17 13 projects Microaspersión para el Sistema de Riego Putucay EC-MAG-94935-CS-INDV / Fiscalización de Obra de Component 1: Investments Ejecución 2019-08- 2019-09- 2019-09- 2020-01- Riego - Implementación IBRD / 85150 for climate-smart sub- Posterior Individual Open 26,880.00 0.00 2019-08-06 pendiente 30 02 10 08 de Riego Parcelario projects Tecnificado Luis Cordero EC-MAG-94938-CS-INDV / Fiscalización de Obra de Component 1: Investments Ejecución 2019-11- 2019-11- 2019-11- 2020-03- Riego - Implementación de COFN / C1410 for climate-smart sub- Posterior Individual Open 24,192.00 0.00 2019-10-10 pendiente 01 04 12 11 Riego Parcelario projects Tecnificado "Campo Alegre" EC-MAG-94964-CS-INDV Component 3: Project Ejecución 2019-02- 2019-02- 2019-02- 2019-12- / Técnico Hidráulico COFN / C1410 Posterior Individual Open 35,533.43 0.00 2019-01-21 Management pendiente 10 13 19 31 Chimborazo EC-MAG-94965-CS-INDV Component 3: Project Ejecución 2019-02- 2019-02- 2019-02- 2019-12- COFN / C1410 Posterior Individual Open 35,533.44 0.00 2019-01-21 / Técnico Hidráulico Management pendiente 12 15 21 31 Carchi EC-MAG-94971-CS-INDV / Fiscalización - Component 1: Investments Subproyecto: Tecnificación 2019-02- 2019-02- 2019-02- 2019-06- IBRD / 85150 for climate-smart sub- Posterior Individual Open 34,469.01 0.00 En ejecución 2019-01-21 de riego parcelario por 15 19 25 25 projects micro aspersión para la Comunidad "Estero Piedras" EC-MAG-94972-CS-INDV / Fiscalización - Component 1: Investments Subproyecto - 2019-02- 2019-02- 2019-02- 2019-07- COFN / C1410 for climate-smart sub- Posterior Individual Open 25,738.66 0.00 En ejecución 2019-01-21 Implementación de riego 14 18 25 25 projects parcelario tecnificado tecnificado en el predio Sucuso EC-MAG-94979-CS-INDV / Fiscalización - Subproyecto: Component 1: Investments 2019-02- 2019-02- 2019-02- 2019-06- Implementación del COFN / C1410 for climate-smart sub- Posterior Individual Open 12,377.76 0.00 En ejecución 2019-01-21 14 18 25 25 sistema de riego por goteo projects y aspersión en la Asociación "Un Paso Hacia El Progreso" (Huaquer) EC-MAG-94981-CS-INDV / Fiscalización - Component 1: Investments Subproyecto: 2019-02- 2019-02- 2019-02- 2019-08- COFN / C1410 for climate-smart sub- Posterior Individual Open 47,892.21 0.00 En ejecución 2019-01-21 Implementación de riego 14 18 25 24 projects parcelario tecnificado con las familias de usuarios del Óvalo Pinguilí EC-MAG-94983-CS-INDV / Fiscalización - Component 1: Investments Subproyecto: 2019-02- 2019-02- 2019-02- 2019-07- IBRD / 85150 for climate-smart sub- Posterior Individual Open 24,191.62 0.00 En ejecución 2019-01-21 Implementación del 14 18 25 25 projects sistema de riego parcelario por aspersión para la "Comuna Jurídica La Libertad" EC-MAG-94985-CS-INDV / Fiscalización - Component 1: Investments Subproyecto: 2019-02- 2019-02- 2019-02- 2019-06- COFN / C1410 for climate-smart sub- Posterior Individual Open 21,073.07 0.00 En ejecución 2019-01-21 Implementación de riego 14 18 25 25 projects por aspersión en la Asociación Agropecuaria Manuel Freire Barba "La Magdalena" EC-MAG-94986-CS-INDV / Fiscalización - Subproyecto: Component 1: Investments 2019-02- 2019-02- 2019-02- 2019-08- Implementación de riego IBRD / 85150 for climate-smart sub- Posterior Individual Open 25,734.87 0.00 En ejecución 2019-01-21 14 18 25 24 parcelario tecnificado por projects aspersión y goteo para el sistema de riego "Y del Guineo" EC-MAG-94987-CS-INDV / Fiscalización - Subproyecto: Component 1: Investments Implementación del 2019-02- 2019-02- 2019-02- 2019-07- IBRD / 85150 for climate-smart sub- Posterior Individual Open 16,852.82 0.00 En ejecución 2019-01-21 sistema de riego parcelario 14 18 25 25 projects por aspersión para la "Asociación de Productores Agropecuarios La Nueva Esperanza" EC-MAG-94988-CS-INDV / Fiscalización - Component 1: Investments 2019-02- 2019-02- 2019-02- 2019-08- Subproyecto: IBRD / 85150 for climate-smart sub- Posterior Individual Open 22,753.96 0.00 En ejecución 2019-01-21 14 18 25 24 Implementación del projects sistema de riego por aspersión en el predio "Santa Ana" EC-MAG-94989-CS-INDV / Fiscalización - Subproyecto: Component 1: Investments 2019-02- 2019-02- 2019-02- 2019-07- Implementación del IBRD / 85150 for climate-smart sub- Posterior Individual Open 15,627.85 0.00 En ejecución 2019-01-21 14 18 25 25 Sistema de riego projects parcelario por aspersión para la Asociación Agropecuaria "Sierra Morena" EC-MAG-94991-CS-INDV / Fiscalización - Subproyecto: Component 1: Investments 2019-02- 2019-02- 2019-02- 2019-09- Implementación de riego COFN / C1410 for climate-smart sub- Posterior Individual Open 51,416.83 0.00 En ejecución 2019-01-21 14 18 25 30 parcelario tecnificado por projects aspersión en 152.44 ha para la Junta General de Riego "Canal Central Toacaso" EC-MAG-94992-CS-INDV / Fiscalización - Component 1: Investments Subproyecto: 2019-02- 2019-02- 2019-02- 2019-06- IBRD / 85150 for climate-smart sub- Posterior Individual Open 15,182.95 0.00 En ejecución 2019-01-21 Implementación de riego 14 18 25 25 projects tecnificado a nivel parcelario en el sistema de riego El Verde Pacayunga EC-MAG-105021-CS-INDV Component 3: Project 2019-03- 2019-03- 2019-03- 2019-06- / Especialista en IBRD / 85150 Posterior Individual Direct 11,251.23 0.00 En ejecución 2019-03-08 Management 12 13 15 13 Agronegocios Planta Central EC-MAG-105020-CS-INDV Component 3: Project 2019-03- 2019-03- 2019-03- 2019-06- / Especialista Agrícola IBRD / 85150 Posterior Individual Direct 11,251.23 0.00 En ejecución 2019-03-08 Management 12 13 15 13 Planta Central EC-MAG-105024-CS-INDV Component 3: Project 2019-03- 2019-03- 2019-03- 2019-06- / Especialista Ambiental 2 IBRD / 85150 Posterior Individual Direct 11,251.23 0.00 En ejecución 2019-03-08 Management 12 13 15 13 Planta Central EC-MAG-105026-CS-INDV Component 3: Project 2019-03- 2019-03- 2019-03- 2019-06- / Especialista Ambiental 1 IBRD / 85150 Posterior Individual Direct 11,251.23 0.00 En ejecución 2019-03-08 Management 12 13 15 13 Planta Central EC-MAG-105029-CS-INDV Component 3: Project 2019-03- 2019-03- 2019-03- 2019-06- / Especialista Hidráulico IBRD / 85150 Posterior Individual Direct 11,251.23 0.00 En ejecución 2019-03-08 Management 12 13 15 