Document of The World Bank FOR OFFICIAL USE ONLY Report No. 48665 - RO INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT AND INTERNATIONAL FINANCE CORPORATION COUNTRY PARTNERSHIP STRATEGY FOR ROMANIA FOR THE PERIOD July 2009-June 2013 June 12, 2009 Central Europe and the Baltic Countries Country Unit Europe and Central Asia Region International Finance Corporation Southern Europe and Central Asia Department This document has restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization. CURRENCY EQUIVALENTS USD 1 = RON 2.9664 FISCAL YEAR January 1 ­ December 31 ABBREVIATIONS AND ACRONYMS AAA Analytical and Advisory Activities IFC International Finance Corporation CEM Country Economic Memorandum IFI International Financial Institution CP Convergence Program IMF International Monetary Fund CPS Country Partnership Strategy IL Investment Loan DPL Development Policy Loan IT Information Technologies EBRD European Bank for Reconstruction and Development LA Lisbon Agenda EC European Commission MIC Middle Income Country ECA Europe and Central Asia MSME Micro, Small and Medium Enterprises ECB European Commission Board MTEF Medium-term expenditure framework EERP European Economic Recovery Plan NATO North Atlantic Treaty Organization EIB European Investment Bank NBR National Bank of Romania EU European Union NHIF National Health Insurance Fund EU8 Member States that joined the EU on May 1, 2004, NGO Non-governmental organization excluding Malta and Cyprus NRDP National Rural Development Plan EU10 EU8 Member States that joined the EU on NRP National Reform Program January 1, 2007, excluding Malta and Cyprus OECD Organization for Economic Cooperation and FDI Foreign direct investment Development FIAS Foreign Investment Advisory Service OP Operational Program FIRST Financial Sector Reform and Strengthening Initiative PAL Programmatic Adjustment Loan FRL Fiscal Responsibility Law PEIR Public Expenditure and Institutional Review FSAP Financial Sector Assessment Program PISA Programme for International Student Assessment GDP Gross Domestic Product PPP Public Private Partnerships GEF Global Environment Facility ROSC Report on the Observance of Standards and Codes GMI Guaranteed Minimum Income SBA Stand-By Arrangement IBRD International Bank for Reconstruction and SME Small and medium enterprises Development TA Technical assistance USD United States dollar VAT Value Added Tax IBRD IFC Vice President: Shigeo Katsu Vice President: Jyrki Koskelo Country Director: Theodore Ahlers Director: Shahbaz Mavadat Task Team Leader: Benoit Blarel Task Leader: Kaikham Onedamdy 2 Acknowledgements: The Country Partnership Strategy was prepared by a core team comprised of the following World Bank Group staff: Benoit Blarel, Country Manager (TTL), Penny Williams, Senior Country Officer, Catalin Pauna, Senior Economist, Ana Maria Mihaescu, Chief of Mission, IFC, Kaikham Onedamdy, Strategy Officer, IFC, Toni Koleva, Operations Analyst, Cornelia Boranescu, Operations Analyst, Eugen Scanteie, Consultant, Iolanda Staniloiu, Communications Officer, Mihaela Dumitrascu, Executive Assistant, Raluca Banioti, Program Assistant. 3 COUNTRY PARTNERSHIP STRATEGY July 2009-June 2013 TABLE OF CONTENTS Executive Summary 5 I. Country Context 5 A. Political Environment 5 B. Recent Economic Developments 6 C. Impact of Crisis 9 D. Social Outcomes 10 E. Economic Outlook 12 II. Country Development Program 15 A. Public Sector Reforms 16 B. Growth and Competitiveness 18 C. Social and Spatial Inclusion 19 III. The World Bank Group Program 22 A. Implementation of 2006 CPS and Lessons Learned 22 B. External Partners and the Bank's Value Added 24 C. The Proposed Bank Strategy 26 D. Strategic Pillars of the Proposed Program 28 Pillar 1: Public Sector Reform 28 Pillar 2: Growth and Competitiveness 29 Pillar 3: Social and Spatial Inclusion 33 E. Consultations and Partnership with the Government and other Stakeholders 35 F. Measuring Results 36 IV. Risk Management 36 ANNEXES A1. Romania At A Glance B2. Selected Indicators of Bank Portfolio Performance and Management B3. IBRD/IDA Program Summary B3. IFC Investment Operations Program B4. Summary of AAA Services B5. Social Indicators B6. Key Economic Indicators B7. Key Exposure Indicators B8. Operations Portfolio (IBRD/IDA and Grants) B8. IFC's Committed and Disbursed Investment Portfolio C. Results Framework D. CPS Completion Report E. Consultations F. Map 4 Country Partnership Strategy for Romania EXECUTIVE SUMMARY 1. After eight years of rapid economic growth and impressive gains in poverty reduction, the shockwave of the global economic and financial crisis has exposed the growing imbalances and economic vulnerabilities in Romania's economy, rooted in weak economic management and a large, unfinished agenda of public sector and governance reforms. 2. The new Government faces the difficult task of reconciling short-term fiscal consolidation with the need to mitigate the social costs of the crisis and restore the sources of sustainable and equitable growth. The new Government has moved rapidly to take fiscal measures aimed at containing the impact of the crisis, to mobilize an international financial package spearheaded by the IMF, the EU and the World Bank, and to resume the structural reform agenda that had faltered since EU accession on January 1, 2007. 3. The World Bank Group will complement and support this program by i) helping the Government to implement structural reforms to help mitigate the crisis by reducing social and economic vulnerabilities and ii) putting in place the basis for sustainable economic growth in the medium-term. In the first few years of the Country Partnership Strategy (CPS), the Bank program will center on a programmatic series of Development Policy Loans (DPLs), the existing investment portfolio, and Advisory and Analytical Activities (AAA). A mid-term CPS progress report would articulate the Bank program for the outer years of the CPS period. This CPS is fully consistent with a forthcoming Regional Framework that will set out the Bank's value-added and key areas of activity across Central and South Central Europe and the Baltics region. Notwithstanding the current economic crisis, Romania's EU accession is resulting in increased market access and commercial banking activity, with a gradually declining role for the IFC. IFC therefore, envisages a phased reduction of its involvement within a period of 5 years, subject to market conditions, offering support to selective sectors and activities in which IFC can still provide value addition and in which the commercial sector and market cannot fulfill. In the short term, IFC's investment strategy is to play a crisis response role by helping to recapitalize the major banks which are considered vital to the financial system and offering trade finance to financial institutions in Romania. I. COUNTRY CONTEXT A. Political Environment 4. Between 2001 and 2006 stakeholders in Romania united behind the objectives of joining NATO and the EU, but since 2007 reform momentum has slowed sharply. After EU accession on January 1, 2007 political differences escalated and reform fatigue set-in. This affected the consistency and coherence of public policies, and complicated the adoption and implementation of longer-term policies and programs. Coalition politics is expected to prevail over the period covered by this Partnership Strategy but the global economic and financial crisis may provide the necessary impetus for renewed political accommodation that has, prior to EU accession, enabled minority or coalition governments to undertake important reforms. 5 5. In late December 2008 a coalition Government took office following parliamentary elections a month before. The current Government, which enjoys a 70 percent majority in the Parliament, is formed by a coalition between democrat-liberals and the social- democrats/conservatives alliance under a political pact - Partnership for Romania. Given its large majority in the Parliament and the support of the President, the coalition Government in principle controls the important legislative initiatives needed to manage the crisis and renew reform. The breadth and depth of these legislative and policy measures will be necessarily limited to the areas of overlap between the respective agendas of the coalition members. At the same time, these measures will necessarily have cross-party support and therefore may be more likely to be sustainable. However, the Presidential elections scheduled for Fall 2009 could strain the coalition as candidates from the two main coalition parties are likely to compete for the Presidency. 6. The crisis provides stimulus for reform consensus. The crisis has forced strong austerity measures and a re-evaluation of populist policies, including in public sector wages and pensions. Success in mitigating the impact of the crisis hinges on the commitment and capacity of political institutions to work together to enact bold reforms and to mobilize key stakeholders and the population behind them. B. Recent Economic Developments Growing macro imbalances and the build-up of vulnerability 7. The Romanian economy experienced an economic boom during 2003-08, associated with the process of accession to the EU, leading to rapid gains in poverty reduction. Growth averaged over 6.5 percent per year during that period, reaching over 7 percent in 2008. Absolute poverty declined from 35.9 percent in 2000 to 5.7 percent in 2008. A large part of the domestic absorption boom was driven by private investment: with EU accession prospects becoming more certain, capital flows, particularly foreign direct investment, were attracted by perceptions of lower investment risk that made Romania a favorable investment location. Sharp increases in asset prices and rising collateral values added a self-reinforcing momentum to the absorption boom. ECONOMIC GROWTH & POVERTY, ROMANIA 2002-2009 35 12000 30 28.9 10000 25 25.1 8000 20 18.8 6000 15 15.1 13.8 4000 10 9.8 7.4 5 5.7 2000 0 0 2002 2003 2004 2005 2006 2007 2008 Poverty Rate GDP per capita, 2002 prices (projected) 2009 Source: Romania - Rapid assessment of the economic crisis on poverty. Joint note by UNICEF and the World Bank, April 2009 6 8. The strong economic growth was accompanied by widening current account imbalances. Although exports to the EU countries grew at a robust pace, domestic demand grew at an even faster rate, and the current account deficit rose from just over 5.0 percent of GDP in 2003 to 12.4 percent of GDP in 2008. 9. At the same time, in the past two to three years, the composition of the capital inflows moved increasingly towards private debt flows--in large part the result of borrowing by banks, often by subsidiaries of foreign banks from their parent banks but also as a result of direct borrowing by corporates. Figure 1. Figure 2. Growing current account deficits were .. and the structure of private debt shifted toward increasingly financed with private borrowing shorter maturity until 2008.... Percent of GDP Percent of GDP 20 Other incl E&O 60 Pvt 10 borrowing (net) Other incl E&O 50 Public Pvt bor (net) Public borr (net) Pub bor MLT FDI FDI 0 FDI (net) Current 40 Account Current Current Account Account Private -10 30 MLT NBR Res -20 NBR Res NBR Res 20 Other incl E&O -30 10 Short-term Pvt debt borrowing (net) -40 Public borr (net) 0 2003 2007 2008 2003 2004 2005 2006 2007 2008 10. The domestic overheating and external imbalance were exacerbated by the fiscal policy stance. Fiscal policy in Romania has been highly pro-cyclical in recent years with fiscal management lacking in medium term orientation. Following efforts of fiscal consolidation during 2003-05 that led to a narrowing of the fiscal deficit to 0.8 percent of GDP in 2005, the fiscal deficit widened again progressively to reach 4.9 percent in 2008 (while the structural fiscal deficit increased from 0.7 percent of GDP in 2005 to 6.5 percent of GDP in 2008) as a result of excessive public spending policies. Government spending doubled between 2005 and 2008 pushing the public sector share of economic activity from 31 percent of GDP to 37.8 percent of GDP. The public sector wage bill more than doubled over these three years due to high wage increases combined with a huge increase in government employment. In the final months of 2008, further expenditure hikes in the run up to the November 2008 parliamentary elections left a legacy of precarious financing of the deficit. This doubling of government spending was not matched by a corresponding increase in the amount and quality of public services. 7 Figure 3. Figure 4. Fiscal policy was pro-cyclical and deficits grew.. ..driven in large part by loose public pay policy Percent of GDP Gross wage (2003=100) 0 350 Economy wide Public Administration -1 300 Education Health -2 250 -3 200 Ed PA -4 Fiscal balance 150 EW Health Structural balance -5 100 -6 50 -7 0 2005 2006 2007 2008 2005 2006 2007 2008 11. The overheating and large capital inflows complicated monetary policy. Monetary policy was relatively tight--with the National Bank of Romania (NBR) increasing reserve requirements and interest rates in an attempt to dampen inflationary pressures. In addition, a number of measures were undertaken to contain credit expansion, especially in foreign currency lending. Between 2004 and 2008, policy interest rates were raised, as were minimum reserve requirements (to 18 percent on local currency liabilities and 40 percent on foreign currency liabilities); measures were taken to limit household debt exposures, especially with regard to mortgage debt; prudential regulations were strengthened to limit lending to un-hedged borrowers of foreign exchange, and restrictions on household debt service ceilings were tightened. These measures contributed to the subsequent deceleration in household credit growth, but pressure from an expansionary fiscal policy and capital inflows caused the NBR to miss its inflation target in 2007 and 2008. At the same time, the interest rate differential between domestic and international rates and the restrictions on credit growth mentioned above, may have served to further encourage direct external borrowing and short term capital inflows. In particular, large firms began to borrow directly abroad as reflected in an increase in direct borrowing by firms from the equivalent of 4 percent (on a net basis) of GDP in 2005 to nearly 11 percent of GDP in 2007. 12. Romania's financial system--which is dominated by commercial banks--played an integral part in the domestic overheating. Between 2003 and 2007, total financial system assets more than doubled from about 36 percent to 74 percent of GDP (with the banking sector accounting for 83 percent of total assets). At the end of 2007, foreign-owned banks (mostly subsidiaries) accounted for 88 percent of total banking sector assets. Growth in real private sector credit rose from 23 percent per year in 2003 to over to 60 percent in 2007 before slowing slightly to 54 percent in 2008. Much of banks' lending was directed towards households, three quarters of which towards consumer credit. Between 2003 and 2007, claims on households rose from 12 to 28 percent of total banking sector assets (19.5 percent of GDP in mid-2008), while claims on companies declined from 37 to around 30 percent of banks' assets. 8 13. The proportion of banks' lending funded from non-deposit sources--particularly foreign borrowing--rose progressively. While deposits grew relatively steadily, lending significantly outpaced the growth in deposits with the loan to deposit ratio increasing by over 43 percent during 2003-2008 to reach 130 percent at end 2008. The large resort of banks to external financing of lending is reflected in the rise in net foreign liabilities of banks from the equivalent of -2 percent of GDP in 2003 to around 18 percent at end 2008. 14. The indebtedness of households and corporates also grew rapidly, with much of the borrowing denominated in foreign currency. Total borrowing by the corporate sector grew at an annualized rate of 44 percent between 2004 to mid-June 2008 entailing a near doubling of indebtedness to 28 percent of GDP. Although the proportion of foreign currency (FX) borrowing declined slightly over the period, it was still over 70 percent in 2008. While household disposable income grew at an average annual rate of 20 percent, household debt increased at a rate of 77 percent, with FX denominated borrowing rising even more rapidly; by mid-2008, the share of FX borrowing in total household borrowing had risen to 56 percent (from 45 percent in 2005). 15. In sum, the Romanian economy had become vulnerable to liquidity and foreign exchange risks by the time the global financial crisis unfolded. C. Impact of crisis 16. The economy has been hit hard by the global economic downturn. Economic activity declined sharply in the last quarter of 2008 and has fallen further in early 2009. Real GDP growth shifted from an average of 9 percent (quarter on quarter annualized) during the first three quarters of 2008 to a 13 percent decline in the fourth quarter. The decline was driven primarily by a drop in domestic demand. Export growth also slowed. With imports dropping even more sharply, the correction in the current account deficit began towards the end of 2008. For the first quarter of 2009, early indicators (confidence, industrial production, retail sales and tax revenues) all point to a continued sharp drop in GDP, along with rising unemployment as well as poverty incidence. 17. Asset and financial markets have been severely affected by the effects of the global crisis and economic downturn. The stock market has lost 65 percent of its value since the peak in August 2008. The inter-bank market was disrupted in October 2008 by rumors of liquidity problems at a commercial bank, leading to a spiking of rates; these rates remained relatively high thereafter due to lingering concerns about counterparty risk, high risk aversion, and market segmentation due to an uneven distribution of assets (T-bills) eligible for discount with the NBR. Balance of payment pressures drove a 15 percent depreciation of the leu against the Euro from October 2008, putting pressures on household, corporate and bank balance sheets. To dampen currency volatility, the central bank intervened in the spot market, with some EUR4½ billion in reserves since end-October. Despite the depreciation, financial conditions tightened significantly on increased sovereign credit default swap premium and monetary policy tightening. Romania's international credit rating was cut in late 2008 by a larger margin than those of other countries in the region, reflecting market concerns about the sustainability of Romania's large current account deficit, uncertainties surrounding the outlook for fiscal and incomes policies, and the 9 financial health of banks with subsidiaries or branches in Romania. This has translated into significantly higher external borrowing costs for Romanian banks and corporates. 18. As conditions in the financial markets have worsened, the financing of the fiscal deficit has been increasingly concentrated at very short maturities. This has exposed the Government to roll-over risks in the current environment of de-leveraging. 19. Romania's deteriorating macro-financial environment has created risks for financial stability. Over the last few months, liquidity risk has become substantial in view of the difficulties in parent banks and the downgrading of Romania's sovereign rating to below investment grade by major international ratings agencies in late 2008 leading to a decline in the capital account flows. A sharp contraction or reversal of inflows could threaten macroeconomic and financial stability through a drying up of credit to the private sector, resulting in an even sharper slump in economic activity and larger increases in loan defaults. In addition, a reversal of capital inflows would put additional downward pressures on the exchange rate. While banks' direct exposures to foreign exchange risk reflected in their net open positions are low, as noted above, many households and businesses are exposed to un-hedged foreign exchange risks. Banks, therefore, have substantial indirect foreign exchange risk exposures, in the form of credit risk. 20. The rapid deterioration in economic conditions and depreciation of the leu will place strains on bank capital positions. The banking system entered the crisis well capitalized and with high liquidity buffers. Stress testing has already been performed by the National Bank of Romania. A strengthening of capital positions may be warranted and, in line with commitments made in Vienna and in Brussels, parents of most foreign owned banks have agreed to maintain lines of credit to their subsidiaries and borrowers in Romania and to increase their capital in order to comply with the minimum agreed level of solvency. In addition, banks will need to be proactive in enhancing loan quality by developing and implementing effective debt restructuring or workout procedures for household and corporate clients. D. Social Outcomes 21. Growth was highly successful in reducing poverty for the large majority of the population. The rapid growth witnessed over most of this decade has led to a dramatic decline in absolute poverty to 5.7 percent in 2008. The number of absolute poor fell from 2.1 million in 2007 to about 1.2 million in 2008. Poverty remains concentrated among vulnerable groups, in particular in rural areas where 75 percent of the poor are found. Besides rural areas, children, in particular those of large familes, the youth, the Roma, the unemployed and the self-employed (especially in agriculture), are at higher risk of poverty. 22. Poverty reduction gains are at risk, with both core and transient poverty expected to increase. The onset of the crisis is expected to partially reverse the important gains in overall poverty reduction derived from past economic growth. Poverty is expected to rise to 7.4 percent of the population in 2009, and the proportion of children living in absolute poverty is projected to increase from 7.8 percent in 2008 to 10.7 percent in 2009. Although most of poor continue to reside in rural areas, poverty is expected to increase faster in urban than in rural areas (by 40 and 30 percent, respectively), and the self-employed (outside of agriculture) where the impact of the 10 crisis is expected to be most pronounced. The budget transfers needed to finance increased demands on social assistance from the chronically poor, the unemployed and those vulnerable to transient poverty will be a challenging task given the reduced fiscal space. Figure 5. Effectiveness of Social Assistance Programs across EU member states percent reduction in poverty after non-contributory social benefits 60% 50% 40% 30% 20% 10% 0% coun15 coun tries) tries) edennmarkFinlanRepub d lic nia Sw De Slove FranceAustrHungar IrelandelgiummbourSlovaKingdom ia y g kia a s a a B ItalyGreece EU (25EU ( Czech Netherlands Germany MaltaPolandEstoniPortugalCypruLithuaniRomaniaLatviBulgaria Spain Luxe United Source: World Bank Policy Briefs, 2009 23. Social protection schemes do not address poverty well. Romania's social protection expenditure per capita is the lowest in the EU, and spending on poverty-targeted programs is low in proportion to GDP and to needs; it has actually declined in recent years. Only a few safety net programs perform well, while the overall system of social assistance cash benefits performs less well than in other EU countries in reaching the vulnerable and in providing them with adequate protection (figure 5). Most of the social assistance benefits have a low adequacy, representing only 10-20 percent of the minimum wage, and cover less than 30 percent of the household consumption of the poorest beneficiaries. The total social assistance benefits are not cost- effective from a poverty reduction perspective: 13 RON are spent for 1 RON reduction in the poverty gap (not taking into account administrative costs). Leakages and inequity in social assistance programs are high (figure 6): only 17 percent of the social assistance benefits reach the poorest quintile, 29 percent of the poor are excluded from the system ("remaining poverty gap" in figure 6), and half of the funds spill to the wealthier quintiles. Spending on poverty- targeted programs has decreased relative to GDP in recent years. Well-targeted programs such as the Guaranteed Minimum Income Program (GMI) or income-tested family allowances are under- funded, leaving out 60 percent of the rural poor and 77 percent of the urban poor. 11 Figure 6. Effectiveness of Social Assistance Programs in Romania Performance of Social Assistance (SA) cash transfers in reducing the Poverty Gap cesipr ant constNOR Spillover Total SA spending ng, spendiAS Poverty Line Poverty Gap and covered by SA apGyt transfers Remaining Poverty Gap overP 2004 2005 2006 Social Assistance cash transfers spillover Poverty Gap after transfers Portion of the Poverty Gap covered by social assistance cash transfers Source: World Bank Policy Briefs, 2009 E. Economic Outlook 24. The economy is expected to contract by about 4 percent in 2009 (Table 1). Domestic demand will contract as foreign direct investment and capital inflows, which previously helped finance high consumption and investment growth, will drop sharply. With no fiscal space and tight financing conditions, an easing of fiscal policy to cushion the downturn will not be possible. 25. The Government has already initiated substantial measures to address the fiscal deficit. The 2009 approved budget contains important spending cuts and revenue increases yielding around 3 percent of GDP in total. These measures include i) an increase of 3.3 percentage points in social contributions; ii) higher property taxes due to an overdue increase in appraisals; iii) removal of a reduced VAT rate for the purchase of a first house; iv) significant cuts in the public wage bill by reducing bonuses and other benefits and by eliminating 137,000 vacancies (previously used to grant higher allowances to existing staff); and v) substantial cuts in spending on goods and services as well as subsidies. It is estimated that the fiscal measures already approved in the budget would reduce the fiscal deficit to about 5.2 percent of GDP and the structural deficit would fall by about 1.7 percent of GDP. 26. The Government has sought multilateral support, including from the IMF, the EC and the World Bank Group. The Fund's program of support seeks to i) strengthen fiscal policy further to reduce the Government's financing needs and improve long term fiscal sustainability; ii) maintain adequate capitalization of banks and liquidity in domestic financial 12 markets; iii) sustainably reduce inflation; and iv) secure external financing and improve confidence. Table 1: Selected macro indicators Actual Projected 2005 2006 2007 2008 2009 2010 2011 Annual percentage change Output and prices Real GDP 4.1 7.9 6.2 7.1 -4.1 0.0 5.0 Domestic demand 8.3 12.8 14.3 8.9 -8.2 -3.3 6.0 Consumer price index (CPI av) 9.0 6.6 4.8 7.8 5.9 3.9 3.5 Unemployment rate 5.8 5.8 4.3 4.0 8.9 9.7 7.7 Nominal wages 17.0 18.9 22.6 23.6 5.9 3.8 5.2 Public sector wages 25.9 27.3 18.5 31.0 5.1 3.9 3.5 Private sector wages 14.7 16.5 23.2 21.2 6.2 3.8 5.7 In percent of GDP Savings and investment Gross domestic savings 23.3 26.5 31.1 31.4 30.8 29.9 31.9 Gross national savings 14.4 16.1 17.3 19.0 23.2 23.4 25.7 General government Revenue 30.1 31.0 32.5 32.6 33.0 33.4 33.1 Expenditure 30.9 31.6 35.6 37.5 37.5 37.0 35.8 Fiscal balance -0.8 -0.6 -3.1 -4.9 -4.6 -3.6 -2.7 Privatization proceeds 1.3 0.4 0.1 0.1 0.0 0.0 0.0 External financing 0.5 0.1 0.1 0.5 2.8 1.1 0.2 Domestic financing -1.0 0.1 2.9 4.4 1.8 2.4 2.5 Structural balance 1/ -0.6 -2.1 -4.2 -6.5 -3.8 -1.7 -1.2 Gross public debt (direct debt only) 15.6 15.4 17.5 20.1 23.6 25.7 25.7 Annual percentage change Money and credit Broad money (M3) 36.5 28.1 33.7 17.6 6.6 6.5 11.5 Credit to the private sector - 54.5 60.4 33.7 15.9 5.1 3.2 In percent Interest rates Euribor six months 2.8 3.2 4.8 3.5 - - - NBR policy rate 7.5 8.7 7.5 10.2 - - - NBR lending rate (Lombard) 14.0 14.0 12 14.2 - - - Interbank offer rate (1 week) 7.0 7.4 7.8 15.9 - - - In percent of GDP Balance of payments Current account balance -8.9 -10.4 -13.8 -12.4 -7.5 -6.5 -6.2 Merchandise trade balance -9.9 -12.0 -14.4 -13.5 -7.5 -6.6 -6.8 Capital and financial account 15.6 15.7 17.3 13.9 -2.4 3.3 7.8 FDI 6.6 8.9 5.8 6.7 3.1 3.7 3.7 International investment position -29.9 -35.3 -40.9 -52.9 -56.8 -55.8 -54.1 Gross official reserves 22.0 23.4 22.1 20.5 23.4 26.1 25.6 Gross external debt 39.0 42.9 47.1 53.4 64.2 68.5 64.0 Exchange rates RON per euro (eop) 3.7 3.4 3.5 4.0 - - - Real effective exchange rate CPI based (depreciation -) 17.9 7.6 9.0 -4.2 -10.3 -2.1 1.3 Nominal GDP (bn RON) 289.0 344.7 412.8 504.0 531.3 568.5 634.1 Nominal GDP (bn Euro) 79.7 97.8 123.6 136.8 119.7 118.8 130.7 1/Actual fiscal balance adjusted for automatic effects of internal imbalance (output gap) and external imbalance (absorption gap). Source: IMF. 13 27. Under the Fund's program, the fiscal deficit is expected to further narrow to 4.6 percent of GDP in 2009 from 4.9 percent of GDP in 2008. Fiscal measures yielding an additional 1.1 percent of GDP are to be implemented in 2009 as prior actions for the IMF program, concentrating on expenditure reductions. The fiscal deficit for 2009 is thus expected to be 0.3 percentage points lower than 2008, at 4.6 percent of GDP. In order to safeguard the targets, spending plans will be back-loaded and their execution will be conditional on revenue performance. The structural fiscal deficit would decline by nearly 3 percentage points of GDP (from 6.7 percent to 3.8 percent of GDP). The authorities envisage additional adjustment efforts in 2010 to bring the deficit down to around 3.7 percent in that year, and to bring it to well below 3 percent of GDP in 2011 to meet the Maastricht deficit criterion. 28. The current account deficit is projected to decline from 12.5 percent of GDP in 2008 to 7.5 percent in 2009 and further to 6.5 percent in 2010. This adjustment process is expected to be driven primarily by a sharp import decline arising from the drop in domestic demand and the depreciation in the real exchange rate. 29. The balance in the capital and financial account is expected to fall from a surplus of EUR18.8 billion in 2008 to a EUR2.7 billion deficit in 2009. FDI is expected to decline considerably in 2009, and trade credit contracts will fall in line with import compression, consistent with developments in recent months. The capital and financial account is projected to reach a EUR3.8 billion surplus in 2010, on the back of a slight recovery in FDI and reduced capital outflows. 30. Romania faces considerable balance of payments financing needs over the next 24 months. Based on the projected current account deficit and stock of short term and maturing medium and long-term debt, Romania's gross financing needs would amount to EUR44 billion in 2009. Under the assumptions of average rollover rates for amortizing debt in 2009 of around 90 percent for banks and 70 percent for corporates, a financing gap of approximately EUR11¾ billion would emerge. For 2010 and the first quarter of 2011, the Fund's macro framework assumes that a strong adjustment program will reduce the financing gap to about EUR8¼ billion, bringing total financing gap under the program to EUR20 billion, as the current account is expected to continue to adjust and rollover rates and FDI to improve due to higher confidence in economic policies and the expected incipient recovery in the world economy. The financing gap for 2010 includes a build up in gross international reserves of about EUR3 billion, increasing reserves coverage to about 100 percent of short-term external debt at end-2010 from about 75 percent at end-March 2008, significantly reducing external vulnerabilities. 31. Over the medium term, a gradual economic recovery is expected, whose pace and strength will reflect the restoration and broadening of the economic reform agenda initiated before EU accession. Output is projected to follow a U-shaped adjustment pattern, and while positive growth is expected to resume by the second quarter of 2010, it would remain near zero in 2010. Beyond the economic stabilization and fiscal consolidation efforts under way, economic reforms will decide the evolution of the economy after the crisis, in particular how quickly and strong the economic recovery will be. In the short-term, Government priorities are to stimulate confidence in the economy, protect the poor and vulnerable from the effects of the crisis, protect employment, and contain the slowdown in demand, with focus on the financial system and fiscal policy. 14 32. Consistent with the European Economic Recovery Plan, short-term actions are anchored on a longer term strategy aimed at fostering sustainable growth and employment by addressing the development challenges facing Romania. The quality of the fiscal adjustment in reducing economic vulnerabilities and depth of the crisis would hinge on public sector reforms in the areas of public financial management, public administration, and macroeconomic management, complemented by governance and sector reforms to increase the efficiency of public spending and quality of public service delivery (notably in health, education, transport). The lack of sustainability of recent growth underscores the need for Romania to diversify its sources of growth in line with the recommendations of the Lisbon Agenda on enhanced competitiveness and business environment, better skills through education and innovation, and better infrastructure in transport, communication and energy; particularly important is capturing the growth potential of agriculture, a sector largely by-passed by growth over the past two decades. Finally, because the crisis will boost transient poverty, and the already significant core poverty will swell, economic growth must be accompanied by social policies to ensure social and spatial equity, through access to gainful employment and public services, and through well-targeted social assistance and sustainable social insurance programs. The severity of the crisis and the political support of the coalition Government offer a rare opportunity to address these structural and institutional reforms. 33. The outlook is, however, subject to exceptional uncertainties and risks. The recovery depends on global events, and on addressing structural challenges through a credible and sustained reform effort. In the near term, output could be further compressed through balance- sheet effects arising from a further RON depreciation and higher-than-expected inflation, especially if capital outflows are larger than anticipated. It would also be affected by a further worsening of global growth prospects, notably in Europe. II. COUNTRY DEVELOPMENT PROGRAM 34. Romania's overarching objective is to achieve convergence with the EU in terms of income and living standards. With a GDP per capita of slightly over 40 percent of the EU 27 average, Romania has a large unfinished development agenda. The approach to pursuing the convergence agenda has been consolidated in the National Reform Program (NRP) for promoting sustainable and equitable economic growth in the context of the European Lisbon Strategy. The NRP, updated annually and reviewed by the European Commission, complements the four themes of the Lisbon Agenda ­ investing in people and modernizing labor markets, unlocking the business potential, especially of SMEs, investing in knowledge and innovation, and energy and climate change ­ with the need to improve the quality and management of administrative capacity and government expenditure in the context of prudent macroeconomic policies. 35. The May 2009 Convergence Program of the Government reaffirms Romania's objective of joining the Eurozone in 2014. The document emphasizes the importance of promoting sound macroeconomic management and coordination of policies to gradually correct the existing imbalances. The Convergence Program aims to reduce the budget deficit to less than 15 3 percent of GDP, in line with the provisions of the EU Growth and Stability Pact, and inflation to 3.2 percent by 2011 to allow Romania to join the Exchange Rate Mechanism in 2012. 36. The political agenda of the governing coalition is articulated in the Government Program for the period 2009-2012. The objectives of the Program are two-fold: · dealing with the effects of crisis by stimulating the confidence in the economy and mitigating its adverse impact, especially on the poor and vulnerable; and · anchoring these short term measures in a medium-term structural reform agenda that would support economic growth and resume progress towards convergence with EU living standards, social cohesion and eventual entry into the Euro-zone. 37. The Government program recognizes the need to re-focus the policy attention on the large unfinished structural reform agenda laid out in the National Reform Program to pull Romania out of the crisis and converge sustainably with the EU. The measures proposed by the Government are organized into three broad categories: (i) reforming the public sector; (ii) rebalancing the foundations of growth and enhancing competitiveness; and (iii) promoting social and spatial inclusion. A. Public Sector Reforms 38. The Government has taken steps to develop its public financial management system to optimize resource mobilization and generate fiscal savings within a more transparent, predictable and accountable framework. In the short term, the Government has adopted a series of policy decisions which led to a sizeable fiscal consolidation (see paragraph 26). The authorities recognize that weaknesses in managing public spending have been at the core of the fiscal deficits and the poor delivery of public services. Therefore, they have initiated key fiscal reforms which are structural benchmarks under the IMF program: (i) the approval of a Fiscal Responsibility Law (FRL). The FRL would provide a framework for improved multi-year budgeting, fiscal rules on expenditures, public debt and the primary deficit, and for managing guarantees and other contingent liabilities. The FRL would also set limits on the frequency of intra-year budget rectifications, and create an independent Fiscal Council; (ii) the adoption of legislation for the introduction of unified, simplified public compensation, which would consolidate most payments under the base salary; and (iii) the adoption of legislation for a revised pension system which would index benefits to inflation, raise and eventually equalize retirement age between men and women, and restore projected increases in contributions to the second pension pillar. These measures will test the commitment of the authorities to address key sources of economic vulnerabilities. 39. The medium-term expenditure framework (MTEF) process will be strengthened so that it guides strategic planning in line ministries and prioritization of expenditures. As an intermediate step towards performance-based budgeting, the MTEF would provide line ministries with incentives to prioritize expenditures within their policy agenda, better plan capital investment projects, arbitrate trade-offs between personnel costs and capital expenditures, and allow a priori agreements between the Government and the Parliament on the budget priorities in the case of unexpected changes in revenues. In the short-term, the MTEF should facilitate the mobilization of the significant EU Funds available to Romania; in the medium-term, the MTEF 16 should enhance the strategic allocation of resources and fiscal discipline. The challenge is, however, to aggressively implement the MTEF agenda, whose main elements have already been drawn up in the context of the program with the IFIs. 40. To remove disparities in pay and promote performance, a unitary public sector pay system will be gradually introduced, using analytical work provided by the Bank as a basis for reform. The Government has already taken steps to reduce non-wage compensation and integrate allowances into base salaries and has engaged trade unions in consultations. Beyond the establishment of the unitary pay system, there is also scope to rationalize the public administration in line with current priorities and needs, and strengthen its capacity to perform. Functional reviews of central government institutions will be undertaken to improve performance and resource allocation across public sector entities, reduce bureaucracy, cut administrative costs and lead to savings which can be used to, for example, implement the unitary pay system and advance decentralization. 41. The Government has maintained the flat 16 percent income and profit tax, and recognizes the need for sustained reform of tax administration to improve revenue collection, reduce administrative costs and tax burden for tax-payers. As a share of GDP tax revenue collection remains low compared to other EU members, while costs are high in spite of improved tax administration management in recent years, indicating that there is still substantial room to enhance tax compliance and reduce costs. The Government has taken steps to reduce the number of taxes and simplify submissions to improve tax revenue collection, reduce the bureaucratic burden for the tax-payers as well as administrative costs of tax collection. More remains to be done, however, to reduce the administrative burden for the business environment and improve the interaction of the business sector with the administration. 42. The Government has begun implementing a rapid decentralization of public services. Efforts to decentralize have so far been partial and have not resolved the key issues affecting sub-national public administration. The new Government appears strongly committed to move forward the decentralization agenda rapidly. A strategy for health decentralization has been drafted and presented to the Government. The approach to decentralization of education is also in an advanced design phase. The changes pursued seek to improve the efficiency of service delivery at local level and enhance sub-national investments quality. One key challenge would be for the Government to advance the process of decentralization at a pace which is commensurate with the establishment of an appropriate accountability framework and capacity- building for local governments to warrant the transparent and effective use of the public resources at sub-national level. 43. The reform of the judiciary is led by the commitments assumed by Romania in the EU accession process. The framework for reforms is defined by four benchmarks established within the Co-operation and Verification Mechanism agreed with the EU. One benchmark requires measures aimed at enhancing the capacity and accountability of the Superior Council of Magistrates, and three other benchmarks cover integrity and anti-corruption matters. The judiciary still faces systemic problems to courts' efficiency, magistrates' accountability and corruption. To address these key challenges, the Government has set a bold agenda, which needs to be implemented: (i) the adoption of the new Civil and Criminal Codes and Civil and Criminal Procedure Codes; (ii) the adoption of a human resources policy in the judicial system, together 17 with a new salary policy; and (iii) the adoption of a reformed court management system. The four draft Codes are currently under Parliamentary debate and expected to be adopted in 2009. Regulatory impact assessments are planned to be undertaken after their adoption. The reform of the court system requires, however, renewed attention by the Government. B. Growth and Competitiveness 44. The Government recognizes that sound macroeconomic management is more critical than ever to address the financial crisis and make progress towards the medium- term objectives of resuming growth and joining the Euro-zone. To reduce macroeconomic vulnerabilities, fiscal discipline is being strengthened and coordination between fiscal (including debt management) and monetary policies is improving in the context of the program with international partners. The 2009 budget has been rectified to reflect the more constrained economic and financial environment, and redirects expenditure to priority areas ­ especially critical investments funded from EU funds and social protection - and seeks to contain the deficit. In line with the recommendations of the European Economic Recovery Plan (EERP), short-term prudent fiscal policies will be anchored in a medium-term program of reform, supported by the adoption of the Fiscal Responsibility Law and the gradual introduction of the MTEF. 45. In the financial sector, the priorities of the Government include the management of liquidity and addressing eventual solvency problems, access to finance, improved financial sector supervision, and contingency planning. Maintaining credit for private enterprises, especially SMEs and agro-businesses is critical to stem the economic and social impacts of the crisis. Contingency planning would require stronger coordination between regulatory agencies, the Ministry of Finance and similar agencies in home countries of parent banks, and a more flexible framework for bank intervention and resolution. Regulatory and supervisory authorities in the financial sector will be strengthened by introducing a merit-based appointment process for prospective Board members. In the medium term, the Government seeks to support further deepening of the financial sector. 46. Improving the business environment is also on the agenda of the Government. The business environment is affected by uncertainty about regulatory policies, excessive number and rates of taxes including high non-wage labor taxation, excessive and inefficient government bureaucracy, and slow and unpredictable settlement of business disputes. The Government has initiated a program to cut or eliminate 179 taxes and tariffs out of 489 and envisages further measures to reduce bureaucracy. While this is a good start, reforms need to continue. The implementation of the "Better regulation strategy for 2008-2013", prepared as part of the EU accession commitment, provides the appropriate framework for advancing the reform agenda. The implementation of the Service Directive, which requires a firm though feasible schedule, is also expected to be a challenge. 47. A National Pact on Education concluded in 2008 between all major stakeholders sets ambitious objectives for 2015 to increase the quality and relevance of education, access by vulnerable groups, and expansion of adult education. In pre-university education, proposed measures include legislation in 2009 of a new structure better aligned on European standards; reform of school curricula and associate training of teachers and school managers; updating of 18 student evaluation norms and procedures; accelerated decentralization of financial and human resources, and of administration and curricula; and a comprehensive program to upgrade teaching staff and school management. In university education, measures include external evaluation of public and private institutions and study programs, full autonomy of universities in managing human resources, improved access and quality of student services and students' voice in decisions, introduction of student loans, etc. Finally, continuous learning would be promoted through the adoption of appropriate legislation, government financial support, and information and communication campaigns. 48. The policy in agriculture is driven by the EU Common Agricultural Policy (CAP). Under the Common Agricultural Policy (CAP), Romania has now access to significant financial resources, totaling EUR 14.5 billion for 2007-2013, to support the development of its agriculture and rural areas. Romanian farmers can therefore benefit from the opportunities offered by market integration and enhanced stability and predictability of the CAP policy, and its significant financial support framework. This would allow Romania to address the significant restructuring and competitiveness challenges resulting from the dual farm structure and missing markets (commodity, inputs, credit, land, credit) that characterize its agriculture. Since adopting the National Rural Development Program, Romania is making clear progress towards accessing CAP funds, but the actual absorption of funds by farmers and their impact on effective sector restructuring and rural economic development remain to be measured and assessed carefully. 49. The Government is focused on the development of transport and communication to enhance competitiveness and increase mobility. The policy agenda in infrastructure includes developing a medium-term strategy for transport, a program and financing plan and the restructuring of state-owned companies. The Government aims to mobilize the important amounts of resources available for Romania from the Structural and Cohesion Funds, largely untapped to date, together with private funding where feasible, to boost investment in infrastructure as a means of mitigating the effects of the crisis and boosting growth. This would require significant reforms of sectoral policies and institutions, which remain to be firmed up. 50. The 2007 Energy Strategy for 2007-2020 provides a basis for action in improving energy efficiency and climate change mitigation. The Government plans to mobilize resources from the EU Structural Funds and by selling surplus CO2 emission rights under the Kyoto Protocol Mechanism to finance improved energy efficiency and the development of the considerable potential for renewable energy generation. Gas supply sources could be diversified within a regional, possibly European, approach, and Romania is a strong supporter of this. The continuation of mining sector reform is still a challenge for Romania due to the large state subsidies provided to the sector. The Government is looking into finding suitable solutions for adjusting the size of the mining sector in alignment with the energy sector development. C. Social and Spatial Inclusion 51. In the short-term, the Government's focus is on containing and mitigating the increase in transient and core poverty caused by the crisis. The policy focus is on a more cost-efficient mix of social assistance programs, and better targeting of benefits, within the fiscal constraints. The relatively well-targeted Guaranteed Minimum Income (GMI) is a priority for expansion, but it has suffered from limited and declining funding, while the income-tested family 19 benefits program is also underfunded. A recent Government decision to grant all retirees a minimum pension of just under USD100/month is expected to have a positive impact on poverty. The Government has increased the resources allocated to social assistance programs through the recent budget rectification. In addition, the level of the unemployment benefit has been increased and the duration extended. 52. In the medium-term, the aim of the Government is to strengthen the safety net measures and make them more inclusive, while also promoting more active policies. There have been efforts to bring social assistance benefits under a single body ­ the National Agency for Social Benefits (NASB) - under the Ministry of Labor, Family and Social Protection, with a single form for all benefits, a single payment system and a single beneficiary registry. However, this system is not fully operational yet. It will be important to improve the social safety net for those disadvantaged and vulnerable categories or people who have not benefitted from economic growth, and to improve the monitoring and evaluation of the impact of these social assistance programs. To increase economic opportunities, it will also be important to strengthen linkages between social assistance, education, and labor policies, with particular attention to education, skills upgrading and employment generation. 53. The Government has launched an ambitious reform program in health, aimed at improving the access to quality health services at all levels of service in a more cost effective manner. The main measures promoted include: (i) the improvement of the drugs pricing mechanisms and adoption of the generic drugs prescription; (ii) redressing the balance from the costly hospital based services towards the less costly outpatient and primary care services; (iii) definition of a realistic package of health services covered by the social health insurance system; (iv) introduction of co-payment with exceptions targeted to those unable to pay; (v) improvement of the provider payment mechanisms and (vi) the introduction of the voluntary supplementary health insurance. 54. The Government is contemplating further reforms of the pension system to improve the fiscal sustainability of the public pillar and enhance the equity of the multi-pillar system. To improve the balance of the public pension fund, the social assistance contributions have been increased by 3.3 percent in 2009. Parametric reforms for the consolidation of the first pillar are envisaged in the context of the program with the IFIs, such as switching to inflation- based indexation and gradually increasing and equalizing the retirement age. Policy changes to restore the level of contributions to the second pillar, in which about 3.5 million workers participate, are also contemplated. The special non-contributory pensions, from which a number of public sector categories benefits, are expected to be integrated into the standard system, while the establishment of private occupational pension schemes is also envisaged. These measures are key for addressing the aging of the population, the imbalance between pension contributors and beneficiaries, and containing the budget deficits in both short and long term. 55. The Government is implementing the Strategy for the Improvement of the Roma Situation, adopted in 2001 and updated in 2006. Roma policies are aimed at increasing the accountability of central and local authorities in order to address Roma issues, promote an intellectual and economic Roma elite expected to facilitate social inclusion initiatives, eliminate discrimination, and induce a positive change in the public opinion regarding Roma. At the same time, efforts are being made in order to promote tolerance and social solidarity, stimulate the 20 participation of Roma in economic, social, education, cultural and political life through sector assistance and community development programs, prevent social discrimination and ensure equal opportunities for Roma and a decent living standard. However, the Roma continue to be in a marginalized and vulnerable situation as evidenced by important indicators such as poverty rates, infant mortality, and school enrollment. 56. Some population groups have not benefitted from economic growth. Rural dwellers, in particular, were left behind during the period of national economic growth. Out of the four million farms which provide the main source of livelihood for 90 percent of the people living in rural areas, three million survive at the margin of subsistence on less than a hectare. Many of them are past or fast approaching the retirement age, and not appropriately covered by pensions or social assistance schemes, suggesting the need to explore social assistance policy options to address their needs. A recent Government decision to grant all retirees a minimum pension of just under USD100/month is expected to provide some relief in this area. 57. Romania guarantees gender equity and equality opportunities in law, but women are more likely to be poor. The Romanian Constitution guarantees equal opportunities for men and women and a special law on equal opportunities for women and men was passed in 2002 ensuring equal pay for equal work, measures for employees' protection against dismissal in case of gender discrimination, and employers' responsibility to inform employees about legal provisions in this area. A National Action Plan for Equal Opportunities was adopted in 2000 to implement the legislation. EU accession and the adoption of the acquis legislation for equal opportunities have strengthened the rights of individuals and improved their protection. In practice, however, wages of women remain though below those of men for equal qualifications. Women are concentrated in low paid sectors and are under-represented in managerial positions and in politics. Poverty among households with women head of families is higher, according to the Bank's Poverty Update (2007). Trafficking of women still exists, but the Government and NGOs are actively engaged in preventing and fighting against it. Another challenge is to translate equal gender opportunity policies into practice to raise the labor force participation of women in a way that reconciles their professional and family lives, such as through accessible social care facilities for the elderly and children, and flexible work arrangements. 58. The Government relies substantially on the EU Structural and Cohesion Funds to pursue its regional policy agenda. Regional development is supported by large net inflows of EU funds during 2007­2013. The Regional Operational Program is specifically targeted towards regional and municipal development, but most sector operational programmes, especially the Environment Operational Programme and the National Rural Development Plan, have territorial development dimensions that affect regional and municipal development, and axes and measures that rely heavily on local public authorities for success. These programs finance a range of social services and provide key infrastructure services, including water, wastewater, and solid waste, particularly critical, as Romania has to comply with standards specified in the EU environmental acquis. However, the EU funds cover only a small part of the required investments and the Government, municipalities and other beneficiaries will need to mobilize significant counterpart and private sector funding in order for Romania to comply with EU directives. A key challenge for the Government is to address the existing institutional weaknesses, including by better defining the regional development model it wants to pursue. 21 III. THE WORLD BANK GROUP PROGRAM A. Implementation of 2006 CPS and Lessons Learned 59. The FY06-09 CPS Bank program failed to establish a partnership with Romania, despite being well aligned on Romania's priorities prior to and after EU accession and well coordinated with the EU at both policy and technical levels. The result was that while Romania made significant progress against its development goals, the CPS did not achieve many of the outcomes it sought. The CPS did not anticipate the pressure of populist policies stemming from the high expectations of the population following EU accession. It also underestimated the rapid inflow of other lower cost sources of finance and the desire of the Ministry of Finance to diversify its financing sources. The CPS did not identify areas of the Bank's value-added vis-à- vis other external partners and was perceived as being inflexible and having high transaction costs in comparison. 60. IFC's portfolio has performed well. IFC was relatively less affected than the Bank by the change in Government financing preferences and the shift towards EU institutions as preferred partners. During the CPS period IFC invested a total of $383 million of its own fund and help mobilized $191 million in 15 projects. These included 8 projects in the financial sector, a project to support the modernization of refinery, a project to improve river transportation, a project to support the first private hospital chain and a project in transportation and warehousing. Additionally IFC invested in regional projects in private equity funds, which allowed investments in smaller competitive companies as well as in oil and gas exploration. IFC-Bank cooperation throughout the period was strong. The CPS envisaged some links, for example with IFC supporting privatizations in infrastructure and energy proposed through the Programmatic Adjustment Loan (PAL) series, but these were stopped when the policy loan series was dropped and a halt in privatization of utilities by the Government. 61. The Bank program was too optimistic and highly dependent on the anchor which was to be provided by policy-based lending. The program was highly integrated, which worked well when the whole agenda moved forward as planned. However, when the PAL series was dropped, the associated investment loans also suffered, the program lost focus and coherence. Other financing sources replaced and exceeded Bank lending, but the associated technical assistance to line Ministries remained in demand. The Bank lending program was reduced to 40 percent of the indicative amount projected by the CPS and technical assistance was curtailed. 62. The implementation of the portfolio was affected by the deterioration of the country dialogue. As the dialogue around the PAL series weakened, implementation problems in the associated investment loans multiplied, commitments at risk increased and disbursement performance deteriorated. Commitments at risk rose from zero in FY05 to 36 percent in mid- FY09, twice the average rate Bank-wide. Disbursements declined from a peak of 27 percent in FY03 to 10.9 percent in FY07, well below Bank-wide performance. Disbursement performance recovered to 18 percent in FY08 owing to more pro-active portfolio management and a new generation of faster disbursing projects. 22 63. Portfolio implementation problems notwithstanding, the Bank maintained a dialogue with many stakeholders, based on a solid body of analytical work. Analytical work on policy issues positioned the Bank to take an effective role in advising the new Government on the reform agenda in the short- to medium-term. This includes the 2006 Public Expenditure and Institutional Review; the 2008 Public Sector Pay Practices; the 2007 Notes on Pensions, Health Sector Policy, and Education Policy; the 2007 report on Private Sector Development Strategy; the 2008 Notes on Municipal Finance and on Regional Development; the 2007-08 Programmatic Poverty Assessments; the 2008 report on Financial Sector Literacy and Consumer Protection, the 2008 Discussion Paper on a Student Loan Scheme; the Policy Briefs issued in January 2009; the 2009 joint IMF-WB Financial Sector Assessment Program; the 2009 ROSC on accounting and auditing; and the ongoing Public Expenditure Review Update. The recommendations of these reports have inspired some of the decisions made by the new Government in response to the crisis. The proposed new DPL series resumes structural reforms launched under the 2003-2007 PAL program, which supported reforms in public finance management, education, health, social assistance, pensions, judiciary, and private sector development. 