13 Planta Central Page 12 EC-MAG-105032-CS-INDV Component 3: Project 2019-03- 2019-03- 2019-03- 2019-06- / Especialista Social IBRD / 85150 Posterior Individual Direct 11,251.23 0.00 En ejecución 2019-03-08 Management 12 13 15 13 Planta Central EC-MAG-108572-CS-INDV Component 3: Project Ejecución 2019-04- 2019-04- 2019-04- 2019-05- / Técnico Agropecuario y IBRD / 85150 Posterior Individual Direct 2,961.12 0.00 2019-04-18 Management pendiente 23 24 26 26 de Comercialización Azuay EC-MAG-108573-CS-INDV Component 3: Project Ejecución 2019-04- 2019-04- 2019-04- 2019-05- / Técnico Agropecuario y IBRD / 85150 Posterior Individual Direct 2,961.12 0.00 2019-04-18 Management pendiente 23 24 26 26 de Comercialización Bolívar EC-MAG-108574-CS-INDV Component 3: Project Ejecución 2019-04- 2019-04- 2019-04- 2019-05- / Técnico Agropecuario y IBRD / 85150 Posterior Individual Direct 3,261.12 0.00 2019-04-18 Management pendiente 23 24 26 26 de Comercialización Manabí EC-MAG-108577-CS-INDV Component 3: Project Ejecución 2019-04- 2019-04- 2019-04- 2019-05- IBRD / 85150 Posterior Individual Direct 2,961.12 0.00 2019-04-18 / Técnico Hidráulico Azuay Management pendiente 23 24 26 26 EC-MAG-108576-CS-INDV Component 3: Project Ejecución 2019-04- 2019-04- 2019-04- 2019-05- / Técnico Agropecuario y IBRD / 85150 Posterior Individual Direct 2,736.12 0.00 2019-04-18 Management pendiente 23 24 26 26 de Comercialización Pichincha EC-MAG-108578-CS-INDV Component 3: Project Ejecución 2019-04- 2019-04- 2019-04- 2019-05- COFN / C1410 Posterior Individual Direct 2,736.12 0.00 2019-04-18 / Técnico Hidráulico Management pendiente 23 24 26 26 Cotopaxi EC-MAG-108579-CS-INDV Component 3: Project Ejecución 2019-04- 2019-04- 2019-04- 2019-05- COFN / C1410 Posterior Individual Direct 2,961.12 0.00 2019-04-18 / Técnico Hidráulico Management pendiente 20 21 23 23 Imbabura EC-MAG-108580-CS-INDV Component 3: Project Ejecución 2019-04- 2019-04- 2019-04- 2019-05- IBRD / 85150 Posterior Individual Direct 2,961.12 0.00 2019-04-18 / Técnico Hidráulico Loja Management pendiente 23 24 26 26 EC-MAG-108581-CS-INDV Component 3: Project Ejecución 2019-04- 2019-04- 2019-04- 2019-05- / Técnico Hidráulico COFN / C1410 Posterior Individual Direct 2,736.12 0.00 2019-04-18 Management pendiente 20 21 23 23 Tungurahua EC-MAG-108584-CS-INDV Component 3: Project Ejecución 2019-04- 2019-04- 2019-04- 2019-05- COFN / C1410 Posterior Individual Direct 2,961.12 0.00 2019-04-18 / Técnico Social Carchi Management pendiente 20 21 23 23 EC-MAG-108587-CS-INDV Component 3: Project Ejecución 2019-04- 2019-04- 2019-04- 2019-05- IBRD / 85150 Posterior Individual Direct 2,961.12 0.00 2019-04-18 / Técnico Social Azuay Management pendiente 23 24 26 26 EC-MAG-108589-CS-INDV Component 3: Project Ejecución 2019-04- 2019-04- 2019-04- 2019-05- IBRD / 85150 Posterior Individual Direct 3,261.12 0.00 2019-04-18 / Técnico Social Manabí Management pendiente 23 24 26 26 EC-MAG-108590-CS-INDV Component 3: Project Ejecución 2019-04- 2019-04- 2019-04- 2019-05- IBRD / 85150 Posterior Individual Direct 2,961.12 0.00 2019-04-18 / Técnico Social Loja Management pendiente 20 21 23 23 EC-MAG-108591-CS-INDV Component 3: Project Ejecución 2019-04- 2019-04- 2019-04- 2019-05- IBRD / 85150 Posterior Individual Direct 2,736.12 0.00 2019-04-18 / Técnico Social Pichincha Management pendiente 20 21 23 23 EC-MAG-74528-CS-INDV Component 3: Project Ejecución 2019-04- 2019-04- 2019-04- 2019-05- COFN / C1410 Posterior Individual Open 2,736.12 0.00 2019-04-18 / Técnico Social 1 Management pendiente 24 25 29 29 Tungurahua EC-MAG-118180-CS-INDV Component 3: Project Ejecución 2019-06- 2019-06- 2019-06- 2019-10- / Especialista en IBRD / 85150 Posterior Individual Direct 15,001.64 0.00 2019-06-07 Management pendiente 11 12 17 15 Agronegocios Planta Central EC-MAG-118182-CS-INDV Component 3: Project 2019-06- 2019-06- 2019-06- 2019-10- / Especialista Ambiental IBRD / 85150 Posterior Individual Direct 15,001.64 0.00 Cancelado 2019-06-07 Management 11 12 17 15 Planta Central 1 EC-MAG-118186-CS-INDV Component 3: Project Ejecución 2019-06- 2019-06- 2019-06- 2019-10- / Especialista Ambiental IBRD / 85150 Posterior Individual Direct 15,001.64 0.00 2019-06-07 Management pendiente 11 12 17 15 Planta Central 2 EC-MAG-105030-CS-INDV Component 3: Project 2019-03- 2019-03- 2019-03- 2019-06- / Especialista de IBRD / 85150 Posterior Individual Direct 11,251.23 0.00 Cancelado 2019-03-08 Management 12 13 15 13 Capacitación Planta Central EC-MAG-118188-CS-INDV Component 3: Project Ejecución 2019-07- 2019-07- 2019-07- 2019-11- / Especialista de IBRD / 85150 Posterior Individual Open 15,001.64 0.00 2019-06-10 Management pendiente 01 04 08 05 Capacitación Planta Central EC-MAG-118196-CS-INDV Component 3: Project Ejecución 2019-06- 2019-06- 2019-07- 2019-10- / Especialista Hidráulico IBRD / 85150 Posterior Individual Direct 15,001.64 0.00 2019-06-07 Management pendiente 11 12 01 29 Planta Central EC-MAG-118197-CS-INDV Component 3: Project Ejecución 2019-06- 2019-06- 2019-06- 2019-10- / Especialista Social IBRD / 85150 Posterior Individual Direct 15,001.64 0.00 2019-06-07 Management pendiente 11 12 17 15 Planta Central EC-MAG-118198-CS-INDV Component 3: Project Ejecución 2019-06- 2019-06- 2019-06- 2019-10- / Técnico Agropecuario y IBRD / 85150 Posterior Individual Direct 11,844.48 0.00 2019-06-07 Management pendiente 11 12 17 15 de Comercialización Azuay EC-MAG-118199-CS-INDV Component 3: Project Ejecución 2019-06- 2019-06- 2019-06- 2019-10- / Técnico Agropecuario y IBRD / 85150 Posterior Individual Direct 13,044.48 0.00 2019-06-07 Management pendiente 11 12 17 15 de Comercialización Bolívar EC-MAG-118200-CS-INDV Component 3: Project Ejecución 2019-06- 2019-06- 2019-06- 2019-10- / Técnico Agropecuario y IBRD / 85150 Posterior Individual Direct 11,844.48 0.00 2019-06-07 Management pendiente 11 12 17 15 de Comercialización Pichincha EC-MAG-118201-CS-INDV Component 3: Project Ejecución 2019-06- 2019-06- 2019-06- 2019-10- / Técnico Agropecuario y IBRD / 85150 Posterior Individual Direct 13,044.48 0.00 2019-06-07 Management pendiente 11 12 17 15 de Comercialización Manabí EC-MAG-118202-CS-INDV Component 3: Project Ejecución 2019-06- 2019-06- 2019-06- 2019-10- IBRD / 85150 Posterior Individual