64. The following lessons can be drawn: · Identify the Bank's comparative advantage vis-à-vis other external partners and design the program around these areas. The Bank did not heed sufficiently the need for a different approach towards a MIC client no longer dependent on Bank financing. The program continued to emphasize large investment loans when other larger, faster, cheaper and more flexible financing sources were available. The Bank did not re-focus its role as a knowledge-provider or technical adviser. More could also have been done to experiment with more flexible, outcome-oriented investment loans that would support performance based budgeting and allow for lower non-financial transaction costs, by taking advantage of new opportunities and innovations ­such as country systems pilots-- that arose during the CPS programming period. As a result, the dissonance between the desire of line ministries for Bank projects to secure programs and predictable budgetary resources as well as knowledge on the one hand, and the desire of the Ministry of Economy and Finance to diversify its sources of financing to increase flexibility and reduce financing costs on the other, was not resolved. Bottlenecks in project financing due to budgetary constraints and limited fiscal space hindered successful implementation of several projects. The Bank should focus on its areas comparative advantage in some key reform areas, and on lowering its non-financial transaction costs (see Section B below). · Allow flexibility in a CPS to manage changing circumstances and the prevailing needs. Given the fact that the program spanned such an important historical moment for Romania, the CPS program was somewhat over-determined with a program of loans outlined for all four years of the CPS. The Bank appeared to have a pre-set agenda and was unable to adjust with sufficient flexibility in line with the Government's revised priorities. While Investment Loans (ILs) and Advisory and Analytical Activities (AAA) can reinforce a Development Policy Loan series, they should not be so inextricably linked as to create an `all-or-nothing' program. Likewise, investment projects should not be overly complex (in technical and financing terms), which results in implementation delays and the need for restructuring or capacity building during implementation. The program should be designed so it can be scaled up or down according to the Government's demand. As the lack of interest in lending 23 manifested itself, the Bank could have stepped-up its AAA program to demonstrate its value-added and develop a new knowledge partnership, but instead AAA declined in line with the lending program. · Anticipate and manage political transitions. The CPS acknowledged that much of the commitment to reforms had been due to EU accession aspirations, but anticipated this reform commitment would continue to achieve convergence. In doing so, it underestimated an understandable reform fatigue after years of reforms in preparation for accession. At times, the Bank heard only the voices it chose to or sought agreement to its plans from other parts of Romania's governance structure. Such dialogue was counter-productive. The Bank should maintain dialogue with a wide range of stakeholders across the political spectrum, at all levels of the civil service and with a wide range of public stakeholders, including businesses, special interest groups and other non-governmental organizations. 65. This CPS has been designed to reflect these lessons, although the circumstances under which it is presented are very different to those prevailing at the time of the last CPS. The Bank is focusing on a series of budget support operations, presented alongside the CPS, with lower non-financial transaction costs for the Romanian authorities. However, unlike the last CPS, the other operations are not so intricately linked to the DPL as to make the whole program hostage to the success of this operation. Instead, the DPL is underpinned by analytical work that can be used to take forward Romania's objectives in a variety of ways, when needed. The program could be scaled up in the near-term only with significant cancellations within the current investment portfolio; in the absence of reform or ownership it could be scaled back to a limited portfolio of activities in areas of greatest need and ownership. A revitalized communications and outreach program is being implemented. B. External Partners and the Bank's Value Added 66. The EU and EU-related institutions have become Romania's main external partner. The EU has committed more than EUR 32 billion in grants to Romania over the period 2007-13, equivalent to about 25 percent of Romania's GDP in 2009, to further the EU's objectives of convergence and cohesion, support for SMEs, environmental sustainability, innovation, development of trans-European transport and energy networks, and sustainable and secure energy. 67. EIB and EBRD are key supporters of Romania's development objectives. EIB is the largest institutional investor in Romania with a portfolio of EUR 6.2 billion and planned activities of EUR 1.5 billion for 2009 and 2010. The EIB plays an important role in providing required co-financing for the EU structural and cohesion funds and also technical assistance to support the convergence, infrastructure, environment and energy goals. The EIB lending focuses on industry, transport, and energy. The EIB lends at both national and sub-national lending levels. EBRD invests in both the private and public sectors in areas such as power, transport, municipal infrastructure, financial institutions and the corporate sector. EBRD is supporting Romania's efforts to decrease the intensity of its carbon fuel consumption and is promoting energy efficiency projects and energy efficiency loans via the banks. 24 68. As the crisis unfolded, the Government requested an international support package of EUR19.95 billion for the 2009-10 period. The IMF would contribute EUR12.95 billion, the EU EUR5 billion, the World Bank EUR1 billion, IFC EUR100M in 2009-2010 and EUR100M in 2010-11 (subject to market conditions) and EBRD and EIB the remainder. The programs supported by the various partners are complementary. The IMF Stand-By Arrangement (SBA) envisages a new Fiscal Responsibility Law that will, among others, set up procedures for improved multi-year budgeting supported by DPLs; similarly, the SBA envisages a reform in key parameters of the pension system and financial sector reforms coordinated with DPL actions. The EU funds would support fiscal consolidation and fiscal governance reform, strengthening of monetary and financial sector policies, and structural reforms in public administration, quality of public services, and business environment. EBRD intends to double its investment in the private sector in Romania to EUR1 billion during the 2009-10 period. Approximately half of this amount would support the financial sector. EIB's additional resources (total amount of lending envisaged for 2009 is EUR 1.5 billion) will be targeted to investments both in the public sector (e.g. infrastructure) and the private sector (e.g. industry, energy, and support of SMEs lending). For the 2007-13 period, Table 2- Breakdown of EU funds by operational Romania has been allocated program 2007-13 EUR 19,67 billion: EUR 19,21 billion under the Convergence EU objective and EUR 0,46 billion Operational Program allocation under the European Territorial EUR mln Cooperation objective. Development of Human Resources Operational Programme 3476.14 Together with the national Administrative Capacity Development contribution of EUR 5,53 Operational Programme 208.00 billion, total financing for Cohesion policy activities Regional Operational Programme 3726.02 would amount to EUR 25,2 Increase of Economic Competitiveness Operational Programme 2554.22 billion over the seven-year period. Romania's Transport Operational Programme 4565.94 contribution to the EU budget Environment Operational Programme 4512.47 will amount to EUR 10.2 Technical Assistance Operational billion. Programme 170.24 European territorial cooperation Objective 454.56 TOTAL OPs 19.667.60 CAP - Pillar 1 6127.50 CAP - Pillar 2 (NRDP) 8022.50 TOTAL CAP 14150.00 Source: European Commission, staff calculations 69. The World Bank can contribute significant value-added to Romania's development policy agenda, especially in structural reforms. Building on past support to reform and analytical work, it can play an important role in supporting crisis management and reform in the 25 areas of public finance management in general and public expenditure in particular, public sector pay, education, health, social protection, and the financial sector. These specific areas were chosen as a focus for the DPL series in consultation with the Government and external partners, based on two main considerations: the Bank's knowledge through past sector involvement, analytical work, and regional experience; and the competence available from other sources. The Bank's role in supporting social sector reform is particularly critical, given that this area is largely excluded from the EU acquis and EU-supported programs. The Bank can provide value-added in four ways: · Substance: The Bank can be a strategic partner in sectors for which there is limited or no coverage in the EU acquis communautaire, i.e. health, education, social protection, pensions and public administration. · Approach: The acquis sets the goals and standards to be achieved by Member States, but usually leaves the choice of implementation path to achievement of those goals to the individual countries. The Bank can assist with a diagnosis of the degree of readiness to achieve European goals, present options, and provide capacity building for implementation, i.e., to help with the `how to' of complex policy and reform issues. For example, all member states need to achieve the 20-20-20 climate change targets, but may not know whether it is most efficient and effective to do so by changing the mix of power generation sources or by reducing the demand for energy. The Bank can help design implementation plans, identify costs, benefits and areas of vulnerability, build capacity and ­ with other partners ­ assist in the implementation of the plans. · Cross-sector integration: Some topics demand a holistic, cross-sector response, which the Bank is well-placed to provide. For example, the demographic shifts currently taking place in EU10 countries will require solutions that incorporate a range of structural reforms, including in health, education and pensions. · Global perspective: The Bank can both draw on experience in other countries to bring innovative ideas, examples and lessons, as well as learn from EU-10 countries to enhance programs across the range of the Bank's client countries. One example of sharing global ideas is the conditional cash transfer programs that were initially developed in Latin America and are now being applied in the US and in Europe. C. The Proposed Bank Strategy 70. The dual objective of the Bank is to support Romania deal with the economic and financial crisis, and to broaden and deepen the reform program for sustainable and equitable growth. 71. The proposed Bank program is largely defined for the first two years, and outlined for the outer years. Learning from the earlier CPS, the approach of this CPS seeks flexibility and ability to respond to evolving circumstances and demand by adopting a results-based program centered on development outcomes and objectives that, on the one hand, reflect the 26 Government priorities and, on the other, are aligned with the Bank's comparative advantage and value-added. 72. The main thrust of the engagement program is three-pronged, drawing on: existing projects, the DPL program, and opportunities for lending and AAA engagement depending on supply and demand factors. In the first two years, the Bank program consists of the following activities: the portfolio of on-going projects, the proposed DPL program, and analytical and advisory activities (AAA) centered around the implementation of the reform program supported by the DPL. To the extent possible, the Bank will tap additional resources, e.g., through Trust Funds such as the Financial Sector Reforms and Strengthening Initiative (FIRST), and partnership opportunities with the EU and other IFIs. A mid-term review of the CPS with Government would define the program for outer years and could also include new lending activities (subject to available lending headroom) that would need to be defined in terms of objectives and modalities (general budget support, or sector specific budget support), and a program of new analytical and advisory activities. 73. In the first two years of the CPS, the Bank's lending program in Romania would be dominated by a EUR 1 billion programmatic series of three DPLs as part of a joint program with the IMF and the EC. In line with the respective mandates of other partners, the Bank's engagement would focus on the financial sector, social sector reforms and public sector reforms. Selective investment lending outside the DPL program could be considered provided there is ownership, with priority given to areas which have the required absorption capacity and aligned with the Bank's comparative advantage which are outlined below. A substantial portfolio restructuring exercise is underway to free up resources from existing loans that no longer match the Government's priorities and to create headroom for such operations. 74. Lending would be complemented by a substantive AAA program to inform and help guide the implementation of individual reforms. Special emphasis will be place on peer- learning and dissemination, including sharing best practice in project design and implementation. AAA work is anticipated around the core reform topics supported by the DPL including education, health and pensions as well as public financial management issues with an emphasis on decentralization, tax and civil service reform. AAA will also be used to maintain a dialogue with strategically important sectors not covered by the DPL, including agriculture, infrastructure and the environment. 75. The program is characterized by uncertainties. If the pace of global and European economic recovery is slower than currently anticipated and/or the Government's interest to pursue reforms is sustained, lending may continue into the outer years of the CPS beyond the DPL series (subject to available lending headroom). If, however, the pace of economic recovery is rapid and/or the Government's commitment to reform weakens, the focus of the program may shift towards a knowledge-sharing agenda based on AAA and a cost-sharing relationship. While the early years of the program are reasonably well defined, the outer years are not and will be defined following a mid-term review and consultations with the Government. 76. As of end of April 2009, IFC's portfolio in Romania stood at about $470 million which represents IFC's 3rd largest portfolio in Europe and Central Asia after Russia and Turkey. However, IFC envisages a phased reduction of involvement in Romania within a period of 5 years (subject to market conditions), offering support to selective sectors and activities in 27 which IFC can still provide value addition and in which the commercial sector and market cannot fulfill. In addition, IFC's activities will maintain their focus on managing its existing portfolio of investments. IFC has begun withdrawing from sectors and lines of business in Romania where the private sector is ready to take over. For example, IFC does not participate in FDI in projects below US$50 million where commercial banks are willing to finance and also IFC does not offer credit lines to large banks, with the exception of special types of financing (energy efficiency, long term local currency, agriculture lending and MSMEs financing). In the short term, IFC's investment strategy is to play a crisis response role by helping to recapitalize the major banks which are considered vital to the financial system and offering trade finance to financial institutions in Romania. IFC's effort will contribute to speed up economic recovery and boost job creation while reducing the impact of the financial crisis. Also, IFC will consider investments, on a very selective basis, in banks and sectors that have a very strong development impact in frontier regions or in the areas of agriculture, climate change, infrastructure and health and education. Table 3. Proposed IBRD Lending Program1 and Selected AAA Services Proposed IBRD Base-Case Lending Program Calendar Amount Year Euro (M) DPL 1 2009 300 DPL 2 2009 360 DPL 3 2010 340 TOTAL 1,000 Recent/Proposed AAA Services Completion Calendar Year Public Expenditure and Institutional Review Programmatic 2009-10 Pensions for the Elderly Poor 2009 Macro Monitoring 2009-10 DPL Education Reform TA 2009-10 DPL Health Reform TA 2009-10 DPL Civil Service ­ Public Financial Management TA 2009-10 DPL Financial Sector TA 2009-10 Tax Administration TA 2009-10 Poverty Monitoring Programmatic Series 2009-10 Student Loans TA 2009-10 IT Assessment at NBR TA 2009 Pension Annuities TA 2010-11 1Subject to IBRD financial capacity 28 D. Strategic Pillars of the Proposed Program 77. The Bank's envisaged strategic partnership with Romania would be based on three pillars: (i) public sector reform; (ii) growth and competitiveness; and (iii) social and spatial inclusion. Pillar 1: Public Sector Reform Goals: in the short-term to secure fiscal savings without adversely affecting priority services and social assistance; and in the medium-term to modernize the public administration to improve the accountability and responsiveness of its staff and predictability and efficiency in public resource management. Public financial management - Objective: reduce fiscal vulnerabilities by restoring budget discipline, improving the effectiveness and efficiency of public expenditures, and improved resource mobilization. 78. The IMF's SBA program supports a Fiscal Responsibility Law which aims to streamline the budget process and ensure fiscal sustainability over the medium term. As a complement, the World Bank will work with the authorities through the DPL program to improve the quality of annual budget planning by anchoring it more firmly in a credible medium-term expenditure framework and then to start to implement this process with selected line ministries. Through this process, the Bank will aim to strengthen national policy formulation; better link budget allocations with outcomes and performance; build capacities for economic analysis and forecasting; and improve the capacity of the Parliament and civil society for economic analysis. As a result, it is expected that the efficiency and effectiveness of Romanian public expenditure will be improved in the medium-term. 79. A programmatic series of Public Expenditure Review updates will complement the DPL series with the first in the series focusing on identifying opportunities for short-term savings and efficiency gains in major expenditure categories of the public budget, including education and health, transport and agriculture. Later updates will also cover issues around the systemic and institutional aspects of budget formulation and execution. In parallel to the Public Expenditure Review, the World Bank would also focus its analytical and advisory services on fiscal decentralization and tax administration where the needs are large. 80. In the outer-years of the CPS, output-based investment operations could be considered in support of decentralization, tax administration and performance-based budget support in selected sectors (for example, providing financing for the implementation of the per capita education scheme). Public administration reform - Objective: improve the public pay system to enhance transparency and predictability, motivate performance among public sector employees, attract and retain critical skills. 81. The DPL program will support changes to Romania's public pay system to enhance capacity to attract and retain critical skills in the public administration. The reforms would aim 29 to keep personnel costs in line with GDP growth, improve the delivery of public services and limit discretion within the system. AAA work on civil service reform will be considered as a complement to the DPL. Overall, the program hopes to upgrade the Romanian public administration to align it better with European practices. Functional reviews and institutional reforms in selected public sector entities could be supported by DPLs; the former could be addressed by Advisory and Analytical Activities on a fee for services basis if so requested by Government. Governance - Objective: strengthen the efficiency and accountability of the justice system. 82. Improved governance is implicit in many of the Bank-supported operations, and will be an important objective of the DPL-sponsored public sector reforms and supporting technical assistance and analytical work. A Judicial Reform project already in the portfolio will continue to increase the efficiency of the Romanian courts and improve accountability of the judiciary, in support of Romanian and EU objectives in this area. Pillar 2: Growth and Competitiveness Goals: in the short-run to put in place crisis-management measures in the financial sector; and in the medium-term to establish the building blocks for a resumption of growth for sustainable convergence to EU-average living standards through improved business environment, enhanced skills, upgrades in the infrastructure network and more efficient agriculture. Financial sector - Objective: deepen and strengthen the resilience of the financial sector. 83. The DPL series will include measures across the series drawn from a recent Financial Sector Assessment Program (FSAP) update. Some aspects of contingency planning have begun under the IMF program. The Bank's program will support adoption of a Strategic Action Plan to further this process to guide the response to a potential financial crisis, dealing particularly with potential future interventions in the financial sector, guidelines for mortgage and corporate debt restructuring, and amendments to the Insolvency Law. The DPL program will also seek to strengthen consolidated supervision of the financial sector and ensure the political and financial independence of financial sector regulators, and support the implementation of Basel II. Analytical work on the financial sector is up-to-date, but more may be needed in the outer years of the CPS, especially if external conditions or regulations change. The overall aim of the Bank is to help the authorities to strengthen their financial sector to underpin a resumption of growth and become more resilient to future shocks. IFC will selectively and in the short-run enhance its crisis response initiative by helping restore liquidity and confidence by working with other partners to provide appropriate funding to banks and by supporting trade finance. IFC's role in Romania in this context, is to: a) work together with other IFIs to develop and implement support programs for main banks in the country, subject also to further support from the parent banks and from the Romanian authorities (where applicable); and b) signal IFC's confidence and strong support for the Romanian banking sector through investments in systemic banks. 84. The degree of financial intermediation, remains at one of the lowest levels in Central and Eastern Europe and the system continues to offer limited products and services. Moreover, the global liquidity crisis has weakened the access to finance to underserved segments such as 30 MSMEs and the agriculture sector especially in rural areas of the country. In light of this, IFC strategy in the financial sector is to support existing clients, particularly those that are deemed systemic in their respective countries, to continue to strengthen financial intermediation to MSMEs, to facilitate trade and to introduce new financial products and services, such as local currency products, agriculture finance and energy efficiency lending. Success of the MSMEs sector is critical to the health of the Romanian economy as MSMEs represent more than 90 percent of registered companies, 70 percent of GDP and an important share of employment. IFC will also continue to finance private equity funds which are targeting SMEs. These funds will help local enterprises expand and improve their competitiveness. Business environment - Objective: improve the business environment, including institutional and policy framework for R&D and innovation, and the development of a knowledge-based society and economy. 85. A Knowledge Economy project in the portfolio supports the Government in improving e-government services, including for small and medium enterprises. Advisory work is being considered on tax administration to reduce the tax (and tax processing) burden on businesses in Romania and corporate financial reporting. The Bank-wide Doing Business report may provide the basis for further analytical work in the outer years of the CPS. The Bank could also consider support the Romanian authorities in implementation of their Better Regulation Strategy for 2008- 2013, with particular emphasis on simplifying the top 10-15 regulations identified by business surveys as being most onerous. Additionally, after the recommendations of the 2008 Accounting and Auditing Report on the Observance of Standards and Codes (A&A ROSC), the Bank may assist Romania to further implement the EU acquis communautaire as it relates to corporate financial reporting, including by advising Romania on the set-up of the audit oversight system that is crucial to enhance external audit quality in Romania. This assistance could be financed under a Bank fee-for-service arrangement, similar to the ones that are already in place with several new EU Member States under the Swiss Enlargement Contribution. On June 26, 2008 Switzerland and the EC signed a political declaration of intent to extend the Swiss Enlargement Contribution to the 2007 new Member States, Bulgaria and Romania, adding CHF 257 million (approximately US$255 million) to the existing funding of CHF 1 billion, subject to approval by the Swiss Parliament (which still needs to take place) and the negotiation of Bilateral Framework Agreements (expected by the end of 2009). The Swiss State Secretariat for Economic Affairs (SECO) has already indicated its wish that the Bank-managed TA program on corporate financial reporting should also be extended to these countries using a portion of the Contribution, a move which is facilitated by the active policy dialog associated with the A&A ROSC. Education, skills and knowledge - Objective: support the Government in improve access to and quality of education in a fiscally sound manner. 86. The DPL takes education as a focus sector for implementation of key reforms measures to improve the efficiency of resource use while enhancing the quality and access of public services. The series of loans will support a reform of education financing in primary and secondary education, which will free up resources for improving quality, while an on-going Rural Education project in the portfolio focuses on quality and access issues through rehabilitation and innovation. Technical assistance work will support the careful design and implementation of the decentralization of primary and secondary education, while at the tertiary 31 level a technical assistance program will support the introduction of a Student Loans scheme, which will boost the revenue base of the education system and provide an alternative and complement to the existing grant (scholarship) system. A Knowledge Economy project in the portfolio helps to connect disadvantaged communities with public services, and also supports the Government to adjust the delivery of its services (e.g., primary education) or introduce e- government services, including for small and medium enterprises. The overall objectives are to enhance the transparency and accountability of public sector activities through full and timely access to public information. Further support in this sector could be considered in output-based investment operations and/or technical assistance. IFC will also consider investments in education provided that the private players become more transparent. Agriculture - Objective: provide advisory, technical and financial assistance to support the market-based restructuring and competitiveness of Romanian agriculture. 87. The Bank remains active in the agriculture sector with three projects: one that supports the implementation of land tenure and titling reform and enables greater absorption of EU funds; another aims to improve the competitiveness of farmers and agro-processors through improved advisory services, to modernize the agricultural research apparatus, and to improve food safety, in line with EU requirements; and a third supports the rehabilitation and reform of irrigation systems to increase agricultural productivity. Complementary analytical work could include a review of the optimal mix of EU Common Agriculture Policy and national funds to maximize the impact on competitiveness. Analytical work (in the Public Expenditure and Institutional Review) and technical assistance may also be considered to strengthen the capacity of those Government departments responsible for agriculture and rural development to enhance their strategic planning and programming capacity as one of the key expenditure categories in the budget. The Romanian agriculture sector is often referred to as a significant beneficiary of European Union membership because EU integration can give Romanian farmers access to a market with more than 500 million consumers. Despite the comparative advantages of the country, namely, an abundance of arable land and a favorable climate, the Romanian agriculture sector suffers from fragmentation and obsolete production methods. Investments are needed to raise the sector's competitiveness and to help local farmers improve efficiency through upgraded technology. IFC will selectively support direct investments in agribusiness as well as financial institutions which provides financing to the agriculture sector, which has been largely ignored by the financial sector. IFC's support of this key sector can help to encourage additional investment from the financial community. Transport - Objective: improve the efficiency of the roads and railways sub-sectors, help reduce the overall costs of transportation, improve road safety, and reduce the negative impacts of traffic congestion and pollution in selected cities. 