Direct 11,844.48 0.00 2019-06-07 / Técnico Hidráulico Azuay Management pendiente 11 12 17 15 EC-MAG-118204-CS-INDV Component 3: Project Ejecución 2019-06- 2019-06- 2019-06- 2019-10- COFN / C1410 Posterior Individual Direct 11,844.48 0.00 2019-06-07 / Técnico Hidráulico Management pendiente 11 12 17 15 Cotopaxi EC-MAG-118205-CS-INDV Component 3: Project Ejecución 2019-06- 2019-06- 2019-06- 2019-10- COFN / C1410 Posterior Individual Direct 11,844.48 0.00 2019-06-07 / Técnico Hidráulico Management pendiente 11 12 17 15 Imbabura EC-MAG-118206-CS-INDV Component 3: Project Ejecución 2019-06- 2019-06- 2019-06- 2019-10- IBRD / 85150 Posterior Individual Direct 11,844.48 0.00 2019-06-07 / Técnico Social Azuay Management pendiente 11 12 17 15 EC-MAG-118208-CS-INDV Component 3: Project Ejecución 2019-06- 2019-06- 2019-06- 2019-10- COFN / C1410 Posterior Individual Direct 11,844.48 0.00 2019-06-07 / Técnico Social Carchi Management pendiente 11 12 17 15 EC-MAG-118210-CS-INDV Component 3: Project Ejecución 2019-06- 2019-06- 2019-06- 2019-10- / Técnico Hidráulico COFN / C1410 Posterior Individual Direct 11,844.48 0.00 2019-06-07 Management pendiente 11 12 17 15 Tungurahua EC-MAG-118211-CS-INDV Component 3: Project Ejecución 2019-06- 2019-06- 2019-06- 2019-10- IBRD / 85150 Posterior Individual Direct 11,844.48 0.00 2019-06-07 / Técnico Social Loja Management pendiente 11 12 17 15 EC-MAG-118212-CS-INDV Component 3: Project Ejecución 2019-06- 2019-06- 2019-06- 2019-10- IBRD / 85150 Posterior Individual Direct 13,044.48 0.00 2019-06-07 / Técnico Social Manabí Management pendiente 11 12 17 15 EC-MAG-118213-CS-INDV Component 3: Project Ejecución 2019-06- 2019-06- 2019-06- 2019-10- IBRD / 85150 Posterior Individual Direct 11,844.48 0.00 2019-06-07 / Técnico Social Pichincha Management pendiente 11 12 17 15 EC-MAG-94790-CS-INDV Component 3: Project 2019-04- 2019-04- 2019-04- 2019-05- IBRD / 85150 Posterior Individual Open 2,736.12 0.00 Cancelado 2019-04-18 / Técnico Hidráulico Management 24 25 29 29 Pichincha EC-MAG-118215-CS-INDV Component 3: Project Ejecución 2019-07- 2019-07- 2019-07- 2019-12- IBRD / 85150 Previa Individual Open 14,805.60 0.00 2019-06-10 / Técnico Hidráulico Management pendiente 01 04 08 05 Pichincha EC-MAG-74526-CS-INDV Component 3: Project 2019-04- 2019-04- 2019-04- 2019-05- IBRD / 85150 Posterior Individual Open 3,261.12 0.00 Cancelado 2019-04-18 / Técnico Hidráulico Management 24 25 29 29 Manabí EC-MAG-118216-CS-INDV Component 3: Project Ejecución 2019-07- 2019-07- 2019-07- 2019-12- IBRD / 85150 Posterior Individual Open 16,305.60 0.00 2019-06-10 / Técnico Hidráulico Management pendiente 01 04 08 05 Manabí EC-MAG-118217-CS-INDV Component 3: Project Ejecución 2019-07- 2019-07- 2019-07- 2019-11- IBRD / 85150 Posterior Individual Open 11,844.48 0.00 2019-06-10 / Técnico Hidráulico Loja Management pendiente 01 04 08 05 EC-MAG-108575-CS-INDV Component 3: Project 2019-04- 2019-04- 2019-04- 2019-05- / Técnico Agropecuario y IBRD / 85150 Posterior Individual Direct 2,961.12 0.00 Cancelado 2019-04-18 Management 23 24 26 26 de Comercialización El Oro EC-MAG-118346-CS-INDV Component 3: Project Ejecución 2019-07- 2019-07- 2019-07- 2019-11- / Técnico Agropecuario y IBRD / 85150 Posterior Individual Open 11,844.48 0.00 2019-06-10 Management pendiente 01 04 08 05 de Comercialización El Oro EC-MAG-83537-CS-INDV Component 3: Project 2019-02- 2019-02- 2019-02- 2019-12- / Técnico Hidráulico 2 IBRD / 85150 Posterior Individual Open 33,733.44 0.00 Cancelado 2019-01-21 Management 11 14 18 31 Pichincha EC-MAG-118348-CS-INDV Component 3: Project Ejecución 2019-07- 2019-07- 2019-07- 2019-11- / Técnico Hidráulico 2 IBRD / 85150 Posterior Individual Open 11,844.48 0.00 2019-06-10 Management pendiente 01 04 08 05 Pichincha EC-MAG-83543-CS-INDV Component 3: Project 2019-02- 2019-02- 2019-02- 2019-12- IBRD / 85150 Posterior Individual Open 36,433.44 0.00 Cancelado 2019-01-21 / Técnico Ambiental Management 11 14 18 31 Pichincha EC-MAG-118350-CS-INDV Component 3: Project Ejecución 2019-07- 2019-07- 2019-07- 2019-11- IBRD / 85150 Posterior Individual Open 11,844.48 0.00 2019-06-10 / Técnico Ambiental Management pendiente 01 04 08 05 Pichincha Page 13 EC-MAG-83544-CS-INDV Component 3: Project 2019-04- 2019-04- 2019-04- 2019-05- / Técnico Hidráulico 1 IBRD / 85150 Posterior Individual Open 2,961.12 0.00 Cancelado 2019-04-18 Management 24 25 29 29 Guayas, Los Rios y Santa Elena EC-MAG-118355-CS-INDV Component 3: Project Ejecución 2019-07- 2019-07- 2019-07- 2019-12- / Técnico Hidráulico 1 IBRD / 85150 Posterior Individual Open 14,805.60 0.00 2019-06-10 Management pendiente 01 04 08 05 Guayas, Santa Elena, Los Ríos EC-MAG-83545-CS-INDV Component 3: Project 2019-02- 2019-02- 2019-02- 2019-12- / Técnico Hidráulico 2 IBRD / 85150 Posterior Individual Open 38,353.44 0.00 Cancelado 2019-01-21 Management 11 14 18 31 Guayas, Los Ríos y Santa Elena. EC-MAG-118356-CS-INDV Component 3: Project Ejecución 2019-07- 2019-07- 2019-07- 2019-11- / Técnico Hidráulico 2 IBRD / 85150 Posterior Individual Open 13,044.48 0.00 2019-06-10 Management pendiente 01 04 08 05 Guayas, Santa Elena, Los Ríos EC-MAG-83546-CS-INDV Component 3: Project 2019-04- 2019-04- 2019-04- 2019-05- / Técnico Social Guayas, IBRD / 85150 Posterior Individual Open 2,961.12 0.00 Cancelado 2019-04-18 Management 24 25 29 29 Santa Elena, Los Ríos. EC-MAG-118359-CS-INDV Component 3: Project Ejecución 2019-07- 2019-07- 2019-07- 2019-12- / Técnico Social Guayas, IBRD / 85150 Posterior Individual Open 14,805.60 0.00 2019-06-10 Management pendiente 01 04 08 05 Santa Elena, Los Ríos EC-MAG-83547-CS-INDV Component 3: Project 2019-02- 2019-02- 2019-02- 2019-12- COFN / C1410 Posterior Individual Open 33,733.44 0.00 Cancelado 2019-01-21 / Técnico Social 2 Management 11 14 18 31 Tungurahua EC-MAG-118360-CS-INDV Component 3: Project Ejecución 2019-07- 2019-07- 2019-07- 2019-10- COFN / C1410 Posterior Individual Open 8,883.36 0.00 2019-06-10 / Técnico Social 2 Management pendiente 01 04 08 06 Tungurahua EC-MAG-86042-CS-INDV Component 3: Project 2019-04- 2019-04- 2019-04- 2019-05- / Técnico Hidráulico 2 COFN / C1410 Posterior Individual Open 2,736.12 0.00 Cancelado 2019-04-18 Management 24 25 29 29 Tungurahua EC-MAG-118361-CS-INDV Component 