88. The portfolio of transport projects in the current portfolio is expected to close in the first few months of the CPS. However, as a major expenditure category in the budget, the PER will consider opportunities for fiscal savings and efficiency gains drawing on the Bank's experience in this sector. While other institutions, particularly EIB and EC, remain the key counterparts on transport issues, a future Bank role in this sector could be envisaged in the areas of strategic planning, institutional and policy reforms, safety and development of PPP projects. IFC will closely coordinate with EBRD and EIB to finance PPPs with significant developmental impact. 32 Energy and Environment - Objective: assist Romania in meeting its commitments in respect to energy market liberalization and EU 20-20-20 targets, implementation of EU Water and Nitrate Directives, and in reducing environmental, social and economic vulnerabilities to natural and technological disasters. 89. The Bank's support in this area has been declining and now focuses on rehabilitation of a hydropower station and a guarantee operation of a privatization agreement for electricity distribution companies under a new regulatory framework, and the closing of mines in an environmental safe manner together with the regeneration of economic activities in the mining areas. Should the Government decide to resume the privatization process to include the remaining state-owned energy companies and mining companies, the Bank may consider supporting this process and/or the associated institutional and regulatory issues. The Bank has also recently supported lending (including a GEF grant), analytical and technical assistance to support companies' adoption of energy efficient technologies. It is hoped that this work may be furthered during the CPS period as Romania has to meet the EU's ambitious climate change targets and could draw significant revenues from the sale of surplus CO2 emission rights under the Kyoto Protocol. 90. An Integrated Nutrition Pollution Control loan and associated GEF grant in the portfolio will help Romania to meet the EU Nitrates Directive requirements by reducing pollution discharge into water bodies and strengthening institutional and regulatory capacity. The on- going Municipal Services projects is assisting Romania meets its commitments with respect to water quality, and also in the absorption of EU funds. In collaboration with the Bank, IFC may support new investors in the power sector (generation and distribution) and other network utilities (water, gas, district heating), where emerging regulatory frameworks are not yet well- tested and constitute an element of uncertainty and "political risk" which may otherwise constrain investor interest. IFC will also work with local financial institutions to provide energy efficiency lending and invest in renewable energy projects (wind and/or biomass). 91. The on-going Hazard Risk and Emergency Preparedness in Romania project aims to reduce environmental, social and economic vulnerabilities to natural and technological disasters by enhancing the Government's institutional and technical capacity for disaster risk management. This includes establishing an integrated disaster information management system, developing earthquake scenarios, conducting public awareness and preparedness programs. The Bank may also discuss Catastrophic Risk Insurance options with the Romanian Government. Pillar 3: Social and Spatial Inclusion Goals: in the short-term to protect the new and existing poor populations from the adverse effects of the crisis; in the medium-term to promote social inclusion and regional development. Social assistance - Objective: improve the cost effectiveness and targeting of social assistance programs to mitigate the impact of the crisis on the poor and vulnerable. 92. Social protection is a core theme of the DPL series, which will aim to improve the design and increase the coverage of the most efficient and well targeted social assistance program - the Guaranteed Minimum Income (GMI) ­ while progressively rationalizing the coverage of the less efficiently targeted programs. The Bank has some considerable analytical and advisory work 33 already in place on this topic, but will continue to deepen this through a programmatic poverty monitoring series to help in particular with the monitoring and evaluation, and the design of future improvements. Further lending or technical assistance work to support implementation of the measures could be considered in the outer years of the CPS, notably in helping the development of activation policies and programs. Social Inclusion - Objective: improve the social inclusion and living conditions of the most disadvantaged and vulnerable people in the Romanian society. 93. The Bank's program already has a Social Inclusion operation that aims to improve the living conditions and social inclusion of the most disadvantaged in society, which in Romania include the Roma, persons with disabilities, children at risk and victims of domestic violence. The programmatic poverty monitoring program will provide further analytical coverage of these issues. Three other programs in the current portfolio also have a strong inclusion focus: the Knowledge Economy project specifically targets remote and disadvantaged communities to link them electronically to broader society; the Rural Education project supports school-based innovations in remote regions; and a Mine Closure project provides socio-economic regeneration opportunities to mining communities and local authorities. Further work in transport or communications would continue to focus on connectivity and inclusion. Health sector - Objective: support the design and implementation of health sector reform program to improve health outcomes. 94. As with education, the DPL takes health as a focus sector for implementation of key reforms measures to improve the efficiency of resource use while enhancing the quality and access of public services. Specific reforms to be supported include those that would support the Government's decisions on drug pricing and adoption of legislation to promote the prescription of generic drugs; improve the design of the benefits package and in particular introducing a co- payment system with exemptions for the poor; promoting the development of supplementary insurance rationalizing hospitals and shifting to a focus on primary care services which would be supported by provider payment reforms. This program will be supported by analytical work and further lending for health could be considered in the outer years of the CPS given the extensive reform agenda. An on-going health project is supporting the modernization of maternity and emergency services. IFC will seek to help stimulate the growth of the private healthcare sector in Romania, as well as support the delivery of higher quality and better reach of services by offering advisory services within the World Bank programs and promoting private sector participation. IFC will also help establish benchmarks for delivery of private health services in the country. Pension system - Objective: strengthen the performance, financial viability, integrity and equity of pension system. 95. The DPL series will support reforms in the pension system to put it back onto a sustainable footing, including indexation of benefit adjustments to inflation, raising and gradually equalizing the retirement age and increasing the contribution rate to the second pillar. Other important aspects of the Bank's program include analytical work, which could be followed by implementation support, to provide better social protection for elderly poor (effectively a zero 34 pension pillar) and implementation of a capacity building program for the pension system administration. The Bank may also advise on strengthening pension annuities in anticipation of the time when the second, private pillar will start to pay out. Regional development - Objective: address the disparities across regions by focusing on strengthening the administrative and financial management capacity with the view to improve the quality of public service delivery at sub-national level. 96. The Bank supports the regional development policy of the Government through investment lending in municipal infrastructure and advisory services. Under a Bank-financed project Master Plans for water and wastewater infrastructure are prepared for eleven (out of forty two) counties for financing by the EU funds. Another project provides TA to Roma communities to prepare projects (small roads, water, sanitation, small housing investments) for financing through EU funds and capacity building and training at local level for preparation of investment projects for EU financing. The Bank stands ready to continue to offer support in lending and analytical and advisory services for regional and municipal development. Areas for assistance could be envisaged in planning, institutional and policy reforms, including decentralization, capacity building at sub-national level and co-financing of EU funds. E. Consultations and Partnership with the Government and other Stakeholders 97. To be effective, the Bank will need to forge a true partnership with the Government, based on sharing of goals and mutual trust, and anchored on broad support among other stakeholders. The Bank will seek to continue the practice of regular portfolio reviews with the authorities to ensure a good alignment of priorities and prompt follow-up where issues arise. Such reviews could take place every six months with officials, and at least once a year at Ministerial level. 98. The FY10-13 World Bank Group CPS was prepared by drawing on intensive dialogue and feed-back mechanisms. The CPS teams used a variety of consultation mechanisms. Stakeholder consultations were the main instrument for identifying key challenges and possible CPS themes in May 2009. These workshops involved national and local Governments, civil society, the business community/private sector, academia, unions, youth groups, and other development partners. Further live and online consultations are envisaged through CPS implementation. Other tools included a series of consultations on policy notes, issued in early 2009, dissemination and consultations of individual analytical or TA reports produced by the WB (e.g. social protection, regional development, municipal finance, students loan, civil service pay), and an on-line feedback mechanism via the website (See Annex E for more details). 99. The consultations provided a venue for a meaningful exchange of views with various stakeholders on the critical challenges of current economic crisis affecting Romania and long-term prospects as well as policy options and programs that would address these challenges. The key messages and implications for further Bank Group support are summarized in Box 1. The goal of these discussions was to listen to a wide spectrum of voices and to incorporate the most relevant opinions and comments in the CPS design. A detailed feed-back 35 report will be sent to all participants and posted on the Bank's Romanian website to inform the public about messages and recommendations. Box 1. Key Messages from Stakeholder Consultations Lessons learned from past and ongoing work of the World Bank in Romania. Need to scale up successful experiences, including reforms piloted by Bank-financed projects. Need to bolster information and communication on policies and projects. Need for better coordination among donors/lenders. Consistency of proposed Bank program with needs and expectations. The Bank program should consider sectoral strategies and not only 3 main national programmatic documents (GP2009, Lisbon Agenda, NRP 2007) Advice extended to the Bank on balancing flexibility with the need for firmness, especially concerning agreed reform objectives and specific project outcomes. Political and economic context, risks and opportunities. Coalition politics create risks for sustainability of both reform and project implementation. General concern about the commitment and capacity to design and implement needed reforms. Reservations about the extent to which current cooperation of the Government with IFIs goes beyond financial needs and is driven by genuine acceptance of the need for reform. Scope for resuming reform. Education was unanimously identified as the neediest area for reform. Teachers' pay must be linked to broader reform objectives and outcomes. Public Sector is seen as lacking lack professionalism and management skills. Perceived inefficiency of the bureaucracy, lacking communication and coordination, is hampering delivery of public services. Governance. Concern with implementation capacities in both central and local administrations. Need for better inter-ministerial coordination and at local level. Virtual consensus on inability to address governance issues. F. Measuring Results 100. The proposed Bank engagement is expected to support the achievement of key Government objectives. The envisaged lending and AAA program would be supportive of key Government objectives in selected policy areas. The results framework (Annex C) largely reflects the results anticipated from the existing portfolio activities (lending, and analytical and advisory) and those new activities planned for the first years of the CPS. The Bank program would be small in the context of Romania's overall development program and the actions of other parties ­ Government or other outside agencies ­ will also play a part in contributing to these outcomes. Nevertheless, the specific outcomes identified in Annex C are those that the Bank will try to influence and those which can be attributed to the Bank's interventions. IV. Risk Management 101. The proposed Bank strategy carries risks. 102. Institutional capacity risks relate to policy formulation and coordination capacity, medium-term vision, implementation, and accountability. Capacity constraints could delay key elements of the reform program to be supported by the Bank. The Bank's program has a strong focus on capacity building in both the executive and legislative branches of the Government with emphasis on public financial management and public administration reforms. AAA could play an important role in addressing capacity constraints and building institutional capacity where needed. 36 103. External economic and financial risks relate to the uncertainty of the global economic outlook, the risk that financial markets may remain frozen over a prolonged period, the risk that the economic downturn in the EU may be more severe and protracted than currently envisaged, and that the perceptions of institutional investors and risk-assessment agencies may be more pessimistic than expected. Should that happen, Romania's growth could be further compressed, especially if capital outflows exceed expectations. This risk is exogenous and cannot be mitigated. The Bank has limited headroom to increase lending in the near-term. 104. Domestic economic risks include the ability of Romania to withstand external shocks, the response of the economy to reforms, and the capacity to mobilize and absorb external funds. The relatively large size of the package may provide sufficient space for building up reserves, that would help deal with worse than expected capital outflows, and prolonged distress of the financial sector. The DPL program and associated analytical work aims to help Romania to identify efficiency savings and to maintain manageable fiscal balances. 105. Social risks stem from popular expectations, the persistence of core poverty relatively unaffected by economic growth, and the rise in transient poverty during the crisis. The Bank- supported DPL and other programs target assistance towards those in poverty or socially excluded. 37 Annex A1 Page 1 of 3 Romania at a glance 9/24/08 Europe & Upper Key Development Indicators Central middle Romania Asia income Age distribution, 2007 (2007) Male Female Population, mid-year (millions) 21.5 445 823 75-79 Surface area (thousand sq. km) 238 23,972 41,497 Population growth (%) -0.2 0.0 0.6 60-64 Urban population (% of total population) 54 64 75 45-49 GNI (Atlas method, US$ billions) 158.4 2,694 5,750 30-34 GNI per capita (Atlas method, US$) 7,370 6,051 6,987 15-19 GNI per capita (PPP, international $) 10,980 11,116 11,868 0-4 GDP growth (%) 6.6 6.8 5.8 10 5 0 5 10 GDP per capita growth (%) 6.5 6.7 5.1 percent (most recent estimate, 2000­2007) Poverty headcount ratio at $1.25 a day (PPP, %) 10 5 .. Poverty headcount ratio at $2.00 a day (PPP, %) .. 11 .. Under-5 mortality rate (per 1,000) Life expectancy at birth (years) 72 69 70 Infant mortality (per 1,000 live births) 16 23 22 60 Child malnutrition (% of children under 5) 4 .. .. 50 Adult literacy, male (% of ages 15 and older) 98 99 94 40 Adult literacy, female (% of ages 15 and older) 96 96 92 30 Gross primary enrollment, male (% of age group) 105 98 112 20 Gross primary enrollment, female (% of age group) 104 96 109 10 Access to an improved water source (% of population) 88 95 95 0 Access to improved sanitation facilities (% of population) 72 89 83 1990 1995 2000 2006 Romania Europe & Central Asia Net Aid Flows 1980 1990 2000 2007 a (US$ millions) Net ODA and official aid .. 243 432 914 Growth of GDP and GDP per capita (%) Top 3 donors (in 2006): European Commission .. 62 264 695 10 Germany .. 68 25 51 France .. 0 17 42 5 0 Aid (% of GNI) .. 0.6 1.2 1.3 Aid per capita (US$) .. 10 19 42 -5 -10 Long-Term Economic Trends -15 95 05 Consumer prices (annual % change) .. .. 45.7 4.8 GDP implicit deflator (annual % change) 12.1 13.6 44.3 12.7 GDP GDP per capita Exchange rate (annual average, local per US$) .. 0.0 2.2 2.4 Terms of trade index (2000 = 100) .. 83 100 90 1980­90 1990­2000 2000­07 (average annual growth %) Population, mid-year (millions) 22.2 23.2 22.4 21.5 0.4 -0.3 -0.6 GDP (US$ millions) .. 38,299 37,053 169,283 1.3 -0.6 6.1 (% of GDP) Agriculture 16.4 23.7 12.5 6.4 1.9 -1.9 7.1 Industry 56.6 49.9 36.4 37.1 -1.0 -1.2 5.6 Manufacturing .. 33.8 14.5 21.9 .. .. .. Services 27.0 26.3 51.1 56.5 .. 0.9 5.1 Household final consumption expenditure 53.7 65.9 79.0 75.3 .. 1.3 6.8 General gov't final consumption expenditure 12.3 13.3 7.2 7.6 .. 0.8 7.1 Gross capital formation 36.3 30.2 19.5 31.1 .. -5.1 9.4 Exports of goods and services .. 16.7 32.9 29.5 .. 8.1 10.4 Imports of goods and services .. 26.2 38.5 43.5 .. 6.0 12.4 Gross savings .. 21.5 15.4 17.6 Note: Figures in italics are for years other than those specified. 2007 data are preliminary. .. indicates data are not available. a. Aid data are for 2006. Development Economics, Development Data Group (DECDG). 1 Annex A1 Page 2 of 3 Romania Balance of Payments and Trade 2000 2007 Governance indicators, 2000 and 2007 (US$ millions) Total merchandise exports (fob) 10,366 40,445 Total merchandise imports (cif) 13,054 70,245 Voice and accountability Net trade in goods and services -1,930 -23,740 Political stability Workers' remittances and compensation of employees (receipts) 96 8,569 Regulatory quality Current account balance -1,355 -22,826 Rule of law as a % of GDP -3.7 -13.5 Control of corruption Reserves, including gold 3,396 37,211 0 25 50 75 100 Central Government Finance 2007 Country's percentile rank (0-100) 2000 higher values imply better ratings (% of GDP) Current revenue (including grants) 31.1 30.6 Source: Kaufmann-Kraay-Mastruzzi, World Bank Tax revenue 29.2 28.5 Current expenditure 31.8 29.2 Technology and Infrastructure 2000 2007 Overall surplus/deficit -4.0 -2.8 Paved roads (% of total) 49.5 30.2 Highest marginal tax rate (%) Fixed line and mobile phone Individual 40 16 subscribers (per 1,000 people) 29 126 Corporate 25 16 High technology exports (% of manufactured exports) 5.5 4.4 External Debt and Resource Flows Environment (US$ millions) Total debt outstanding and disbursed 11,160 88,374 Agricultural land (% of land area) 65 63 Total debt service 2,500 11,721 Forest area (% of land area) 27.7 27.7 Debt relief (HIPC, MDRI) ­ ­ Nationally protected areas (% of land area) .. 2.5 Total debt (% of GDP) 30.1 47.1 Freshwater resources per capita (cu. meters) .. 1,955 Total debt service (% of exports) 20.1 19.0 Freshwater withdrawal (% of internal resources) 54.8 .. Foreign direct investment (net inflows) 1,037 9,834 CO2 emissions per capita (mt) 3.9 4.2 Portfolio equity (net inflows) 58 301 GDP per unit of energy use (2005 PPP $ per kg of oil equivalent) 4.2 5.3 Composition of total external debt, 2006 Energy use per capita (kg of oil equivalent) 1,616 1,772 IDA, 0 IMF, 104 IBRD, 2,481 Other multi- lateral, 3,631 World Bank Group portfolio 2000 2007 Short-term, 17,725 Bilateral, 583 (US$ millions) IBRD Total debt outstanding and disbursed 1,898 2,634 Disbursements 384 232 Private, 30,591 Principal repayments 91 211 Interest payments 104 132 US$ millions IDA Total debt outstanding and disbursed 0 0 Disbursements 0 0 Private Sector Development 2000 2008 Total debt service 0 0 Time required to start a business (days) ­ 10 IFC (fiscal year) Cost to start a business (% of GNI per capita) ­ 3.6 Total disbursed and outstanding portfolio 284 438 Time required to register property (days) ­ 83 of which IFC own account 112 391 Disbursements for IFC own account 17 47 Ranked as a major constraint to business 2000 2007 Portfolio sales, prepayments and (% of managers surveyed who agreed) repayments for IFC own account 5 162 Tax administration .. 35.6 Tax rates .. 34.1 MIGA Gross exposure 20 138 Stock market capitalization (% of GDP) 2.9 27.1 New guarantees 0 0 Bank capital to asset ratio (%) 8.6 8.9 Note: Figures in italics are for years other than those specified. 2007 data are preliminary. 9/24/08 .. indicates data are not available. ­ indicates observation is not applicable. Development Economics, Development Data Group (DECDG). 2 Annex A1 Page 3 of 3 Millennium Development Goals Romania With selected targets to achieve between 1990 and 2015 (estimate closest to date shown, +/- 2 years) Romania Goal 1: halve the rates for extreme poverty and malnutrition 1990 1995 2000 2007 Poverty headcount ratio at $1.25 a day (PPP, % of population) .. .. .. 9.6 Poverty headcount ratio at national poverty line (% of population) .. 25.4 36* 13.9 Share of income or consumption to the poorest qunitile (%) 9.9 8.9 8.2 8.2 Prevalence of malnutrition (% of children under 5) .. .. 3.7 .. Goal 2: ensure that children are able to complete primary schooling Primary school enrollment (net, %) 81 .. 94 93 Primary completion rate (% of relevant age group) 96 86 102 101 Secondary school enrollment (gross, %) 92 .. 81 86 Youth literacy rate (% of people ages 15-24) 99 .. 98 .. Goal 3: eliminate gender disparity in education and empower women Ratio of girls to boys in primary and secondary education (%) 99 .. 100 100 Women employed in the nonagricultural sector (% of nonagricultural employment) .. 42 46 46 Proportion of seats held by women in national parliament (%) 34 7 7 11 Goal 4: reduce under-5 mortality by two-thirds Under-5 mortality rate (per 1,000) 31 26 22 18 Infant mortality rate (per 1,000 live births) 27 21 19 16 Measles immunization (proportion of one-year olds immunized, %) 92 93 98 95 Goal 5: reduce maternal mortality by three-fourths Maternal mortality ratio (modeled estimate, per 100,000 live births) .. .. .. 24 Births attended by skilled health staff (% of total) .. 99 98 98 Contraceptive prevalence (% of women ages 15-49) .. 57 64 70 Goal 6: halt and begin to reverse the spread of HIV/AIDS and other major diseases Prevalence of HIV (% of population ages 15-49) .. .. 0.1 0.1 Incidence of tuberculosis (per 100,000 people) 74 112 136 128 Tuberculosis cases detected under DOTS (%) .. .. 9 79 Goal 7: halve the proportion of people without sustainable access to basic needs Access to an improved water source (% of population) 76 80 85 88 Access to improved sanitation facilities (% of population) 72 72 73 72 Forest area (% of total land area) 27.8 .. 27.7 27.7 Nationally protected areas (% of total land area) .. .. .. 2.5 CO2 emissions (metric tons per capita) 6.7 5.5 3.9 4.2 GDP per unit of energy use (constant 2005 PPP $ per kg of oil equivalent) 2.9 3.5 4.2 5.3 Goal 8: develop a global partnership for development Telephone mainlines (per 100 people) 10.2 13.1 17.4 20.0 Mobile phone subscribers (per 100 people) 0.0 0.0 11.1 106.2 Internet users (per 100 people) 0.0 0.1 3.6 55.7 Personal computers (per 100 people) 0.2 1.3 3.2 14.8 Education indicators (%) Measles immunization (% of 1-year olds) ICT indicators (per 1,000 people) 125 100 150 100 75 75 100 50 50 25 50 0 25 2000 2002 2004 2006 0 0 1990 1995 2000 2006 2000 2002 2004 2006 Primary net enrollment ratio Ratio of girls to boys in primary & Fixed + mobile subscribers Romania Europe & Central Asia secondary education Internet users Note: Figures in italics are for years other than those specified. .. indicates data are not available. * national data 9/24/08 Development Economics, Development Data Group (DECDG). 3 Annex B2 CAS Annex B2 - Romania Selected Indicators* of Bank Portfolio Performance and Management As Of Date 06/08/2009 Indicator 2006 2007 2008 2009 Portfolio Assessment Number of Projects Under Implementation a 22 21 20 17 Average Implementation Period (years) b 3.2 3.3 3.7 4.3 Percent of Problem Projects by Number a, c 4.5 14.3 15.0 35.3 Percent of Problem Projects by Amount a, c 5.4 26.3 12.3 35.5 Percent of Projects at Risk by Number a, d 4.5 14.3 15.0 35.3 Percent of Projects at Risk by Amount a, d 5.4 26.3 12.3 35.5 Disbursement Ratio (%) e 12.0 10.9 18.2 10.6 Portfolio Management CPPR during the year: Joint Portfolio Review held in 2007, Q2, 3, 4, 2008, 2009 Supervision Resources (total US$) Average Supervision (US$/project) Memorandum Item Since FY 80 Last Five FYs Proj Eval by OED by Number 65 14 Proj Eval by OED by Amt (US$ millions) 5,395.7 1,007.1 % of OED Projects Rated U or HU by Number 18.5 0.0 % of OED Projects Rated U or HU by Amt 22.0 0.0 a. As shown in the Annual Report on Portfolio Performance (except for current FY). b. Average age of projects in the Bank's country portfolio. c. Percent of projects rated U or HU on development objectives (DO) and/or implementation progress (IP). d. As defined under the Portfolio Improvement Program. e. Ratio of disbursements during the year to the undisbursed balance of the Bank's portfolio at the beginning of the year: Investment projects only. * All indicators are for projects active in the Portfolio, with the exception of Disbursement Ratio, which includes all active projects as well as projects which exited during the fiscal year. 1 Annex B3 Page 1 of 2 CAS Annex B3 - IBRD/IDA Program Summary - Romania As Of Date 08/06/2009 Proposed IBRD/IDA Base-Case Lending Program a Strategic Fiscal year Project ID Euro(M) Rewards b Implementation (H/M/L) b Risks (H/M/L) 2010 DPL 1 300.0 DPL 2 360.0 Sub-total 660.0 2011 DPL 3 340.0 2 Annex B3 Page 2 of 2 Annex B3 Romania: IFC Investment Operations Program 2006 2007 2008 2009* Commitments (US$m) Gross** 146.29 132.9 39.45 169.75 Net*** 133.32 136.07 45.19 64.00 Net commitments by Sector (percent) Finance 61 63 39 88 Global Manufacturing 0 0 0 0 Health & Education 0 9 1 0 Infrastructure 13 28 60 12 Oil, Gas, Mining & Chemicals 26 0 0 0 100 100 100 100 Net Commitments by Investment (percent) Equity 5 4 58 12 Loan 95 96 42 88 100 100 100 100 * as of April 30, 2009 ** IFC and Participants *** IFC's account only 3 Annex B4 CAS Annex B4 - Summary of Nonlending Services - Romania As Of Date 06/08/2009 Product Completion FY Cost (US$000) Audiencea Objectiveb Recent completions PEIR 06 537 G,D,B,P,D KG, PS PSD Policy Note 07 103 G,D,B KG, PS Rural Regional TA 07 176 G,D,B,P,D KG, PS Poverty Monitoring 07 57 G,D,B,P,D KG, PS Municipal Finance Policy Note 07 155 G,D,B,P,D KG, PS HD Sector Policy Notes 07 144 G,D,B,P,D KG, PD ROSC 08 167 G,D,B,P,D KG, PS, PD EU Convergence 08 146 G,P,D Poverty Monitoring 2 08 144 G,D,B,P,D KG, PS, PD Public Pay and Employment 08 55 G,D,B,P,D KG, PS National Rural Development Plan TA 08 53 G,D KG, PS FSAP Update 09 286 G,D,B KG, PS Reform of Higher Education Financing 09 127 G,D,B KG, PS, PD Underway IT Assessment at NBR TA 10 60 G,D,B,P,D KG, PS PEIR Update 10 62 G,D,B,P,D KG, PD Poverty Monitoring (III) 10 84 G,D,B,P,D KG, PS, PD Pensions for Elderly Poor 10 118 G,D,B,P,D KG, PS, PD Planned PEIR Programatic (I) 10 100 Macro-Monitoring 10 150 DPL Education Reform TA 10 100 DPL Health Reform TA 10 100 DPL Civil Service - PFM TA 10 100 DPL Financial Sector TA 10 100 TAX Administration TA 10 100 Poverty Monitoring (IV) 10 75 Student Loans TA 10 100 PEIR Programatic (II) 11 100 Macro-Monitoring 11 100 DPL Education Reform TA (II) 11 100 DPL Civil Service - PFM TA 11 100 Poverty Monitoring (V) 11 75 a. Government, donor, Bank, public dissemination. b. Knowledge generation, public debate, problem-solving. 4 Annex B5 Romania Social Indicators Latest single year Same region/income group Europe & Upper- Central middle- 1980-85 1990-95 2001-07 Asia income POPULATION Total population, mid-year (millions) 22.7 22.7 21.5 445.1 822.9 Growth rate (% annual average for period) 0.5 -0.5 -0.4 0.0 0.7 Urban population (% of population) 49.6 54.0 54.1 63.6 75.2 Total fertility rate (births per woman) 2.3 1.3 1.3 1.6 2.0 POVERTY (% of population) National headcount index .. 25.4 .. .. .. Urban headcount index .. 20.4 .. .. .. Rural headcount index .. 27.9 .. .. .. INCOME GNI per capita (US$) .. 1,470 6,150 6,051 6,987 Consumer price index (2000=100) .. 8 259 159 152 Food price index (2000=100) 0 11 184 .. .. INCOME/CONSUMPTION DISTRIBUTION Gini index .. 28.2 31.5 .. .. Lowest quintile (% of income or consumption) .. 8.9 8.2 .. .. Highest quintile (% of income or consumption) .. 37.2 40.0 .. .. SOCIAL INDICATORS Public expenditure Health (% of GDP) .. .. 3.9 4.1 3.6 Education (% of GDP) .. 3.5 3.5 4.6 4.7 Net primary school enrollment rate (% of age group) Total .. 81 93 91 94 Male .. 81 93 92 94 Female .. 81 93 90 94 Access to an improved water source (% of population) Total .. 80 88 95 95 Urban .. 95 99 99 98 Rural .. 62 76 88 83 Immunization rate (% of children ages 12-23 months) Measles 88 93 95 97 94 DPT 95 98 97 95 96 Child malnutrition (% under 5 years) .. .. 4 .. .. Life expectancy at birth (years) Total 70 69 72 69 70 Male 67 66 69 64 67 Female 73 73 76 74 74 Mortality Infant (per 1,000 live births) 26 21 16 23 22 Under 5 (per 1,000) 32 26 18 26 26 Adult (15-59) Male (per 1,000 population) 228 270 205 299 258 Female (per 1,000 population) 114 119 87 123 137 Maternal (modeled, per 100,000 live births) .. .. 24 44 97 Births attended by skilled health staff (%) .. 99 98 95 94 Note: 0 or 0.0 means zero or less than half the unit shown. Net enrollment rate: break in series between 1997 and 1998 due to change from ISCED76 to ISCED97. Immunization: refers to children ages 12-23 months who received vaccinations before one year of age or at any time before the survey. World Development Indicators database, World Bank - 10 September 2008. 5 Annex B6 Page 1 of 2 Romania - Key Economic Indicators Actual Estimate Projected Indicator 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 National accounts (as % of GDP) Gross domestic producta 100 100 100 100 100 100 100 100 100 Agriculture 14 9 9 6 7 7 7 7 7 Industry 35 36 36 37 37 36 36 36 36 Services 51 55 55 57 55 57 57 57 57 Total Consumption 85 87 86 83 81 78 76 74 73 Gross domestic fixed investment 22 24 26 30 33 32 31 31 32 Government investment 3 4 5 6 5 6 7 7 0 Private investment 19 20 21 25 28 25 24 24 0 Exports (GNFS)b 36 33 32 30 31 28 28 27 27 Imports (GNFS) 45 43 44 44 44 36 34 33 32 Gross domestic savings 15 13 14 17 19 22 25 26 27 Gross national savingsc 15 15 16 18 19 22 24 25 26 Memorandum items Gross domestic product 75,795 99,173 122,695 169,283 200,079 172,500 187,007 202,649 225,322 (US$ million at current prices) GNI per capita (US$, Atlas metho 2,950 3,830 4,830 7,370 8,610 Real annual growth rates (%, calculated from 05 prices) Gross domestic product at market prices 8.4 4.1 7.7 6.6 7.8 1.0 2.5 5.0 5.0 Gross Domestic Income 8.2 2.3 7.3 6.5 8.4 1.0 2.3 5.6 5.9 Real annual per capita growth rates (%, calculated from 05 prices) Gross domestic product at market prices 8.8 4.4 8.1 6.5 7.2 -3.6 0.4 2.7 4.1 Total consumption 10.6 9.1 9.6 9.9 8.2 -5.0 -0.2 2.1 3.4 Private consumption 16.2 10.3 12.9 11.8 9.3 -3.7 -0.4 2.3 3.6 Balance of Payments (US$ millions) Exports (GNFS)b 27,121 32,819 39,445 49,930 61,988 48,987 51,740 54,956 60,055 Merchandise FOB 23,515 27,711 32,434 40,445 49,165 39,188 41,378 43,909 48,043 Imports (GNFS)b 33,996 42,973 54,194 73,670 87,614 61,680 63,484 66,692 72,093 Merchandise FOB 30,126 37,431 47,189 64,837 76,025 53,539 55,125 57,717 62,247 Resource balance -6,876 -10,154 -14,749 -23,740 -25,625 -12,695 -11,743 -11,737 -12,039 Net current transfers 3,691 4,474 6,079 6,597 8,774 7,461 7,668 7,871 8,624 Current account balance -6,333 -8,577 -12,743 -22,826 -24,704 -12,961 -12,089 -12,841 -13,729 Net private foreign direct invest 5,020 6,477 8,600 9,834 15,000 7,000 8,000 8,000 8,000 Long-term loans (net) 2,894 5,937 9,000 15,318 6,007 7,652 6,746 7,623 12,553 Official 473 427 141 225 787 10,000 8,000 8,000 6,000 Private 2,421 5,511 8,859 10,093 5,220 -8,000 -4,000 -377 6,553 Other capital (net, incl. errors & 4,258 2,917 -3,836 3,840 6,810 -4,191 -610 -571 -5,116 Change in reservesd -5,838 -6,754 -1,021 -6,166 -3,113 2,500 -2,047 -2,211 -1,707 Memorandum items Resource balance (% of GDP) -9.1 -10.2 -12.0 -14.0 -12.8 -7.4 -6.3 -5.8 -5.3 Real annual growth rates ( YR05 prices) Merchandise exports (FOB) .. .. 12.2 14.4 17.5 -21.0 5.6 6.2 9.3 Primary .. .. 8.0 13.7 18.0 4.0 3.1 3.6 4.6 Manufactures .. .. 13.5 14.9 17.4 5.3 3.8 4.3 5.2 Merchandise imports (CIF) .. .. 8.9 15.3 12.0 -29.6 3.0 4.7 7.8 (Continued) 6 Annex B6 Page 2 of 2 Romania - Key Economic Indicators (Continued) Actual Estimate Projected Indicator 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Public finance (as % of GDP at market prices)e Current revenues 28.5 30.0 29.9 30.6 32.1 30.2 32.1 30.4 32.1 Current expenditures 26.6 28.2 28.0 29.2 28.3 28.1 28.0 27.3 25.1 Current account surplus (+) or d 1.9 1.9 1.9 1.5 3.8 2.1 4.2 3.0 7.0 Capital expenditure 3.2 2.6 3.3 4.3 4.2 5.0 4.8 4.7 4.5 Foreign financing .. .. .. 1.2 0.7 1.0 0.3 0.5 0.0 Monetary indicators M2/GDP 26.2 30.0 29.2 36.6 34.5 33.3 32.3 31.3 33.3 Growth of M2 (%) 40.1 33.8 15.7 48.3 8.2 6.8 6.2 5.4 15.7 Private sector credit growth / 169.3 85.3 159.9 79.6 176.7 114.6 111.6 134.8 91.4 total credit growth (%) Price indices( YR05 =100) Merchandise export price index .. 100.0 100.9 100.0 100.4 100.9 102.4 103.8 106.4 Merchandise import price index .. 100.0 102.6 100.0 98.8 97.7 97.5 97.5 97.5 Merchandise terms of trade inde .. 100.0 98.3 100.0 101.7 103.3 105.0 106.5 109.1 Real exchange rate (US$/LCU)f .. .. .. .. .. .. .. .. .. Real interest rates Consumer price index (% chang 11.9 9.0 6.6 4.8 7.9 5.8 3.5 3.2 2.8 GDP deflator (% change) 15.5 12.2 10.6 12.7 14.0 9.9 6.9 5.1 4.8 a. GDP at factor cost b. "GNFS" denotes "goods and nonfactor services." c. Includes net unrequited transfers excluding official capital grants. d. Includes use of IMF resources. e. Consolidated central government. f. "LCU" denotes "local currency units." An increase in US$/LCU denotes appreciation. 7 Annex B7 Romania - Key Exposure Indicators - Romania As of Date 06/08/2009 Actual Estimate Projected Indicator 2004 2005 2006 2007 2008 2009 2010 2011 2012 Total debt outstanding and 29,573 38,861 54,001 88,374 82,470 74,698 67,785 60,057 47,409 disbursed (TDO) (US$m)a Net disbursements (US$m)a .. .. .. 15,568 -5,875 -7,772 -6,912 -7,728 -12,649 Total debt service (TDS) .. .. .. 11,721 11,248 10,517 11,342 9,668 9,582 (US$m)a Debt and debt service indicators (%) TDO/XGSb 107.0 104.9 135.2 143.0 117.6 93.1 75.8 62.1 44.9 TDO/GDP 39.2 39.3 44.4 47.1 41.1 33.4 27.3 22.0 15.9 TDS/XGS .. .. .. 19.0 16.0 13.1 12.7 10.0 9.1 Concessional/TDO 1.7 2.2 2.1 .. 1.9 2.5 3.0 3.5 4.4 IBRD exposure indicators (%) IBRD DS/public DS 9.8 11.5 13.2 15.1 12.1 16.9 13.5 20.7 15.6 Preferred creditor DS/public 34.3 29.5 37.5 35.2 32.2 47.4 35.2 50.0 38.5 DS (%)c IBRD DS/XGS 0.8 0.8 0.8 0.6 0.6 0.6 0.5 0.5 0.5 IBRD TDO (US$m)d 2,522 2,448 2,481 2,634 2,625 3,450 3,915 3,729 3,541 Of which present value of guarantees (US$m) Share of IBRD portfolio (%) 2 2 2 2 3 3 3 3 3 IDA TDO (US$m)d .. .. .. 0 0 0 0 0 0 IFC (US$m) Loans 110.8 186.5 203.9 208.6 297.0 358.7 .. .. .. Equity and quasi-equity /c 126.8 128.0 285.2 183.0 211.0 104.3 .. .. .. MIGA MIGA guarantees (US$m) 131.8 84.8 .. .. .. .. .. .. .. a. Includes public and publicly guaranteed debt, private nonguaranteed, use of IMF credits and net short- term capital. b. "XGS" denotes exports of goods and services, including workers' remittances. c. Preferred creditors are defined as IBRD, IDA, the regional multilateral development banks, the IMF, and the Bank for International Settlements. d. Includes present value of guarantees. e. Includes equity and quasi-equity types of both loan and equity instruments. 8 Annex B8 Page 1 of 2 CAS Annex B8 - Romania Operations Portfolio (IBRD/IDA and Grants) As Of Date 06/08/2009 Closed Projects 74 IBRD/IDA * Total Disbursed (Active) 458.61 of which has been repaid 13.68 Total Disbursed (Closed) 5,813.78 of which has been repaid 4,484.94 Total Disbursed (Active + Closed) 6,272.38 of which has been repaid 4,498.62 Total Undisbursed (Active) 1,136.73 Total Undisbursed (Closed) 0.00 Total Undisbursed (Active + Closed) 1,136.73 Active Projects Difference Between Last PSR Expected and Actual Supervision Rating Original Amount in US$ Millions Disbursements a/ Project ID Project Name Development Implementation Objectives Progress Fiscal Year IBRD IDA GRANT Cancel. Undisb. Orig. Frm Rev'd P100470 AVIAN FLU - RO MU U 2007 37.7 9.8 26.4 35.1 28.7 P100638 CESAR MS MU 2008 65 62.0 6.0 0.6 P086694 ECSEE APL #1 (CRL) S S 2005 84.3 53.1 41.7 20.1 P067367 FOREST DEVT S S 2003 25 3.7 2.7 6.3 2.3 P075163 HAZ MITIG MS MS 2004 150 94.1 74.1 72.4 P081950 HAZARD MITIGATION (GE S MS 2004 7 3.3 3.3 3.0 P078971 HEALTH SEC REF 2 (APL #MS MS 2005 80 47.7 40.7 P099528 INT. NUTRIENT POLLUTIOS S 2008 5.5 5.0 -0.3 P093775 INTEG NUTRIENT POLLUTS S 2008 68.1 65.9 11.6 P043881 IRRIG REHAB MS MS 2004 80 46.2 30.1 18.1 P090309 JUDICIAL REFORM U U 2006 130 140.7 125.8 51.5 P088165 KNOW ECON S S 2006 60 36.0 22.8 P087807 MINE CLOSURE, ENV & SOMS MS 2005 120 89.7 69.7 P086949 MOD AGR KNOWLEDGE &MS MU 2005 50 39.9 25.8 P088252 Municipal Services Project S S 2007 131.7 96.8 14.1 P073967 RURAL EDUC S S 2003 60 6.8 6.8 6.8 P093096 SOC INCL PROG (CRL) MU MU 2006 58.5 59.4 24.7 P083620 TRANSPORT RESTRUCTUU MU 2005 225 167.6 167.6 P093812 TRANSPORT SECTOR SU MS MS 2007 180 35.0 101.7 121.7 Overall Result 1605.3 12.5 48.5 1145.1 827.8 203.4 9 Annex B8 Page 2 of 2 Romania Committed and Outstanding Investment Portfolio As of April 30, 2009 (in US$ millions) Committed Disbursed and Outstanding Commitment Institution LN ET QL + QE GT ALL ALL LN ET QL + QE GT ALL ALL Fiscal Year Short Name Cmtd - Cmtd - Cmtd - Cmtd - Cmtd - Cmtd - Out - Out - Out - Out - Out - Out - IFC IFC IFC IFC IFC Part IFC IFC IFC IFC IFC Part 2005/ 2008/ 2009 ATE Romania 13 7 0 0 20 0 0 7 0 0 7 0 2007/ 2008 Arabesque SRL 36 0 0 7 43 36 36 0 0 7 43 36 2003/ 2004/ 2006 Banca Comerciala 118 0 0 0 118 0 118 0 0 0 118 0 Banat Construct 0 0 5 0 5 0 0 0 3 0 3 0 2007 Credit Europe Bk 41 0 0 0 41 0 41 0 0 0 41 0 2007 MedLife SA 7 5 0 0 12 0 5 5 0 0 10 0 2006 Petrotel-Lukoil 21 0 0 0 21 16 21 0 0 0 21 16 2002/ 2003/ 2004/ 2007 ProCreditRomania 10 2 0 0 12 0 10 2 0 0 12 0 2005 RGH 0 48 0 0 48 0 0 36 0 0 36 0 2004 Ro-Fin 3 0 0 0 3 0 3 0 0 0 3 0 2006 TTS SA 13 0 0 0 13 0 13 0 0 0 13 0 2008/ 2009 TTS Romania 0 7 13 0 20 0 0 0 13 0 13 0 2004/ 2005/ 2007/ 2009 Transilvaniabank 78 0 36 0 114 94 78 0 36 0 114 94 Total Portfolio 340 68 53 7 469 146 326 50 51 7 435 146 10 Annex C RESULTS FRAMEWORK CPS RESULTS AREAS AND OUTCOMES INDICATIVE MILESTONES WBG INSTRUMENTS CAS PILLAR 1: PUBLIC SECTOR REFORM GOALS: To improve the accountability and responsiveness of the public administration and to enhance predictability and efficiency in public resource management. Issues and Obstacles: Pro-cyclical fiscal policies and weak fiscal management have led to serious macroeconomic vulnerabilities. The budget process lacks predictability and transparency, as well as weak prioritization of public investment. Introduction of an MTEF will require capacity and support to both plan on a multi- year horizon and to link budget with outcomes. Public sector wages have more than doubled since 2005 contributing to pro-cyclical policies, but without adequately rewarding performance or productivity. Governance is weak and monitored by the EU bi-annually. The court system has a large back-log of cases. 1.1 PUBLIC FINANCIAL MANAGEMENT Objective: Reduce fiscal vulnerabilities by restoring · Fiscal Responsibility Law approved. Ongoing: budget discipline, improving the effectiveness and · Independent Fiscal Council established. efficiency of public expenditures, and improved resource · MTEF approved by Parliament (prior to the annual (a) Policy Briefs 2009 mobilization. budget) with three-year ceilings for major spending (b) PEIR Update 2009 ministries and aggregate limit on personnel. Outcome 1: An effective Medium Term Expenditure · Wage bill for 2010 increases below the rate of Framework operational by 2012 inflation. New · Indicator 1: Budget is executed consistent with the (c) DPL series aggregate and ministerial expenditure ceilings (d) Programmatic series of PER updates approved by Parliament in the MTEF (2011-13). focusing on opportunities for fiscal Baseline: MTEF not approved by Parliament, no savings and efficiency gains in major binding ministry ceilings, spending exceeds original expenditure categories, starting with budget amounts. education, health, transport, agriculture (e) AAA on fiscal decentralization · Indicator 2: Summary of multi-year public investment (f) AAA on Public Financial Management program annexed to budget and consistent with MTEF (g) AAA on tax administration projections Target: Annex included in budget with multi-year costing of projects vs. Baseline: Single year budget allocations only and no historical data. Outcome 2: Sustainable growth in public wage bill · Indicator: Annual expenditure for personnel is consistent with limits approved in MTEF and do not increase as a share of GDP above expected 2009 level. 11 Annex C CPS RESULTS AREAS AND OUTCOMES INDICATIVE MILESTONES WBG INSTRUMENTS Target: no positive percentage variation against MTEF ceiling, and personnel expenditures at or below 2009 ratio to GDP. Baseline: 7.5 percent in 2009 and 8.4 percent in 2008 1.2 PUBLIC ADMINISTRATION REFORM Objective: improve the public pay system to enhance · New salary legislation on public sector pay which Ongoing transparency and predictability, motivate performance limits non wage expenditures approved among public sector employees, attract and retain critical (a) Public Sector Pay Practices in Romania skills. · Functional reviews of the public administration 2007 and 2008 undertaken to identify budget resources that could be Outcome: Align public sector pay system to EU practice released for better targeting pay. (transparency, equity, ability to attract & retain critical New skills in public administration) · A detailed pay reform plan is approved by · Indicator 1: Reduction in aggregate allowances and Government for implementing (a) a uniform job a) DPL series bonuses and limit amount for any individual grading framework for the public service and (b) b) AAA on civil service pay, public Target: Maximum 30percent of the total public more closely aligning pay for selected benchmark administration and functional reviews compensation. jobs to actual labor market conditions (through a · Indicator 2: Align pay structures more closely to salary survey) actual labor market conditions Target: Pay adjustments are targeted toward key · Regulations drafted that enforces compliance with positions reflecting salary survey results merit based principles of employment and promotion 1.3 GOVERNANCE Objective: strengthen the efficiency and accountability of · Improved capacity of the court system to adjudicate Ongoing: the justice system disputes (in terms of fairness, speed, affordability, ability to enforce decisions) a) Judicial Reform Project Outcome 1: Strengthened admin capacity of courts · Indicator 1: Introduction of new case mgmt techniques · New internal working arrangements within courts, Target: new case mgmt techniques used by 30 percent whereby non-judicial tasks are transferred from of courts judges to court clerks · Indicator 2: Trained economic managers Target: 50 percent of economic managers are trained · Improved public image of the judiciary according to and obtain satisfactory performance ratings survey Outcome 2: Enhanced competence, professionalism and 12 Annex C CPS RESULTS AREAS AND OUTCOMES INDICATIVE MILESTONES WBG INSTRUMENTS integrity of judges and court staff · Indicator: new qualification examination procedures are successfully piloted by NIM CAS PILLAR 2: GROWTH AND COMPETITIVENESS GOALS: in the short-run, put in place crisis-management measures in the financial sector; and in the medium-term, establish the building blocks for sustainable convergence to EU-average living standards through improved business environment, enhanced skills, better infrastructure and more efficient agriculture. Issues and Obstacles: The crisis has revealed weaknesses in financial sector supervision across the region, new, best practices will need to be adopted to strengthen the system. A recovery in growth will depend both on recovery in key trading partners and on the strength of Romania's own reforms and policies. All countries are seeking to emerge from the crisis in a strong position, so competition will be strong. Romania lags international competitors on education, business environment and agriculture productivity indicators. Transport and energy need significant investment and reform to be able to meet demand. 2.1 FINANCIAL SECTOR · NBR has undertaken banking sector stress tests to Ongoing Objective: deepen and strengthen the resilience of the serve as input into the Strategic Action Plan. financial sector · Amendments of the Insolvency Law are issued (a) FSAP November 2008 · A new draft Special Law on the Political (b) Consumer Literacy and protection Outcome 1: Improved stability and resilience of the Independence and Financial Autonomy of the (c) IFC financing to local financial institutions financial system to economic shocks Financial Sector Regulators and Supervisors is · Indicator 1: Stress tests conducted, and Strategic approved by Government New Action Plan adopted and up-dated as needed · Legal and regulatory framework for bank resolution, · Indicator 2: Remove obstacles to out-of-court mortgage and corporate debt restructuring improved (a) DPL series insolvency proceedings, and mortgage and corporate · Internal governance structure for Basel II policy and (b) Analytical and advisory services on debt restructuring guidelines issued and applicable accreditation decisions to be established within NBR financial sector · Assessment and amendments of (i) the adequacy Outcome 2: Improved governance of financial sector definition of Fin. Conglomerates - Ordinance 99/06 supervision. and (ii) adequacy of supervision · Indicator 1: Recommendations of the de La Rosiere · Strengthen decision making and methods for Basel II report adopted, notably with respect to independence adoption and autonomy of financial sector supervisors (CSA, CNVM, CSSPP) · Indicator 2: Supervision standards, regulations and practices strengthened (in line with Basel II) 13 Annex C CPS RESULTS AREAS AND OUTCOMES INDICATIVE MILESTONES WBG INSTRUMENTS 2.2. BUSINESS ENVIRONMENT Objective: improve the business environment, including · National Strategy for the New Economy and Ongoing: institutional and policy framework for R&D and Implementation of the Information Society. Develop innovation, and development of a knowledge-based · Local Community e-Networks (LCeNs) being used a) Knowledge Economy project society and economy. as tools to be used for education, business, public b) MAKIS project (R&D component) communication Outcome 1: Participation of disadvantaged communities in New: K-based society/economy · Indicator : Population in disadvantaged communities (a) Advisory work on tax administration using LCeNs as tool for education, business or public admin (as percent of number of individuals with ICT access) Target 38 percent in 2011 vs. 17.5 percent in 2005 2.3 EDUCATION Objective: support Government to improve access to and Ongoing: quality of education in a fiscally sound manner (a) Knowledge Economy project Outcome 1: Improved efficiency in primary and secondary · Legislation adopted to enable per capita financing in (b) Rural Education project education by providing more flexible financing, more eight counties, starting with school year 2010/11 (c) Policy Briefs 2009 autonomy and enhanced accountability (focusing on · All schools in 8 counties are financed using per (d) Education Policy Note in 2007 results) to local authorities and school principles capita finance, starting with school year 2010/11. (e) Discussion paper on Introducing a · Indicator: Increase in average class size. Student loan Scheme in Romania (Baseline: 19.6 in school year 2008/09. Target: 23 in (f) PER update school year 2013/14). New: Outcome 2: Provide financial support to tertiary students · First disbursements from student loans scheme begin in a more equitable manner and with better incentives built starting with the school year 2011/12 (a) TA on decentralization of primary and into the support. · First cohort of students receiving student loans secondary education · Indicator 1: Average duration of study of students graduate from their programs in the summer of 2013. (b) TA program for the introduction of a receiving student loan compared to an appropriately Student Loans Scheme selected "control group" of students (who will not (c) IFC financing in private education receive the student loan). · Indicator 2: Average number of months it takes to find a job following graduation of students receiving student loan compared to an appropriately selected "control" group of students (who will not receive the student loan) 14 Annex C CPS RESULTS AREAS AND OUTCOMES INDICATIVE MILESTONES WBG INSTRUMENTS Baseline and targets: to be determined as part of the student loan design. However, students receiving loans should graduate faster and find jobs quicker than the appropriately selected control group of students 2.4 AGRICULTURE AND RURAL DEVELOPMENT · Systematic registration of property title of land in Ongoing Objective: provide advisory, technical and financial rural areas has begun assistance to support the market-based restructuring and (a) CESAR project competitiveness of Romanian agriculture. (b) MAKIS project (c) Irrigation Rehab and Reform project Outcome 1: Increased capacity to provide advisory · Integrated agricultural offices being rolled out (d) AAA on the EU Common Agriculture services to farmers and agro-processors in the EU nationwide Policy and national funds to maximize accession environment the impact on competitiveness. · Indicator : Number of trained and graduated advisors · Piloting of socio-economic advisory services in X Target 300 in 2013 vs. 0 in 2008 judet (e) AAA to strengthen the capacity of Government departments responsible for Outcome 2: Support for regional convergence and · Improved absorption rate of EU structural funds agriculture and rural development to territorial cohesion of Romania as defined in National enhance their strategic planning and Rural Development Plan 2007-2013 · Evidence of restructuring of the farming sector programming capacity as one of the key · Indicator: Handbook of Socio-Econ Guide based on expenditure categories in the budget EU best practice available to farmers (f) IFC direct lending to agribusiness projects and support to local financial institutions which provides MSMEs lending and agriculture financing 2.5 ENERGY AND ENVIRONMENT Ongoing: Objective: Support Romania in implementing its energy strategy in line with EU Directives, including EU 20-20-20 (a) Energy Community in SEE targets, and implementing selected environmental (b) PRG Privatization of Banat and directives. Dobrogea electricity distribution companies Outcome 1: Increase security of electricity supply through · Romania and its electricity market and power system (c) Integrated Nutrient Pollution Control integration of regional markets, attracting private sector in operates with help of ancillary services from Project and GEF grant the development of energy markets. Romania's Lotru project (d) Municipal Services Project · Indicator 1: Develop energy transmission services, including availability of ancillary services for stronger integration into regional markets, and absorption of energy generated by renewable sources. 15 Annex C CPS RESULTS AREAS AND OUTCOMES INDICATIVE MILESTONES WBG INSTRUMENTS · Indicator 2: Increased private sector participation in investments in energy sector. · At least 80 percent of targeted NVZ show 10 percent New: reduction in nutrient discharge in water bodies a) IFC support to local financial institutions Outcome 2: Implementation of the EU Water and Nitrate · Percentage of population in targeted NVZ area which provided energy efficiency lending. Directives adopting preventive and remedial measures to reduce b) IFC direct lending to power projects and to · Indicator : Favorable EU assessment of Romania's nutrient discharge renewable energy projects (wind and/or progress towards meeting EU Nitrates Directive biomass). · 2.6 TRANSPORT , HAZARD MITIGATION · Corrective measures taken at road sections with high Ongoing Objective: improve the efficiency of the roads and traffic crash rates railways sub-sectors, help reduce the overall costs of · Road traffic crash database established (a) Transport Restructuring transportation, improve road safety, and reduce the · Functionality of EMIS developed under Hazard Risk (b) Transport Sector Support negative impacts of traffic congestion and pollution in project is tested, and design for extension finalized (c) Hazards Risks Mitigation and Emergency selected cities. · Risk assessment of public buildings, dams and waste Preparedness Project deposits is undertaken, based on country regulations Outcome 1: Improved road safety to enable prioritization of investments New · Indicator: Fatalities per 10,000 vehicles · Short term investment and financing plans prepared a) IFC support financing of private sector in Target: 5 in 2009 vs. 6.7 in 2008 in accordance with risk assessment and financing PPPs prioritization. Outcome 2: Improved emergency preparedness and response management · Indicator 1: The Emergency Management Information System is extended to include all central and local administration units · Indicator 2: A comprehensive Emergency Communication System is created to enable stable and reliable communication among decision makers and executive agencies during emergency. · Indicator 3: Investment programs for seismic retrofitting of public buildings, dam safety, and environmental safety of waste deposits from mining industry are prepared and funded. 16 Annex C CPS RESULTS AREAS AND OUTCOMES INDICATIVE MILESTONES WBG INSTRUMENTS CAS PILLAR 3: SOCIAL AND SPATIAL INCLUSION GOALS: in the short-term, protect the vulnerable from the adverse effects of the crisis; in the medium-term, promote social inclusion and regional development. Issues and Obstacles: The crisis will temporarily increase the number of poor people, especially those involved in service and manufacturing industries. The long- term poor in rural areas and among some population groups remain hard to reach. Some of the social assistance programs are not well targeted. The pension system can be important for poverty reduction, but is currently running a deficit and does not reach all those who need it. Romania's health indicators are lagging the average of those in the EU in important areas. 3.1 SOCIAL INCLUSION Objective: assist Romania to improve the social inclusion · Improvements in water and road infrastructure Ongoing: and living conditions of most disadvantaged and evident in targeted Roma communities vulnerable people in the Romanian society (a) Social Inclusion Project · Roma in poor settlements report a closer link (b) Rural Education project Outcome 1:Improved social inclusion of Roma living in (through annual consultations) with the local (c) Mine Closure and Socio-Economic poor settlements authorities, for addressing community needs Regeneration · Indicator: Gap in living condition index between targeted settlements and neighboring communities · Number of children in disadvantaged groups Target: Reduce by 20 percent in 2013 vs. 2007 level participating in ECE increasing annually (TBD) Outcome 2: Increased inclusiveness of children in disadvantaged groups in Early Childhood Education services in targeted areas · Indicator: Number of children in disadvantaged groups participating in ECE Target: 5 percent in 2013 vs. None in 2007 17 Annex C CPS RESULTS AREAS AND OUTCOMES INDICATIVE MILESTONES WBG INSTRUMENTS 3.2. SOCIAL ASSISTANCE · Legislation to improved design and funding of well New: Objective: improve the cost effectiveness and targeting of targeted social assistance programs (e.g., GMI) is social assistance programs to mitigate the impact of the passed a) DPL series crisis on the vulnerable, and promote activation policies · More transparent and predictable GMI budget b) Programmatic poverty monitoring allocations & benefits program Outcome 1: increase the coverage and adequacy of the · Re-introduction of conditional cash transfer for CFB most efficient and well targeted social assistance program - beneficiaries) the Guaranteed Minimum Income (GMI) · Indicator 1: Number of unpaid GMI entitled beneficiaries Target: 0 by 2011 vs. 25 percent in 2009 · Indicator 2: Maintain level of benefit adequacy over time (share of benefits in average household consumption) Target: 25 percent in 2008 is maintained Outcome 2: Consolidate & rationalize SA programs to better serve poor in most cost efficient manner · Indicator: Reduce the number of SA programs Target: 35 programs in 2008, reduced by 25 percent over the CPS period 3.3. SOCIAL INSURANCE · Pension legislation to introduces inflation indexation Ongoing Objective: strengthen the fiscal viability, integrity and · Pension legislation introduces a move towards equity of the multi-pillar pension system. equalization of retirement age between men and (a) Policy Briefs 2009 Outcome 1: Improved fiscal sustainability of the public, women (b) Poverty Assessment Series (Phases I and pillar 1 pension. II) · Indicator 1: Deficit of Pension Pillar 1 is reduced as a · Social insurance policy options for elderly poor, (c) Pension Sector Policy Note 2007 result of parametric reforms (gradual move to notably in rural areas, identified and solution (d) Rapid Assessment of Impact of indexation to inflation of pension benefits. initiated designing an appropriate social protection Economic Crisis on Poverty Target: Reduced by 0.5 percent in 2015 as a result of for elderly poor who are not covered at present parametric reforms New: · Indicator 2: Retirement age equalized Target: Increase retirement age for women to 65 (a) DPL series beyond 2014 (b) Analytical Work on Elderly Poor Pension Output 2: Improved equity of pension system Scheme · Indicator: Introduction of a zero pillar to cover (c) Analytical and advisory services on elderly poor financial sector, and pension system 18 Annex C CPS RESULTS AREAS AND OUTCOMES INDICATIVE MILESTONES WBG INSTRUMENTS 3.4. HEALTH SECTOR Objective: support the design and implementation of the · Adoption of the updated Hospital Rationalization Ongoing Government's health sector reform program to (i) improve Strategy through a Government Decision in/by 2010 efficiency and quality of health services, (ii) mobilize · Adoption of the Rural Primary Care Strategy in/by (a) Health Sector Reform APL2 additional resources for health and (iii) improve health 2010 (b) Health Sector Policy Note 2007 outcomes (c) Policy Briefs 2009 (d) IFC advisory services and financing to Outcome 1: Better efficiency and quality of health services support private sector participation in the health sector · Indicator 1: Annual rate of admission to acute care facilities Target: Reduce annual admission rate to acute care New facilities from 229 per 1,000 people to below 200 (a) DPL series · Indicator 2: Annual growth rate of drug expenditures (b) Analytical and advisory services on kept below 10 percent health sector reform · Adoption of the legislation of the revised benefit · Indicator 3: 24-hour death rate among patients treated package, including (i) the introduction of in ER and then admitted to hospital copayments and exemption mechanisms for the poor Target: Decrease by 10 percent in 2013 vs. baseline and (ii) transparent mechanisms for inclusion of new 2007 technology and new drugs in the benefits package · Adoption of legislation for revised provider payment · Indicator 4: Maternal Mortality Ratio mechanisms Target: decrease MMR by 20 percent in 2012 vs. · Adoption of legislation for voluntary health baseline in 2004 insurance Outcome 2: Additional resources for health mobilized in a transparent and equitable manner · Indicator 1: Amount of copayment raised. Baseline: NA; target: TBD · Indicator 2: Coverage of copayment exemption among eligible population. Baseline: NA; target: >70 percent · Indicator 3: percent of households with voluntary insurance. Baseline: NA. Target: 10 percent 19 Annex D FY06 ­ FY09 CPS COMPLETION REPORT (prepared Fall 2008) 1. This Country Partnership Strategy Completion Report (CPSCR) assesses the effectiveness of the FY06-09 CPS for Romania2. The CPSCR will i) assess the Bank's effectiveness in aligning its program with Romania's strategic goals; ii) detail the results achieved under the CPS; and iii) provide lessons for subsequent strategy design. The CPSCR team has used reviews of portfolio implementation undertaken by the Country Management Unit, the Quality Assurance Group and the Independent Evaluation Group. An outside consultant's assessments have also been used as input for this exercise, as well as interviews with selected client counterparts and with team members. This CPSCR is being prepared a few months ahead of the intended closure of the CPS so as to inform preparation of a new Partnership Strategy, which will cover future Bank involvement in ten new European Union (EU) Member States in Central Europe and the Baltic Countries. Country Development Context 2. Romania's transition from a centralized to a market economy was challenging during the 1990's but strong progress was made this decade. Romania had among the worst economic and social starting conditions of the transition economies. The 1990s were characterized by a precipitous fall in GDP per capita and an increase in poverty. But the financial crisis and the opening of EU accession negotiations, both in 1999, provided a stimulus for reform. A program of macroeconomic stabilization began to tackle the economic problems and elections in November 2000 brought a new Government with a new policy agenda. These policy efforts were supported by a World Bank financed adjustment operation and an IMF Stand By Arrangement. Between 1999 and 2006 (the start of the CPS), GDP per capita rose from $2,900 to $5,000 and the poverty rate fell from 35.9 percent to 13.8 percent of the population. Growth, reform and investor confidence were stimulated and sustained in large part by the prospect of EU accession. 