3: Project Ejecución 2019-07- 2019-07- 2019-07- 2019-12- / Técnico Hidráulico 2 COFN / C1410 Posterior Individual Open 14,520.48 0.00 2019-06-10 Management pendiente 01 04 08 05 Tungurahua EC-MAG-118364-CS-INDV / Técnico Agropecuario y Component 3: Project Ejecución 2019-07- 2019-07- 2019-07- 2019-10- COFN / C1410 Posterior Individual Open 8,883.36 0.00 2019-06-10 de Comercialización Management pendiente 01 04 08 06 Esmeraldas, Carchi e Imbabura EC-MAG-118365-CS-INDV / Técnico Agropecuario y Component 3: Project Ejecución 2019-07- 2019-07- 2019-07- 2019-10- COFN / C1410 Posterior Individual Open 8,883.36 0.00 2019-06-10 de Comercialización Management pendiente 01 04 08 06 Chimborazo, Cotopaxi y Tungurahua EC-MAG-118366-CS-INDV / Técnico Ambiental Component 3: Project Ejecución 2019-07- 2019-07- 2019-07- 2019-11- IBRD / 85150 Posterior Individual Open 13,044.48 0.00 2019-06-10 Guayas, Los Ríos, Santa Management pendiente 01 04 08 05 Elena, Bolívar EC-MAG-94140-CS-INDV Component 3: Project Ejecución 2019-07- 2019-07- 2019-08- 2019-09- IBRD / 85150 Posterior Individual Open 4,451.88 0.00 2019-06-24 / Especialista Informático Management pendiente 19 22 01 30 1 EC-MAG-94144-CS-INDV Component 3: Project Ejecución 2019-07- 2019-07- 2019-08- 2019-09- IBRD / 85150 Posterior Individual Open 4,451.88 0.00 2019-06-24 / Especialista Informático Management pendiente 19 22 01 30 2 EC-MAG-118370-CS-INDV Component 3: Project 2019-07- 2019-07- 2019-07- 2019-12- COFN / C1410 Posterior Individual Open 14,520.48 0.00 Cancelado 2019-06-10 / Técnico Social 1 Management 01 04 08 05 Tungurahua EC-MAG-118178-CS-INDV Component 3: Project Ejecución 2019-06- 2019-06- 2019-06- 2019-10- / Especialista Agrícola IBRD / 85150 Posterior Individual Direct 15,001.64 0.00 2019-06-07 Management pendiente 11 12 17 15 Planta Central EC-MAG-123266-CS-INDV Component 3: Project Ejecución 2019-09- 2019-09- 2019-11- 2020-03- / Especialista Ambiental IBRD / 85150 Posterior Individual Open 15,001.64 0.00 2019-07-22 Management pendiente 09 30 04 03 Planta Central 1 EC-MAG-125445-CS-INDV Component 3: Project Ejecución 2019-08- 2019-08- 2019-10- 2020-03- COFN / C1410 Posterior Individual Direct 14,520.48 0.00 2019-07-31 / Técnico Social 1 Management pendiente 10 31 05 03 Tungurahua EC-MAG-94146-CS-INDV Component 3: Project Ejecución 2019-08- 2019-08- 2019-09- 2019-11- IBRD / 85150 Posterior Individual Open 3,275.16 0.00 2019-08-02 / Analista de Encuestas 1 Management pendiente 24 27 02 01 EC-MAG-94148-CS-INDV Component 3: Project Ejecución 2019-08- 2019-08- 2019-09- 2019-11- IBRD / 85150 Posterior Individual Open 3,275.16 0.00 2019-08-02 / Analista de Encuestas 2 Management pendiente 24 27 02 01 EC-MAG-94151-CS-INDV Component 3: Project Ejecución 2019-08- 2019-08- 2019-09- 2019-11- IBRD / 85150 Posterior Individual Open 5,042.16 0.00 2019-08-02 / Supervisor de Encuestas Management pendiente 24 27 02 01 2 EC-MAG-94150-CS-INDV Component 3: Project Ejecución 2019-08- 2019-08- 2019-09- 2019-11- IBRD / 85150 Posterior Individual Open 5,042.16 0.00 2019-08-02 / Supervisor de Encuestas Management pendiente 24 27 02 01 1 Page 14