3. The prospect of EU accession provided a critical stimulus for reform. The EU Accession Treaty was signed in April 2005. Accession was tentatively scheduled for January 1, 2007 but a safety clause allowed for a one year delay if Romania did not comply with key requirements. At the time the CPS was presented to the Board in May 2006 - just seven months ahead of Romania's anticipated EU entry date - activation of the safety clause and delay of EU membership remained distinct possibilities. The CPS noted the strong national consensus in favor of EU accession and the Government's policy and reform efforts focused intently on meeting the remaining accession requirements. 20 Annex D Alignment of the CPS with the Government's Own Strategic Goals 4. The CPS was built around Romania's EU accession and convergence goals. The Government Program 2005-08 and a National Strategic Reference Framework coordinated by the Ministry of Public Finance were centered on the twin objectives of i) joining the EU in 2007 and ii) thereafter converging towards average EU living standards. The CPS was fully aligned with this agenda, and was also designed in two distinct parts: the pre-EU accession period and the post-accession period, with a break point for a joint review of the program intended shortly after accession occurred. The CPS pillars were designed to span both the pre- and post-accession parts of the CPS program. 5. The CPS pillars linked to the Government of Romania's priorities. The CPS outlined three ways in which Romania expected to accelerate economic convergence: enhancing competitiveness and the business environment; improving fiscal management; and modernizing the public sector. The first two pillars of the CPS - accelerating structural and institutional reforms for sustained growth; and addressing fiscal vulnerabilities and modernizing the public sector - directly support these country goals. In addition (and in line with the advice from an earlier review3) a third pillar was included that focused on targeting poverty reduction and promoting social inclusion. 6. To arrive at the CPS priorities, the CPS team had undertaken extensive consultation, including a conference in January 2005 attended by most of Romania's Ministers, the Prime Minister and a large part of the Bank's Romania team. At that conference, two distinct voices were heard: the line ministries proposed numerous investment projects for which they would wish to have the Bank's financial support during the CPS period, running to a billion dollars a year or more; meanwhile, the Central Bank Governor and an Adviser to the Prime Minister expressed reservations about the need for any Bank (or other IFI) involvement in Romania, given the economic boost provided by EU accession prospects, likely high inflows of foreign exchange, and Romania's borrowing needs and capacity. The Government divided its projects between the European agencies and the Bank. The proposed Bank lending program was set at approximately $450-550m a year ­ the figure that appears in the CPS ­ a 50 percent increase over the envelopes set in previous CASs. The discomfort with continued IFI engagement among some influential counterparts appears to have gone unheeded by the Bank and is not mentioned in the CPS. 7. The CPS was presented to the Board shortly before EU accession. Almost two years passed between the expiry of the previous CPS and the Board presentation of the FY06-09 CPS, by which time there was only seven months left to the anticipated EU accession date and the first, pre-accession part of the CPS program was already well underway4. As some of the activities intended for this CPS were actually carried out in the CPS preparation period, they will be reported under this Completion Report. The 3QAG report 44570: Romania Country Lending Enhancement Review, August 2004, para 60 4This delay in Board presentation was not acknowledged in the CPS, but explains why some results targeted were achieved prior to the formal start of the CPS period. 21 Annex D bulk of the program activities implemented during the formal CPS period were from the post-accession part of the CPS. Romania's Progress Towards its Goals during the CPS period 8. In many ways, the period under this CPS was very successful for Romania. Romania achieved its primary goal of EU accession on 1 January 2007. The prospect and then reality of EU accession and the effect of the pre-accession reforms gave the economy a significant boost: over the CPS period growth remained steady and strong at 5-6 percent per annum, while market finance flowed in and credit expanded rapidly. Employment increased from 57.6 percent to 58.8 percent between 2005 and 2007 due to strong growth, a flourishing services sector and high levels of foreign direct investment. 9. However, the fiscal and income policies pursued were largely pro-cyclical leading to imbalances and vulnerabilities that are no longer sustainable, while little progress was made on modernizing the public sector. During the CPS period, strong growth and FDI flows masked the risks of lax fiscal policy, wage growth in excess of productivity and a widening current account deficit (the latter grew from 8.5 percent in 2005 to 10.5 percent in 2006 and 14 percent in 2007, moderating only slightly in 2008). As global economic conditions deteriorate and the external deficits keep growing, inflation has risen rapidly and investor confidence has been eroded. In late 2008, this led to depreciation of the currency and a sharp fall in national stock markets. The National Bank of Romania raised interest rates through 2007-08 without managing to dampen credit expansion until new prudential norms were introduced in the Fall 2008; it also intervened to support the lei in late 2008, which helped to stabilize the currency in the face of speculative attacks. Deep and rapid fiscal consolidation will be needed to avoid the risk of a hard landing. Institutional reforms in the public sector will be needed to support the restoration of growth and convergence of living standards with EU averages. 10. Poverty declined during the period, largely due to strong growth, but may increase as a result of the financial crisis. Extreme poverty declined from 4.6 percent in 2005 to 2.4 percent in 2007. Unemployment declined through the CPS period, but may well increase in the coming year as Romanians working overseas return home as their jobs are affected by the economic contraction taking place across Europe. Social inclusion has improved somewhat, with the increased provision of services for vulnerable groups, while spatial disparities have narrowed only very slightly. Governance indicators remained broadly unchanged through the CPS period, but the European Commission has highlighted concerns in its twice-yearly Compliance and Verification monitoring reports. CPS Results ­ the Bank's Contribution to Romania's Progress 11. The Bank has played a significant role in supporting Romania's transition up to EU accession, both in terms of its financial and intellectual contribution to the reform efforts, as well as by providing a stamp of approval which lent credibility to Romania's reform program. An Independent Evaluation Group (IEG) review5 reports that 5IEG Using knowledge to improve development effectiveness (2008). 22 Annex D stakeholders in Romania rated the Bank's ESW and TA (2000-2006) highly - 4.7 on a scale of 1 (low) to 6 (high) ­ in terms of its influence on policy, citing particularly the Bank's core diagnostic work ­ a Public Expenditure Management review and a Public Expenditure and Institutional Review - undertaken in the CPS preparation period. On the lending side, the Programmatic Adjustment Loan (PAL) series was the main instrument through which the Bank supported the Government in its pre-accession structural reform agenda, in close collaboration with the EU and other partners. Overall, during the preparation period and pre-accession part of the CPS, the Bank's role in Romania was highly valued and successful. 12. The Bank's influence declined considerably after EU accession. The availability of market finance and EU grants rendered the Bank's financial assistance less necessary, while reform fatigue limited the Government's interest in further policy advice. Meanwhile, some line ministries continued to seek the Bank's advice. At around the time of accession, the governing coalition split leading to changes in policy direction. While few new Bank-supported activities were introduced post-accession, the portfolio of projects yielded some results. An overview is provided below under each of the three CPS pillars, with more detail in a Results Table (Annex 1). Pillar 1 ­ Accelerating Structural and Institutional Reforms for Sustained Growth 13. Pillar 1 aimed to put in place the key building blocks for a strong economy and sustained growth. The Bank envisaged support in the following sectors: public finance, human development, environment, transport, energy, using the PAL as a cross- cutting reform framework, supported by Sector Investment Loans in most of the sectors mentioned above. AAA in public finance, private sector development, Country Economic Memorandum (CEM), was intended to provide a diagnostic base for the design of lending interventions or was undertaken at the request of the client. 14. This pillar achieved partial results. Romania took significant strides in reforming the financial sector, which was almost completely privatized and became a regional leader in South East Europe in energy sector reform and restructuring. The business environment improved, although taxes remain a problem for companies and individuals alike. However, the transport sector remains inefficient and largely unreformed. Agriculture continues in a bipolar form, with a few efficient agricultural companies and a large hinterland of subsistence farming undertaken by family units. The share of employment in agriculture as a proportion of total employment declined from 32 percent in 2004 to 27.5 percent in mid-2008. 15. Many Bank operations performed well pre-accession but unraveled during the post-accession part of the CPS. Four of the eight new investment loans proposed under this pillar of the CPS (Knowledge Economy (FY06), Transport (FY07), Agriculture (FY08) and Environmental Management (which became the Integrated Nutrient Reduction FY08) were approved and launched. The three-part PAL program underpinned many of the reforms associated with these investment loans. Even though PAL 2 and 3 were not approved or disbursed (in part because the IMF's program was 23 Annex D declared off-track), many of the reforms envisaged in the PAL series were undertaken. The first PAL was accompanied by a Private and Public Sector Institution Building loan that provided significant Technical Assistance (TA) resources to support implementation of PAL measures relating to public administration and was used for broader capacity building when the PAL series was dropped. A grant from the Netherlands (of US$2.6m) supported the PAL series through technical assistance to improve public and private sector performance. On the private side, the grant supported reform in district heating; corporate governance; mining and infrastructure reforms; capital markets development; and regional development. 16. The Bank Group played a major role in the transformation of the financial sector. At the time of CPS preparation, this sector was characterized by low financial intermediation and thin, short-term capital markets. The CEM helped in the creation of a securities commission, while the PAL supported the privatization of the banking system. Nearly 100 percent of the banking system is now privately owned. Over the CPS period intermediation grew at a very fast rate, providing credit to a growing Romanian economy. However, a substantial part of this growth relied on external funding, especially from foreign mother banks, making Romania's banking system highly dependant on, and sensitive to, Western Europe's financial markets. As the external macro-financial environment facing Romania has deteriorated rapidly, substantial risks exist today that could adversely impact the financial system and reverse some of the progress achieved. In the financial sector, IFC supported the successful issuance of the first 7-year local currency bond. IFC's investment in BCR bank, following two failed privatization attempts, was highly successful and generated significant profits. During the CPS period, IFC provided over $250 million of its own fund and help mobilized $106 million to support six local financial institutions to increase access to finance to MSMEs. Most recently, IFC supported local currency term funding to a local bank to expand lending to the agriculture sector. Additionally, IFC invested in several regional private equity funds which provides scarce equity financing and managerial support to improve Romanian companies' competitiveness. CEC bank remains in majority public ownership. 17. The Bank also played a significant role in the development of Romania's energy sector through the CPS period. The Government's 2003 Energy Sector Road Map and 2007 Energy Strategy supported by the PAL program encompassed privatization so as to attract private investment, upgrade obsolete technology, increase efficiency and reduce losses. The Road Map was annexed to the EU acquis chapter dealing with energy. The strategies were implemented closely in the pre-accession period. A satisfactory regulatory framework was put in place and bill collection issues addressed, allowing Romania to privatize successfully some electricity and gas distribution companies (with the support of the World Bank's partial risk guarantee for the first transactions in electricity). Electricity markets (totaling about 9.5 million consumers) were liberalized, but few households or companies exercise their right to select an alternative energy provider resulting in a limited free market. 18. During the post-accession part of the CPS, no new privatizations in the energy sector were launched, despite strong market interest. The three distribution 24 Annex D companies that remain in the public sector could have been privatized as market interest was strong. Due to a halt in privatization of utilities, proposed IFC investments in the power sector were not pursued. Two further energy projects (FY08 and FY09) and a partial risk guarantee for generation privatization were envisaged during the CPS, but did not materialize due to the Government's opposition to further privatization in the energy sector and Romanian Government proposals to develop a national energy champion. After a slow start, the Bank also played a significant role in supporting the Romanian Fund for Energy Efficiency through a GEF project, which demonstrated to the banking community that investments in energy efficiency could be financially viable. Twenty projects were financed and the scheme is now being considered for purchase by a commercial bank. 19. Romania's business environment was a constraint to growth at the time of CPS preparation. Several aspects of this agenda ­ regulatory policies, labor laws and taxation, and transport costs - were targeted under the CPS through a combination of development policy loans and investment lending accompanied by AAA. However, a specific Business Environment loan envisaged for 2009 was not prepared. IFC invested in small Romanian private equity firms undertaking regional programs across the region. During the CPS period, the Romanian authorities implemented the recommendations of the 2003 Accounting and Auditing Report on the Observance of Standards and Codes (A+A ROSC). Some of the implementation activities were financed by two Dutch grants and the Public and Private Institution Building Loan (PPIBL). An update was carried out in 2008, which sets out new reform challenges and recommendations, which will help Romania to meet its corporate financial reporting obligations in the EU acquis communautaire. 20. With the support of the PAL program, Romania achieved significant improvements in its business regulatory environment, which was perceived as a particular problem (BEEPS 2005), including: simplification of administrative and regulatory procedures to reduce transaction costs for business entry and operation; improving the bankruptcy process; and improving transparency in the functioning of firms. An IFC Competitiveness Study became a good resource for the Government in determining which sectors would be competitive post-accession. However, progress was concentrated in the pre-accession part of the CPS and fell away during the post-accession part. The Bank's Doing Business reports show substantial improvements in the ease of doing business between 2005 and 2008 (Romania rose from 78th to 47th place, but remained in the same position for DB 2009). Business entry, targeted by the CPS, was substantially improved: it takes six procedures and 10 days to register a company, which is lower than the OECD average. BEEPS 2008 data is not yet available to determine whether the number of firms indicating uncertainty in regulatory policies has decreased since 2005. 21. Mixed progress was made in addressing the rigid labor laws and high labor taxation that encouraged a thriving informal economy in Romania. Several amendments to the Labor Code were enacted with the support of the PAL program, but Romania's relative rank in Doing Business' Rigidity of Employment index worsened 25 Annex D slightly between 2006 and 2008, returning to 2006 levels in Doing Business 20096. However, reductions in labor taxation were achieved: contributions to pensions were reduced by 3 percent; to unemployment by 2 percent; and to health by 3 percent. Overall, labor taxation was reduced by 8-9 percent over the lifetime of the PAL program. In addition, a flat income tax of 16 percent was introduced in 2005. Nevertheless, labor taxation still remains one of the highest in Europe. Employment rates are increasing ­ according to the 2007 Labor Force Survey ­ but at 58.8 percent remain short of the 60 percent CPS target and the 70 percent Lisbon Strategy target. 22. The CPS envisaged reductions in transport costs, but these were not achieved. Through a Bank loan for road maintenance based on a Sector-Wide Approach loan and a Transport Reform project for institutional change, transport costs were envisaged to decline. Both were delayed and suffered from inadequate counterpart financing or Government commitment7. In roads, a program of road user charges was introduced to establish a reliable source of funding for road rehabilitation and maintenance and revenues from this source increased by more than 50 percent. In railways, increased track utilization was envisaged through the closing of unsustainable rail lines. However, instead of closing the lines, the Government tried to lease the lines to private parties and track utilization has remained stable or even decreased slightly. In waterways, IFC supported a fleet of barges on the Danube to improve transport logistics. Due to delays in implementation of both transport projects, most of these objectives have not been met. A Rural Development project, which closed during the CPS period, rehabilitated over 800km of roads thus reducing travel time to schools, markets and health centers by 10-20 percent and reduced the number of villages that were not accessible year-round from 71 percent to 43 percent. 23. The Bank provided timely support through projects and technical assistance in agriculture to help Romania meet EU requirements. A QAG review (2004) recommended Bank involvement in agriculture since the sector included 45 percent of the rural population and 67 percent of the poor, while productivity was at most 50 percent of corresponding levels amongst `old' EU member states. Prior to EU accession, the Bank provided technical assistance that helped Romania to close pre-accession negotiations in agriculture. Post-accession, the Bank demonstrated high responsiveness through innovative just-in-time technical assistance following an urgent request for assistance to bring the Government's National Rural Development Plan into compliance with EU requirements. This technical assistance ultimately helped Romania to obtain European Commission accreditation for $11.5 million in EU agricultural and rural development funds. 24. Support to the Government of Romania's agricultural reform program by means of a Development Policy Loan (DPL) was considered but ultimately rejected. 6Romania, Rigidity of Employment Index: Doing Business 2006: 62; DB 2007: 62; DB 2008: 66; DB 2009: 62. 7The QAG review referenced above recommended dropping the roads component, given the availability of other sources of financing and the lack of interest on the part of the Government of Romania in sectoral dialogue (para 48). 26 Annex D The Ministry of Agriculture and Rural Development and the Bank jointly considered an investment loan the more appropriate lending instrument given the long term nature of the targeted policy implementation challenges associated with the targeted reforms. A broad agricultural loan (CESAR) facilitating market-based restructuring through enhancing the ability of farmers, farm family members and farm workers to manage their assets and income was approved during FY08. The loan would assist the Government of Romania in initiating the national program of systematic property title registration of land assets in rural areas to improve the security of land property rights and reduce transaction costs on rural land markets. Equally important, it assists the Government of Romania in improving the delivery of socio-economic guidance services to the rural population. However, it has not yet been made effective mainly due to approval delays related to the Government's transition to the use of Treasury systems. The Modern Agriculture Knowledge Information System project has piloted service delivery models to help farmers access EU CAP funds and supports border inspection and food safety standards for EU compliance. Other projects in this area, including irrigation and hazard risk were initially delayed after the change in Government in 2005 but are now proceeding well. Two GEF grants (of US$7m and US$5.5m) directly support investment projects (Hazard Risk Mitigation and Integrated Nutrient Pollution Control) in the portfolio. 25. In education, the Bank supported the Ministry of Education's reform of Higher Education financing plans with technical assistance. The Ministry of Education and the Bank worked closely to develop a strategic document on student loans and scholarships and to deepen existing instruments for measuring the relevance of education to labor market demand. To improve the quality of education, national quality assurance agencies were established and are now operational for schools and higher education, however, Romanian students continue to under perform in international evaluations. Pillar 2 ­ Addressing Fiscal Vulnerabilities and Modernizing the Public Sector 26. Pillar 2 aimed to reduce the fiscal deficit and modernize the public sector. The Bank envisaged support in the following sectors: the judiciary, revenue administration, municipal development, human development and energy, using the PAL as a cross-cutting reform framework, supported by Sector Investment Loans in most of the sectors mentioned above. AAA in public and municipal finance, civil service pay, as well as a Country Procurement Assessment Report, Country Financial Accountability Assessment and CEM, Policy Notes and fiduciary monitoring were intended to provide a diagnostic base for the design of lending interventions. 27. Partial results were achieved under this pillar. As under pillar 1, many of the gains made by Romania in the pre-accession were not extended or even unraveled during the post-accession part of the CPS. The restructuring of the pension system was a difficult, but successful reform, although the sustainability of this success is now under threat by promises of unsustainable increases in pension payouts. 27 Annex D 28. Some progress was made in privatization and reduction in the manufacturing sector, but the pace slowed during the CPS period. By November 2007, the privatization company (Authority for State Assets Recovery, AVAS) had 1025 companies in its portfolio (down from 7676 in 1992) almost half of which are not privatizable and in various stages of liquidation. The PAL 2 program aimed to complete the divestiture of the state shareholdings by the end of 2006, but by this time only 86 of 153 companies in which AVAS held a majority ownership were privatized or liquidated, with a further 13 in different stages of privatization and the residual stakes were sold in only 23 of 421 companies in which AVAS held a minority position. Some of the companies subsequently returned into the AVAS portfolio due to breaches of the privatization contracts and the imposition of labor force conditions. Most of these companies have subsequently been re-privatized or liquidated. The slowdown in the pace of privatization is partially due to the lack of attractiveness of the remaining portfolio, but also due to inflexibility on the method of privatization and changes in economic policy 29. The burden of the mining sector on the state budget was partly reduced during the CPS period, but the gains have to be reviewed in light of a newly-prepared plan for restructuring the coal sector approved by the European Commission in 2007. Between 2002 and 2006, the Government closed 235 mining units and cut the number of employees in the lignite and hard coal sector from 45,700 to 28,500, while coal output barely changed. State aid to the mining industry did not decline measurably, however, as deeper restructuring was needed. The Romanian Government plans to spend EUR411 million in state aid over 2007-2010, while gradually reducing subsidies to the coal sector. 30. Few public sector reforms took place, for example in civil service, judiciary or public financial management. Lax fiscal policy contributed to widening fiscal balances, while a fragmented and cumbersome tax system led to widespread inefficiencies and evasion. (Doing Business 2009 places Romania last in terms of the number of tax payments: it is estimated that around 10 percent of taxpayers - including both firms and individuals - are evading taxes.) The fiscal deficits which were manageable during a period of strong growth will now inhibit a rapid and effective response to the international financial crisis. 31. Just two (Judicial Reform and Municipal Services) of the eight new loans proposed under this pillar of the CPS were taken forward. The anticipated follow- through with PAL 2 and 3, a Fiscal and Governance DPL and a Revenue Administration project did not materialize. A grant from the Netherlands (of US$2.6m) supported the PAL series through technical assistance for judicial reforms; policy formulation; transparency, anti-corruption and governance reforms; public expenditure management, including budget preparation, execution and control and intergovernmental fiscal relations; and revenue administration. 32. The CPS program helped the Government to reduce subsidies to state owned enterprises, which were high (although declining) at the time of CPS preparation. A privatization agenda was pursued with the support of the PAL program in the manufacturing sector to reduce direct and indirect subsidies (see above). In the mining 28 Annex D sector, the CPS targeted the closure of loss making and non-viable mines through the PAL series and through continuation of a successful mine restructuring operation resulting in the closure of 31 small mines. A follow-up Mine Closure II project is tackling 20 more complex cases that potentially have environmental legacy issues. 33. The pension system was substantially restructured and the public pension deficit eliminated. Measures towards fiscal consolidation of the public pension system were underway prior to CPS preparation, however the system remained vulnerable: beneficiaries outnumbered contributors; the system provided low benefits; and was subject to ad hoc political decisions. Some considerable success was achieved on this ambitious and politically difficult agenda in the accession period of the CPS: the pension system was restructured with the support of the PAL program and a multi-pillar pension system launched in 2008, the retirement age was gradually increased and services unrelated to pensions were externalized. As a result, the public pension system achieved a surplus in 2006. This outcome however is threatened by a 50 percent increase in pensions announced in October 2008, which may put the system back into a deficit. 34. A project to support Romania's efforts to reduce the health-related fiscal deficit was not taken forward, but Romania has made progress in reducing this part of the deficit. At this moment the arrears in payment of the National Health Insurance Fund are small, pertaining only to some hospitals with high fixed costs and limited turnover and some pharmacies which exceeded their contract ceiling. Likewise, a project to improve tax compliance was not taken forward, but Romania's revenue collection has improved in recent years, probably as a result of the introduction of a flat tax in 2005. IFC has helped the NHIF to outsource dialysis services of 8 hospitals to the main private providers. 35. Several projects aimed to help Romania to absorb the potential inflows of EU funds to which it became eligible at accession. The CPS aimed to assist in improving Romania's capacity to absorb EU funds in a systemic way through the PAL program (which was dropped mid-series), a Fiscal and Governance DPL (which was never prepared) and through institutional capacity building under a second Rural and Regional Development loan (which was never prepared). An IDF grant, which closed in 2008, helped to increase the capacity of the Managing Authority for EU grants to prepare detailed cost-benefit analysis for projects eligible for EU financing and so improved Romania's capacity to manage flows of EU funds. 36. Further, improved absorptive capacity was attempted at the sectoral level where sub-components of Bank-supported projects were introduced to help with the identification and preparation of project pipelines to improve the absorption of EU funds. The MAKIS project developed a Training and Information Center in Bucharest (and three others are planned) to serve as a knowledge resource base, accreditation and training center for extension agents, food safety specialists and researchers, which will increase the capacity of researchers to develop proposals for EU funding and will prepare them to benefit fully from the funds once they become available, as well as "Integrated Agricultural Offices" or `one stop service centers' which bring together agricultural 29 Annex D advisory and administration services and serve as the main service point for filing applications for CAP support schemes, provision of information and advice on support programs, farm management and technical advice. Other projects, including the Social Inclusion Project, Transport Sector Support, Municipal Services, Integrated Nutrient Pollution and Complementing EU support for Agricultural Restructuring (CESAR) also aimed to improve absorptive capacity, but most of these projects have been delayed or are not yet effective. Absorptive capacity of EU funds remains low. 37. Limited improvements were made in the civil service through Bank interventions. The PAL series targeted a broad range of objectives for improving the civil service in Romania, while a Fiscal and Governance DPL, intended to deepen the PAL-supported reforms, was never taken forward. Given a lack of political support for deep civil service reforms, the PAL focused on improving the civil service agency in monitoring indicators. The indicators were monitored partially, irregularly and infrequently and there is no evidence to suggest that the indicators were monitored after the PAL series was dropped. The CPS also targeted a more meritocratic civil service. Some legislative changes were made to the Civil Service and Conflict of Interest Laws and the Law of Declaration of Assets as amended is now one of the strictest in the EU, but not all have been fully implemented. A medium term Civil Service Pay and Employment strategy was also drafted, but not implemented. 38. Some progress was made in improving public financial management (PFM), although more remains to be done. Improvements in PFM were targeted by the PAL series. A Strategic Development Plan was drafted and some progress made in improving internal and external audit and accounting standards, as well as in enhancing the quality of the annual budget process. However, linkages between resources and performance remain weak and the absence of a medium-term strategic framework undermines efforts to improve the prioritization, efficiency, predictability and transparency of resource allocation. As pressure grows on the Government's budget and public spending comes under strain, such weaknesses will inhibit the Government's ability to respond to the current financial crisis. 39. In the judicial sector the Bank was responsive to an urgent request for assistance with this important element in the EU accession agenda and approved a Judicial Reform Loan. There was strong support for reform in this area under one Minister in the pre-accession period, but interest waned rapidly when she left the post and Romania joined the EU. To increase efficiency and reduce administrative costs, a study on the rationalization of the court system was completed, but it was not implemented. Pillar 3 ­ Targeting Poverty Reduction and Promoting Social Inclusion 40. Pillar 3 aimed to reduce poverty and improve the livelihoods of those marginalized in society. The Bank envisaged support in the following sectors: human development, rural and regional development, using the PAL as a cross-cutting reform framework, supported by Sector Investment Loans in most of the sectors mentioned above. AAA, including on rural/regional development, poverty monitoring, a CEM and a 30 Annex D series of policy notes in health, was intended to provide a diagnostic base for the design of lending interventions or was undertaken at the request of the client. 41. Few results have been achieved (so far) under this pillar. Poverty has been reduced as a result of strong growth, but this is under threat as the economic situation deteriorates. Social inclusion has improved as a result of increased services targeted towards vulnerable groups. Regional disparities have narrowed, but only very slightly, in most of Romania's regions over the CPS period. 42. Only one of eight potential new loans anticipated under this pillar of the CPS were approved ­ the Social Inclusion Project. As most of the CPS monitoring indicators relate to this project and it has been delayed, few results can be seen from this pillar yet. The anticipated Rural and Regional project and the Human Development DPL series, were not taken forward. It is the only pillar that did not directly relate to Romania's EU accession ambition and therefore did not benefit from the drive and momentum behind the other pillars during the early years of the CPS. 43. Poverty was reduced over the CPS period, largely due to economic growth, but some groups were left behind. The CPS aimed to support Romania's goal of halving extreme poverty through improving coverage of the Minimum Income Guarantee program and reforming eligibility rules. The extreme poverty rate has been reduced dramatically (below the CPS target), as a result of strong and sustained economic growth. At the same time, social assistance is becoming progressively less targeted, the Minimum Income Guarantee program was partially reformed, but as GDP continues to rise, the relative size of the guaranteed income is actually declining and coverage of the poor is decreasing. A programmatic Poverty Monitoring AAA program was undertaken to work with the Romanian authorities to build capacity to monitor poverty and social inclusion trends, as well as to evaluate social programs aiming to reduce social exclusion. The program was only partially successful, mainly due to understaffing in the relevant Government departments, resulting in low levels of participation and knowledge transfer. 44. The on-going Social Services Project helped to improve services for some vulnerable groups. The development and provision of social assistance services and employment services contributed to a certain extent to the social inclusion of persons coming form various groups at risk. Out of 1520 persons with disabilities that were enrolled on employment counseling services, 770 succeeded in getting full employment - a 50.6 percent placement rate. The provision of multi-functional social assistance services in 70 community based centers contributed to the social inclusion of children at risk, victims of domestic violence, persons with disabilities and the elderly. 45. An Institutional Development Fund (IDF) grant and a Japanese Social Development Fund Grant supported Romania's Roma agenda. The National Roma Agency and line ministries involved in the Decade for Roma Inclusion were direct beneficiaries of the IDF grant, which supported the formulation of inclusive policies for housing and education; training for regional and local authorities in the development of inclusive development plans; and establishment of a monitoring and evaluation system to 31 Annex D help the National Roma Agency oversee and evaluate the implementation of Roma programs. A Japanese Social Development Fund (JSDF) grant also supported priority programs for Roma inclusion and empowerment by working with local and regional Roma NGOs and creating partnerships between Roma communities and the local public administration. The grant is linked to a project that has only recently started, so it is too early to assess results at this stage. 46. Regional disparities between central and rural regions were high at the start of the CPS period and remain so today, although in most regions they have narrowed slightly. The Bank proposed engagement on Regional Development issues through lending and technical assistance. A Regional Development Loan was planned, which would have built on the recommendations of ESW undertaken earlier in the decade and was intended as a complement to the Mine Closure project, to examine potential areas of competitiveness and to bring social and economic regeneration measures to poorer parts of western Romania. However, views within Government were mixed on the approach and there was no single counterpart. Eventually, the Mine Closure II project incorporated a socio-economic regeneration component. 47. Technical assistance to the Government of Romania to formulate its regional and rural development programs and assist in their implementation was successful. A conference at the outset (2006) opened a substantive policy dialogue with the Ministry of Development, Public Works and Housing and led to the adoption of many policy recommendations in the Government's regional program. However, the decision not to pursue the Regional Development project limited the Bank's involvement in implementation. 48. Information technology is helping to bridge spatial and knowledge disparities. To reduce the disparities in knowledge between lagging and central regions, a Knowledge Economy project has provided about 1.8 million people (or 44 percent of the most knowledge-disadvantaged communities) with access to information communication technology through the establishment of 255 Local Community electronic Networks. The aim of the project is to see these networks evolve into a daily tool for education, business and public communication with the Government, with increasing private management and financial self-sustainability. The project was championed by local governments and was recently awarded the European Commission's e-Inclusion Medal Award 2008. 49. Another Bank-supported project aimed to reduce urban-rural divides by improving access to good quality rural education. The gap between urban and rural students who scored well at national examinations for grade 8 decreased from 16.5 percent in 2001/2 to 13.8 percent in 2006/7. Successful interventions under Bank- financed projects are now being replicated by the Government at national level using EU structural funds. 50. A range of social disparities were targeted by the Social Investment Project. The project supported a range of interventions to improve the living conditions for Roma, 32 Annex D to increase attendance at Early Childhood Development Programs, to improve facilities for persons with disabilities to EU standards and to improve multifunctional centers for youth at risk to help them enter employment. The project suffered significant delays, but has now picked up and is expected to deliver results in 2009. 51. Health sector improvements were targeted under an on-going Health Sector Reform project, in PAL 2 and a series of Human Development DPLs (the latter two were not taken forward). The nature of potential reforms was assessed in a series of Human Development policy notes, discussed with stakeholders in 2007. The recommendations pertained to continuing hospital reform for the purpose of increasing efficiency and quality of care, redressing the bias towards inpatient care, improving pharmaceutical pricing methodology and establishment of reimbursement list, improving access to care in underserved areas, and addressing the HR issues (diminishing supply of health professionals). The recommendations yielded limited improvements in pharmaceutical pricing methodology and establishment of reimbursement list an increase in payments for family doctors. The restructuring of health care services in underserved areas to ensure access and quality was not taken forward due to a change in Romanian legislation that treats primary health care practices as private ventures which can not benefit from public money and regulation ambiguities regarding the privatization of medical infrastructure. A micro-credit scheme was also dropped, at the request of the Government. IFC, however, supported some operations in the health sector, namely the expansion of private hospitals which will increase the supply of higher quality hospital services in Romania and help relieve some of the burden currently placed on the public health system, and allow public health resources to focus on lower income segments of the population and emergency services. Bank Performance Strategic Relevance 52. The CPS design was fully in line with and relevant to the Government of Romania's agenda: support for EU accession and for continued convergence thereafter. Projects were designed with a strong EU focus helping Romania either to meet EU accession requirements (for example, in judicial reform), membership obligations and EU Directives (for example, the Integrated Nutrient Pollution Control) and/or to absorb EU financing. 53. The Bank's analytical and advisory work also played a major role in preparing Romania for EU accession. The Country Economic Memorandum (2004) focused on the policy areas and challenges that underpinned Romania's integration into the EU structures: trade, agriculture, enterprise restructuring, business environment, energy, environment and the labor market. A Public Expenditure and Institutional Review (PEIR, 2006) helped Romania be better prepared to improve the quality and effectiveness of planning and public spending to meet the demands of the EU accession and absorb EU funds, while maintaining prudent macroeconomic policies. A large number of policy measures recommended by the two reports were included in the PAL program, which constituted de facto the framework in which the EU accession reform 33 Annex D program was pursued by the Romanian authorities. Romanian officials report that the Bank helped with their dialogue with the EU and may have contributed to its successful entry into the EU8. 54. The CPS program design was anchored by adjustment loans intended to deal with systemic reform issues, complemented by a series of investment projects and AAA products. In the first, pre-accession part of the CPS, the on-going PAL series performed this anchor function effectively (as did the external anchor of EU accession). Even though PAL 2 and PAL 3 did not materialize, many of the reforms identified for these loans were undertaken. However, in the second, post-accession part of the program, the PAL program was discontinued, the proposed Human Development DPL series and the Fiscal and Governance DPLs were not prepared. At the same time as the external anchor of EU accession disappeared, so too did the program anchor. 55. The program moved from high-case to low-case through the CPS period. Given the evident importance attached to the PAL series as a centerpiece for the program, it is surprising that this DPL series was only forecast for a high-case scenario. Triggers for this high case scenario were anyway those essential for continuing the PAL series (appropriate macroeconomic conditions and progress on PAL triggers). Thus, the CPS started in ­ and was built around - the high case scenario. When the DPLs were abandoned mid-CPS9, the program moved to the base case of investment loans (intended to link to the PAL), heavy on procurement of equipment and light on policy, at just under 40 percent of the indicative amounts given in the CPS. When they too unraveled in the absence of an anchor10 the CPS slipped towards the low case scenario of AAA only. (Annex 2 ­ Planned and Actual Lending). 56. The Bank endeavored to adapt the portfolio to meet new needs: just-in-time technical assistance was provided to help the Romanian Government with its National Rural Development program and, at the Government's request, an emergency Avian Flu operation was prepared. The Bank examined opportunities to use Romanian environmental standards and fiduciary controls in project implementation. Furthermore, the Bank has signed a Memorandum of Understanding with the Romanian Government in preparation for adoption of the Romanian's new public debt management system (due to commence January 2009), which will use Romania's treasury to pre-finance all expenditures in Bank-supported projects and simply request reimbursement from the Bank. However, concerns remain about the readiness of the authorities to implement the system and the Government's current financial capacity to pre-finance all project expenditures: these concerns are being addressed by the Ministry of Public Finance, which has requested a shift back to the advance system of disbursement in early 2009. 8IEG Using knowledge to improve development effectiveness (2008). 9The Romania Country Assistance Evaluation (OED, May 2005), finds that when government commitment is clearly weak, it is important for the Bank to acknowledge this explicitly and refrain from continuing with adjustment lending. 10The same CAE noted that investment lending in a distorted policy environment is unlikely to achieve its objectives. 34 Annex D Major Factors that Affected CPS Implementation 57. The CPS recognized the defining moment that EU accession would bring, yet when it happened, the Bank did not rebalance its program rapidly enough. Following accession and a change in the governing coalition, interest in borrowing from the Bank waned rapidly. The Bank underestimated the rapid loss in its strategic relevance as Romania rapidly adjusted its financing strategy towards increased use of market finance, investment loans from the European Investment Bank and Structural and Cohesion grants from the EU. The break-up of the governing coalition at around the same time as accession also contributed to the change in approach towards the Bank. As a result of the diminished dialogue, the intended joint review of the partnership strategy did not take place and the portfolio was not adjusted towards a new partnership approach. IFC was relatively less affected than the Bank by the change in Government financing preferences and the shift towards EU institutions as preferred partners. 58. The risks identified in the CPS materialized. Three risks were identified in the CPS: i) failure to address weaknesses in the macroeconomic framework; ii) slippages in the reform agenda (especially if the EU safety clause is invoked and accession is delayed); and iii) lack of attention to strengthening institutional capacity. Each of these risks played out, although the slippage in the reform agenda was more due to the achievement EU accession, which led to some relaxation of the reform path, rather than due to the feared delay in EU accession. The financial crisis that erupted in late 2008 will severely test the economy while attention to institutional strengthening has been limited. Quality of Bank Services Portfolio 59. As of September 2008, Romania's active portfolio consists of 17 projects11 with total commitments of US$ 1.62 billion, of which US$ 1.18 billion remains undisbursed. During the CPS period, eight projects (or one third of the portfolio, totaling US $731 million) were approved, corresponding to 38.5 percent of the indicative FY06-09 lending program. The new loans were agreed in the early years of the CPS: three projects in FY06; three in FY07; and two in FY08; none so far in FY09. Investment operations now account for the entire portfolio, although a DPL operation will be presented at the same time as the new CPS. 60. At the start of this CPS, the Bank's portfolio in Romania was third largest in ECA and operations approved prior to this CPS generally exhibited strong quality. IEG reviews of the eight projects that closed during FY06-0912 show that 100 percent had satisfactory outcomes and likely sustainability. For all eight projects the quality at entry, quality of supervision and the Borrower performance were rated satisfactory or higher. These outcomes confirm the highly relevant and valued Bank-Romania pre-accession partnership. 1117 SILs including 2 co-financing GEFs, which component the Hazard Mitigation and Integrated Nutrient Pollution Control projects 1210 projects closed FY06-08, of which 8 reviewed by IEG. 35 Annex D 61. Romanian in-country stakeholders rated the Bank strongly (4.7 out of 6) in terms of building capacity and strengthening institutions13. They specifically noted that the Bank's comparative advantage is in accumulating practical knowledge and best practice experience from many different countries which could help them avoid costly mistakes. 62. As Government interest in new loans declined, so too did portfolio quality. Commitments at risk, a measure of the likelihood that projects will not meet their stated development objectives on time, increased sharply from zero in FY05 to 36 percent in mid-FY08. A portfolio-wide review held in early 2008 assessed the reasons for the portfolio quality deterioration and factors affecting the disbursement performance. Key factors include: (i) Government weakness in strategic planning and sectoral policy, which triggers frequent changes in policy priorities and directions; (ii) absence of an effective medium-term expenditure framework which results in uncertainty regarding funds availability and imposition of spending ceilings; (iii) limited funding being made available during the annual budget cycle leaving projects hopeful but not certain of increased financing during periodic budget rectifications; and (iv) poor managerial practices (insufficient decentralization of project implementation responsibilities, frequent changes of project management teams, lack of coordination among key players involved in project implementation and cumbersome approval process of budget financed investments). The review helped stimulate improved portfolio performance, resulting in a healthy disbursement ratio of 18.2 percent at the end of FY08, compared to just 10 percent a year earlier, while the number of projects at risk was reduced from six to three and commitments at risk went down from 26.3 percent to 12.3 percent by end FY08. 63. Financial Management performance was generally good while procurement has been problematic. Financial management performance was generally satisfactory and compliance with audit and reporting covenants good (with the exception of some audit reports for the road and railway entities, although the previously long delays have also been significantly reduced). The public procurement law aligned with EU directives was adopted prior to Romania's EU accession, but procurement risks for eight projects14 in the portfolio are considered to be high. In most instances this relates to weak capacity of the implementing agencies to handle procurement related work. Two projects in the portfolio are considered procurement problematic based on an assessment made by task teams during supervision and slow implementation progress. 64. IFC's portfolio has performed well. During the CPS period IFC invested a total of $383 million of its own fund and help mobilized $191 million in 15 projects. These included 8 projects in the financial sector, a project to support the modernization of refinery, a project to improve river transportation, a project to support the first private hospital chain and a project in transportation and warehousing. Additionally IFC invested in regional projects in private equity funds, which allowed investments in smaller competitive companies as well as in oil and gas exploration, covering Turkey and 13IEG Using knowledge to improve development effectiveness (2008). 14Forest Development, Hazard Mitigation loan and associated GEF project, Health Sector Reforms, Social Inclusion, Avian Flu, Transport Restructuring and Transport Sector Support Projects. 36 Annex D Romania. IFC-Bank cooperation throughout the period was strong. The CPS envisaged some links, for example with IFC supporting privatizations in infrastructure and energy proposed through the PAL series, but these were stopped when the policy loan series was dropped. Analytical and Advisory Work 65. The lending portfolio was complemented by a series of analytical and advisory activities (AAA), which perform a variety of functions: due diligence for the Bank; policy options and advice for the Government; and technical work to assist in the preparation or implementation of loans. 66. AAA from both the Bank and IFC was relatively light, given the size of the program and declined, rather than increased, as the program moved into the low case (Annex 3 ­ AAA Delivered). However, while the Ministry of Economy and Finance showed no interest in Bank loans, the line Ministries continued to be receptive to analytical advice, suggesting that AAA could have been scaled up effectively as the main channel for policy guidance to line ministries, but instead as interest in loans declined, so too did the budget allocated to Romania. Some IFC health sector work paved the way for the out-sourcing of eight dialysis centers, while the IFC's Competitiveness Study helped the authorities analyze sector competitiveness compared to their EU counterparts. 67. As mentioned above, AAA work that was particularly useful in the pre- accession part of the CPS helped Romania to prepare for EU accession. Romanian officials noted that they were interested in the Bank looking ahead and identifying the next generation of policies and issues that would be important in the future, giving the example of the Romanian Food and Agriculture in a European Perspective analytical work and related technical assistance, which set out the impacts of the prospective reform of the EU Common Agricultural Policy (CAP) in 2013 on Romania. On many of the studies, the partnership between the line ministry and the Bank staff was close, while the frequent participation of Romanian specialists in the AAA work helped enhance local capacity and ownership and secure realism and best outcomes. 68. Generally, dissemination of AAA work took place in country and in the local language with the significant participation of Government officials from the Ministry of Economy and Finance, line Ministries and agencies, representatives of professional organizations, think tanks, researchers, academia and, when appropriate, the press. For example, in June 2007 the Romania Country Office organized a series of workshops to disseminate four policy notes on health and pharmaceuticals, pensions, poverty and social assistance, and education to prepare for and underpin a series of proposed Human Development DPLs (which were not ultimately prepared). Delivery 69. In line with the deterioration in portfolio quality and the reduction in demand for new IBRD loans, so too lead times for those projects that were under preparation increased significantly from 12 months in FY06 to 2315 months in FY08. 15Average lag from PCN to approval 37 Annex D Likewise, the elapsed time between the benchmark spending of US$30,000 before a concept note is prepared and Board approval has also increased from 14 months in FY06 to 22.35 months in FY08. Both indicators are now significantly higher than ECA and Bank-wide averages. 70. In FY06-07, the average 11-month preparation time for ESW products was in line with the envisaged target of 12 months. However, to remain relevant and to reposition the Bank as a knowledge-provider, this lead time will need to be shortened further to provide shorter, more responsive analytical work, so long as this does not undermine the technical quality of the work. 71. Project management through the CPS period was significantly decentralized to the country office. At the time of the CPS three projects were led by staff in the country office; this has increased to ten during the CPS period, but currently stands at six. Local team leaders are closer to the projects and to understanding the political economy behind delays or obstacles. However, some were left with limited supervision and support from their sector units. Country dialogue 72. Through the CPS implementation period, the divergence of views between the Government's wishes from the Bank and the Bank's proposed program increased. On the one hand, as accession became a certainty and then a reality, Romania became eligible for structural and cohesion funds, reform fatigue set in while the fruits of the earlier reforms were enjoyed, financial market access became easier, the anchor of the pre-accession requirements was lost and Romania became even more determined to avoid the perceived stigma of continued association with a development Bank. This latter may be particularly pronounced given the perceived influence of the Bank over policy setting (although the EU's power in the same respect was not perceived negatively). There is also some evidence of the Bank adjusting operations to meet HQ-requirements (for example grouping multiple projects into one and manipulating delivery dates) but in doing so losing the ownership of the counterparts. Furthermore, the Bank heard the demand from line ministries for continued engagement but was not able to demonstrate its value-added to a reluctant Ministry of Finance. In its apparent determination to press ahead with loans for which there was no ownership in the Ministry of Finance, the Bank only further alienated its main counterpart. 73. The level of interest in Bank support for development programs in the convergence part of the CPS dropped off sharply after accession with the change in Government and improved access to external financing. Romania adjusted rapidly to its new circumstances and the Bank was not able to adjust rapidly enough. One project was dropped in FY06 (including the core programmatic adjustment loan (PAL) series), two in FY07, three in FY08 and by FY09 there were no lending projects in the pipeline. Significantly, all the proposed DPLs were dropped. Only two new investment loans were agreed post-accession (but experienced lengthy approval and effectiveness delays). Implementation of projects already underway worsened (the decline began around 2005) and the dialogue between the Bank and the Government declined as the Government 38 Annex D became more focused on market financing16. During the post-accession part of the CPS, the Bank's role in Romania diminished considerably and in September 2007 the Government expressed interest in graduation from Bank lending. Monitoring and Evaluation 74. CPS monitoring was linked to the PAL program. The CPS envisaged that monitoring of the program would take place through the Project Implementation Unit for the PAL program in the Chancellery of the Prime Minister's office, which was staffed with specialists covering the main areas of reform. This arrangement was intended to sustain the impact of the PAL program under changing circumstances. Monthly and quarterly progress reports were prepared on specific monitoring indicators linked to the CPS monitoring framework. Quarterly Portfolio Reviews were held between the Ministry of Finance and the Country Director. However, when the PAL was dropped in 2006, the regular monitoring and meetings stopped. 75. Once the PAL had been dropped, joint portfolio monitoring continued, but with greater frequency. Progress on individual projects was reported separately and brought together on several occasions ­ in 2006 and 2008 ­ when joint Portfolio-wide Reviews were undertaken at the Bank's instigation with representatives of the Bank, the Ministry of Economy and Finance, project management units, line ministries and agencies, as well as throughout 2007 in quarterly portfolio reviews to redress deteriorating portfolio quality. The reviews identified particular problems in projects and resulted in agreement as to the proposed actions to resolve such issues. Lessons Learned · Identify the Bank's comparative advantage vis-à-vis other external partners and design the program around these areas. The Bank did not heed sufficiently the need for a different approach towards a MIC client no longer dependent on Bank financing. The program continued to emphasize large loans when other larger, faster, cheaper financing sources were available and did not re-focus the Bank's role as a knowledge-provider or technical adviser. The dissonance between the desire of line ministries to continue borrowing and the desire of the Ministry of Economy and Finance to diversify its sources of financing was not resolved. The lack of commitment and therefore budgetary resources from the Bank's key counterpart in the Ministry of Economy and Finance hindered successful implementation of several projects. The Bank should focus on its areas comparative advantage in some key reform areas (see Section B below). · Allow flexibility in a CPS to manage changing circumstances and the prevailing needs. Given the fact that the program spanned such an important historical moment for Romania, the CPS program was somewhat over-determined with a program of loans outlined for all four years of the CPS. The Bank appeared to have a pre-set agenda and was unable to adjust with sufficient flexibility in line with the Government's revised priorities. While ILs and AAA can reinforce a 16The QAG review referenced above already foreshadowed that `after accession the Bank may be perceived as less important and Romanians may have a reduced interest in the relationship'. 39 Annex D DPL series, they should not be so inextricably linked as to create an `all-or- nothing' program. Likewise, investment projects should not be overly complex (in technical and financing terms), which results in implementation delays and the need for restructuring or capacity building during implementation. The program should be designed so it can be scaled up or down according to the Government's demand. As the lack of interest in lending manifested itself, the Bank could have stepped-up its AAA program to demonstrate its value-added and develop a new knowledge partnership, but instead AAA declined in line with the lending program. · Anticipate and manage political transitions. The CPS acknowledged that much of the commitment to reforms had been due to EU accession aspirations, but anticipated this reform commitment would continue to achieve convergence. In doing so, it underestimated an understandable reform fatigue after years of reforms in preparation for accession. At times, the Bank heard only the voices it chose to or sought agreement to its plans from other parts of Romania's governance structure. Such dialogue was counter-productive. The Bank should maintain dialogue with a wide range of stakeholders across the political spectrum, at all levels of the civil service and with a wide range of public stakeholders, including businesses, special interest groups and other non- governmental organizations. Conclusion 76. The Bank was an important partner in Romania's development prior to accession. However, a change in Government, EU accession and the Bank's narrow focus on lending limited the effectiveness of Bank support during the post-accession period. With a new approach, focused on the Bank's value-added in reform-oriented and knowledge products, a successful new partnership could be forged again. 40 Pillar 1 Accelerating Structural and Institutional Reforms for Sustained Growth At CPS entry CAS Outcomes Milestones Results at CPS completion Incomplete privatization Increase in private sector Completion of Substantially Achieved. 98% of banking assets privatized. agenda in banking sector. share of banking assets to privatization of BCR BCR privatized in Dec 2005 through an open, international 62.5% of banking assets 100% and CEC banks and competitive tender in the largest privatization deal to state-owned. In 2003, 3 of date in Romania. CEC not privatized. In 2007, 2 of the 42 the 39 credit institutions credit institutions are state owned (CEC and Eximbank). were state owned. Incomplete privatization Completion of divestiture of Completion of Partially achieved. 86 of 153 companies in which AVAS agenda in enterprise sector. manufacturing SOEs privatization of SOEs held a majority ownership were privatized or liquidated, Weight of private sector in held by AVAS with a further 13 in different stages of privatization, while GDP was 67.7% in 2003 the residual stakes were sold in only 23 of 421 companies in which AVAS held a minority position. The weight of the private sector in GDP was 71.8% in 2006 Rigidities in the labor market Reduction of rigidities in Amendments of the Partially Achieved. Amends to the Labor Code were due to employment hiring and firing asa Labor Code to enacted under PAL 2 preparation. DB shows that labor protection legislation measured by Cost of Doing improve flexibility market flexibility has improved a little (149 to 143), but still Business indices remains rather rigid. Employment rate among 15- Increase in employment Partially Achieved. Employment rates 58.8% in 2007 64 years olds 58% in 2004 rate of population aged 15- (Labour Force Survey). Labor codes were amended and 64 from 58% I 2004 to 60% may have had a positive effect on employment, but in 2009 attribution of the increase in employment to this alone is unrealistic. Rigidities in land markets. Increased activity in Successful Not achieved. Project not effective yet due to delays in Incomplete land agriculture land markets as introduction of land Government transition to Treasury systems.No systematic restitution/demarcation measured by the number of restitution and registration process underway at this time but expected to process. land registrations and lease demarcation reform be initatiated in early 2009. ANCPI (National Cadastre contracts program in 2-4 judets Agency) has completed one pilot. Slow farm restructuring Decrease in share of Implementation of Achieved. New service delivery model being implemented process farmers unable to employment in agriculture service delivery under MAKIS project. Integrated Agricultural Offices employ EU CAP funds for to total from 32% in 2004 to models pilots in 2 (integrated service centres) provide "one-stop-shop" competitiveness 28% I 2009 judets service points for agricultural and EU funding advice to enhancement farmers. High cost of doing business Percentage of firms Implementation of Not achieved. The Government drafted an Ordinance that indicating uncertainty about Silent Approval Law cover 455 areas subject of the silent approval law. regulatory policies as a However, the Ordinance is being reviewed by the line problem declines relative to Ministries and has not yet been approved by Parliament 2005 in the next BEEPS 41 Pillar 1 Accelerating Structural and Institutional Reforms for Sustained Growth (Cont'd) At CPS entry CAS Outcomes Milestones Results at CPS completion High cost of doing business Amendment of the Achieved. The company law was amended substantially by Company Law introducing the OECD conrporate governance principles and aligning it with five EU directives High cost of doing business Alignment of Achieved. The Doing Business 2009 report places business entry Romania as one of the best performers (26 place out of the requirements with EU 181economies) in terms of easiness of starting a busines; Countries it takes six procedures, 10 days to register a company. Less than OECD countries' average. High labor taxation Reduction in labor taxation Introduction of the Achieved. Multi-pillar pension system created and in a sustainable way by 2% multi-pillar pension operational. Final legislation for second mandatory private system by 2008 pillar prepared under the PAL 1 and 2, and launched in 2008. Contributions to: Pensions down by 3%, Unemployment by 2%, Health by 3%. High transport costs. 67% of Increase in percentage of Establishment of a Partially achieved. The design of the Road Data Register national road in good or fair national road in good or fair reliable funding for has been completed under TRP and implementation is condition condition from 67% in 2005 road rehabilitation ongoing. Revenues from road user charges (Rovignette) to 75% in 2009 and maintenance by increased by more than 50%. However, the percentage of introducing Road national road in good or fair condition is estimated to have User Charge and deteriorated to 63%. Road Data Register High transport costs. Increasing railway track In the railway sector, Not achieved. Track utilization has remained stable or Railway track utilization utilization (in thousand elimination of 40 decreased slightly. Rail lines have not been closed, but 2,223 (in thousand traffic traffic units per route km) hazardous locations instead leased to private parties (with limited success). units per route km) in 2005 from 2,223 in 2005 to 3000 and decrease lines Elimination of hazardous locations not yet achieved, but on in 2009 with speed track. restrictions by 180kms Incomplete reform in energy 100% electricity market Satisfactory Achieved. Electricity market liberalization achieved in sector to improve efficiency liberalization as measured implementation of 2007. Approximately 9,500, 000 customers, including and meet EU requirements by number of customers power sector road households, could exercise their right to select an electricity eligible to choose supplier map under PAL supplier/negotiate bilateral contracts in the free market, but and free to enter bilateral program few do so. Only 50% of the energy consumed by industry is contracts with supplier traded on the free market. The power sector road map was implemented well until 2006. Since then implementation has continued with the exception of the privatization program. 42 Pillar 1 Accelerating Structural and Institutional Reforms for Sustained Growth (Cont'd) At CPS entry CAS Outcomes Milestones Results at CPS completion Insufficient alignment of Improvement in education Implementation of Partially achieved. National quality assurance agencies education relevance to the quality by 2.5 to 5% based program for were set up for primary and secondary schools and higher labor market. on various assessments improving quality education and they are operational. However, at national and examination results assurance and level, Romanian student performance in PISA 2006 was accountability in below OECD and EU average scores. In PIRLS 2006 primary and Romanian student scores were 36 of 45 participating secondary schools countries and Romania scores declined between 2001 and and higher education 2006 Insufficient alignment of Reduction in secondary Not achieved. Drop-out rates have actually increased to education relevance to the education drop-out rate 2.1% in 2006 labor market. from 1.7% in 2004 to 1.2% in 2009 Poor regulatory framework 20% improved soil and Development of Not achieved. The project start has been delayed by and institutional capacity to water quality in the areas testing of sub- almost 2 years. implement the EU Nitrates covered by the Bank project legislation in line with Directive EU Directives Poor regulatory framework Implementation of Not achieved. The project start was delayed by almost 2 and institutional capacity to integrated action years due to a combination of Government transition to use implement the EU Nitrates plans for remedial of Treasury systems (which delayed Negotiations by 7 Directive interventions at the months) and a lengthy period to effectiveness (approaching water basin level 1 year). Pillar 2 Addressing Fiscal Vulnerabilities and Modernizing the Public Sector At CPS entry CAS Outcomes Milestones At CPS completion High total subsidies to the Reduction in enterprise Closure of loss Achieved. Under the 2004 Government strategy for enterprise sector including subsidies as percent of making and non- restructuring the mining sector, the Government closed 235 selected state enterprises GDP from 2.2 in 2002 to viable mines mining units and cut the number of total employees in the less than 1.5 in 2009 lignite and hard coal sector from 45,700 in 2002 to 28,500 in 2006 without affecting output. Three of the more difficult mines have been closed under the Bank-supported project. Enterprise subsidies being phased out by 2010. 43 Pillar 2 Addressing Fiscal Vulnerabilities and Modernizing the Public Sector (Cont'd) At CPS entry CAS Outcomes Milestones At CPS completion Fiscal vulnerability from Reduction of quasi-fiscal Privatization of three Substantially Achieved. Although there is no information quasi fiscal energy subsidies energy subsidies as % of electricity distribution available on the level of arrears in the energy sector on an GDP from 1.7 in 2004 to companies aggregate basis, the team believes that they declined less than 1 in 2009 considerably after 2004, very likely below 1% of GDP. including clean-up of past Termoelectrica and some local producers are likely to be arrears the only companies still in arrears, although this could change in the current financial crisis. The first two of eight distribution companies were sold in 2005 and three more in 2006. Privatization of the remaining three was stopped in 2007. Fiscal vulnerability from Reduction of quasi-fiscal Increase in electricity Achieved. Energy sector regulator has adjusted electricity quasi fiscal energy subsidies energy subsidies as % of and gas tariffs and gas prices. GDP from 1.7 in 2004 to less than 1 in 2009 including clean-up of past arrears Fiscal vulnerability from high Maintenance of public Increase in Achieved. The public pension system has been in surplus pension liabilities pensions deficit at less than retirement age in recent years, following a comprehensive restructuring, 1% of GDP or identification including by: gradually increasing the retirement age, of funding sources if deficit externalizing services unrelated to pensions contributions, temporarily widens as a transferring the pensions of agricultural workers to the state result of appropriate budget, improving revenue collection and indexing benefits policies to inflation. Unsustainable health Reduction in amount of Implementation of Partially achieved. Arrears to suppliers fluctuate, but have financing arrears by health care health reform at times been eliminated altogether, only to increase again. providers to suppliers by package in PAL and more than 50% between strengthened by HD 2005 and 2009 DPL series Unsustainable health Reduction in amount of Implementation of Achieved due to increased Health Insurance Fund financing arrears by health care health reform revenues (higher salaries). Arrears to suppliers are minimal providers to suppliers by package in PAL and but the sustainability of this situation is doubtful because of more than 50% between strengthened by HD the projected reduction of employers contribution to the 2005 and 2009 DPL series Health Insurance Fund. 44 Pillar 2 Addressing Fiscal Vulnerabilities and Modernizing the Public Sector (Cont'd) At CPS entry CAS Outcomes Milestones At CPS completion Unsustainable health Incidence of informal Adoption of informal Unknown. No formal measures were taken in this regard. financing payments in the health payments reduction There is no officially published data that allows an sector reduced from 10% of measures assessment of whether the level of informal payments has total health sector decreased. expenditure in 2005 to 5% in 2008 based on info from surveys Limited capacity to absorb More than 75% absorption Eu grants committed Partially Achieved. Activities are on-going in 10 counties, EU pre- and post-accession of EU funds in the water to 11 counties for the EU is financing the 11th. The indicator is on track to be funds. and wastewater sectors in water and wastewater exceeded well before the closing date of the project as counties supported by Bank projects amounting to applications corresponding to EUR 850 million of EU grants project about $500 million should be submitted by June 2009. Inefficient public More meritocratic civil Adoption and Not achieved. The Strategy was drafted, but not administration. Perceived service as indicated by: implementation of a implemented due to the lack of political will. high levels of corruption in incidence of formal medium term Civil administration evaluations for civil Service Pay and servants exceeding 95% Employment Strategy each year during the CPS period; and increase in the % of civil servants with university degrees to 77% for central administration and 50% for local administration Inefficient public Enactment of new Achieved. Amendments to the Civil Service Law were administration. Perceived Civil Service Law adopted high levels of corruption in administration Perceived high levels of Amendments to Partially achieved. The Conflict of Interest law was corruption in administration strengthen the amended, but it is not clear that it is being implemented. Conflict of Interest Law Perceived high levels of Publication of Achieved. Amendments to the law of Declaration of Assets corruption in administration declarations as adopted in 2004 were substantial and resulted in a marked required in the Law of improvement of the process and quality of public Declaration of Assets declaration of assets. The declaration is one of the strictest in the EU. 45 Pillar 2 Addressing Fiscal Vulnerabilities and Modernizing the Public Sector (Cont'd) At CPS entry CAS Outcomes Milestones At CPS completion Inefficient public Implementation of Partially achieved. The SDP was drafted. Some progress administration. the Strategic in improving internal and external audit and accounting Development Plan standards, as well as in enhancing the quality of the annual for Public Financial budget process, has been achieved. However, linkages Management in the between performance and resources allocated in the public PAL program sector remain weak. Inefficient judicial system Reduction of time spent by Implementation of Not achieved. The proposed program for court courts on administrative the program for rationalization has not been taken forward. matters by 30% rationalization of the court system Pillar 3 Targeting Poverty Reduction and Promoting Social Inclusion At CPS entry CAS Outcomes Milestones At CPS completion Limited effectiveness of the Halving of the extreme Improved coverage Partially achieved. Extreme poverty rates are below the social assistance system poverty rate of 11% in 2003 of the MIG scheme target rate at 2.4% in 2007 but this was mainly due to by 2009 by reforming economic growth. The MIG scheme was reformed eligibility rules (partially), but its funding is now decreasing relative to GDP and coverage is decreasing Social and economic 20% reduction of gaps Implementation of Not (yet) achieved. Works for small infrastructure exclusion of disadvantaged between selected the Priority rehabilitation has started in 25 selected localities but have groups depressed areas and Interventions not yet been completed. neighbouring communities Program through the as measured by the living Social Development conditions index Funds Social and economic 70% of Roma in targeted Implementation of Not (yet) achieved. Works for small infrastructure exclusion of disadvantaged settlements acknowledging the Priority rehabilitation has started in 25 selected localities but have groups an improvement in basic Interventions not yet been completed. living conditions Program through the Social Development Funds Social and economic 5% increase in children Enactment and Not achieved. Kindergartens will be rehabilitated to exclusion of disadvantaged from targeted communities implementation of a support this objective, but the works have not yet started. groups participating in Early coherent Early Childhood Education Childhood Education program legislation to promote access 46 Pillar 3 Targeting Poverty Reduction and Promoting Social Inclusion (Cont'd) At CPS entry CAS Outcomes Milestones At CPS completion Social and economic 25% of services for Persons Rehabilitation of Not (yet) achieved. Works for the rehabilitation and exclusion of disadvantaged with Disabilites scoring at existing facilities construction of long-term care institutions for persons with groups least 80% on the standards aligned to EU disabilities will start in 2009. compliance index for each standards for main category of quality Persons with standards Disabilities Social and economic 40% increase in the rate of Increased financing Not (yet) achieved. Works for the construction of social exclusion of disadvantaged employment of youth 18+ for multi-functional assistance multi-functional cetners will start in 2009. groups benefiting from centres catering to multifunctional centres youth at risk Poor health outcomes and Reduction by 10% of Restructuring of Not achieved. The Primary Health Care part of the project access by certain groups people who forego medical health care services dropped as Govt could not accept public money for primary care for financial reasons in underserved areas health care institutions which are technically private and to ensure access and due to a lack of a primary care strategy. However aside quality. from geographically impaired access and the supply failure in some areas, certain poor groups forego available medical care services for financial reasons (specialized ambulatory, dental, optical care, and services deemed to require high informal payments, like surgery). Poor access to markets by Increased availability and Improved capacity at Not achieved. Regional Development Project dropped. households in rural areas condition of infrastructure in the local level to plan Mining Rehabilitation II project is promoting socio- rural and economically and implement small economic regeneration in rural mining areas. depressed areas infrastructure projects Poor access to markets by Increased availability and Adoption and Not achieved. It did happen, driven by the need to access households in rural areas condition of infrastructure in implementation of EU funds, but not under a Bank project and not with the rural and economically the Regional same comprehensiveness. depressed areas Development Strategy for economically depressed areas in line with EU requirements 47 Annex 2: Original and Actual CPS Lending Program Fiscal Project ID Planned Actuals Status Year US$ M US$ M 2006 Judicial Reform 130 130 Approved and active Knowledge Economy 60 60 Approved and active Social Inclusion 58.5 58.5 Approved and active Revenue Administration 70 0 Negotiated Reform Sub-Total 447.0 17 248.5 2007 PAL 2 150 0 Dropped Municipal Services (from 2006) 128.5 131.7 Approved and active Transport Sector Support 150 180 Approved and active Avian Flu 35 37.7 Approved and active Human Development DPL 1 100 0 Dropped Sub-Total 550.0 18 349.4 2008 Complementing EU Support for 65 65 Approved but not yet effective Agricultural Restructuring (from 2007) Integrated Nutrient Pollution 50 68.1 Effective December 8, 2008 Control (was Enviro Mgt project from 2007) Rural and Regional 50 0 Preparation on hold Development PAL 3 150 0 Dropped Human Development DPL 2 100 0 Dropped Sub-Total 450 19 133.1 2009 Hidroelectrica/Tarnita (from 150 0 Dropped 2008) Electricity- Privatization 5020 0 Not started Guarantee Business Environment 50 Not started Fiscal & Governance DPL 150 Not started Human Development DPL 3 100 Not started Sub-Total 450 21 0 TOTAL 1897.0 731.0 17 CPS lending for FY2006 included the Municipal Services loan (US$ 128.5 mil.) moved to FY2007. 18 CPS lending for FY2007 included an Agriculture loan of US$ 65 mil. (now CESAR) and an Environment Management loan of US$ 50 mil. (now Integrated Nutrient Pollution) moved to FY 2008. 19 CPS lending for FY2008 included an Energy loan of US$ 150 mil (now Hidroelectrica/Tarnita project) moved to FY 2009. 4. CPS mentioned two possible operations: two partial risk guarantees (PRGs) of about US$ 50 mil. each for FY08-09. 21 CPS lending for FY2009 included an Energy2 or Transport 2 loan with a value of US$ 150 mil. In addition there are two possible Partial Risk Guarantees operations, one in FY08 and another in FY09, initially estimated at US$ 50 mil. each 48 Annex 3: Analytical and Advisory Program Activity Type of Status product FY 07 Implementation of Regional Development TA Delivered June 2008 and Integration with other EU Operational Programs (TA) FY07 Private Sector Development Strategy in ESW Delivered May 2007 Romania after EU Accession: Policy Priorities and Implications FY07 Poverty Monitoring Analytical and ESW Delivered June 2007 Advisory Assistance Program FY07 Municipal Finance Policy Note Policy Note Delivered June 2007 FY07 Public , HD, PSD Policy Notes ESW Delivered June 2007 FY08 Analytical guidance in revising the TA Delivered Dec 2007 National Rural Development Program FY08 ROSC (Reports on Observance of TA Delivered June 2008 Accounting and Auditing Standard and Codes) - Follow-up TA FY08 Poverty Monitoring Analytical and ESW Delivered June 2008 Advisory Assistance Program ­ II · Labor Markets · Social Protection FY08 Public Pay and Employment ESW Delivered June 2008 Surveys on the public sector pay practices and employment policies. FY08 Visioning EU Convergence ESW Dissemination Conference Challenges in achieving convergence of real held April 2008 incomes towards the EU levels. FY09 Reform of Higher Education Financing TA Delivered January 2009 · Changes in higher education financing · TA on students loans and scholarships · Instruments for measuring the relevance of education to labor market FY09 FSAP Update ESW Delivered January 2009 FY09 Green Investment Scheme Implementation TA Draft. Review Scheduled for Spring 2009 FY09 Public Expenditures and Institutional ESW Moved to FY10 Review Update FY09 Review Financial Oversight & ESW Moved to FY10 Procurement in State Owned Enterprises 49 Annex E Annex E FY10-13 Romania CPS Stakeholder Consultations 1. Process. Stakeholder consultations were held in May 2009 with representatives of the trade unions, non-governmental organizations, academia, youth organizations, the Parliament, and IFI's. The CPS tight processing schedule and competing claims on stakeholders' availability (e.g. Parliament's heavy agenda, electoral campaign for the European Parliament) influenced the extent of consultations ­ but outreach and consultations will continue through CPS implementation to allow the Bank to be responsive to new demands and to adjust its program appropriately. The consultations thus far sought to validate the CPS findings, proposed strategy and Bank program, and to discuss the perception of stakeholders concerning risks and opportunities in the current context of Romania. Further consultations are envisaged with national and local governments, the business community/private sector, and other stakeholders. The consultations for the 2009- 2013 Country Partnership Strategy are held directly with the groups identified above, and through the local website of the Bank with a wider audience. 2. Topics for discussion. The consultations provided a venue for a meaningful exchange of views with Government and various stakeholders on the critical challenges of current economic crisis affecting Romania and long-term prospects as well as policy options and programs that would address these challenges. The main topics included: · Lessons learned from past and ongoing work of the Bank in Romania · Political and economic context, risks and opportunities · Scope for resuming reform · Consistency of proposed Bank program with needs and expectations 3. Results. The discussions tapped a large array of sensitive issues and provided a reality check against World Bank's existing assessments and perceptions. The issues of governance at national and local level, surfaced throughout all consultations. Participants were in agreement about the main issues that need immediate attention: social protection in response to ongoing economic crisis, education, health, infrastructure, EU convergence. 4. Key messages. The following is a summary of the key messages received from stakeholders. 4.1. General Messages · General concern about the commitment and capacity of the political leadership to design and implement needed reforms · High risk of coalition politics for both reform and project implementation · Virtual consensus that the culture of corruption has not been reversed or diminished. 50 Annex E · Need to scale up and communicate successful experiences, including reforms piloted by Bank-financed projects and the result of analytical work · Concern with implementation capacities in both central and local administrations · Reservations about the extent to which current cooperation of the Government with IFIs goes beyond financial needs and is driven by genuine acceptance of the need for reform · Advice extended to the Bank on balancing flexibility (to promote ownership) with the need for firmness, especially concerning agreed reform objectives and specific project outcomes. · The Bank program should consider sectoral strategies and not only 3 main national programmatic documents (NRP 2007, GP 2009, Lisbon Agenda) · Need for donors/lenders better coordination · Need for better inter-ministerial coordination and at local level 4.2. Sector messages Education · Identified as the neediest area for reform. Repeated failed attempts to reform the sector did more harm than good · Society as a whole is reform adverse because education (curricula) is still very much un-reformed · Teachers' pay must be linked to broader reform objectives and outcomes Public Sector · Public Administration suffering from weak professionalism and management skills of political leaders and public servants · Perceived inefficiency of the bureaucracy, lacking communication and coordination, hampering delivery of public services · Public sector pay and numbers were inflated by the demilitarization of army, police, and other institutions 5. Overall Conclusions · Bank has been a respected partner for Romania and still has a role to play due to its expertise, analytical work, and independence. · Main priorities for further Bank work in Romania should address the areas in which structural reforms lacked, failed or lagged during pre- and post-EU accession period. · Key areas for development in partnership with the Bank are education, health, capacity building in public administration for better absorption of EU-funds. 51 52